WAL -MART
G. Stock Areas (Wal -Mart "Small" Stores with no rolling racks):
1. Density: 0.30 gpm/sq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 286 °F.
3. Spacing: 100 square feet per head, (maximum).
H. Stock Areas, including rolling racks(Wal -Mart "Large" Stores and "Small" Stores with rolling racks):
1. Density: 0.40 gpm/sq. h. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 286 °F.
3. Spacing: 100 square feet per head, (maximum).
I. Gun Room:
1. Sprinkler Head: 165 °F. Locate head, ceiling mounted, centered on gun room door.
2. Wire Guards: Provide wire guards around head to prevent mechanical damage.
Aerosol Rooms:
1. Density: 0.40 gpm/sq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 286 °F. Provide sprinkler head heat collector, if ceiling is of wire mesh
construction.
3. Spacing: 100 square feet per head, (maximum).
K. Offices:
1. Densfi : 0.10 gpm/sq. ft. over 1500 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinker Heads: 165 °F.
3. Spacing: 130 square feet per head, (maximum).
L. Auto Service (TBO) Areas:
1. Density: 0.30 gpnUsq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 286 °F.
3. Spacing: 100 sq.tt. per head, (maximum).
M. Auto Service Pit (TBO) Areas:
1. Density: 0.30 gprrVpq. it. over 2000 square feet, with a 250 qpm outside hose stream allowance.
2. Sprinkler Heads: 286 °F.
3. Spacing: 100 sq.ft. per head, (maximum).
N. Auto Service (TBO) Tire Storage Room including Rolling Tire Storage Rados:
1. Density: 0.60 gprrVsq. ft. over entire room, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 286 °F.
3. Spacing: 100 sq.tt. per head, (maximum).
O. Auto Service (TBO) Aerosol Room:
1. Density: 0.30 gpnVsq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 286 "F.
3. Spacing: 100 sgJ1. per head, (maximum).
P. to Service (Used Tire and Battery Storage Area):
t. Density: 0.45 gprNsq. ft. over entire storage area.
2. Sprinkler Heads: 2861F.
3. Spacing: 100 sq.ff. per head (maximum).
END OF SECTION
15300 -8
WM - Lake Elsinore, CA July 16, 1993
M •
SECTION 15400
WM:
PLUMBING
060'3
PART GENERAL
1.01 SUMMARY
A. Section Includes:
1. Water piping.
2. Sanitary drainage.
3. Vent piping
4. Storm water piping.
5. Condensate piping.
6. Compressed air piping.
7. Connection of miscellaneous equipment furnished under other Sections.
8. Testing.
B. Related Sections:
1. Other Division 15 Sections, as applicable. Refer to other Divisions for coordination of work.
1.02 SUBMITTALS
A. Section 01300 - Submittals: Procedures for submittals.
B . Product Data: Submit on Product Compliance Letter.
PART PRODUCTS
2.01 WATER PIPING SYSTEMS
A. Water Piping Above Grade: Type "L" hard drawn, seamless copper water tube, ASTM B88 and
Federal pecilicatien WW -T -799. Joined with wrought copper pressure fittings, ANSI BI 6.22. Make
joints using "lead tree" solder and a non - corrosive, paste -type flux. Core solder is not allowed.
Solder will be solid string or wire type. Where soldered copper piping is connected to threaded
brass piping, use a cast brass adaptor.
B. Water Piping Below Grade (Under Slab):
1. 2 inches and Under: Type "K" soft copper without joints beneath slab. If joints are necessary,
bring pipes above slab in a wall, make pints, and turn back down under slab.
2. 2 -1/ Inches and Up: Type "K " hard drawn with brazed fittings.
C. Make piping connections to fixtures and equipment with chrome - plated seamless brass tube, ASTM
8135 and Federal Specification WW -T -791. No ferrous piping or materials are allowed in water
piping smaller than 4 Inches.
D. Insulation: Owens- Coming Fiberglas 25 ASJ /SSL. Insulate domestic hot and cold water lin3s with
rigid glass fiber insulation, with maximum K factor at 75 °F of 0.23, 3 Wit density minimum of 1/2 inch
thick with white all- service jacket (vapor retarder). Insulate fittings with PVC fit6g covers with glass
fiber inserts.
1. Substitutions: Under provisions of Section 01600 and subject to compliance with requirements,
one of the following manufacturers may be substituted for that specified.
a. Certainteed.
b. Knauf.
c Manville.
2.02 SANITARY DRAINAGE
A. Sanitary Drainage Lines (Soil, Waste, and Vent): Cast iron soil pipe and fittings, coated inside and
outside, ASTM A74 and Federal Specification WW -P -401. Lab'il with Cast Iron Soil Pipe Institutes
Mark of Quality and Permanence ". Weight of pipe as required by Code for location and duty.
B. PVC Pipe: Not used.
WM - Lake Elsinore. CA
il6+ Pr
July 16, 1993
2.09 TRAPS
A. Provide deep seal P -traps for floor drains, including drains furnished as integral parts of floor -type
mop basins, and similar fixtures.
2.10 TRAP PRIMERS
A. Zum No. 2 -1022 Series all bronze primer valve with removable operating parts, integral vacuum
breaker, and gasketed access cover for installation in a cold water service line to a plumbing fixture
with piping to fixture required trap seal.
B. Substitutions: Subject to compliance with requirements and Section 01600, trap primers by one of
the following manufacturers may be substituted for that specified.
1. Jay R. Smith.
2. Jonespec.
3. Josam.
4. Wade.
2.11 WALL HYDRANTS (FROST PROOF)
A. Zum No. Z -1320 non- freeze wall hydrants, with bronze casing. Fumish with each hydrant a loose key
and an integral vacuum breaker - bacldlow preventer.
B. Substitutions: Subject to compliance with requirements and Section 01600, wall hydrants by one of
the following manufacturers may be substituted for that specified.
1. Jay R. Smith.
2. Jonespec.
3. Josam.
4. Wade.
5. Woodford.
2.12 CLEANOUTS
A. Cleanouts as follows, by Zum. Dura - crated cast iron with round, heavy duty, scoriated, nickel- bronze
top, adjustable to finish floor after concrete has set.
1. Exposed Cast Iron Pipe: Model No. Z- 1403 -A.
2. Threaded Drainage Fittings: Model No. Z- 1470 -A.
3. In Wall: Model No. Z -1468.
4. In Floors: Model No. ZN -1400.
B . Substitutions: Subject to compliance with requirements and Section. 01600, ceanouts by one of the
following manufacturers may be substituted for that specified.
1. Jay R. Smith.
2. Jonespec.
3. Josam.
4. Wade.
5. Woodford.
2.13 SHOCK ABSORBERS
A. Provide shock absorbers where shown on Drawings or otherwise required. Conform to the
requiremenls set forth by the Plumbing and Drainage Institute (PDI.)
