HomeMy WebLinkAbout31700 GRAPE ST_ 2077 (34)31700 GRAPE STREET 2077 3/30 WAL -MART WALPMART STORES REQUEST FOR INFORMATION DATE: _ RFI NO: TO: Stores FAX (918) 582 -7907 PROJECT: City, State) FROM: DETAIL/DRAWING: General Contractor) SPECSJSECTION: Project Superintendent) Job Site Fax Number) INFORMATION REQUESTED: Requested By: REPLY: _ FILE DISTRIBUTION: p Job Specific p Specification p 9FI File p Consultant p Prototype SIGNED- DATE: WM - Lake Elsinore, CA l i I WALPMART SECTION 01300 STORES WM: 052093 SUBMITTALS REQUEST FOR INFORMATION PROCESS PART GENERAL I' i 1.01 SUMMARY A. Section Includes: W 1. Submittal procedures. Seg 2. Shop drawings. 3. Productl data. 4. Samples. i S. Letters of conformance. 6. Letters of certification. 7. Submittal schedule. B. Related Sections: a 1. Section 01010 - Summary of Work: Wal -Mart and Owner furnished products. 2. Section 01410 -Testing Laboratory Services: Submittals required for tests and inspections. ffo j 3. Section 01700 -Contract Closeout: Closeout submittals. Ns^ O "I 1.02 SUBMITTAL PROCEDURES - CONTRACTOR FURNISHED PRODUCTS i A. Contractors Responsibilities: 1 1. Submit all required submittals within 15 days after Contract Date. ff 2. Sequentially number transmittals; add alphabetical suffix to resubmittals. 3. Identify Project, Contractor, Subcontractor or supplier, pertinent Drawing sheet and detail 5 numbers, and specification Section number, as appropriate. 4. Apply Contractors stamp, signed or initialed certifying that Productsreview, verification of required, field dimensions, a. adjacent construction, and coordination of Information, Is In s accordance with the requirements of the Work and Contract Documents. 5. Schedule submittals to expedite the Project; coordinate itemssubmissionofrelated into single submittal. 6. Submit all submittals required within an Individual specification section in a single submittal. 7. Identify variations from contract Documents and Product and system limitations which may be detrlmental to successful performance of the completed Work. t 8. Provide space for Contractor, Architect, and Architect's Consultant review stamps els 9. Forward submittals to specified party along with transmittal. Where submittals are forwarded i directly to Architect or Architect's Consultants, forward copy to Wal -Mart. 10. Allow 10 working days for review. s 8 I! 11. Revise and resubmit submittals when required; identify changes made since previous submittal. 12. Distribute copies of reviewed submittals to concerned parties and to Record Documents file. Instruct parties to promptly report any inability to comply with provisions. B. Architect's Responsibilities: 1. Review submittals and mark to Indicate action taken: a. Rejected. s c. Acceptedt as noted. a d. Revise and resubmit. e. specified 11 2. Return reviewed submittals to Contractor along with transmittal form. t 1.03 SUBMITTAL PROCEDURES - WAL -MART AND OWNER FURNISHED PRODUCTS A. Suppliers Responsibilities: i5 rt 3 e E 1 1. Sequential number transmittals; add alphabetical suffix to resubmittals. 2. Identify Project, Contractor, Subcontractor or supplier, DrawingiTpertinent sheet and detail numbers, and specification section number, as appropriate. Q J45 gLMI 3. Schedule submittals toexpedite the Project. Individual a S 4. Submit all submittals required within an sequiispecification section in a single submittal. 5. Identify variations from Contract Documents and Product and system limitations which may be detrimental to successful performance of the completed Work. 01036.3 01300 -1 WM - Lake Elsinore, CA July 16,1993 WM - Lake Elsinore, CA July 16, 1993 j I, 1 y.., s' ++ 4 am 7 ... _ _ ,, ,. „Qa.: - , X..... .... 7.. 3'. -. -i •;.; c '.3•!. - - 4, s ^`. -_., x.. .,.,.. -,: ^. .. ?!::. ys - ^ar r .-.0 , xt•.'.s, :ltr..+.r..ve, x--- ^'•-tlY v,. t wYS+yDT 4., ,. p:.!:_ p" 'Y: wn+Fi•-wswo cv r-r:- n.,.,,.. t. x r GA filaxR. +s »+. .: ... '•f`D?':t ±wuna "`Wig,.= .v''- r aecaRYA']ltta, tAi "IfI 111W_ WAS PR100u T 1NOI1:: TO VM T AM 'W* OOIIPI.l U 71" c. A AIL=A AT T)9S 1 a- 7.3.6.5 Delete; replace with the following: 7.3.6.5 Additional costs of supervision and field office personnel directly attributable to the change shall be applicable only to Change Orders that change the Contract Time of the Project. ARTICLE 9 - PAYMENTS Ai'D COMPLETION 9.2 SCHEDULE OF VALUES Add the following: 9.2.1.1 The Contractor is provided a "Subcontractor Listing and Project Budget" form as part of the Accounting Package. The Contractor shall complete this form to Identify the Subcontractors and Material Suppliers and their respective costs estimates. The completed form shall be submitted b the Contractor to Wal -Mart along with other required documents not more than ten (10) days by the Notice of Award, and must be received and approved by the Wal -Mart Construction Manager before the Contract will be executed. 9.3 APPLICATIONS FOR PAYMENT 9.3.1 Ad - ' lowing: 9.3.1.3 Wal- Mart shall determine the amount less ten percent (10 %) retainage of each Ication for t App 1 twenty f(2 revs after thededfirst tday of the completed ino df ol9inatb }pep amount riedtby tthe Wal -Mart's possession rat later than the first day of the mont h: 9.3.1.4 The Contractor is provided with accounting system fortes by Wal-Mart as part of the Contra,,. 