HomeMy WebLinkAbout2023-0925 TRUSS CALCS (1)ROOF TRUSS CALCULATIONS
Project Name:Fairfield @ Alberhill Ranch
Project Number: RE1536
Jobsite Location: Lake Elsinore, CA
E.O.R.: Swanson @ Associares Engineering
Customer: Pulte Homes
Design Engineer: DV
Date: June 20, 2023
The bound truss drawings having an electronic seal and signature printed on each
page have been reviewed and approved by the truss designer (truss design
engineer). This review and approval applies solely to the attached truss design
drawing pages that are bound together.
Table of Content
Certificate of Quality
ANSI/TPI Standard Responsibilities
ICCES ESR1118 Evaluation Report on ITW Connector Plates
Inland Empire Truss Inc. General Truss Details
BCSI-BCS B1 Summary Sheet Bracing Recommendations
Truss Placement Plan
Truss Drawings
TPI 1-2014 REQUIREMENTS OF THE TRUSS DESIGNER AND MANUFACTURER2.3.5 Requirements of the Truss Designer. 2.3.5.1 Preparation of Truss Drawings.The Truss Designer is responsible for the preparation of the Truss Design Drawings based on the Truss design criteriaand requirements set forth in the Construction Documents or as otherwise set forth in writing by the BuildingDesigner as supplied to the Truss Designer by the Contractor through the Truss Manufacturer.2.3.5.2 Single Truss Component Design. The Truss Designer shall be responsible for the design, in accordance with this Standard, of each singular Trussdepicted on each Truss Design Drawing. 2.3.5.3 Truss Design Drawing Seal and SignatureWhere the Legal Requirements mandate a Registered Design Professional for buildings, each individual Truss Design Drawing shall bear the seal and signature of the Truss Designer.Exception: When a Cover/Truss Index Sheet is used, it is the only document required to be signed and sealed by theTruss Designer.2.3.5.4 Truss Placement Diagram. When the Truss Placement Diagram serves only as a guide for Truss installation, it does not require the seal of the Truss Designer. 2.3.5.5 Information on Truss Design Drawings. Truss Design Drawings shall include, at a minimum, the information specified below:(a) Building Code used for design, unless specified on Cover/Truss Index Sheet. (b) Slope or depth, span and spacing.(c) Location of all joints and support locations.(d) Number of plies if greater than one.(e) Required bearing widths.(f) Design loads as applicable, including1. Top Chord live load (for roof Trusses, this shall be the controlling case of live, snow or rainload);2. Top Chord dead load;3. Bottom Chord live load;4. Bottom Chord dead load;5. Additional loads and locations;6. Environmental load design criteria (wind speed, snow, rain, seismic, and all applicable factors as required to calculate the Truss loads); and7. Other lateral loads, including drag strut loads.(g) Adjustments to Wood Member and Metal Connector Plate design values for conditions of use. (h) Maximum reaction force and direction, including maximum uplift reaction forces where applicable.(i) Metal Connector Plate type, manufacturer, size, and thickness or gauge, and the dimensioned locationof each Metal Connector Plate except where symmetrically located relative to the joint interface.(j) Size, species and grade for each Wood Member.(k) Truss-to-Truss connection and Truss field assembly requirements.(l) Calculated span to deflection ratio and/or maximum vertical and horizontal deflection for live load andfor live plus dead load and as applicable per Section 7.6.(m) Maximum axial tension and compression forces in the Truss members. (n) Fabrication tolerance per Section 6.4.10.(o) Required Permanent Individual Truss Member Restraint Location.(p) Truss Designer 2.3.5.6 Responsibility Exemptions.The Truss Designer is responsible for items listed in Section 2.3.5 and is not responsible for the requirements of otherparties specified outside of Section 2.3.5. 2.3.6 Requirements of the Truss Manufacturer. 2.3.6.1 Truss Design Criteria and Requirements.The Truss Manufacturer shall obtain the Truss design criteria and requirements from the Construction Documents.2.3.6.2 Communication to Truss Design Engineer.The Truss Manufacturer shall communicate the truss design criteria and requirements to the Truss Designer.2.3.6.3 Alternate Truss Designs. If an alternative or partial set of truss design(s) is proposed either by the Truss Manufacturer or the Truss Designer, such alternative set of design(s) shall be sent to and reviewed by the Building Designer for the Building prior to manufacturing. Where the Legal Requirements mandate a Registered Design Professional for buildings, these alternative set of design(s) do not require the seal of the Truss Designer until accepted by the Building Designer, whereupon these alternative Truss Design Drawings shall be sealed by the Truss Designer. 2.3.6.4 Truss Placement Diagram. Where required by the Construction Documents or Contract, the Truss Manufacturer shall prepare the TrussPlacement Diagram that identifies the assumed location for each individually designated Truss and references the corresponding Truss Design Drawing. The Truss Placement Diagram shall be permitted to include identifying marks forother products including Structural Elements, so that they can be more easily identified by the Contractor during fielderection. When the Truss Placement Diagram serves only as a guide for Truss installation and requires no engineeringinput, it does not require the seal of any Registered Design Professional including in cases where the Legal Requirements mandate a Registered Design Professional for buildings.2.3.6.5 Required Documents.The Truss Manufacturer shall supply to the Contractor the Truss Submittal Package, including the Truss Design Drawings, a Truss Placement Diagram, if required by the Construction Documents or Contract, and the requiredPermanent Individual Truss Member Restraint location and the method to be used per Section2.3.6.6 Special Application Conditions.The Truss Manufacturer shall be allowed to provide detail drawings to the Contractor to document special applicationconditions.2.3.6.7 Truss Submittal Packages. Where required by the Construction Documents or Contract, Legal Requirements or the Building Official, the TrussManufacturer shall provide the appropriate Truss Submittal Package to one or more of the following: Building Official;Building Designer and/or Contractor for review and/or approval per Section 2.3.4.2.2.3.6.8 Reliance on Construction Documents. The Truss Manufacturer shall be permitted to rely on the accuracy and completeness of information furnished in theConstruction Documents or otherwise furnished in writing by the Building Designer and/or Contractor.2.3.6.9 Fabrication Tolerance.The Truss Manufacturer shall determine the value for the fabrication tolerance to be used in the design of the Trusses(see Section 6.4.10).2.3.6.10 Manufacturer Quality Criteria.The Truss Manufacturer shall manufacture the Trusses in accordance with the final Truss Design Drawings, using the quality criteria required by this Standard unless more stringent quality criteria is provided by the Owner in writing orthrough the Construction Documents.2.3.6.11 In-Plant Truss Inspections. Truss inspections, as required by the Jurisdiction, shall be performed at the manufacturer’s facility using the manufacturer’s In-Plan Quality Assurance Program monitored by an inspection agency approved by the Jurisdiction,and shall satisfy any Quality Control/quality assurance requirements for the Trusses and shall satisfy any designated in-plant special inspection requirements for the Trusses.2.3.6.12 Responsibility Exemptions.The Truss Manufacturer is responsible for items listed in Section 2.3.6, and is not responsible for the requirements of other parties specified outside of Section 2.3.6.
DETAILDETAIL
DETAIL
DETAILDETAIL
DETAILDETAIL
DETAILDETAIL
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
BUILDINGJOB NAME:DRAWN BY:
ROOF PITCH:
TYPICAL SPACING:
TYPICAL OVERHANG:
PROJECT #:
DATE:
DATE ON PLANS:
TRUSS HEEL HEIGHT:
! " #$$%
&' ()$$*)++,-#+) (.#*-)+,$#
/' (.#*-)+,$
!!!0
!01
2 33
42-#567
42"6 8 "24"" 4
%$%
%0$%0$$ %-0$0$
9:;#)%$$$%
<2 +,#
!"#
$$
$
!#
#0$$
%
&'
3
3
1=
1
3
3
3 ) 33
!(3*
.
(3*0
#+0%-0-0.%+ %#+0%-0--$0%%.$
-#+0%-0--$0%+#$ %#+0%-0--$0--- -
#+0%-0--$0-%)$ ##+0%-0--$0+)-
+#+0%-0--0##++ #)#+0%-0--%0$%#$ +
.#+0%-0-)0$)+$ )$#+0%-0---0)#$
#+0%-0---0#)#$ %#+0%-0--0$$+-+
-#+0%-0--0- 6 #+0%-0--0$)+ 2
#+0%-0--#0%$$+ ##+0%-0--#0%#%+
+#+0%-0--+0$+%- )#+0%-0--+0+$ >
.#+0%-0--+0%$)$ ;%$#+0%-0--+0%+%$ "
%#+0%-0--+0$%+$ ?%%#+0%-0--+0.-
%-#+0%-0--)0$#-#+ &%#+0%-0--)0++#- :
%#+0%-0--.0$$#.+ 4 %##+0%-0--.0%$#+ <
%+#+0%-0-.0).$ %)#+0%-0$-0-$$
%.#+0%-0-$0$)$ -$#+0%-0-$0%-$$ %
-#+0%-0-$0%%$ --%#+0%-0-$0-%-+
--#+0%-0-0$$ -#+0%-0-%0)$-
-#+0%-0-%0%--)+ 6 -##+0%-0$#0+-)- 6
-+#+0%-0-%0+)%+ 6%-)#+0%-0--0$$- 6
-.#+0%-0--0$- 2 $#+0%-0$0%%$ 2
#+0%-0--0-.$+ 2%%#+0%-0--0%$ 2
-#+0%-0-0%- #+0%-0%$0$.$$ %
#+0%-0.0$%$ %##+0%-0%$0)).$ %%
+#+0%-0%0)+$ %-)#+0%-0%0#$+- %
.#+0%-0%0)++ %$#+0%-0%-0%)%)- %#
@A629BC
CA"D' <BC
General Notes
Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities:
The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1,
Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate
Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design
Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and
dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to
independently verify the accuracy or completeness of the information provided by others and may rely on that information
without liability. The responsibility for verification of that information remains with others neither employed nor controlled
by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page
listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component
designs and not for the technical information furnished by others which technical information and consequences thereof
remain their sole responsibility.
The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in
accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and
loads for each truss component match those required by the plans and by the actual use of the individual component, and
for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any
additional factors required in the particular application. Truss components using metal connector plates with integral teeth
shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to
exceed 19% and/or cause corrosion of connector plates and other metal fasteners.
The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set
forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss
component design loads, inspection of the truss components before or after installation, the design of temporary or
permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear
walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the
foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports,
installation of the truss components, observation of the truss component installation process, review of truss assembly
procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in
the installation of the truss components and/or its connections.
This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic
file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request.
Temporary Lateral Restraint and Bracing:
Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2,
B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or
other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these
drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to
and may not be relied upon for the temporary stability of the truss components during their installation.
Permanent Lateral Restraint and Bracing:
The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of
the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of
BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional.
These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building
stability bracing which are parts of the overall building design to be specified, designed, and detailed by the Building
Designer.
Connector Plate Information:
Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations,
gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60.
Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at
www.icc-es.org.
Fire Retardant Treated Lumber:
Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all
stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special
handling care must be taken to prevent breakage during all handling activities.
Page 1 of 3
#%NOSEAL?$
General Notes (continued)
Key to Terms:
Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed
information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be
found in calculation sheets available upon written request.
BCDL = Bottom Chord standard design Dead Load in pounds per square foot.
BCLL = Bottom Chord standard design Live Load in pounds per square foot.
CL = Certified lumber.
Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot.
FRT = Fire Retardant Treated lumber.
FRT-DB = D-Blaze Fire Retardant Treated lumber.
FRT-DC = Dricon Fire Retardant Treated lumber.
FRT-FP = FirePRO Fire Retardant Treated lumber.
FRT-FL = FlamePRO Fire Retardant Treated lumber.
FRT-FT = FlameTech Fire Retardant Treated lumber.
FRT-PG = PYRO-GUARD Fire Retardant Treated lumber.
FRT-PR = ProWood Fire Retardant Treated lumber.
g = green lumber.
HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches.
HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep
adjustment.
HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds.
Ic = Incised lumber.
FJ = Finger Jointed lumber.
L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value.
L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the
referenced panel point. Reported as 999 if greater than or equal to 999.
Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection.
Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for all load cases.
Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for all load cases.
Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for all load cases.
NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot.
PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds.
PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds
PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds.
PP = Panel Point.
R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc).
-R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc).
Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the
indicated location (Loc).
RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic)
load cases, at the indicated location (Loc).
Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
identified location (Loc).
TCDL = Top Chord standard design Dead Load in pounds per square foot.
TCLL = Top Chord standard design Live Load in pounds per square foot.
U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
indicated location (Loc).
VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in
inches.
VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and
maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment.
VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load.
VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment.
W = Width of non-hanger bearing, in inches.
Refer to ASCE-7 for Wind and Seismic abbreviations.
Uppercase Acronyms not explained above are as defined in TPI 1.
Page 2 of 3
#%NOSEAL?$
References:
1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175;www.awc.org.
2. ICC: International Code Council;www.iccsafe.org.
3. Alpine, a division of ITW Building Components Group Inc.: 155 Harlem Ave, North Building, 4th Floor, Glenview, IL
60025;www.alpineitw.com.
4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601;www.tpinst.org.
5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcacomponents.com.
Page 3 of 3
#%NOSEAL?$
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) M14,M15,M16,M17,
M18 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 152 /- /- /63 /- /58
B /-478
BD /-305
BC /-243
AJ /-457
Wind reactions based on MWFRS
B Brg Wid = 540 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 1388 -1444
L - P 590 - 600
Chords Tens. Comp.
S - Z 540 -545
Z -AJ 1338 - 1389
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -BD 1342 -1332
BD-BC 1336 -1335
Chords Tens. Comp.
BC-AY 1206 -1212
AY-AJ 1262 -1242
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P -BC 370 -422
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
BD- P 326 - 383
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 AJ 999 240
VERT(CL): 0.005 AJ 999 180
HORZ(LL): -0.035 T - -
HORZ(TL): 0.067 T - -
Creep Factor: 2.0
Max TC CSI: 0.249
Max BC CSI: 0.252
Max Web CSI: 0.467
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A
Ply: 1SEQN: 10867 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T9
DrwNo: 167.23.1355.14927
RDF / RTT 06/16/2023
M14
M15
M16
M17
M18
45'
2'6"
1'4"
(TYP)
22'6"
22'6"
45'
22'6"
45'
45'1'2"1'2"
4"19'8"910'2"2(a)(a)(a)(a)
(a)
A
B
L
P
S
Z
AJ
AK
AYBCBD
5
12
3X6(A1)
1.5X4
1.5X4
3X61.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X41.5X4
3X4
H0510
1.5X41.5X4
1.5X4
5X6
1.5X41.5X4
1.5X4
5X6
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X43X6
1.5X4
1.5X4
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) M14,M15,M16,M17,
M18 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 152 /- /- /63 /- /58
B /-478
BD /-305
BC /-243
AJ /-457
Wind reactions based on MWFRS
B Brg Wid = 540 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 1388 -1444
L - P 590 - 600
Chords Tens. Comp.
S - Z 540 -545
Z -AJ 1338 - 1389
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -BD 1342 -1332
BD-BC 1336 -1335
Chords Tens. Comp.
BC-AY 1206 -1212
AY-AJ 1262 -1242
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P -BC 370 -422
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
BD- P 326 - 383
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 AJ 999 240
VERT(CL): 0.005 AJ 999 180
HORZ(LL): -0.035 T - -
HORZ(TL): 0.067 T - -
Creep Factor: 2.0
Max TC CSI: 0.249
Max BC CSI: 0.252
Max Web CSI: 0.467
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A
Ply: 1SEQN: 10867 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T9
DrwNo: 167.23.1355.14927
RDF / RTT 06/16/2023
M14
M15
M16
M17
M18
45'
2'6"
1'4"
(TYP)
22'6"
22'6"
45'
22'6"
45'
45'1'2"1'2"
4"19'8"910'2"2(a)(a)(a)(a)
(a)
A
B
L
P
S
Z
AJ
AK
AYBCBD
5
12
3X6(A1)
1.5X4
1.5X4
3X61.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X41.5X4
3X4
H0510
1.5X41.5X4
1.5X4
5X6
1.5X41.5X4
1.5X4
5X6
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X4
1.5X43X6
1.5X4
1.5X4
3X6(A1)
$%Lbl:A?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2600 # ( 57.79 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2600 57.79 TC 0.00 45.00
2600 BC 19.69
Case 2: 2600 57.79 TC 0.00 45.00
1149 58.78 BC 0.15 19.69
294 58.78 BC 20.00 25.00
1157 58.78 BC 25.17 44.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A
Ply: 1
Qty: 1
SEQN: 10867 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T9
DrwNo: 167.23.1355.14927
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2600 # ( 57.79 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2600 57.79 TC 0.00 45.00
2600 BC 19.69
Case 2: 2600 57.79 TC 0.00 45.00
1149 58.78 BC 0.15 19.69
294 58.78 BC 20.00 25.00
1157 58.78 BC 25.17 44.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A
Ply: 1
Qty: 1
SEQN: 10867 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T9
DrwNo: 167.23.1355.14927
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B1 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g)
W3 2x4 DF-L #1&Bet.(g); W7,W8,W10 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
(++) - This plate works for both joints covered.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1139 /- /- /677 /- /159
V 1309 /- /- /781 /- /-
S 1046 /- /- /559 /- /-
N 1310 /- /- /811 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
V Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 1.5 (Truss)
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & N are a rigid surface.
Bearings V & S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 19 -2003
C - D 51 - 1708
D - E 74 - 1158
E - F 80 -1308
F - G 108 - 1300
G - H 160 - 1239
Chords Tens. Comp.
H - I 155 -1296
I - J 122 -1793
J - K 84 -1619
K - L 73 -1742
L - M 33 - 2491
M - N 0 -2515
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1793 0
X - W 1161 0
W - V 1161 0
V - U 1162 0
U - T 1131 0
Chords Tens. Comp.
T - S 1210 0
S - R 1210 0
R - Q 1210 0
Q - P 1717 0
P - N 2262 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 64 -502
X - D 629 0
Y - E 10 -605
V - Y 4 -1064
H - T 385 - 30
I -AA 580 -14
Webs Tens. Comp.
AA- J 50 -596
AA- Q 661 -15
S -AA 50 -755
Q - L 64 -525
L - P 759 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.120 I 999 240
VERT(CL): 0.260 I 773 180
HORZ(LL): 0.064 J - -
HORZ(TL): 0.139 J - -
Creep Factor: 2.0
Max TC CSI: 0.947
Max BC CSI: 0.958
Max Web CSI: 0.909
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A1
Ply: 1SEQN: 5883 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T168
DrwNo: 167.23.1330.22940
RDF / RTT 06/16/2023
B1
W3
W7
W8
W10
13'4"4 16'9"8 14'10"4
5'7"8
5'7"8
11'3"
5'7"8
13'4"4
2'1"4
16'9"8
3'5"4
22'6"
5'8"8
27'4"6
4'10"6
30'1"12
2'9"6
35'4"14
5'3"2
45'
9'7"2
7'6"
7'6"
15'6"
8'
24'3"3
8'9"3
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)
A
B
C
D
EF
G
H
I
J K
L
M
N
O
PQRSTUVWX
Y
AA
5
12
3X6(A1)
1.5X3
3X4
3X4
H0308
1.5X4
1.5X4
1.5X4
H0510(++)
3X4
3X4
5X6
3X8
3X4 1.5X4
1.5X4
1.5X4
1.5X4
3X6
3X6 3X4
3X4
3X4
1.5X3
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B1 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g)
W3 2x4 DF-L #1&Bet.(g); W7,W8,W10 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
(++) - This plate works for both joints covered.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1139 /- /- /677 /- /159
V 1309 /- /- /781 /- /-
S 1046 /- /- /559 /- /-
N 1310 /- /- /811 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
V Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 1.5 (Truss)
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & N are a rigid surface.
Bearings V & S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 19 -2003
C - D 51 - 1708
D - E 74 - 1158
E - F 80 -1308
F - G 108 - 1300
G - H 160 - 1239
Chords Tens. Comp.
H - I 155 -1296
I - J 122 -1793
J - K 84 -1619
K - L 73 -1742
L - M 33 - 2491
M - N 0 -2515
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1793 0
X - W 1161 0
W - V 1161 0
V - U 1162 0
U - T 1131 0
Chords Tens. Comp.
T - S 1210 0
S - R 1210 0
R - Q 1210 0
Q - P 1717 0
P - N 2262 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 64 -502
X - D 629 0
Y - E 10 -605
V - Y 4 -1064
H - T 385 - 30
I -AA 580 -14
Webs Tens. Comp.
AA- J 50 -596
AA- Q 661 -15
S -AA 50 -755
Q - L 64 -525
L - P 759 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.120 I 999 240
VERT(CL): 0.260 I 773 180
HORZ(LL): 0.064 J - -
HORZ(TL): 0.139 J - -
Creep Factor: 2.0
Max TC CSI: 0.947
Max BC CSI: 0.958
Max Web CSI: 0.909
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A1
Ply: 1SEQN: 5883 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T168
DrwNo: 167.23.1330.22940
RDF / RTT 06/16/2023
B1
W3
W7
W8
W10
13'4"4 16'9"8 14'10"4
5'7"8
5'7"8
11'3"
5'7"8
13'4"4
2'1"4
16'9"8
3'5"4
22'6"
5'8"8
27'4"6
4'10"6
30'1"12
2'9"6
35'4"14
5'3"2
45'
9'7"2
7'6"
7'6"
15'6"
8'
24'3"3
8'9"3
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)
A
B
C
D
EF
G
H
I
J K
L
M
N
O
PQRSTUVWX
Y
AA
5
12
3X6(A1)
1.5X3
3X4
3X4
H0308
1.5X4
1.5X4
1.5X4
H0510(++)
3X4
3X4
5X6
3X8
3X4 1.5X4
1.5X4
1.5X4
1.5X4
3X6
3X6 3X4
3X4
3X4
1.5X3
3X6(A1)
$%Lbl:A1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T3,
T4 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #1&Bet.(g)
B3 2x4 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,
W6 2x4 DF-L #2(g); W8 2x4 DF-L #1&Bet.(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2146 /- /- /1264 /- /159
Q 741 /- /- /377 /- /-
L 1902 /- /- /1134 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.3 (Truss)
Q Brg Wid = 3.5 Min Req = 1.5 (Truss)
L Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & L are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 23 -4495
C - D 56 - 4236
D - E 87 - 3446
E - F 116 -3374
F - G 180 - 2317
Chords Tens. Comp.
G - H 188 -2638
H - I 171 -3182
I - J 134 -3305
J - K 77 -3874
K - L 22 -3939
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 4074 0
U - T 3562 0
T - S 3562 0
S - R 2962 0
R - Q 2571 0
Chords Tens. Comp.
Q - P 2580 0
P - O 2580 0
O - N 3158 0
N - L 3559 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 65 -376
U - D 611 0
D - S 53 -682
S - F 818 0
F - R 61 - 1229
G - R 1496 - 58
Webs Tens. Comp.
R - H 123 - 579
H - V 566 -29
V - O 706 -31
O - J 79 -710
J - N 665 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.252 S 999 240
VERT(CL): 0.546 S 658 180
HORZ(LL): 0.087 L - -
HORZ(TL): 0.189 L - -
Creep Factor: 2.0
Max TC CSI: 0.762
Max BC CSI: 0.938
Max Web CSI: 0.907
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A2
Ply: 1SEQN: 5886 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T167
DrwNo: 167.23.1330.27560
RDF / RTT 06/16/2023
T3
T4
B3
W5
W6
W8
30'1"12 14'10"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'4"14
8'0"8
45'
9'7"2
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)
A
B
C
D
E
F
G
H
I
J
K
L
M
NOPQRSTU
V
5
12
4X8(A2)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
4X8
3X4
1.5X4
1.5X4
3X6
H0308 3X4
3X4
3X4
1.5X3
3X10(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T3,
T4 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #1&Bet.(g)
B3 2x4 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,
W6 2x4 DF-L #2(g); W8 2x4 DF-L #1&Bet.(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2146 /- /- /1264 /- /159
Q 741 /- /- /377 /- /-
L 1902 /- /- /1134 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.3 (Truss)
Q Brg Wid = 3.5 Min Req = 1.5 (Truss)
L Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & L are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 23 -4495
C - D 56 - 4236
D - E 87 - 3446
E - F 116 -3374
F - G 180 - 2317
Chords Tens. Comp.
G - H 188 -2638
H - I 171 -3182
I - J 134 -3305
J - K 77 -3874
K - L 22 -3939
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 4074 0
U - T 3562 0
T - S 3562 0
S - R 2962 0
R - Q 2571 0
Chords Tens. Comp.
Q - P 2580 0
P - O 2580 0
O - N 3158 0
N - L 3559 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 65 -376
U - D 611 0
D - S 53 -682
S - F 818 0
F - R 61 - 1229
G - R 1496 - 58
Webs Tens. Comp.
R - H 123 - 579
H - V 566 -29
V - O 706 -31
O - J 79 -710
J - N 665 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.252 S 999 240
VERT(CL): 0.546 S 658 180
HORZ(LL): 0.087 L - -
HORZ(TL): 0.189 L - -
Creep Factor: 2.0
Max TC CSI: 0.762
Max BC CSI: 0.938
Max Web CSI: 0.907
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A2
Ply: 1SEQN: 5886 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T167
DrwNo: 167.23.1330.27560
RDF / RTT 06/16/2023
T3
T4
B3
W5
W6
W8
30'1"12 14'10"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'4"14
8'0"8
45'
9'7"2
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)
A
B
C
D
E
F
G
H
I
J
K
L
M
NOPQRSTU
V
5
12
4X8(A2)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
4X8
3X4
1.5X4
1.5X4
3X6
H0308 3X4
3X4
3X4
1.5X3
3X10(A1)
$%Lbl:a2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T1 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #1&Bet.(g)
B2 2x4 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g); W9 2x4 DF-L #1&Bet.(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
(++) - This plate works for both joints covered.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1790 /- /- /1068 /- /159
P 2743 /- /- /1488 /- /-
M 418 /- /- /231 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.9 (Truss)
P Brg Wid = 3.5 Min Req = 2.6 (Truss)
M Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & M are a rigid surface.
Bearing P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3620
C - D 27 - 3337
D - E 61 - 2497
E - F 90 -2426
F - G 151 - 1436
Chords Tens. Comp.
G - H 150 -1580
H - I 432 0
J - K 617 0
K - L 388 -237
L - M 381 - 244
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 3269 0
V - U 2732 0
U - T 2732 0
T - S 2118 0
Chords Tens. Comp.
S - R 1206 0
R - Q 1206 0
Q - P 114 - 598
P - O 114 -599
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 66 -392
V - W 619 0
D - W 531 0
W - T 51 - 718
T - F 760 0
F - S 64 - 1188
G - S 716 - 30
S - H 483 0
Webs Tens. Comp.
H - Q 2 -2198
Q - X 1651 0
X - P 0 -2453
X - K 579 0
J - X 79 -1176
K - O 735 -15
O - L 53 -417
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.142 D 999 240
VERT(CL): 0.305 D 999 180
HORZ(LL): 0.047 Q - -
HORZ(TL): 0.103 Q - -
Creep Factor: 2.0
Max TC CSI: 0.861
Max BC CSI: 0.938
Max Web CSI: 0.944
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A3
Ply: 1SEQN: 5889 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T166
DrwNo: 167.23.1330.31433
RDF / RTT 06/16/2023
T1
B2
W5
W6
W8
W9
34'10"4 10'1"12
5'7"8
5'7"8
11'3"
5'7"8
11'4"3
1"4
16'9"8
5'5"5
22'6"
5'8"8
27'4"6
4'10"6
34'10"4
7'5"14
35'5"7
7"3
40'0"15
4'7"9
45'
4'11"1
7'8"7
7'8"7
15'8"7
8'
24'3"3
8'6"12
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)(a)
A
B
C
D
E
F
G
H
I
J K
L
M
N
OPQRSTUV
W
X
5
12
3X10(A1)
1.5X3
3X4
3X4(++)
H0308
3X6
3X4
4X4
5X6
4X8
3X10
3X6
3X6
4X6
3X63X4
1.5X4
3X43X4
3X4
1.5X3
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T1 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #1&Bet.(g)
B2 2x4 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g); W9 2x4 DF-L #1&Bet.(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
(++) - This plate works for both joints covered.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1790 /- /- /1068 /- /159
P 2743 /- /- /1488 /- /-
M 418 /- /- /231 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.9 (Truss)
P Brg Wid = 3.5 Min Req = 2.6 (Truss)
M Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & M are a rigid surface.
Bearing P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3620
C - D 27 - 3337
D - E 61 - 2497
E - F 90 -2426
F - G 151 - 1436
Chords Tens. Comp.
G - H 150 -1580
H - I 432 0
J - K 617 0
K - L 388 -237
L - M 381 - 244
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 3269 0
V - U 2732 0
U - T 2732 0
T - S 2118 0
Chords Tens. Comp.
S - R 1206 0
R - Q 1206 0
Q - P 114 - 598
P - O 114 -599
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 66 -392
V - W 619 0
D - W 531 0
W - T 51 - 718
T - F 760 0
F - S 64 - 1188
G - S 716 - 30
S - H 483 0
Webs Tens. Comp.
H - Q 2 -2198
Q - X 1651 0
X - P 0 -2453
X - K 579 0
J - X 79 -1176
K - O 735 -15
O - L 53 -417
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.142 D 999 240
VERT(CL): 0.305 D 999 180
HORZ(LL): 0.047 Q - -
HORZ(TL): 0.103 Q - -
Creep Factor: 2.0
Max TC CSI: 0.861
Max BC CSI: 0.938
Max Web CSI: 0.944
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A3
Ply: 1SEQN: 5889 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T166
DrwNo: 167.23.1330.31433
RDF / RTT 06/16/2023
T1
B2
W5
W6
W8
W9
34'10"4 10'1"12
5'7"8
5'7"8
11'3"
5'7"8
11'4"3
1"4
16'9"8
5'5"5
22'6"
5'8"8
27'4"6
4'10"6
34'10"4
7'5"14
35'5"7
7"3
40'0"15
4'7"9
45'
4'11"1
7'8"7
7'8"7
15'8"7
8'
24'3"3
8'6"12
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)(a)
A
B
C
D
E
F
G
H
I
J K
L
M
N
OPQRSTUV
W
X
5
12
3X10(A1)
1.5X3
3X4
3X4(++)
H0308
3X6
3X4
4X4
5X6
4X8
3X10
3X6
3X6
4X6
3X63X4
1.5X4
3X43X4
3X4
1.5X3
3X6(A1)
$%Lbl:A3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 949 /- /- /572 /- /159
Q 3348 /- /- /1780 /- /-
L 708 /- /- /438 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
Q Brg Wid = 3.5 Min Req = 3.2 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 16 -1541
C - D 48 - 1267
F - G 1125 0
Chords Tens. Comp.
G - H 1366 0
J - K 50 -935
K - L 0 -977
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1361 0
T - S 744 - 34
S - R 744 -34
Q - P 109 - 823
Chords Tens. Comp.
P - O 109 -823
O - N 444 - 145
N - L 845 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 66 -429
T - D 680 0
D - R 50 -711
R - F 769 0
F - Q 75 - 1232
Webs Tens. Comp.