2.14 PRESSURE REDUCING VALVE
A. Design Requirements: Feild verify supply pressure. When the water system static pressure is
greater than 75 psi, provide a pressure reducing valve ahead of all fixtures and located in an
accessible place.
B. Pressure Reducing Valve: Series 223, by Watts or Series 500, by Wilkins.
C. Provide shut -off valve at each side of pressure reducing valve.
D. Set valve pressure to 50 psi.
154UC - 3
WM - Lake Elsinore, CA
t .. Y .. ...... .. .. -1- ..... ,.r, _.:o.. a +.... ,. -._. ,. [. ..w.., .vo .... .. ,.k. -.. r. .. t' - -- - r. e., w. .....,-- r-- .•...+ww,,.,,..n..- R. "N Y., ... .:... :. -.. •':.. r ., .:.:,...: (. ...
h w... a ., ... ... - . v t ... ... A
r.P,. - -......n,,....
w. -- I I ..-"o %
THIS P1IJ1 WAS PHODDCED FWK
THE BERT AND UO3T COMPLETE i
D AWWINGG A "'.11. AhLZ AT THE
TI R OF Mw'. ..._... r.J
July 16, 1993
I
a
1.05 WARRANTY
A. Warrant to Wal -Mart that materials, equipment. except Owner- furnished equipment, and workmanship
provided under this Division of the Specifications will be free from defects for a period of one year
from the date of acceptance by Owner for beneficial use by Wal -Mart. Additional equipment
warranty requirements are stated in other sections of the Specifications.
PART PRODUCTS
2.(,1 MATERIALS
A. Products are to be new and free from defects, and are tj be installed by competent specialists for
each subtrade in accordance with the manufacturer's recommendations. Materials or equipment not
meeting these standards, or the acceptance of the Architect/Engineer, maybe rejected by Owner,
and will be replaced at no additional cost to Owner.
PART 3 EXECUTION
3.01 PIP . 3TALLATION
A. Conceal piping in pipe chases, walls, furred spaces, and above ceiling, unless otherwise indicated.
B. Should any condition arise which would cause piping or ductwork to be exposed in finished areas, it
will be called to the Owner's attention immediately, and correction of the condition will be made in
accordance with the Owner's instructions.
C. Frr items to be installed in split face CMU, grind surface of CMU to a smooth finish for tight
Installation. Seal with sealant.
3.02 HANGERS AND SUPPORTS
A. Adequately support pipes throughout the buildings, both horizontal and vertical. Securely attach to
structure overhead by methods approved at job site.
1. For Projects in Seismic Zones 2B, 3 or 4: Provide sway bracing to comply with code seismic
requirements.
B. Hanger Schedule:
SERVICE PIPE SIZE HANGER TYPE GRINNELL NO.
Uninsulated 2" & smaller Split Ring 108 with adjuster
Steel 114
2 -1/2" & larger Clovis 260
Uninsulated 2" & smaller Ring CT 99
Copper
2.1/2" & larger Clovis CT 65
Cast Iron All Clovis 590
Soil Pipe
Insulated Steel 4" & smaller Clevis 260 with shield
Insulated Copper 2" & smaller Clovis CT 65
2 -1/2" & larger Clovis 260 with shield
C. Multiple or Trapeze Hangers: Steel channels with angles or unistrut spacers and hanger rods.
D. Wall Support: Pipe sizes to 3 Inches, cast iron hook.
WM . Lake Elsinore, CA
15050 -2
July 16, 1993
y
E. Wall Support for Pipe Sizes 4 Inches and Over: Welded steel bracket and wrought steel clamp,
adjustable steel yoke and cast iron roll for hot pipe sizes 6 inches and over.
F. Vertical Sunport: Steel riser clamp.
G. Provide copper plated hangers and supports for copper piping or provide sheet plastic tape
wrapping between hanger or support and piping.
H. Equivalent products of B -Line, PDH or Elcen are acceptable substitutes for the Grinnell hangers
specified.
I. Piping support:
1. Support horizontal steel and copper piping as follows:
MAXIMUM SPACING (IN FEET)
pi" I.D. Copper Steel Cast Iron
Up to 1" 8' 8'
1 -1/4" - 3" 10' 10' 10 %0" maximum &
minimum one hanger
at each joint
4" - 8" 15 16
10" - 14" 20'
J. Install hangers to provide minimum 1/2 Inch clear space between finished covering and adjacent wceK.
K. Place a hanger within one toot of each horizontal elbow.
L. Support horizontal soil pipe near each hub, with 10 feet maximum spacing between hangers.
M. Support PVC piping per manufacturer's recommendations.
3.03 ELECTRICAL WIRING OF MOTORS AND EQUIPMENT
A. Except as otherwise specified in Division 15, provide field power and power control wiring under
Division 16.
3.04 EXCAVATION AND BACKFILL
A. Comply with requirements of Division 2 for excavation and backtill.
3.05 ACCESS PANELS AND DOORS
A. Install access panels and doors in accordance with manufacturers instructions.
3.06 TESTS
A. Field test mechanical equipment installed under this Contract as required by Owner. Test in
presence of Wal -Mart Construction Manager.
B . Parform tests required by governing authorities, in addition to tests specified in individual Sections.
C. Complete final installation and testing 14 days prior to Contract Substantial Completion Date.
END OF SECTION
I WM - Lake Elsinore, CA
SECTION 15300
i Uni: 021593
FIRE PROTECTION
PART GENERAL
1.01 SUMMARY
A. Section Includes:
1. Automatic sprinkler systems.
2. Fire protection sprinkler piping work with feed and cross main piping, branch line piping test
valves, test connections and sprinklers. Also include flow indicators, valves, gauges, ;farms, and
drain piping.
B. Related Sections:
1. Section 05210 - Steel Joists: Coordinate fire protection system design with steel joist's
structural capacities to support fire protection pipping.
2. Applicable Division 15 Sections. Refer to other Divisions for coordination of work.
1.02 REFERENCES
A. Factory Mutual System (FM) - Approval Guide.
B . NFPA 13 - Installation of Sprinkler Systems.
C. NFPA 20 - Installation of Centrifugal Fire Pumps.
D. NFPA 231C - Standard for Rack Storage of Materials.
E. ASME Code.
1.03 DEFINITIONS
A. Conform to the following criteria for Interpretation of terms used In this Section.
B . Wal -Mart "Small" Store: Typically under 80,000 sq.ft., without movable shelving system "rolling racks"
i in main stockroom areas. Has mezzanine level in main stockroom.
C. Wal -Mart "Large" Store: Typically over 80,000 sq.ft., with movable shelving system "rolling racks" in
main stockroom areas.
1.04 SYSTEM DESCRIPTION - DESIGN REQUIREMENTS
A. System to provide coverage for building areas as noted in Schedule, as shown on drawings and as
specified herein.