'b=ments Package and the Contractor shall properly complete and submit the required iorms with each Application for Payment. 9.3.1.5 The Contractor is provided with Charge Order forms as part of the Contract Documents Package. In the event a Change Order Is necessary, the form shall indicate the cost of the Work and the cost of the Chanae Order fee which includes all overhead, profit and operational hems such as taxes, bonds and insurance. All itemized costs shall be listed as an attachment complete with Subcontractor and/or supplier quotes. i 9.3.1.6. All utility costs for the period between the "Date of Substantial Completion ", or Wal -Mart possession, whichever is the earliest date, and the "Grand Opening Date" shall be paid by the Contractor exclusive of the Contract amount. Wal -Mart shall reimburse the Contractor for all such utility costs that have occurred during the above described period upon proper verilicatbn, such as copies of billings, canceled checks, etc., paid by the Contractor, for I the actual billing costs and no markup will be allowed on these relmbursen-,ants. 9.3.3 Add the following: I_ 9.3.3.1. In the event Wal -Mart received information that Indicated a lien has been tiled or that 1 there exists a potential Hen situation, the Contractor will be notified by Wal -Mart and they will expect the Contractor to Immediately resolve the situation to the satisfaction of Wal -Mart. I 9.3.3.2. It is hereby agreed between Wal -Mart and the Contractor that each property executed 1 Application and Certificate for Payment" (Forth C -1200 or Forth C -1210) is a valid lien release, as stated on the forth, and the Contractor thereby agrees to defend and Indemnify Wal -Mart against any and all claims resulting from a lien against the property. 9.8 SUBSTANTIAL_ COMPLETION 9.8.1 Delete Subparagraph 9.8.1 and substitute the following: 9.8.1 The date of substantial completion is hereby defined as the dace when all construction Indicated in the Contract Documents is 1000/6 complete and accepted for possession by Wal -Mart with the exception of Wal -Mart furnished and/or installed items which must be connected or installed by the Contractor, for the purpose of installing fixtures, equipment and stocking merchandise. 00800-4 WM - Lake Elsinore, CA July 16,1993 3'aM, vs:_'MJf+["4. n+"wWWS18R 'NYN VUw- .,._:...+•:wr" .'isMtW,r!WS..]i0#s.:".N.. .. .... .. .,: ,. -. _ 9.9 PARTIAL OCCUPANCY OR USE 11.3.1.2 Delete Clause 11.31.2 in its entirety. Supplement in accordance with provisions of Section 01010. I 11.3.1.3 Delete Clause 11.3.1.3 In its entirety. 9.10 FINAL COMPLETION AND FINAL PAYMENT 11.3.2 Delete 'The Owner shall purchase" and substitute "The Contractor shall purchase ". Supplement in accordance with provisions of Section 01700. 11.3.4 Delete Subparagraph 11.3.4 in Its entirety. i iARTICLE10 - PROTECTION OF PERSONS AND PROPERTY 11.3.6 Delete Subparagraph 11.3.6 in its entirety: 10.2 SAFETY OF PERSONS AND PROPERTY See Subparagraph 11.1.3 for instructions for proof of insurance coverage. 10.2.1 Add the following: 11.3.7 Modify Subparagraph 11.3.7 by substituting "Contractor" for "Owner" at the end of the first sentence. 10.2.1 4 Material and equipment provided by the Owner shall be received, stored, and protected in accordance with Paragraph 10.2.1.2 of the General Conditions. Incurred for 11.3.8 Modify Subparagraph 11.3.8 by substituting "Contractor" for "Owner" as fiduciary; except thatcosts receiving, storage, liability, and warranty labor shall be included in the Contract Amount. I at the first reference to "Owner" In the first sentence, the word "this" should be substituted for Owner's ". 10.2.2 Add the following to Subparagraph 10.2.2: 11.3.9 Modify Subparagraph 11.3.9 by substituting "Contractor" for "Owner" each time the latter word The Contractor shall Include, but is not limited to, the latest federal Occupational Safety and appears. Health Administration (OSHA) excavation safety standards, for trenches exceeding depths of 5 ft. Specific costs directly related thereto shall be included In the Schedule of Values, required 11.3.10 Modify Subparagraph 11.3.10 by substituting "Contractor" for "Owner" each time the latter by Paragraph 9.2, either per lineal foot of trench or per square foot of sheeting or shoring. word appears. 