HomeMy WebLinkAboutCC Reso No 2005-032RESOLUTION NO. 2005-32
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
LAICE ELSINORE, CALIFORNIA, CERTIFYING THE FINAL
SUB5EQUENT ENVIRONMENTAL IMPACT REPORT, SCH
# 2004071082, ADOPTING THE MITIGATION MONITORING
AND REPORTING PROGRAM THERETO, AND ADOPTING
THE FINDINGS OF FACT AND STATEMENT OF
OVERRIDING CONSIDERATIONS, FOR GENERAI, PLAN
AMENDMENT NO. 2004-05, ZONE CHANGE NO. 2004-06,
AMENDMENT NO. 1 TO THE TUSCANY HILLS SPECIFIC
PLAN NO. 89-3, AND TENTATIVE TRACT MAP NO. 31370
WHEREAS, an application has been filed with the City of Lake Elsinore by
Centex Homes to develop the northern portion of the Tuscany Hills Specific Plan on
approximately 368.4+ acres of unimproved property into 807 residential lots, community
and neighborhood parks, a recreational facility, and approximately 130 acres of open
space. The project site is located on the northeastern edge of the City of Lake Elsinore,
south of Greenwald Avenue, north of the existing Tuscany Hills community, west of the
Canyon Lake community, and east of undeveloped property within the Ramsgate Specific
Plan and Bureau of Land Management; and
WIIEREAS, General Plan Amendment No. 2004-05, Zone Change No. 2004-06,
Amendment No. 1 to the Tuscany Hills Specific Plan No. 89-3, and Tentative Tract Map
No. 31370 together comprise the "projecY' as defined by Section 21065 of the Califomia
Environmental Quality Act (CEQA), and the California Public Resources Code Section
21000 et. seq. A project is defined as an activity which may cause either a direct physical
change in the environment or a reasonably foreseeable indirect physical change in the
environment, and which includes the issuance to a person of a lease, permit, license,
certificate, or other entitlement for use by one or more public agencies; and
WHEREAS, a Subsequent Environmental Impact Report has been prepared to
evaluate environmental impacts resulting from the project; and
WHEREAS, Section 21081.6 of CEQA requires that where an EIlZ has been
prepared for a project for which mitigation measures are adopted, that a mitigation
monitoring or reporting program be adopted for said project, and pursuant to Section
21081.6 of CEQA, the City has prepared and updated a Mitigation Monitoring and
Reporting Program;
WHEREAS, the Planning Commission of the City of Lake Elsinore at a regulaz
meeting held on March 1, 2005, made its report upon the desirability of the proposed
project and made its recommendations in favor of the project by adopting Planning
RESOLUTION NO. 2005- 32
CERTIFICATION OF SEIR, SCH#2004071082
MARCH 22, 2005
PAGE 2 OF 3
Commission Resolution No. 2005-32 recommending to the City Council certification of
the Final Subsequent Environmental Impact Report, adoprion of the Mitigation
Monitoring and Reporting Program thereto, the Findings of Fact and Statement of
Overriding Considerations; and
WHEREAS, public norice of said application has been given, and the City
Council has considered evidence presented by the Community Development Department
and other interested parties at a public hearing held with respect to this item on March 22,
2005;
NOW THEREFORE, the City Council of the City of Lake Elsinore DOES
HEREBY RESOLVE as follows:
SECTION 1. The City Council has considered the Final Subsequent
Environmental Impact Report, the proposed Mitigation Monitoring and Reporting
Program thereto, the Findings of Fact and Statement of Overriding Considerations prio.r
to making a decision. Pursuant to Section 15063, of the California Environmentai Quality
Act (CEQA), it has been determined that:
1. The City Council has reviewed and considered the Final Subsequent EIR for
Amendment No. 1 to the Tuscany Hills Specific Plan and associated discretionary
approvals and finds that it is complete, adequate in its evaluation of all environxnental
effects of the proposal, contains all required information, and has been completed in
compliance with CEQA and the City's CEQA requirements.
2. Amendment No. 1 to the Tuscany Hills Specific Plan and associated discretionary
approvals wi1T result in significant unavoidable air quality and transportation and
traffic impacts regardless of mitigation measures. A Statement of Overriding
Considerations has been prepared in accordance with Section 15093 of the CEQA
Guidelines. The Statement of Overriding Considerations "balances" the proposed
project against its unavoidable environmental effects.
3. The Final Subsequent EIR, which was prepared in accordance with Section 15163 of
the State CEQA Guidelines, includes the Draft SEIR, Response to Comments
document, Mitigation Monitoring and Reporting Program, Findings of Fact, and
Statement of Overriding Considerations.
4. The Subsequent EIR identified several significant environmental effects resulting
from implementation of the project. Some of these significant effects can be fully
avoided/mitigated through the adoption of feasible mitigation measures. To the extent
RESOLUTION NO. 2005- 32
CERTIFICATION OF SEIR, SCH#2004071082
MARCH 1, 2005
PAGE 3 of 5
that these findings conclude that various proposed mitigation measures outlined in the
Final SEIR are feasible and have not been modified, superseded, or withdrawn, the
City hereby binds itself to implement these measures. These findings are not merely
informational, but rather constitute a binding set of obligations that will come into
effect when the City Council formally approves the project.
5. The mitigation measures and/or the standard design features and construction
measures are referenced in the Conditions of Approval and Mitigation Monitoring
and Reporting Program adopted concurrently with these Findings, and will be
implemented through the final design, consiruction and post-construction periods.