B. Provide system to NFPA 13 ordinary hazard, Group 2 occupancy requirements (Mercantile). NFPA
13, Figure 2 -2.1 will be the standard for water supply demand and sprinkler design densities, for the
retail area densities. NFPA 231 C is the standard for stockroom densities.
C. System design shall be based upon water flow test data shown on project Civil Drawings. Water
flow test data does not include any reductions for backflow preventers. If backflow preventers are
required, use reductions as specified. Minimum water supply is relational to stockroom densities.
Verify water flow test data. If actual water flow is greater than shown on Civil Drawings, then provide
written justification of changes (prior to system design) to Wal -Mart and CIGNA for their approval.
1. Water Supply Requirements(Wal -Mart "Small" Store): The minimum acceptable water supply,
at the base of the riser, for design use is 900 gpm.
a. Standard Design required: If residual pressure is greater than 30 psi, without backflow
preventer. (35 psi with backflow preventer.)
j b. 750 gpm Pump Design required: If residual pressure is 20 -29 psi, without backflow
with backflow (Maximum sprinkler density 0.30 gpnVft.) proventer. (34 psi preventer.)
C. 750 gpm Pump and 75,000 gal. Tank Design required: if residual pressure is less than 20
j psi. (Maximum sprinkler density 0.30 gpm/ft.)
15300 -1
15050
WM - Lake Elsinore, CA July 16, 1993
July 16, 1993 i
i
t. ,. :. .'.,.. . t.: '.• , . .,> ..:.,v i r ..5.: .l+ ...,: -. .... : t :.4 rf v,.. .., 'cS. {. -x .., MiwxK ICAO"+ caM -, f ... . .. <. -..
a . . .. r t ..,v . ,n.r v .. ... c. ,.e ... ... :... .. _ .., .. _.... -.. ;.....f. /1 .:. •._.
THIS FILM WAS PRODUCED 7 ROl1'
THE BEST AND MOST COMPLETE (.
DRAWINGS AVAILABLE AT THE
TI OF FILMIC H
i
C. Joints:
1. Joints fabricated by use of "Push -On" type gasketed joints (above or r.,;:cw ground).
2. "No -Hub" mechanical joints (above ground only).
3. Solvent - welded joints: PVC not used.
2.03 STORM WATER PIPING
A. Storm Water Piping: Cast iron or plastic pipe as specified for sanitary drainage.
2.04 CONDENSATE PIPING
A. Provide condensate piping system if required by code.
B. Condensate trap and condensate piping: Schedule 40 galvanized steel or Schedule 80 PVC,
painted with latex paint. Pipe fittings: Galvanized malleable iron.
C. When condensate piping to sanitary sewer is required by local codes, PVC -DWV o:astic, Schedule
40, NSF Seal CS -272, with solvent welded joints may be used below the roof when local codes
permit.
D. Insulation: Owens - Corning Fiberglas 25 ASJ /SSL. Insulate domestic hot and cold water lines with
rigid glass fiber insulation, with maximum K factor at 75 °F of 0.23, 3 lb/ft density, minimum of 1/2 inch
thick with white all- service jacket (vapor retarder). Insulate fittings with PVC fittl-,.;d covers with glass
fiber inserts.
1. Substitutions: Under provisions of Section 01600 and subject to compliance with requirements,
one of the following manufacturers may be substituted for that specified.
a. Certainteed.
b. Knauf.
c. Manville.
2.05 COMPRESSED AIR PIPING
A. Compressed Air Piping (Above Grade):
1. Type K hard drawn seamless copper water tube, ASTM B88. Joined with wrought copper
pressure fittings, ANSI 918 22. Silver solder or braze joints. Where copper piping is
connected to threaded brass piping use a cast brass adaptor.
2. Galvanized schedule 40 pipe.
2.06 VALVES
A. Valves for Domestic Water Piping Systems: Red and White .Jo 5044 or 5049 or Crane No. 2180 or
2182 , or NIBCO T -580 brass ball valves with plastic jacketed lever type handle.
2.07 FLASHINGS
A. Pipe Flashings: Prov de pipes passing through the roof with preformed neoprene or thermoplastic
pipe (lashings extending at least 12 Inches in all directions beneath the roofing., clamped to the pipe
and made watertight. Extend vent piping 12 inches above roof line, or more if required by Code.
Refer to u: tail on architectural drawings. Coordinate Installation with roof membrane requirements.
2.08 BACKF:.OW PRF_VENTER
A. Backfk,w Prevarter: Series No. 709, by Watts.
1. Double -u.eck valve assembly for backflow prevention in each domestic water service where
required by 1, ;al authority having jurisdiction.
2. Include twe independent -acting check valves, two shut -off valves, and required means for testing
for each as ernbly.
3. W''ere local code rr-quires the use of reduced pressure type backflow preventer, provide
Series No. 909, bit Way .is, bacMlow preventer, with shut -off valves and test cocks or approved
substitute. Install ,.-ain line to approved receptor.
B. Substitutions: Under provisions of Seaton 01600 and subject to compliance with requirements, one
of the following manufacturers may be substituted for that specified.
1. Hersey.
15400.2
WM - Lake Elsinore, CA July 16, 1993
2.15 DRAINS
A. Floor Drains: Model No. ZN- 415 -5B, by Zurn.
1. Coated cast iron bodied drain with bottom outlet, combination membrane clamp and adjustable
Nikaloy strainer.
B. Floor Drains (Auto Pit): Model No. ZN -509, by Zurn.
1. Coated cast iron bodied drain with bottom outlet, combination membrane clamp and adjustable
Nikaloy strainer.
C. Floor Drains (Auto Service): Model No. ZN -534, by Zurn.
1. Coated cast iron bodied drain with bottom outlet combination membrane clamp and adjustable
Nikaloy strainer.
D. Floor Drains (Mechanical Room): Model Z -511, by Zurn.
1. Coated cast iron bodied drain with bottom outlet, combination membrane clamp and cast iron
grate and sediment bucket.
E. Floor Sinks (Snack Bar): Model No. Z- 1960 -2 -33, by Zum.
1. Acid resisting enamelled cast iror. , ;ith loose set, half -grate and dome strainer.
F. Roof Drains: Model No. Z- 100 -E, by Zurn.
1. Insulation: Insulate roof drains and horizontal piping with flexible glass fiber insulation, maximum
K Factor at 75 °F of .26, with factory applied reinforced aluminum foil vapor barrier. Thickness:
1/2 inch minimum.
G. Substitutions: Subject to compliance with requirements, drains (floor, roof, and floor sinks) by one of
the following manufacturers may also be provided:
1. Jay R. Smith.
2. Jonespec.
3. Josam.
4. Wade.
2.16 GREASE INTERCEPTORS
A. Pre -Cast Concrete Grease Traps: Pre -cast concrete in accordance with local requirements. Provide
gas and watertight gasketed non -skid cover. Minimum size is shown on the Drawings; field verify
actual requirements.
