F. Open cut excavation with trenching machine or bac khos. Where machines other than ladder or 3.05 COMPACTION
12. C 110 Physical Testing for Quicklime and Hydrated Lime, Wet Sieve Method
13. C 618 Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral
wheel -type trenching machines are used, do not use clods for bacMlll. Dispose of unsuitable
material and provide other suitable material at no additional cost to Owner. A. Exercise proper caution when compacting immediately over top of pipes or conduits. Water
jetting or flooding is not permitted as method of compaction. Admixture in Portland Cement Concrete
14. C 917 Quicklime and Hydrated Lime for Soil Stabilization
Transportation Officials (AASHTO) latest edition
G. Accurateiy grade trench bottom to provide uniform bearing and support for each section of pipe
on bedding material at every point along entire length, except where necessary to excavate for
connections. Dig bell holes and
B . Maintain optimum moisture content of fill materials to attain required compaction density.
B. American Association of State Highway and
T 88 Mechanical Analysis of Soils
bell holes, proper sealing of pipe joints, or other required
depressions for joints after trench bottom has been graded. Dig no deeper, longer, or wider C. An independent testing laboratory shall perform test at Intervals not exceeding 200' -0" of trench
for the first and every other eight-inch (8') lift to compacted trench backffll and fumish copies of
1.04 QUALITY ASSURANCE
than needed to make joint connection property. test results as specified. Compact to minimum density of 95% of optimum density in accordance
with ASTM D 698 (or 92% of optimum density in accordance with ASTM D1557). H. Trench width requirements below the top of the pipe shall not be less than 12" nor more than 18"
A. Independent testing laboratory selected and paid by owner, shdll be retained to perform
construction testing on bacldilling operations as specified In Section 02200 and as stated herein.
wider than outside surface of any pipe or conduit that is not to be installed to designated
elevations and grades. All other trench width requirements for pipe, conduit, or cable shall be
least practical width that will allow for proper compaction of trench backfill.
D. All materials used for back ill shall be tested In with Section 02200.
1.05 SUBMITTALS
3.06 BORINGS AND CASINGS UNDER ROADS, HIGHWAYS AND RAILROAD CROSSINGS
A. Shop rawings or details pertaining to Site Utilities are not required unless use of material,. p pe n9 equ
contrary to Drawings or these specifications are proposed.
I. Trench depth requirements measured from finished grade or paved surface shall meet the
following requirements or applicable codes and ordinances:
i. Water Mains: 30" to top of barrel or 6' below the frost line (established by (he local
A. by Drawings pectifk tions, make certain street, road, highway, or railroadWhenindicatedDrawsands
crossings for utility mains by jacking and boring method, and Install utility pipe In accordance withmethods, equipment, or procedures
Do rat perform work until required shop drawings have been accepted by Owner.
pipe
building official), whichever is deeper. B
AREA specifications.
Excavation of approach pits and trenches within right- of-way of street,road, highway, or railroad
B . The Contractor shall ootttact all trttl companies and determine H additional easements will be
required to complete the project. C ontr roroshallprovidewrittenconfirmationofthestatusof ;Ili
2. Sanitary Sewer. Elevations, and grades as indicated on Drawings.
3. Storm Sewer. Depths, elevations, and grades as shown on Drawings.
4. Electrical Conduits:
Dap s,
minimum to top of conduit or as required
in
NEC 300 -5, NEC
shall be of sufficient distance from paving or railroad tracks to permit traffic to pass without
interference. Tamp bacldill for approach pits and trenches within right- of -way in layers not greater
than 6" thick for entiro length and depth of trench or pit. Compact baddill to 9596 of maximum
easements to the Wal -Mart Construction Manager at the time of the preconstruction conference or
no later than 90 dare prior to the project possession date.
710 -36 codes, or the local utility company requirements, whichever s deeper.
5. TV Conduits: 18" minimum to top of conduit or as required by the local utility company, density obtained at optimum moisture as determined by AASHO T 180 -57, Method A.
whichever Is deeper. Mechanical tampers may be used after cover of 6" has been obtained over top of barrel of
C. d InSubmitasampleofeachtypeofottsttetillmaterialthatIstobeusedIn baddlllirq in an air tight,
o the aggregate
6. Telephone Conduits: 18" minimum to top of conduit, or as required by the local utility pipe.
10 tic container for the testing laboratory or submit a gradation and certification
that is to be used to the testing laboratory for review.
company, whichever is deeper.
7. Gas Mains and Service: 30" minimum to top of pipe, or as required by the local utility C. Accomplish boring operation usin commercial t burin and bored hole to propermPnpPeqtypeqrig
material
RECORD DOCUMENTS
company, whichever is deeper.
alignment and grade and within 2 of same diameter as largest outside joint diameter of pipe
installed. install pipe in hole immediately after bore has been made, and in no instance shall hole
1.06 PROJECT
J. Provide sheeting and bred when necessary, in trenches and other excavations where
be left open while unattended.
A. Accurately record actual locations of a/ subsurface utilities, structures and obstructions protection of workmen required. Sheeting may be removed after sufficient bacidilling to protect D. In event subsurface operations result in failure or damage to pavement within one year of
encountered. against damaging or injurious caving. construction, Contractor to make necessary re alts to pavement at no additional cost to Owner.
In event paving cracks on either side of pipe line or is otherwise disturbed or broken due to
PART 2 PRODUCTS
3.03 PIPE BEDDING construction operations, repair or replace disturbed or broken area without further compensation.
201 MATERIALS
A. Accurately cut trenches for pipe
bottom
conduit
of pipe
is installed to designated elevations and grades to
line orb grade from 4' below bottom of pipe and to width as specified. Place 4" of bedding E. haftCleanandrimeinteriorandexteriorofcastiandlinewithtwocoatsofashaft inPcasingpipe; asp
material, compact in bottom of trench, and accurately shape to conform to lower portion of pipe accordance with AREA specifications.
Beddi Material: Processed sand and ravel free from clay lumps, organic, or other deleteriousngg
and complying with following gradation requirements:
barrel. After pipe installation, place select bacidill and compact in maximum 6" layers measured
loose the top of the trench.