G - Q 0 -1234
Q - H 119 -1048
H - O 1176 0
O - J 83 -677
J - N 686 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.036 T 999 240
VERT(CL): 0.090 T 999 180
HORZ(LL): 0.009 C - -
HORZ(TL): 0.023 C - -
Creep Factor: 2.0
Max TC CSI: 0.606
Max BC CSI: 0.762
Max Web CSI: 0.539
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A4
Ply: 1SEQN: 5892 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T169
DrwNo: 167.23.1330.35280
RDF / RTT 06/16/2023
T3
W5
W6
W8
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'4"14
8'0"8
45'
9'7"2
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L
M
NOPQRST
5
12
3X6(A1)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
3X10
3X6
H0308
3X6 4X4
3X4
3X4
1.5X3
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 949 /- /- /572 /- /159
Q 3348 /- /- /1780 /- /-
L 708 /- /- /438 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
Q Brg Wid = 3.5 Min Req = 3.2 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 16 -1541
C - D 48 - 1267
F - G 1125 0
Chords Tens. Comp.
G - H 1366 0
J - K 50 -935
K - L 0 -977
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1361 0
T - S 744 - 34
S - R 744 -34
Q - P 109 - 823
Chords Tens. Comp.
P - O 109 -823
O - N 444 - 145
N - L 845 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 66 -429
T - D 680 0
D - R 50 -711
R - F 769 0
F - Q 75 - 1232
Webs Tens. Comp.
G - Q 0 -1234
Q - H 119 -1048
H - O 1176 0
O - J 83 -677
J - N 686 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.036 T 999 240
VERT(CL): 0.090 T 999 180
HORZ(LL): 0.009 C - -
HORZ(TL): 0.023 C - -
Creep Factor: 2.0
Max TC CSI: 0.606
Max BC CSI: 0.762
Max Web CSI: 0.539
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A4
Ply: 1SEQN: 5892 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T169
DrwNo: 167.23.1330.35280
RDF / RTT 06/16/2023
T3
W5
W6
W8
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'4"14
8'0"8
45'
9'7"2
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
34'2"5
9'11"3
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"19'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L
M
NOPQRST
5
12
3X6(A1)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
3X10
3X6
H0308
3X6 4X4
3X4
3X4
1.5X3
3X6(A1)
$%Lbl:A4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g) B3 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 104 plf at -1.28 to 104 plf at 46.28
BC: From 6 plf at -1.28 to 6 plf at 0.00
BC: From 21 plf at 0.00 to 21 plf at 45.00
BC: From 6 plf at 45.00 to 6 plf at 46.28
PLB: From 53 plf at 16.31 to 53 plf at 20.16
BC: 90 lb Conc. Load at 28.46
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Bearing Block(s)
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 24.167' 1 13" 8 DF-L Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1244 /- /- /743 /- /209
S 4280 /- /0 /2354 /- /-
L 903 /- /- /569 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = -
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 31 -2014
C - D 73 - 1654
D - E 176 - 482
E - F 239 - 388
F - G 1500 0
Chords Tens. Comp.
G - H 1820 0
H - I 558 - 221
I - J 478 - 383
J - K 74 -1183
K - L 6 -1239
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1779 0
V - U 974 -50
U - T 974 - 50
S - R 131 -1122
R - S 178 - 1642
Chords Tens. Comp.
R - Q 710 -1927
Q - P 131 -1122
P - O 131 -1122
O - N 491 - 290
N - L 1068 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 87 -566
V - D 797 0
D - T 66 -927
T - F 1037 0
F - S 96 - 1643
G - S 0 -1639
Webs Tens. Comp.
S - H 157 -1334
H - O 1447 0
O - J 106 - 911
J - N 788 -3
N - K 62 -381
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 31.5 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.046 V 999 240
VERT(CL): 0.281 Q 874 180
HORZ(LL): 0.012 C - -
HORZ(TL): 0.033 S - -
Creep Factor: 2.0
Max TC CSI: 0.910
Max BC CSI: 0.980
Max Web CSI: 0.719
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A5
Ply: 1SEQN: 5898 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T170
DrwNo: 167.23.1330.51783
RDF / RTT 06/16/2023
T3
B3
W5
W6
W8
BL1
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'5"7
8'1"
40'2"11
4'9"5
45'
4'9"5
7'6"
7'6"
15'6"
8'
24'4"15
8'10"15
25'10"14
1'5"15
30'10"14
5'
32'6"
1'7"2
34'2"5
1'8"5
40'2"11
6'0"6
45'
4'9"51'2"1'2"
4"13"89'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L M
NOPQRSTUV
5 12
3X6(A1)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X6
5X6
4X10 3X4
4X6
3X41.5X3 3X6
H0308
3X6 4X6
3X4
3X4
1.5X3
3X6(A1)
28'5"8
90#
16'6"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g) B3 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 104 plf at -1.28 to 104 plf at 46.28
BC: From 6 plf at -1.28 to 6 plf at 0.00
BC: From 21 plf at 0.00 to 21 plf at 45.00
BC: From 6 plf at 45.00 to 6 plf at 46.28
PLB: From 53 plf at 16.31 to 53 plf at 20.16
BC: 90 lb Conc. Load at 28.46
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Bearing Block(s)
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 24.167' 1 13" 8 DF-L Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1244 /- /- /743 /- /209
S 4280 /- /0 /2354 /- /-
L 903 /- /- /569 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = -
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 31 -2014
C - D 73 - 1654
D - E 176 - 482
E - F 239 - 388
F - G 1500 0
Chords Tens. Comp.
G - H 1820 0
H - I 558 - 221
I - J 478 - 383
J - K 74 -1183
K - L 6 -1239
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1779 0
V - U 974 -50
U - T 974 - 50
S - R 131 -1122
R - S 178 - 1642
Chords Tens. Comp.
R - Q 710 -1927
Q - P 131 -1122
P - O 131 -1122
O - N 491 - 290
N - L 1068 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 87 -566
V - D 797 0
D - T 66 -927
T - F 1037 0
F - S 96 - 1643
G - S 0 -1639
Webs Tens. Comp.
S - H 157 -1334
H - O 1447 0
O - J 106 - 911
J - N 788 -3
N - K 62 -381
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 31.5 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.046 V 999 240
VERT(CL): 0.281 Q 874 180
HORZ(LL): 0.012 C - -
HORZ(TL): 0.033 S - -
Creep Factor: 2.0
Max TC CSI: 0.910
Max BC CSI: 0.980
Max Web CSI: 0.719
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A5
Ply: 1SEQN: 5898 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T170
DrwNo: 167.23.1330.51783
RDF / RTT 06/16/2023
T3
B3
W5
W6
W8
BL1
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'5"7
8'1"
40'2"11
4'9"5
45'
4'9"5
7'6"
7'6"
15'6"
8'
24'4"15
8'10"15
25'10"14
1'5"15
30'10"14
5'
32'6"
1'7"2
34'2"5
1'8"5
40'2"11
6'0"6
45'
4'9"51'2"1'2"
4"13"89'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L M
NOPQRSTUV
5 12
3X6(A1)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X6
5X6
4X10 3X4
4X6
3X41.5X3 3X6
H0308
3X6 4X6
3X4
3X4
1.5X3
3X6(A1)
28'5"8
90#
16'6"8
$%Lbl:a5?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Minimum Required bearing length for support points
with bearing plates (BP) and/or bearing blocks (BLn)
is equal to the nominal Brg Width shown.
WARNING: 20 psf additional bottom chord live load
check has been modified
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A5
Ply: 1
Qty: 1
SEQN: 5898 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T170
DrwNo: 167.23.1330.51783
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Minimum Required bearing length for support points
with bearing plates (BP) and/or bearing blocks (BLn)
is equal to the nominal Brg Width shown.
WARNING: 20 psf additional bottom chord live load
check has been modified
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A5
Ply: 1
Qty: 1
SEQN: 5898 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T170
DrwNo: 167.23.1330.51783
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B3 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 46.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 45.00
BC: From 4 plf at 45.00 to 4 plf at 46.28
BC: From 40 plf at 16.31 to 40 plf at 20.16
BC: 90 lb Conc. Load at 28.25
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: 20 psf additional bottom chord live load
check has been modified
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 949 /- /- /568 /- /159
S 3276 /- /0 /1788 /- /-
L 691 /- /- /435 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 22 -1538
C - D 54 - 1264
F - G 1138 0
G - H 1382 0
Chords Tens. Comp.
H - I 410 - 181
J - K 55 -908
K - L 0 -951
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1359 0
V - U 746 -37
U - T 746 - 37
S - R 102 - 849
R - S 273 - 1348
Chords Tens. Comp.
R - Q 768 -1659
Q - P 102 - 849
P - O 102 -849
O - N 386 - 207
N - L 820 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 66 -431
V - D 681 0
D - T 50 -707
T - F 789 0
F - S 73 - 1251
Webs Tens. Comp.
G - S 0 -1247
S - H 120 -1019
H - O 1116 0
O - J 81 -695
J - N 680 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.038 Q 999 240
VERT(CL): 0.263 Q 932 180
HORZ(LL): 0.009 C - -
HORZ(TL): 0.026 S - -
Creep Factor: 2.0
Max TC CSI: 0.916
Max BC CSI: 0.919
Max Web CSI: 0.547
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A6
Ply: 1SEQN: 5896 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T5
DrwNo: 167.23.1331.46677
RDF / RTT 06/16/2023
B3
W5
W6
W8
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'5"7
8'1"
45'
9'6"9
7'6"
7'6"
15'6"
8'
24'3"3
8'9"3
25'10"14
1'7"11
30'10"14
5'
32'6"
1'7"2
34'4"12
1'10"12
40'0"15
5'8"3
45'
4'11"11'2"1'2"
4"13"89'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L M
NOPQRSTUV
5 12
3X6(A1)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
3X10 3X4
3X6
2X31.5X3 3X6
H0308
3X6 4X4
3X4
3X4
1.5X3
3X6(A1)
28'3"
90#
16'9"
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B3 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 46.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 45.00
BC: From 4 plf at 45.00 to 4 plf at 46.28
BC: From 40 plf at 16.31 to 40 plf at 20.16
BC: 90 lb Conc. Load at 28.25
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: 20 psf additional bottom chord live load
check has been modified
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 949 /- /- /568 /- /159
S 3276 /- /0 /1788 /- /-
L 691 /- /- /435 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 22 -1538
C - D 54 - 1264
F - G 1138 0
G - H 1382 0
Chords Tens. Comp.
H - I 410 - 181
J - K 55 -908
K - L 0 -951
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 1359 0
V - U 746 -37
U - T 746 - 37
S - R 102 - 849
R - S 273 - 1348
Chords Tens. Comp.
R - Q 768 -1659
Q - P 102 - 849
P - O 102 -849
O - N 386 - 207
N - L 820 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 66 -431
V - D 681 0
D - T 50 -707
T - F 789 0
F - S 73 - 1251
Webs Tens. Comp.
G - S 0 -1247
S - H 120 -1019
H - O 1116 0
O - J 81 -695
J - N 680 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.038 Q 999 240
VERT(CL): 0.263 Q 932 180
HORZ(LL): 0.009 C - -
HORZ(TL): 0.026 S - -
Creep Factor: 2.0
Max TC CSI: 0.916
Max BC CSI: 0.919
Max Web CSI: 0.547
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A6
Ply: 1SEQN: 5896 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T5
DrwNo: 167.23.1331.46677
RDF / RTT 06/16/2023
B3
W5
W6
W8
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'5"7
8'1"
45'
9'6"9
7'6"
7'6"
15'6"
8'
24'3"3
8'9"3
25'10"14
1'7"11
30'10"14
5'
32'6"
1'7"2
34'4"12
1'10"12
40'0"15
5'8"3
45'
4'11"11'2"1'2"
4"13"89'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L M
NOPQRSTUV
5 12
3X6(A1)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
3X10 3X4
3X6
2X31.5X3 3X6
H0308
3X6 4X4
3X4
3X4
1.5X3
3X6(A1)
28'3"
90#
16'9"
$%Lbl:a6?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B3 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 46.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 45.00
BC: From 4 plf at 45.00 to 4 plf at 46.28
BC: From 40 plf at 16.31 to 40 plf at 20.16
BC: 90 lb Conc. Load at 28.53
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
4400 # ( 97.79 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 4400 97.79 TC 0.00 45.00
4400 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 949 /- /- /1762 /793 /4401
S 3275 /- /0 /2536 /- /-
L 692 /- /- /838 /170 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.9 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2429 -3901
C - D 2048 - 3247
D - E 2052 - 2162
E - F 1838 -1878
F - G 2070 - 984
Chords Tens. Comp.
G - H 1849 - 323
H - I 682 - 471
J - K 338 -1106
K - L 761 -1570
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 2080 - 779
V - U 1657 -1090
U - T 1657 - 1090
T - S 1300 - 1421
S - R 718 -1674
R - S 718 - 2088
Chords Tens. Comp.
R - Q 776 -2494
Q - P 718 -1674
P - O 718 -1674
O - N 1256 - 1108
N - L 1474 - 782
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 66 -431
V - D 681 0
D - T 50 -707
T - F 789 0
F - S 73 - 1251
Webs Tens. Comp.
G - S 112 -1459
S - H 120 -1021
H - O 1120 0
O - J 81 -695
J - N 679 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.059 V 999 240
VERT(CL): 0.263 Q 931 180
HORZ(LL): 0.059 H - -
HORZ(TL): 0.092 H - -
Creep Factor: 2.0
Max TC CSI: 0.916
Max BC CSI: 0.919
Max Web CSI: 0.547
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A7
Ply: 1SEQN: 5904 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T6
DrwNo: 167.23.1332.02640
RDF / RTT 06/16/2023
B3
W5
W6
W8
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'5"7
8'1"
40'0"15
4'7"9
45'
4'11"1
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
25'10"14
1'7"11
30'10"14
5'
32'6"
1'7"2
34'2"5
1'8"5
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"13"89'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L M
NOPQRSTUV
5 12
4X6(A2)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
3X10 3X4
3X6
2X31.5X3 3X6
H0308
3X6 4X4
3X4
3X4
1.5X3
3X6(A1)
28'6"5
90#
16'5"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B3 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 46.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 45.00
BC: From 4 plf at 45.00 to 4 plf at 46.28
BC: From 40 plf at 16.31 to 40 plf at 20.16
BC: 90 lb Conc. Load at 28.53
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
4400 # ( 97.79 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 4400 97.79 TC 0.00 45.00
4400 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 949 /- /- /1762 /793 /4401
S 3275 /- /0 /2536 /- /-
L 692 /- /- /838 /170 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.9 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 2429 -3901
C - D 2048 - 3247
D - E 2052 - 2162
E - F 1838 -1878
F - G 2070 - 984
Chords Tens. Comp.
G - H 1849 - 323
H - I 682 - 471
J - K 338 -1106
K - L 761 -1570
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 2080 - 779
V - U 1657 -1090
U - T 1657 - 1090
T - S 1300 - 1421
S - R 718 -1674
R - S 718 - 2088
Chords Tens. Comp.
R - Q 776 -2494
Q - P 718 -1674
P - O 718 -1674
O - N 1256 - 1108
N - L 1474 - 782
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 66 -431
V - D 681 0
D - T 50 -707
T - F 789 0
F - S 73 - 1251
Webs Tens. Comp.
G - S 112 -1459
S - H 120 -1021
H - O 1120 0
O - J 81 -695
J - N 679 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.059 V 999 240
VERT(CL): 0.263 Q 931 180
HORZ(LL): 0.059 H - -
HORZ(TL): 0.092 H - -
Creep Factor: 2.0
Max TC CSI: 0.916
Max BC CSI: 0.919
Max Web CSI: 0.547
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A7
Ply: 1SEQN: 5904 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T6
DrwNo: 167.23.1332.02640
RDF / RTT 06/16/2023
B3
W5
W6
W8
24'3"12 20'8"4
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
27'4"6
4'10"6
35'5"7
8'1"
40'0"15
4'7"9
45'
4'11"1
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
25'10"14
1'7"11
30'10"14
5'
32'6"
1'7"2
34'2"5
1'8"5
40'0"15
5'10"10
45'
4'11"11'2"1'2"
4"13"89'8"910'2"2(a)
(a)
(a)
A
B
C
D
E
F
G
H
I
J
K
L M
NOPQRSTUV
5 12
4X6(A2)
1.5X3
3X4
3X4
H0308
3X6
4X4
4X4
5X6
3X10 3X4
3X6
2X31.5X3 3X6
H0308
3X6 4X4
3X4
3X4
1.5X3
3X6(A1)
28'6"5
90#
16'5"11
$%Lbl:a7?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
WARNING: 20 psf additional bottom chord live load
check has been modified
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A7
Ply: 1
Qty: 1
SEQN: 5904 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T6
DrwNo: 167.23.1332.02640
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
WARNING: 20 psf additional bottom chord live load
check has been modified
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A7
Ply: 1
Qty: 1
SEQN: 5904 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T6
DrwNo: 167.23.1332.02640
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W9,W14,
M13 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 8.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 89 plf at -1.28 to 89 plf at 0.00
TC: From 92 plf at 0.00 to 148 plf at 13.49
TC: From 148 plf at 13.49 to 186 plf at 22.50
TC: From 186 plf at 22.50 to 148 plf at 31.51
TC: From 148 plf at 31.51 to 92 plf at 45.00
TC: From 89 plf at 45.00 to 89 plf at 46.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 8 plf at 0.00 to 8 plf at 0.65
BC: From 108 plf at 0.65 to 108 plf at 24.05
BC: From 8 plf at 24.05 to 8 plf at 45.00
BC: From 4 plf at 45.00 to 4 plf at 46.28
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2177 /- /- /676 /- /179
AY 6401 /- /- /1820 /- /-
AH 830 /- /- /577 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
AY Brg Wid = 3.5 Min Req = 2.1 (Support)
AH Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & AH are a rigid surface.
Bearing AY Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 14 -1299
C - D 16 - 1197
D - G 11 -921
M - R 609 0
Chords Tens. Comp.
R - S 576 0
S - V 765 0
V - W 440 0
W - Y 468 -60
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -BB 1172 0
BB-BA 791 0
Chords Tens. Comp.
BA-AZ 791 0
AY-AV 49 -587
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
BB-BD 493 0
BD- G 539 0
G -BH 8 -405
BH-AZ 18 -503
AZ-BL 642 0
BL-BM 672 0
BM- M 698 0
M -BN 12 -863
BN-BQ 11 -858
Webs Tens. Comp.
BQ-BT 12 -862
BT-BW 17 -894
BW-BX 44 -1100
BX-AY 46 -1069
R -CA 9 -773
CA-AY 0 -774
AV- W 55 -1338
AT- Y 23 -699
AQ-AA 28 -811
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
BZ- S 50 -444
V -AV 678 -24
Gables Tens. Comp.
W -AU 642 -22
AA-AP 442 -11
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.153 AM 999 240
VERT(CL): 0.447 AM 553 180
HORZ(LL): -0.061 AD - -
HORZ(TL): 0.179 AD - -
Creep Factor: 2.0
Max TC CSI: 0.651
Max BC CSI: 0.590
Max Web CSI: 0.375
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A8
Ply: 3SEQN: 2455 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T189
DrwNo: 167.23.1358.08470
/ RTT 06/16/2023
3 Complete Trusses Required
W9
W14
M13
24'3"12 20'8"4
9'2"1'4"
(TYP)
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
45'
22'6"
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
45'
20'8"131'2"1'2"
4"19'8"910'2"2A
B
C
D
G
J
M
R S
V W
Y
AA
AH
AI
APAQARATAUAVAYAZBABB
BD BH BL
BM
BN
BQ
BT
BW
BX BZ
CA
5
12
3X6(A1T)
1.5X3
1.5X3
3X4
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
3X4
1.5X3
1.5X3
3X6
3X6
3X41.5X4(**)3X4
4X41.5X4(**)
3X4
5X10(R1)
3X43X4
3X4
4X4
3X4
3X4 3X4
5X12
3X6
1.5X3
3X4
3X4
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
3X6(A1T)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W9,W14,
M13 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 8.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 89 plf at -1.28 to 89 plf at 0.00
TC: From 92 plf at 0.00 to 148 plf at 13.49
TC: From 148 plf at 13.49 to 186 plf at 22.50
TC: From 186 plf at 22.50 to 148 plf at 31.51
TC: From 148 plf at 31.51 to 92 plf at 45.00
TC: From 89 plf at 45.00 to 89 plf at 46.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 8 plf at 0.00 to 8 plf at 0.65
BC: From 108 plf at 0.65 to 108 plf at 24.05
BC: From 8 plf at 24.05 to 8 plf at 45.00
BC: From 4 plf at 45.00 to 4 plf at 46.28
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X4 except as noted.
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2177 /- /- /676 /- /179
AY 6401 /- /- /1820 /- /-
AH 830 /- /- /577 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
AY Brg Wid = 3.5 Min Req = 2.1 (Support)
AH Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & AH are a rigid surface.
Bearing AY Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 14 -1299
C - D 16 - 1197
D - G 11 -921
M - R 609 0
Chords Tens. Comp.
R - S 576 0
S - V 765 0
V - W 440 0
W - Y 468 -60
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -BB 1172 0
BB-BA 791 0
Chords Tens. Comp.
BA-AZ 791 0
AY-AV 49 -587
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
BB-BD 493 0
BD- G 539 0
G -BH 8 -405
BH-AZ 18 -503
AZ-BL 642 0
BL-BM 672 0
BM- M 698 0
M -BN 12 -863
BN-BQ 11 -858
Webs Tens. Comp.
BQ-BT 12 -862
BT-BW 17 -894
BW-BX 44 -1100
BX-AY 46 -1069
R -CA 9 -773
CA-AY 0 -774
AV- W 55 -1338
AT- Y 23 -699
AQ-AA 28 -811
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
BZ- S 50 -444
V -AV 678 -24
Gables Tens. Comp.
W -AU 642 -22
AA-AP 442 -11
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.153 AM 999 240
VERT(CL): 0.447 AM 553 180
HORZ(LL): -0.061 AD - -
HORZ(TL): 0.179 AD - -
Creep Factor: 2.0
Max TC CSI: 0.651
Max BC CSI: 0.590
Max Web CSI: 0.375
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A8
Ply: 3SEQN: 2455 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T189
DrwNo: 167.23.1358.08470
/ RTT 06/16/2023
3 Complete Trusses Required
W9
W14
M13
24'3"12 20'8"4
9'2"1'4"
(TYP)
5'7"8
5'7"8
11'3"
5'7"8
16'9"8
5'6"8
22'6"
5'8"8
45'
22'6"
7'6"
7'6"
15'6"5
8'0"5
24'3"3
8'8"13
45'
20'8"131'2"1'2"
4"19'8"910'2"2A
B
C
D
G
J
M
R S
V W
Y
AA
AH
AI
APAQARATAUAVAYAZBABB
BD BH BL
BM
BN
BQ
BT
BW
BX BZ
CA
5
12
3X6(A1T)
1.5X3
1.5X3
3X4
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
3X4
1.5X3
1.5X3
3X6
3X6
3X41.5X4(**)3X4
4X41.5X4(**)
3X4
5X10(R1)
3X43X4
3X4
4X4
3X4
3X4 3X4
5X12
3X6
1.5X3
3X4
3X4
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
1.5X3
3X6(A1T)
$%Lbl:a8?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Top Chord overhang(s) may be field trimmed.
Brace all exposed vertical surfaces for lateral wind
forces. Anchor the perimeter of exposed vertical
surfaces using sistered truss or nailer at edge of
lower roof diaphragm. All diaphragms, braces, and
connections shall be designed by the engineer of
record.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A8
Ply: 3
Qty: 1
SEQN: 2455 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T189
DrwNo: 167.23.1358.08470
/ RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Top Chord overhang(s) may be field trimmed.
Brace all exposed vertical surfaces for lateral wind
forces. Anchor the perimeter of exposed vertical
surfaces using sistered truss or nailer at edge of
lower roof diaphragm. All diaphragms, braces, and
connections shall be designed by the engineer of
record.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:A8
Ply: 3
Qty: 1
SEQN: 2455 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T189
DrwNo: 167.23.1358.08470
/ RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2,
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 6.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 50 8.00 37.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1698 /- /- /240 /- /-
Q 3058 /- /- /331 /- /-
N 5293 /- /1 /603 /- /0
J 1138 /- /- /169 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
Q Brg Wid = 3.5 Min Req = 1.5 (Truss)
N Brg Wid = 3.5 Min Req = 2.5 (Support)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Bearings Q & N Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -1379
B - C 0 -1530
D - E 0 -1368
E - F 0 -1145
Chords Tens. Comp.
F - G 766 0
G - H 766 0
H - I 0 -742
I - J 0 -844
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 1370 0
S - R 1150 0
R - Q 1150 0
Q - P 1150 0
P - O 1632 0
Chords Tens. Comp.
O - N 1632 0
N - M 0 -1247
M - L 0 -623
L - J 742 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - Q 0 -1101
D - T 0 -857
P - F 0 -533
F - N 0 -2592
Webs Tens. Comp.
N - H 0 -1507
H - L 1464 0
L - I 10 -505
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.099 O 999 240
VERT(CL): 0.233 O 865 180
HORZ(LL): 0.026 J - -
HORZ(TL): 0.060 J - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.900
Max Web CSI: 0.721
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AA
Ply: 2SEQN: 5947 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T220
DrwNo: 167.23.1333.48610
RDF / RTT 06/16/2023
2 Complete Trusses Required
T2 T3
W2
13'4"4 16'9"8 14'10"4
7'11"11
7'11"11
13'4"4
5'4"9
15'
1'7"12
22'6"
7'6"
30'
7'6"
37'0"5
7'0"5
45'
7'11"11
7'7"13
7'7"13
13'4"4
5'8"7
15'
1'7"12
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"13'7"154'1"8(a)
A
B
C DE F G H I
J
K
LMNOPQRS
T
5
12
3X6(A1T)
3X4
3X4 H0308
1.5X4
1.5X4
1.5X4
1.5X4
3X4
3X4
4X12
1.5X4
H0308
4X6
4X6
3X6 4X6
3X4
3X6(A1T)
794#
29'0"10
794#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2,
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 6.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 50 8.00 37.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1698 /- /- /240 /- /-
Q 3058 /- /- /331 /- /-
N 5293 /- /1 /603 /- /0
J 1138 /- /- /169 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
Q Brg Wid = 3.5 Min Req = 1.5 (Truss)
N Brg Wid = 3.5 Min Req = 2.5 (Support)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Bearings Q & N Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -1379
B - C 0 -1530
D - E 0 -1368
E - F 0 -1145
Chords Tens. Comp.
F - G 766 0
G - H 766 0
H - I 0 -742
I - J 0 -844
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 1370 0
S - R 1150 0
R - Q 1150 0
Q - P 1150 0
P - O 1632 0
Chords Tens. Comp.
O - N 1632 0
N - M 0 -1247
M - L 0 -623
L - J 742 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - Q 0 -1101
D - T 0 -857
P - F 0 -533
F - N 0 -2592
Webs Tens. Comp.
N - H 0 -1507
H - L 1464 0
L - I 10 -505
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.099 O 999 240
VERT(CL): 0.233 O 865 180
HORZ(LL): 0.026 J - -
HORZ(TL): 0.060 J - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.900
Max Web CSI: 0.721
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AA
Ply: 2SEQN: 5947 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T220
DrwNo: 167.23.1333.48610
RDF / RTT 06/16/2023
2 Complete Trusses Required
T2 T3
W2
13'4"4 16'9"8 14'10"4
7'11"11
7'11"11
13'4"4
5'4"9
15'
1'7"12
22'6"
7'6"
30'
7'6"
37'0"5
7'0"5
45'
7'11"11
7'7"13
7'7"13
13'4"4
5'8"7
15'
1'7"12
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"13'7"154'1"8(a)
A
B
C DE F G H I
J
K
LMNOPQRS
T
5
12
3X6(A1T)
3X4
3X4 H0308
1.5X4
1.5X4
1.5X4
1.5X4
3X4
3X4
4X12
1.5X4
H0308
4X6
4X6
3X6 4X6
3X4
3X6(A1T)
794#
29'0"10
794#
$%Lbl:AA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AA
Ply: 2
Qty: 1
SEQN: 5947 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T220
DrwNo: 167.23.1333.48610
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AA
Ply: 2
Qty: 1
SEQN: 5947 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T220
DrwNo: 167.23.1333.48610
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 53 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 901 /- /- /577 /- /73
S 1036 /- /- /588 /- /-
P 1856 /- /0 /1046 /- /0
L 744 /- /- /464 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 1.5 (Truss)
P Brg Wid = 3.5 Min Req = 1.6 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearings S & P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 115 -1230
C - E 162 - 1043
E - F 161 -1036
F - G 135 - 911
Chords Tens. Comp.
G - H 517 0
H - I 517 0
I - K 156 - 695
K - L 109 -855
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 1036 -29
U - T 914 - 7
T - S 914 - 7
S - R 913 -7
R - Q 1232 - 14
Chords Tens. Comp.
Q - P 1232 - 14
P - O 111 -896
O - N 55 -448
N - L 693 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - V 399 - 156
V - S 62 -739
E - V 53 -561
R - G 42 -475
Webs Tens. Comp.
G - Q 426 0
G - P 84 - 1895
P - I 124 -1033
I - N 1023 - 43
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.073 Q 999 240
VERT(CL): 0.167 Q 999 180
HORZ(LL): 0.019 L - -
HORZ(TL): 0.045 L - -
Creep Factor: 2.0
Max TC CSI: 0.988
Max BC CSI: 0.881
Max Web CSI: 0.583
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AB
Ply: 1SEQN: 5951 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T221
DrwNo: 167.23.1333.56860
RDF / RTT 06/16/2023
W2
13'4"4 16'9"8 14'10"4
8'
8'
13'4"4
5'4"4
15'
1'7"12
22'6"
7'6"
30'
7'6"
36'0"5
6'0"5
37'4"3
1'3"14
45'
7'7"13
7'7"13
7'7"13
13'4"4
5'8"7
15'
1'7"12
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"14'0"154'6"8(a)
A
B
C D
EF G H I J K
L
M
NOPQRSTU
V
5
12
3X6(A1)
3X4
3X4 3X6
3X4
3X4
4X10 H0308
4X6
4X4
3X6 4X4
4X4
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 53 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 901 /- /- /577 /- /73
S 1036 /- /- /588 /- /-
P 1856 /- /0 /1046 /- /0
L 744 /- /- /464 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 1.5 (Truss)
P Brg Wid = 3.5 Min Req = 1.6 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearings S & P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 115 -1230
C - E 162 - 1043
E - F 161 -1036
F - G 135 - 911
Chords Tens. Comp.
G - H 517 0
H - I 517 0
I - K 156 - 695
K - L 109 -855
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 1036 -29
U - T 914 - 7
T - S 914 - 7
S - R 913 -7
R - Q 1232 - 14
Chords Tens. Comp.
Q - P 1232 - 14
P - O 111 -896
O - N 55 -448
N - L 693 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - V 399 - 156
V - S 62 -739
E - V 53 -561
R - G 42 -475
Webs Tens. Comp.