I
2.17 HOSE BIBBS
A. Hose Bibbs (Toilets): Model 24P, by Woodford. 1/2" with adjustable packing nut with deep stem
guard, teflon impregnated packing, standard "0" size washer, vacuum breaker- backilow preventer,
loose tee key, and polished chrome finish.
B. Hose Bibbs (TBO): Model 24, by Woodford. All brass, wheel handle, adjustable packingg nut with
deep stem guard, Teflon impregnated packing and standard "O" size washer. Provide with each I
hose bibb a vacuum breaker - bacMlow preventer. Provide Tee Key Operator at Freezer /Cooler
Locations.
PART 3 EXECUTION
3.01 PIPING INSTALLATION
A. Install piping neatly and parallel with, or perpendicular to, lines of the structure. Install pipe hangers
to maintain accurately aligned piping systems, adequately supported both laterally and vertically.
Where practicable, connect two or more vents together and extend as one vent through roof. Make
vent connections to stacks by appropriate use of 45 wyes, long sweep quarter bends, sixth, eighth,
or sixteenth bends, except that sanitary tees may be used on the vertical stacks.
1. Install horizontal sot, waste, and vent pipe with a grade of 1/4 inch per toot where possible and
required by code, and not less than 1/9 inch per toot. jB. Conceal piping in pipe chases, walls, furred spaces and above ceiling in sales area, stockrooms with 11ceilings, vestibules, garden center with ceilings and office areas.
C. Extend condensate drain piping frnm units with condensate discharge. `
15400-4
WM - Lake Elsinore, CA July 16, 1993
1
3.02 PIPING INSULATION - INSTALLATION
A. Domestic hot and cold water lines: Insulate witn specified insulation. Insulate fittings with PVC fitting
covers with glass fiber inserts. Insulate lines above slab, and exposed lines under f andi -cap
lavatories.
B . Insulate drain lines under handi -cap lavatories with same insulation as used for dom ,3st c water lines.
Insulate piping in insulated toilet room walls.
C. Roof Drainage Insulation: Insulate roof drains and piping with specified insulation. Adhere insulation
with 6 inch wide adhesive strips on 16 inch centers. Provide 16 gage annealed tie wire, :spiral wound,
or tied at 16 foot centers for securing Insulation until adhesive sets. Butt insulation and seal joints with
2 inch wide foil tape, adhered over joints. Insulate drain bodies, vertical connections between drains,
and horizontal piping, and all connected horizontal piping.
3.03 PIPE TESTS
A. Test piping before installing equipment and before insulation Is applied, using specified methods
and conditions. Subject piping to test for not less than 24 hours under inspection by Wal -Mart
Construction Manager. Make necessary replacements and repairs and repeat tests until entire
system is accepted as satisfactory. Work includes testing equipment. After installation of equipment,
operate systems, clean out scale, dirt, oil, waste, and foreign matter, and correct additional leaks.
Test underground piping prior to backfilling.
B . Test plumbing drainage systems under 10 foot static head. Test water systems under 150 psig
hydrostatic pressure.
C. Sterilize domestic water system to meet regulatory agency requirements. Flush system thoroughly of
dirt and foreign matter, then fill with water treated with 50 ppm of chlorine. During filling process,
open valves and faucets several times to assure treatment of entire system. Leave treated water in
system for 24 hours after which time system may be flushed: if residual chlorine is not less than 10
ppm, repeat flushing. After sterilization, receive approval by regulatory agency on samples of water
in system.
WM - La!:e Elsinore, CA
END OF SECTION
15400-5
July 16, 1993
i . -. .. ., .. -. ... .. .. . .. ..:, , -,.. , ....... .. .. K...,..,. .: ,, a :. :.,. . , i ,... 1c::, G. a. 6 .i.ee.3o.a.w:..4'4.7u,,.d i. `,.i,6Siriw.dd. ..w.L:«.,;,bVca hv:d, .... .,,..n.+:,_._ ."..,.u."s..o....,. ...•... YL .. _ -. _
THIS FILM WAS PRODUCED FROM
THE HEST AND MOST C011PLETE -
DRAWINGS AVAILABLE AT THE
TINE OF FILHI G"
2. Water Supply Requirements(Wal -Mart "Large" Store): The minimum acceptable water supply,
at the base of the riser, for design use is 1150 gpm.
a. Standard Design required: If residual pressure is greater than 38 psi, without backflow
preventer. (43 psi with backilow preventer.)
b. 1000 gpm Pump Design required: If residual pressure is 20.37 psi, without backflow
preventer. (42 psi with backflow preventer.)
c. 1000 gpm Pump and 100,000 gal. Tank Design required: If residual pressure is less than 20
psi.
3. PSI hown above for backflow preventers must be adjusted it reduced pressure or double
check - detector type are required. (see 2.05.C.)
D. Provide a 5 pound cushion between the supply curve and the demand point, including the 250 gpm
hose stream allowance.
E. Local authorities having jurisdiction may require the following areas to be sprinklered: Truck Dock
Canopies, Wastepaper areas, Open Canopies at front and sides of building, Garden Center
Canopies, and Trash Compactor Chute. Be responsible for verifying sprinkler requirements and
providing protection for these areas as required by local authorities. If sprinkler system in these
areas is subject to freezing, then use anti - freeze loop.
1.05 SUBMITTALS
A. Submit the following under provisions of Section 01300,
1. To ensure proper and time)y approval of submittals, it is imperative that submittals be
complete, accurate and in full compliance with specifications.
2. No extension of time will be allowed due to submittal approval delays due to rejected
submittals. If submittal is rejected, revise and submit until approved.
B. Submittal Rejection: If submittal is rejected by CIGNA for any reason listed below, Wal -Mart
Stores, Inc., will back - charge the Contractor $200.00 (Two Hundred Dollars) via Change Order, to
cover the processing costs of each subsequent review, until submittal is approved.
C. Submittal shall include, but is not limited to, fire protection system design, product data, shop
drawings, hydraulic calculations, and additional data as may be required by local authorities having
jurisdiction. CIGNA will reject submittals for the following reasons:
1. Hydraulics: Input errors, incorrect remote areas, shop drawings do not match calculations, etc.
2. Design Problems: Incorrect densities and design areas. Wrong equipment, wrong area per
head, hose station missing, incomplete system design, etc.
3. Wrong Water Test: Did not use Wal -mart water test found on project Civil Drawings. No other
water test data is permitted for system design submittals.
4. Backflow Preventors: Devices Incorrectly located on the suction side of pumps. Improper
friction loss used in calculations. Device Installed in the vertical position.
5. Pump Details: Make, model number unknown. Piping and valve arrangement not defined.
product data not submitted. Electrical details missing.