F. Butt weld steel casing. Welds shall be lull penetration single butt welds in accordance with
material, AWWA C- 205 and AWS D7 -0.82.
Sieve Size Percent Passing (by weiohtl B. Place geotextile fabric as specified on the plans and specifications. G. Install casing and utility pipe with end seals, vent pipe, and in accordance with other special
1 Inch 100
3/4 Inch 90.100 3.04 BACKFILLING requirements of AREA specifications and governing authorities.
318 Inch 2D.0
No. 4 0.10 A. Ciiteria: Trenches shall not be bacidilled until required tests are perfom id and the utility 3.07 ROCK EXCAVATION See Section 02229 Rock Removal
No. 8 0.5 systems comply with and are accepted by le governing authu(.jes. Back ill trenches as
bacidf reopen depth required obtain proper
B. Back ill material from site as specified in Section 02200 and approved by the owner or owner's
specffied, If improperly
I manner. Bacidill and compact, as specified, to properly correct condition in an acceptable manner. ed,
END OF SECTION
representative.
B . Baddilling: After pipe or conduit has been installed, bedded, and tested as specified, back ill
I
C. Back ill material from off site as specified in Section 0220u and approved by the owner or owner's trench or structure excavation with specified material placed in 8" maximum loose lifts.
representative.
C. Baddill trenches to the contours and elevations shown on the plans with untroz,n materials.
D. Steel Casing, Pipe: CompN with AWWA C -201 or C -202, minimum grade B, size and Nail
thickness as indicated on ODrawings. D. Systematically bacldill to allow maximum time for natural settlement. Do not bacldill over porous,
wet, frozen or spongy subgrads surfaces.
02222-4
02222-5
02222-2
April B. 1993
April 8 1993
w
THIS FILM WAS PRODUCED FROM
THE BEST AND POST COMPLETE ;
DRAWINGS AVAILABLE AT THE
s
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TI E OF FIi.iIING. -,
2. After drainage of low area is complete, remove mulch, mud, debris, and other unsuitable
G. Material imported from off -site shall have a CBR (California Bearing Ratio) or LBR (Umerock
Bearing Ratio) value equal to or above the pavement design subgrade CBR or LBR value
SECTION 02221
material by using acceptable equipment and methods that will keep natural soils underlying
low areas dry and undisturbed.
3. If for flll, all muck, mud, and other materials removed from above low areas shall
indicated on the Drawings. EXCAVATION, BACKFILLING AND COMPACTING FOR STRUCTURE
proposed
be dried on -site by spreading in thin layers for observation by owner or owners
3.04 MAINTENANCE OF SUBGRADE
representative. Material shall be Inspecteu and, N found to be suitable for use as fill
material, shall be incorporated into lowest elevation of site filling operation, but not under
A. Finished subgrades shall be verified to ensure proper elevation and conditions for construction
PART 1 GENERAL
the building area or within 10' -0" of perimeter of building pad or paving subgrade. If, after
above subgrade. 1.01 SECTION INCLUDES
ob3ervation by owner or owners representative, material is found to be unsuitable, all
unsuitable material shall be removed from site.
B. Protect subgrade from excessive wheel loading during constriction, including concrete trucks and A. Excavate to line, grade and configuration as shown in the plans and specifications for proposed
dump trucks. structures.
3.02 EXCAVATION FOR FILLING AND GRADING C. Remove areas of finished subgrade found to have Insuffblert compaction density to depth B . Fill to fine, grade and configuration as shown in the plans and specifications for proposed
A. Classification of Excavation: Contractor by submitting bid acknowledges that he has investigated
determine type, and character of excavation work to be performed.
necessary aril replace in a manner that will comply with compaction requirements by use of
material equal to or better than best subgrade material Surface of subgrade after
structures.
site to quantity, quality,
Excavation shall considered unclassified excavation.
use.
compaction shall be hard, uniform, smooth, stable, aril trrue to grade and cross section. C. Compacting for materials in an acceptable manner as stated herein. - ..
B. Perfr— P— avation using capable, well maintained equipment and methods acceptable to owner
3.05 RIP RAP 1.02 RELATED SECTIONS
and c ;g agencies. A. Place rip rap in all area where Indicated on the Drawings. The stone for rip -rap shall consists of
in is The A. Section 02200 - Earthwork
C. When performing grading operations during periods of wet weather, provide adequate drainage
management to intro) moisture o} soils,
field stone or rough unhewn quarry stone as nearly uniform, section as practical. stones
shall be dense, resistant to the action of air and water, and suitable In all aspects for the purpose B . Section 02227 - Aggregate materialwaterandgroundwaterIntended. Unless otherwise specified, all stones used as rip -rap shall weigh between 50 and 150
D. Shore, brace, and drain excavations as necessary to maintain safe, secure, and free of water at all B.
pounds each, and at least 60 percent of the stones shall weigh more than 00 pounds each.
Slopes and other areas to be protected shall be dressed to the Tine and grade shown an the
C. Section 02229 Rock Removal
times. plans prior to the placing of rip rap. Contractor shall then undorcrrt the areas to receive rip-rap to D. Section 02245 - Soil Stabilization
E. Excavated material containing rock or stone greater than 6" in largest dimension is unacceptable an elevation equal to the final elevation less the average diameter of the stones before placing
the rip -rap. as fill to within the proposed building and paving area. F. Section 02500 - Paving and Surfacing
F. Rock or stone less than 6" in largest dimension is acceptable as fill to within 24" of surface of
C. Filter fabric and bedding.stone shall be installed prior to the placement of the stones it so
Indicated on the drawings. The bedding stone shall be quarried and crushed angular limestone In
F. Section 02520 - Portland Cement Concrete Paving
proposed subgrade when mixed with suitable material. accordance with Section 02227 and shall be 6" in depth. Filter fabric shall be as specified herein G. Geotechnical report (N available) for boring locations and findings of subsurface materials and
G. Rock or stone less than 2" in largest dimension and mixed with suitable material is acceptable as
and as detailed on the plans. conditions•
fill within the upper 2' of proposed subgrade. D. Storms shall be placed so that the greater portion of their weight is carried by the earth and not H. Constriction drawings.