11.4 PERFORMANCE BOND AND PAYMENT BOND 1 ARTICLE 11 - INSURANCE 11.4.1 Add the following: 11.1 CONTRACTOR'S LIABILITY INSURANCE 11.4.1.1. The Contractor shall provide Wal-Mart with an acceptable Performance Bond and an 11.1.2 Add the follows mg acceptable Labor and Material Payment Bond that complies with all statutory and administrative requirements by the law the Project 11.1.2.1. Insurance coverage limits shall be not less than the following: governed of place where the is located. These bonds shall stay in force for the entire period the contract Is in effect and shall be replaced by Completed Operations coverage for the one year correction period. Mn MINIMUM LIMITS 11.4,12 The Bonds described in paragraph 11.4.1.1 above shall each be for an amount not less than one hundred percent (100%) of ffl e Contract amount. In addition, the Bond shall Builuers All -Risk contain the following paragraph, "And the said surety, for value received, hereby stipulates and agrees that Contractor and Sub - Contractors Total Building Cost Amount no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specificatons accompanying the same shall in Earthquake Insurance Total Building Cost Amount I any way affect its obligations on this Bond, trod ft does hereby waive notice of any change, extensions of time, alteration or addition to the terms of the Contract or to the work or to the Workman's CameenQatbn specifications." I 11.4.1.3. The Bonds described In paragraph 11.4.1.1 above shall each be filed prior to Contractor and Sub - Contractors Statutory Amount commencement of construction by the Contractor In the book of land records of the County where the project is located and the recorded documents with recordation stamp affixed shall 1WaiverofSubregationwherepermittedbylawEmployer's be submitted, by the Contractor to Wal -Mart along with other required documents. before the Liability $1,000,000 Contract will be executed by Wal -Mart. Cra eCeoycnracalanInepneGoraorleeGoraorI11.4.1.4. The Completed Operations Bond referred to In 11.4.1.1 above shall be for an amount not less than one hundred percent (1000/6) of the Contract amount and shall remain in Bodily Injury (including death) & Property Damage Per Each effect for one full year following the date the Contract Final Payment is Issued. Occurrence $5,000A00 Sub - Contractors General Liability ARTICLE 13 - MISCELLANEOUS PROVISIONS Bodily Injury (including death) & Property Damage Per Each 13.5 TESTS AND INSPECTIONS Occurrence $2'000'000 Contractors and Sub - Contractors Liabilkv Supplement in accordance with provisions of Section 01410. Bodily Injury (including death) & Property Damage Per Each Occurrence $2,000,000 1iI 00800 -6 I l 00800 -8 1 WM - Lake Elsinore, CA July 16, 1993 WM - Lake Elsinore, CA July 16,1993 l 4D t71 3 ". rll(II AVAIL BLN AT "M OI !I a, a ydi A+ 13.8 HARMONY CLAUSE 13.8.1. The Contractor and all Subcontractors agree that no labor dispute of any kind involving any Contractor or Subcontractor, or their employees or agents shall be permitted to occur or be manifested on the Project and the Contractor and Subcontractors agree to that end to only employ persons on the Work who will work at all times in harmony with other persons employed on the Project. 13.8.2. The Contractor and all Subcontractors agree that their employees shall not participate in or accede to any work stoppage, slow down or any type of Interierence with the performance of woW.. by other persons on the project which may occur as a result of any labor dispute Involving their employees. 13.8.3. Should there be a work stoppage, slow down or any type of interference with the performance of work on the project involving the Contractor or his employees or a Subcontractor or his employees resulting from a labor dispute and which in the judgment of Wal -Mart will cause, or threatens to cause delay in the progress of construction, then upon twenty -four (24) hours written notice Wal -Mart shall have the right to declare the Contractor and/or Subcontractor in default under this Contract and take such steps as are necessary to finish the uncompleted portion of the Work. In such event Wal -Mart shall have the right to take possession of and use all of the Contractor's and/or Subcontractor's materials (exclusive of tools) intended for use on the Work. The cost of completion Including all expenses, attomey's fees and costs incurred In resolving the labor dispute shall be charged against the Contractor and/or Subcontractor's remaining Interest in the Contract amount. 13.8.4. Should the Contractor and/or Subcontractor(s) become Involved In a labor dispute resulting In a work stoppage, slow down or any type of Interference with progress of construclion and result ing in an Increase in interest charges to Wal -Mart, the Contractor and/or Subcontractor(s) shall be liable to Wal -Mart for this Increased cost. If the Contractor and/or Subcontractor's remaining Interest In the Contract amount exceeds cost of completion, the Contractor and/or Subcontractors) agree to pay Wal -Mart such excess within thirty (30) days after written demand for such excess has been made upon him by Wal -Mart. 13.8.5. Harmony cause provisions similar to the provisions of the Immediately preceding paragraphs shall be included in any of the Contractor and/or Subcontractor's subcontracts relating to the Work. END OF SUPPLEMENTARY CONDITIONS 00600 -9 WM - Lake Elsinore, CA July 16,1993 iBV11* ngsAN M OWINGS AVAILAWA AT TB1B T. or Hx 1.09 PROJECT COORDINATION A. Coordinate work of the various sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later and under separate contracts. B. Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various Sections having Interdependent responsibilities for installing, connecting to, and placing in service, such equipment. C. Coordinate space requirements and Installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits, as closely as practicable; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. D. In finished areas conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements. E. Execute cutting and patching to integrate elements of Work, uncover III- timed, defective, and non - conforming work, provide openings for penetrations of existing surfaces, and proviue samples for testing. Seal penetrations through floors, walls, and ceilings. F. After Wal -Mart occupancy, coordinate access to site and premises for correction of defective work and work not in accordance with the Contract Documents, to minimize disruption of Wal -Mart's activities. 1.10 REFERENCE STANDARDS A. Reference to national construction standards contained herein shall be used where applicable. Where referenced, the latest edition of the reference standard shall apply. B . Coordinate requirements with local requirements. Local requirements shall take precedence unless special approval is Issued by the authority having jurisdiction. 1.11 WAL -MART OCCUPANCY A. Wal -Mart may occupy any completed or partially completed portions of the Project as provided for in the Conditions of the Contract. B . Cooperate with Wal -Mart to minimize conflict, and to facilitate Wal -Mart's operations. C. Schedule the Work to accommodate this requirement. D. Prior to Wal -Mart occupancy, ensure that the following conditions have been met: 1. Illuminate l exit signs and emergency lighting are installed and operational. 2. Exit doors are installed, including required panic hardware, and operational. 3. Lighted, enclosed walkways and other temporary safety measures are in place if required by authorities having jurisdiction. 4. Fire sprinkler system is operational. 5. Doors required for Wal -Mart's security purposes are Installed and operational. E. After Wal -Mart occupancy: 1. Keep exit routes and exit doors free from obstructions. 2. Maintain exit signs and fire sprinkler system in operational condition. 3. Provide security for Wal -Mart's products, equipment, and operations. 4. Do not permit smoking in the building. FART PRODUCTS Not Used. 01010.3 WM - lake Elsinore, CA July 16,1993 A SECTION 01010 WM: 03303 SUMMARY OF WORK PART GENERAL 1.01 SUMMARY A. Section Includes: 1. Definitions. 2. Work covered by Contract Documents. 3. Work by Wal -Mart or Separate Contractors. 4. Wal -Mart furnished products. 5. Owner furnished products. 6. Contractor use of Site and Premises. 7. Alternates. 8. Protect coordination. 9. Reference standards. 10. Wal -Mart Occupancy. 1.02 DEFINITIONS A. Furnish: Purchase and deliver to project site, ready for installation. B. Install: Unpack, assemble, set in final position, fasten in place, make final connections, clean, adjust, and leave ready for use by Wal -Mart. C. Provide: Furnish and install. 1.03 WORK COVERED BY CONTRACT DOCUMENTS A. Work of '.hl, Contract comprises of general construction required for a new Wal -Mart store, located as indicated on cover of Project Manual. B. Construct the Work under a single lump sum contract. 1.04 WORK BY WAL -MART OR SEPARATE CONTRACTORS A. Wal -Mart may award separate contracts for work at the Site, which will be executed concurrent with work of this Contract. Consult and 000perata with separate contractors to the full extent provided for In the Conditions of the Contract. B. During setup of equipment by Wal -Mart, make crane service available to hoist equipment directly from trucks to final position. Coordinate schedule with Wal -Mart's Construction Manager. 1.05 i WAL -MART FURNISHED PRODUCTS A. Products furnished to the site and paid for by Wal -Mart are those Indicated under "Products Furnished by Others Schedule" at end of this Section. j B. Wal -Mart's Responsibilities: 1. Arrange for delivery of supplier furnished shop drawings, product data, and samples to Contractor. 2. Arrange and pay for product delivery to site, in accordance with agreed upon construction schedule. 3. Deliver supplier's shipment list of materials to Contractor. 4. Submit claims for transportation damage. 5. Arrange for replacement of damaged, defective, or missing items. 6. Arrange for manufacturers' warranties, bonds, inspections, I services, and as required. 01010.1 WM - Lake Elsinore, CA July 16, 1993 1 iBV11* ngsAN M OWINGS AVAILAWA AT TB1B T. or Hx 1.09 PROJECT COORDINATION A. Coordinate work of the various sections of Specifications to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items installed later and under separate contracts. B. Verify characteristics of elements of interrelated operating equipment are compatible; coordinate work of various Sections having Interdependent responsibilities for installing, connecting to, and placing in service, such equipment. C. Coordinate space requirements and Installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduits, as closely as practicable; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. D. In finished areas conceal pipes, ducts, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements. E. Execute cutting and patching to integrate elements of Work, uncover III- timed, defective, and non - conforming work, provide openings for penetrations of existing surfaces, and proviue samples for testing. Seal penetrations through floors, walls, and ceilings. F. After Wal -Mart occupancy, coordinate access to site and premises for correction of defective work and work not in accordance with the Contract Documents, to minimize disruption of Wal -Mart's activities. 