Loading...
HomeMy WebLinkAbout31700 GRAPE ST_ 2077 (56)31700 GRAPE STREET 2077 25/30 WAL -MART SEIZMIC MATERIAL HANDLING ENGINEERING EST. 1985 3.02 INSTALLATION DESCRIPTION PAGE # COVER SHEET 1 TABLE OF CONTENTS STORAGE RACKS STEEL SHELVING CITY APPROVALS L NEW MFJ(KO A. Conduit for rooftop units shall be installed through curb. No root penetrations for electrical conduits are allowed without prior Wal -Martaapproval. If roof penetration Is approved, it shall be made inpppPPP accordance with other portions of these Specifications. DRIVE -IN RACKS CANTILEVER RACKS MEZZANINES CONVEI.ORS MOVABLE SHEL \1NG STORAGE TAWS MODULAR OFFICES GONDOLAS STATE APPROVALS PRODUCT TESTING FIELD INSPECTION SPECIAL FABRICATION CALIFORNIACOORADOCOLORADOIDAHO MISSOURI OREGON UTAH PENNSYLVANIA UTAH WASHINGTON LONGITUDINAL ANALYSIS CAROUSELS BOOKSTACKS PERMITTING SERVICES NEVADA 24 B . Electronic thermostats and remote override sensors will be located as shown on mechanical drawings and Energy Management drawings. Furnish and install 1/2 inch condui, with cable set between each Rem. Wiring exposed to moisture shall be run in seattite conduit. C. Install control wiring for dud smoke detector operation R air duct smoke detectors are indicated on Drawings or required by local codes. Verity requirements with Mechanical Contractor. Mechanical Contractor will conned control wiring. 3.03 UNIT HEATERS A. Make final electrical connections when unit heaters are installed under Section 15500. 1 B . Install disconnects for unit heaters. C. Install 1/2 Inch conduit and install Novar Controls cable set for radiant heaters. END OF SECTION 1 1 i 16925.2 WM - Lake Elsinore, CA July 16, 1993 11 -- SEISMIC ANALYSIS OF SELECTIVE RACK & FOR WAL -MART #207 /' 31700 GRAPE ST. LAKE ELSINORE, CA 92530 JOB #91 -362 7 P.E. 14180 -1 LIVE OAK AVENUE • BALDWIN PARK • CA 91706 • TEL: (818)962 -1162 • FAX:(818)962 -1279 c+••.•,.,_ . „- .f,.. -s.F.o- w.,•.v t YS.w,«+ +,a< .. _ .. :?:^Veih!iA°°':XR' _a- r.;,.Y L' i 9E.+ x' ....,E3- :.iL.,.L-- ....w.,.. THIS IIA WAS PHODIICED FDrA TBB BES1 AND W)ST DOHPLM DB,AWINOS AVAILLB 16 AT TBS 1, SEIZMIC PROJECr WAL. -MART #2077 INC. FOR AL- MART SHEET NO. 2 of MATERIAL HANDLING ENGINEERING P.T. 6= 'jTJg-4-- TEL: (818) 962 -1162 • FAX: (818) 962 -1279 CALCULATED BY DATE 14180 -1 LIVE OAK AVENUE • BALDWIN PARK • CA 91706 TABLE OF CONTENTS DESCRIPTION PAGE # COVER SHEET 1 TABLE OF CONTENTS 2 SCOPE 2 PARAMETERS 3 CONFIGURATIONS 4 - 9 COMPONENTS & SPECS. 10- 20 LOADS AND DISTRIBUTION 21 LONGITUDINAL ANALYSIS 22 COLUMN 23 BEAM 24 BEAM TO COLUMN 25 BRACING 26 OVERTURNING 27 BASE PLATE 28 SLAB & SOIL 29 GONDOLAS & T -FRAME STORAGE SHELVING 30 - 56 THIS ANALYSIS OF THE STORAGE SYSTEM IS TO DETERMINE ITS COMPLIANCE WITH THE APPROPRIATE BUILDING CODES WITH RESPECT TO STATIC AND SEISMIC FORCES. THE STORAGE RACKS ARE PREFABRICATED AND ARE TO BE FIELD ASSEMBLED ONLY, WITHOUT ANY FIELD WELDING. A PART 3 EXECUTION 1.n5 WARRANTY 3.03 TESTING 3.01 INSTALLATION A. Provide Owner with one year warranty certificate signed by Contractor and by company providing A. Testing: Make and record voltmeter measurements as described in Section 16011. In addition, actual warranty labor. This certificate must be received by Owner prior to final payment. provide labor, material, and energy to conduct a parking lot light test at least 30 days prior to A. Install lighting fixtures, lamps, and sign circuits and connections in accordance with manufacturer's Substantial Completion date. This test shall consist of continuous operation of fixtures and lamps for recommendations and as indicated on Drawings. a time period of 0 hours, at night. Contractor shall witness and ceRrfv the continuous operation and PART 2 PRODUCTS time duration of the test. At the end of the testing period, Immediately request warranty parts and B. Recessed fixtures installed in lay -in ceiling grid systems shall have four to six feet of flexible conduit replace defective components at least three days prior to Substantial Completion date. from outlet boxes supported from building stn,ctural system to fixtures. Fixtures shall be attached 2.01 MATERIALS to ceiling grid. 1 END OF SECTION THIS FIL11 WAS PWMCBD YH011,i,STIMBESTANDMOSTCOIIPZ, M DRAWINGS AVAILABLIS AT THB ,. c. It OF ]P IL 11, *a _ F, 16MO.4 July 16,1993 0 I, A. Site Lighting: C. Fixtures shall not be installed until ceiling grid system has been leveled to assure level plane. 