WAL- MART
r
AIR CONDITIONING SYSTEMS START -UP REPORT
Page _ of
PROJECT UNIT NO.'
LOCATION AU ITUDE IN FEET
MANUFACTURER SIZE
MODEL NO SERIAL NO.
r CONDENSER TEST DATA ACTUAL
Low Amb. Control - set point
TI -T2
Degrees F
T2 - T3
Suction Pressure - Stage 1/2
Head Pressure - Stage 1/2
ran c case Hir. Amps -
TiNo. 1/2
ompr. Amps - Stage /
T3T1
72
13
Compr. Voliage - tage I
T1 -T2
T2 -T3
T3 -T4
Cond. Fan Vohs - Number 1!2
Cond. Fan Amps - Number 1/2 I
r
Unit Number shall correspond to
marked nutter on Drawings.
ELECTRIC HEATING DATA
EAT /LAT D rees F
ACTUAL
Voltage tags 12
TI -T2
T2 - T3 I
T3 - T4
Amps - Stage 1/
Fuel Natural Gas or Propane)
Ti
T2
T3
GAS HEATING DATA
EAT /UT Degrees F
VVeri! I r,itl n -Sta a 1/2
ne ressure, n. WC
U stream of Unit Control "
loge
Na, am o ressure,
In. WC Downstream of
Appliance Regulator"
tag
Burner Orifice Size
t9 e
Most remote unit only. Read gas
ppressure when equipment in
building is in full operation.
START -UP DATE _ TIME READINGS BY
VERIFIED BY
weneral Contractor)
REMARKS:
1.3500-8
WM - Lake Elsinore, CA July 16, 1993
MAKE -UP AIR UNIT START -UP REPORT
PROJECT
LOCATION
MANUFACTURER
MODEL NO.
EATrLAT Degrees F
t a
Verity Ignition - Stage 1!2
loge
Gas Line Pressure, In. WC
Upstream of Unit Control"
loge
Gas Manifold Pressure, In. WC
Downstream of Appliance Regulator—
tag
Burner Orifice Size
t9 e
Fuel Natural Gas or Propane)
Stage
UNIT NO.'
ALTITUDE IN FEET_
OUTPUT (DTUH /KW)
SERIAL NO.
Page _ of
NOTE:
Unit Number shall ;;orrespond to marked number on drawings
Most remote unit only. Read gas pressure when equipment in building is in full operation.
ELECTRICAL
HEATING DATA
EAT LAT Degrees F
t a tag loge Stage loge sge tag t8 a t9 e t e Stage to
2
Stile age
4
lage
55
Voltage - Stage 1/2
T -1 - T -2
T -2 - T -3
T -3 - T -4
AMPS - Stage 1/2
T1
T2
T3
START-UP DATE TIME READINGS BY
VERIFIED BY
General Contractor)
REMARKS:
END OF SECTION
15500 -9
WM . Lake Elsinore, CA July 16, 1993
r. .. .n..rtw! - x u.,....s+n - w...:. w,.....:. a. ii,.,TIS -. .,.. .-ru. '.:li+- w.•.., ..- -. ..- m, ... .. .. r
1a - r .i... . ?,. a..u .n.,.. s :>Y.: 1., R'.:. -: - u . _ _ .. . -w. :FV`+... 4.....tu e.. ,.i:..:.. } .. ....n .L: a .. ..: .Ma >. .. Y..v!. .n aTS7.be ..Ha MMN.. io- .r.. ('M ..4 ta.. it.. ... M4' zts M .n.. .! 1 N. ...7ro.r.a.. +.•k ia.GAY. N4. #. i. 1 "rt .. .' - -.. -.. _. ... .i. f .. ...... ......... .: 4................. 1....: +aL1 iP- :),'c tiH7.Mitw:l.ccua::
THIS FILM TIAS 1 >1111WUCED FROM
THE BEST AZ P HOOT COMM
UBAVIAGB AVATLABLB AT THE
WM.
SECTION 15880
052693
AIR DISTRIBUTION
PART GENERAL
1.01 SUMMARY
A. Section Includes:
1. Ductwork, dampers, inlets, outlets and accessories for HVAC systems.
B. Related Sections:
1. Section 15500 - He; Ing, Ventilating, and Air Conditioning:
2. Section 15990 - Testing, Adjusting, and Balancing:
3. Other Division 15 Sections.
4. Refer to other Divisions for coordination of work.
1.02 REFERENCES
f A. American Society for Testing and Materials (ASTM):
1. ASTM A527 - Specification for Steel Sheet, Zinc- Coated (Galvanized) by the Hot -Dip Process,
Lock - Forming Quality.
2. AST%1 A525 - Specification for General Requirements for Steel Sheet, Zinc - Coated
Galvanized) by the Hot -Dip Process, Lock- Forming Quality.
3. ASTM E84 - Test Method for Surface Burning Characteristics of Building Materials.
B. National Fire Code (NFPA):
1. NFPA 90A - Installation of Air Conditioning and Ventilating Systems.
I 2. NFPA 90B - Installation of Warm Air Heating and Air Conditioning Systems.
C. SMACNA - Architectural Sheet Metal Manual.
1.03 WARRANTY
E A. Guarantee ductwork for a perlod of one year from date of final acceptance, against noise, chatter.
whistling, and vibration. Guarantee to be free from pulsation under full range of operating conditions.