3.03 FILLING AND SUBGRADE PREPARATION by the adjacent stones. The stones shall be placed Ina single layer with close joixrts. The upright
areas of the stone shall make an angle of approximately 90 degree with the embankment slope. 1. Architectural plans and specifications as they relate specif ically to earthwork beneath the
A. Fill areas to contours and elevations shown with unfrozen materials.
The courses shall be placed from the bottom of the embankment upward, the larger stones
being placed in the lower courses. Open joints shah be filled with spalls. Stones shall be
embedded in the embankment as necessary to present a uniform top surface such that the
buildings, where the architectural requirements are more stringent than the civil requirements.
B. Place fill in continuous lilts specified herein. variation between tops of adjacent stones shall not exceed three Inches.
1.03 REFERENCE STANDARDS
C. Refer to Section 02221 for filling requirements for structures. 3.06 FINISH GRADING
A. American axially for testing and materials (ASTM) latest edition.
1. D 422 Method for particle size analysis of sods.
D. Refer to Section 02223 for filling requirements for pavements. A. Grade all areas where finish rode elevations or contours are indicated on Drawl s, other thangn9
2. D 698 Test for moisture- density, relations of soils using 5.5 lb. (2.5 kg) Rammer and 12 Inch
304.8 mm) drop (Stridard Proctor).
E Areas exposed by excavation or stripping and on which subgrade preparations are to be
performed shall be scarified to minimum de of 8" and impacted to minimum of 959'0 of
paved areas and buildings, including excavated areas, filled and transition areas, and landscaped
areas. Graded areas shall be uniform and smooth, free from rock, debris, or irregular surface
changes. Finished subgrade surface shall not be more than 0.10 feet above or belowg
3. D 1556 Test for density of soil in place by the sand cone method.
4. D 1557 Test for moisture- density relations of soils using 10 -b 4 5 Rammer and 18 -inchrig ( kg)
h457 mm drop (Modified Proctor). optimum density in accordance with ASTM 698 (or 929'0 ct optimum density, in accordance with
ASTM D 1557), at a moisture intent of not less than 1% below and rot more than 3% above the
optimum moisture intent. These areas shall then be proofrolled to detect any areas of
established finished subgrade elevation, and all ground surfaces shall vary uniformly between
Indicated elevations. Finish ditches shall be graded to allow for proper drainage without nding
and in a manner that will minimize erosion potential. For topsoil application, refer to Section
5. D 1559 rest method for resistance to plastic flow of bituminous mixtures using Marshall
Apparatus.
6. D2167 Test for density of soil in by the Rubber Balton Method. insufticrent ccmpadbm. Proofrollimg shall He accomplished by making a minimum of two (2)
loaded tandem•axle dump truck or approved equivalent, in each of 02900 Landscaping.
place
7. D 2216 Laboratory determination of moisture intent of soil. co mplete passes with afully
the two perpendicular directions under the supervisio n and direction of a fled geotechnicalth
Areas
u
failure shall be excavated and reimpacted as stated above. engineer.
B. Coned all settlement and eroded areas within one year after date of completion at not additional
8. D 2487 Classification of soils for engineering purposes.
9, D 2922 Tests for density of soil and soil- aggregate in place by nuclear methods (shallow
expense to owner. Brit% grades to proper elevation. Replant or replace any grass, shrubs,
bushes, or other vegetation disturbed by construction using corrective measures. Refer to
deptit).
10. D 3017 Test for of lard soil aggregate in lace nuclear methodsF. Fill materials used in preparation of subgrade shall be placed in lifts or layers not to exceed 8"
loose measure and compacted to a minimum density of 95% of opffmur,N density, in accordance Section 02270 for slope protection and erosion control.
moisture intent soil p
shallow depth).
with ASTM D 698, (or 92% of the optimum density, in accordance with ASTM D 1557) at a moisture
content of not less than 1% below and not more than 3% above the optimum moisture content.
11. D 4318 Test for plastic limit, liquid IimN, & plasticity index of soils.
12. C 25 Chemical analysis of limestone, quicklime and hydrated lime.
13. C 110 Physical testing for and hydrated lime, wet sieve method. quicklime
14. C 618 Specification for fly ash and raw or calcined natural pozzolan for use as a mineral
admixture in portland cement concrete.
02200-4
02200-5 02221-1
April 8, 1993
April 8, 1993 April 8, 1993
xrnntR r't ASe"' °f6K.crr.,,. : : -.gn+ I: L;9 royl BSfe c*a-
4' ., ... .; ,..-.k :..,,.T. ,,.r4 . >.,..
max„
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TI E OF FIi.iIING. -,
C. Refer to Section 02245 for soil stabilization using lime, cement, fly ash and geotextile fabric 15. C 977 Quicklime and hydrated lime for soil stabilization.
methods for subbase materials.
B. American Association of State Highway and Transportation Officials (AASHTO) latest edition.
3.07 ROCK EXCAVATION (See Sertlon 02229 Rock Removal) T 88 Mechanical Analysis of Soils.
END OF SECTION 1.04 QUALITY ASSURANCE
A. Independent testing laboratory selected and paid by owner shall be retained to perform
construction testing on filling operations and subgrade analysis as specified in section 02200 and
as stated herein.
1.05 SUBMITTALS
A. Shop drawings or details pertaining to excavating and filling for structures are not required unless
otherwise shown on the drawings or specifications or if contrary procedures to the project
documents are proposed.
B. Submit a sample of each type of off -sffe fill material that Is to be used In baddllling In an air - tight,
10 lb. container for the testi: g laboratory or submit a gradation and certification of the aggregate
material that is to be used to the testing laboratory for review.
PART2 PRODUCTS
201 MATERIALS
A. Fill material from on -site as specified in section 02200 and approved by the owner or owner's
representative.
B . Fill material from off-site as specified in section 02200 and approved by the owner or owner's
representative.
C. Aggregate material as specified In section 02227.
PART 3 EXECUTION
3.01 PREPARATION
A. Identify all lines, elevations and grades necessary to construct building subgrades as shown in the
plans and specifications.
B . Carefully protect bench marks, property comers, monuments or other reference points.