1. Poles: One piece 39 feet 0 inches round, tapered at 0.14 inches per foot, single, uniform thickness; U.S. domestic steel having a guaranteed minimum yield strength of 55,000 psi after D. Strip lights shall be attached and wired as Indicated on Drawings. Rows shall be straight, true, and fabrication complying with ASTM A595, Grade A, steel with seamless appearing longitudinal parallel to ceiling grid. weld. Erected poles and anchor bolts shall be capable of supporting maximum vertical and horizontal loads exerted on the completed structure in accordance with the latest AASHTO END OF SECTION edition meeting the requirements of 120 mph winds with a 1.3 gust factor. The pole shall have a 46 inch reinforced hand hole located approximately 18 inches above base plate with grounding lug welded to interior of pole opposite hand hole. Poles shall be factory primed inside and outside and delivered to jobsite with an adequate amount of #DU313 dark bronze paint to provide two coats of paint totalling 5 mils thick. 2. Pole Base Plates: Shall be fabricated from a commercial quality, hot rolled carbon steel I conforming to the requirements of ASTM A36 having a minimum yield strength of 36,000 psi. The base plate shall telescope the poles shaft and be circumferentially welded top and bottom. The base plate shall be slotted to accommodate a + variation in the nominal bolt circle. 3. Anchor Bolt: Supply 4 anchor bolts with each pole. Anchor bolts shall be 1 inch minimum diameter hot rolled domestic steel bar complying with ASTM A36 (modified) and have minimum strength of 55,000 and shall be 36 Inches long with additional 4 inch hook atguaranteedyieldpsi 90 degrees totally galvanized. Each anchor bolt shall be supplied with 2 galvanized hex nuts per ASTM A307, 2 galvanized flat washers, one galvanized lock washer and one die cast nut cover with a 1/4 inch stainless steel, hex head, sent tapping screw. Fabricate formed4. Fixtures: from or extruded aluminum. Steel housings are not acceptable. Assemble to form weatherproof and bug proof unit. Each fixture shall bear the UL label for wet location. Fixture shall have an Architectural Class I anodized finish or an Owner approved baked on polyester finish. Color shall be #DU313 dark bronze. Injected silicon used as a weatherproofing seal shall not be directly exposed to sunlight and shall riot be the sole means to pr ;vent water intrusion. Lens frame shall be mitered, extruded anodized aluminum with stainless steel spring loaded latches and hinge pins. Tool -less access Is required to optic chamber and ballast. Lens door frame shall be essentially watertight with a memory retentive extruded silicon rubber gasket. Lens shall be heat tempered glass or polycarbonate material. Fixture arm shall have an Internal extruded bolt channel guide. Bolts shall be hardened domestic steel. The fixture arm shall have an integral hand hold and a cover for the field wiring connections. 5. Fixture Optical Assembly: One universal fixture housing shall be capable of containing the following general optical systems without modification and each optical system shall be field Interchangeable and rotatable in 90 degree Increments without tho use of tools: 1a. Type 1: Optics that produce a longer narrower light pattern that concentrates light 1 distribution equally on both sides of Iuminaire. b. Type III: Optics that produce an asymmetrical light pattern that directs 213 of the light in front of the Iuminaire. n Type V, Horizontal Lamp: Optics that produce a symmetrical square light pattern about the luminalre. d. Floodlight: Optics that will