PART2 PRODUCTS
2.01 DUCTWORK AND ACCESSORIES
A. Rectangular Sheet Metal Ductwork: Continuous hot -dip mill galvanized, minimum coating of G60,
lock- forming quality steel sheets, in accordance with ASTM A527 and ASTM A525.
B. Round Sheet Metal Ductwork: Galvanized, longitudinal or spiral seam.
1. Minimum Gauges for Round Duct:
a. 14 inches and smaller, 26 ga.
b . 15 inches and larger, 24 ga.
C. Duct Liner: ASTM C1071, ASTM C518, ASTM C177, ASTM E84, ASTM C423, NFPA 90A, and NFPA
90B.
1. Material Fibers: Bonded with thermosetting resin, with smooth air stream surface.
C 2. Maximum flame spread rating: 25.
3. Maximum smoke developed rating: 50.
E 4. Density: 2 lb. per cu.ft. with the following minimum R values at 75 degrees F.
I
a. 1/2 inch thick liner: R =2.1 (min.)
b. 1 inch thick liner: R -4.2 (min.)
C 1 -1/2 Inch thick liner: R =6.3 (min.)
l
158aU -1
WM - Lake Elsinore, CA July 16, 1993
I
is MX', .3:: ".a 6'./53,! . Y:i•ff !rA sA 0.' Xr :., i.i i.'. FYI
0
PART 3 EXECUTION
3.01 INSTALLATION
A. Plumbing fixtures and equipment shall be set in place at locations indicated on the Drawings, leveled
and connected. Fixtures shall be protected from damage during construction.
B . Installation procedures shall be in accordance with these Specifications and the Manufacturers
directions.
3.02 ADJUSTING AND CLEANING
A. Prior to final acceptance, inspect faucets, flush valves, slip valves, and similar devices, to determine
that they operate properly and discharge the proper quantities of water. Correct any deficiencies as
directed by the Owners representatives.
B. Clean fixtures, trim, and accessories of foreign materials, including labels.
END OF SECTION
15440 -2 1
WM - Lake Elsinore, CA July 16, 1993
1
B. Pipe welders to be certified and bear evidence of certification 30 days prior to commencing work on
this project. If there is doubt as to proficiency of welder, Owner's representative may require welder
to take another test. This will be done at no cost to Owner. Certification will be by Pittsburgh
Testing Laboratories or other approved authority.
3.02 FIELD QUALITY CONTROL ,
A. Testing: After installation, pressure test the entire system.
1. For each line intended to be operated at pressure of less than 1 psig, give leak test at a
pressure of 25 psig, or as required by local authority if more stringent.
2. For each line intended to be operated at a pressure of 1 psig and above, give leak test at a
pressure of 100 psig, or as required by local authority if more stringent.
3. Maintain full test pressure for a period of 30 minutes, and make visual inspection for tightness of
System.
B. Testing In State of Colorado: If project is in Colorado, test in accordance with the following in (`
addition to that specif ied above. j
1. For each non - welded line, give leak test at a pressure of 25 psig, or as required by local
authority it more stringent.
2. For each welded line, give leak test at a pressure of 60 psig, or as required by local authority if
more stringent.
3. Maintain full test pressure for a period of 30 minutes, and make visual inspection for tightness of
system.
END OF SECTION
i
WM - Lake Elsinore, CA
15490 -2
SECTION 15500
WM: 060493
HEATING, VENTILATING, AND AIR CONDITIONING
PART GENERAL
1.01 SUMMARY
A. Section Includes:
1. Heating, ventilating, and air conditioning systems.
2. Energy Management Controls for heating, ventilating, and air conditioning.
B . Work Installed but not Furnished under this Section:
1. Owners HVAC supplier will furnish rooftop HVAC units and curbs, including smoke detectors
when required for ducts.
2. Contractor Is responsible for providing related products required to complete installation.
C. Related Sections and Work:
1. Section 01010 -Summary of Work: General procedures related to Owner furnished products.
2. Electrical contractor shall provide cable sets and conduit system for the remote temperature
sensor and communications cables.
3. Energy Management contractor shall provide written instructions for the installation of the Novar
System Components.
4. Wal -Mart Support Service, ( Novar Controls Corp) shall provide all programming parameters
and control strategies for the Energy Management System.
5. EMS contractor shall be responsible for all EMS communication cable terminations.
D. Comply with other Division 15 Sections, as applicable. Refer to other Divisions for coordination of
work.
1.02 CERTIFICATIONS
A. Each Rem of equipment of a type which is available with capacity ratings certified by AMCA, and/or
ARI, will be furnished with capacity ratings so certified.
B . Energy management system controls certifications will be on file with the Owner.
C. Owner furnished roof -top units will be California Energy Commission certified. All Contractor
furnished equipment shall be CEC certified as required.
1.03 SUBMITTALS
A. Submit the following under provisions of Section 01300.
B . Provide submittal data for approval of products furnished under this Section, (except Owner
furnished).
C. No submittal data shall be required for energy management system controls.
1.04 WARRANTY
A. After acceptance by Owner, EMS contractor shall supply materials and labor warranty for EMS
components supplied under this Section.