C. Locate and identify all site utilities that have previously been installed apd may be in danger of
damage by grading operations.
D. Locate and Identify all existing utilities that are to remain and protect them from damage.
E. Over excavate and property prepare areas of subgrade that are not capable-of supporting the
proposed systems. These areas are to be stabilized by using acceptable bacdill materials
placed and compacted as specified, finer fabrics and/or aggregate materials.
3.02 EXCAVATION
A. Excavate building areas to line and grade as shown in the plans anc specifications being careful
not to over excavate beyond the elevations needed for building subgrades.
B . Engage all suitable material into the project fill areas as specified in Section 02200.
C. Unsuitable excavated material is to be disposed of in a manner and location that is acceptable
to the owner and local governing agencies.
02200-6 02221-2
April B, 1993 April 8, 1993
D. Perform excavation using capable, well maintained equipment and methods acceptable to the
owner and the project document requirements.
3.03 FILLING AND SUBGRADE PREPARATION
A. Building area subgrade pad shall be that portion of site directly beneath and ten feet (10')
beyond the building and appurtenances including the limits of any future building expansion
areas as shown on the civil site drawings.
B. The building area subgrade pad shall be prepared in strict accordance with the 'foundation
subsurface preparation* as shown on the civil -site drawings and/or the architectural- structural
drawings whichever is more stringent. Rock larger than six Inches (6') shall not be part of building
subgrade fill.
C. Areas exposed by excavation or st log and an which (wilding subgrade preparations are to
performed shall be scarified to a min mum depth of 8' and compacted to a minimum of 95% of
the optimum density , in accordance with A•IiTM D 699, (or 92% of the optimum density, in
accordance with ASTM D1557) at a moisbire content of not less than 1% below and not more than
3% above the optimum moisture content. These areas shall then be proofrolled to detect any
areas of insufficient compaction. Pmofmlling shall be accomplished by making a minimum of two
2) complete passes with a fully loaded tandem -axle dump truck, or approved equivalent, in each
of the two perpendicular directions under the supervisions avid direction of a field geotechnical
engineer. Areas of failure shall be excavated and recompacted as stated above.
D. Fill materials used in preparation of handing subgrade shall be placed In lifts or layers rat to
exceed 8' loose measure and compacted to a minimum density of 95% of optimum density, in
accordance with ASTM D 698 (or 920/6 of the optimum density, in accordance with ASTM D 1557),
at a moisture content of not less than•1% below and not more than 3% above the optimum
moisture content. Unless specifically stated otherwise in the 'foundation subsurface preparation
on the Drawings, the following table stipulates maximum allowable values for plasticity index (PI)
and liquid limit (LL) of suitable materials to be used as fill In the specified areas:
Ltxalka PI LL
Building area, below upper four feet 20 50
Building area, upper four feet 12 40
3.04 COMPACTION
A. Maintain optimum moisture content of fill materials to attain required compaction density.
B . All materials shall be tested in accordance with Section 02200.
C. An Independent testing laboratory selected and paid by the owner, shall be retained to perform
testing on site.
D. Compaction tests will be as specified in Section 02200 together wind the following for building
subgrade areas Including 10' -0' outside exterior building lines:
1. In cwt areas, rat less than one compaction test for every 2,500 square feet. In fill areas,
same rate of testing for each 8' lift (measured loose).
E. If compaction requirements are not complied with at any tim:t during construction process, remove
and recompact deficient areas until proper compaction is obtained at na additional expense to
Wal-Mart.
3.05 MAINTENANCE OF SUBGRADE
A. Finished subgrades shall be verified to ensure proper elevation and conditions for construction
above subgrade.
B. Protect subgrade from excessive wheel loading during construction, including concrete trucks and
02221-3
April 8, 1993
w.L -, .;,, .., .. ._._,,_:Mea,..l.•iv..a.,a J ,Kea..:8;r;duxw..u.ktidi..». pis... i• e-, o-.. ,...,..,........- .•.r...,e... .,.., ...,.,. - _-.. .._
r'b.l•:,x. - .,;gyp. ,... ..... -.
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TIME OF FILMING.
a
s i
Jx .: . .. .:. .Me.Jlwuuofww. nr:..wlu W:wbau.w-..s.:ww t - ..u.ua. -.. ___ ... ....i wi..... ...v }.t: .Gs_Jn'.hsv _<.'..'VeC .aa^w+"1R!' -4s'fb i t• .. Al. o{ ._.... 1. 1, A1kra., bwafShv_ Irhi. l4... 11, Y. aai1 'u- iawa.m.:+'..;Wddevdti.LwYb'Y Y•'N'k:u.t-
THIS FIIA WAS PRODUCED FROM
THE BEST AND Ilion COMPLETE j
DRAWINGS AVAILABLE AT THE
TINE OF FILMING , •:
4
i
i
1;.
SECTION 02223 E Over excavate and properly prepare areas of subgrade that are not capable of supporting the SECTION 02227
proposed systems. These areas are to be stabilized by using acceptable backfill materials T
EXCAVATION, BACKFILLING AND COMPACTING FOR PAVEMENT
f1
placed and compacted as specified, fiiter fabrics and/or aggregate material.
f
AGGREGATE MATERIALS
3.02 EXCAVATION
PART1 GENERAL
i PART1 GENERAL A. Excavate roadway and pavement areas to line and grade as shown In the plans and 1.01 SECTION INCLUDES
1.01 SEC ION INCLUDES
specifications.
A. Excavate to line, grade and configuration as shown in the plans and specifications for proposed B. Engage all suitable material kilo the project fill areas as specified in Section 02200. i
A. Aggregate Materials
pavements. C. Unsuitable excavated material is to be dispoeed of in a manner and location that is acceptable to 1.02 iELATED SECTIONS
B. Fill to line, grade and configuration as shown in the plans and specifications for proposed the owner and local governing agencies. A. Section 02050 - Demolition
pavements. D. Perform excavation using capable, well maintained equipment and methods acceptable to the B. Section 02100 - Site Preparation -
C. Compacting fill materials in an acceptable manner as stated herein. - i owner and the project document requirements.
1.02 RELATED SECTIONS 3.03
A.
FILLING.