1.10 REFERENCE STANDARDS A. Reference to national construction standards contained herein shall be used where applicable. Where referenced, the latest edition of the reference standard shall apply. B . Coordinate requirements with local requirements. Local requirements shall take precedence unless special approval is Issued by the authority having jurisdiction. 1.11 WAL -MART OCCUPANCY A. Wal -Mart may occupy any completed or partially completed portions of the Project as provided for in the Conditions of the Contract. B . Cooperate with Wal -Mart to minimize conflict, and to facilitate Wal -Mart's operations. C. Schedule the Work to accommodate this requirement. D. Prior to Wal -Mart occupancy, ensure that the following conditions have been met: 1. Illuminate l exit signs and emergency lighting are installed and operational. 2. Exit doors are installed, including required panic hardware, and operational. 3. Lighted, enclosed walkways and other temporary safety measures are in place if required by authorities having jurisdiction. 4. Fire sprinkler system is operational. 5. Doors required for Wal -Mart's security purposes are Installed and operational. E. After Wal -Mart occupancy: 1. Keep exit routes and exit doors free from obstructions. 2. Maintain exit signs and fire sprinkler system in operational condition. 3. Provide security for Wal -Mart's products, equipment, and operations. 4. Do not permit smoking in the building. FART PRODUCTS Not Used. 01010.3 WM - lake Elsinore, CA July 16,1993 A 6. Provide space for Contractor, Architect, and Architect's Consultant review stamps. 7. Forward submittals to s ecilied party along with transmittal. 8. Allow 10 working days for review. 9. Revise and resubmit submittals when required; identify changes made since previous submittal. 10. Forward copies of reviewed submittals to Contractor. B. Architect's Consultant's Responsibilities: Where submittals are Indicated to be fonvarded directly to Architect's Consultant: 1. Review submittals and mark to indicate action taken: a. Rejected. b. No exceptions taken. c. Accepted as noted. d. Revise and resubmit. e. Submit specified item. 2. Forward reviewed submittals to Architect. C. Architect's Responsibilities: 1. Review submittals and mark to indicate action taken: a. Rejected. b. No exceptions taken. c. Accepted as noted. d. Revise and resubmit. e. Submit specified item. 2. Return reviewed submittals to supplier along with transmittal. 3. Forward copy to Wal -Mart's Construction Manager. D. Contractor's Responsibilities: 1. Review submittals to verily Products required, field dimensions, and adjacent construction. 2. Coordinate Information on submittals with the requirements of the Work and Contract Documents. 3. Forward executed copy of Submittal Review Form to supplier within 5 days after receipt of submittal, with copies to Architect and Wal -Marrs Construction Manager. 4. Schedule delivery date for products with supplier. 1.04 SHOP DRAWINGS A. Fresenf In clear and thorough manner. B. Identify details by reference to sheet, detail, schedule or room names shown on Drawings. C. Maximum sheet size: 30 Inches by 42 Inches. D. Number of Copies Required: 1. Submittals made to Architect or Architect's Consultants: One reproduc?ble transparency and one bi431!ne or blackline reproduction. 2. Submittals made to Wal -Mart: Four blueline or blackline reproductions. E. After reviaw, reproduce and distribute In accordance with Article on Procedures above and for Record Documents described in Section 01700 - Contract Closeout. 1.05 Pf : DUCT DATA A. WAnufacturor's standard scht matio drawings and diagrams: 1. Cleary mark to Identify pertinent products. 2. Show performance characteristics and capacities. 3. Show armenslons and clearances required. 4. Show ilring or pipinngg diagrams and controls. 5. Modify drawings an diagrams to delete information not applicable to this work. 6. Supplement Voa:fard drawinge and diagrams to provide complete Information applicable to this work. B. Mark each copy to identify applicayle products, models, options, and other data. Supplement manufacturers' standard data to provide information unique to this Project. C. Number of lsaies Required: Four. 01300 -2 WM - Lake Elsinore, CA July 16, 1993 n ]" _, J .•,7, ` - .:P?'!rF`4, tr l'F1,4 [3ut''f+`c'2_ ..If F;.i.,L'P}SS1 Y-, v ..Ali.:c i 1 i 1.06 SAMPLES A. Illustrate functional and aesthetic characteristics of the Product, with integral parts and attachment devices. Coordinate sample submittals for Interfacing 'Nork. B. Submit samples of finishes from the full range of manufacturers' standard colors, textures, and patterns for Architect's selection, or in colors, textures, and patterns specified. C. Include identification on each samp!e, with full Project information. D. Number of Copies Required: 1. Color submittals: Four of each sample; one of which will be retained by Architect. 