sharply confine any back light behind the pole. The patterns shall be in the forward direction. ie. Type V, Vertical Lamp: Optics that produce a symmetrical square light pattern about the Iuminaire with a maximum of 7% of the total output lumens above the 75 degree cutoff line. Optics are based on square light distribution patterns with the other optical patterns used to effectively cover odd shaped areas. Optical assemblies that produce a round light distribution pattern are rat acceptable. All optics with the exception of Type V vertical lamp shall have no more than 3% of total output lumens above the 75 degree cutoff line. Wal -Mart shall be the sole judge regarding acceptability of optical system performance. 1 16500 -2 16530.2 WM - Lake Elsinore, CA July 16, 1993 WM - Lake Elsinore, CA July 16, 1993 WM - Lake Elsinore, CA THIS FIL11 WAS PWMCBD YH011,i,STIMBESTANDMOSTCOIIPZ, M DRAWINGS AVAILABLIS AT THB ,. c. It OF ]P IL 11, *a _ F, 16MO.4 July 16,1993 0 I, I SEIZMIC PROJECT WAL -MART #2077 FOR WAL- MART 1NC, SHEET NO. 3 - OF MATERIAL HANDLING ENGINEERING P.T. TEL' (818) 962 -1162 • FAX* (818) 962 -1279 CALCULATED BY DATE 14180 -1 LIVE OAK AVENUE • BALDWIN PARK • CA 91706 STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH DIRECTIONS WI il'I THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN ANY ADJACENT BAYS. THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYZED IN BOTH LONGITUDINAL AND TRANSVERSE DIRECTION. STABILITY LONGITUDINALLY IS DEPENDANT ON BEAM TO COLUMN MOMENT, WHILE THE BRACING ACT TRANSVERSELY. 1. COLUMN. Ta18UTARYAREA 2. BEAM. 3. BEAM TO COLUMN. 4. BASE PLATE. 5. HORIZONTAL BRACING. 6. DIAGONAL BRACING. 7. BACKCONNECTt;R. TRANSVERSE LONGITUDI TOP VIEW SEIZMIC PROJE - MART #2077 ART INC. FOR SHEET N0. OF MATERIAL HANDLING ENGINEERING _ ._ 1 992r_ TEL: (818) 962 -1162 • FAX: (818) 962 -1279 CALa1LATEO BY DATE 141804 LIVE OAK AVENUE • BALDWIN PARK • CA 91706 SYNDICATE TYPE 1 I; AVAIt a t A, 'm OF SEIZMIC PROJECT WAL -MART #2077 BrC. FOR_ SHEET N0. OF_ MATERIAL HANDLING ENGINEERING TEL: (818) 962 -1162 • FAX: (818) 962 -1279 CALCULATED BY DATE 14180 -1 LIVE OAK AVENUE • BALDVAN PARK • CA 91706 SYNDICATE TYPE 2 1.000 lb. 5 e• 1,000 lb. I ' 4 8- 120, 1,000 lb. 49 ' 1,000 lb. 0. 2 1,000 lb. L1 T-- 93. 47.4 TENNSCO SNQ F 25". 5 250 lb. 4 144' I 250 ib. 4• 250 lb. 2 250 lb. Iz- 1 72• 18.4 R SECTION 16600 WM: -EDC 10272 SECTION 16700 f WM:•EDCSPECIALSYSTEMSWM: -EDC 070993 ENERGY MANAGEMENT SYSTEM WIRING IPART COMMUNICATIONS PART GENERAL SUMMARY PART 1 GENERAL 1 .01 SUMMARY 1.01 SUMMARY A. Section Includes: 1. Cash register, register data collection equipment, ONEAC unit, and Satellite Dish power A. Section Includes: Pay charges demand pulse generator. circuiting and outlet requirements. 4. 1. Cash Re EquipRegisterandRegisterDataCollectionEw ment. 9 q B. Related Work: 2. Satellite Dish Equipment. B. Related Sections: 2. Indoor, outdoor, enthalpy, and analog sensors (humidity, pressure, light, etc.) shall be installed 3. Telephone and Signal system Equipment. 1. Section 16050 - Basic Electrical Materials and Methods: 1 B. Related Sections: 1.02 WARRANTY 1. Section 16050 - Basic Electrical Materials and Methods: PART 2 PRODUCTS for EMS components (excluding cable sets), supplied under this Section. 2. Section 16400 - Service and Distribution: Pre - Fabricated Electrical Distribution Center. 2.01 MATERIALS 1.02 SEQUENCING AND SCHEDULING A. Receptacles: Provide specified receptacles as indicated on Drawings. For pricing and ordering information, contact: A. Conduit cable and power to s ^tellite dish shall be installed 7 days prior to possession dale set by Wal -Mart Construction Manager, or the General Contractor will be responsible for paying any Wal -Mart Support Service Novar Controls CorporationI114SouthCollegeAve., Suite -D bypass" charges, incurred by the Wal -Mart satellite installer. PART 3 EXECUTION B . Telephone plywood mounting panel, 86 telephone system ground conductor, and telephone conduit 3.01 INSTALLATION system