Areas exposed by excavation or strippin0 and on which subgrade preparations are to be
C. Section 02200 - Earthwork
A Section 02200 - Earthwork performed shall be scarified to minimum death of 8" and compacted to minimum of 95% of D. Section 02221 - Excavation, Baddill and Compaction for Structures
optimum density, in accordance with ASTM D 698 (or 92% of optimum density, In accordance with
ASTM D 1557), at a moisture content of not less than 11% below and not more than 3% above the E Section 02222 - Excavation, Baddill and Compaction for Utilities
B . Section 02227 - Aggregate Materials optimum moLsture content' These areas shall then be proofrolled to dated arty areas of
C. Section 02229 - Rock Removal Insufficient compadbn. Proolro lling shall be accomplished by malting a minimum of two (2)
with a fully -loaded tsndem axle dump truck or approved ekiuivalent, In each of
F. Section 02223 - Excavation, Baddill and Compaction for Paverr nt
D. Section 02245 Soil Stabilization
complete passes
the two perpendicular directions under the supervision and direction of a field gaotechnical G . Section 02245 -Soil Stabilization
engineer. Areas of failure shall be excavated and recompaded as stated above.
H. Section 02270 - Slope Protection and Erosion Control
E Section 02505 - Paving Base Course B. Fill materials used in preparation of subgrade shall be placed in lifts or layers not to exceed 8"
F. Section 02511 - Asphaltic Concrete Paving loose measure and compacted to a minimum density of 95% of optimum density, in accordance
with ASTM D 698, (or 920!6 of the optimum density, In accordance with ASTM D 1557) at a moisture
I. Construction Drawings
1 G. Section 02512 - Crushed Stone Paving content of not less than 1% below and not more than 3% above the optimum moisture content. 1.J3 REFERENCE STANDARDS
H. Section 02520 - Portland Cement Concrete Paving C. The following table stipulates maximum allowable . values for plasticity Index (PI) and liquid limit
LL) of suitable fill materials to be used In the specified areas, unless specifically stated
A. American Society for Testing and Materials (ASTM) latest edition.
1. ANSI /ASTM C136 - Method for Sieve Analysis of Fine and Coarse Aggregates.
I. Section 02525 - Curbs and Sidewalks otherwise on the Drawings: 2. ANSI/ASTM 0698- Test Methods for Moisture- Density Relations of Sorts and
Soil - Aggregate Mixtures, Using 5.5 lo (2.49 Kg) Rammer and 12 inch (304.8 mm) Drop.
3. ANSI/ D1557 Test Methods for Malst) Relations Soils
J. GeoterLnical Report (it available) for Boring Location„ and Findings of Subsurface Materials and
Corditsons. Pav1 Area P,elow Upper Two Feet 20 50
of and
RammerSoil -A negate Mixtures Using 10 Ito (4.54 Kg) Rammer and 18 Inch (457 mm) Drop.
4. ASTM 172167 - Test Method for Density and Unit Weight of Soil in Place by the RubberPavingAreaAboveUpperTwoFeet1540BalloonMethod.
K. Constnidfon Drawings References to Depth are to Proposed Subgrade Elevations 5. ASTM D2487 - Classification of Soils for Engineering Purposes.
6. ASTM D2922 - Test Methods for Density of Soil boll- Aggregate In Place by Nuclear
1.03 REFERENCE STANDARDS D. Material imported from off -site shall have a CBR (Califomia Bearing Ratio) or LBR (Limerock and
Methods (Shallow Depth .
A. American Society for Testing and Materials (ASTM latest edition.
Bearing Ratio) value equal to or above the pavement design subgrade CBR or LBR value
indicated on the Drawings.
7. ASTM D3017 - Test Methods for Moisture Content of Soil and Soil- Aggregate Mixtures.
8. ASTM D4318 -Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.
i
1. ) 422 Method for Particle Sire Analysis of Soils
2, D 698 Test for Moisture- Density Relations of Solis Using 5.5 lb. (2.5 kg) Rammer and 12 -inch
Drop Proctor)
3.04 COMPACTION B • American Association of State Highway and Transportation Officials (AASHTO) latest edition.
304.8 mm) (Standard
3 01 E56 Test for Density of soil in Place by the Sand Cone Method A. Maintain optimum moisture content of fill materials to attain required compaction density.
1. AASHTO T1
m -
Moisture Density Relations of Soils Using a 10-lb (4.54 Kg) Hammer and an
18 Inch (457 mm) Drop.
l
4. 01557 Test for Moisture - Density Relations of Soils Using 10 -1b (4.5 Kg) Rammer and
18 -Inch (457 mm)) Drop (Modified Proctor
Mixtures Using Marshall
B . All materials shall be tested in accordance with Section 02200. 2. AASHTO M147 - Materials for Aggregate and Soil- Aggregate.
5. D 158; Lest M Yhod for Resistance to Plastic Flow of Bituminous
Ap r•atus C. An independent testing laboratory selected and paid by the owner, shall be retained to perform 1.04 QUALITY ASSURANCE
6. D 21 .7 Test 'or Density of Soil in Place by the Rubi)sr Balloon Method testing on -site. A. Tests and analysis of aggregate material will be performed in accordance with standard ASTM
7. 0 2216 Labrnitory Determination of Moisture conterrt of Soil
8. D 2487 Clara iticd0on of Soils for Engineering Purposes D. Compaction test will be as specified in Section 02200 together with the following for paving and AASHTO procedures listed herein.
9. D 2922 Tests or tensity of Soil and Soil- Aggregate in Place by Nuclear Methods (Shallow
Depth
areas:
1. In cut areas not less than one compaction. test for every 10,000 square feet.
1.05 SUBMITTALS
10. D 301 Test for Moisture Content of Sol! and Soil- Aggregate In Place by Nuclear Methods 2, In fill areas, same rate of testing for each 8" lift (measursd loose). I A. Submit in air tight containers a 10 pound sample of each aggregate or mixture that is to be
Shallow )epth)
11. D 431;: T, st for Plastic Limit, Liquid Limit, and Plasticity Index cf Soils E. If compaction requirements are not complied with at any time during construction process, remove incorporated into the project to the testing laboratory designated by the owner.