G - Q 426 0
G - P 84 - 1895
P - I 124 -1033
I - N 1023 - 43
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.073 Q 999 240
VERT(CL): 0.167 Q 999 180
HORZ(LL): 0.019 L - -
HORZ(TL): 0.045 L - -
Creep Factor: 2.0
Max TC CSI: 0.988
Max BC CSI: 0.881
Max Web CSI: 0.583
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AB
Ply: 1SEQN: 5951 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T221
DrwNo: 167.23.1333.56860
RDF / RTT 06/16/2023
W2
13'4"4 16'9"8 14'10"4
8'
8'
13'4"4
5'4"4
15'
1'7"12
22'6"
7'6"
30'
7'6"
36'0"5
6'0"5
37'4"3
1'3"14
45'
7'7"13
7'7"13
7'7"13
13'4"4
5'8"7
15'
1'7"12
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"14'0"154'6"8(a)
A
B
C D
EF G H I J K
L
M
NOPQRSTU
V
5
12
3X6(A1)
3X4
3X4 3X6
3X4
3X4
4X10 H0308
4X6
4X4
3X6 4X4
4X4
3X6(A1)
$%Lbl:AB?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 4X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1394 /- /- /864 /- /79
O 2569 /- /1 /1442 /- /0
K 642 /- /- /374 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
O Brg Wid = 3.5 Min Req = 2.4 (Truss)
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & K are a rigid surface.
Bearing O Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 194 -2536
C - E 255 - 2260
E - F 254 -2845
F - G 1302 0
Chords Tens. Comp.
G - H 1302 0
H - J 211 - 481
J - K 281 -619
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 2247 - 109
S - R 2880 - 117
R - Q 2880 - 117
Q - P 1728 - 37
Chords Tens. Comp.
P - O 1728 -37
O - N 218 -2437
N - M 109 -1218
M - K 483 -204
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 491 0
S - E 93 -681
E - Q 103 - 376
Q - F 1217 - 76
F - P 412 0
Webs Tens. Comp.
F - O 169 -3282
O - H 136 -1191
H - M 1458 - 77
M - J 101 -499
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.171 E 999 240
VERT(CL): 0.400 E 899 180
HORZ(LL): 0.038 C - -
HORZ(TL): 0.091 C - -
Creep Factor: 2.0
Max TC CSI: 0.982
Max BC CSI: 0.976
Max Web CSI: 0.781
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AC
Ply: 1SEQN: 5956 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T222
DrwNo: 167.23.1334.00737
RDF / RTT 06/16/2023
30'1"12 14'10"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
35'0"5
5'0"5
37'4"3
2'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"14'5"154'11"8(a)
(a)
A
B
C
D
EFGHIJ
K
L
MNOPQRS
5
12
3X6(A1)3X4 H0308
3X4
4X4
6X10
1.5X4
H0308
3X10 3X6
3X4
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 4X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1394 /- /- /864 /- /79
O 2569 /- /1 /1442 /- /0
K 642 /- /- /374 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
O Brg Wid = 3.5 Min Req = 2.4 (Truss)
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & K are a rigid surface.
Bearing O Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 194 -2536
C - E 255 - 2260
E - F 254 -2845
F - G 1302 0
Chords Tens. Comp.
G - H 1302 0
H - J 211 - 481
J - K 281 -619
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 2247 - 109
S - R 2880 - 117
R - Q 2880 - 117
Q - P 1728 - 37
Chords Tens. Comp.
P - O 1728 -37
O - N 218 -2437
N - M 109 -1218
M - K 483 -204
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 491 0
S - E 93 -681
E - Q 103 - 376
Q - F 1217 - 76
F - P 412 0
Webs Tens. Comp.
F - O 169 -3282
O - H 136 -1191
H - M 1458 - 77
M - J 101 -499
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.171 E 999 240
VERT(CL): 0.400 E 899 180
HORZ(LL): 0.038 C - -
HORZ(TL): 0.091 C - -
Creep Factor: 2.0
Max TC CSI: 0.982
Max BC CSI: 0.976
Max Web CSI: 0.781
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AC
Ply: 1SEQN: 5956 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T222
DrwNo: 167.23.1334.00737
RDF / RTT 06/16/2023
30'1"12 14'10"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
35'0"5
5'0"5
37'4"3
2'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"14'5"154'11"8(a)
(a)
A
B
C
D
EFGHIJ
K
L
MNOPQRS
5
12
3X6(A1)3X4 H0308
3X4
4X4
6X10
1.5X4
H0308
3X10 3X6
3X4
3X6(A1)
$%Lbl:AC?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (C-F) 41 7.59 37.41
TC 120 11.59 33.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1466 /- /- /900 /- /90
K 2461 /- /1 /1369 /- /0
G 715 /- /- /431 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.6 (Truss)
K Brg Wid = 3.5 Min Req = 2.3 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & G are a rigid surface.
Bearing K Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 200 -2714
C - D 51 -585
Chords Tens. Comp.
E - F 58 -583
F - G 127 - 809
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2411 - 124
O - N 2903 - 112
N - M 2903 - 112
M - L 1903 -56
Chords Tens. Comp.
L - K 1903 - 56
K - J 192 -2096
J - I 96 -1048
I - G 659 -16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 449 0
C - P 231 - 2030
O - Q 79 -558
P - Q 230 -2027
D - R 60 -469
Q - S 211 - 2510
M - W 1051 -51
R - S 71 -437
R - T 59 -461
S - U 211 -2510
T - V 59 -461
U - W 211 - 2510
V - W 77 -452
V - X 59 -461
Webs Tens. Comp.
W - L 408 0
W - Y 1553 0
W - K 172 - 3244
X - Z 59 -461
Y -AA 1553 0
Z -AB 59 -461
AA-AC 1553 0
AB-AC 72 -441
AB- E 60 -469
AC-AD 1553 0
K -AD 121 -1089
AD- I 1531 - 77
I - F 100 - 526
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.190 U 999 240
VERT(CL): 0.429 U 839 180
HORZ(LL): 0.050 D - -
HORZ(TL): 0.135 D - -
Creep Factor: 2.0
Max TC CSI: 0.992
Max BC CSI: 0.948
Max Web CSI: 0.998
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AD
Ply: 1SEQN: 6012 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T224
DrwNo: 167.23.1334.44453
RDF / RTT 06/16/2023
B2
12'15'7"13 17'4"3
30'1"12 14'10"4
8'
8'
11'7"13
3'7"13
15'
3'4"4
22'6"
7'6"
30'
7'6"
33'0"5
3'0"5
37'4"3
4'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"15'3"155'9"8(a)
A
B
C
D E
F
G
H
IJKLMNO
PQ
R
S
T
U
V
W
X
Y
Z
AA
AB
ACAD
5
12
4X6(A2T)
4X4
3X4
1.5X33X4
H0308
3X4
4X4
12X12 H0308H0308
3X10
4X6
3X6
3X41.5X3
4X6
3X4
3X6(A1T)
11'11"11
79#
2'
150#
17'0"10
150#
2'
79#
11'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (C-F) 41 7.59 37.41
TC 120 11.59 33.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1466 /- /- /900 /- /90
K 2461 /- /1 /1369 /- /0
G 715 /- /- /431 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.6 (Truss)
K Brg Wid = 3.5 Min Req = 2.3 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & G are a rigid surface.
Bearing K Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 200 -2714
C - D 51 -585
Chords Tens. Comp.
E - F 58 -583
F - G 127 - 809
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2411 - 124
O - N 2903 - 112
N - M 2903 - 112
M - L 1903 -56
Chords Tens. Comp.
L - K 1903 - 56
K - J 192 -2096
J - I 96 -1048
I - G 659 -16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 449 0
C - P 231 - 2030
O - Q 79 -558
P - Q 230 -2027
D - R 60 -469
Q - S 211 - 2510
M - W 1051 -51
R - S 71 -437
R - T 59 -461
S - U 211 -2510
T - V 59 -461
U - W 211 - 2510
V - W 77 -452
V - X 59 -461
Webs Tens. Comp.
W - L 408 0
W - Y 1553 0
W - K 172 - 3244
X - Z 59 -461
Y -AA 1553 0
Z -AB 59 -461
AA-AC 1553 0
AB-AC 72 -441
AB- E 60 -469
AC-AD 1553 0
K -AD 121 -1089
AD- I 1531 - 77
I - F 100 - 526
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.190 U 999 240
VERT(CL): 0.429 U 839 180
HORZ(LL): 0.050 D - -
HORZ(TL): 0.135 D - -
Creep Factor: 2.0
Max TC CSI: 0.992
Max BC CSI: 0.948
Max Web CSI: 0.998
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AD
Ply: 1SEQN: 6012 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T224
DrwNo: 167.23.1334.44453
RDF / RTT 06/16/2023
B2
12'15'7"13 17'4"3
30'1"12 14'10"4
8'
8'
11'7"13
3'7"13
15'
3'4"4
22'6"
7'6"
30'
7'6"
33'0"5
3'0"5
37'4"3
4'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
30'
7'6"
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"15'3"155'9"8(a)
A
B
C
D E
F
G
H
IJKLMNO
PQ
R
S
T
U
V
W
X
Y
Z
AA
AB
ACAD
5
12
4X6(A2T)
4X4
3X4
1.5X33X4
H0308
3X4
4X4
12X12 H0308H0308
3X10
4X6
3X6
3X41.5X3
4X6
3X4
3X6(A1T)
11'11"11
79#
2'
150#
17'0"10
150#
2'
79#
11'11"11
$%Lbl:AD?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AD
Ply: 1
Qty: 1
SEQN: 6012 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T224
DrwNo: 167.23.1334.44453
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AD
Ply: 1
Qty: 1
SEQN: 6012 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T224
DrwNo: 167.23.1334.44453
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 4X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 30 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1389 /- /- /877 /- /105
S 2604 /- /1 /1478 /- /0
O 619 /- /- /369 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 2.4 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 173 -2534
C - E 293 - 2226
E - G 302 -2256
G - H 345 - 2842
H - I 1388 0
Chords Tens. Comp.
I - J 1388 0
J - L 230 -441
L - N 232 - 420
N - O 304 - 576
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 2249 - 105
W - V 2879 - 160
V - U 2879 - 160
U - T 1677 - 16
Chords Tens. Comp.
T - S 1677 - 16
S - R 334 -2545
R - Q 167 -1272
Q - O 448 - 223
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 485 0
W - G 88 - 677
G - U 129 - 401
U - H 1286 - 143
H - T 412 0
Webs Tens. Comp.
H - S 209 -3284
S - J 173 -1222
J - Q 1524 -58
Q - N 95 -531
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.282 E 999 240
VERT(CL): 0.672 E 535 180
HORZ(LL): 0.106 D - -
HORZ(TL): 0.253 D - -
Creep Factor: 2.0
Max TC CSI: 0.996
Max BC CSI: 0.984
Max Web CSI: 0.782
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AE
Ply: 1SEQN: 5965 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T226
DrwNo: 167.23.1335.11087
RDF / RTT 06/16/2023
2'9"42'10"14
7'2"8
30'1"12 14'10"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
31'0"5
1'0"5
37'4"3
6'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
30'
7'6"
45'
15'1'2"1'2"
4"1
30'1"12 7'2"8 7'7"136'1"152'11"6'7"8(a)
(a)
A
B
C
D E
F
GHIJ
K
L
M
N
O
P
QRSTUVW
5
12
3X6(A1)3X4
1.5X31.5X4
H0308
3X4
4X4
6X10
1.5X4
H0308
3X10 3X6
1.5X31.5X3
3X4
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 4X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 30 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1389 /- /- /877 /- /105
S 2604 /- /1 /1478 /- /0
O 619 /- /- /369 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 2.4 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 173 -2534
C - E 293 - 2226
E - G 302 -2256
G - H 345 - 2842
H - I 1388 0
Chords Tens. Comp.
I - J 1388 0
J - L 230 -441
L - N 232 - 420
N - O 304 - 576
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 2249 - 105
W - V 2879 - 160
V - U 2879 - 160
U - T 1677 - 16
Chords Tens. Comp.
T - S 1677 - 16
S - R 334 -2545
R - Q 167 -1272
Q - O 448 - 223
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 485 0
W - G 88 - 677
G - U 129 - 401
U - H 1286 - 143
H - T 412 0
Webs Tens. Comp.
H - S 209 -3284
S - J 173 -1222
J - Q 1524 -58
Q - N 95 -531
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.282 E 999 240
VERT(CL): 0.672 E 535 180
HORZ(LL): 0.106 D - -
HORZ(TL): 0.253 D - -
Creep Factor: 2.0
Max TC CSI: 0.996
Max BC CSI: 0.984
Max Web CSI: 0.782
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AE
Ply: 1SEQN: 5965 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T226
DrwNo: 167.23.1335.11087
RDF / RTT 06/16/2023
2'9"42'10"14
7'2"8
30'1"12 14'10"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
31'0"5
1'0"5
37'4"3
6'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
30'
7'6"
45'
15'1'2"1'2"
4"1
30'1"12 7'2"8 7'7"136'1"152'11"6'7"8(a)
(a)
A
B
C
D E
F
GHIJ
K
L
M
N
O
P
QRSTUVW
5
12
3X6(A1)3X4
1.5X31.5X4
H0308
3X4
4X4
6X10
1.5X4
H0308
3X10 3X6
1.5X31.5X3
3X4
3X6(A1)
$%Lbl:AE?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W5,
W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 43 16.00 29.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1634 /- /- /983 /- /118
N 2298 /- /- /1254 /- /-
J 832 /- /- /523 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
N Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Bearing N Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 182 -1905
B - C 98 -3125
C - D 144 - 2183
Chords Tens. Comp.
D - E 185 -1975
G - H 112 - 589
I - J 12 - 1048
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2787 -10
T - S 2782 - 11
S - R 2782 -11
R - Q 1896 0
Q - P 1654 0
Chords Tens. Comp.
P - O 1654 0
N - M 868 0
M - L 868 0
L - J 870 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - C 408 0
C - R 62 - 1023
Q - F 481 - 27
F - P 387 0
Webs Tens. Comp.
F - O 81 - 1910
O - G 597 -24
H - N 121 -1090
N - I 54 -830
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.163 D 999 240
VERT(CL): 0.362 D 998 180
HORZ(LL): 0.046 J - -
HORZ(TL): 0.103 J - -
Creep Factor: 2.0
Max TC CSI: 0.970
Max BC CSI: 0.958
Max Web CSI: 0.985
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AF
Ply: 1SEQN: 6017 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T227
DrwNo: 167.23.1336.20017
RDF / RTT 06/16/2023
B2
W5
W7
30'1"12 14'10"4
8'1"13
8'1"13
14'10"4
6'8"7
15'11"11
1'1"7
22'6"
6'6"5
29'0"5
6'6"5
30'1"12
1'1"7
36'10"3
6'8"7
45'
8'1"13
8'1"13
8'1"13
14'10"4
6'8"7
15'7"13
9"9
22'6"
6'10"3
29'4"3
6'10"3
30'1"12
9"9
36'10"3
6'8"7
45'
8'1"131'2"1'2"
4"16'11"157'5"8(a)
(a)
A
B
C
D E FGH
I
J
K
LMNOPQRST
5
12
4X6(A2T)1.5X4
3X4
H0308 3X4
1.5X44X4
3X4
4X10
1.5X4 4X6
3X41.5X4
3X4 H0308
3X4
1.5X3 3X6(A1T)
15'11"11
79#
2'
150#
9'0"10
150#
2'
79#
15'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W5,
W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 43 16.00 29.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1634 /- /- /983 /- /118
N 2298 /- /- /1254 /- /-
J 832 /- /- /523 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
N Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Bearing N Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 182 -1905
B - C 98 -3125
C - D 144 - 2183
Chords Tens. Comp.
D - E 185 -1975
G - H 112 - 589
I - J 12 - 1048
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2787 -10
T - S 2782 - 11
S - R 2782 -11
R - Q 1896 0
Q - P 1654 0
Chords Tens. Comp.
P - O 1654 0
N - M 868 0
M - L 868 0
L - J 870 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - C 408 0
C - R 62 - 1023
Q - F 481 - 27
F - P 387 0
Webs Tens. Comp.
F - O 81 - 1910
O - G 597 -24
H - N 121 -1090
N - I 54 -830
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.163 D 999 240
VERT(CL): 0.362 D 998 180
HORZ(LL): 0.046 J - -
HORZ(TL): 0.103 J - -
Creep Factor: 2.0
Max TC CSI: 0.970
Max BC CSI: 0.958
Max Web CSI: 0.985
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AF
Ply: 1SEQN: 6017 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T227
DrwNo: 167.23.1336.20017
RDF / RTT 06/16/2023
B2
W5
W7
30'1"12 14'10"4
8'1"13
8'1"13
14'10"4
6'8"7
15'11"11
1'1"7
22'6"
6'6"5
29'0"5
6'6"5
30'1"12
1'1"7
36'10"3
6'8"7
45'
8'1"13
8'1"13
8'1"13
14'10"4
6'8"7
15'7"13
9"9
22'6"
6'10"3
29'4"3
6'10"3
30'1"12
9"9
36'10"3
6'8"7
45'
8'1"131'2"1'2"
4"16'11"157'5"8(a)
(a)
A
B
C
D E FGH
I
J
K
LMNOPQRST
5
12
4X6(A2T)1.5X4
3X4
H0308 3X4
1.5X44X4
3X4
4X10
1.5X4 4X6
3X41.5X4
3X4 H0308
3X4
1.5X3 3X6(A1T)
15'11"11
79#
2'
150#
9'0"10
150#
2'
79#
15'11"11
$%Lbl:AF?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AF
Ply: 1
Qty: 1
SEQN: 6017 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T227
DrwNo: 167.23.1336.20017
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AF
Ply: 1
Qty: 1
SEQN: 6017 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T227
DrwNo: 167.23.1336.20017
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W5,
W7 2x4 DF-L #2(g);
Lt Wedge: 2x4 DF-L Standard(g);
Rt Wedge: 2x4 DF-L Standard(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 50 15.59 29.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Y 1639 /- /- /1001 /- /130
R 2169 /- /- /1203 /- /-
N 883 /- /- /565 /- /-
Wind reactions based on MWFRS
Y Brg Wid = 3.5 Min Req = 1.7 (Truss)
R Brg Wid = 3.5 Min Req = 1.9 (Truss)
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings Y & N are a rigid surface.
Bearing R Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 108 -3114
C - D 151 - 2210
D - E 162 - 2049
E - F 187 -1965
F - H 236 - 1933
Chords Tens. Comp.
H - J 178 - 404
J - K 133 -611
L - M 87 -454
M - N 39 -1147
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 2791 -28
X - W 2786 - 29
W - V 2786 - 29
V - U 1926 0
U - T 1662 0
Chords Tens. Comp.
T - S 1662 0
S - R 397 -11
R - Q 972 0
Q - P 972 0
P - N 975 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
X - C 408 0
C - V 49 -974
U - H 448 - 41
H - T 396 0
Webs Tens. Comp.
H - S 89 - 1796
S - J 475 -14
K - R 71 -927
R - M 43 -727
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.152 V 999 240
VERT(CL): 0.338 V 999 180
HORZ(LL): 0.045 K - -
HORZ(TL): 0.101 K - -
Creep Factor: 2.0
Max TC CSI: 0.972
Max BC CSI: 0.789
Max Web CSI: 0.953
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AG
Ply: 1SEQN: 6022 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T228
DrwNo: 167.23.1336.26127
RDF / RTT 06/16/2023
W5
W7
30'1"12 14'10"4
8'1"13
8'1"13
14'8"8
6'6"11
16'
1'3"8
22'6"
6'6"
27'0"5
4'6"5
29'4"3
2'3"14
30'3"8
11"5
36'10"3
6'6"11
45'
8'1"13
8'1"13
8'1"13
14'8"8
6'6"11
15'7"13
11"5
22'6"
6'10"3
29'4"3
6'10"3
30'3"8
11"5
36'10"3
6'6"11
45'
8'1"131'2"1'2"
4"17'9"158'3"8(a)
A
B
C
D
E F
G
HIJKL
M
N
O
PQRSTUVWXY
5
12
4X6(A2T)3X8 1.5X4 H0308
3X6
1.5X44X4
4X10
1.5X4 4X6
1.5X4
H0308
H0308 1.5X3 3X6(A1T)3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W5,
W7 2x4 DF-L #2(g);
Lt Wedge: 2x4 DF-L Standard(g);
Rt Wedge: 2x4 DF-L Standard(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 50 15.59 29.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Y 1639 /- /- /1001 /- /130
R 2169 /- /- /1203 /- /-
N 883 /- /- /565 /- /-
Wind reactions based on MWFRS
Y Brg Wid = 3.5 Min Req = 1.7 (Truss)
R Brg Wid = 3.5 Min Req = 1.9 (Truss)
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings Y & N are a rigid surface.
Bearing R Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 108 -3114
C - D 151 - 2210
D - E 162 - 2049
E - F 187 -1965
F - H 236 - 1933
Chords Tens. Comp.
H - J 178 - 404
J - K 133 -611
L - M 87 -454
M - N 39 -1147
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 2791 -28
X - W 2786 - 29
W - V 2786 - 29
V - U 1926 0
U - T 1662 0
Chords Tens. Comp.
T - S 1662 0
S - R 397 -11
R - Q 972 0
Q - P 972 0
P - N 975 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
X - C 408 0
C - V 49 -974
U - H 448 - 41
H - T 396 0
Webs Tens. Comp.
H - S 89 - 1796
S - J 475 -14
K - R 71 -927
R - M 43 -727
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.152 V 999 240
VERT(CL): 0.338 V 999 180
HORZ(LL): 0.045 K - -
HORZ(TL): 0.101 K - -
Creep Factor: 2.0
Max TC CSI: 0.972
Max BC CSI: 0.789
Max Web CSI: 0.953
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AG
Ply: 1SEQN: 6022 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T228
DrwNo: 167.23.1336.26127
RDF / RTT 06/16/2023
W5
W7
30'1"12 14'10"4
8'1"13
8'1"13
14'8"8
6'6"11
16'
1'3"8
22'6"
6'6"
27'0"5
4'6"5
29'4"3
2'3"14
30'3"8
11"5
36'10"3
6'6"11
45'
8'1"13
8'1"13
8'1"13
14'8"8
6'6"11
15'7"13
11"5
22'6"
6'10"3
29'4"3
6'10"3
30'3"8
11"5
36'10"3
6'6"11
45'
8'1"131'2"1'2"
4"17'9"158'3"8(a)
A
B
C
D
E F
G
HIJKL
M
N
O
PQRSTUVWXY
5
12
4X6(A2T)3X8 1.5X4 H0308
3X6
1.5X44X4
4X10
1.5X4 4X6
1.5X4
H0308
H0308 1.5X3 3X6(A1T)3X8
$%Lbl:AG?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.31 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 3-3-4 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1625 /- /- /1010 /- /165
Q 3300 /- /- /1833 /- /-
M 583 /- /- /361 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
Q Brg Wid = 3.5 Min Req = 3.1 (Truss)
M Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & M are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - H 201 - 1022
B - C 36 -3125
C - D 55 - 2784
D - E 118 - 1880
E - F 133 -1746
Chords Tens. Comp.
F - G 183 -1198
I - J 1286 0
J - K 1243 0
K - L 465 -190
L - M 260 - 558
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 2812 0
V - U 2271 0
U - T 2271 0
T - S 1628 0
Chords Tens. Comp.
R - Q 122 -1007
Q - P 91 -574
P - O 91 -574
O - M 458 - 195
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 67 -409
V - D 583 0
D - T 42 -807
T - F 649 0
F - S 70 - 1044
S - H 1292 -41
Webs Tens. Comp.
H - R 32 - 1436
R - I 2009 0
I - Q 50 - 2667
Q - K 42 -848
K - O 630 0
O - L 67 -477
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.102 D 999 240
VERT(CL): 0.236 D 999 180
HORZ(LL): 0.028 R - -
HORZ(TL): 0.066 R - -
Creep Factor: 2.0
Max TC CSI: 0.996
Max BC CSI: 0.870
Max Web CSI: 0.816
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AH
Ply: 1SEQN: 6024 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T229
DrwNo: 167.23.1337.10723
RDF / RTT 06/16/2023
W7
30'1"12 14'10"4
4'10"13
4'10"13
9'9"11
4'10"13
14'10"4
5'0"9
19'11"11
5'1"7
25'0"5
5'0"10
30'1"12
5'1"7
35'2"5
5'0"9
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'10"4
7'6"
19'7"13
4'9"9
25'4"3
5'8"6
30'1"12
4'9"9
37'7"12
7'6"
45'
7'4"41'2"1'2"
4"18'7"159'1"8(a)
(a)(a)
(a)
A
B
C
D
E
F
G H
I J
K
L
M
N
OPQRSTUV
5
12
4X6(A2T)
1.5X3
3X4
3X4
H0308
3X6
3X4
3X4
5X8
3X4 8X8
5X6
6X6
4X6
3X6
3X6
3X4
3X4
1.5X3
3X6(A1T)
13'7"4
91#
2'3"12186#
13'2"
186#
2'3"1291#
13'7"4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.31 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 3-3-4 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1625 /- /- /1010 /- /165
Q 3300 /- /- /1833 /- /-
M 583 /- /- /361 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
Q Brg Wid = 3.5 Min Req = 3.1 (Truss)
M Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & M are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - H 201 - 1022
B - C 36 -3125
C - D 55 - 2784
D - E 118 - 1880
E - F 133 -1746
Chords Tens. Comp.
F - G 183 -1198
I - J 1286 0
J - K 1243 0
K - L 465 -190
L - M 260 - 558
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 2812 0
V - U 2271 0
U - T 2271 0
T - S 1628 0
Chords Tens. Comp.
R - Q 122 -1007
Q - P 91 -574
P - O 91 -574
O - M 458 - 195
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 67 -409
V - D 583 0
D - T 42 -807
T - F 649 0
F - S 70 - 1044
S - H 1292 -41
Webs Tens. Comp.
H - R 32 - 1436
R - I 2009 0
I - Q 50 - 2667
Q - K 42 -848
K - O 630 0
O - L 67 -477
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.102 D 999 240
VERT(CL): 0.236 D 999 180
HORZ(LL): 0.028 R - -
HORZ(TL): 0.066 R - -
Creep Factor: 2.0
Max TC CSI: 0.996
Max BC CSI: 0.870
Max Web CSI: 0.816
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AH
Ply: 1SEQN: 6024 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T229
DrwNo: 167.23.1337.10723
RDF / RTT 06/16/2023
W7
30'1"12 14'10"4
4'10"13
4'10"13
9'9"11
4'10"13
14'10"4
5'0"9
19'11"11
5'1"7
25'0"5
5'0"10
30'1"12
5'1"7
35'2"5
5'0"9
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'10"4
7'6"
19'7"13
4'9"9
25'4"3
5'8"6
30'1"12
4'9"9
37'7"12
7'6"
45'
7'4"41'2"1'2"
4"18'7"159'1"8(a)
(a)(a)
(a)
A
B
C
D
E
F
G H
I J
K
L
M
N
OPQRSTUV
5
12
4X6(A2T)
1.5X3
3X4
3X4
H0308
3X6
3X4
3X4
5X8
3X4 8X8
5X6
6X6
4X6
3X6
3X6
3X4
3X4
1.5X3
3X6(A1T)
13'7"4
91#
2'3"12186#
13'2"
186#
2'3"1291#
13'7"4
$%Lbl:AH?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 19.97
TC 50 20.00 25.00
TC 24 25.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AH
Ply: 1
Qty: 1
SEQN: 6024 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T229
DrwNo: 167.23.1337.10723
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 19.97
TC 50 20.00 25.00
TC 24 25.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AH
Ply: 1
Qty: 1
SEQN: 6024 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T229
DrwNo: 167.23.1337.10723
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 21.97
TC 65 19.59 25.41
TC 24 23.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1626 /- /- /1011 /- /180
S 3265 /- /- /1840 /- /-
O 584 /- /- /361 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 31 -3127
C - D 52 - 2788
D - E 113 - 1880
E - F 128 -1747
F - G 181 - 1206
G - J 249 - 1047
Chords Tens. Comp.
J - K 180 -380
K - L 1283 0
L - M 1234 0
M - N 458 -193
N - O 255 - 560
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 2813 0
X - W 2277 0
W - V 2277 0
V - U 1624 0
Chords Tens. Comp.
T - S 123 -1003
S - R 90 -565
R - Q 90 -565
Q - O 460 - 190
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 65 -405
X - D 581 0
D - V 44 -817
V - F 656 0
F - U 50 -983
U - J 1279 - 61
Webs Tens. Comp.
J - T 41 -1461
T - K 2039 0
K - S 47 -2627
S - M 44 -854
M - Q 629 0
Q - N 66 -473
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.101 D 999 240
VERT(CL): 0.236 D 999 180
HORZ(LL): 0.028 T - -
HORZ(TL): 0.066 T - -
Creep Factor: 2.0
Max TC CSI: 0.987
Max BC CSI: 0.871
Max Web CSI: 0.829
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AJ
Ply: 1SEQN: 5996 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T230
DrwNo: 167.23.1337.15570
RDF / RTT 06/16/2023
W7
30'1"12 14'10"4
4'10"13
4'10"13
9'9"11
4'10"13
15'
5'2"5
20'
5'
23'0"5
3'0"5
25'4"3
2'3"14
30'
4'7"13
35'2"5
5'2"5
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'8"8
7'4"4
19'7"13
4'11"5
25'4"3
5'8"6
30'3"8
4'11"5
37'7"12
7'4"4
45'
7'4"41'2"1'2"
4"19'5"159'11"8(a)
(a)(a)
(a)
A
B
C
D
E
F
G
H
IJ
K L
M
N
O
P
QRSTUVWX
5
12
4X6(A2)
1.5X3
H0308
3X6
5X8
8X8
5X6
6X6
4X6
3X6
3X6
1.5X3
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 21.97
TC 65 19.59 25.41
TC 24 23.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1626 /- /- /1011 /- /180
S 3265 /- /- /1840 /- /-
O 584 /- /- /361 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 31 -3127
C - D 52 - 2788
D - E 113 - 1880
E - F 128 -1747
F - G 181 - 1206
G - J 249 - 1047
Chords Tens. Comp.
J - K 180 -380
K - L 1283 0
L - M 1234 0
M - N 458 -193
N - O 255 - 560
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 2813 0
X - W 2277 0
W - V 2277 0
V - U 1624 0
Chords Tens. Comp.
T - S 123 -1003
S - R 90 -565
R - Q 90 -565
Q - O 460 - 190
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 65 -405
X - D 581 0
D - V 44 -817
V - F 656 0
F - U 50 -983
U - J 1279 - 61
Webs Tens. Comp.
J - T 41 -1461
T - K 2039 0
K - S 47 -2627
S - M 44 -854
M - Q 629 0
Q - N 66 -473
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.101 D 999 240
VERT(CL): 0.236 D 999 180
HORZ(LL): 0.028 T - -
HORZ(TL): 0.066 T - -
Creep Factor: 2.0
Max TC CSI: 0.987
Max BC CSI: 0.871
Max Web CSI: 0.829
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AJ
Ply: 1SEQN: 5996 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T230
DrwNo: 167.23.1337.15570
RDF / RTT 06/16/2023
W7
30'1"12 14'10"4
4'10"13
4'10"13
9'9"11
4'10"13
15'
5'2"5
20'
5'
23'0"5
3'0"5
25'4"3
2'3"14
30'
4'7"13
35'2"5
5'2"5
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'8"8
7'4"4
19'7"13
4'11"5
25'4"3
5'8"6
30'3"8
4'11"5
37'7"12
7'4"4
45'
7'4"41'2"1'2"
4"19'5"159'11"8(a)
(a)(a)
(a)
A
B
C
D
E
F
G
H
IJ
K L
M
N
O
P
QRSTUVWX
5
12
4X6(A2)
1.5X3
H0308
3X6
5X8
8X8
5X6
6X6
4X6
3X6
3X6
1.5X3
3X6(A1)
$%Lbl:AJ?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 21.97
TC 70 19.59 25.41
TC 24 23.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1209 /- /- /753 /- /180
U 3158 /- /- /1848 /- /-
O 960 /- /- /618 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
U Brg Wid = 3.5 Min Req = 3.0 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing U Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 27 -2101
C - D 47 - 1749
D - E 108 - 818
E - F 122 - 684
Chords Tens. Comp.