2. Other samples: Two of each sample unless otherwise Indicated In individual specification Sections; one of which will be retained by Architect. E. Reviewed samples which may be used in the Work are indicated in individual specification sections. 1.07 LETTERS OF CONFORMANCE A. For products which will be furnished the same as those specified, submit Letter of Conformance. B. Indicate compliance of product with requirements of Contract Documerts; list manufacturer, model, and components to be provided. C. Number of Copies Required: Four. 1.08 LETTERS OF CERTIFICATION A. Certify manufacturer's or installer's qualN!cations, conformance with tests or specified criteria, or other factors as required in individual specification sections. B. Submit supporting reference date, aflkfavhs, and certifications as required. C. Number of Copies Required: Four. 1.09 MANUFACTURER'S INSTRUCTIONS A. Manufacturer's printed Instructions for delivery, storage, assembly, Installation, start up, testing, adjusting, and finishing. B. Identify conflicts between manufacturers' Instructions and Contract Documents. PART 2 PRODUCTS Not Used. 01300 -3 WM - Lake Elsinore, CA July 16, 1993 tls. rM P) T6 If uIrf AN6 " T ampmu Ta rIMB AVAIL"A AT Tits 71 AAUWA i k t 1 j I 5 r 1 s f f WM - Lake Elsinore, CA 01300 -5 July 16, 1993 C. Contractor's Responsibilities: 1. Determine and coordinate quantities of materials with Wal -Mart's Construction Department. 2. Coordinate required delivery dates with Wal -Mart's Construction Department. 3. Review supplier fur,.' ` ed shop drawings, product data, and samples under provisions of Section 01300. Subn.,, to supplier with notification to Architect and Wal -Mart's Construction Department of any discrepancies or problems anticipated in the use the products. 4. Receive and unload products at site when indicated In "Products Furnished by Others Schedule" at end of this Section. 5. Promptly inspect products upon receipt for shortages, damaged, or defective items; report to Wal -Mart's Construction Department. 6. Handle products at site, Including uncrating, storage, and protection. 7. Install products when Indicated in "Products Furnished by Others Schedule" at end of this Section. 8. Protect installed products from damage. 9. Replace items damaged by Contractor. 10. Remove trash, debris, and rubbish. 1.06 OWNER FURNISHED PRODUCTS A. Products furnished to the site and paid for by Owner are those Indicated in "Products Furnished byOthersSchedule" at end of this Section. B. Owner's Responsibilities: 1. Arrange for delivery of supplier furnished shop drawings, product data, and samples to Contractor. 2. Arrange and pay for product delivery to site, In accordance with agreed upon construction schedule. 3. Deliver supplier's shipment list of materials to Contractor. 4. Submit claims for transportation damage. 5. Arrange for replacement of damaged, defective, or missing items. 6. Arrange for manufacturers' warrardles, bonds, services, and inspections, as required. C. Contractors Responsibilities: 1. Determine and coordinate quantities of materials with Owner and Wal- Mart's Construction Department. 2. Coordinate required delivery dates with Owner and Wal -Mart's Construction Department. 3. Review supplier furnished shop drawings, pproduct data, and samples under provisions of Section 01300. Submit to supplier with notif cation to Architect, Owner, and Wal- Mart's Construction Department of any discrepancies or problems anticipated in the use the products. 4. Receive and unload products at site when Indicated in "Products Furnished by Others Schedule" at end of this Section. 5. Promptly Inspect products upon receipt for shortages, damaged, or defective items; report to Owner and Wal -Mart's Construction Department. 6. Handle products at she, Including uncrating, storage, and protection. 7. Install products when indicated In "Products Furnished by Others Schedule" at end of this Section. 8. Protect InI.talled products from damage. 9. Replace hems damaged by Contractor. 10. Remove trash, debris, and rubbish. 1.07 CONTRACTOR USE OF SITE AND PREMISES A. Limit use of she to allow for: 1. Wal -Mart occupancy. 2. Work by separate contractors and by Wal -Mart. B. Do not unreasonably encumber she with products or equipment. 1.08 ALTERNATES A. Alternates included elsewhere in the Contract Documents will be reviewed and accepted or rejected at Wal -Mart's option. Accepted Alternates will be identified in Owner- Contractor Agreement. B . Coordinate related work and modify surrounding work as required. 01010-2 WM - Lake Elsinore, CA July 16,1993 At PART 3 EXECUTION 3.01 PRODUCTS FURNISHED BY OTHERS SCHEDULE 5PECIFI- CATION SECTION I DESCRIPTION FURNISHED BY RECEIVED - BY INUIALLED BY CONNECTIONREQUIRED UNDERDIVISIONS 05120 Structural tee ner orator orar Steel Joists Contractor Contractor tee Owner and actor ntract 796u- HVAC Rooftop Units Owner ontaor lbow e ain I ures ornracor o ra or Service an Distribution ner WM - Lake Elsinore, CA END OF SECTION 01010-4 Bi. .... -. •e Yr r•Kr.r- st. :. °-a sy- ,sip?