12. C 25 &omical Analysis of Limestone, Quicklime and Hydrated Lime and recompact deficient areas until proper compaction is obtained at no additional expense to B. Submit the name of each material supplier and specificppp type and source of each material. Any
j} I change in source throughout the job requires approval of the owner o: engineer.
02123 '. 02223-3 02227.1
April 8, 1993 April 8, 1993 April 8,1993
r . ,- - ,,,- •,:.w_ w _ _ _ _„ e . 6666.,.. ._ . _. .. , ,
6666 _
q,ews sri i »x•-sr« ..... nanx-in ,r
a
s i
Jx .: . .. .:. .Me.Jlwuuofww. nr:..wlu W:wbau.w-..s.:ww t - ..u.ua. -.. ___ ... ....i wi..... ...v }.t: .Gs_Jn'.hsv _<.'..'VeC .aa^w+"1R!' -4s'fb i t• .. Al. o{ ._.... 1. 1, A1kra., bwafShv_ Irhi. l4... 11, Y. aai1 'u- iawa.m.:+'..;Wddevdti.LwYb'Y Y•'N'k:u.t-
THIS FIIA WAS PRODUCED FROM
THE BEST AND Ilion COMPLETE j
DRAWINGS AVAILABLE AT THE
TINE OF FILMING , •:
4
i
02223.2
02223.4
April 8, 1993
April 8. 1993
0 .- „- .-, -;_ new." sY! vy„ + i. ? „e„a ^m.+.cz- raa.w_+rfaee6e'" aeFCJ* atw+Mnf t.=°'O_:: --•-. .. __....- --'- + -- -. _ °. :"°,r'yv_.' °J' _. -.. .... - __ _ - _. .. . , -_. ___. __.. -- .. .. -. -- „- -_, - _.. - -- •
f..: ,,t . ._ . . a
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TI OF FILMING.
r
C. Submit materials certificate to on -she Independent testing laboratory which is signed by material
producer and Contractor, certifying that materials comply with, or exceed, the requirements
herein.
PART PRODUCTS i
2.01 MATERIALS
A. All construction and materials shall meet or exceed the requirements of this section and any state
highway department specification section referred to or noted on the drawings which pertain to
paving base course design, materials, preparation, and/or execution. All materials shall be as
indicated on Drawings and shall comply with applicable state highway specification regarding
source, quality, gradation, liquid Ibnh, plasticity index, and mix proportioning.
B . The following tables serve as a guidance for the grr :ations of the various aggregate materials.
Local availability and variances with each states requirements may change the gradations and -
parameters cf these materials. The contractor shall indicate when submitting materials to be
tested what the various applications will be.
1 1 1
Material Descr+^tio^ 3- 1/2' 2" 3/4" /2" 1• 1/2' 94 #!6 #50 1!200
3" Surface and Roadstone 100 90. 100 60 -90 35 -70 20.40 6.95 4-12 4 -1 }
Large Stone Aggregate 100 88- 100 35 -75 0-16 0-6
RR Ballast, RipRap Bedding 100 94-100 16-65 0 -10 o-e
Stabilized Base Course too 90 -100 60 -90 35.56 10 -40 4.12
Utility Trench Bedding
2 1 1
100 90 -100 30.60 0.10
Material Descrintion 3' 1/2- 2" 314" 1/2' 1' 112" #4 #18 050 0200
Pea Gravel 100 15.45 0-4
Non Porous Embankment
and Bacidill 100 45 -85 2686 10.30 5.15
F: ;rcus Embankment
and Backfill too. 90 -100 50.100 30.80 0 -20 0-4 1
i
Large Subbase (No Fines) 2" - 4• Limestone
SmaU RipRap 4' 12" Pieces
RipRap 6' - 18' Pieces
Maternal Descriallon 9/8' #4 88 016 940 #50 #100 #200
Fill Sand 100 94-100 45-85 3 -29 0.10 `
Mason Sand 100 15-45 0 -110
Agriculture Lime 100 94.100 60- 100 40.75 20-40 10.30 0.18
i
PART 3 EXECUTION
3.01 STOCKPILING
A. Stockpile on -site at locatior s Indicated by the owner In such a manner that there will be no
standing water or mixing with other materials.
3.02 BORROW SITES i
A. Upon completion of borrow operations, clean up borrow areas as Indic-!ad on !ne plans and in a
f
neat and reasonable manner to the satisfaction of the property owner or the engineer.
3.03 TRANSPORTATION l
A. Off-site materials shall be transported to the project using well maintained and operating
vehicles. Once on the joh she, all transporting vehicles shall stay on designated haul roads and ;
shall at no time endanger any of the improvements by rutting, overloading or pumping the haul t
road.
02227-2
April 8, 1993
er+r+<..,,,,.. ,;- f -.. _ ... -i.: -.. 7 - -: o.a,.r_vwreb..!v^r R'!rr+.vr 'nsr«*•aM l
f 1
4...;,.1 '•....AS.C.1.ul..J- .,_..: L..._5.....aY,.rJ bui.
Y
13. C 110 Physical Testing for Quicklime and Hydrated Lime, Wet Sieve Method
owner.
14. C 618 Specification for Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral 3.05 MAINTENANCE OF SUBGRADE
Admixture in Portland Cement Concrete
15. C 977 Quicklime and Hydrated Lime for Soil Stabilization A. Finished subgrades shall be verified to ensure proper elevation and conditions for construction
B. American Association of State Highway and Transpotlation Off ici„ Is (AASHTO) latest edition
above subgrade.
T 88 Mechanical Analysis of Soils B. Protect subgrade from excessive wheel loading during construction including concrete trucks and
1.04 QUALITY ASSURANCE dump trucks.
A. Independent testing laboratory selected and paid by owner shall be retained to perform C. Remove areas of finished subgrade found to have insufficient compaction density to depth
necessary and replace in a manner that will comply with compaction requirements by use ofconstructiontestingonfillingoperationsandsubgradeanalysisasspecifiedinSection02200andmaterialequaltoorbetterthanbestsubgradematerialon -site. Surface of subgrade after
as stated herein. compaction shall be hard, uniform, smooth, stable, and true to grade and cross - section.