J - K 887 0
M - N 51 -1128
N - O 31 - 1488
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 1873 0
Y - X 1304 0
X - W 1304 0
W - V 643 - 16
V - U 142 -1111
Chords Tens. Comp.
U - T 143 -1135
S - R 719 0
R - Q 719 0
Q - O 1311 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 65 -434
Y - D 599 0
D - W 45 -826
W - F 674 0
F - V 48 - 1020
V - G 70 -549
V - Z 1709 -71
U - Z 44 - 2828
Webs Tens. Comp.
Z - J 1053 - 59
Z - T 2253 - 34
J - T 41 -1583
T - K 46 - 1053
K - S 684 0
S - M 45 -832
M - Q 610 0
Q - N 65 -450
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.060 D 999 240
VERT(CL): 0.148 D 999 180
HORZ(LL): 0.016 O - -
HORZ(TL): 0.038 O - -
Creep Factor: 2.0
Max TC CSI: 0.629
Max BC CSI: 0.796
Max Web CSI: 0.915
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AK
Ply: 1SEQN: 6002 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T363
DrwNo: 167.23.1337.21080
RDF / RTT 06/16/2023
W7
24'3"12 20'8"4
4'10"13
4'10"13
9'9"11
4'10"13
15'
5'2"5
20'
5'
23'0"5
3'0"5
25'4"3
2'3"14
30'
4'7"13
35'2"5
5'2"5
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'8"8
7'4"4
19'7"13
4'11"5
24'3"12
4'7"15
25'4"3
1'0"7
30'3"8
4'11"5
37'7"12
7'4"4
45'
7'4"41'2"1'2"
4"19'5"159'11"8(a)
(a)
(a)
(a)
(a)
A
B
C
D
E
F
G
H
IJ
K L
M
N
O
P
QRSTUVWXY
Z512
3X6(A1)
1.5X3
3X6
3X6
6X8 4X4
4X12
8X8
6X10
3X6
3X6
1.5X3
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 21.97
TC 70 19.59 25.41
TC 24 23.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1209 /- /- /753 /- /180
U 3158 /- /- /1848 /- /-
O 960 /- /- /618 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
U Brg Wid = 3.5 Min Req = 3.0 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing U Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 27 -2101
C - D 47 - 1749
D - E 108 - 818
E - F 122 - 684
Chords Tens. Comp.
J - K 887 0
M - N 51 -1128
N - O 31 - 1488
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 1873 0
Y - X 1304 0
X - W 1304 0
W - V 643 - 16
V - U 142 -1111
Chords Tens. Comp.
U - T 143 -1135
S - R 719 0
R - Q 719 0
Q - O 1311 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Y 65 -434
Y - D 599 0
D - W 45 -826
W - F 674 0
F - V 48 - 1020
V - G 70 -549
V - Z 1709 -71
U - Z 44 - 2828
Webs Tens. Comp.
Z - J 1053 - 59
Z - T 2253 - 34
J - T 41 -1583
T - K 46 - 1053
K - S 684 0
S - M 45 -832
M - Q 610 0
Q - N 65 -450
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.060 D 999 240
VERT(CL): 0.148 D 999 180
HORZ(LL): 0.016 O - -
HORZ(TL): 0.038 O - -
Creep Factor: 2.0
Max TC CSI: 0.629
Max BC CSI: 0.796
Max Web CSI: 0.915
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AK
Ply: 1SEQN: 6002 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T363
DrwNo: 167.23.1337.21080
RDF / RTT 06/16/2023
W7
24'3"12 20'8"4
4'10"13
4'10"13
9'9"11
4'10"13
15'
5'2"5
20'
5'
23'0"5
3'0"5
25'4"3
2'3"14
30'
4'7"13
35'2"5
5'2"5
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'8"8
7'4"4
19'7"13
4'11"5
24'3"12
4'7"15
25'4"3
1'0"7
30'3"8
4'11"5
37'7"12
7'4"4
45'
7'4"41'2"1'2"
4"19'5"159'11"8(a)
(a)
(a)
(a)
(a)
A
B
C
D
E
F
G
H
IJ
K L
M
N
O
P
QRSTUVWXY
Z512
3X6(A1)
1.5X3
3X6
3X6
6X8 4X4
4X12
8X8
6X10
3X6
3X6
1.5X3
3X6(A1)
$%Lbl:AK?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.31 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 3-3-4 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1209 /- /- /753 /- /165
S 3273 /- /- /1837 /- /-
M 959 /- /- /618 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
M Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & M are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 34 -2101
C - D 53 - 1747
D - E 116 - 819
E - F 130 - 686
Chords Tens. Comp.
H - I 881 0
K - L 55 -1126
L - M 35 - 1487
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 1873 0
W - V 1299 0
V - U 1299 0
U - T 648 - 9
T - S 145 - 1135
Chords Tens. Comp.
S - R 146 -1159
Q - P 716 0
P - O 716 0
O - M 1310 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 67 -436
W - D 600 0
D - U 43 -815
U - F 668 0
F - T 67 - 1064
T - G 37 -567
T - X 1771 - 50
S - X 40 -2933
Webs Tens. Comp.
X - H 1050 - 39
X - R 2337 - 31
H - R 31 - 1639
R - I 65 - 1081
I - Q 683 0
Q - K 43 -821
K - O 611 0
O - L 67 -453
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.062 D 999 240
VERT(CL): 0.148 D 999 180
HORZ(LL): 0.017 M - -
HORZ(TL): 0.039 M - -
Creep Factor: 2.0
Max TC CSI: 0.864
Max BC CSI: 0.795
Max Web CSI: 0.950
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AL
Ply: 1SEQN: 6027 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T364
DrwNo: 167.23.1337.27420
RDF / RTT 06/16/2023
T3
W7
24'3"12 20'8"4
4'10"13
4'10"13
9'9"11
4'10"13
14'10"4
5'0"9
19'11"11
5'1"7
25'0"5
5'0"10
30'1"12
5'1"7
35'2"5
5'0"9
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'10"4
7'6"
19'7"13
4'9"9
25'4"3
5'8"6
30'1"12
4'9"9
37'7"12
7'6"
45'
7'4"41'2"1'2"
4"18'7"159'1"8(a)
(a)
(a)
(a)
(a)
A B
C
D
E
F
G H
I J
K
L
M
N
OPQRSTUVW
X
5
12
3X6(A1T)
1.5X3
3X4
3X4
3X6
3X6
3X4
3X4
6X8
4X4
4X4
4X128X8
6X12
3X4
3X4
3X6
3X6
3X4
3X4
1.5X3
3X6(A1T)
20'
91#
2'3"12186#4"8
186#
2'3"1291#
20'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint, equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.31 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 3-3-4 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1209 /- /- /753 /- /165
S 3273 /- /- /1837 /- /-
M 959 /- /- /618 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
S Brg Wid = 3.5 Min Req = 3.1 (Truss)
M Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & M are a rigid surface.
Bearing S Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 34 -2101
C - D 53 - 1747
D - E 116 - 819
E - F 130 - 686
Chords Tens. Comp.
H - I 881 0
K - L 55 -1126
L - M 35 - 1487
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 1873 0
W - V 1299 0
V - U 1299 0
U - T 648 - 9
T - S 145 - 1135
Chords Tens. Comp.
S - R 146 -1159
Q - P 716 0
P - O 716 0
O - M 1310 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 67 -436
W - D 600 0
D - U 43 -815
U - F 668 0
F - T 67 - 1064
T - G 37 -567
T - X 1771 - 50
S - X 40 -2933
Webs Tens. Comp.
X - H 1050 - 39
X - R 2337 - 31
H - R 31 - 1639
R - I 65 - 1081
I - Q 683 0
Q - K 43 -821
K - O 611 0
O - L 67 -453
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.062 D 999 240
VERT(CL): 0.148 D 999 180
HORZ(LL): 0.017 M - -
HORZ(TL): 0.039 M - -
Creep Factor: 2.0
Max TC CSI: 0.864
Max BC CSI: 0.795
Max Web CSI: 0.950
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AL
Ply: 1SEQN: 6027 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T364
DrwNo: 167.23.1337.27420
RDF / RTT 06/16/2023
T3
W7
24'3"12 20'8"4
4'10"13
4'10"13
9'9"11
4'10"13
14'10"4
5'0"9
19'11"11
5'1"7
25'0"5
5'0"10
30'1"12
5'1"7
35'2"5
5'0"9
40'1"3
4'10"13
45'
4'10"13
7'4"4
7'4"4
14'10"4
7'6"
19'7"13
4'9"9
25'4"3
5'8"6
30'1"12
4'9"9
37'7"12
7'6"
45'
7'4"41'2"1'2"
4"18'7"159'1"8(a)
(a)
(a)
(a)
(a)
A B
C
D
E
F
G H
I J
K
L
M
N
OPQRSTUVW
X
5
12
3X6(A1T)
1.5X3
3X4
3X4
3X6
3X6
3X4
3X4
6X8
4X4
4X4
4X128X8
6X12
3X4
3X4
3X6
3X6
3X4
3X4
1.5X3
3X6(A1T)
20'
91#
2'3"12186#4"8
186#
2'3"1291#
20'
$%Lbl:AL?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 19.97
TC 60 20.00 25.00
TC 24 25.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AL
Ply: 1
Qty: 1
SEQN: 6027 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T364
DrwNo: 167.23.1337.27420
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 19.97
TC 60 20.00 25.00
TC 24 25.03 46.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AL
Ply: 1
Qty: 1
SEQN: 6027 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T364
DrwNo: 167.23.1337.27420
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 75 15.59 29.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1112 /- /- /694 /- /130
Q 2651 /- /- /1484 /- /-
L 915 /- /- /592 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
Q Brg Wid = 3.5 Min Req = 2.5 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 87 -1797
C - D 129 - 847
D - E 148 - 685
Chords Tens. Comp.
E - G 215 -679
K - L 88 -1308
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 1563 -10
U - T 1559 - 12
T - S 1559 - 12
R - Q 102 - 1012
Chords Tens. Comp.
Q - P 103 -1036
P - O 1109 0
O - N 1109 0
N - L 1113 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - C 385 0
C - S 52 -987
S - G 1232 -46
G - R 95 - 1773
G - V 686 - 36
R - V 2037 - 42
Webs Tens. Comp.
V - Q 54 -2580
V - P 1489 -53
I - P 79 -504
P - K 51 -1020
K - N 397 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.051 U 999 240
VERT(CL): 0.119 U 999 180
HORZ(LL): 0.017 L - -
HORZ(TL): 0.038 L - -
Creep Factor: 2.0
Max TC CSI: 0.797
Max BC CSI: 0.919
Max Web CSI: 0.828
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AM
Ply: 1SEQN: 6008 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T365
DrwNo: 167.23.1337.40270
RDF / RTT 06/16/2023
T3
B2
W4
W6
24'3"12 20'8"4
8'1"13
8'1"13
16'
7'10"3
22'6"
6'6"
27'0"5
4'6"5
29'4"3
2'3"14
36'10"3
7'6"
45'
8'1"13
8'1"13
8'1"13
15'7"13
7'6"
22'6"
6'10"3
24'3"12
1'9"12
29'4"3
5'0"7
36'10"3
7'6"
45'
8'1"131'2"1'2"
4"17'9"158'3"8(a)
(a)
(a)
(a)
A
B
C
D
E
F
GHI
J
K
L
M
NOPQRSTU
V
5
12
3X6(A1)1.5X4 H0308
3X6
4X10
4X10
6X6
4X10
5X8
3X6
H0308 1.5X4 3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
T3 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 75 15.59 29.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1112 /- /- /694 /- /130
Q 2651 /- /- /1484 /- /-
L 915 /- /- /592 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
Q Brg Wid = 3.5 Min Req = 2.5 (Truss)
L Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & L are a rigid surface.
Bearing Q Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 87 -1797
C - D 129 - 847
D - E 148 - 685
Chords Tens. Comp.
E - G 215 -679
K - L 88 -1308
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 1563 -10
U - T 1559 - 12
T - S 1559 - 12
R - Q 102 - 1012
Chords Tens. Comp.
Q - P 103 -1036
P - O 1109 0
O - N 1109 0
N - L 1113 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
U - C 385 0
C - S 52 -987
S - G 1232 -46
G - R 95 - 1773
G - V 686 - 36
R - V 2037 - 42
Webs Tens. Comp.
V - Q 54 -2580
V - P 1489 -53
I - P 79 -504
P - K 51 -1020
K - N 397 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.051 U 999 240
VERT(CL): 0.119 U 999 180
HORZ(LL): 0.017 L - -
HORZ(TL): 0.038 L - -
Creep Factor: 2.0
Max TC CSI: 0.797
Max BC CSI: 0.919
Max Web CSI: 0.828
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AM
Ply: 1SEQN: 6008 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T365
DrwNo: 167.23.1337.40270
RDF / RTT 06/16/2023
T3
B2
W4
W6
24'3"12 20'8"4
8'1"13
8'1"13
16'
7'10"3
22'6"
6'6"
27'0"5
4'6"5
29'4"3
2'3"14
36'10"3
7'6"
45'
8'1"13
8'1"13
8'1"13
15'7"13
7'6"
22'6"
6'10"3
24'3"12
1'9"12
29'4"3
5'0"7
36'10"3
7'6"
45'
8'1"131'2"1'2"
4"17'9"158'3"8(a)
(a)
(a)
(a)
A
B
C
D
E
F
GHI
J
K
L
M
NOPQRSTU
V
5
12
3X6(A1)1.5X4 H0308
3X6
4X10
4X10
6X6
4X10
5X8
3X6
H0308 1.5X4 3X6(A1)
$%Lbl:AM?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 62 16.00 29.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1081 /- /- /689 /- /118
M 2722 /- /- /1480 /- /-
H 853 /- /- /585 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
M Brg Wid = 3.5 Min Req = 2.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & H are a rigid surface.
Bearing M Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 166 - 585
B - C 87 -1725
Chords Tens. Comp.
C - D 139 - 753
G - H 85 - 1161
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1499 0
Q - P 1496 - 2
P - O 1496 -2
N - M 102 - 1037
Chords Tens. Comp.
M - L 103 -1062
L - K 975 0
K - J 975 0
J - H 979 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - C 384 0
C - O 67 - 1026
O - E 1222 - 22
E - N 93 -1827
E - R 544 -14
N - R 2092 - 41
Webs Tens. Comp.
R - M 52 - 2649
R - L 1487 - 32
F - L 58 -488
L - G 66 - 1058
G - J 396 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.052 Q 999 240
VERT(CL): 0.119 Q 999 180
HORZ(LL): 0.017 H - -
HORZ(TL): 0.038 H - -
Creep Factor: 2.0
Max TC CSI: 0.999
Max BC CSI: 0.915
Max Web CSI: 0.850
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AN
Ply: 1SEQN: 6029 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T366
DrwNo: 167.23.1337.59553
RDF / RTT 06/16/2023
B2
W4
W6
24'3"12 20'8"4
8'1"13
8'1"13
15'11"11
7'9"14
22'6"
6'6"5
29'0"5
6'6"5
36'10"3
7'9"14
45'
8'1"13
8'1"13
8'1"13
15'7"13
7'6"
22'6"
6'10"3
29'4"3
6'10"3
36'10"3
7'6"
45'
8'1"131'2"1'2"
4"16'11"157'5"8(a)
(a)
(a)
(a)
A
B
C
D EF
G
H
I
JKLMNOPQ
R512
3X6(A1T)1.5X4
3X4
H0308 4X10
4X4 4X10
5X8
5X8
3X4
4X4
4X10 H0308
3X4
1.5X4 3X6(A1T)
15'11"11
79#
2'
150#
9'0"10
150#
2'
79#
15'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 62 16.00 29.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1081 /- /- /689 /- /118
M 2722 /- /- /1480 /- /-
H 853 /- /- /585 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
M Brg Wid = 3.5 Min Req = 2.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & H are a rigid surface.
Bearing M Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 166 - 585
B - C 87 -1725
Chords Tens. Comp.
C - D 139 - 753
G - H 85 - 1161
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1499 0
Q - P 1496 - 2
P - O 1496 -2
N - M 102 - 1037
Chords Tens. Comp.
M - L 103 -1062
L - K 975 0
K - J 975 0
J - H 979 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - C 384 0
C - O 67 - 1026
O - E 1222 - 22
E - N 93 -1827
E - R 544 -14
N - R 2092 - 41
Webs Tens. Comp.
R - M 52 - 2649
R - L 1487 - 32
F - L 58 -488
L - G 66 - 1058
G - J 396 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.052 Q 999 240
VERT(CL): 0.119 Q 999 180
HORZ(LL): 0.017 H - -
HORZ(TL): 0.038 H - -
Creep Factor: 2.0
Max TC CSI: 0.999
Max BC CSI: 0.915
Max Web CSI: 0.850
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AN
Ply: 1SEQN: 6029 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T366
DrwNo: 167.23.1337.59553
RDF / RTT 06/16/2023
B2
W4
W6
24'3"12 20'8"4
8'1"13
8'1"13
15'11"11
7'9"14
22'6"
6'6"5
29'0"5
6'6"5
36'10"3
7'9"14
45'
8'1"13
8'1"13
8'1"13
15'7"13
7'6"
22'6"
6'10"3
29'4"3
6'10"3
36'10"3
7'6"
45'
8'1"131'2"1'2"
4"16'11"157'5"8(a)
(a)
(a)
(a)
A
B
C
D EF
G
H
I
JKLMNOPQ
R512
3X6(A1T)1.5X4
3X4
H0308 4X10
4X4 4X10
5X8
5X8
3X4
4X4
4X10 H0308
3X4
1.5X4 3X6(A1T)
15'11"11
79#
2'
150#
9'0"10
150#
2'
79#
15'11"11
$%Lbl:AN?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AN
Ply: 1
Qty: 1
SEQN: 6029 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T366
DrwNo: 167.23.1337.59553
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AN
Ply: 1
Qty: 1
SEQN: 6029 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T366
DrwNo: 167.23.1337.59553
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 39 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1115 /- /- /707 /- /105
T 2503 /- /- /1422 /- /-
O 945 /- /- /600 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
T Brg Wid = 3.5 Min Req = 2.3 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing T Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 135 -1847
C - E 258 - 1592
E - G 266 -1618
G - H 269 - 1514
H - I 241 - 666
Chords Tens. Comp.
I - J 241 - 666
J - L 252 -1222
L - N 243 -1199
N - O 119 -1420
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1616 -70
X - W 1577 - 85
W - V 1577 - 85
V - U 120 - 521
U - T 187 - 1838
Chords Tens. Comp.
T - S 191 -1923
S - R 746 -18
R - Q 746 -18
Q - O 1223 - 10
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - V 145 - 683
V - H 2061 - 177
H - U 153 - 1768
H - Y 1286 - 134
U - Y 2200 - 116
Webs Tens. Comp.
Y - T 128 -2413
Y - S 2495 -205
S - J 150 -894
J - Q 680 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.187 E 999 240
VERT(CL): 0.453 E 640 180
HORZ(LL): 0.071 D - -
HORZ(TL): 0.170 D - -
Creep Factor: 2.0
Max TC CSI: 0.986
Max BC CSI: 0.861
Max Web CSI: 0.894
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AP
Ply: 1SEQN: 6032 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T367
DrwNo: 167.23.1338.06367
RDF / RTT 06/16/2023
W6
2'9"42'10"14
7'2"8
24'3"12 20'8"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
31'0"5
1'0"5
37'4"3
6'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
45'
15'1'2"1'2"
4"1
30'1"12 7'2"8 7'7"136'1"152'11"6'7"8A
B
C
D E
F
GHIJ
K
L
M
N
O
P
QRSTUVWX
Y
5
12
3X6(A1T)
4X4
1.5X31.5X3
H0308 4X8
5X12
5X6
5X6 H0308
3X10 3X6
1.5X31.5X3
3X6(A1T)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 39 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1115 /- /- /707 /- /105
T 2503 /- /- /1422 /- /-
O 945 /- /- /600 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
T Brg Wid = 3.5 Min Req = 2.3 (Truss)
O Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & O are a rigid surface.
Bearing T Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 135 -1847
C - E 258 - 1592
E - G 266 -1618
G - H 269 - 1514
H - I 241 - 666
Chords Tens. Comp.
I - J 241 - 666
J - L 252 -1222
L - N 243 -1199
N - O 119 -1420
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 1616 -70
X - W 1577 - 85
W - V 1577 - 85
V - U 120 - 521
U - T 187 - 1838
Chords Tens. Comp.
T - S 191 -1923
S - R 746 -18
R - Q 746 -18
Q - O 1223 - 10
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
G - V 145 - 683
V - H 2061 - 177
H - U 153 - 1768
H - Y 1286 - 134
U - Y 2200 - 116
Webs Tens. Comp.
Y - T 128 -2413
Y - S 2495 -205
S - J 150 -894
J - Q 680 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.187 E 999 240
VERT(CL): 0.453 E 640 180
HORZ(LL): 0.071 D - -
HORZ(TL): 0.170 D - -
Creep Factor: 2.0
Max TC CSI: 0.986
Max BC CSI: 0.861
Max Web CSI: 0.894
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AP
Ply: 1SEQN: 6032 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T367
DrwNo: 167.23.1338.06367
RDF / RTT 06/16/2023
W6
2'9"42'10"14
7'2"8
24'3"12 20'8"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
31'0"5
1'0"5
37'4"3
6'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
45'
15'1'2"1'2"
4"1
30'1"12 7'2"8 7'7"136'1"152'11"6'7"8A
B
C
D E
F
GHIJ
K
L
M
N
O
P
QRSTUVWX
Y
5
12
3X6(A1T)
4X4
1.5X31.5X3
H0308 4X8
5X12
5X6
5X6 H0308
3X10 3X6
1.5X31.5X3
3X6(A1T)
$%Lbl:AP?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W6 2x4 DF-L #2(g);
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (C-F) 58 7.59 37.41
TC 120 11.59 33.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1172 /- /- /734 /- /90
L 2400 /- /- /1338 /- /-
G 1003 /- /- /634 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
L Brg Wid = 3.5 Min Req = 2.2 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & G are a rigid surface.
Bearing L Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 171 -1977
C - D 54 -588
Chords Tens. Comp.
E - F 53 -588
F - G 164 -1558
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 1732 -97
P - O 1575 -58
O - N 1575 - 58
M - L 88 -1494
Chords Tens. Comp.
L - K 91 - 1575
K - J 787 -7
J - I 787 -7
I - G 1347 - 50
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 208 - 1402
Q - R 207 - 1398
D - S 57 -472
R - N 105 - 584
R - T 160 - 1187
N - X 1806 - 76
S - T 71 -424
S - U 56 -465
T - V 160 - 1187
U - W 56 -465
V - X 160 -1187
W - X 77 - 469
W - Z 56 - 465
X - M 120 - 1695
X - Y 1096 - 50
Webs Tens. Comp.
X -AA 339 -391
M - Y 2109 -76
Y - L 83 -2310
Y - K 2222 -95
Z -AB 56 -465
AA-AC 339 -391
AB-AD 56 -465
AC-AE 339 -391
AD-AE 71 -424
AD- E 57 -472
AE-AF 339 -391
K -AF 107 -787
AF-AG 201 -1021
AF- I 797 -45
AG- F 201 -1024
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.080 T 999 240
VERT(CL): 0.193 T 999 180
HORZ(LL): 0.020 D - -
HORZ(TL): 0.061 D - -
Creep Factor: 2.0
Max TC CSI: 0.986
Max BC CSI: 0.873
Max Web CSI: 0.857
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AQ
Ply: 1SEQN: 6034 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T368
DrwNo: 167.23.1338.47763
RDF / RTT 06/16/2023
B2
W6
12'15'7"13 17'4"3
24'3"12 20'8"4
8'
8'
11'7"13
3'7"13
15'
3'4"4
22'6"
7'6"
30'
7'6"
33'0"5
3'0"5
37'4"3
4'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"15'3"155'9"8A
B
C
D E
F
G
H
IJKLMNOP
QR
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE AF AG
5
12
3X6(A1T)
1.5X3
H0308 4X6
1.5X41.5X4 1.5X41.5X4 1.5X410X10
5X6 5X6
1.5X41.5X4
H0308
H0308
1.5X41.5X4
3X10 H0308
1.5X3
3X6(A1T)
11'11"11
79#
2'
150#
17'0"10
150#
2'
79#
11'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W6 2x4 DF-L #2(g);
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (C-F) 58 7.59 37.41
TC 120 11.59 33.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 2.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 2-9-15 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1172 /- /- /734 /- /90
L 2400 /- /- /1338 /- /-
G 1003 /- /- /634 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
L Brg Wid = 3.5 Min Req = 2.2 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & G are a rigid surface.
Bearing L Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 171 -1977
C - D 54 -588
Chords Tens. Comp.
E - F 53 -588
F - G 164 -1558
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 1732 -97
P - O 1575 -58
O - N 1575 - 58
M - L 88 -1494
Chords Tens. Comp.
L - K 91 - 1575
K - J 787 -7
J - I 787 -7
I - G 1347 - 50
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 208 - 1402
Q - R 207 - 1398
D - S 57 -472
R - N 105 - 584
R - T 160 - 1187
N - X 1806 - 76
S - T 71 -424
S - U 56 -465
T - V 160 - 1187
U - W 56 -465
V - X 160 -1187
W - X 77 - 469
W - Z 56 - 465
X - M 120 - 1695
X - Y 1096 - 50
Webs Tens. Comp.
X -AA 339 -391
M - Y 2109 -76
Y - L 83 -2310
Y - K 2222 -95
Z -AB 56 -465
AA-AC 339 -391
AB-AD 56 -465
AC-AE 339 -391
AD-AE 71 -424
AD- E 57 -472
AE-AF 339 -391
K -AF 107 -787
AF-AG 201 -1021
AF- I 797 -45
AG- F 201 -1024
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.080 T 999 240
VERT(CL): 0.193 T 999 180
HORZ(LL): 0.020 D - -
HORZ(TL): 0.061 D - -
Creep Factor: 2.0
Max TC CSI: 0.986
Max BC CSI: 0.873
Max Web CSI: 0.857
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AQ
Ply: 1SEQN: 6034 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T368
DrwNo: 167.23.1338.47763
RDF / RTT 06/16/2023
B2
W6
12'15'7"13 17'4"3
24'3"12 20'8"4
8'
8'
11'7"13
3'7"13
15'
3'4"4
22'6"
7'6"
30'
7'6"
33'0"5
3'0"5
37'4"3
4'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"15'3"155'9"8A
B
C
D E
F
G
H
IJKLMNOP
QR
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE AF AG
5
12
3X6(A1T)
1.5X3
H0308 4X6
1.5X41.5X4 1.5X41.5X4 1.5X410X10
5X6 5X6
1.5X41.5X4
H0308
H0308
1.5X41.5X4
3X10 H0308
1.5X3
3X6(A1T)
11'11"11
79#
2'
150#
17'0"10
150#
2'
79#
11'11"11
$%Lbl:AQ?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 44 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1126 /- /- /700 /- /79
P 2470 /- /- /1390 /- /-
K 958 /- /- /595 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
P Brg Wid = 3.5 Min Req = 2.3 (Truss)
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & K are a rigid surface.
Bearing P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 163 -1861
C - E 227 - 1633
E - F 192 -1545
F - G 170 - 713
Chords Tens. Comp.
G - H 170 - 713
H - J 214 -1244
J - K 149 -1441
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1625 -80
T - S 1606 - 56
S - R 1606 -56
R - Q 65 -403
Q - P 123 - 1703
Chords Tens. Comp.
P - O 127 -1787
O - N 791 -3
N - M 791 -3
M - K 1238 -36
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - R 116 - 656
R - F 1988 - 103
F - Q 139 - 1743
F - U 1238 - 67
Q - U 2172 - 99
Webs Tens. Comp.
U - P 109 -2382
U - O 2420 - 128
O - H 120 - 866
H - M 637 -35
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.067 E 999 240
VERT(CL): 0.163 E 999 180
HORZ(LL): 0.018 C - -
HORZ(TL): 0.042 C - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.871
Max Web CSI: 0.883
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AR
Ply: 1SEQN: 6036 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T369
DrwNo: 167.23.1339.00697
RDF / RTT 06/16/2023
W6
24'3"12 20'8"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
35'0"5
5'0"5
37'4"3
2'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"14'5"154'11"8A
B
C
D
EFGHIJ
K
L
MNOPQRST
U
5
12
3X6(A1T)
4X4
H0308 3X10
4X12
5X6
5X6 H0308
3X10 3X6 3X6(A1T)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 44 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1126 /- /- /700 /- /79
P 2470 /- /- /1390 /- /-
K 958 /- /- /595 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
P Brg Wid = 3.5 Min Req = 2.3 (Truss)
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & K are a rigid surface.
Bearing P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 163 -1861
C - E 227 - 1633
E - F 192 -1545
F - G 170 - 713
Chords Tens. Comp.
G - H 170 - 713
H - J 214 -1244
J - K 149 -1441
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1625 -80
T - S 1606 - 56
S - R 1606 -56
R - Q 65 -403
Q - P 123 - 1703
Chords Tens. Comp.
P - O 127 -1787
O - N 791 -3
N - M 791 -3
M - K 1238 -36
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - R 116 - 656
R - F 1988 - 103
F - Q 139 - 1743
F - U 1238 - 67
Q - U 2172 - 99
Webs Tens. Comp.
U - P 109 -2382
U - O 2420 - 128
O - H 120 - 866
H - M 637 -35
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.067 E 999 240
VERT(CL): 0.163 E 999 180
HORZ(LL): 0.018 C - -
HORZ(TL): 0.042 C - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.871
Max Web CSI: 0.883
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AR
Ply: 1SEQN: 6036 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T369
DrwNo: 167.23.1339.00697
RDF / RTT 06/16/2023
W6
24'3"12 20'8"4
8'
8'
15'
7'
22'6"
7'6"
30'
7'6"
35'0"5
5'0"5
37'4"3
2'3"14
45'
7'7"13
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"14'5"154'11"8A
B
C
D
EFGHIJ
K
L
MNOPQRST
U
5
12
3X6(A1T)
4X4
H0308 3X10
4X12
5X6
5X6 H0308
3X10 3X6 3X6(A1T)
$%Lbl:AR?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2,
T4 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2,W4,W6,
W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 110 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 9-4-0 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 0" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1397 /- /- /310 /- /-
P 3212 /- /- /757 /- /-
K 1137 /- /- /248 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
P Brg Wid = 3.5 Min Req = 1.5 (Support)
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & K are a rigid surface.
Bearing P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -1169
C - E 0 -1076
E - F 0 -1040
Chords Tens. Comp.
F - G 0 -932
I - J 0 -706
J - K 0 -814
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1037 0
T - S 964 0
S - R 964 0
Chords Tens. Comp.
Q - P 0 -1115
P - O 0 -1168
M - K 702 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - G 1316 0
G - Q 0 -1052
G - U 662 0
Q - U 1395 0
Webs Tens. Comp.