July 16,1993 ! WM - Lake Elsinore, CA
i
ra .,...a .., ice.:.. F ..,j ,,. . z ....Y!, , .,i '.., .r' -•.:'m ,, .wt . , ':,xiiar... eA. .. .- r - _ .. ...: .. ,,. e .... ... ,i...c.%,,. _..0 )..WNW;`
rmwfV... -++. .s,- yypr..Aw :...:..+w.onwrw,
THIS FILM WAS PRMUCED FROM,,!
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TIME OF F" IN
X
S. r
15500.1
July 16, 1993
A'
3
LA
5. Subject to compliance with requirements, provide duct liner of one of the following
manufacturers:
a. Certainteed.
b . Knauf.
c. Manville.
d. Owens /Corning.
e. Substitutions: None accepted.
D. Duct Wrap: ASTM C553, ASTM C1136, ASTM C518, ASTM C177, ASTM E96, ASTM E84, and
NFPA 90A, 90B. I
1. Material Facing: Type II FSK or vinyl.
2. Maximum flame spread rating: 25.
3. Maximum smoke developed rating: 50.
4. Density: 1 lb. per cu.ft. with the following minimum R values at 75 degrees F.
a. 1 -1/2 inch thick duct wrap: R-5.5 (min.)
b. 2 inch thick duct wrap: R -7.4 (min.)
5. Subject to compliance with requirements, provide duct wrap of one of the following
manufacturers:
a. Certainteed.
b . Knauf.
a Manville.
d. Owens /Corning.
e. Substitutions: None accepted.
2.02 FLEXIBLE DUCT (SUPPLY AIR)
A. Flexible Duct: UL Class One and equal to Thermoflex requirements of UL -181, NFPA 90A, and ,
other governing authorities. Limit flexible d:jct to 4 feet, and in straight runs only. Not permitted for
use as return air ductwork.
2.03 FLEXIBLE ALUMINUM AIR DUCT
A. Flexible Duct (Aluminum): Triple Lock Type M, by Flexmaster. UL Class 1, requirements of UL 181,
NFPA 90A, and governing authorities. Limit flexible aluminum air duct to 20 inch diameter return &:r
applications only. ,
2.04 CONTROL DAMPERS
A. Provide volume - control dampers where indicated by Drawings. Dampers to have end bearings and
lever -type control handle with position indicator. Provide extension to protect insulation. Provide
access panels where required. Refer to drawing notes for .?proved model numbers. Refer to
detail for adk;itional data.
B. No field fabricated dampers.
C. Sec .re control dampers after Testing, Adjusting and Balancing as directed by ITBA and specified in
Sedan 15990.
05 FIRE DAf1PERS
A. Install :,;^,,oved fire dampers in air ducts where required by codes and regulations of governing
authorqtes. Install access doors in rhicts for inspection of fusible links. Dampers: UL labeled,
consbu .ted ano Installed in aocordPrtce with NFPA 90 A and UL instructions. Size dampers to
provide free %ea equal to duct dimensions.
8. Provide hanger design, and methods of hanging and supporting compatible with the structure.
2.06 AIR OUTLETS ^ND INLETS
A. Grilles, registers, ceilinr. outlets, and ceiling Inlets to be as indicated on Drawings. Provide with
heavy -duty sponge, or suit felt gaskets.
1. Subject to compliance with requiiemertts, provide air outlets and inlets of one of the following
manufacturers:
a. Titus
b. Carnes.
Q Krueger.
15e8o-2
d. Metal Aire.
e. Hart and Cooley.
I. Barber Coleman.
g. Lima.
h. J & J Register.
I. Substitutions: None accepted.
B. Locations of outlets shown on the Drawings are approximate, to be coordinated with other trades to
make symmetrical patterns, and to be governed by the established pattern of the lighting fixtures or
Architectural reflected ceiling plan.
C. Install fire dampers and other devices at air inlets and outlets as required by codes and regulations of
governing authorities.
2.07 DUCT SEALERS
A. Subject to compliance with requirements, provide duct sealers of the following manufacturers:
1. Kingco 18 -136.
2. United Sheet Metal Duct- Sealer
3. Multipurpose duct sealant manures tured by Trans - Continental Equipment Co.
4. Hardcast #601 Iron -Grip.
5. Hardcast Peel.N -Seal Tape.
B. Substitutions: None accepted.
PART 3 EXECUTION
3.01 FABRICATION
A. Fabricate, erect and Install ductwork for heating ventilating, and air conditioning systems in a first -classmanner, per state and local requirements, and SMACNA duct construction standards (latest edition).
B . Make joints air tight on supply, return, and exhaust ducts. Seal transverse and longitudinal joints with
duct sealer. Seal exhaust ducts with exterior seal as required to assure a positive seal.
C. Insulate rectangular supply ductwork with specified liner in accordance with latest edition of SMACNA
duct liner application standard.
D. Insulate rectangular return ductwork with specffed liner in accordance with latest edition of SMACNA
duct liner application standard.
E. Insulate round supply and return ductwork with specified duct wrap. Overlap facing and staple
securely, leaving clean and neat.
3.02 DUCT SUPPORTS
A. Horizontal and vertical sheet metal duct work shall be supported in accordance with the appropriate
latest SMACNA Duct Constructic a Standards and the schedule following.
