Loading...
HomeMy WebLinkAboutPre-Application CITY or APPLICATION FORM LAKE SIIYOR, PRELIMINARY APPLICATION [.RF.AM EXTREME REVIEW APPLICANT: PROPERTY OWNER: Name: Name: Company: Jackman Industries, Inc. Company: Lake Elsinore Village I, LLC Address: Address: Lake Elsinore Village Il, LLC City/State/ZiL6179 E-Mail: E-Mail: p9arrett@thegarrettgroup.net rw Please check thi�box if you are willing to receive staff reports via email. If this box is checked, staff reports will not be sent via Fed-Ex. ASSESSOR'S PARC L NUMBER(S)- 381-050-001; 381-050-002 GENERAL L.00ATIO OF PROJECT I ADDRESS: 15900 Grand Avenue, Lake Elsinore, CA PROJECT DESCRIPTION (Attach a separate sheet if needed): See Attached PROJECT INFORMATION: Zoning Designation: uMU, General Plan Designation: CMU Acreage:42•7 __ Number of Buildings/Units:Approx. 16 buildings; 460 units Is Project Intended to a Phased? YES Specific Plan in which Site is Located Lake Shore Village Planned Applications SUP; Subdivision Map AFFIDAVIT: !t ereby certify that the information fumished above is accurate, true, and correct to the best of my knowledge or belief. Applicant's Signature _ _ Date: 10/16/17 Type/Print Name: Property Owner's Signature: ". �� `'� Date: 10/16/17 Maul Garrett Type/Print Name: Ri####►####H#Ir##11n1F#i 11##i#if� �#•#4#Y•sl4f#�tl}ik#Y�14#iY1r##�f##rf R�R*w#za Ni'.;k�i##����t�sl4�rfr***x#tMxR.txe� a Rrrw�l Mf M Rxw�wtRfsTi}RF�� �#�\�.StffkRf##kAt##Mtl6 Received 4i FOR OFFICE USE ONLY Date: I CRS Numbr Project Planner: Project Nu ber(s): i - 4 1 INVOICE BILLING CONTACT l�E ;',I ORE " INVOICE NUMBER INVOICE DATE INVOICE DUE DATE INVOICE STATUS INVOICE DESCRIPTION INV-00009047 10/17/2017 10/17/2017 DUE NONE REFERENCE NUMBER FEE NAME TOTAL PAR-2017-00001 PRELIMINARY APPLICATION $1,800.00 15900 Grand Ave Lake Elsinore, CA 92530 SUBTOTAL $1,800.00 TOTAL $1,800.00 October 17,2017 Page 1 of 1 CITY OF LAKE ELSINORE PLANNING DEPARTMENT AGREEMENT FOR COST RECOVERY Project LiveAble Communities Name: Application Number(s): N- 2 d(-7- 2 of 7`o( CRS Number(s): )040 The application(s) for the above referenced project may generate processing costs in excess of the amount of the filing fee. If applicable, your initial deposit amount of 04 will be applied toward your application. Draws against this deposit will be made based on staff time and materials needed to process your application Statements will be sent to you documenting the draws against your deposit. If the deposit reaches a balance of $500.00 or less, you will be asked to make a subsequent deposit. You will be expected to pay these bills within 30 days of invoice date. The remaining $500.00 or less will be used to reconcile your final bill. If there is a balance remaining after reconciling the final bill, a refund check will be mailed to you. I * (as responsible party), agree that actual recorded costs plus overhead, incurred in the processing of this application(s) will be paid to City of Lake Elsinore, c/o Lake Elsinore Planning Department, 130 S. Main Street, Lake Elsinore, CA 92530. Additionally, I understand that, in the event that my account is not paid within 30 days of the invoice date, processing will be suspended until such time that payment is made. In order to implement the cost recovery provisions, please sign this statement indicating your agreement to the cost recovery procedure. The signed agreement is required for your application to be accepted for processing. Responsible Party's Signature: Date: 9 L , -Able Communities, LL ' Development Plan for Lakefront Village Property Lake Elsinore, California LiveAble Communities is planning to acquire the 42.7 acre property located at the intersection of Grand Avenue and Ortega Highway in Lake Elsinore, California in Riverside County, consisting of Parcels 381- 050-001(21.17 acres) and 381-050-002 (21.55 acres). The property, known as Lakefront Village,was the former site of the Elsinore Naval & Military Academy,which operated on the site for over 40 years until 1977. The existing building is a three-story structure, measuring approximately 34,000 square feet of indoor space with surrounding hardscape including an outdoor patio,fountain and swimming pool. A number of concrete foundations remain on the property as remnants of former structures used by the Academy during its years of operation. The development plan for the property will be done in stages over a projected five year period in order to maximize the value of the land and provide needed housing,commercial and recreational facilities for the area based on market demands. Phase One of development will include the restoration of the existing structure and new housing construction of 200 units in six two-story buildings on approximately 10.6 acres. The restored building will be utilized as common area facilities for an independent apartment community for adults with intellectual and developmental disabilities. Other amenities planned in Phase One include walking trails, a shared organic garden with Phase Three, sports court,sports field and swimming pool. The facility will be secured,with 24-hour staffing and employ approximately 75 people in mostly full-time positions. Projected Development Timeline: 24 months. Independent Living Community Project Information Project Site 10.6 acres Project Site Area 461,736 sq-ft. New Building Heights 2 stories New Number of Units 200 units New Number of Beds 200 beds New Building Area 132,000 sq-ft. Existing Building 3 stories Height Existing Building Area 34,000 sq-ft. Parking Spaces 100 spaces Project Calculations Building Footprint 77,333 sq-ft. BuildAreo/'Storfes Parking Area 35,000 sq-ft. 350 sq-ftlspace Impermeable Surface 122,333 sq-ft. 24% FAR= 0.29 1 Phaso Two of the developmen ill include construction of 250 units for a L cinuing care retirement community on approximately 10.5 acres. A two-story building is planned for the accommodation of 55+adults with various levels of care including independent living, assisted living, memory care and skilled nursing care. The facility is expected to employ 90 people in mostly full-time positions. Projected Development Timeline: 36 months. Retirement Community Project Information Project Site 10.5 acres Project Site Area 457,380 sq-ft. Building Heights 2 stories Number of Units 250 units Number of Beds 330 beds Building Area 243,000 sq-ft. Parking Spaces 110 spaces 0.33 Spaces/Bed Project Calculations Building Footprint 121,500 sq-ft. 0.50 Build ArealStories Parking Area 38,500 sq-ft. 350 sq-ft./space Impermeable Surface 160,000 sq-ft. 35% FAR= 0.53 Phase Three will include commercial development of an approximately 6.8 acre site at the corner of Grand Avenue and Ortega Highway. The size and configuration of the development will be determined based on feasibility studies and market demand by prospective tenants, owners or other developers. Projected Development Timeline: 24—48 months. Commercial Project Information Project Site 6.8 acres Project Site Area 296,208 sq-ft. New Building Heights 1 stories New Building Area 50,000 sq-ft. Parking Spaces 167 spaces 0.0033 Per commercial sq ft Project Calculations Building Footprint 50,000 sq-ft. Build A reolStories Parking Area 58,333 sq-ft. 350 sq ftlspace Impermeable Surface 108,333 sq-ft. 37% FAR= 0.17 2 Phase Four will include the commercial and recreational development of approximately 14.9 acres of lakefront property. bevelopment will be contingent on feasibility studies, input from the City of Lake Elsinore and prospective tenants, owners and developers. Projected Development Timeline: 24—60 months. 1330 Orange Avenue,#335 Coronado,CA 92118 619-708-4446 3