6. Two environmental effects cannot be reduced to less than significant levels by the
adoption of feasible mitigation measures ar feasible environmentally superior
alternatives. Short and long-term impacts to air quality and transportation and traffic
impacts at one intersection have been identified as unavoidable and significant. The
project has the potential to adversely affect humans, either directly or indirectly.
7. The City Council considered the information contained in the FSEIlZ prior to its
certification, and the FSEIR reflects the City Council's independent judgxnent and
analysis. The City Council has weighed the benefits of the project against the
significant adverse impacts identified in the FSEIR that have not been avoided or
lessened through mitigation to a level of less than significant. The City Council
hereby determines that benefits of the project outweigh the unxnitigated adverse
impacts and that the project should be approved.
8. The City Council finds that to the extent that the identified significant or potenrially
significant adverse impacts have not been auoided or substantially lessened, there are
specific economic, legal, social, technological and other considerations which support
approval of the project. The project would provide the following benefits which offset
the identified significant short and long-term air quality and intersection impacts:
a. Social
(1) To facilitate the orderly and timely completion of the northem portion of
the Tuscany Hills Specific Plan community.
(2) To provide housing for the City of Lake Elsinore's growing population
consistent with the City's General Plan.
(3) To update the infrastructure facilities plan that serves the Tuscany Hills
Specific Plan community.
RESOLUTION NO. 2005- 32
CERTIFICATION OF SEIR, SCH#2004071082
MARCA 22, 2005
PAGE 4 of 5
(4) To establish undisturbed natural open space in the form of a 2,000-foot
wide wildlife corridor through the center of the Project site that is
consistent with the Western Riverside County Multiple Species Habitat
Conservation Plan by dedicating 88.1 acres, which will not include
manufactured slopes or Fuel Modification Zones, as permanent open
space.
(5) To respond to California's water shortage by incoxporating a more water
efficient landscape design within the undeveloped northern portion of the
Tuscany Hills Specific Plan and removing a water intensive iake from the
Project's land use plan.
(6) Dedicate a 5-acre park with two regulation Little League fields to the City
of Lake Elsinore.
b. Economic
(1) Construction of the project will generate its fair share of property taac
revenues to Riverside County annually. Construction of the project will
also generate utility user tax revenues to the City and County.
(2) The project will be built out by early 2011, providing steady construction
jobs over the construction period.
(3) The project will contribute fees or in lieu ameniries in accordance with the
Development Agreement between Centex and the City recorded December
8, 2003, toward school facilities, park facilities, fire services, police
services, water facilities, and sewer facilities.
(4) The project applicant will contribute a fee in lieu of providing 15% of the
units as affordable housing in accordance with Section 33413(b)(2) of the
California Community Redevelopment Law.
SECTION 2. PURSUANT TO THE ABOVE FINDINGS, the City Council of
the City of Lake Elsinore DOES HEREBY CERTIFY that Final Subsequent
Environmental Impact Report SCH #2004071082 and the Mitigation Monitoring and
Reporting Program thereto for Amendment No. 1 to the Tuscany Hills Specific Plan and
its associated discretionary approvals aze complete and adequate and provides appropriate
environmental documentation for the Project, and fully complies with the requirements of
CEQA, the State CEQA Guidelines, and the City's environmental clearance procedures.
The City Council of the City of Lake Elsinore DOES HEREBY ADOPT the
Findings of Fact and Statement of Overriding Considerations prepazed for the Project.
RESOLUTION NO. 2005-32
CERTIFICATION OF SEIR, SCH#2004071082
MARCH 22, 2005
PAGE 5 of 5
PASSED, APPROVED AND ADOPTED, this 22`h day of Mazch, 2005 by the
following vote:
AYES: COLJNCILMEMBERS: HICKhRAN, KELLEY, MAGEE, SCHIFFNER
NOES: COUNCILMEMBERS: NONE
ABSENT: COLTNCILMEMBERS: gUCKLEY
ABSTAIN: COUNCILMEMBERS: NONE
/ / -
Robert E. Magee, Ma
City of Lake Elsinore
~:icki Lynne
(SEAL)
STATE OF CALIFORNIA )
COUNTY OF ffiVERSIDE ) SS:
CITY OF LAKE ELSINORE )
I, VICHI KASAD, CITY CLERK OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, DO HEREBY CERTIFY that the foregoing Resolution duly adopted by
the City Council of the City of Lake Elsinore at a Regular Meeting of said Council on the
22"a of March, 2005, and that it was so adopted by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
COUNCILMEMBERS:
CLERK/
uLJMAPti RES~URCES DIRECTOR
CIT'~' OF LAKE ELSINORE
(SEE+„i,j
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) SS:
CITY OF LAKE ELSINORE)
HICKMAN, KELLEY, SCHIFFNER,
MAGEE
NONE
BUCKLEY
NONE
I, VICHI KASAD, CITY CLERK OF THE CITY OF LAKE ELSINORE,
DO HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
Resolution No. 2005-32 of said Council, and that the same has not been amended or
repealed.
DA E: A ri114, 2005
~~
"~,.CHI I~; A5A1?, ~it~IC, CI Y CLERK/
;~IdJMAIV" RESCLTRi ES DIRECTOR
i;I'3'Y OF LAKE r.LSINORE
(SEAL)