RECTANGULAR DUCTWORK ( Minimum Hanger Siie)
Maximum a o
Duct Perimeter'
Pair at
S akin
Fa- ir
S aci
Pair at 5 It
S akin
Pair at TF
S akin
11 trap o trap / o trap / o trap/ o
1" x i" 1" 1"
P12 = 30" 22 a 10 a 22 a 10 a 22 a 12 a 22 a 12 a
x x x x
P/2 - 72" 18 a 3/8" 20 a 1!4^ 22 a 1/4" 22 a 1/4"
Perimeter - Sum of Sides
WM - Lake Elsinore, CA July 16, 1993 WM - Lake Elsinore, CA
1)• Ire]
July 16, 1993
SECTION 15990
WM: 060293
TESTING, ADJUSTING, AND BALANCING
PART 11 GENERAL
1.01 TESTING
A. Wal -Mart will provide the services of an Independent Test and Balance Agency (ITBA) who will be
responsible for the Test and Balance of all environmental systems installed or modified under this
Contract.
B. Provide all necessary balancing dampers as specified and shown on the Drawings for proper
balancing of all systems.
C. The Contractor shall prepare the system for Test and Balance as follows:
1. Install, start up, check out, and adjust all HVAC systems per Drawings and Specifications and
have fully operational with all deficiencies corrected on or before Wal -Mart's Substantial
Completion Date.
2. Verify that mechanical contractor has installed new fitters no more than one day prior to starting
test and balance procedure.
3. Verify that all duct work is clean and sealed tight against leaks.
4. Verify that all controls, dampers, and actuators are installed, adjusted, and calibrated.
5. To maintain schedules and prevent return trips, have experienced personnel available to correct
HVAC system deficiencies while ITBA is scheduled on site.
6. Secure control dampers after Test and Balance as directed by ITBA.
D. The Contractor shall notify Wal -Mart Construction Department when HVAC systems are ready for
Test and Balance. If Contractor fails to notify Wal -Mart Construction Department of status, the ITBA
will be scheduled into the store during the week following Contract Substantial Completion Date.
E. Upon completion of system Test and Balance, a copy of the ITBA report will be forwarded to
Contractor. If HVAC system deficiencies exist, a letter listing those deficiencies will also be
forwarded to the Contractor immediately for correction. If the Contractor fails to respond and correct
these deficiencies within seven days upon receipt of the letter, Wal -Mart will authorize repairs as
judged necessary and take the necessary contractual action to recover adequate compensation for the
repair expenses.
F. As a result of HVAC system performance or operational deficiencies, a return trip by the ITBA to
complete Test and Balance will be authorized when deemed necessary by Wal -Mart Construction
Department. This return trip will be costed at $45.00 per hour plus mileage and expenses, and
Wal -Mart will take the necessary contractual action to recover adequate compensation for the ITBA
expenses.
1.02 INDEPENDENT TEST AND BALANCE AGENT
A. The ITBA shall be certified by the National Environmental Balancing Bureau (NEBB) or the
Associated Air Balance Council (AABC). Testing and balancing shall be supervised by a Registered
Professional Engineer. All personnel Involved in the execution of the work for the ITBA shall be
technicians experienced and trained specifically in the testing and balancing of mechanical systems.
All instrurrants used by this ITBA shall be recently and accurately calibrated and maintained in good
working order. Verification of calibration shall be submitted in the final test report if so requested by
Wal -Mart.
1.03 TESTING AND BALANCING PROCEDURES
A. All specified eqquipment shall be tested, adjusted, and balanced in accordance with the governing
NEBB or AABC Procedural Standards.
B. Make a preliminary system check on all HVAC, control and Energy Management systems and
equipment to be tested to determine that equipment, duct work, etc. is installed and will operate.
Deficiencies shall be immediately reported to the General Contractors job site superintendent and
the Wal -Mart General Offices.
15990 -1
WM - La;,,a Elsinore, CA July 16. 1993
1 ++MM aavysscn
i." " -iT -L " . -'N WMiYX NFifHi4 .in..T'.. LlNn .. 1 R r. r4.....a..i"r.14.....; -: H, -..1, v,•sX:sl yi:,%tsr,. v, " „Y,2 h: ' -..,t .. I- .- -... +.. !'.. .. e"t- asp„ Ns, ,,.,,.}z. ...M•fv ^'+"t aY N%"!!, -: «.+.. "'TatM( IIJf ''A. vi N+. ^ -_V ;;'_:i. .,..._t:,..,T -. 1. l..«:.:......-...:.....-..-:. ..: c.; .; f. LtiB:.. isdil ;1351?..'dt LfJl.ti1 141'41Gk `i1171 5d :
THIS FILM WAS PB WUC19D FROM •,
THE BEST AND MOST OOMPUfflg
DRAWINGS AVAILABLE AT THE
i._._'
CIB OF FIIJt
i
PART PRODUCTS
2.01 ENERGY MANAGEMENT CONTROLS
A. Only controls manufactured by Novar Controls Corporation will be accepted. (See Section 13810)
For pncing and ordering information, contact:
Wal -Mart Support Service
Novar Controls Corporation
114 South College Ave. Suite -D
P.O. Box 3345, Fayetteville, AR 72702
501) 521 -7795
B . All heating, ventilating, and air conditioning systems /equipment, unless otherwise noted, shall use
Novar Controls.