shall be completed 35 days prior to date of Substantial Completion. A. Circuiting: Cash register, data collection, ONEAC and satellite dish equipment require 120V isolated Provide and install the following Novar Controls equipment. See Drawings for location and 7 and dedicated circuits for continuous, uninterrupted 24 hour operation. PART 2 PRODUCTS B. Circuit Breakers: One 20 amp breaker and circuit Is required from panelboard for supplying power 2.01 CASH REGISTER AND REGISTER DATA COLLECTION EQUIPMENT provide a demand pulse generator. to maximum of two DTS cash registers or two NCR cash registers per circuit. Circuits in panelboard a. Watt Transducer: WAT-80 shall be clearly labeled for 24 hour operation, and also labeled to clearly Indicate their terminating A. Equipment: To be furnished and installed by others. i location. B. Cabling: Cash register and register data collection equipment data (IRC) cable will be furnished by C. Grounding: There shall be an insulated, isolated, grounding conductor for each cash register circuit as B. Conduit: Furnish 112 inch conduit for Novar Controls cable sets f: others. Install cable as indicated on drawings. Final terminations to equipment will be by others. 1. Indicated on Drawings. This conductor shall be at least as large as the current carrying conductors to act as common ground between each outlet on same circuit. This conductor must be a non - current 2. C. Raceway System: Provide raceways for data cable as indicated on drawings. 3. carrying ground, not a neutral common, and must not be connected anywhere or in any way to the 4. Cables are to be installed less than 15 feet AFF. 5. neutral nor to any conduit system before bonding with equipment grounding conductor, ground 2.02 SATELLITE DISH EQUIPMENT Cables are to pass through any fire wall. electrode conductor, transformer neutral, and transformer case ground at the cash register transformer 7. Cables are to be installed underground. secondary. Cables are to be installed in any concealed area. A. Equipment: To be furnished and installed b others. Y Cables are to be installed in any finished area. 1. Note: Proper grounding and use of the above criteria is critical to the performance of this 10. Cables are to be installed in any finished wall. C. Nipples: Furnish and install 1/2 conduit nipples for Novar Controls cable sets it: equipment. it Is mandatory that only cash register equipment be connected to these circuits. Connection to and use of other type of equipment will adversely affect cash register system and B . Cabling: Satellite Dish Communication (IFL) Cable will be furnished by others. Install cable as indicated on drawings. Final terminations to equipment will be by others. will not be permitted. f 3. 1 C. Raceway System: Provide raceways for satellite dish communication cable as indicated on drawings. END OF SECTION 2.03 TELEPHONE SYSTEM A. Plywood Mounting Panel: Included in EDC Unit per Section 16400. B. Telephone System Grounding Conductors: No. 6 AWG, copper grounding conductor from telephone service equipment to electrical service grounding electrode system or dry type transformer grounding electrode system. C. Telephone Conduit System: Furnish as Indicated on Drawings. including: 1. Telephone service conduit. 2. Other conduits as Indicated on Drawings. Furnish N14 AWG soft iron pull wire or heavy nylon cord in each conduit for pulling the telephone cable to each termination point. 3. Outlet boxes, which shall conform to requirements of "Outlet Boxes and Conduit Fitting" of these Specifications, shall include necessary cover plates. i I16600.1 I ' 16700.1 WM - Lake Elsinore, CA July 16,1993 I j WM - Lake Elsinore, CA I fou- THIS FILM WAS PPAMU BD F80l1;; Tin BBBT AND KWT OONPLBTB 1 DRAWINGS AVAILABIA AT TBS July 16, 1993 n 1 I SECTION 16920 f WM:•EDC 10272 ENERGY MANAGEMENT SYSTEM WIRING IPART GENERAL 1.01 SUMMARY A. Section Includes: 1. Energy Management System control wiring, and conduit system installation. 