U - P 0 -1529
U - O 1576 0
O - I 0 -484
I - M 410 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.070 E 999 240
VERT(CL): 0.196 E 999 180
HORZ(LL): 0.017 D - -
HORZ(TL): 0.047 D - -
Creep Factor: 2.0
Max TC CSI: 0.984
Max BC CSI: 0.538
Max Web CSI: 0.354
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AS
Ply: 2SEQN: 6068 SPEC
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520004 T370
DrwNo: 170.23.1817.35997
/ RTT 06/19/2023
2 Complete Trusses Required
T2 T4
W2 W4
W6W7
24'3"12 20'8"4
8'
8'
11'5"2
3'5"2
15'
3'6"15
22'6"
7'6"
27'7"13
5'1"13
30'
2'4"3
37'0"5
7'0"5
45'
7'11"11
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"1 3'7"154'2"114'8"5A
B
C
D
EF G HI J
K
L
MNOPQRST
U
5
12
3X6(A1T)
3X6
1.5X3
3X6 4X4
4X10
4X6
4X6 H0308
4X6 3X6 3X6(A1T)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2,
T4 2x4 DF-L #1&Bet.(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2,W4,W6,
W7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 110 7.59 37.41
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 9-4-0 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 0" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1397 /- /- /310 /- /-
P 3212 /- /- /757 /- /-
K 1137 /- /- /248 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
P Brg Wid = 3.5 Min Req = 1.5 (Support)
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & K are a rigid surface.
Bearing P Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -1169
C - E 0 -1076
E - F 0 -1040
Chords Tens. Comp.
F - G 0 -932
I - J 0 -706
J - K 0 -814
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 1037 0
T - S 964 0
S - R 964 0
Chords Tens. Comp.
Q - P 0 -1115
P - O 0 -1168
M - K 702 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - G 1316 0
G - Q 0 -1052
G - U 662 0
Q - U 1395 0
Webs Tens. Comp.
U - P 0 -1529
U - O 1576 0
O - I 0 -484
I - M 410 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 4.50 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.070 E 999 240
VERT(CL): 0.196 E 999 180
HORZ(LL): 0.017 D - -
HORZ(TL): 0.047 D - -
Creep Factor: 2.0
Max TC CSI: 0.984
Max BC CSI: 0.538
Max Web CSI: 0.354
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AS
Ply: 2SEQN: 6068 SPEC
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520004 T370
DrwNo: 170.23.1817.35997
/ RTT 06/19/2023
2 Complete Trusses Required
T2 T4
W2 W4
W6W7
24'3"12 20'8"4
8'
8'
11'5"2
3'5"2
15'
3'6"15
22'6"
7'6"
27'7"13
5'1"13
30'
2'4"3
37'0"5
7'0"5
45'
7'11"11
7'7"13
7'7"13
15'
7'4"4
22'6"
7'6"
24'3"12
1'9"12
30'
5'8"4
37'4"3
7'4"4
45'
7'7"131'2"1'2"
4"1 3'7"154'2"114'8"5A
B
C
D
EF G HI J
K
L
MNOPQRST
U
5
12
3X6(A1T)
3X6
1.5X3
3X6 4X4
4X10
4X6
4X6 H0308
4X6 3X6 3X6(A1T)
$%Lbl:AS?$
06/19/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AS
Ply: 2
Qty: 1
SEQN: 6068 SPEC
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520004 T370
DrwNo: 170.23.1817.35997
/ RTT 06/19/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "WARNING" note below.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:AS
Ply: 2
Qty: 1
SEQN: 6068 SPEC
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520004 T370
DrwNo: 170.23.1817.35997
/ RTT 06/19/2023
06/19/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 132 /- /- /66 /- /107
B /-320
U /-259
N /-483
Wind reactions based on MWFRS
B Brg Wid = 224 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 999 -1044
Chords Tens. Comp.
H - N 1436 - 1481
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 950 - 938
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 N 999 240
VERT(CL): 0.005 B 999 180
HORZ(LL): -0.012 E - -
HORZ(TL): 0.019 E - -
Creep Factor: 2.0
Max TC CSI: 0.237
Max BC CSI: 0.180
Max Web CSI: 0.026
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:B
Ply: 1SEQN: 10870 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T13
DrwNo: 167.23.1359.55890
RDF / RTT 06/16/2023
18'8"
2'8"1'4"
(TYP)
9'4"
9'4"
18'8"
9'4"
18'8"
18'8"1'2"1'2"
4"14'2"114'8"5A
B
H
N
O
U
5
12
3X4(A1)
4X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 132 /- /- /66 /- /107
B /-320
U /-259
N /-483
Wind reactions based on MWFRS
B Brg Wid = 224 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 999 -1044
Chords Tens. Comp.
H - N 1436 - 1481
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 950 - 938
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 N 999 240
VERT(CL): 0.005 B 999 180
HORZ(LL): -0.012 E - -
HORZ(TL): 0.019 E - -
Creep Factor: 2.0
Max TC CSI: 0.237
Max BC CSI: 0.180
Max Web CSI: 0.026
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:B
Ply: 1SEQN: 10870 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T13
DrwNo: 167.23.1359.55890
RDF / RTT 06/16/2023
18'8"
2'8"1'4"
(TYP)
9'4"
9'4"
18'8"
9'4"
18'8"
18'8"1'2"1'2"
4"14'2"114'8"5A
B
H
N
O
U
5
12
3X4(A1)
4X4
3X4(A1)
$%Lbl:B?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2000 # ( 107.15 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 107.15 TC 0.00 18.67
2000 BC 18.52
Case 2: 2000 107.15 TC 0.00 18.67
2000 108.84 BC 0.15 18.52
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:B
Ply: 1
Qty: 1
SEQN: 10870 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T13
DrwNo: 167.23.1359.55890
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2000 # ( 107.15 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 107.15 TC 0.00 18.67
2000 BC 18.52
Case 2: 2000 107.15 TC 0.00 18.67
2000 108.84 BC 0.15 18.52
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:B
Ply: 1
Qty: 1
SEQN: 10870 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T13
DrwNo: 167.23.1359.55890
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W1 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
(S) 2x4 x 6'0" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 325 /- /- /171 /- /132
N 1328 /- /- /754 /- /-
S /-399
Wind reactions based on MWFRS
B Brg Wid = 73.0 Min Req = -
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 230 - 588
E - J 77 -538
J - L 69 -478
Chords Tens. Comp.
L - M 49 - 1848
M - N 50 -2432
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 554 - 259
R - Q 2079 0
Chords Tens. Comp.
Q - P 2169 0
P - N 2169 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - X 124 - 1846
X - Q 97 -505
X - L 53 - 1438
Webs Tens. Comp.
Q - L 546 0
Q - M 67 -615
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
E - R 59 -555
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.053 H 999 240
VERT(CL): 0.144 H 999 180
HORZ(LL): 0.021 N - -
HORZ(TL): 0.057 N - -
Creep Factor: 2.0
Max TC CSI: 0.456
Max BC CSI: 0.900
Max Web CSI: 0.927
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C
Ply: 1SEQN: 10872 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T15
DrwNo: 167.23.1403.41300
RDF / RTT 06/16/2023
B2
W1
24'5"8
2'10"12 1'4"
(TYP)
12'2"12
12'2"12
15'1"8
2'10"12
19'5"10
4'4"2
24'5"8
4'11"14
6'5"5
6'5"5
15'1"8
8'8"3
24'5"8
9'4"1'2"1'2"
4"15'5"35'10"12(a)
A
B
E
J
L
M
N
O
PQR
S
X
5
12
3X4(A1)3X12
4X4
3X8
4X6
H0308 3X6(A1)
(S)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W1 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
(S) 2x4 x 6'0" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 325 /- /- /171 /- /132
N 1328 /- /- /754 /- /-
S /-399
Wind reactions based on MWFRS
B Brg Wid = 73.0 Min Req = -
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 230 - 588
E - J 77 -538
J - L 69 -478
Chords Tens. Comp.
L - M 49 - 1848
M - N 50 -2432
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 554 - 259
R - Q 2079 0
Chords Tens. Comp.
Q - P 2169 0
P - N 2169 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - X 124 - 1846
X - Q 97 -505
X - L 53 - 1438
Webs Tens. Comp.
Q - L 546 0
Q - M 67 -615
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
E - R 59 -555
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.053 H 999 240
VERT(CL): 0.144 H 999 180
HORZ(LL): 0.021 N - -
HORZ(TL): 0.057 N - -
Creep Factor: 2.0
Max TC CSI: 0.456
Max BC CSI: 0.900
Max Web CSI: 0.927
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C
Ply: 1SEQN: 10872 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T15
DrwNo: 167.23.1403.41300
RDF / RTT 06/16/2023
B2
W1
24'5"8
2'10"12 1'4"
(TYP)
12'2"12
12'2"12
15'1"8
2'10"12
19'5"10
4'4"2
24'5"8
4'11"14
6'5"5
6'5"5
15'1"8
8'8"3
24'5"8
9'4"1'2"1'2"
4"15'5"35'10"12(a)
A
B
E
J
L
M
N
O
PQR
S
X
5
12
3X4(A1)3X12
4X4
3X8
4X6
H0308 3X6(A1)
(S)
$%Lbl:C?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
800 # ( 32.71 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 32.71 TC 0.00 24.46
800 BC 0.15
Case 2: 800 32.71 TC 0.00 24.46
800 133.80 BC 0.15 6.12
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C
Ply: 1
Qty: 1
SEQN: 10872 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T15
DrwNo: 167.23.1403.41300
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
800 # ( 32.71 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 32.71 TC 0.00 24.46
800 BC 0.15
Case 2: 800 32.71 TC 0.00 24.46
800 133.80 BC 0.15 6.12
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C
Ply: 1
Qty: 1
SEQN: 10872 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T15
DrwNo: 167.23.1403.41300
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1264 /- /- /769 /- /82
F 1264 /- /- /769 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 40 -2268
C - D 75 - 1982
Chords Tens. Comp.
D - E 75 - 1981
E - F 41 -2267
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2019 0
I - H 1366 0
Chords Tens. Comp.
H - F 2018 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 82 -461
I - D 698 0
Webs Tens. Comp.
D - H 697 0
H - E 82 -461
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 I 999 240
VERT(CL): 0.167 I 999 180
HORZ(LL): 0.026 F - -
HORZ(TL): 0.060 F - -
Creep Factor: 2.0
Max TC CSI: 0.418
Max BC CSI: 0.936
Max Web CSI: 0.256
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C1
Ply: 1SEQN: 5931 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T14
DrwNo: 167.23.1340.15080
RDF / RTT 06/16/2023
24'5"8
6'5"4
6'5"4
12'2"12
5'9"8
18'0"4
5'9"8
24'5"8
6'5"4
8'4"7
8'4"7
16'1"1
7'8"10
24'5"8
8'4"71'2"1'2"
4"15'5"35'10"12A
B
C
D
E
F
G
HI
5
12
4X4(A2)
1.5X3
3X4
4X6
5X6
1.5X3
4X4(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1264 /- /- /769 /- /82
F 1264 /- /- /769 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 40 -2268
C - D 75 - 1982
Chords Tens. Comp.
D - E 75 - 1981
E - F 41 -2267
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 2019 0
I - H 1366 0
Chords Tens. Comp.
H - F 2018 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - I 82 -461
I - D 698 0
Webs Tens. Comp.
D - H 697 0
H - E 82 -461
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 I 999 240
VERT(CL): 0.167 I 999 180
HORZ(LL): 0.026 F - -
HORZ(TL): 0.060 F - -
Creep Factor: 2.0
Max TC CSI: 0.418
Max BC CSI: 0.936
Max Web CSI: 0.256
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C1
Ply: 1SEQN: 5931 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T14
DrwNo: 167.23.1340.15080
RDF / RTT 06/16/2023
24'5"8
6'5"4
6'5"4
12'2"12
5'9"8
18'0"4
5'9"8
24'5"8
6'5"4
8'4"7
8'4"7
16'1"1
7'8"10
24'5"8
8'4"71'2"1'2"
4"15'5"35'10"12A
B
C
D
E
F
G
HI
5
12
4X4(A2)
1.5X3
3X4
4X6
5X6
1.5X3
4X4(A2)
$%Lbl:C1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 40.89 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 40.89 TC 0.00 24.46
1000 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1159 /- /- /882 /- /1000
E 1267 /- /- /938 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 44 -2292
B - C 80 -2003
Chords Tens. Comp.
C - D 76 - 1989
D - E 43 - 2275
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 2044 0
H - G 1374 0
Chords Tens. Comp.
G - E 2025 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 83 -472
H - C 708 0
Webs Tens. Comp.
C - G 696 0
G - D 82 -462
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 G 999 240
VERT(CL): 0.167 G 999 180
HORZ(LL): 0.025 E - -
HORZ(TL): 0.060 E - -
Creep Factor: 2.0
Max TC CSI: 0.452
Max BC CSI: 0.944
Max Web CSI: 0.264
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C2
Ply: 1SEQN: 5937 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T21
DrwNo: 167.23.1340.21300
RDF / RTT 06/16/2023
24'5"8
6'5"4
6'5"4
12'2"12
5'9"8
18'0"4
5'9"8
24'5"8
6'5"4
8'4"7
8'4"7
16'1"1
7'8"10
24'5"8
8'4"7 1'2"
4"15'5"35'10"12A
B
C
D
E
F
GH
5
12
4X4(A2)
1.5X3
3X4
4X6
5X6
1.5X3
4X4(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 40.89 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 40.89 TC 0.00 24.46
1000 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1159 /- /- /882 /- /1000
E 1267 /- /- /938 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 44 -2292
B - C 80 -2003
Chords Tens. Comp.
C - D 76 - 1989
D - E 43 - 2275
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 2044 0
H - G 1374 0
Chords Tens. Comp.
G - E 2025 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 83 -472
H - C 708 0
Webs Tens. Comp.
C - G 696 0
G - D 82 -462
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 G 999 240
VERT(CL): 0.167 G 999 180
HORZ(LL): 0.025 E - -
HORZ(TL): 0.060 E - -
Creep Factor: 2.0
Max TC CSI: 0.452
Max BC CSI: 0.944
Max Web CSI: 0.264
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C2
Ply: 1SEQN: 5937 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T21
DrwNo: 167.23.1340.21300
RDF / RTT 06/16/2023
24'5"8
6'5"4
6'5"4
12'2"12
5'9"8
18'0"4
5'9"8
24'5"8
6'5"4
8'4"7
8'4"7
16'1"1
7'8"10
24'5"8
8'4"7 1'2"
4"15'5"35'10"12A
B
C
D
E
F
GH
5
12
4X4(A2)
1.5X3
3X4
4X6
5X6
1.5X3
4X4(A2)
$%Lbl:C2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1159 /- /- /697 /- /76
E 1267 /- /- /770 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 44 -2292
B - C 80 -2003
Chords Tens. Comp.
C - D 76 - 1989
D - E 43 - 2275
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 2044 0
H - G 1374 0
Chords Tens. Comp.
G - E 2025 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 83 -472
H - C 708 0
Webs Tens. Comp.
C - G 696 0
G - D 82 -462
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 G 999 240
VERT(CL): 0.167 G 999 180
HORZ(LL): 0.025 E - -
HORZ(TL): 0.060 E - -
Creep Factor: 2.0
Max TC CSI: 0.452
Max BC CSI: 0.944
Max Web CSI: 0.264
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C3
Ply: 1SEQN: 5941 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T34
DrwNo: 167.23.1340.25120
RDF / RTT 06/16/2023
24'5"8
6'5"4
6'5"4
12'2"12
5'9"8
18'0"4
5'9"8
24'5"8
6'5"4
8'4"7
8'4"7
16'1"1
7'8"10
24'5"8
8'4"7 1'2"
4"15'5"35'10"12A
B
C
D
E
F
GH
5
12
4X4(A2)
1.5X3
3X4
4X6
5X6
1.5X3
4X4(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1159 /- /- /697 /- /76
E 1267 /- /- /770 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 44 -2292
B - C 80 -2003
Chords Tens. Comp.
C - D 76 - 1989
D - E 43 - 2275
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 2044 0
H - G 1374 0
Chords Tens. Comp.
G - E 2025 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 83 -472
H - C 708 0
Webs Tens. Comp.
C - G 696 0
G - D 82 -462
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 G 999 240
VERT(CL): 0.167 G 999 180
HORZ(LL): 0.025 E - -
HORZ(TL): 0.060 E - -
Creep Factor: 2.0
Max TC CSI: 0.452
Max BC CSI: 0.944
Max Web CSI: 0.264
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C3
Ply: 1SEQN: 5941 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T34
DrwNo: 167.23.1340.25120
RDF / RTT 06/16/2023
24'5"8
6'5"4
6'5"4
12'2"12
5'9"8
18'0"4
5'9"8
24'5"8
6'5"4
8'4"7
8'4"7
16'1"1
7'8"10
24'5"8
8'4"7 1'2"
4"15'5"35'10"12A
B
C
D
E
F
GH
5
12
4X4(A2)
1.5X3
3X4
4X6
5X6
1.5X3
4X4(A2)
$%Lbl:C3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 982 /- /- /591 /- /66
E 1091 /- /- /664 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 71 -1882
B - C 67 -1376
Chords Tens. Comp.
C - D 66 - 1375
D - E 70 - 1869
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 1681 -1
H - G 1664 0
Chords Tens. Comp.
G - E 1664 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 90 -534
C - H 658 0
Webs Tens. Comp.
H - D 87 -515
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.047 H 999 240
VERT(CL): 0.111 H 999 180
HORZ(LL): 0.017 E - -
HORZ(TL): 0.041 E - -
Creep Factor: 2.0
Max TC CSI: 0.499
Max BC CSI: 0.813
Max Web CSI: 0.276
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C4
Ply: 1SEQN: 74781 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T33
DrwNo: 167.23.1340.32137
RDF / RTT 06/16/2023
20'9"
5'6"2
5'6"2
10'4"8
4'10"6
15'2"14
4'10"6
20'9"
5'6"2
10'4"8
10'4"8
20'9"
10'4"8 1'2"
4"14'7"155'1"8A
B
C
D
E
F
GH
5
12
4X4(A2)
1.5X3
4X4
3X8 H0308
1.5X3
4X4(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 982 /- /- /591 /- /66
E 1091 /- /- /664 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 71 -1882
B - C 67 -1376
Chords Tens. Comp.
C - D 66 - 1375
D - E 70 - 1869
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - H 1681 -1
H - G 1664 0
Chords Tens. Comp.
G - E 1664 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 90 -534
C - H 658 0
Webs Tens. Comp.
H - D 87 -515
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.047 H 999 240
VERT(CL): 0.111 H 999 180
HORZ(LL): 0.017 E - -
HORZ(TL): 0.041 E - -
Creep Factor: 2.0
Max TC CSI: 0.499
Max BC CSI: 0.813
Max Web CSI: 0.276
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:C4
Ply: 1SEQN: 74781 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T33
DrwNo: 167.23.1340.32137
RDF / RTT 06/16/2023
20'9"
5'6"2
5'6"2
10'4"8
4'10"6
15'2"14
4'10"6
20'9"
5'6"2
10'4"8
10'4"8
20'9"
10'4"8 1'2"
4"14'7"155'1"8A
B
C
D
E
F
GH
5
12
4X4(A2)
1.5X3
4X4
3X8 H0308
1.5X3
4X4(A2)
$%Lbl:C4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 57 8.00 12.75
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2224 /- /- /1892 /- /3002
E 2329 /- /- /1949 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -2114
A - B 0 -2326
Chords Tens. Comp.
C - D 0 -2140
D - E 0 -2349
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 2095 0
I - H 2367 0
Chords Tens. Comp.
H - G 2367 0
G - E 2123 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - C 0 -398
B - I 431 0
Webs Tens. Comp.
G - D 390 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 C 999 240
VERT(CL): 0.170 C 999 180
HORZ(LL): 0.031 E - -
HORZ(TL): 0.061 E - -
Creep Factor: 2.0
Max TC CSI: 0.628
Max BC CSI: 0.608
Max Web CSI: 0.175
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:CA
Ply: 2SEQN: 74782 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T19
DrwNo: 167.23.1341.40410
RDF / RTT 06/16/2023
2 Complete Trusses Required
20'9"
7'11"11
7'11"11
10'4"8
2'4"13
12'9"5
2'4"13
20'9"
7'11"11
7'7"13
7'7"13
13'1"3
5'5"6
20'9"
7'7"13 1'2"
4"13'7"154'1"8A
B CD
E
F
GHI
5
12
4X4(A2)
4X4
3X4
3X4
3X6 3X4
4X4
4X4(A2T)
734#
4'9"10
734#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 57 8.00 12.75
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2224 /- /- /1892 /- /3002
E 2329 /- /- /1949 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -2114
A - B 0 -2326
Chords Tens. Comp.
C - D 0 -2140
D - E 0 -2349
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 2095 0
I - H 2367 0
Chords Tens. Comp.
H - G 2367 0
G - E 2123 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - C 0 -398
B - I 431 0
Webs Tens. Comp.
G - D 390 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.071 C 999 240
VERT(CL): 0.170 C 999 180
HORZ(LL): 0.031 E - -
HORZ(TL): 0.061 E - -
Creep Factor: 2.0
Max TC CSI: 0.628
Max BC CSI: 0.608
Max Web CSI: 0.175
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:CA
Ply: 2SEQN: 74782 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T19
DrwNo: 167.23.1341.40410
RDF / RTT 06/16/2023
2 Complete Trusses Required
20'9"
7'11"11
7'11"11
10'4"8
2'4"13
12'9"5
2'4"13
20'9"
7'11"11
7'7"13
7'7"13
13'1"3
5'5"6
20'9"
7'7"13 1'2"
4"13'7"154'1"8A
B CD
E
F
GHI
5
12
4X4(A2)
4X4
3X4
3X4
3X6 3X4
4X4
4X4(A2T)
734#
4'9"10
734#
$%Lbl:CA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
3000 # ( 144.59 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 3000 144.59 TC 0.00 20.75
3000 BC 0.15
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:CA
Ply: 2
Qty: 1
SEQN: 74782 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T19
DrwNo: 167.23.1341.40410
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
3000 # ( 144.59 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 3000 144.59 TC 0.00 20.75
3000 BC 0.15
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:CA
Ply: 2
Qty: 1
SEQN: 74782 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T19
DrwNo: 167.23.1341.40410
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
B2 2x4 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lt Wedge: 2x8 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 22.03
BC: From 16 plf at 0.00 to 16 plf at 20.75
BC: From 4 plf at 20.75 to 4 plf at 22.03
TC: 500 lb Conc. Load at 1.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 55 7.59 13.16
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1461 /- /- /591 /- /64
G 1112 /- /- /664 /- /-
Wind reactions based on MWFRS
L Brg Wid = 3.5 Min Req = 1.6 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings L & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 119 -1856
B - D 180 -1667
Chords Tens. Comp.
D - F 177 -1576
F - G 114 -1802
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 1660 -32
K - J 1693 -21
Chords Tens. Comp.
J - I 1693 -21
I - G 1570 - 6
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.099 A 999 240
VERT(CL): 0.333 A 737 180
HORZ(LL): 0.040 A - -
HORZ(TL): 0.136 A - -
Creep Factor: 2.0
Max TC CSI: 0.954
Max BC CSI: 0.888
Max Web CSI: 0.125
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:CB
Ply: 1SEQN: 74783 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T20
DrwNo: 167.23.1342.15803
RDF / RTT 06/16/2023
B2
20'9"
8'
8'
10'4"8
2'4"8
10'9"5
4"13
13'1"3
2'3"14
20'9"
7'7"13
7'7"13
7'7"13
13'1"3
5'5"6
20'9"
7'7"13 1'2"
4"14'5"154'11"8A
B
C D
EF
G
H
IJKL
5 12
4X4(A2)H0308
4X4 4X4
4X4(A2)
1'
500#
19'9"
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
B2 2x4 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lt Wedge: 2x8 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 22.03
BC: From 16 plf at 0.00 to 16 plf at 20.75
BC: From 4 plf at 20.75 to 4 plf at 22.03
TC: 500 lb Conc. Load at 1.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 55 7.59 13.16
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 1461 /- /- /591 /- /64
G 1112 /- /- /664 /- /-
Wind reactions based on MWFRS
L Brg Wid = 3.5 Min Req = 1.6 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings L & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 119 -1856
B - D 180 -1667
Chords Tens. Comp.
D - F 177 -1576
F - G 114 -1802
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 1660 -32
K - J 1693 -21
Chords Tens. Comp.
J - I 1693 -21
I - G 1570 - 6
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.099 A 999 240
VERT(CL): 0.333 A 737 180
HORZ(LL): 0.040 A - -
HORZ(TL): 0.136 A - -
Creep Factor: 2.0
Max TC CSI: 0.954
Max BC CSI: 0.888
Max Web CSI: 0.125
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:CB
Ply: 1SEQN: 74783 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T20
DrwNo: 167.23.1342.15803
RDF / RTT 06/16/2023
B2
20'9"
8'
8'
10'4"8
2'4"8
10'9"5
4"13
13'1"3
2'3"14
20'9"
7'7"13
7'7"13
7'7"13
13'1"3
5'5"6
20'9"
7'7"13 1'2"
4"14'5"154'11"8A
B
C D
EF
G
H
IJKL
5 12
4X4(A2)H0308
4X4 4X4
4X4(A2)
1'
500#
19'9"
$%Lbl:CB?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 882 /- /- /531 /- /60
E 993 /- /- /605 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -1675
B - C 85 -1228
Chords Tens. Comp.
C - D 84 - 1227
D - E 99 - 1660
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 1495 -26
Chords Tens. Comp.
G - E 1476 - 16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 96 -472
C - G 600 0
Webs Tens. Comp.
G - D 92 -450
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040 G 999 240
VERT(CL): 0.094 G 999 180
HORZ(LL): 0.016 E - -
HORZ(TL): 0.037 E - -
Creep Factor: 2.0
Max TC CSI: 0.444
Max BC CSI: 0.956
Max Web CSI: 0.238
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D
Ply: 1SEQN: 6042 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T32
DrwNo: 167.23.1342.23387
RDF / RTT 06/16/2023
18'8"
4'11"14
4'11"14
9'4"
4'4"2
13'8"2
4'4"2
18'8"
4'11"14
9'4"
9'4"
18'8"
9'4"1'2"
4"14'2"114'8"5A
B
C
D
E
F
G
5
12
3X4(A1)
1.5X3
4X4
3X8
1.5X3
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 882 /- /- /531 /- /60
E 993 /- /- /605 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -1675
B - C 85 -1228
Chords Tens. Comp.
C - D 84 - 1227
D - E 99 - 1660
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 1495 -26
Chords Tens. Comp.
G - E 1476 - 16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 96 -472
C - G 600 0
Webs Tens. Comp.
G - D 92 -450
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040 G 999 240
VERT(CL): 0.094 G 999 180
HORZ(LL): 0.016 E - -
HORZ(TL): 0.037 E - -
Creep Factor: 2.0
Max TC CSI: 0.444
Max BC CSI: 0.956
Max Web CSI: 0.238
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D
Ply: 1SEQN: 6042 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T32
DrwNo: 167.23.1342.23387
RDF / RTT 06/16/2023
18'8"
4'11"14
4'11"14
9'4"
4'4"2
13'8"2
4'4"2
18'8"
4'11"14
9'4"
9'4"
18'8"
9'4"1'2"
4"14'2"114'8"5A
B
C
D
E
F
G
5
12
3X4(A1)
1.5X3
4X4
3X8
1.5X3
3X4(A1)
$%Lbl:D?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Brace all exposed vertical surfaces for lateral wind
forces. Anchor the perimeter of exposed vertical
surfaces using sistered truss or nailer at edge of
lower roof diaphragm. All diaphragms, braces, and
connections shall be designed by the engineer of
record.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 132 /- /- /66 /- /43
N /-101
Wind reactions based on MWFRS
B Brg Wid = 224 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - N 545 - 589
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 N 999 240
VERT(CL): 0.005 N 999 180
HORZ(LL): -0.003 D - -
HORZ(TL): 0.008 D - -
Creep Factor: 2.0
Max TC CSI: 0.142
Max BC CSI: 0.164
Max Web CSI: 0.059
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D1
Ply: 1SEQN: 10875 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T374
DrwNo: 167.23.1406.47383
RDF / RTT 06/16/2023
18'8"
2'8"1'4"
(TYP)
9'4"
9'4"
18'8"
9'4"
6'9"12
6'9"12
18'8"
11'10"41'2"1'2"
4"14'2"114'8"5A
B
H
J
N
O
X
5
12
3X4(A1)3X4 4X6 4X6
4X4
4X6
4X6
3X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Brace all exposed vertical surfaces for lateral wind
forces. Anchor the perimeter of exposed vertical
surfaces using sistered truss or nailer at edge of
lower roof diaphragm. All diaphragms, braces, and
connections shall be designed by the engineer of
record.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 132 /- /- /66 /- /43
N /-101
Wind reactions based on MWFRS
B Brg Wid = 224 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - N 545 - 589
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 N 999 240
VERT(CL): 0.005 N 999 180
HORZ(LL): -0.003 D - -
HORZ(TL): 0.008 D - -
Creep Factor: 2.0
Max TC CSI: 0.142
Max BC CSI: 0.164
Max Web CSI: 0.059
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D1
Ply: 1SEQN: 10875 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T374
DrwNo: 167.23.1406.47383
RDF / RTT 06/16/2023
18'8"
2'8"1'4"
(TYP)
9'4"
9'4"
18'8"
9'4"
6'9"12
6'9"12
18'8"
11'10"41'2"1'2"
4"14'2"114'8"5A
B
H
J
N
O
X
5
12
3X4(A1)3X4 4X6 4X6
4X4
4X6
4X6
3X4
3X4(A1)
$%Lbl:D1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
800 # ( 42.86 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 42.86 TC 0.00 18.67
800 BC 18.52
Case 2: 800 42.86 TC 0.00 18.67
800 43.54 BC 0.15 18.52
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D1
Ply: 1
Qty: 1
SEQN: 10875 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T374
DrwNo: 167.23.1406.47383
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
800 # ( 42.86 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 42.86 TC 0.00 18.67
800 BC 18.52
Case 2: 800 42.86 TC 0.00 18.67
800 43.54 BC 0.15 18.52
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D1
Ply: 1
Qty: 1
SEQN: 10875 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T374
DrwNo: 167.23.1406.47383
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 53.58 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 53.58 TC 0.00 18.67
1000 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 882 /- /- /723 /- /1000
E 993 /- /- /781 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -1675
B - C 85 -1228
Chords Tens. Comp.
C - D 84 - 1227
D - E 99 - 1660
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 1495 -26
Chords Tens. Comp.
G - E 1476 - 16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 96 -472
C - G 600 0
Webs Tens. Comp.
G - D 92 -450
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040 G 999 240
VERT(CL): 0.094 G 999 180
HORZ(LL): 0.017 E - -
HORZ(TL): 0.037 E - -
Creep Factor: 2.0
Max TC CSI: 0.444
Max BC CSI: 0.956
Max Web CSI: 0.238
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D2
Ply: 1SEQN: 6052 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T375
DrwNo: 167.23.1342.47827
RDF / RTT 06/16/2023
18'8"
4'11"14
4'11"14
9'4"
4'4"2
13'8"2
4'4"2
18'8"
4'11"14
9'4"
9'4"
18'8"
9'4"1'2"
4"14'2"114'8"5A
B
C
D
E
F
G
5
12
3X4(A1)
1.5X3
4X4
3X8
1.5X3
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 53.58 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 53.58 TC 0.00 18.67
1000 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 882 /- /- /723 /- /1000
E 993 /- /- /781 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 100 -1675
B - C 85 -1228
Chords Tens. Comp.
C - D 84 - 1227
D - E 99 - 1660
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 1495 -26
Chords Tens. Comp.
G - E 1476 - 16
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - G 96 -472
C - G 600 0
Webs Tens. Comp.