1.05 SUBMITTALS 3.06 FINISH GRADING
A. Shop drawings or details pertaining to excavating and filling for pavement are not required unless -
otherwise shown on the drawings or specifications or If contrary procedures to the project
A. Finish grading shall be In accordance with Section 02200 and as more specifically stated herein.
documents are proposed. B. Grading of paving areas shall be checked by string line from grade stakes (blue tops) set at not
more than 50' centers. Tolerances of 0.10 feet more or less, will be pennitted^Contractor to
B. Submit a sample of each type of off -she fill material that it to be used in baddllfing In an air - tight,
10 lb. container for the testing laboratory or submit a gradation and certification of the aggregate provide engineering and field staking necessary for verification of lines, grades, and elevations.
material that is to be used to the testing laboratory for review. 3.07 ROCK EXCAVATION (See Section 02229 Rock Removal)
PART 2 PRODUCTS
END OF SECTION
2.01 MATERIALS
A. Fill material from on -site as specified in Section 02200 and approved by the owner or owners
representative.
B. Fill material from off -she as specified In Section 02200 and approved by the owner or owners
representative.
C. Aggregate material as specified in Section 02227.
D. Acceptable stabilization fabrics and geogrids:
1. Mirafi 500X or 60OX
2. Phillips 66 Supac 6WS
3. Dupont TyPar 3401 and 3601
Trevira S1114 S11204. and
5. Tensar SS -1 and SS -2
6. Exxon GTF -200 or 350
PART 3 EXECUTION
3.01 PREPARATION
A. Identify all lines, elevations ano grades necessary to construct pavements, curb and gutter,
bases, walkways and roadways as shown in the plans and specifications.
B. Carefully protect benchmarks, property comers, monuments or other reference points.
C. Locate and Identify all site utilities that h, e previously been installed and may be in danger of
damage by grading operations.
D. Locate and identify all existing utilities that are to remain and protect them from damage.
02223.2
02223.4
April 8, 1993
April 8. 1993
0 .- „- .-, -;_ new." sY! vy„ + i. ? „e„a ^m.+.cz- raa.w_+rfaee6e'" aeFCJ* atw+Mnf t.=°'O_:: --•-. .. __....- --'- + -- -. _ °. :"°,r'yv_.' °J' _. -.. .... - __ _ - _. .. . , -_. ___. __.. -- .. .. -. -- „- -_, - _.. - -- •
f..: ,,t . ._ . . a
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TI OF FILMING.
r
C. Submit materials certificate to on -she Independent testing laboratory which is signed by material
producer and Contractor, certifying that materials comply with, or exceed, the requirements
herein.
PART PRODUCTS i
2.01 MATERIALS
A. All construction and materials shall meet or exceed the requirements of this section and any state
highway department specification section referred to or noted on the drawings which pertain to
paving base course design, materials, preparation, and/or execution. All materials shall be as
indicated on Drawings and shall comply with applicable state highway specification regarding
source, quality, gradation, liquid Ibnh, plasticity index, and mix proportioning.
B . The following tables serve as a guidance for the grr :ations of the various aggregate materials.
Local availability and variances with each states requirements may change the gradations and -
parameters cf these materials. The contractor shall indicate when submitting materials to be
tested what the various applications will be.
1 1 1
Material Descr+^tio^ 3- 1/2' 2" 3/4" /2" 1• 1/2' 94 #!6 #50 1!200
3" Surface and Roadstone 100 90. 100 60 -90 35 -70 20.40 6.95 4-12 4 -1 }
Large Stone Aggregate 100 88- 100 35 -75 0-16 0-6
RR Ballast, RipRap Bedding 100 94-100 16-65 0 -10 o-e
Stabilized Base Course too 90 -100 60 -90 35.56 10 -40 4.12
Utility Trench Bedding
2 1 1
100 90 -100 30.60 0.10
Material Descrintion 3' 1/2- 2" 314" 1/2' 1' 112" #4 #18 050 0200
Pea Gravel 100 15.45 0-4
Non Porous Embankment
and Bacidill 100 45 -85 2686 10.30 5.15
F: ;rcus Embankment
and Backfill too. 90 -100 50.100 30.80 0 -20 0-4 1
i
Large Subbase (No Fines) 2" - 4• Limestone
SmaU RipRap 4' 12" Pieces
RipRap 6' - 18' Pieces
Maternal Descriallon 9/8' #4 88 016 940 #50 #100 #200
Fill Sand 100 94-100 45-85 3 -29 0.10 `
Mason Sand 100 15-45 0 -110
Agriculture Lime 100 94.100 60- 100 40.75 20-40 10.30 0.18
i
PART 3 EXECUTION
3.01 STOCKPILING
A. Stockpile on -site at locatior s Indicated by the owner In such a manner that there will be no
standing water or mixing with other materials.
3.02 BORROW SITES i
A. Upon completion of borrow operations, clean up borrow areas as Indic-!ad on !ne plans and in a
f
neat and reasonable manner to the satisfaction of the property owner or the engineer.
3.03 TRANSPORTATION l
A. Off-site materials shall be transported to the project using well maintained and operating
vehicles. Once on the joh she, all transporting vehicles shall stay on designated haul roads and ;
shall at no time endanger any of the improvements by rutting, overloading or pumping the haul t
road.
02227-2
April 8, 1993
er+r+<..,,,,.. ,;- f -.. _ ... -i.: -.. 7 - -: o.a,.r_vwreb..!v^r R'!rr+.vr 'nsr«*•aM l
f 1
4...;,.1 '•....AS.C.1.ul..J- .,_..: L..._5.....aY,.rJ bui.
Y
dump trucks.
C. Remove areas of fi .'- ,ed subgrade found to have insufficient compaction density of depth
necessary and replai_. in a manner that will comply with compaction requirements by use of
materials equal to or better than best subgrade material on site. Surface of subgrade after
compaction shall be hard, uniform, smooth, stable, and true to grade and cross - section.
3.06 FINISH GRADING
A. Finish grading shall be in accordance with Section 02200 and as more specifically stated herein.
B. Grading of building areas shall be checked by string line from grade stakes (blue tops) set at not
more than 50' centers. Tolerance of 0"10 feat • more or less, will be permitted. Contractor to
provide engineering and field staking necessary for verification of lines, grades, and elevations.