2. All 120V and above Energy Management System conduit, wiring, and terminations. 3. Pay charges demand pulse generator. 4. Coordinate with local utility. B. Related Work: 1. Electrical Subcontractor shall make all line voltage terminations. 2. Indoor, outdoor, enthalpy, and analog sensors (humidity, pressure, light, etc.) shall be installed and terminated by the Energy Management Contractor. 3. Energy Management shall be responsible for all EMS communication terminations. 1.02 WARRANTY A. After acceptance by Owner, Energy Management Contractor shall provide material and labor warranty for EMS components (excluding cable sets), supplied under this Section. PARTS PRODUCTS I2.01 MATERIALS A. 1. For pricing and ordering information, contact: Wal -Mart Support Service Novar Controls CorporationI114SouthCollegeAve., Suite -D P.O. Box 3345 Fayetteville, AR 72701 501) 521 -7795 2. Provide and install the following Novar Controls equipment. See Drawings for location and quantity. a. Novar WIR -2020 communication and control cable sets. 3. Provide the following Novar Controls equipment only if the local electric power utility is unable to provide a demand pulse generator. a. Watt Transducer: WAT-80 b. Three Current Transducers: CTS -81 -3 a Shorting Switch Assembly: ESA -82 d. Isolation Relay Assembly: IRA -83 e. Enclosure: ENC-84 B. Conduit: Furnish 112 inch conduit for Novar Controls cable sets f: 1. Required by local electrical codes. 2. Crawl space is used for return air. 3. Cables are to be installed outside the buildingg 4. Cables are to be installed less than 15 feet AFF. 5. Cables are subject to physical damage. 6. Cables are to pass through any fire wall. 7. Cables are to be installed underground. 8. Cables are to be installed in any concealed area. 9. Cables are to be installed in any finished area. 10. Cables are to be installed in any finished wall. C. Nipples: Furnish and install 1/2 conduit nipples for Novar Controls cable sets it: 1. Required by local codes. 2. Cables pass through any wall. 3. Cables pass through any floor. 16920 -1 WM - Lake Elsinore, CA July 16, 1993 n 2.04 SIGNAL SYSTEMS A. Furnish Hubbell Catalog No. 1281 MO momentary switch in flush switch box with Hubbell Cat. No. 1795 weatherproof cover at truck dock personnel door and Edwards Cat. No. 1065 -N5, 120 volt AC buzzer in flush switch box with Slater Cat. No. S -771N louvered cover plate in Stockroom as indicated on Drawings. PART 3 EXECUTION 3.01 EXAMINATION A. Verification of Conditions: Verify final layout of all cabling (telephone, register (IRC) and satellite dish IFL) with Wal -Mart prior to beginning work of this Section. Reworking of cable, not approved by Wal -Mart, will be accomplished at no additional cost to Wal -Mart. 3.02 INSTALLATION A. Install telephone conduit system and telephone grounding conductor, as indicated on Drawings. B . Install cash register, register data collection and satellite dish cabling as indicated on drawings. C. Install signal system as indicated on drawings. Provide flush mounted, single gganngg masonry boxes for mounting of push buttons and bells. Signal system wiring shall be No. 12AWG unless otherwise indicated on drawings. END OF SECTION l l l 16700 -2 PART 3 EXECUTION 3.01 INSTALLATION A. Install materials to manufacturer's recommendations and as indicated on Drawings. B . Cable sets shall be located as Indicated on Mechanical and Energy Management Plans. All energy management cable sets shall be Installed by the electrical Contractor. All cable sets shall be run from designated termination points without splice, and shall run as indicated on Drawings. No deviations or substitutions in materials or procedures will be accepted. C. EMS installation shall be coordinated with the Energy Management Contractor. Electrical Sub- contractor shall make arrangements with the Energy Management Contractor for installation dates, testing dates, and completion dates. Electrical Subcontractor shali be responsible for any extra fees imposed by the Energy Management Contractor for extra labor and expenses for negligence on the part of the Electrical Subcontractor. D. Secure permits, fees, deposits etc. for a demand meter pulse generator, as required in accordance with Document 00800. Coordinate with Section 13810 and the local Utility. Furnish and install 1/2 inch conduit with one Novar WIP2020 cable in a continuous length without splices or terminations between the Utility Demand Meter and the Energy Management Electrical Interface Panel. 