G - D 92 -450
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.040 G 999 240
VERT(CL): 0.094 G 999 180
HORZ(LL): 0.017 E - -
HORZ(TL): 0.037 E - -
Creep Factor: 2.0
Max TC CSI: 0.444
Max BC CSI: 0.956
Max Web CSI: 0.238
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:D2
Ply: 1SEQN: 6052 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T375
DrwNo: 167.23.1342.47827
RDF / RTT 06/16/2023
18'8"
4'11"14
4'11"14
9'4"
4'4"2
13'8"2
4'4"2
18'8"
4'11"14
9'4"
9'4"
18'8"
9'4"1'2"
4"14'2"114'8"5A
B
C
D
E
F
G
5
12
3X4(A1)
1.5X3
4X4
3X8
1.5X3
3X4(A1)
$%Lbl:D2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 7.97
TC: From 152 plf at 7.97 to 231 plf at 9.33
TC: From 231 plf at 9.33 to 153 plf at 10.67
TC: From 78 plf at 10.67 to 77 plf at 10.69
TC: From 79 plf at 10.69 to 79 plf at 19.95
BC: From 39 plf at 0.00 to 39 plf at 18.67
BC: From 4 plf at 18.67 to 4 plf at 19.95
TC: 710 lb Conc. Load at 7.97,10.69
BC: 240 lb Conc. Load at 4.00,14.67
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 32 8.00 10.67
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
California hip girder load case modified
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2197 /- /- /293 /- /-
D 2307 /- /- /299 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 81 -1983
A - B 70 -2178
Chords Tens. Comp.
C - D 70 - 2191
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 1963 -15
G - F 1957 - 16
Chords Tens. Comp.
F - D 1981 - 11
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.051 F 999 240
VERT(CL): 0.122 F 999 180
HORZ(LL): 0.020 D - -
HORZ(TL): 0.048 D - -
Creep Factor: 2.0
Max TC CSI: 0.660
Max BC CSI: 0.903
Max Web CSI: 0.093
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:DA
Ply: 2SEQN: 6040 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T371
DrwNo: 167.23.1343.00543
RDF / RTT 06/16/2023
2 Complete Trusses Required
18'8"
7'11"11
7'11"11
10'8"5
2'8"10
18'8"
7'11"11
7'7"13
7'7"13
11'0"3
3'4"6
18'8"
7'7"13 1'2"
4"13'7"154'1"8A
B C
D
E
FG
5 12
4X4(A2)1.5X3
6X8
3X4
4X4
4X4(A2T)
4'
240#
710#710#
10'8"
240#
4'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 7.97
TC: From 152 plf at 7.97 to 231 plf at 9.33
TC: From 231 plf at 9.33 to 153 plf at 10.67
TC: From 78 plf at 10.67 to 77 plf at 10.69
TC: From 79 plf at 10.69 to 79 plf at 19.95
BC: From 39 plf at 0.00 to 39 plf at 18.67
BC: From 4 plf at 18.67 to 4 plf at 19.95
TC: 710 lb Conc. Load at 7.97,10.69
BC: 240 lb Conc. Load at 4.00,14.67
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 32 8.00 10.67
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
California hip girder load case modified
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2197 /- /- /293 /- /-
D 2307 /- /- /299 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 81 -1983
A - B 70 -2178
Chords Tens. Comp.
C - D 70 - 2191
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 1963 -15
G - F 1957 - 16
Chords Tens. Comp.
F - D 1981 - 11
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.051 F 999 240
VERT(CL): 0.122 F 999 180
HORZ(LL): 0.020 D - -
HORZ(TL): 0.048 D - -
Creep Factor: 2.0
Max TC CSI: 0.660
Max BC CSI: 0.903
Max Web CSI: 0.093
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:DA
Ply: 2SEQN: 6040 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T371
DrwNo: 167.23.1343.00543
RDF / RTT 06/16/2023
2 Complete Trusses Required
18'8"
7'11"11
7'11"11
10'8"5
2'8"10
18'8"
7'11"11
7'7"13
7'7"13
11'0"3
3'4"6
18'8"
7'7"13 1'2"
4"13'7"154'1"8A
B C
D
E
FG
5 12
4X4(A2)1.5X3
6X8
3X4
4X4
4X4(A2T)
4'
240#
710#710#
10'8"
240#
4'
$%Lbl:DA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:DA
Ply: 2
Qty: 1
SEQN: 6040 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T371
DrwNo: 167.23.1343.00543
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:DA
Ply: 2
Qty: 1
SEQN: 6040 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T371
DrwNo: 167.23.1343.00543
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are not exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 546 /- /- /279 /- /36
G 546 /- /- /279 /- /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & G are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 F 999 240
VERT(CL): 0.003 F 999 180
HORZ(LL): 0.000 D - -
HORZ(TL): 0.001 D - -
Creep Factor: 2.0
Max TC CSI: 0.208
Max BC CSI: 0.429
Max Web CSI: 0.097
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:E
Ply: 1SEQN: 6046 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T373
DrwNo: 167.23.1343.05553
RDF / RTT 06/16/2023
8"8 6'1"8"8
3'9"
3'9"
7'6"
3'9"
10"4
10"4
6'7"12
5'9"8
7'6"
10"4
1'2"1'2"3'4'6"12A
B
C
D
E
FGHI
5
12
3X4
3X6 3X4
4X4
3X4
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are not exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 546 /- /- /279 /- /36
G 546 /- /- /279 /- /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & G are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 F 999 240
VERT(CL): 0.003 F 999 180
HORZ(LL): 0.000 D - -
HORZ(TL): 0.001 D - -
Creep Factor: 2.0
Max TC CSI: 0.208
Max BC CSI: 0.429
Max Web CSI: 0.097
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:E
Ply: 1SEQN: 6046 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T373
DrwNo: 167.23.1343.05553
RDF / RTT 06/16/2023
8"8 6'1"8"8
3'9"
3'9"
7'6"
3'9"
10"4
10"4
6'7"12
5'9"8
7'6"
10"4
1'2"1'2"3'4'6"12A
B
C
D
E
FGHI
5
12
3X4
3X6 3X4
4X4
3X4
3X4
3X6
$%Lbl:E?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W1,W2,M1,
M7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 266.74 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 266.74 TC 0.00 7.50
2000 BC 0.00
Case 2: 2000 266.74 TC 0.00 7.50
2000 266.67 BC 0.00 7.50
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Right cantilever is not exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Gable Studs
Gable studs (dashed members) may be
installed at 16" oc with Wave plates shown, or use
(3) 16 ga. 1/2" x 1.75" wire staples (0.064 Dia.) Toe
nailed through chord into web & web into chord on
one face for a total of (6) staples per connection.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
P* 182 /- /- /82 /19 /294
P /-5896
O /-4900
M /-623
L /-375
K /-323
Wind reactions based on MWFRS
P Brg Wid = 81.5 Min Req = -
Bearing P is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 1870 -1859
Chords Tens. Comp.
E - G 955 -876
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1489 -1489
O - M 1551 - 1605
Chords Tens. Comp.
M - K 802 -858
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 5299 -5517
Webs Tens. Comp.
K - H 415 -632
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
P - B 5896 -5911
E - M 616 - 754
Gables Tens. Comp.
G - K 519 - 532
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
HS, WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.043 J 195 240
VERT(CL): 0.046 J 182 180
HORZ(LL): 0.144 G - -
HORZ(TL): 0.164 G - -
Creep Factor: 2.0
Max TC CSI: 0.402
Max BC CSI: 0.356
Max Web CSI: 0.761
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:E1
Ply: 1SEQN: 10877 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T377
DrwNo: 167.23.1410.25240
RDF / RTT 06/16/2023
W1
W2
M1
M7
7'6"
1'1"1'4"
(TYP)
11"4
3'9"
3'9"
7'6"
3'9"
7'6"
7'6"1'2"1'2"3'4'6"12A
B
E
G
H
I
JK
LMO
P
5
12
H0610
6X8
6X8
4X4
3X4
1.5X4
3X4
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W1,W2,M1,
M7 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 266.74 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 266.74 TC 0.00 7.50
2000 BC 0.00
Case 2: 2000 266.74 TC 0.00 7.50
2000 266.67 BC 0.00 7.50
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Right cantilever is not exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Gable Studs
Gable studs (dashed members) may be
installed at 16" oc with Wave plates shown, or use
(3) 16 ga. 1/2" x 1.75" wire staples (0.064 Dia.) Toe
nailed through chord into web & web into chord on
one face for a total of (6) staples per connection.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
P* 182 /- /- /82 /19 /294
P /-5896
O /-4900
M /-623
L /-375
K /-323
Wind reactions based on MWFRS
P Brg Wid = 81.5 Min Req = -
Bearing P is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 1870 -1859
Chords Tens. Comp.
E - G 955 -876
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 1489 -1489
O - M 1551 - 1605
Chords Tens. Comp.
M - K 802 -858
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 5299 -5517
Webs Tens. Comp.
K - H 415 -632
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
P - B 5896 -5911
E - M 616 - 754
Gables Tens. Comp.
G - K 519 - 532
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
HS, WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.043 J 195 240
VERT(CL): 0.046 J 182 180
HORZ(LL): 0.144 G - -
HORZ(TL): 0.164 G - -
Creep Factor: 2.0
Max TC CSI: 0.402
Max BC CSI: 0.356
Max Web CSI: 0.761
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:E1
Ply: 1SEQN: 10877 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T377
DrwNo: 167.23.1410.25240
RDF / RTT 06/16/2023
W1
W2
M1
M7
7'6"
1'1"1'4"
(TYP)
11"4
3'9"
3'9"
7'6"
3'9"
7'6"
7'6"1'2"1'2"3'4'6"12A
B
E
G
H
I
JK
LMO
P
5
12
H0610
6X8
6X8
4X4
3X4
1.5X4
3X4
3X4
3X6
$%Lbl:E1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 133.37 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 133.37 TC 0.00 7.50
1000 BC 0.85
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are not exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 546 /- /- /995 /476 /1000
G 546 /- /- /995 /476 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 587 - 483
Chords Tens. Comp.
C - D 588 - 483
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 525 - 475
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - C 789 - 969
Webs Tens. Comp.
C - G 790 - 969
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 B 999 240
VERT(CL): 0.005 B 999 180
HORZ(LL): 0.011 D - -
HORZ(TL): 0.016 D - -
Creep Factor: 2.0
Max TC CSI: 0.208
Max BC CSI: 0.429
Max Web CSI: 0.453
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:E2
Ply: 1SEQN: 6066 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T378
DrwNo: 167.23.1343.39017
RDF / RTT 06/16/2023
8"8 6'1"8"8
3'9"
3'9"
7'6"
3'9"
10"4
10"4
6'7"12
5'9"8
7'6"
10"4
1'2"1'2"3'4'6"12A
B
C
D
E
FGHI
5
12
3X4
3X6 3X4
4X4
3X4
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 133.37 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 133.37 TC 0.00 7.50
1000 BC 0.85
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are not exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 546 /- /- /995 /476 /1000
G 546 /- /- /995 /476 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 587 - 483
Chords Tens. Comp.
C - D 588 - 483
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 525 - 475
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
H - C 789 - 969
Webs Tens. Comp.
C - G 790 - 969
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 B 999 240
VERT(CL): 0.005 B 999 180
HORZ(LL): 0.011 D - -
HORZ(TL): 0.016 D - -
Creep Factor: 2.0
Max TC CSI: 0.208
Max BC CSI: 0.429
Max Web CSI: 0.453
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:E2
Ply: 1SEQN: 6066 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T378
DrwNo: 167.23.1343.39017
RDF / RTT 06/16/2023
8"8 6'1"8"8
3'9"
3'9"
7'6"
3'9"
10"4
10"4
6'7"12
5'9"8
7'6"
10"4
1'2"1'2"3'4'6"12A
B
C
D
E
FGHI
5
12
3X4
3X6 3X4
4X4
3X4
3X4
3X6
$%Lbl:E2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 18 3.00 4.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 2-11-11 setback supports end jacks on
bottom chord. Corner(s) framed with a hipJack
supporting corner rafters and joists, or open-end
jacks.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are not exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 585 /- /- /60 /- /-
H 585 /- /- /60 /- /-
Wind reactions based on MWFRS
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings K & H are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 I 999 240
VERT(CL): 0.003 I 999 180
HORZ(LL): 0.000 E - -
HORZ(TL): 0.001 E - -
Creep Factor: 2.0
Max TC CSI: 0.118
Max BC CSI: 0.104
Max Web CSI: 0.050
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:EA
Ply: 2SEQN: 6044 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T372
DrwNo: 167.23.1343.54210
RDF / RTT 06/16/2023
2 Complete Trusses Required
8"8 6'1"8"8
2'11"11
2'11"11
4'6"5
1'6"10
7'6"
2'11"11
10"4
10"4
2'7"13
1'9"9
4'10"3
2'2"6
6'7"12
1'9"9
7'6"
10"4
1'2"1'2"3'4'2"14A
B
C D
E
F
GHIJKL
5 12
3X4
1.5X4 3X4
3X8
3X4 1.5X3
6X10
3X4
3X4
1.5X4
4#
66#
4#
66#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 18 3.00 4.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 2-11-11 setback supports end jacks on
bottom chord. Corner(s) framed with a hipJack
supporting corner rafters and joists, or open-end
jacks.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left and right cantilevers are not exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 585 /- /- /60 /- /-
H 585 /- /- /60 /- /-
Wind reactions based on MWFRS
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings K & H are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 I 999 240
VERT(CL): 0.003 I 999 180
HORZ(LL): 0.000 E - -
HORZ(TL): 0.001 E - -
Creep Factor: 2.0
Max TC CSI: 0.118
Max BC CSI: 0.104
Max Web CSI: 0.050
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:EA
Ply: 2SEQN: 6044 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T372
DrwNo: 167.23.1343.54210
RDF / RTT 06/16/2023
2 Complete Trusses Required
8"8 6'1"8"8
2'11"11
2'11"11
4'6"5
1'6"10
7'6"
2'11"11
10"4
10"4
2'7"13
1'9"9
4'10"3
2'2"6
6'7"12
1'9"9
7'6"
10"4
1'2"1'2"3'4'2"14A
B
C D
E
F
GHIJKL
5 12
3X4
1.5X4 3X4
3X8
3X4 1.5X3
6X10
3X4
3X4
1.5X4
4#
66#
4#
66#
$%Lbl:EA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:EA
Ply: 2
Qty: 1
SEQN: 6044 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T372
DrwNo: 167.23.1343.54210
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:EA
Ply: 2
Qty: 1
SEQN: 6044 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T372
DrwNo: 167.23.1343.54210
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 131 /- /- /68 /- /148
B /-318
O /-264
J /-477
Wind reactions based on MWFRS
B Brg Wid = 162 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 974 -1016
Chords Tens. Comp.
F - J 1400 - 1456
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 928 - 918
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 J 999 240
VERT(CL): 0.006 B 999 180
HORZ(LL): 0.010 D - -
HORZ(TL): 0.014 D - -
Creep Factor: 2.0
Max TC CSI: 0.231
Max BC CSI: 0.176
Max Web CSI: 0.016
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:F
Ply: 1SEQN: 10881 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T376
DrwNo: 167.23.1413.15523
RDF / RTT 06/16/2023
13'6"
2'9"1'4"
(TYP)
6'9"
6'9"
13'6"
6'9"
13'6"
13'6"1'2"1'2"
4"13'1"133'7"6A
B
F
J
K
O
5
12
3X4(A1)
4X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS S11515ENC160118 & GBLLETIN0118 for
gable wind bracing and other requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 131 /- /- /68 /- /148
B /-318
O /-264
J /-477
Wind reactions based on MWFRS
B Brg Wid = 162 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 974 -1016
Chords Tens. Comp.
F - J 1400 - 1456
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 928 - 918
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 J 999 240
VERT(CL): 0.006 B 999 180
HORZ(LL): 0.010 D - -
HORZ(TL): 0.014 D - -
Creep Factor: 2.0
Max TC CSI: 0.231
Max BC CSI: 0.176
Max Web CSI: 0.016
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:F
Ply: 1SEQN: 10881 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T376
DrwNo: 167.23.1413.15523
RDF / RTT 06/16/2023
13'6"
2'9"1'4"
(TYP)
6'9"
6'9"
13'6"
6'9"
13'6"
13'6"1'2"1'2"
4"13'1"133'7"6A
B
F
J
K
O
5
12
3X4(A1)
4X4
3X4(A1)
$%Lbl:F?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2000 # ( 148.18 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 148.18 TC 0.00 13.50
2000 BC 13.35
Case 2: 2000 148.17 TC 0.00 13.50
2000 151.42 BC 0.15 13.35
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Gable Studs
Gable studs (dashed members) may be
installed at 16" oc with Wave plates shown, or use
(3) 16 ga. 1/2" x 1.75" wire staples (0.064 Dia.) Toe
nailed through chord into web & web into chord on
one face for a total of (6) staples per connection.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:F
Ply: 1
Qty: 1
SEQN: 10881 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T376
DrwNo: 167.23.1413.15523
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2000 # ( 148.18 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 148.18 TC 0.00 13.50
2000 BC 13.35
Case 2: 2000 148.17 TC 0.00 13.50
2000 151.42 BC 0.15 13.35
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Gable Studs
Gable studs (dashed members) may be
installed at 16" oc with Wave plates shown, or use
(3) 16 ga. 1/2" x 1.75" wire staples (0.064 Dia.) Toe
nailed through chord into web & web into chord on
one face for a total of (6) staples per connection.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:F
Ply: 1
Qty: 1
SEQN: 10881 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T376
DrwNo: 167.23.1413.15523
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2000 /- /- /1172 /- /124
J 1894 /- /- /1099 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4118
C - D 52 - 3896
D - E 76 - 3185
E - F 125 -3138
Chords Tens. Comp.
F - G 124 -3134
G - H 75 - 3181
H - I 68 - 3957
I - J 12 - 4091
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3725 0
O - N 3165 0
N - M 2329 0
Chords Tens. Comp.
M - L 2329 0
L - K 3164 0
K - J 3692 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 65 -391
O - D 675 0
D - N 88 -724
N - F 1040 0
Webs Tens. Comp.
F - L 1037 0
L - H 88 -726
H - K 722 -2
K - I 67 -402
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.214 N 999 240
VERT(CL): 0.475 N 951 180
HORZ(LL): 0.075 J - -
HORZ(TL): 0.168 J - -
Creep Factor: 2.0
Max TC CSI: 0.772
Max BC CSI: 0.994
Max Web CSI: 0.404
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A1
Ply: 1SEQN: 74238 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T241
DrwNo: 167.23.1120.09050
RDF / RTT 06/16/2023
W4 W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"141'2"
4"18'3"18'8"10A
B
C
D E
F
G
H
I
J
KLMNO
5 12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2000 /- /- /1172 /- /124
J 1894 /- /- /1099 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4118
C - D 52 - 3896
D - E 76 - 3185
E - F 125 -3138
Chords Tens. Comp.
F - G 124 -3134
G - H 75 - 3181
H - I 68 - 3957
I - J 12 - 4091
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3725 0
O - N 3165 0
N - M 2329 0
Chords Tens. Comp.
M - L 2329 0
L - K 3164 0
K - J 3692 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 65 -391
O - D 675 0
D - N 88 -724
N - F 1040 0
Webs Tens. Comp.
F - L 1037 0
L - H 88 -726
H - K 722 -2
K - I 67 -402
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.214 N 999 240
VERT(CL): 0.475 N 951 180
HORZ(LL): 0.075 J - -
HORZ(TL): 0.168 J - -
Creep Factor: 2.0
Max TC CSI: 0.772
Max BC CSI: 0.994
Max Web CSI: 0.404
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A1
Ply: 1SEQN: 74238 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T241
DrwNo: 167.23.1120.09050
RDF / RTT 06/16/2023
W4 W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"141'2"
4"18'3"18'8"10A
B
C
D E
F
G
H
I
J
KLMNO
5 12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
$%Lbl:2a1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1400 # ( 36.97 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1400 36.97 TC 0.00 38.00
1400 37.13 BC 0.15 37.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 144 /- /- /71 /- /7
AO*142 /- /- /72 /- /-
B /-170
AB /-241
Wind reactions based on MWFRS
B Brg Wid = 240 Min Req = -
AO Brg Wid = 216 Min Req = -
Bearings B & AO are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 707 - 771
Chords Tens. Comp.
S -AB 711 -768
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AO 694 -667
Chords Tens. Comp.
AO-AB 695 -666
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 AB 999 240
VERT(CL): 0.008 AB 999 180
HORZ(LL): -0.013 O - -
HORZ(TL): 0.022 O - -
Creep Factor: 2.0
Max TC CSI: 0.162
Max BC CSI: 0.203
Max Web CSI: 0.144
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A
Ply: 1SEQN: 74955 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T240
DrwNo: 167.23.1119.04250
RDF / RTT 06/16/2023
38'
3'1'4"
(TYP)
19'
19'
38'
19'
38'
38'1'2"
4"18'3"18'8"10A
B
K
O
S
AB
AO
5
12
3X4(A1T)
5X6
5X6
3X6
5X6
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1400 # ( 36.97 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1400 36.97 TC 0.00 38.00
1400 37.13 BC 0.15 37.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 144 /- /- /71 /- /7
AO*142 /- /- /72 /- /-
B /-170
AB /-241
Wind reactions based on MWFRS
B Brg Wid = 240 Min Req = -
AO Brg Wid = 216 Min Req = -
Bearings B & AO are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 707 - 771
Chords Tens. Comp.
S -AB 711 -768
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AO 694 -667
Chords Tens. Comp.
AO-AB 695 -666
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 AB 999 240
VERT(CL): 0.008 AB 999 180
HORZ(LL): -0.013 O - -
HORZ(TL): 0.022 O - -
Creep Factor: 2.0
Max TC CSI: 0.162
Max BC CSI: 0.203
Max Web CSI: 0.144
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A
Ply: 1SEQN: 74955 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T240
DrwNo: 167.23.1119.04250
RDF / RTT 06/16/2023
38'
3'1'4"
(TYP)
19'
19'
38'
19'
38'
38'1'2"
4"18'3"18'8"10A
B
K
O
S
AB
AO
5
12
3X4(A1T)
5X6
5X6
3X6
5X6
3X4(A1)
$%Lbl:2A?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1896 /- /- /1100 /- /114
I 1896 /- /- /1100 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 14 -4148
B - C 59 -3924
C - D 77 - 3193
D - E 126 - 3145
Chords Tens. Comp.
E - F 125 -3139
F - G 76 - 3186
G - H 69 - 3962
H - I 12 - 4096
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3755 0
N - M 3175 0
M - L 2334 0
Chords Tens. Comp.
L - K 2334 0
K - J 3169 0
J - I 3696 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 68 -402
N - C 686 0
C - M 89 -731
M - E 1045 0
Webs Tens. Comp.
E - K 1037 0
K - G 88 -726
G - J 722 -2
J - H 67 -402
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.213 M 999 240
VERT(CL): 0.476 M 951 180
HORZ(LL): 0.075 I - -
HORZ(TL): 0.168 I - -
Creep Factor: 2.0
Max TC CSI: 0.773
Max BC CSI: 0.995
Max Web CSI: 0.407
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A2
Ply: 1SEQN: 74239 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T242
DrwNo: 167.23.1120.48890
RDF / RTT 06/16/2023
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"14
4"18'3"1A
B
C D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1896 /- /- /1100 /- /114
I 1896 /- /- /1100 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 14 -4148
B - C 59 -3924
C - D 77 - 3193
D - E 126 - 3145
Chords Tens. Comp.
E - F 125 -3139
F - G 76 - 3186
G - H 69 - 3962
H - I 12 - 4096
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3755 0
N - M 3175 0
M - L 2334 0
Chords Tens. Comp.
L - K 2334 0
K - J 3169 0
J - I 3696 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 68 -402
N - C 686 0
C - M 89 -731
M - E 1045 0
Webs Tens. Comp.
E - K 1037 0
K - G 88 -726
G - J 722 -2
J - H 67 -402
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.213 M 999 240
VERT(CL): 0.476 M 951 180
HORZ(LL): 0.075 I - -
HORZ(TL): 0.168 I - -
Creep Factor: 2.0
Max TC CSI: 0.773
Max BC CSI: 0.995
Max Web CSI: 0.407
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A2
Ply: 1SEQN: 74239 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T242
DrwNo: 167.23.1120.48890
RDF / RTT 06/16/2023
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"14
4"18'3"1A
B
C D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
$%Lbl:2A2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 38.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1850 /- /- /1100 /- /114
I 1850 /- /- /1100 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 13 -4043
B - C 58 -3819
C - D 80 - 3055
D - E 129 - 3008
Chords Tens. Comp.
E - F 128 -3001
F - G 79 - 3049
G - H 67 - 3857
H - I 11 - 3992
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - P 3658 0
P - O 3055 0
O - N 2237 0
N - M 2310 - 629
M - L 2189 0
Chords Tens. Comp.
M - L 123 -632
L - K 2237 0
K - J 3048 0
J - I 3599 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 68 -401
P - C 680 0
C - O 87 -746
O - E 985 0
Webs Tens. Comp.
E - K 976 0
K - G 86 -741
G - J 715 0
J - H 68 -401
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.225 M 999 240
VERT(CL): 0.480 M 942 180
HORZ(LL): 0.067 I - -
HORZ(TL): 0.162 I - -
Creep Factor: 2.0
Max TC CSI: 0.903
Max BC CSI: 0.987
Max Web CSI: 0.416
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A3
Ply: 1SEQN: 74240 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T243
DrwNo: 167.23.1121.18750
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"14
4"13"88'3"1A
B
C D
E
F
G
H
I
JKLMNOP
5
12
3X10(B1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 38.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1850 /- /- /1100 /- /114
I 1850 /- /- /1100 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 13 -4043
B - C 58 -3819
C - D 80 - 3055
D - E 129 - 3008
Chords Tens. Comp.
E - F 128 -3001
F - G 79 - 3049
G - H 67 - 3857
H - I 11 - 3992
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - P 3658 0
P - O 3055 0
O - N 2237 0
N - M 2310 - 629
M - L 2189 0
Chords Tens. Comp.
M - L 123 -632
L - K 2237 0
K - J 3048 0
J - I 3599 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - P 68 -401
P - C 680 0
C - O 87 -746
O - E 985 0
Webs Tens. Comp.
E - K 976 0
K - G 86 -741
G - J 715 0
J - H 68 -401
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.225 M 999 240
VERT(CL): 0.480 M 942 180
HORZ(LL): 0.067 I - -
HORZ(TL): 0.162 I - -
Creep Factor: 2.0
Max TC CSI: 0.903
Max BC CSI: 0.987
Max Web CSI: 0.416
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A3
Ply: 1SEQN: 74240 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T243
DrwNo: 167.23.1121.18750
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"14
4"13"88'3"1A
B
C D
E
F
G
H
I
JKLMNOP
5
12
3X10(B1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
19'
90#
19'
$%Lbl:2A3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 39.28
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1848 /- /- /1099 /- /124
I 1954 /- /- /1172 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 13 -4038
B - C 57 -3814
C - D 79 - 3050
D - E 129 - 3003
Chords Tens. Comp.
E - F 126 -2994
F - G 77 - 3041
G - H 61 - 3828
H - I 5 -3964
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - Q 3654 0
Q - P 3050 0
P - O 2232 0
O - N 2308 - 629
N - M 2186 0
Chords Tens. Comp.
N - M 124 - 631
M - L 2232 0
L - K 3038 0
K - I 3571 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 68 -401
Q - C 680 0
C - P 87 -746
P - E 984 0
Webs Tens. Comp.
E - L 971 0
L - G 85 -734
G - K 703 0
K - H 65 -391
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.226 N 999 240
VERT(CL): 0.480 N 943 180
HORZ(LL): 0.067 I - -
HORZ(TL): 0.162 I - -
Creep Factor: 2.0
Max TC CSI: 0.765
Max BC CSI: 0.973
Max Web CSI: 0.416
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A4
Ply: 1SEQN: 74241 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T244
DrwNo: 167.23.1121.46073
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"14 1'2"
4"13"88'3"18'8"10A
B
C D
E
F
G
H
I
J
KLMNOPQ
5
12
3X10(B1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 39.28
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1848 /- /- /1099 /- /124
I 1954 /- /- /1172 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 13 -4038
B - C 57 -3814
C - D 79 - 3050
D - E 129 - 3003
Chords Tens. Comp.
E - F 126 -2994
F - G 77 - 3041
G - H 61 - 3828
H - I 5 -3964
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - Q 3654 0
Q - P 3050 0
P - O 2232 0
O - N 2308 - 629
N - M 2186 0
Chords Tens. Comp.
N - M 124 - 631
M - L 2232 0
L - K 3038 0
K - I 3571 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 68 -401
Q - C 680 0
C - P 87 -746
P - E 984 0
Webs Tens. Comp.
E - L 971 0
L - G 85 -734
G - K 703 0
K - H 65 -391
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.226 N 999 240
VERT(CL): 0.480 N 943 180
HORZ(LL): 0.067 I - -
HORZ(TL): 0.162 I - -
Creep Factor: 2.0
Max TC CSI: 0.765
Max BC CSI: 0.973
Max Web CSI: 0.416
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A4
Ply: 1SEQN: 74241 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T244
DrwNo: 167.23.1121.46073
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"14 1'2"
4"13"88'3"18'8"10A
B
C D
E
F
G
H
I
J
KLMNOPQ
5
12
3X10(B1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
$%Lbl:2A4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1172 /- /130
J 1952 /- /- /1172 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 6 -4008
C - D 51 - 3786
D - E 78 - 3042
E - F 127 -2995
Chords Tens. Comp.
F - G 126 -2988
G - H 77 - 3036
H - I 60 - 3823
I - J 4 -3959
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 3623 0
R - Q 3040 0
Q - P 2227 0
P - O 2305 - 628
O - N 2183 0
Chords Tens. Comp.
O - N 124 - 631
N - M 2227 0
M - L 3033 0
L - J 3566 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 65 -390
R - D 668 0
D - Q 86 -740
Q - F 979 0
Webs Tens. Comp.
F - M 971 0
M - H 85 -734
H - L 703 0
L - I 65 -391
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.226 O 999 240
VERT(CL): 0.479 O 943 180
HORZ(LL): 0.067 J - -
HORZ(TL): 0.162 J - -
Creep Factor: 2.0
Max TC CSI: 0.765
Max BC CSI: 0.972
Max Web CSI: 0.412
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A5
Ply: 1SEQN: 74242 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T245
DrwNo: 167.23.1121.58177
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"141'2"1'2"
4"13"88'3"18'8"10A
B
C
D E
F
G
H
I
J
K
LMNOPQR
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1172 /- /130
J 1952 /- /- /1172 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 6 -4008
C - D 51 - 3786
D - E 78 - 3042
E - F 127 -2995
Chords Tens. Comp.
F - G 126 -2988
G - H 77 - 3036
H - I 60 - 3823
I - J 4 -3959
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 3623 0
R - Q 3040 0
Q - P 2227 0
P - O 2305 - 628
O - N 2183 0
Chords Tens. Comp.
O - N 124 - 631
N - M 2227 0
M - L 3033 0
L - J 3566 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 65 -390
R - D 668 0
D - Q 86 -740
Q - F 979 0
Webs Tens. Comp.