6. Pump Electrical: Safety shut -off not shown in power feed to pump controller.
7. Incorrect Pi e: Unapproved pipe pproducts being proposed. Submit pipe as specified.
8. Incomplete Caloulatlons: Submit carulatlons for all areas sppecified and shown on drawings.
9. Incorrect Valves: Do not propose OS &Y valves when PIV's are specified.
10. Incorrect Sprinkler Heads: Unapproved sprinkler heads being proposed as substitutions.
Submit sprinkler heads only as specified.
11. Substitute products which are proposed, but not specified, will be cause for rejection and
200.00 penalty, described above, will be Imposed until submittals are approved by CIGNA.
D. Send submittals to governing authorities and CIGNA within 15 days after award of contract. Expect
30 day tum- around on submniitttals returned from CIGNA.
1
authorities having jurisdiction. Sulbmit additional
two
0 equi ed. submittals to governing
2. Submittals to CIGNA: Submit five copies of shop drawings (folded, not rolled), one copy of
hydraulic calculations, one copy of product data cut sheets, and one copy of fire pump motor
control electrical diagrams. Send CIGNA submittals to: ) .
Ms. Yuvonne Moore
CIGNA Loss Control Services
8755 W. Higgins Road
Chicago, IL 60631
312)380-8281
Telephone calls may also be directed to Ms. Yuvonne Moore.
i
15300-2
WM - Lake Elsinore, CA July 16,1993
3
3. Submittals to Wal -Mart: After receiving approval from the governing authorities and CIGNA,
forward two (CIGNA stamped and approved) copies of the submittal to Wal -Mart Construction
Department, before Fire Protection Work begins.
E. Certificates: Submit a certificate upon completion of the fire protection sprinkler piping system
stating that the work has been completed and tested in accordance with NFPA 13, that there are no
defects in the system, and that it is operational. Sprinkler test procedures and certificate format will
be as Indicated in NFPA 13, unless otherwise directed by the governing authorities.
1.06 QUALITY ASSURANCE
A. Sprinkler Systems: Perform work in accordance with NFPA 13 and NFPA 231C and other applicable
NFPA standards.
B Welding Materials and Procedures: Perform in accordance with ASME Code.
C. Equipment and Components: UL listed/FM approved with appropriate labels or markings.
D. Regulatory Requirements (Governing Authorities):
1. Comply with applicable state and local codes, and with the requirements of other authorities
having jurisdiction. Confnnn to "class 4 commodity" for all classifications of occupancy, area
coverage, rating of heads, and maximum number of heads served by each branch line and riser.
2. Once General Contractor has been awarded Contract for Construction, the sprinkler submittals
must be made to the governing authorities within number of days specified under Submittals.
Governing authorities may not issue full building permits until sprinkler submittals have been
submitted and approved.
3. If required, provide a Fire Department lock -box, in size, type and location as directed by local
authorities having jurisdiction.
1.07 MAINTENANCE
A. Extra Materials: For each style and temperature range required, furnish an additional two sprinkler
heads for every 100 installed units, but not less than six units of each type.
B . Emergency Head Storage Cabinet: Provide red, baked enamel, steel sprinkler cabinet to store the
extra sprinklers and wrenches, as required by NFPA 13.
PART2 PRODUCTS
2.01 MATERIALS
A. Provide materials complying with NFPA 13, "Standard for the Installation of Sprinkler Systems ". Size
drain piping as shown, or if not shown, as required to drain the sprinkler system piping properly.
2.02 SPRINKLER PIPING
A. Underground Pipe: Class 150, UL listed, cement -lined centrifugally cast -iron iping for use in water
distribution systems (AWWA C151), manufactured in accordance with ANSI A21.51, and fittings
manufactured in accordance with ANSI 21. 10. B16.1, or B16.4. Join piping with mechanical joints.
1. Provide underground sprinkler lead -in from the public mains with minimum 8 inch diameter pipe.
B. Above Grade Pipe - Indoors:
1. Pipe Sizes 6 Inches and Smaller:
a. Pipe: Schedule 40 ASTM A -120 black steel.
b. Fittings: Class 150 malleable iron or Class 125 cast iron, threaded, ANSI 816.3 or 816.4,
or mechanical grooved pipe couplings and fittings, cut groove type.
2. Pipe Sizes 8 Inches and Larger:
a. Pipe: Schedule 30, ASTM Al 20 black steel.
b . Fittings: Class 150 malleable iron, Class 125 cast iron, or forged steel, threaded, ANSI
816.3 or 816.4., or mechanical grooved pipe couplings and fittings, cut groove type.
3. Options (When permitted by code): Schedule 10 pipe may be used on overhead sprinkler
piping for pipe 5 inches and smaller, 6 inches with 0.134" minimum wall thickness, and 8 inches
and larger with 0.188" minimum wall thickness.
a. Join pipe by UL listed mechanical grooved pipe couplings and fittings, roll groove or
mechanical locking type.
15300 -3
WM - Lake Elsinore, CA July 16, 1993
fv'y:a..ry+ ,:,iN. Na \Y!!.t•Y \ k:. tifriVYe2F:,ht- uu: /.Nu b..+,i.; +iN f.4tw«•..y,9 f!Aw` .'... .. - t F .. ••d.i ...i!'K'- Y1. "v'jivfeY sk.:;KY :Hf:.. ... r+4 Y XM,.+ a w(D MrA iGNR}'A Nrv- ,sef.V.NII.MFtl!4Ua. n[nA +NN?.,lrtX.:.aGw+ 1 :C?•C:: ..,... K::: ti w. .- ,....:1.%...w.i.1.i... -... = :J.'i
qy eac...,p....y, ..spy: ..1/n,.. - ...i:- ."•"...r -.
TEIS FILM WAS PDODUCBD 711"
M BEST AND MOST COl('LBTB aa,,x;
DRAWINGS AVAILABLE AT TEE Sa
TI O8 FILUIIxti,,
f
4. Globe Fire Sprinkler Corp.
5. Reliable Fire Equipment Co.
6. Star Sprinkler Corp.
7. The Viking Corp.
2.05 VALVES
A. Provide valves where shown on the Drawings and elsewhere as specified or required lo comply with
NFPA Standards and requirements of governing authorities. Provide backflow prevention devices,
check valves, and drains where required by state or local codes. Main control valves for risers shall
be thru -wall post indicator valves.
1. Wall post indicator valves are required for all ceiling and in -rack system risers.
B. Relief Valves: Gridded sprinkler systems shall be provided with a relief valve not less than 1/4 inch
size set to operate at pressure not greater than 175 psi.
C. Backlow Preventer: Provide only if required by local authorities having jurisdiction.
1. 6 inch Connections:
a. If local authority requires a double check type, use: Model N2000SS, double check type,
by Ames. (Friction loss: 4.3 psi.)
b . If local authority requires a double detector check type, use: Model N3000SS, double
detector check type, by Ames. (Friction loss: 4.3 psi.)
a If local authority requires a reduced pressure type, use: Model M4000SS, reduced
pressure type, by Ames. (Friction loss: 8.8 psi.)