2.02 ROOF TOP AIR CONDITIONING UNITS
A. Roof top air conditioning units with curbs, manufactured by, The AAON Company, Tulsa, Oklahoma.
1. The Contractor contact is:
The AAON Company
Ann: Jerry Nolan
918) 583 -2266 Ext.102
B. Provide, and install, and terminate Novar Controls wall temperature sensors (WTS -10) for each roof
top unit (RTU) according to location on plans. Install Novar Controls equipment under the
supervision and direction of the energy management contractor. See Section 13810.
C. Follow unit manufacturers printed installation and start-up instructions. Record the designated
start-up data on form "Air Conditioning Start-u Report". The General Contractor shall retain the
form on site and submit to Wal -Mart Independent Test and Balance Agency prior to the start of -
balancing.
1. Prior to Test and Balance, the mechanical contractor shall complete all work in this Section,
schedule final checkout of EMS controls to be performed by EMS contractor and have final
inspection by Energy Management Contractor.
D. Start-up shall be in the presence of Wal -Mart Construction Manager unless Owner directs otherwise.
It all start-up and testing cannot be properly done due to seasonal weather conditions, remaining
start-up shall be performed at an appropriate time. Payment may be withheld until work is complete.
During start-up, Contractor shall operate each unit In every mode and step of fan, heating and cooling
separately or in conjunction with other units for a sufllolent period of time, demonstrating to the
Owners satisfaction that each unit is operating properly.
2.03 AIR DUCT SMOKE DETECTORS
A. Where required for roof top units, the snake detector will be factory mounted and wired in the roof
top unit unless noted otherwise on plans. -
2.04 ROOF EXHAUST FANS
A. Roof Fans: Low contour, spun aluminum hood and base sections with curb cap, bird screen,
centrifugal with direct or bait drive motor mounted on resilient supports with isolators between 7
support and base. Motor shall have thermal overloads and be located out of exhaust air stream.
Fans to be UL listed and AMCA rated, of capacities and electrical characteristics scheduled.
Equipment as manufactured by one of the following manufacturers:
1. Acme. i
2. Carnes. l
3. Cook.
4. Penn.
5. Greenback.
6. Breidert. f
7. ILG.
B. Fan Curbs: 18 gage galvanized steel or aluminum welded prefabricated curbs at least 14 inches high
with built-in cant strip, attached to the roof deck and properly flashed and sealed to the building roof,
conforming to roofing requirements and forming a weatherproof connection between the unit and the
roof.
15500 -2 !
C. Follow unit manufacturer's printed installation and start-up instructions. Check fan rotation and
operation of dampers.
D. Contractor shall schedule start-up, allowing Wal -Mart Construction Manager to be present unless
Owner directs otherwise. During start-up, operate each unit in every mode separately or in
conjunction with other units for a sufficient period of time demonstrating to the Owners/Wal -Mart
Construction Managers satisfaction that the unit is operating properly.
E. During first -year warranty, Contractor may be required to make some or all of the above readings in
order to demonstrate that the systems are operating properly during each season. Contractor will
make additional adjustments and corrections as required during the warranty period ensuring proper
operation of fan.
F. Controls for roof exhaust fans shall be installed by the electrical contractor. Electrical contractor shall
provide and install related Energy Management equipment for roof exhaust fans.
2.05 CEILING EXHAUST FANS
A. Provide ceiling exhaust fans for use as indicated on Drawings. Fans shall have an integral face grille,
insulated cabinet with backdrafl damper, and direct drive centrifugal wheel. Fans shall be UL listed
and AMCA rated, of capacitiL.3 and electrical characteristics scheduled. Equipment as manufactured
by one of the following:
1. Acme.
2. Breidert.
3. Carnes.
4. Cook.
5. Greenhec k.
6. ILG.
7. Penn.
B. Furnish and Install roof cap with birdscreen on 18 gage galvanized steel or aluminum welded
prefabricated curb at least 14 inches high with built -in cant strip, attached to the roof deck and
property flashed and sealed to the building roof, conforming to roofing requirements, and forming a
weatherproof connection between the unit and the roof.
C. Follow unit manufacturers printed installation and start-up instructions. Check fan rotation and
operation of damper.
D. Contractor shall schedule start-up allowing Owners Representative to be present unless Owner
directs otherwise. During start-up Contractor shall operate each unit in every mode separately or in
conjunction with other units, for a sufficient period of time demonstrating to the Owners satisfaction
that the unit is operating properly.
E. During the first -year warranty, Contractor may be required to make some or all of the above readings
In order to demonstrate that the unit is operating properly during each season. Contractor will make
additional adjustments and corrections as required during the warranty period ensuring proper
operation of fan.
F. Controls for ceiling exhaust fans shall be installed by the electrical contractor. Electrical contractor shall
provide and install related Energy Management equipment for ceiling exhaust fans.
2.06 CEILING MOUNTED UNIT HEATER - VESTIBULE
A. Provide 2'x2' recessed ceiling mounted fan heater as indicated on Drawings. Heaters will be Omark
CDF- 547 -RE. Each heater shall be nominal 24 Inches by 24 inches for taunting in a T -bar ceiling and
shall be UL listed.