3.07 ROCK EXCAVATION (SEE SECTION 02229 ROCK REMOVAL)
END OF SECTION
02221 -4
SECTION 02222
EXCAVATION, BACKFILLING AND COMPACTING FOR UTILITIES
PART GENERAL
1.01 SECTION INCLUDES
A. Excavating trenches for the installation of utilities
B. Bacdilling trench with bedding material as specified and indicated and finishing filling trench with
suitable material to proposed subgrade.
C. Compacting backfill materials in an acceptable manner
D. Borings and casings under roads
1.02 RELATED SECTIONS
A. Section 02200 - Earthwork
B. Section 02227 - Aggregate Materials
C. Section 02229 - Rock Removal
D. Section 02605 - Sewer Stnxtures
E. Section 02660 - Water Distribution Systems
F. Section 02687 - Site Gas Lines
G . Section 02720 - Storm Sewer Systems
H. Section 02730 - Sanitary Sewer Systems
I. Section 02810 - Landscape Irrigation
J. Geotechnical report (if available) for boring locations and findings of subsurface materials and
conditions
K. Construction Drawings
1.03 REFERENCE STANDARDS
A. American socety for testing and materials (ASTM) Latest Edition
1. D 422 Method for Particle Size Analysis
2. D 698 Test for Moisture- Density Relations of Soils Using 5.5 -lb. (2.5 Kg) Rammer and
12 -inch (304.8mm) Drop (Standard Proctor)
3. D 1556 Test for Density of soil in Place by the Sand Cone Method
4. D 1557 Test for Moisture - Density Relations of Soils Using 10 -lb. (4.5 Kg) Rammer and
18 -inch (457 mm) Drop (Modified Proctor)
5. D 1559 Test Method for Resistance to Plastic Flow of Bituminous Mixtures Using Marshall
Apparatus
6. D 2216 Laboratory Determination of Moisture Content of Soil
7. D 2487 Classification of Soils for Engineering Purposes
8. D 2922 Tests for Density of Soil and Soil- Aggregate in Place by Nuclear Methods (Shallow
Depth)
9. D 3017 Test for Moisture Content of Soil and Soil- Aggregate In Place by Nuclear Methods
Shallow Depth)
10. D 4318 Test for Plastic Limit, Liquid Limit, & Plasticity Index of Soils
11. C 25 Chemical Analysis of Limestone, Quicklime and Hydrated Lime.
02222.1
April 8, 1993 1.
fl(IE:.-.°ll+OaYV:.••1 i(S"iR 7. , `.a'!'.,vr c!K:,.IEI+.,!r:: +fite R1>RSi' Of 7id„q ,:. -. , w, .ws: :5kni;.,'ia i- :'T':° .,_,. -_.. . -..
mss
1 / - - -.,__ '_.._..._ -_.. _
w .- - --
1
E. Acceptive Stabilization Fabrics and Geogrkls
1. lmfi 500X or 600X
2. Phillips 66 Supac 6WS
3. Dupont Typar 3401 and 3601
4. Trevira S1114 and S1120
5. Tenser SS -1 and SS -2
6. Exxon GTF -200 or 350
F. Filter /Drainage Fabrics
1. Miraf1 140 NS
2. Phillips 66 Supac 4NP
3. Dupont Typar 3341
PART EXECUTION
3.01 PREPARATION
A. Set all lines, elevations, and grades for utility and drainage system work and control system for
duration of work, including careful maintenance of bench marks, property comers, monuments, or
other reference points.
B. Maintain in operating condition existing utilities, activities utilities, and drainage systems
encountered in utility Installation. Repair any surface or subsurface Improvements shown on
Drawings.
C. Verify location, size, elevation, and other pertinent data required to make connections to existing
utilities and drainage systems as indicated on Drawings. Contractor shall comply with local codes
and regulations.
D. Over excavate and property prepare areas of subgrade that are not capable of supporting the
proposed systems. These areas are to be stabilized by using acceptable bacldill materials
placed and compacted as specified, filter fabrics and/or additional bedding material.
E. Install dewatering system; that will be required to construct the proposed utilities in a manner that
is described herein.
3.02 EXCAVATION
A. The local utility companies shall be contacted before excavation shall begin. Dig trench at proper
width and depth for laying pipe, conduit, or cable. Cut trench banks practically and remove
stones as necessary to avoid point - bearing. Over excavate wet or unstable soil, if encountered, .
from trench bottom as necessary to provide suitable base for continuous and uniform bedding.
B. All trench excavation side walls greater than 5 feet in dapth shall be sloped, shored, sheeted,
braced or otherwise supported by means of the sufficient strength to protect the workmen within
them in accordance with the applicable rules and regulations established for construction by the
Department of Labor, Occupational Safety and Health Administration (OSHA), and by local
ordinances. Lateral travel distance to an exit laddbr or steps shall not be greater than 25 feet in
trenches 4 feet or deeper.
C. Perform excavation as indicated for specified depths. During excavation, stockpile materials
suitable for bacdilling in orderly manner far enough from bank of trench to avoid overloading,
slides, or cave -Ins.
D. Remove excavated materials rat required or not suitable for bacldill or embankments and waste
as specified. Any structures discovered during excavation(s) shall be disposed of as specified.
E. Prevent surface water from flowing into trenches or other excavations by temporary grading or
other methods, as required. Remove accumulated water in trenches or other excavations by
pumping or other acceptable methods.
02222 - 3
April 8, 1993 April 8, 1993
I- ..;- ... - -.. ,:_., .. ,...._ _.,:: ..:r -.. - . ;.wwe.,,r.;rG:.:'..:. .tR Yt' "'C- Y.•y,,' ,-A ,'- `kr"?5'._
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TINE OF FILMING.
w
v l ,e:l' aiibv.N- )V+k5....d ":n M,mxlbll•1G '.1WU l..LiVw. ,:ea
THIS FILM WAS PRODUCED FROM
THE BEST AND MOST COMPLETE
DRAWINGS AVAILABLE AT THE
TINE OF FILMING.