2. 8 inch Connections:
a. If local authority requires a double check type, use: Model #805YD, double check type, by
Febco. (Friction loss: 5.0 psi.)
b . If local authority requires a double detector check type, use: Model NDDCII, double
detector check type, by Hersey. ( Fricion loss: 8.0 psi.)
a If local authority requires a reduced pressure type, use: Model N825YD, reduced pressure
type, by Febco. (Friction loss: 10.6 psi.)
3. Friction losses shown above must be used in calculations. If other UL listed/FM approved
davices are chosen, friction joss deductions are to be obtained from the FM approval guide and
not the manufacturer's literature.
2.06 ACCESSORIES
A. Water Motor Alarm Gong: Provide 8 inch diameter water - operated alarm gong on exterior of
building adjacent to sprinkler system riser. No electric alarm gong shall be accepted.
1. Alarm Check Valve: Provide a single alarm check valve supplying manifold risers, or one on each
riser.
B . Water Flow Detectors: Equip sprinkler system riser with a vane type flow detector, Model No.
VSR -D, by Potter Electric Signal of St. Louis, Missouri, or Model No. 20- E -12 -2, by Notifier
Company of Lincoln, Nebraska. Set adjustable delayed signal at 30 seconds. The vane -type flow
detector shall be for exclusive use of Wal -Mart, Inc. Additional flow detectors will be required if other
individuals, government agencies, or companies Intend to utilize water flow detection information.
C. Control Valve Supervisory Switches: cM approved, equipped with tamper switches, Model No.
OSYS -B manufactured by Potter Efectrlo Signal of St. Louis, Missouri or acceptable substitute.
1. Post indicator valves shall be equipped with tamper switches, Model No. PIVS -B manufactured
by Potter Electric Signal of St. Louis, Missouri.
D. Fire Department Connections: Provide Fire Department connections in accordance with NFPA 13.
E. Hangers and Supports: Provide hangers and supports as roquired by NFPA 13 and by governing
authorities and UL listed. Attach piping to structural joists with support clips at edge of joist angles.
Attach piping over 2 -1/2 inches diameter at structural joist panel points only.
F. Wire Cage Sprinkler Head Guards: Fig. 6160, by Potter - Roemer or acceptable substitute.
1. Provide sprinkler head guards on sprinkler pendents that are located below 8 feet above
finished floor.
2. Provide sprinkler head guards on all sprinkler heads in Automotive (TBO) areas.
3. Paint sprinkler head guards "white" in Offices and Restrooms; "red" at other locations.
WIIIII&I
1 WM - Lake Elsinore, CA July 16, 1993
14".nJ_'. %-,.: >i$Ys. csFtz:,;` '„(ter.;au l D`34a:?%"> '-.; . - ........ «..a .. - ».. w ..w., .ih..i,1..,....
J
3
4y
SECTION 15455 SECTION 15490
SECTION 15440 WM: 060293 WM: 060293
M:
SECTION
WATER HEATERS NATURAL GAS SYSTEMS
PLUMBING FIXTURES
a
j
i
i
PART1 GENERAL
PART1 GENERAL PART1 GENERAL
1.01 SUMMARY
1.01 SUMMARY 1.01 SUMMARY
A. Section Includes:
A. Section Includes: A. Section Includes:
1. Plumbing fixtures and trim.
1. Domestic water heaters. 1. Natural gas piping systems, piping, valves and regulators.
B. Related Sections:
B. Related Sections: Comply with other Division 15 Sections, as applicable. Refer to other Divisions B. Related Sections:
1. Other Division 15 Sections. D
for coordination of work. 1. Dection 09900 - Painting: Paint types and touch -up.
2. Refer other Divisions for coordination of work.
2. Division 15 Sections: Comply with Division 15 Sections, as applicable.
1.02 SUBMITTALS
1.02 SUBMITTALS A. Submit under provisions of Section 01300. PART 2 PRODUCTS
A. Submit under provisions of Section 01300. 1.03 WARRANTY 01 NATURAL GAS PIPING (ABOVE GRADE)
PART 2 PRODUCTS
A. Provide for each heater a written unconditional one -year warranty, and a written three -year warranty A. Piping: Black steel, standard weight, schedule 40 ASTM A120. Installation shall conform to NFPA 54,
against tank failure due to rust, corrosion, or electrolytic action. and applicable lv,4 codes.
2.01 FITTINGS AND PIPING B. Piping (2 -1/2 inches and larger): Welded, with butt- welding fittings.
A. Provide brass fittings and piping in connection with plumbing fixtures; polished chrome - plated where
PART2 PRODUCTS
C. Piping (2 inches and smaller): Yielded or threaded with malleable iron fittings. exposed to view. 2.01 ELECTRIC WATER HEATERS
B. Provide tight -tittin wall or floor escutcheons of chrome -plated brass wherever pipes ass throughppppg
floors, A. Glass -lined electric storage -type water heater of size and capacity indicated on Drawings. Provide inBudd
2.02 GAS VALVES
walls, or cetlings, each location indicated on Drawings. Approved manufacturers are A.O. Smith, State, and A. Valves (2 inches dnd smaller): Model No. 559b, by McDonald, or acceptable subsitute. 175 PSI
C. Provide required water, waste, soil, and vent connections to plumbing fixtures and equipment, q p g
Rheem.
1. Heating elements will be suitable for efectrbaf current having characteristics indicated on
black iron boot. flat head cock, with brass plug.
together with fittings, supports, fastening devices, cocks, valves and traps, leaving all incomplete Drawings, and to be complete with necessary operating and safety controls. B. Valves (2 -1/2 inches and larger): 175 PSI WOG, semi - steel, lubrk;ated, wrench operated, flange
working order. 2. Each tank to be equipped with magnesium anodes for corrosion protection.
3. Each heater to be UL listed and labeled and meet efficiency requirements of ASHRAE 90A -80.
ends, manufactured by Nordstrom No. 143 or acceptable substitute.
2.02 FIXTURES
a. Water heater must be CalNomia Energy Commission certified for projects in the State of C . Maintenance? Furnish Owner two wrenches.
A. Subject to compliance with requirements, provide plumbing fixtures of one of the followingIPqPP99
California.
4. Relief Valves: Provide temperature and pressure relief valves, ASME and /or AGA stamped, 2.03 GAS SERVICE REGULATORS
manufacturers:
1. American Standard. of the sizes and types required to meet the ASME and/or AGA Code for discharge capacity.
2. Briggs.
A. Gas Pressure Regulators: Provide commercial style gas pressure regulators by Fisher, Rockwell or
3. Crane. Maxitrol, as called for on the working Drawings.
4. PART 3 EXECUTION
K5. KohlKohler.