155003
WM - Lake Elsinore, CA July 16 1993 WM - Lake Elsinore, CA Juy 16,1993
THIS FILM WAS PRODUCED FROM; E <-
TOR BEST AND MOST COYPIXTZ
DRAWINGS AVAILABLE AT TBE
i
w- - '
rIOF p'ILMI
r
i
t I
t
H. Contractor shall schedule start-up allowing Owner's representative to be present unless Owner
i, directs otherwise. If all start-up procedures cannot be properly done due to seasonal weather
conditions, remaining start-up shall be performed at an appropriate time. Payment may be withheld
until work is complete. During start-up, Contractor shall operate each unit in every mode of ignition
and operation for a sufficient period of time demonstrating to the Owners satisfaction that the unit is
operating properly.
I. All start-up readings shall be recorded and furnished to the Owner. Gas line and manifold pressure
shall be measured at each unit at a time when all gas equipment is operating at full capacity. All
readings required on the Gas Fired Unit Heater Start-Up Report be taken Threeshallandrecorded.
sets of these records shall be furnished to Owner.
J. During first -year warranty, Contractor may be required to make some or all of the above readings to
demonstrate that the systems are operating property during each season. Contractor will make
additional adjustments and corrections as required during the warranty period, and use the Gas Fired
Unit Heater Start-Up Report form to record results. Three sets of these reports shall be furnished
Owner. Instruct Owner into the proper method for annual cleaning of the unit.
2.08 UNIT HEATERS - ELECTRIC
A. Unit Heaters: Steel spiral - finned sheath with nickel- chromium wire elements. Permanently lubricated
and thermally protected fan motor. Heaters heavy duty type,UL listed, 480V/3 phase. Provide
hanger brackets and hanger kits. Units shall be manufactured by one of the following:
1. Reznor.
2. Modine.
3. Marley.
B. A complete control system including any step- up/down transformers, relays, relay boards, relay
bases, printed circuit boards, timers, or any other necessary devices, including enclosures for
equipment shall be furnished by the mechanical contractor. Refer to drawings for location(s) and
type(s) of thermostats, timers, etc.
C. Follow unit Manufacturers printed installation and start-up instructions.
D. Mechanical contractor shall schedule start-up allowing Owners representative to be present unless
Owner directs otherwise. It all start-up procedures can rat be property done due to seasonal
weather conditions, remaining start-up procedures shall be performed at an appropriate time.
Payment may be withheld until work is complete. During start-up, mechanical contractor shall operate
Energyeachunitwith Management System for a sufficient period of time, demonstrating to the
Owners satisfaction that the unit is operating properly.
E. During first -year warranty, Contractor may be required to demonstrate that the systems are operating
properly during each season. Contractor shall make addtbnal adjustments and corrections during the
warranty period.
2.09 AUTO CENTER MAKE -UP AIR UNIT
A. The Roof -Top Make -Up Air Unit and control panel will be furnished by Owner and installed by
Contractor. Unit will be manufactured by Engineered Air, Lenexa, KS. The Contractor contact is:
Mr. Rick Rambacher or Ken Wash
End
913)
8)
888 1071
B . Unit will be furnished with capacities and accessories as scheduled on working drawings.
C. Curb for make -up air unit will be furnished by Owner and installed by Contractor. The curb will be
manufactured by A.E.S., Inc., East Tallahassee, AL, (205)283 -6578.
D. Energy Management contractor shall supervise connection of Novar Energy Management System to
factory installed temperature probe and to EMS on-off contacts.
1
i
155003
WM -
r
Lake Elsinore, CA July 16,1993
aJ
ROUND DUCTWORK (Minimum Hanger Size) I C. Inspect and test all Novar Controls electronic thermostat modules using ETM Interface Analyzer for
the following control functions:
Diameter
Maximum
Spacing Rod Strap
1. Fan control.
2. Stage 1 cooling control.
3. Stage 1 heating control.
10" and less 12' 1/4" 1" x 22 a
4. Stage 2 cooling control.
5. Stage 2 heating control. 11- 12' 1/4" x22ga 6. Economizer control.
Items 7 and 3 shall be verified with Wal -Mart Support Service. For information, please contact:
Wal -Mart Support Service
B . Don ;t use fasteners which penetrate roof deck. Novar Controls Corporation
315 South Gregg Street
C. Provide sway bracing to comply with seismic requirements per local codes and authorities havingYgPYqP9 P.O. Box 157
jurisdiction. Fayetteville, AR 72702
501) 521 -7795
3.03 TESTING
A. Prepare systems for Testing, Adjusting, and Balancing, specified in Section 15990.
7. Unit shut down upon fan operation loss, and alarm received at offices. (Novar, Wal -Mart Maint.
Dept., Wal -Mart EMS)
B . Make changes in pulleys, bells, ductwork, and dampers as required in Section 15990 for correct
8. Alarm initiated upon filter blockage of 50 % capacity, and alarm received at offices. (Novar,
Wal -Mart Maint. Dept., Wal -Mart EMS)
balance as recommended by air balance and testing agency at no additional cost to Owner. 7
END OF SECTION J All readings and testing data shall be recorded for inclusion Into final report.
D. The following testing and balancing shall be performed. All readings shall be recorded for inclusion
into the final report:
1 1. Test and adjust fan speeds to deliver the design CFM and record rpm and full load amperes at
design CFM Record voltage at each unit.