% 4'88 BE" AJ COMM 11141111111110 AVAILAei,Ta Alf 4'81 T OF VIJ x, i i i t 1 1 1 I i I L 1 1 I SECTION 01036 Uni: 060793 REQUESTS FOR INFORMATION PART GENERAL 1.01 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for handling and processing Requests for Information (RFI). 2. Request for Information form attached at the end of this Section. 3. Request for Information Process diagram attached at the end of this Section. 1.02 DEFINITION A. Requests for Information: A formal process used during the construction phase to facilitate communication between the Contractor and the Architect with regard to requests for additional information and clarification of the intcnt of the Contract Documents (Drawings and Specifications). B. Do not use Request for Information form during bidding. Direct questions during bidding phase to the Wal -Mart Construction Department, telephone number (501) 273 -4000. 1.03 PROCEDURE A. Conditions Requiring Clarification of the Contract Documents: Submit a Request for Information to Wal -Mart Stores Team) [Sam's Team] (Supercenter Team] . 1. Submit Requests for Information from Contractor's office or field office only. Requests for Information submitted directly from subcontractors or suppliers will not be accepted. 2. Generate Requests for Information by one source per project and number accordingly. 3. Submit one request for Information per form. B. Architect will review formal requests from the Contractor with reasonable promptness and the Contractor will be notified in writing of decisions made. 1. Architect's response shall not be considered as a Change Order or Change Directive, nor does it authorize changes in the Contract Sum or Contract Time. C. Maintain log of Requests for Information sent to, and responses from, [Wal -Mart Stores Team] Sam's Team [Supercenter Team] . Fax Requests for Information log every Friday to (Wal -Mart tones Team)'[Sam's Team] (Superoenter Team]. D. Scheduling, Costing, and Owner Provided Equipment Coordination: Direct to the Owners Cc- 4ruction Manager. 1.04 REQUEST FOR INFORMATION FORM A. Submit requests for information on attached Request for Information form. Architect will not respond to requests for information unless this format is utilized. B. Where submittal form does not provide space needed for complete information, additional sheets may be attached. PART2 PRODUCTS Not Used. PART3 EXECUTION Not Used. WM - Lake Elsinore, CA END OF SECTION 01036.1 July 16,1993 PART 3 EXECUTION 3.01 SUBMITTAL SCHEDULE A. Legend: WM Wal -Mart A Architect of Record ASC Architect's Structural Consultant AMC Architect's Mechanical Consultant AEC Architect's Electrical Consultant 01300 -4 WM - Lake Elsinore, CA July 16, 1993 I Wal -Mart Stores SECTION 01310 PRODUCT COMPLIANCE LETTER t WM: 060493 PROJECT SCHEDULES Project Location: Date: t PART 1 GENERAL CRY) 1.01 SUMMARY State) i A. Section Y I: kl•[ KL? a7Tt7yll[ :T.[YZ'T:11 1[7'jjj:'-- 1. roject Schedule Requirements. Project Number: i 3. Schedule Updates. Store Number: 4. Schedule Revisions. 5. Recovery Plan. Specification Section Number: 6. Definitions. 7. Log. Specified Product: _ 1.02 DESCRIPTION OF WORK Manufacturer: A. Schedu:mg and progress reporting under this Contract will be performed using the Critical Path Method, hereinafter to CPM. Model Number: j referred as Requirements for CPM Are included to ensure adequate kkIrIu planning and execution of the Work and to assist the Owner in evaluating progress of the Work. Statement of Conformance 1.03 QUALITY ASSURANCE CoThis "Product mpliance Letter is offered instead of Shop Drawings, Product Data, Cut Sheets, and Samples in A. It is expected that the Contractor and its representatives will have adequate knowledge of, and experte.c ^with, CPM and the scheduling techniques to be utilized in this Contract. accordance with Section 01300 •Submittals. The undone nod hereby declares that the Product Identified above by manuta%turee' name and model number is the 1. Reference for basic CPM principles: J. J. Moder, C. R. Phillips, and E. W. Davis, Protect one o products) specified, suitable for 3rd Edition, New York: VantheintendeduseasdefinedwithintheContractDocumentsandwillbeprovidedandplacedinoperationalNostrandReinholdCompany, 1983. condition in accordance with the manufacturer's published instructions and the Contract Documents. B. The schedule for this project will be computerized. C. Any and all costs Incurred by the Contractor In researching and/or educating its personnel in CPM and the systems to be utilized In this project are ;o be bome by the Contractor and will not be Contact name of subcontractor offering above product) Phone: reimbursed by the Owner. 