2.04 FINISHING
3.01 INSTALLATION
B . Provide new plumbing fixtures, first quality, free from mars or chips. Sufficient means to support A. Install to requirements of governing authorities, and the recommendations of the equipment
A. Paint gas piping before installation. See Section 09900 for paint type and for touch -up on the job
site.
each fixture in an adequate and rigid manner which permits no perceptible movement of fixture by manufacturer.
manually applied forces. The space between fixtures and floor or walls to be sealed wh silicone
sealant.
B. Should recommendations of manufacturer of any equipment not be available prior to time of PART 3 EXECUTION
C. Each fixture shall be complete with required trim, and exposed piping and trim shall be polished installation, contact the manufacturer dirbcty and obtain necessary recommendations in writing.
3.01 INSTALLATION
chrome - plated brass. Each fixture shall be furnished with stop valves having metal -to -metal seats. END OF SECTION
D. Provide for each sink a flow -Iimiti device which will limit flow to not more than 3n9 gpm. Devices shall
A. Mechanical Contractor to extend gas piping to gas appliances and install shut -off, valve, dirt leg, and
union at each appliance.
be integral with fixture trim, wherever possible, and shall be products of the fixture trim manufacturer iinallcases.
I
E. Provide for each lavatory a flow - limiting device which will limit flow to not more than 5 gpm. Devices ishallbeintegralwithfixturetrim, wherever p7, , ible, and shall be products of the fixture trim
manufacturer in all cases.
F. Provide flush valves and compatible plumbing fixtures as scheduled, to not exceed code
requirements for maximum gallons per flush.
G . Provide plumbing fixtures as scheduled on Drawings.
15455.1 15490 -1
15440 -1
WM -Lake Elsinore, CA July 16, 1993
WM - Lake Elsinore, CA July 16, 1993 WM - Lake Elsinore, CA July 16, 1993
n..,f .. .:..... .,.- ... .. ... ._ . .: .: -. ,- .,... . -... `+"Mi^ . +IV. n3!+{'IMr!'r.+ >!.:u- .*.•)R!..y M' , `.a,.•1N. .q,,{.r ..
c........... ......., n ..... _. a .,....< .. _
n ;:tiwva.': F. -:f:: t:. >: .. r 1... "i r..:. .. a. . ....'' a ..'.':,. \'. .. .v:,w <... . ... .• .(. .. .. [. 1... ... <er:l+..a Y.t -.. .nt....a..... If. .. .... .. 1.. .. .wM[. a .. • ..
mw__ -.yv-. -a+ trig ' .... .
S
THIS FILM WAS PNOD110ED FROM
THE BEST AND HIM (X)MPLSTS ;
DRAWINGS AVAILABLE AT THE
TIF OF FILMING
i. ..: iiiim., 6V§ e, u1. aN. UAb1;!? dfnLSea ,4'4(iiJiiM4L,Y,illarl -" ` : xetrmsr r.., Aw. te. nu.. m« ss. w•+ wor w.. rram. a ....wvr::.-a..s=- .:_1.::, a..
f
b. Wrought steel butt welded fittings with welded joints may also be used.
Neither cut grooves nor threaded couplings are permitted.
C. Fittings: UL listed /FM approved: ASTM A135, electric- resistance welded steel pipe. Segmented
elbows are not acceptable and shall not be used.
1. Option: UL listed/FM approved couplings and fittings, per NFPA, by one of the following
manufacturers.
a. "FIT" (Fast installation Technique), by Victaulic Co.
b. 1/4 turn cam -lock plain end fittings, by Grinnell.
a "Pressfit" system, by Victaulic Co.
d. Substitutions: Other "FIT' type, 1/4 turn, cam -lock plain end fittings, bearing UL listed/FM
approved markings, will be considered for approval.
D. Thinwall Pipe Option: Subject to compliance with requirements, thinwall pipe of one of the following
manufacturers may be used on overhead sprinkler piping provided the following conditions are met.
1. Manufacturers:
a. Allied Superflow & XL.
b. Bullmoose /Eddylite.
a Century Tube I.S.
d. Dyna Flow, by American Tube Co., Inc.
2. Thinwall pipe must meet the following conditions:
a. Minimum Pipe Size 1 inch: maximum pipe size 3 inches.
b. Threads: Shop cut according to applicable ANSI standards.
a Pipe Fittings: Specftir:ally rated for use with thinwall pipe.
d. UL listed and FM approved.
3. Substitutions: Manufacturer's products which are UL listed and FM approved, subject to
compliance with specified requirements.
E. Make reductions in pipe sizes with one -piece reducing fittings. Bushings not acceptable, except that
when one-piece reducing fittings of proper size are not obtainable, single bushings of the face type
will be permitted up to 5 /o of total number of reducing fittings in the system. Where face bushings
are used, install with outer face flush with the face of fitting opening being reduced.
F. Couplings are not to be used except where length of pipe between fittings exceeds 20 feet.
G. Use flanged fittings in the control valve and drain assembly at base of risers and in risers of multiple
story sprinkler systems at each floor system connection. Where part of a sprinkler system is on the
opposite side of a wall or partition, a flanged connection may be used.
H. Use ground joint malleable iron unions in looped sprinkler systems where pipe is 2 inches in
diameter or smaller. Where loops larger than 2 inches are used, install companion flanges.
2.03 PIPING PRODUCTS
A. Provide factory- fabricated fire protection sprinkler piping products of the sizes and types indicated.
Where not indicated, provide products to comply with installation requirements and with NFPA 13.
Provide sizes and types to match piping and equipment connections.
2.04 SPRINKLER HEADS
A. Manufacturer: Gem Sprinkler Co., a Division of Grinnell Corp.
B. Sprinkler Heads: Standard UL listed/FM approved, soldered -link, automatic sprinklers, with 1/2" or
17/32" orifice.
1. Unoccupied Utility Areas: Duraspeed, bronze, by Gem.
2. Occupied Areas: Duraspeed, chrome, with two -piece white enamel escutcheon plate, deflector
type SSP -1, by Gem.
3. Glass Bulb type sprinkler heads, by Star Sprinkler Corp., Globe Fire Sprinkler Corp., or The
Viking Corp. are permitted as acceptable substitutes for all areas except "in -rack" sprinkler
locations.
C. Substitutions: Subject to compliance with requirements, UL listed /FM approved, one of the
following manufacturer's may be substituted for that specified above.
t. Ascoa.
2. Central Sprinkler Corp.
3. Firematic Sprinkler Devices, Inc.
15300-4
2.07 SLEEVES AND ESCUTCHEONS
A. Sleeves through structural concrete members and sleeves for walls below grade and floors on grade
shall be standard weight galvanized Schedule 40 steel pipe. Sleeves through other than structural
components of the building shall be 20 gage galvanized sheet metal with lock seam joints. Top of
sleeve shall be two inches above floor minimum. USG Thermatiber sating insulation shall be
installed between sleeve and pipe.