2. Test and adjust system for design CFM outside air.
3. Test and record suction and discharge external static pressures at respective plenums. Seal
access holes with rubber or metal snap4n plugs. The use of duct tape to seal access holes will
not be permitted.
4. Test and record entering air temperatures. (Dry Bulb heating and cooling, Wet Bulb cooling.)
5. Test leavingandrecord air temperature. (Dry Bulb heating and cooling; Wet Buru cooling.)
Test Dry Bulb Wet6. and record outside air and Bulb temperatures.
7. Test and adjust the volume dampers in the main duct runs to each diffuser, grille, and register to
provide ±10% of design CFM requirements.
8. Identify each diffuser, grille, and register to location and area. 1 9. Record Unit Data and Motor Data for each air system tested per appropriate NEBB or AABC
test report.
I
E. Test and record voltage and amperage measurements and calculate KW rating per appropriate
NEBB or AABC procedure for each electric radiant heater, electric coil heating section, or radiant heat
panel.
F. Verify and record proper operation of all stages of gas heating sections or gas radiant heaters.
G. Verity and record the proper operation of coiling fans.
H. Report Procedures:
1. if any air system or outlet is not within 10% of the design capacity at design rpm, determine the
reason. Check duct work and plenums for leaks; coils, filter, for excessive pressure drop, etc.;
and list on HVAC Deficiency Report.
2. Using data obtained during test, the ITBA shall determine if the cooling side of the roof top
1 units is performing in accordance with published data. One representative unit's record data for
each size RTU shall be plotted on a psychometric chart for comparison to manufacturer's
published literature. These psychometric charts shall be part of the final test report. Any
deficiencies shall be listed on the HVAC Deficiency Report.
I
15880-4 14 15990.2
WM - Lake Elsinore, CA July 16,1993 WM - Lake Elsinore, CA
yv.w.evn pr+ cunt,., ruv:. aN.«fwN ..crw..a,+w3 o f.zn*.dc... - - 5.s!s.s?r A"_v rt aa3`.zu.; ...A....- .,.:::;,
T
rte• -+s+,. .,,.•,. ,...- '^."..,- ,- ..,-- .,. -.«
r + ,`
THIS FILM WAS PRODUCED FNDILi;
TRM BEST AND YOSl' ODIIPLBTB
DRAWINGS AVAILABLE AT T18E
OF FI114I
r.
Juy 16, 1993
i
i
I
I
i
I
i
t;
3. Before leaving the job site, the ITBA shall provide the General Contractor's representative a
neat, legible deficiency list of all remaining HVAC system deficiencies for correction. The content
of this HVAC Deficiency Report shall be provided to Wal -Mart by phone before leaving job
k site.
4. The ITBA shall submit three bound copies of the final testing and balancing report. All data shall
be recorded on applicable NEBB or AABC certified reporting forms. The report shall include
all start-up data provided by the Mechanical Contractor; a summary sheet of all deficiencies with
status (corrected or not corrected at time of report) and recommendations. This report shall be
submitted within 14 days after final test and balance.
f
I. Guarantee: The ITBA shall guarantee the test and balance for a period of ninety days from date of
final acceptance of the Test and Balance Report. During this period, the ITBA shall correct
deficiencies at no cost to Wal -Mart.
I,
PART 2 PRODUCTS Not Used.
PART 3 EXECUTION Not Used.
END OF SECTION
i
1
I
i
1
15949 -3
are, CA July 16, 1993
i
J
B . Mechanical contractor shall provide a complete control system including any step-up/down transformer
for 24 AC control, relays, relay boards, relay bases, printed circuit boards, or any other necessary
devices, including enclosures for equipment shall be furnished by the mechanical contractor. When
shown on Drawings, mechanical contractor shall also furnish and install the following Novar Controls
equipment, according to Novar Controls printed installation and hardware mounting procedure. Refer
to Drawings for location of Electronic Thermostat Module and Baseplate. No deviations from these
instructions and mc. '`ng procedures shall be accepted. All Novar Controls equipment shall be
installed under the s_.Nervision of the Energy Management contrartor.
1. Electronic Thermostat Module: ETM -2020
2. ETM Baseplate: ETM -BPL
C. Contractor shall follow urn Manufacturer's printed installation and start-up instructions, and verify
proper operation.
D. Contractor shall schedule start-up allowing Owner's representative to be present unless Owner
directs otherwise. If all start-up procedures can not be properly done due to seasonal weather
conditions, remaining tests shall be performed at an appropriate time. Payment may be withheld
until work is complete. Durirg start-up Contractor shall operate each unit with Energy Management
System for a sufficient period of time demonstrating to the Owner's satisfaction that the unit is
operating properly.
E. During first -year warranty, Contractor may be required to demonstrate that the systems are operating
properly during each season. Contractor shall make additional adjustments and corrections during the
warranty period.
2.07 UNIT HEATERS - GAS FIRED
A. Unit Heaters: Heavy -duty type which are design certified by A.G.A., comply with current OSHA
requirements, accepted by FIA/FM and UL listed. Heaters shall have direct ignition spark of the
pilot ignitor through a solid-state, direct-spark ignition system. Loss of gas or power shall cause
100% shut -off of main burner and pilot. Heater shall be equipped with controls for 24 VAC
thermostatic operation as manufactured by one of the following:
1. Dravo - Hastings.
2. Lennox.
3. Modine.
4. Reznor.
5. Sterling.
B . Heaters shall have aluminized steel or stainless steel heat exchanger and aluminized steel burners
with stainless steel burner insert.