3.02 ENERGY MANAGEMENT SYSTEM MILESTONE A. Have related control and electrical wiring completed 21 days prior to Project acceptance by Wal -Mart. END OF SECTION l 1 i 16920 -2 WM - Lake Elsinore, CA July 16,1993 ' WM - Lake Elsinore, CA July 16,1993 THIS BILL! WAS PRMCSD FR011; J THE HEST AND iWST 0011P1+R'1'S I DRAWINGS AVAILABL19 AT THE A T OP YILM r ,e F. E t i WM: SECTION 16925 HEATING AND COOLING CONTROLS 03083 PART GENERAL 1.01 SUMMARY A. Section Includes: 1. Electrical conduit, fusible disconnects, fuses, power and control wiring, and electrical power terminations for heating and cooling systems. B. Related Work: 1. Heating, ventilating, and air conditioning equipment Including ductwork and exhaust fans will be furnished and installed by Mechanical Contractor. 2. Motor starters and control devices for each rooftop unit will be furnished and installed by Mechanical Contractor. Mechanical control terminations will be by Mechanical Contractor. 3. Electronic Thermostat Modules will be furnished by the mechanical contractor. Thermostat terminations will be made by the mechanical contractor. 4. Remote Temperature Sensors for the Electronic Thermostat Modules will be furnished by the mechanical contractor. Terminations for the Remote Temperature Sensors will be made by the mechanical contractor. 5. Duct Temperature Sensors for the Electronic Thermostat Modules will be factory mounted in RTU. PART2 PRODUCTS 2.01 MATERIALS A. Only controls manufactured by Novar Controls will be accepted. 1. For pricing and order information, contact: Wal -Mart Support Service Novar Controls Corporation 114 South College Ave. Sufte -D P.O. Box 3345, Fayetteville, AR 72702 501) 521.7795 2. Furnish and install 112 inch conduit and Novar Controls cable for each RTU. See mechanical drawings for location, quantities, and cable sets. a. Remote Temp. Cable Set WIR -2020 B. Furnish electrical interlace items shown on Contract Drawings. Sizes shown are nominal. Coordinate requirements with Mechanical Contractor and furnish and Install electrical items with proper rating to match requirements of equipment supplied. C. ii air duct smoke detectors are Indicated on Drawings or required by local code except in roof top units, Electrical Contractor shall furnish control wiring for duct smoke detector operation. If local governing code permits, connect power to nearest general purpose receptacle. If smoke detectors are required in the roof top units, they will be Owner furnished, factory mounted and wired in the roof top unit. D. Furnish disconnects for radiant heaters. E. Furnish disconnects for exhaust fans. RT 3 EXECUTION 1 MECHANICAL SYSTEM MILESTONE A. Have related control and electrical wiring completed and checked out 21 days prior to Substantial Completion date. 16925.1 0 - Lake Elsinore, CA July 16,1993 91 SONIC PROJECT WAL -MART #2077 INC FoR WAL -MART SHEET NO. 6 OF MATERIAL HANDLING ENGINEERING P.T. 94 TEL: (818) 962 -1162 • FAX: (818) 962 -1279 CALCULATED BY DATE _ 141804 IJVE OAK AVENUE • BALDWIN PARK • CA 91706 SEIZMIC PROJECT WAL -MART #2077 WAL -MART FORINC. SHEET N0. 7 OF 56 MATERIAL HANDLING ENGINEERING P.T. 6-09-1994 TEL: (818) 962 -1162 • FAX: (818) 962 -1279 CALCULATED BY DATE 14180.1 LIVE OAK AVENUE • BALDWIN PARK • CA 91706 i1 RID -U -RAK 3 n rfoSOEOIZMIC PROJECr WAL- MART #2077 FOR WAL ING ._ TEL: (8118) 962-1162 D•1 FAX: ( 8ENGINEERING 8) 62 -1279 CALCULATED BY P.T. DATE - 14180 -1 LIVE OAK AVENUE • BAIDNAN PARK • CA 91706 T 6 >3E8T AflD f10d 00UPLm TIN AVAILAUX AT TZ3 OF IF ic' 1• 4 nk,.. Y nk,..