B. Escutcheon plates to be installed where exposed piping passes through walls, ceilings, and floors of
building shall be minimum 20 gage steel, chrome plated. Exposed hanger rods in finished spaces
with ceiling shall have escutcheon set screw. Split type escutcheon plates are not acceptable.
2.08 FIRE PUMP
A. Fire Pump not allowed.
PART 3 EXECUTION
3.01 PREPARATION
A. Underground Feed Main: Verify that main feed from water supply source to building is as specified.
B. Coordinate work of this Section with other affected work.
3.02 INSTALLATION
A. Install fire protection system in accordance with the requirements of NFPA 13 - Standard for the
installation of Sprinkler Systems. Install sprinkler piping products in accordance with recognized
industry practices to ensure that fire protection sprinkler piping complies with governing requirements
and serves the intended purposes.
B . Examine other work shown on the Drawings and conditions at the job site. Coordinate the routing of
work with other construction trades to avoid interference with other installations. Do not cut building
structural members, beams, joists, etc. for routing of sprinkler piping. In the event of conflicts, the
Wal -Mart representative shall be consulted, and his decision shall govern.
C. Pipe routing and sprinkler head :)cations shall be located as required to avoid building structure,
equipment, plumbing piping, heating and air conditioning piping, duct work, lighting fixtures, electrical
conduits and bus ducts, and similar work.
1. Final location of lighting will have priority.
2. Route piping in stockroom between wood joists or through steel joists.
3. Minimum height of sprinkler piping in sales area floor shall be 15' -0" AFF.
4. Mezzanines: Maintain spdnk:er piping minimum of T -6" AFF under mezzanines.
D. Piping drops below beams are not allowed.
E. Provide pipe offsets as required to complete the installation. Modify shop prefabricated piping,
pipe hangers, and other components as required to fit the job site conditions.
F. Shop drill and weld weld -o -lets on piping.
G. Ardi- freeze loops: Install, concealed, above ceilings.
H. Conceal piping in pipe chases, walls, furred spaces and above ceiling in areas with dropped ceilings.
I. Test Valves: Install test valves as close to eye -level as is practical.
3.03 PROTECTION OF WORK
A. This Contractor shall protect his work at all times from danger by freezing, breakage, dirt, foreign
materials, etc., and shall replace all work so damaged. This Contractor shall use every precaution to
protect the work of others, and will be held responsible for all damage to other work caused by his
work or through the neglect of his workmen.
15300-6
3.04 IDENTIFICATION
A. Apply signs to controls, and drain, test and alarm valves to identify their purposes and functions.
Provide lettering sizes and styles selected by the Wal -Mart Construction Manager from NFPA's
suggested styles. Provide hydraulic placard for each sprinkler system in accordance with NFPA 13.
3.05 CLEANING AND FLUSHING
A. Prior to connecting sprinkler piping for flushing, flush water feed mains, lead -in connections and control
portions of sprinkler piping. After fire sprinkler piping installation has been completed, and before
piping is placed in service, flush entire sprinkler system under pressure, as required to remove
foreign substances as required by NFPA 13. Continue flushing until water is clear, and check to
ensure that debris has not clogged sprinklers.
3.06 TESTING
A. Notify CIGNA Loss Control Services at (312)380 -8281 two weeks prior to any fire pump acceptance
test so a representative may witness the testing.
B . After flushing system, test fire sprinkler piping hydrostatically in accordance with NFPA 13, at not less
than 200 psig, or at 50 psig in excess of normal operating pressure when normal operating pressure
is in excess of 150 psig. Check system for leakage at joints. Measure hydrostatic pressure at low
point of each system or zone being tested. Send completed copy of the material and test certificate
to CIGNA Loss Control Services, 8755 W. Higgins Road, Chicago, IL, 60631.
C. Repair or replace pipinq system as required to eliminate leakage accordance with NFPA Standardsfor "little or no leakage' , and retest as specified to demonstrate compliance.
3.07 SCHEDULE
i
A. Retail Areas (general):
1. Density: 0.19 gpnUsq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 16 oF.
3. Spacing: 130 sq.ft. per head, (maximum).
B. Vestibule:
1. Density: 0.19 gpm/sq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 165 "F.
3. Sprinkler system in this area must be protected from freezing. If anti - freeze loop is used,
conceal above ceiling.
C. Tire Display Racks (in general retail area): Coverage over tire display area and 20 ft. beyond in all
directions.
1. Density: 0.60 gpm/sq. ft. over display area, with a 250 gpm outside hose stream allowance.
j 2. Sprinkler Heads: 2861F.
3. Spacing: 100 sq.ft. per head, (maximum).
D. Above Ceiling Panels in building with Wood Structure:
1. Density: 0.19 gpm/sq. ft. over 2000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 165 °F.
3. Spacing: 130 sq.ft. per head, (maximum).
E. Enclosed Lawn and Garden Center(Enclosed Seasonal):
1. Density: 0.19 gprNsq. ft. over ,,000 square feet, with a 250 gpm outside hose stream allowance.
2. Sprinkler Heads: 165 °F.
3. Spacing: 130 sq.ft. per head, (maximum).
F. Non - Enclosed Garden Center (If required by local authorities):
1. Density: 0.19 gpm/sq. ft. over 2000 square feet, with a 250 gam outside hose stream allowance.
2. Sprinkler Heads: 165 °F.
3. Protect sprinkler system in this area from freezing with anti- freeze bop.
I
I
15300.7
i
e
WM - Lake Elsnore, CA July 16, 1993 j WM - Lake Elsinore, CA July 16, 1993 r
WM - Lake Elsinore, CA July 16, 1993 j
r...._.._._.... - __.___..._.... -. _ _.
y 1
w
y. .
y .: v,.a ry.- w_..ur •n w v. a.i ..'.N: tip_ u.'.u...nx .,, i -3- \_... t r r.:::. : '. ,,.. .,,.. - ,: ,: - , , , a.. 141:aJ.i•4A:iV.::Yl
7j, ''
u.•„wi... IfYllfh rL .:cs -. -` ia.r7{
rj:
r N. r ... .... r.r... .t. ,+ w-t. ,.a ...,. a ::.. ... .. ..r. r ., - .:.
a- r:!r },Ni7;h.•''', >: r.t.:..,_ <F. '.a...'u.(.,.. .,. a..rc x..ti. .<. xo:. v.,,. . -..,e, r.. i. ,...,. n.._n .. .ri, .. _ . .r...,w. .... .r.:+i. .L. -,.. .v.".5- a.tw,... ...it" - -. ter__. .. -._... ..r _A.J..ilIa1`:t,114.ISVA.0, sue: ..rwrr .-
THIS FILM WAS PRODUCED FH(!Y
THE BEST AND MOST COMPLrm +'
DRAWINGS AVAILABLB AT TH8 7
TI OF FILMING
1
f,