C. Cabinet panels of minimum 20 gage cold rolled steel with enamel finish. Adjustable hangers and
hanger assembly.
D. A complete control system including any step -up /down transformers for 24 VAC control, relays, relay
boards, relay bases, printed circuit boards, timers, or any other necessary devices, including
enclosures for equipment shall be furnished by the mechanical contractor. Refer to drawings for
location(s) and type(s) of thermostats, timers, etr.
E. Where attitude Is above 2,000 ft, gas unit heaters are rat derated, but may require larger orifices to
ensure full gas input for proper radiant temperature and color. Units may also require regulator
adjustment or higher manifold pressure. Follow manufacturer's Instructions carefully.
F. Contractor shall follow unit manufacturer's printed Installation and start-up instructions. Clean each unit
including venuri tube and record verification of proper operation on Gas Fired Unit Heater Start-Up
Test Report form. After each unit has been checked, started up, and adjusted, and is operating
properly, record start-up data on Gas Fired Unit Heater Start-Up Reports, located at the end of this
Section, as it Is accomplished, with date. The General Contractor shall retain the form on site and
submit to Wal- Mart's Independent Test and Balance Agency prior to start of balancing.
G. With so , a gas companies, meter - outlet pressure with full -gas demand may be lower than required to
provide recommended pressure in gas line at unit heater inlet, with resulting manifold pressure lower
than required for orifice furnished with unit heater. Where this is encountered during start-up, the
Contractor shall utilize a larger orifice to obtain correct BTUH Input per manufacturer's instructions and
so indicate on the Start-Up Report.
155004
WM - Lake Elsinore, CA July 16,1993
E. Follow unit manufacturer's printed installation and start-up instructions. Record the designated start-
Make The Contractor the form
UNIT
up data on form -Up Air Unit Start-Up Report". General shal! retain
I T
on site and submit to Wal -Mart Independent Test and Balance Agency prior to the start of balancing.
UNIT
1. Prior to Test and Balance, the mechanical cor3ractor shall complete all work in this Section,
NO.'
schedule final checkout of EMS controls to be performed by EMS contractor and have final
NO.'
inspection by Energy Management Contractor.
F. Start-up shall be in the presence of Wal -Mart Construction Manager unless Owner directs otherwise.
Manufacturer
If all start-up and testing cannot be properly done due to seasonal weather conditions, remaining
start-up shall be performed at an appropriate time. Payment may be withheld until work is
completed. During start-up, Contractor shall operate each unit in every mode and step of fan and
heating for sufficient period of time, demonstrating to the Owner's satisfaction that the unit Is
operating properly.
PART 3 EXECUTION
1 3.01 INSTALLATION
A. Equipment shall be installed at locations indicated on Drawings. Installation procedures shall be in
accordance with these Specifications and the manufacturer's direction and shall be in accordance with
the NEC and local regulations. Serial No.
B . Energy Management equipment shall be installed under supervision of the Energy Management
contractor. Mechanical contractor shall make arrangements with the Energy Management contractor for
installation dates, testing dates, and completion dates. Mechanical contractor shall be responsible for
Name late BTUH
any extra fees imposed by the Energy Management contractor for extra labor and expenses for
negligence on the part of the mechanical contractor.
3.02 MILESTONE
A. Have related controls and components installation completed 21 days prior to acceptance by
ACTUAL
Wal -Mart.
1 END OF SECTION
1
1
1
1
r.
1
1 15500-6
WM - Lake Elsinore, CA
i, ,.may'. ul':. wait : _i <.: r. ,. .^u aa rc ,.>. s.`. rr. l±. iw. n.. uav5 +:,.t[Kn.sa>- A«».r..us...+.. ..o. a. rn _. 2:_;• ^.. _,.. _rc ..i ................ .:.. u XA .1,:ryw'M. r.,a: :.niic ,a .:..iw -d? .J. uw,.•'. -,l i P ...N .. . , SYMf' .. -
THIS ILM WAS PRODUCED FROM
THE BEST AND HOST COMPLETE
DRAWINGS AVAILABLE AT THE
T a OF FILMI
i
4 f.
July 16,1993
a
PROJECT
ALTITUDE IN FEET
GAS FIRED UNIT HEATER START -UP REPORT
LOCATION
Page _ of
UNIT DATA UNIT UNIT I T UNIT UNIT
NO.' NO.' NO.' NO.' NO.' NO.'
Manufacturer
Area Served
Model No.
Serial No.
Name late BTUH
DATA ACTUAL L
mts have been cleaned
including Venturi Tube.
YES NO
as ine pressure (upstream
of appliance regulator),
In. W.C..*
Gas manifold pressure
Downstream of appliance
re ulator, In. W.C."
f I— size used. (verify
size required with
Manufacturer based on above
pressures and attitude.
Unit number shall correspond to number on Drawings.
These gas pressures are to be read at a time when gas equipment in building is in full operation.
START -UP DATE TIME
REMARKS:
READINGS BY
VERIFIED BY
General Contractor)
L
15500 -7
WM - Lake Elsinore, CA July 16,1993