F - M 971 0
M - H 85 -734
H - L 703 0
L - I 65 -391
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.226 O 999 240
VERT(CL): 0.479 O 943 180
HORZ(LL): 0.067 J - -
HORZ(TL): 0.162 J - -
Creep Factor: 2.0
Max TC CSI: 0.765
Max BC CSI: 0.972
Max Web CSI: 0.412
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A5
Ply: 1SEQN: 74242 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T245
DrwNo: 167.23.1121.58177
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"141'2"1'2"
4"13"88'3"18'8"10A
B
C
D E
F
G
H
I
J
K
LMNOPQR
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
$%Lbl:2A5?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
3000 # ( 78.96 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 3000 78.96 TC 0.00 38.00
3000 BC 0.15
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2000 /- /- /1730 /- /3000
J 1894 /- /- /1675 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4118
C - D 52 - 3896
D - E 76 - 3185
E - F 125 -3138
Chords Tens. Comp.
F - G 124 -3134
G - H 75 - 3181
H - I 68 - 3957
I - J 12 - 4091
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3725 0
O - N 3195 0
N - M 2733 - 258
Chords Tens. Comp.
M - L 2733 -258
L - K 3179 0
K - J 3692 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 65 -391
O - D 675 0
D - N 88 -724
N - F 1040 0
Webs Tens. Comp.
F - L 1037 0
L - H 88 -726
H - K 722 -2
K - I 67 -402
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.217 L 999 240
VERT(CL): 0.475 N 951 180
HORZ(LL): 0.103 J - -
HORZ(TL): 0.171 J - -
Creep Factor: 2.0
Max TC CSI: 0.772
Max BC CSI: 0.994
Max Web CSI: 0.404
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A6
Ply: 1SEQN: 74243 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T246
DrwNo: 167.23.1123.28283
RDF / RTT 06/16/2023
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"141'2"
4"18'3"18'8"10A
B
C
D E
F
G
H
I
J
KLMNO
5 12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
3000 # ( 78.96 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 3000 78.96 TC 0.00 38.00
3000 BC 0.15
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2000 /- /- /1730 /- /3000
J 1894 /- /- /1675 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4118
C - D 52 - 3896
D - E 76 - 3185
E - F 125 -3138
Chords Tens. Comp.
F - G 124 -3134
G - H 75 - 3181
H - I 68 - 3957
I - J 12 - 4091
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3725 0
O - N 3195 0
N - M 2733 - 258
Chords Tens. Comp.
M - L 2733 -258
L - K 3179 0
K - J 3692 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 65 -391
O - D 675 0
D - N 88 -724
N - F 1040 0
Webs Tens. Comp.
F - L 1037 0
L - H 88 -726
H - K 722 -2
K - I 67 -402
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.217 L 999 240
VERT(CL): 0.475 N 951 180
HORZ(LL): 0.103 J - -
HORZ(TL): 0.171 J - -
Creep Factor: 2.0
Max TC CSI: 0.772
Max BC CSI: 0.994
Max Web CSI: 0.404
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A6
Ply: 1SEQN: 74243 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T246
DrwNo: 167.23.1123.28283
RDF / RTT 06/16/2023
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"141'2"
4"18'3"18'8"10A
B
C
D E
F
G
H
I
J
KLMNO
5 12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
$%Lbl:2A6?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1988 /- /- /1166 /- /123
J 1882 /- /- /1090 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4090
C - D 52 - 3869
D - E 76 - 3154
E - F 125 -3107
Chords Tens. Comp.
F - G 124 -3092
G - H 75 - 3140
H - I 69 - 3794
I - J 13 - 3934
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3699 0
O - N 3137 0
N - M 2303 0
Chords Tens. Comp.
M - L 2303 0
L - K 3106 0
K - J 3533 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 65 -391
O - D 676 0
D - N 87 -726
N - F 1036 0
Webs Tens. Comp.
F - L 1011 0
L - H 89 -684
H - K 637 -4
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.78 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.209 N 999 240
VERT(CL): 0.464 N 969 180
HORZ(LL): 0.071 J - -
HORZ(TL): 0.158 J - -
Creep Factor: 2.0
Max TC CSI: 0.678
Max BC CSI: 0.981
Max Web CSI: 0.405
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A7
Ply: 1SEQN: 74244 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T247
DrwNo: 167.23.1123.52840
RDF / RTT 06/16/2023
B2
W4
W5
37'9"
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
37'9"
6'5"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
37'9"
7'1"141'2"
4"1 5"58'3"18'8"10A
B
C
D E
F
G
H
I
J
KLMNO
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
5X6(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1988 /- /- /1166 /- /123
J 1882 /- /- /1090 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4090
C - D 52 - 3869
D - E 76 - 3154
E - F 125 -3107
Chords Tens. Comp.
F - G 124 -3092
G - H 75 - 3140
H - I 69 - 3794
I - J 13 - 3934
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3699 0
O - N 3137 0
N - M 2303 0
Chords Tens. Comp.
M - L 2303 0
L - K 3106 0
K - J 3533 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 65 -391
O - D 676 0
D - N 87 -726
N - F 1036 0
Webs Tens. Comp.
F - L 1011 0
L - H 89 -684
H - K 637 -4
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.78 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.209 N 999 240
VERT(CL): 0.464 N 969 180
HORZ(LL): 0.071 J - -
HORZ(TL): 0.158 J - -
Creep Factor: 2.0
Max TC CSI: 0.678
Max BC CSI: 0.981
Max Web CSI: 0.405
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A7
Ply: 1SEQN: 74244 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T247
DrwNo: 167.23.1123.52840
RDF / RTT 06/16/2023
B2
W4
W5
37'9"
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
37'9"
6'5"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
37'9"
7'1"141'2"
4"1 5"58'3"18'8"10A
B
C
D E
F
G
H
I
J
KLMNO
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
5X6(B1)
$%Lbl:2A7?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W2,W3,W4,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 1.5X3 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 320 /- /- /144 /- /12
V 1786 /- /- /856 /- /-
AF /-746
AB /-283
Wind reactions based on MWFRS
B Brg Wid = 135 Min Req = -
V Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 755 -57
E - I 1386 -12
I - J 1200 0
J - K 76 -798
K - O 174 - 908
Chords Tens. Comp.
O - S 143 -1953
S - T 101 -2426
T - U 108 -3506
U - V 44 - 3677
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AF 70 -658
AF-AD 69 -640
AA- Z 791 0
Z - Y 1749 0
Chords Tens. Comp.
Y - X 1749 0
X - W 2545 0
W - V 3279 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E -AD 53 -954
AD- J 0 -2000
AA-AU 60 -928
J -AU 1742 0
AU- Z 1086 0
AU-AW 52 -448
Z -AW 40 - 1165
AW- O 0 -807
Webs Tens. Comp.
AW-BI 89 - 724
O -BI 1211 -29
BI- X 913 0
BI- S 68 -619
X - T 56 -787
T - W 835 -22
W - U 82 - 637
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
E -AF 759 -33
AO-AA 18 -1168
Gables Tens. Comp.
I -AO 17 - 797
AR- K 21 -519
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.78 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.085 W 999 240
VERT(CL): 0.261 W 999 180
HORZ(LL): 0.030 N - -
HORZ(TL): 0.094 N - -
Creep Factor: 2.0
Max TC CSI: 0.788
Max BC CSI: 0.863
Max Web CSI: 0.904
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A8
Ply: 1SEQN: 74245 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T248
DrwNo: 167.23.1136.32667
RDF / RTT 06/16/2023
B2
W2
W3
W4
W6
W8
37'9"
3'2"
1'4"
(TYP)
1'3"9
1'0"15
1'2"2
1'5"14
5'9"9
5'9"9
12'0"10
6'3"1
19'
6'11"6
24'3"12
5'3"12
25'11"6
1'7"11
31'3"13
5'4"6
37'9"
6'5"3
7'4"14
7'4"14
11'7"13
4'2"15
14'5"15
2'10"3
23'6"1
9'0"1
30'7"2
7'1"1
37'9"
7'1"141'2"
4"1 5"58'3"18'8"104'1"2
(a)
(a)
A
B
E
I J
K
O
S
T
U
V
WXYZAAABADAF
AO
AR AU
AW
BI
5
12
3X4(A1)
3X4
3X4 4X4 3X4
8X8
5X6
1.5X43X64X4
5X10(R1)
H0308 4X4
5X6
4X4
3X4 4X6(B10R)
(NNL)
(S)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
B2 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W2,W3,W4,W6,
W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 1.5X3 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 320 /- /- /144 /- /12
V 1786 /- /- /856 /- /-
AF /-746
AB /-283
Wind reactions based on MWFRS
B Brg Wid = 135 Min Req = -
V Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 755 -57
E - I 1386 -12
I - J 1200 0
J - K 76 -798
K - O 174 - 908
Chords Tens. Comp.
O - S 143 -1953
S - T 101 -2426
T - U 108 -3506
U - V 44 - 3677
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AF 70 -658
AF-AD 69 -640
AA- Z 791 0
Z - Y 1749 0
Chords Tens. Comp.
Y - X 1749 0
X - W 2545 0
W - V 3279 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E -AD 53 -954
AD- J 0 -2000
AA-AU 60 -928
J -AU 1742 0
AU- Z 1086 0
AU-AW 52 -448
Z -AW 40 - 1165
AW- O 0 -807
Webs Tens. Comp.
AW-BI 89 - 724
O -BI 1211 -29
BI- X 913 0
BI- S 68 -619
X - T 56 -787
T - W 835 -22
W - U 82 - 637
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
E -AF 759 -33
AO-AA 18 -1168
Gables Tens. Comp.
I -AO 17 - 797
AR- K 21 -519
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.78 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.085 W 999 240
VERT(CL): 0.261 W 999 180
HORZ(LL): 0.030 N - -
HORZ(TL): 0.094 N - -
Creep Factor: 2.0
Max TC CSI: 0.788
Max BC CSI: 0.863
Max Web CSI: 0.904
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A8
Ply: 1SEQN: 74245 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T248
DrwNo: 167.23.1136.32667
RDF / RTT 06/16/2023
B2
W2
W3
W4
W6
W8
37'9"
3'2"
1'4"
(TYP)
1'3"9
1'0"15
1'2"2
1'5"14
5'9"9
5'9"9
12'0"10
6'3"1
19'
6'11"6
24'3"12
5'3"12
25'11"6
1'7"11
31'3"13
5'4"6
37'9"
6'5"3
7'4"14
7'4"14
11'7"13
4'2"15
14'5"15
2'10"3
23'6"1
9'0"1
30'7"2
7'1"1
37'9"
7'1"141'2"
4"1 5"58'3"18'8"104'1"2
(a)
(a)
A
B
E
I J
K
O
S
T
U
V
WXYZAAABADAF
AO
AR AU
AW
BI
5
12
3X4(A1)
3X4
3X4 4X4 3X4
8X8
5X6
1.5X43X64X4
5X10(R1)
H0308 4X4
5X6
4X4
3X4 4X6(B10R)
(NNL)
(S)
$%Lbl:2A8?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Brace all exposed vertical surfaces for lateral
wind forces. Anchor the perimeter of exposed
vertical surfaces and support lower roof using
sistered truss or nailer at edge of lower roof
diaphragm. All diaphragms, braces, and connec-
tions shall be designed by the engineer of record.
(S) 2x4 x 5'4" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A8
Ply: 1
Qty: 1
SEQN: 74245 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T248
DrwNo: 167.23.1136.32667
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Brace all exposed vertical surfaces for lateral
wind forces. Anchor the perimeter of exposed
vertical surfaces and support lower roof using
sistered truss or nailer at edge of lower roof
diaphragm. All diaphragms, braces, and connec-
tions shall be designed by the engineer of record.
(S) 2x4 x 5'4" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A8
Ply: 1
Qty: 1
SEQN: 74245 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T248
DrwNo: 167.23.1136.32667
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2200 # ( 57.90 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2200 57.90 TC 0.00 38.00
2200 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1605 /- /2200
J 1952 /- /- /1605 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 6 -4008
C - D 51 - 3786
D - E 78 - 3042
E - F 127 -2995
Chords Tens. Comp.
F - G 126 -2988
G - H 77 - 3036
H - I 60 - 3823
I - J 4 -3959
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 3623 0
R - Q 3040 0
Q - P 2415 0
P - O 2432 - 628
O - N 2302 0
Chords Tens. Comp.
O - N 124 - 631
N - M 2415 0
M - L 3033 0
L - J 3566 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 65 -390
R - D 668 0
D - Q 86 -740
Q - F 979 0
Webs Tens. Comp.
F - M 971 0
M - H 85 -734
H - L 703 0
L - I 65 -391
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.226 O 999 240
VERT(CL): 0.479 O 943 180
HORZ(LL): 0.078 J - -
HORZ(TL): 0.162 J - -
Creep Factor: 2.0
Max TC CSI: 0.765
Max BC CSI: 0.972
Max Web CSI: 0.412
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A9
Ply: 1SEQN: 74944 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T359
DrwNo: 167.23.1142.43023
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"141'2"1'2"
4"13"88'3"18'8"10A
B
C
D E
F
G
H
I
J
K
LMNOPQR
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2200 # ( 57.90 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2200 57.90 TC 0.00 38.00
2200 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1605 /- /2200
J 1952 /- /- /1605 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 6 -4008
C - D 51 - 3786
D - E 78 - 3042
E - F 127 -2995
Chords Tens. Comp.
F - G 126 -2988
G - H 77 - 3036
H - I 60 - 3823
I - J 4 -3959
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 3623 0
R - Q 3040 0
Q - P 2415 0
P - O 2432 - 628
O - N 2302 0
Chords Tens. Comp.
O - N 124 - 631
N - M 2415 0
M - L 3033 0
L - J 3566 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 65 -390
R - D 668 0
D - Q 86 -740
Q - F 979 0
Webs Tens. Comp.
F - M 971 0
M - H 85 -734
H - L 703 0
L - I 65 -391
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.226 O 999 240
VERT(CL): 0.479 O 943 180
HORZ(LL): 0.078 J - -
HORZ(TL): 0.162 J - -
Creep Factor: 2.0
Max TC CSI: 0.765
Max BC CSI: 0.972
Max Web CSI: 0.412
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A9
Ply: 1SEQN: 74944 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T359
DrwNo: 167.23.1142.43023
RDF / RTT 06/16/2023
B2
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
16'6"
2'0"1
20'
3'6"
21'6"
1'6"
23'6"1
2'0"1
30'7"2
7'1"1
38'
7'4"141'2"1'2"
4"13"88'3"18'8"10A
B
C
D E
F
G
H
I
J
K
LMNOPQR
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4 3X4 2X3
5X6
2X3H0308
3X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
$%Lbl:2A9?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1998 /- /- /1172 /- /130
J 1998 /- /- /1172 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4113
C - D 52 - 3891
D - E 75 - 3180
E - F 124 -3132
Chords Tens. Comp.
F - G 123 -3126
G - H 74 - 3173
H - I 62 - 3928
I - J 5 -4063
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3720 0
P - O 3160 0
O - N 2325 0
Chords Tens. Comp.
N - M 2325 0
M - L 3153 0
L - J 3663 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 65 -391
P - D 675 0
D - O 88 -725
O - F 1040 0
Webs Tens. Comp.
F - M 1032 0
M - H 87 -719
H - L 710 0
L - I 65 -392
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.214 O 999 240
VERT(CL): 0.475 O 951 180
HORZ(LL): 0.075 J - -
HORZ(TL): 0.168 J - -
Creep Factor: 2.0
Max TC CSI: 0.661
Max BC CSI: 0.993
Max Web CSI: 0.404
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A10
Ply: 1SEQN: 74946 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T360
DrwNo: 167.23.1120.45507
RDF / RTT 06/16/2023
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"141'2"1'2"
4"18'3"18'8"10A
B
C
D E
F
G
H
I
J
K
LMNOP
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1998 /- /- /1172 /- /130
J 1998 /- /- /1172 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 7 -4113
C - D 52 - 3891
D - E 75 - 3180
E - F 124 -3132
Chords Tens. Comp.
F - G 123 -3126
G - H 74 - 3173
H - I 62 - 3928
I - J 5 -4063
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3720 0
P - O 3160 0
O - N 2325 0
Chords Tens. Comp.
N - M 2325 0
M - L 3153 0
L - J 3663 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 65 -391
P - D 675 0
D - O 88 -725
O - F 1040 0
Webs Tens. Comp.
F - M 1032 0
M - H 87 -719
H - L 710 0
L - I 65 -392
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.214 O 999 240
VERT(CL): 0.475 O 951 180
HORZ(LL): 0.075 J - -
HORZ(TL): 0.168 J - -
Creep Factor: 2.0
Max TC CSI: 0.661
Max BC CSI: 0.993
Max Web CSI: 0.404
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2A10
Ply: 1SEQN: 74946 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T360
DrwNo: 167.23.1120.45507
RDF / RTT 06/16/2023
W4
W5
38'
5'11"3
5'11"3
12'0"10
6'1"6
19'
6'11"6
25'11"6
6'11"6
31'3"13
5'4"6
38'
6'8"3
7'4"14
7'4"14
14'5"15
7'1"1
23'6"1
9'0"1
30'7"2
7'1"1
38'
7'4"141'2"1'2"
4"18'3"18'8"10A
B
C
D E
F
G
H
I
J
K
LMNOP
5
12
3X10(A1)
1.5X3
3X4
3X4 3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
$%Lbl:2A10?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
See DWG VALTN160118 for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q* 113 /- /- /56 /- /3
Wind reactions based on MWFRS
Q Brg Wid = 168 Min Req = -
Bearing Q is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.60 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 I 999 240
VERT(CL): 0.014 I 999 180
HORZ(LL): -0.001 I - -
HORZ(TL): 0.005 I - -
Creep Factor: 2.0
Max TC CSI: 0.123
Max BC CSI: 0.157
Max Web CSI: 0.019
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2AGOV
Ply: 1SEQN: 74259 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T257
DrwNo: 167.23.1146.26500
RDF / RTT 06/16/2023
14'
3'1'4"
(TYP)
7'
7'
14'
7'
14'
14'2'11"A
E
I
Q
5
12
3X4(D1)
4X4
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
See DWG VALTN160118 for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q* 113 /- /- /56 /- /3
Wind reactions based on MWFRS
Q Brg Wid = 168 Min Req = -
Bearing Q is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.60 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 I 999 240
VERT(CL): 0.014 I 999 180
HORZ(LL): -0.001 I - -
HORZ(TL): 0.005 I - -
Creep Factor: 2.0
Max TC CSI: 0.123
Max BC CSI: 0.157
Max Web CSI: 0.019
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2AGOV
Ply: 1SEQN: 74259 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T257
DrwNo: 167.23.1146.26500
RDF / RTT 06/16/2023
14'
3'1'4"
(TYP)
7'
7'
14'
7'
14'
14'2'11"A
E
I
Q
5
12
3X4(D1)
4X4
3X4(D1)
$%Lbl:2AGOV?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 37.39 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 37.39 TC 0.00 26.75
1000 37.80 BC 0.15 26.60
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A* 128 /- /- /76 /- /9
AE*136 /- /- /70 /- /-
A /-185
Wind reactions based on MWFRS
A Brg Wid = 129 Min Req = -
AE Brg Wid = 192 Min Req = -
Bearings A & AE are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 490 - 547
Chords Tens. Comp.
J - S 507 -569
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A -AE 488 -459
Chords Tens. Comp.
AE- S 511 -482
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 A 999 240
VERT(CL): 0.005 S 999 180
HORZ(LL): 0.007 J - -
HORZ(TL): 0.011 J - -
Creep Factor: 2.0
Max TC CSI: 0.143
Max BC CSI: 0.129
Max Web CSI: 0.057
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2B
Ply: 1SEQN: 74961 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T249
DrwNo: 167.23.1258.12173
RDF / RTT 06/16/2023
26'9"
2'5"8 1'4"
(TYP)
1'5"4
1'5"12
13'3"
13'3"
26'9"
13'6"
26'9"
26'9"1'2"
5"5 4"15'11"96'5"2A
J
S
T
AE
5
12
4X6(B1)3X4
5X6
4X6(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1000 # ( 37.39 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1000 37.39 TC 0.00 26.75
1000 37.80 BC 0.15 26.60
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A* 128 /- /- /76 /- /9
AE*136 /- /- /70 /- /-
A /-185
Wind reactions based on MWFRS
A Brg Wid = 129 Min Req = -
AE Brg Wid = 192 Min Req = -
Bearings A & AE are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - J 490 - 547
Chords Tens. Comp.
J - S 507 -569
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A -AE 488 -459
Chords Tens. Comp.
AE- S 511 -482
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 A 999 240
VERT(CL): 0.005 S 999 180
HORZ(LL): 0.007 J - -
HORZ(TL): 0.011 J - -
Creep Factor: 2.0
Max TC CSI: 0.143
Max BC CSI: 0.129
Max Web CSI: 0.057
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2B
Ply: 1SEQN: 74961 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T249
DrwNo: 167.23.1258.12173
RDF / RTT 06/16/2023
26'9"
2'5"8 1'4"
(TYP)
1'5"4
1'5"12
13'3"
13'3"
26'9"
13'6"
26'9"
26'9"1'2"
5"5 4"15'11"96'5"2A
J
S
T
AE
5
12
4X6(B1)3X4
5X6
4X6(A2)
$%Lbl:2B?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1320 /- /- /761 /- /83
E 1429 /- /- /836 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 44 -2645
B - C 81 -2298
Chords Tens. Comp.
C - D 76 - 2335
D - E 42 - 2691
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 2357 0
I - H 1600 0
Chords Tens. Comp.
H - G 1600 0
G - E 2406 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - I 92 -491
I - C 699 0
Webs Tens. Comp.
C - G 752 0
G - D 90 -515
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.095 I 999 240
VERT(CL): 0.214 I 999 180
HORZ(LL): 0.032 E - -
HORZ(TL): 0.071 E - -
Creep Factor: 2.0
Max TC CSI: 0.513
Max BC CSI: 0.766
Max Web CSI: 0.305
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2B1
Ply: 1SEQN: 74247 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T250
DrwNo: 167.23.1146.40297
RDF / RTT 06/16/2023
26'9"
6'4"14
6'4"14
13'3"
6'10"2
20'1"2
6'10"2
26'9"
6'7"14
8'10"10
8'10"10
17'7"6
8'8"13
26'9"
9'1"10 1'2"
5"5 4"15'11"96'5"2A
B
C
D
E
F
GHI
5
12
4X6(B1)
1.5X3
3X4 3X4
5X6
3X4
1.5X3
4X6(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1320 /- /- /761 /- /83
E 1429 /- /- /836 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 44 -2645
B - C 81 -2298
Chords Tens. Comp.
C - D 76 - 2335
D - E 42 - 2691
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 2357 0
I - H 1600 0
Chords Tens. Comp.
H - G 1600 0
G - E 2406 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - I 92 -491
I - C 699 0
Webs Tens. Comp.
C - G 752 0
G - D 90 -515
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.095 I 999 240
VERT(CL): 0.214 I 999 180
HORZ(LL): 0.032 E - -
HORZ(TL): 0.071 E - -
Creep Factor: 2.0
Max TC CSI: 0.513
Max BC CSI: 0.766
Max Web CSI: 0.305
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2B1
Ply: 1SEQN: 74247 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T250
DrwNo: 167.23.1146.40297
RDF / RTT 06/16/2023
26'9"
6'4"14
6'4"14
13'3"
6'10"2
20'1"2
6'10"2
26'9"
6'7"14
8'10"10
8'10"10
17'7"6
8'8"13
26'9"
9'1"10 1'2"
5"5 4"15'11"96'5"2A
B
C
D
E
F
GHI
5
12
4X6(B1)
1.5X3
3X4 3X4
5X6
3X4
1.5X3
4X6(A2)
$%Lbl:2B1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.15 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.15 TC 0.00 14.00
800 58.36 BC 0.15 13.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 131 /- /- /68 /- /4
Wind reactions based on MWFRS
B Brg Wid = 168 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 374 - 424
Chords Tens. Comp.
F - J 374 - 424
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 378 - 363
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 J 999 240
VERT(CL): 0.007 J 999 180
HORZ(LL): -0.002 F - -
HORZ(TL): 0.003 J - -
Creep Factor: 2.0
Max TC CSI: 0.143
Max BC CSI: 0.193
Max Web CSI: 0.018
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C
Ply: 1SEQN: 74248 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T235
DrwNo: 167.23.1258.17890
RDF / RTT 06/16/2023
14'
3'1'4"
(TYP)
7'
7'
14'
7'
14'
14'1'2"1'2"
4"13'3"13'8"10A
B
F
J
K
5
12
3X4(A1)
4X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.15 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.15 TC 0.00 14.00
800 58.36 BC 0.15 13.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 131 /- /- /68 /- /4
Wind reactions based on MWFRS
B Brg Wid = 168 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 374 - 424
Chords Tens. Comp.
F - J 374 - 424
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - J 378 - 363
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 J 999 240
VERT(CL): 0.007 J 999 180
HORZ(LL): -0.002 F - -
HORZ(TL): 0.003 J - -
Creep Factor: 2.0
Max TC CSI: 0.143
Max BC CSI: 0.193
Max Web CSI: 0.018
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C
Ply: 1SEQN: 74248 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T235
DrwNo: 167.23.1258.17890
RDF / RTT 06/16/2023
14'
3'1'4"
(TYP)
7'
7'
14'
7'
14'
14'1'2"1'2"
4"13'3"13'8"10A
B
F
J
K
5
12
3X4(A1)
4X4
3X4(A1)
$%Lbl:2C?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 767 /- /- /471 /- /54
D 767 /- /- /471 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 116 -1030
Chords Tens. Comp.
C - D 116 -1030
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 870 0
Chords Tens. Comp.
F - D 870 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 383 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.015 F 999 240
VERT(CL): 0.047 D 999 180
HORZ(LL): 0.006 D - -
HORZ(TL): 0.022 B - -
Creep Factor: 2.0
Max TC CSI: 0.479
Max BC CSI: 0.730
Max Web CSI: 0.122
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C1
Ply: 1SEQN: 74249 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T236
DrwNo: 167.23.1147.12773
RDF / RTT 06/16/2023
14'
7'
7'
14'
7'
7'
7'
14'
7'1'2"1'2"
4"13'3"13'8"10A
B
C
D
E
F
5 12
3X4(A1)
5X6
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 767 /- /- /471 /- /54
D 767 /- /- /471 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 116 -1030
Chords Tens. Comp.
C - D 116 -1030
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 870 0
Chords Tens. Comp.
F - D 870 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 383 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.015 F 999 240
VERT(CL): 0.047 D 999 180
HORZ(LL): 0.006 D - -
HORZ(TL): 0.022 B - -
Creep Factor: 2.0
Max TC CSI: 0.479
Max BC CSI: 0.730
Max Web CSI: 0.122
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C1
Ply: 1SEQN: 74249 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T236
DrwNo: 167.23.1147.12773
RDF / RTT 06/16/2023
14'
7'
7'
14'
7'
7'
7'
14'
7'1'2"1'2"
4"13'3"13'8"10A
B
C
D
E
F
5 12
3X4(A1)
5X6
1.5X4 3X4(A1)
$%Lbl:2C1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L SS(g)
Webs 2x4 DF-L Standard(g) W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 3.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 14.00
BC: From 16 plf at 0.00 to 16 plf at 3.00
BC: From 641 plf at 3.00 to 641 plf at 13.00
BC: From 16 plf at 13.00 to 16 plf at 14.00
BC: 1882 lb Conc. Load at 1.33, 2.33
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.16 TC 0.00 14.00
800 BC 0.15
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Minimum Required bearing length for support points
with bearing plates (BP) and/or bearing blocks (BLn)
is equal to the nominal Brg Width shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
M 6635 /- /- /3927 /- /800
G 4709 /- /- /2839 /- /-
Wind reactions based on MWFRS
M Brg Wid = 3.5 Min Req = -
G Brg Wid = 3.5 Min Req = 2.5 (Truss)
Bearings M & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 61 -6155
B - C 64 -4793
C - D 63 - 3595
Chords Tens. Comp.
D - E 63 - 3596
E - F 64 -4454
F - G 61 - 5008
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 5692 -39
L - K 5603 - 40
K - J 4249 -24
Chords Tens. Comp.
J - I 3988 -21
I - H 4576 - 37
H - G 4610 - 36
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 1242 0
B - K 19 -1465
K - C 1444 -1
C - J 28 - 1380
D - J 2613 - 28
Webs Tens. Comp.
J - E 28 -992
E - I 1015 -1
I - F 19 -582
F - H 477 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.089 K 999 240
VERT(CL): 0.206 K 797 180
HORZ(LL): 0.023 G - -
HORZ(TL): 0.053 G - -
Creep Factor: 2.0
Max TC CSI: 0.731
Max BC CSI: 0.899
Max Web CSI: 0.587
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C2
Ply: 2SEQN: 74979 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T237
DrwNo: 167.23.1258.26947
RDF / RTT 06/16/2023
2 Complete Trusses Required
W5
BL1
14'
3'0"6
3'0"6
5'0"3
1'11"13
7'
1'11"13
8'11"13
1'11"13
10'11"10
1'11"13
14'
3'0"6
3'0"6
3'0"6
5'0"3
1'11"13
7'
1'11"13
8'11"13
1'11"13
10'11"10
1'11"13
14'
3'0"6
4"13'3"1A
B
C
D
E
F
G
HIJKLM
5
12
4X12(A8R)3X8
4X6
4X6
4X6
4X6
6X8
4X4
4X4
3X4
3X4 3X12(A6R)
1'4"
1882#
1'
1882#
11'8"
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L SS(g)
Webs 2x4 DF-L Standard(g) W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 3.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 14.00
BC: From 16 plf at 0.00 to 16 plf at 3.00
BC: From 641 plf at 3.00 to 641 plf at 13.00
BC: From 16 plf at 13.00 to 16 plf at 14.00
BC: 1882 lb Conc. Load at 1.33, 2.33
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.16 TC 0.00 14.00
800 BC 0.15
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Minimum Required bearing length for support points
with bearing plates (BP) and/or bearing blocks (BLn)
is equal to the nominal Brg Width shown.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
M 6635 /- /- /3927 /- /800
G 4709 /- /- /2839 /- /-
Wind reactions based on MWFRS
M Brg Wid = 3.5 Min Req = -
G Brg Wid = 3.5 Min Req = 2.5 (Truss)
Bearings M & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 61 -6155
B - C 64 -4793
C - D 63 - 3595
Chords Tens. Comp.
D - E 63 - 3596
E - F 64 -4454
F - G 61 - 5008
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 5692 -39
L - K 5603 - 40
K - J 4249 -24
Chords Tens. Comp.
J - I 3988 -21
I - H 4576 - 37
H - G 4610 - 36
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - B 1242 0
B - K 19 -1465
K - C 1444 -1
C - J 28 - 1380
D - J 2613 - 28
Webs Tens. Comp.