1.04 CONSTRUCTION SCHEDULE Phone: General Contractor: Contact Name) A. Be familiar in detail with the Preliminary Construction Schedule furnished by Wal -Mart. Acknowledge that the Preliminary Construction Schedule is a feasible, reasonable and workable schedule for the Work. it Is the basis for development of the Final Constr_•;tion Schedule. Signature: General Contractor) B. Utilizing the 7reliminary %;onstruction Schedule as the basis, the Wal -Mart Construction Manager will approve the Contractor the Final Construction Schedule which will reflect the specific pro +ect requirements. Therea:ter, the Project will be managed by the Final Construction Schedule, which theENDOFSECTION Contractor shall use In planning, organizing, directing, coordinating and executing the work, and which shall be the basis of evaluating progress of the Work. i 1.05 SCHEDULE UPDATES A. For the purpose of administering This Contra&, " Schodule Update" shall be defined 'he process of applying actual and projected progress Information to be included in schedule ur. ' including actual start and'inish dates, rdn..:. datepercentagecomplete, remaining duration or projecte6 for all activities in progress during reporting Schedule updates may also include minoreperiod. charges In activity descriptions, for the purpose of clarHy UpdatIN1 the schedule does not Include revision of any numeric data, such as activity durations, logic or cons'ra ;ned dates. 01300 -6 01310 -1 WM - Lake Elsinore, CA July 16, 1993 1 WM - Lake Elsinore. CA July 16,1993 i 1 1''1.b.'E^')vF .x ,. _ c•-: -?ate- :•^?f^ s :..,; . .. _. - _ ,,r,, .. _.,, A'M'Y .' -,A V'. `R - - /MI.YRt: -9x-', 7 : ., Efi; J: bl.'• f(t •+P-•.T'e,'is- aw.Y INN 111119:=11 1101 ii,! ".S AG.'1'`•§ :. .i'•*lt .., .. . v.. - a'_ r:' 7...,i. .,PN• tr_ Pte.• 3' .-- .p.......q.r•'`- - WIN I:Y Irl• a Wu dai[1• G VIE I F I :IrI E•j": Vlu 1•I•I h Wu 01300 -4 WM - Lake Elsinore, CA July 16, 1993 I Wal -Mart Stores SECTION 01310 PRODUCT COMPLIANCE LETTER t WM: 060493 PROJECT SCHEDULES Project Location: Date: t PART 1 GENERAL CRY) 1.01 SUMMARY State) i A. Section 1. roject Schedule Requirements. Project Number: 2. Master Construction Schedule. 3. Schedule Updates. Store Number: 4. Schedule Revisions. 5. Recovery Plan. Specification Section Number: 6. Definitions. 7. Log. Specified Product: _ 1.02 DESCRIPTION OF WORK Manufacturer: A. Schedu:mg and progress reporting under this Contract will be performed using the Critical Path Method, hereinafter to CPM. Model Number: j referred as Requirements for CPM Are included to ensure adequate planning and execution of the Work and to assist the Owner in evaluating progress of the Work. Statement of Conformance 1.03 QUALITY ASSURANCE CoThis "Product mpliance Letter is offered instead of Shop Drawings, Product Data, Cut Sheets, and Samples in A. It is expected that the Contractor and its representatives will have adequate knowledge of, and experte.c ^with, CPM and the scheduling techniques to be utilized in this Contract. accordance with Section 01300 •Submittals. The undone nod hereby declares that the Product Identified above by manuta%turee' name and model number is the 1. Reference for basic CPM principles: J. J. Moder, C. R. Phillips, and E. W. Davis, Protect one o products) specified, suitable for 3rd Edition, New York: VantheintendeduseasdefinedwithintheContractDocumentsandwillbeprovidedandplacedinoperationalNostrandReinholdCompany, 1983. condition in accordance with the manufacturer's published instructions and the Contract Documents. B. The schedule for this project will be computerized. C. Any and all costs Incurred by the Contractor In researching and/or educating its personnel in CPM and the systems to be utilized In this project are ;o be bome by the Contractor and will not be Contact name of subcontractor offering above product) Phone: reimbursed by the Owner. 1.04 CONSTRUCTION SCHEDULE Phone: General Contractor: Contact Name) A. Be familiar in detail with the Preliminary Construction Schedule furnished by Wal -Mart. Acknowledge that the Preliminary Construction Schedule is a feasible, reasonable and workable schedule for the Work. it Is the basis for development of the Final Constr_•;tion Schedule. Signature: General Contractor) B. Utilizing the 7reliminary %;onstruction Schedule as the basis, the Wal -Mart Construction Manager will approve the Contractor the Final Construction Schedule which will reflect the specific pro +ect requirements. Therea:ter, the Project will be managed by the Final Construction Schedule, which theENDOFSECTION Contractor shall use In planning, organizing, directing, coordinating and executing the work, and which shall be the basis of evaluating progress of the Work. i 1.05 SCHEDULE UPDATES A. For the purpose of administering This Contra&, " Schodule Update" shall be defined 'he process of applying actual and projected progress Information to be included in schedule ur. ' including actual start and'inish dates, rdn..:. datepercentagecomplete, remaining duration or projecte6 for all activities in progress during reporting Schedule updates may also include minoreperiod. charges In activity descriptions, for the purpose of clarHy UpdatIN1 the schedule does not Include revision of any numeric data, such as activity durations, logic or cons'ra ;ned dates. 01300 -6 01310 -1 WM - Lake Elsinore, CA July 16, 1993 1 WM - Lake Elsinore. CA July 16,1993 i 1 1''1.b.'E^')vF .x ,. _ c•-: -?ate- :•^?f^ s :..,; . .. _. - _ ,,r,, .. _.,, A'M'Y .' -,A V'. `R - - /MI.YRt: -9x-', 7 : ., Efi; J: bl.'• f(t •+P-•.T'e,'is- aw.Y INN 111119:=11 1101 ii,! ".S AG.'1'`•§ :. .i'•*lt .., .. . v.. - a'_ r:' 7...,i. .,PN• tr_ Pte.• 3' .-- .p.......q.r•'`- - WIN a t M - P I® 1riji :NAB_ mimm nw, T®t i3BBT glib fKib't, comp um DMWINGS AVAII-AMM AT TU T or !x` 4i c s t