J - E 28 -992
E - I 1015 -1
I - F 19 -582
F - H 477 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.089 K 999 240
VERT(CL): 0.206 K 797 180
HORZ(LL): 0.023 G - -
HORZ(TL): 0.053 G - -
Creep Factor: 2.0
Max TC CSI: 0.731
Max BC CSI: 0.899
Max Web CSI: 0.587
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C2
Ply: 2SEQN: 74979 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T237
DrwNo: 167.23.1258.26947
RDF / RTT 06/16/2023
2 Complete Trusses Required
W5
BL1
14'
3'0"6
3'0"6
5'0"3
1'11"13
7'
1'11"13
8'11"13
1'11"13
10'11"10
1'11"13
14'
3'0"6
3'0"6
3'0"6
5'0"3
1'11"13
7'
1'11"13
8'11"13
1'11"13
10'11"10
1'11"13
14'
3'0"6
4"13'3"1A
B
C
D
E
F
G
HIJKLM
5
12
4X12(A8R)3X8
4X6
4X6
4X6
4X6
6X8
4X4
4X4
3X4
3X4 3X12(A6R)
1'4"
1882#
1'
1882#
11'8"
$%Lbl:2C2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Bearing Block(s)
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
1 0.000' 1 12" 4 Rigid Surface
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C2
Ply: 2
Qty: 1
SEQN: 74979 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T237
DrwNo: 167.23.1258.26947
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Bearing Block(s)
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
1 0.000' 1 12" 4 Rigid Surface
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C2
Ply: 2
Qty: 1
SEQN: 74979 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T237
DrwNo: 167.23.1258.26947
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.15 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.15 TC 0.00 14.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Brace all exposed vertical surfaces for lateral
wind forces. Anchor the perimeter of exposed
vertical surfaces and support lower roof using
sistered truss or nailer at edge of lower roof
diaphragm. All diaphragms, braces, and connec-
tions shall be designed by the engineer of record.
(S) 2x4 x 7'0" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 918 /- /- /609 /- /800
H 918 /- /- /609 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 155 -1291
F - G 120 - 1005
Chords Tens. Comp.
G - H 147 -1378
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 1122 -11
K - J 945 0
Chords Tens. Comp.
J - H 1180 -35
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - O 385 -75
F - O 481 - 18
Webs Tens. Comp.
O - J 395 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.062 K 999 240
VERT(CL): 0.153 K 999 180
HORZ(LL): 0.024 C - -
HORZ(TL): 0.060 C - -
Creep Factor: 2.0
Max TC CSI: 0.501
Max BC CSI: 0.671
Max Web CSI: 0.676
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C3
Ply: 1SEQN: 74251 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T239
DrwNo: 167.23.1303.38877
RDF / RTT 06/16/2023
W2
14'
3'1'4"
(TYP)
7'
7'
8'9"12
1'9"12
14'
5'2"4
4'3"4
4'3"4
14'
9'8"121'2"1'2"
4"13'3"13'8"10A
B
F
G
H
I
JK
O
5
12
3X4(A1)1.5X3(**)
4X4(R1)
4X61.5X4 3X4(A1)
(S)(S)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W2 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.15 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.15 TC 0.00 14.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Brace all exposed vertical surfaces for lateral
wind forces. Anchor the perimeter of exposed
vertical surfaces and support lower roof using
sistered truss or nailer at edge of lower roof
diaphragm. All diaphragms, braces, and connec-
tions shall be designed by the engineer of record.
(S) 2x4 x 7'0" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 918 /- /- /609 /- /800
H 918 /- /- /609 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 155 -1291
F - G 120 - 1005
Chords Tens. Comp.
G - H 147 -1378
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 1122 -11
K - J 945 0
Chords Tens. Comp.
J - H 1180 -35
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - O 385 -75
F - O 481 - 18
Webs Tens. Comp.
O - J 395 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.062 K 999 240
VERT(CL): 0.153 K 999 180
HORZ(LL): 0.024 C - -
HORZ(TL): 0.060 C - -
Creep Factor: 2.0
Max TC CSI: 0.501
Max BC CSI: 0.671
Max Web CSI: 0.676
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2C3
Ply: 1SEQN: 74251 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T239
DrwNo: 167.23.1303.38877
RDF / RTT 06/16/2023
W2
14'
3'1'4"
(TYP)
7'
7'
8'9"12
1'9"12
14'
5'2"4
4'3"4
4'3"4
14'
9'8"121'2"1'2"
4"13'3"13'8"10A
B
F
G
H
I
JK
O
5
12
3X4(A1)1.5X3(**)
4X4(R1)
4X61.5X4 3X4(A1)
(S)(S)
$%Lbl:2C3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 80.02 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 80.02 TC 0.00 10.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 667 /- /- /500 /22 /800
H 667 /- /- /500 /22 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 162 - 811
Chords Tens. Comp.
E - H 162 -811
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 728 -55
Chords Tens. Comp.
L - H 728 -55
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.020 N 999 240
VERT(CL): 0.074 N 999 180
HORZ(LL): 0.008 C - -
HORZ(TL): 0.031 C - -
Creep Factor: 2.0
Max TC CSI: 0.231
Max BC CSI: 0.367
Max Web CSI: 0.119
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2D
Ply: 1SEQN: 74252 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T238
DrwNo: 167.23.1305.26223
RDF / RTT 06/16/2023
10'
2'4"
1'4"
(TYP)
5'
5'
10'
5'
10'
10'1'2"1'2"
4"12'5"12'10"10A
B
E
H
I
L
5
12
3X4(A1)
4X4
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 80.02 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 80.02 TC 0.00 10.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 667 /- /- /500 /22 /800
H 667 /- /- /500 /22 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - E 162 - 811
Chords Tens. Comp.
E - H 162 -811
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - L 728 -55
Chords Tens. Comp.
L - H 728 -55
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.020 N 999 240
VERT(CL): 0.074 N 999 180
HORZ(LL): 0.008 C - -
HORZ(TL): 0.031 C - -
Creep Factor: 2.0
Max TC CSI: 0.231
Max BC CSI: 0.367
Max Web CSI: 0.119
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2D
Ply: 1SEQN: 74252 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T238
DrwNo: 167.23.1305.26223
RDF / RTT 06/16/2023
10'
2'4"
1'4"
(TYP)
5'
5'
10'
5'
10'
10'1'2"1'2"
4"12'5"12'10"10A
B
E
H
I
L
5
12
3X4(A1)
4X4
1.5X4 3X4(A1)
$%Lbl:2D?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 66.68 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 66.68 TC 0.00 12.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 790 /- /- /554 /- /800
J 790 /- /- /554 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 123 -1157
C - F 158 - 1013
Chords Tens. Comp.
F - I 158 -1013
I - J 123 -1157
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1024 -48
Q - O 886 - 13
Chords Tens. Comp.
O - M 886 -13
M - J 1024 -53
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 52 -426
F - O 425 - 53
Webs Tens. Comp.
M - I 52 -426
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.033 D 999 240
VERT(CL): 0.108 D 999 180
HORZ(LL): 0.012 D - -
HORZ(TL): 0.043 D - -
Creep Factor: 2.0
Max TC CSI: 0.297
Max BC CSI: 0.497
Max Web CSI: 0.150
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2E
Ply: 1SEQN: 74253 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T251
DrwNo: 167.23.1305.46383
RDF / RTT 06/16/2023
12'
2'1'4"
(TYP)
6'
6'
12'
6'
12'
12'1'2"1'2"
4"12'10"13'3"10A
B
C
F
I
J
K
MOQ
5
12
3X4(A1)
3X4
3X4
4X4
1.5X4 3X4
3X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 66.68 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 66.68 TC 0.00 12.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 790 /- /- /554 /- /800
J 790 /- /- /554 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 123 -1157
C - F 158 - 1013
Chords Tens. Comp.
F - I 158 -1013
I - J 123 -1157
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1024 -48
Q - O 886 - 13
Chords Tens. Comp.
O - M 886 -13
M - J 1024 -53
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 52 -426
F - O 425 - 53
Webs Tens. Comp.
M - I 52 -426
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.033 D 999 240
VERT(CL): 0.108 D 999 180
HORZ(LL): 0.012 D - -
HORZ(TL): 0.043 D - -
Creep Factor: 2.0
Max TC CSI: 0.297
Max BC CSI: 0.497
Max Web CSI: 0.150
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2E
Ply: 1SEQN: 74253 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T251
DrwNo: 167.23.1305.46383
RDF / RTT 06/16/2023
12'
2'1'4"
(TYP)
6'
6'
12'
6'
12'
12'1'2"1'2"
4"12'10"13'3"10A
B
C
F
I
J
K
MOQ
5
12
3X4(A1)
3X4
3X4
4X4
1.5X4 3X4
3X4
3X4(A1)
$%Lbl:2E?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 66.69 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 66.69 TC 0.00 12.00
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 583 /- /- /501 /- /800
C 583 /- /- /501 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 131 - 914
Chords Tens. Comp.
B - C 131 -900
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 836 -43
Chords Tens. Comp.
D - C 836 -43
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.013 D 999 240
VERT(CL): 0.035 A 999 180
HORZ(LL): 0.007 C - -
HORZ(TL): 0.017 A - -
Creep Factor: 2.0
Max TC CSI: 0.349
Max BC CSI: 0.608
Max Web CSI: 0.116
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2E1
Ply: 1SEQN: 74254 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T252
DrwNo: 167.23.1305.53763
RDF / RTT 06/16/2023
12'
6'
6'
12'
6'
6'
6'
12'
6'
4"12'10"1A
B
C
D
5
12
3X4(A1)
4X4(R1)
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 66.69 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 66.69 TC 0.00 12.00
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 583 /- /- /501 /- /800
C 583 /- /- /501 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 131 - 914
Chords Tens. Comp.
B - C 131 -900
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 836 -43
Chords Tens. Comp.
D - C 836 -43
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.013 D 999 240
VERT(CL): 0.035 A 999 180
HORZ(LL): 0.007 C - -
HORZ(TL): 0.017 A - -
Creep Factor: 2.0
Max TC CSI: 0.349
Max BC CSI: 0.608
Max Web CSI: 0.116
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2E1
Ply: 1SEQN: 74254 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T252
DrwNo: 167.23.1305.53763
RDF / RTT 06/16/2023
12'
6'
6'
12'
6'
6'
6'
12'
6'
4"12'10"1A
B
C
D
5
12
3X4(A1)
4X4(R1)
1.5X4 3X4(A1)
$%Lbl:2E1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 128.88 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 128.88 TC 0.00 6.21
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 476 /- /- /562 /124 /800
I 732 /- /0 /388 /89 /-
G 107 /-360 /- /38 /174 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
I Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 1.5 Min Req = -
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 568 - 926
Chords Tens. Comp.
D - F 350 - 434
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 377 - 108
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - J 161 - 551
Webs Tens. Comp.
F - I 197 - 593
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
K - D 385 -45
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.016 J 999 240
VERT(CL): 0.041 J 999 180
HORZ(LL): 0.007 E - -
HORZ(TL): 0.016 E - -
Creep Factor: 2.0
Max TC CSI: 0.229
Max BC CSI: 0.283
Max Web CSI: 0.077
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2F
Ply: 1SEQN: 74255 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T253
DrwNo: 167.23.1306.44810
RDF / RTT 06/16/2023
6'2"8
1'11"1'4"
(TYP)
1'2"4
5'11"
5'11"
6'2"8
3"81'2"2'7"54"1 2'11"13'4"11A
B
D
F G
HIJK
5
12
3X4(A1)1.5X4
3X4
3X4 3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 128.88 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 128.88 TC 0.00 6.21
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 476 /- /- /562 /124 /800
I 732 /- /0 /388 /89 /-
G 107 /-360 /- /38 /174 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
I Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 1.5 Min Req = -
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 568 - 926
Chords Tens. Comp.
D - F 350 - 434
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 377 - 108
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - J 161 - 551
Webs Tens. Comp.
F - I 197 - 593
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
K - D 385 -45
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.016 J 999 240
VERT(CL): 0.041 J 999 180
HORZ(LL): 0.007 E - -
HORZ(TL): 0.016 E - -
Creep Factor: 2.0
Max TC CSI: 0.229
Max BC CSI: 0.283
Max Web CSI: 0.077
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2F
Ply: 1SEQN: 74255 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T253
DrwNo: 167.23.1306.44810
RDF / RTT 06/16/2023
6'2"8
1'11"1'4"
(TYP)
1'2"4
5'11"
5'11"
6'2"8
3"81'2"2'7"54"1 2'11"13'4"11A
B
D
F G
HIJK
5
12
3X4(A1)1.5X4
3X4
3X4 3X6
$%Lbl:2F?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2F
Ply: 1
Qty: 1
SEQN: 74255 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T253
DrwNo: 167.23.1306.44810
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2F
Ply: 1
Qty: 1
SEQN: 74255 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T253
DrwNo: 167.23.1306.44810
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 490 /- /- /269 /- /63
D 154 /- /- /57 /- /-
C 355 /- /- /122 /0 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 1.5 Min Req = -
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.011 B - -
HORZ(TL): 0.028 B - -
Creep Factor: 2.0
Max TC CSI: 0.541
Max BC CSI: 0.711
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2F1
Ply: 1SEQN: 74256 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T254
DrwNo: 167.23.1306.48783
RDF / RTT 06/16/2023
6'2"8
6'2"8
6'2"81'2"
4"1 2'11"13'4"11A
B
C
D
5
12
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 490 /- /- /269 /- /63
D 154 /- /- /57 /- /-
C 355 /- /- /122 /0 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 1.5 Min Req = -
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.011 B - -
HORZ(TL): 0.028 B - -
Creep Factor: 2.0
Max TC CSI: 0.541
Max BC CSI: 0.711
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2F1
Ply: 1SEQN: 74256 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T254
DrwNo: 167.23.1306.48783
RDF / RTT 06/16/2023
6'2"8
6'2"8
6'2"81'2"
4"1 2'11"13'4"11A
B
C
D
5
12
3X4(A1)
$%Lbl:2F1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 181.83 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 181.83 TC 0.00 11.00
2000 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
U 714 /- /- /859 /161 /2000
J 624 /- /- /314 /- /-
Wind reactions based on MWFRS
U Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings U & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 1053 -2436
D - F 618 - 1748
Chords Tens. Comp.
F - I 884 - 932
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 1365 - 331
N - M 1138 - 268
Chords Tens. Comp.
M - J 1122 -265
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - N 85 -509
Webs Tens. Comp.
F - J 281 -1186
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.046 O 999 240
VERT(CL): 0.080 K 999 180
HORZ(LL): -0.016 I - -
HORZ(TL): 0.022 I - -
Creep Factor: 2.0
Max TC CSI: 0.216
Max BC CSI: 0.398
Max Web CSI: 0.702
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2G
Ply: 1SEQN: 74971 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T255
DrwNo: 167.23.1307.56397
RDF / RTT 06/16/2023
11'
3'1'4"
(TYP)
6'0"8
6'0"8
11'
4'11"8
6'0"8
6'0"8
11'
4'11"81'2"
3"14 3'0"143'4"2A
B
D
F
I
JMNU
3 12
3X4(A1)
3X4
3X41.5X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 181.83 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 181.83 TC 0.00 11.00
2000 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
U 714 /- /- /859 /161 /2000
J 624 /- /- /314 /- /-
Wind reactions based on MWFRS
U Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings U & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 1053 -2436
D - F 618 - 1748
Chords Tens. Comp.
F - I 884 - 932
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 1365 - 331
N - M 1138 - 268
Chords Tens. Comp.
M - J 1122 -265
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - N 85 -509
Webs Tens. Comp.
F - J 281 -1186
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.046 O 999 240
VERT(CL): 0.080 K 999 180
HORZ(LL): -0.016 I - -
HORZ(TL): 0.022 I - -
Creep Factor: 2.0
Max TC CSI: 0.216
Max BC CSI: 0.398
Max Web CSI: 0.702
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2G
Ply: 1SEQN: 74971 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T255
DrwNo: 167.23.1307.56397
RDF / RTT 06/16/2023
11'
3'1'4"
(TYP)
6'0"8
6'0"8
11'
4'11"8
6'0"8
6'0"8
11'
4'11"81'2"
3"14 3'0"143'4"2A
B
D
F
I
JMNU
3 12
3X4(A1)
3X4
3X41.5X4
3X4
4X4
$%Lbl:2G?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2G
Ply: 1
Qty: 1
SEQN: 74971 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T255
DrwNo: 167.23.1307.56397
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2G
Ply: 1
Qty: 1
SEQN: 74971 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T255
DrwNo: 167.23.1307.56397
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 623 /- /- /362 /- /63
E 535 /- /- /289 /- /-
Wind reactions based on MWFRS
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = - Min Req = -
Bearing G is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 164 -1082
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1012 - 243
Chords Tens. Comp.
F - E 1004 - 247
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 257 - 1046
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.024 F 999 240
VERT(CL): 0.066 B 999 180
HORZ(LL): 0.007 E - -
HORZ(TL): 0.018 B - -
Creep Factor: 2.0
Max TC CSI: 0.329
Max BC CSI: 0.625
Max Web CSI: 0.458
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2G1
Ply: 1SEQN: 74698 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T256
DrwNo: 167.23.1309.15377
RDF / RTT 06/16/2023
11'
6'0"8
6'0"8
11'
4'11"8
6'0"8
6'0"8
11'
4'11"81'2"
3"14 3'0"143'4"2A
B
C
D
EFG
3 12
3X4(A1)1.5X3
3X4
1.5X3
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G 623 /- /- /362 /- /63
E 535 /- /- /289 /- /-
Wind reactions based on MWFRS
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = - Min Req = -
Bearing G is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 164 -1082
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1012 - 243
Chords Tens. Comp.
F - E 1004 - 247
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 257 - 1046
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.024 F 999 240
VERT(CL): 0.066 B 999 180
HORZ(LL): 0.007 E - -
HORZ(TL): 0.018 B - -
Creep Factor: 2.0
Max TC CSI: 0.329
Max BC CSI: 0.625
Max Web CSI: 0.458
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2G1
Ply: 1SEQN: 74698 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T256
DrwNo: 167.23.1309.15377
RDF / RTT 06/16/2023
11'
6'0"8
6'0"8
11'
4'11"8
6'0"8
6'0"8
11'
4'11"81'2"
3"14 3'0"143'4"2A
B
C
D
EFG
3 12
3X4(A1)1.5X3
3X4
1.5X3
4X4
$%Lbl:2G1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 26.71
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 26.71
BC: 90 lb Conc. Load at 13.50
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1419 /- /- /835 /- /83
H 1310 /- /- /759 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 11 -2651
C - D 77 - 2234
Chords Tens. Comp.
F - G 80 - 2213
G - H 15 - 2544
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2359 0
O - N 2316 0
N - M 1754 0
M - L 1881 - 513
L - K 1802 0
Chords Tens. Comp.
L - K 94 -504
K - J 1754 0
J - I 2253 0
I - H 2254 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 61 -509
N - D 666 0
D - F 83 - 1614
Webs Tens. Comp.
F - J 635 0
J - G 65 -436
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.108 L 999 240
VERT(CL): 0.264 D 999 180
HORZ(LL): 0.032 H - -
HORZ(TL): 0.079 H - -
Creep Factor: 2.0
Max TC CSI: 0.623
Max BC CSI: 0.658
Max Web CSI: 0.475
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2H1
Ply: 1SEQN: 74977 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T262
DrwNo: 167.23.1309.27180
RDF / RTT 06/16/2023
B2
26'8"8
7'0"14
7'0"14
11'7"7
4'6"8
13'6"
1'10"9
15'3"13
1'9"13
19'11"2
4'7"4
26'8"8
6'9"6
4'11"8
4'11"8
9'6"12
4'7"4
11'
1'5"4
14'
3'
16'
2'
17'5"4
1'5"4
22'0"8
4'7"4
26'8"8
4'8"1'2"
4"1 5"83"85'11"96'5"2A
B
C
D
E
F
G
H
IJKLMNO
5
12
4X6(A2)1.5X4
3X4
3X4 3X4
3X6
2X3
3X4
4X6
3X4
3X4 3X4
3X4
1.5X3 3X6(B1)
13'6"
90#
13'2"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 26.71
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 26.71
BC: 90 lb Conc. Load at 13.50
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1419 /- /- /835 /- /83
H 1310 /- /- /759 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 11 -2651
C - D 77 - 2234
Chords Tens. Comp.
F - G 80 - 2213
G - H 15 - 2544
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2359 0
O - N 2316 0
N - M 1754 0
M - L 1881 - 513
L - K 1802 0
Chords Tens. Comp.
L - K 94 -504
K - J 1754 0
J - I 2253 0
I - H 2254 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 61 -509
N - D 666 0
D - F 83 - 1614
Webs Tens. Comp.
F - J 635 0
J - G 65 -436
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.108 L 999 240
VERT(CL): 0.264 D 999 180
HORZ(LL): 0.032 H - -
HORZ(TL): 0.079 H - -
Creep Factor: 2.0
Max TC CSI: 0.623
Max BC CSI: 0.658
Max Web CSI: 0.475
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2H1
Ply: 1SEQN: 74977 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T262
DrwNo: 167.23.1309.27180
RDF / RTT 06/16/2023
B2
26'8"8
7'0"14
7'0"14
11'7"7
4'6"8
13'6"
1'10"9
15'3"13
1'9"13
19'11"2
4'7"4
26'8"8
6'9"6
4'11"8
4'11"8
9'6"12
4'7"4
11'
1'5"4
14'
3'
16'
2'
17'5"4
1'5"4
22'0"8
4'7"4
26'8"8
4'8"1'2"
4"1 5"83"85'11"96'5"2A
B
C
D
E
F
G
H
IJKLMNO
5
12
4X6(A2)1.5X4
3X4
3X4 3X4
3X6
2X3
3X4
4X6
3X4
3X4 3X4
3X4
1.5X3 3X6(B1)
13'6"
90#
13'2"8
$%Lbl:2H1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 26.71
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 26.71
BC: 90 lb Conc. Load at 13.50
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1634 /- /- /965 /- /95
H 1508 /- /- /878 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
H Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 13 -3048
C - D 89 - 2565
Chords Tens. Comp.
F - G 92 - 2540
G - H 18 - 2926
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2712 0
O - N 2661 0
N - M 2014 0
M - L 2033 - 504
L - K 1941 0
Chords Tens. Comp.
L - K 109 - 494
K - J 2014 0
J - I 2589 0
I - H 2591 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 382 0
C - N 70 -590
N - D 719 0
Webs Tens. Comp.
D - F 96 - 1852
F - J 685 0
J - G 75 -506
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.124 L 999 240
VERT(CL): 0.282 D 999 180
HORZ(LL): 0.037 H - -
HORZ(TL): 0.090 H - -
Creep Factor: 2.0
Max TC CSI: 0.831
Max BC CSI: 0.711
Max Web CSI: 0.545
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2H2
Ply: 1SEQN: 74290 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T263
DrwNo: 167.23.1310.19703
RDF / RTT 06/16/2023
B2
26'8"8
7'0"14
7'0"14
11'7"7
4'6"8
13'6"
1'10"9
15'3"13
1'9"13
19'11"2
4'7"4
26'8"8
6'9"6
4'11"8
4'11"8
9'6"12
4'7"4
11'
1'5"4
14'
3'
16'
2'
17'5"4
1'5"4
22'0"8
4'7"4
26'8"8
4'8"1'2"
4"1 5"83"85'11"96'5"2A
B
C
D
E
F
G
H
IJKLMNO
5
12
4X6(A2T)1.5X4
3X4
3X4 3X4
3X6
2X3
3X4
4X6
3X6
3X4 3X4
3X4
1.5X3 4X6(B1)
13'6"
90#
13'2"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 26.71
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 26.71
BC: 90 lb Conc. Load at 13.50
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1634 /- /- /965 /- /95
H 1508 /- /- /878 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
H Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 13 -3048
C - D 89 - 2565
Chords Tens. Comp.
F - G 92 - 2540
G - H 18 - 2926
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2712 0
O - N 2661 0
N - M 2014 0
M - L 2033 - 504
L - K 1941 0
Chords Tens. Comp.
L - K 109 - 494
K - J 2014 0
J - I 2589 0
I - H 2591 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 382 0
C - N 70 -590
N - D 719 0
Webs Tens. Comp.
D - F 96 - 1852
F - J 685 0
J - G 75 -506
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.124 L 999 240
VERT(CL): 0.282 D 999 180
HORZ(LL): 0.037 H - -
HORZ(TL): 0.090 H - -
Creep Factor: 2.0
Max TC CSI: 0.831
Max BC CSI: 0.711
Max Web CSI: 0.545
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2H2
Ply: 1SEQN: 74290 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T263
DrwNo: 167.23.1310.19703
RDF / RTT 06/16/2023
B2
26'8"8
7'0"14
7'0"14
11'7"7
4'6"8
13'6"
1'10"9
15'3"13
1'9"13
19'11"2
4'7"4
26'8"8
6'9"6
4'11"8
4'11"8
9'6"12
4'7"4
11'
1'5"4
14'
3'
16'
2'
17'5"4
1'5"4
22'0"8
4'7"4
26'8"8
4'8"1'2"
4"1 5"83"85'11"96'5"2A
B
C
D
E
F
G
H
IJKLMNO
5
12
4X6(A2T)1.5X4
3X4
3X4 3X4
3X6
2X3
3X4
4X6
3X6
3X4 3X4
3X4
1.5X3 4X6(B1)
13'6"
90#
13'2"8
$%Lbl:2H2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 26.71
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 26.71
BC: 90 lb Conc. Load at 13.50
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss transfers a maximum horizontal load of
2200 # ( 82.38 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2200 82.38 TC 0.00 26.71
2200 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1419 /- /- /1308 /- /2203
H 1310 /- /- /1243 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 11 -2733
C - D 77 - 2234
Chords Tens. Comp.
F - G 80 - 2213
G - H 15 - 2557
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2511 0
O - N 2465 0
N - M 2124 - 29
M - L 2124 - 513
L - K 1987 0
Chords Tens. Comp.
L - K 137 - 504
K - J 2124 -29
J - I 2357 0
I - H 2334 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 61 -509
N - D 666 0
D - F 83 - 1614
Webs Tens. Comp.
F - J 635 0
J - G 65 -436
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.139 L 999 240
VERT(CL): 0.264 D 999 180
HORZ(LL): 0.056 H - -
HORZ(TL): 0.093 H - -
Creep Factor: 2.0
Max TC CSI: 0.623
Max BC CSI: 0.658
Max Web CSI: 0.475
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2H3
Ply: 1SEQN: 74975 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T361
DrwNo: 167.23.1310.36793
RDF / RTT 06/16/2023
B2
26'8"8
7'0"14
7'0"14
11'7"7
4'6"8
13'6"
1'10"9
15'3"13
1'9"13
19'11"2
4'7"4
26'8"8
6'9"6
4'11"8
4'11"8
9'6"12
4'7"4
11'
1'5"4
14'
3'
16'
2'
17'5"4
1'5"4
22'0"8
4'7"4
26'8"8
4'8"1'2"
4"1 5"83"85'11"96'5"2A
B
C
D
E
F
G
H
IJKLMNO
5
12
4X6(A2)1.5X4
3X4
3X4 3X4
3X6
2X3
3X4
4X6
3X4
3X4 3X4
3X4
1.5X3 3X6(B1)
13'6"
90#
13'2"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 26.71
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 26.71
BC: 90 lb Conc. Load at 13.50
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss transfers a maximum horizontal load of
2200 # ( 82.38 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2200 82.38 TC 0.00 26.71
2200 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1419 /- /- /1308 /- /2203
H 1310 /- /- /1243 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 11 -2733
C - D 77 - 2234
Chords Tens. Comp.
F - G 80 - 2213
G - H 15 - 2557
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2511 0
O - N 2465 0
N - M 2124 - 29
M - L 2124 - 513
L - K 1987 0
Chords Tens. Comp.
L - K 137 - 504
K - J 2124 -29
J - I 2357 0
I - H 2334 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 61 -509
N - D 666 0
D - F 83 - 1614
Webs Tens. Comp.
F - J 635 0
J - G 65 -436
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.139 L 999 240
VERT(CL): 0.264 D 999 180
HORZ(LL): 0.056 H - -
HORZ(TL): 0.093 H - -
Creep Factor: 2.0
Max TC CSI: 0.623
Max BC CSI: 0.658
Max Web CSI: 0.475
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2H3
Ply: 1SEQN: 74975 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T361
DrwNo: 167.23.1310.36793
RDF / RTT 06/16/2023
B2
26'8"8
7'0"14
7'0"14
11'7"7
4'6"8
13'6"
1'10"9
15'3"13
1'9"13
19'11"2
4'7"4
26'8"8
6'9"6
4'11"8
4'11"8
9'6"12
4'7"4
11'
1'5"4
14'
3'
16'
2'
17'5"4
1'5"4
22'0"8
4'7"4
26'8"8
4'8"1'2"
4"1 5"83"85'11"96'5"2A
B
C
D
E
F
G
H
IJKLMNO
5
12
4X6(A2)1.5X4
3X4
3X4 3X4
3X6
2X3
3X4
4X6
3X4
3X4 3X4
3X4
1.5X3 3X6(B1)
13'6"
90#
13'2"8
$%Lbl:2H3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 42 7.71 18.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 3340 /- /- /407 /- /-
F 3414 /- /- /412 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
F Brg Wid = 3.5 Min Req = 1.8 (Truss)
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3185
A - B 0 -3483
C - D 0 -3983
Chords Tens. Comp.
D - E 0 -3271
E - F 0 -3566
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 3161 0
L - K 3985 0
K - J 3985 0
Chords Tens. Comp.
J - I 3980 0
I - H 3980 0
H - F 3247 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - C 0 -1076
B - L 790 0
Webs Tens. Comp.
D - H 0 -971
H - E 807 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.165 J 999 240
VERT(CL): 0.389 J 815 180
HORZ(LL): 0.050 F - -
HORZ(TL): 0.118 F - -
Creep Factor: 2.0
Max TC CSI: 0.990
Max BC CSI: 0.861
Max Web CSI: 0.328
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HA
Ply: 2SEQN: 74260 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T258
DrwNo: 167.23.1153.19633
RDF / RTT 06/16/2023
2 Complete Trusses Required
26'8"8
7'8"3
7'8"3
11'2"8
3'6"5
15'2"8
3'11"15
18'8"13
3'6"5
26'8"8
7'11"11
7'4"5
7'4"5
11'2"8
3'10"3
15'2"8
3'11"15
19'0"11
3'10"3
26'8"8
7'7"13 1'2"
5"8 4"13'7"154'1"8A
B CDE
F
G
HIJKL
5 12
4X6(B10R)
5X6
3X4
3X10
1.5X3 3X4
3X4
H0308 3X4
5X6
3X10(B1T)
3'8"8
280#
794#
11'0"10
794#
19'
280#
4'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 42 7.71 18.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 3340 /- /- /407 /- /-
F 3414 /- /- /412 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
F Brg Wid = 3.5 Min Req = 1.8 (Truss)
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3185
A - B 0 -3483
C - D 0 -3983
Chords Tens. Comp.
D - E 0 -3271
E - F 0 -3566
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 3161 0
L - K 3985 0
K - J 3985 0
Chords Tens. Comp.
J - I 3980 0
I - H 3980 0
H - F 3247 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
L - C 0 -1076
B - L 790 0
Webs Tens. Comp.
D - H 0 -971
H - E 807 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.165 J 999 240
VERT(CL): 0.389 J 815 180
HORZ(LL): 0.050 F - -
HORZ(TL): 0.118 F - -
Creep Factor: 2.0
Max TC CSI: 0.990
Max BC CSI: 0.861
Max Web CSI: 0.328
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HA
Ply: 2SEQN: 74260 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T258
DrwNo: 167.23.1153.19633
RDF / RTT 06/16/2023
2 Complete Trusses Required
26'8"8
7'8"3
7'8"3
11'2"8
3'6"5
15'2"8
3'11"15
18'8"13
3'6"5
26'8"8
7'11"11
7'4"5
7'4"5
11'2"8
3'10"3
15'2"8
3'11"15
19'0"11
3'10"3
26'8"8
7'7"13 1'2"
5"8 4"13'7"154'1"8A
B CDE
F
G
HIJKL
5 12
4X6(B10R)
5X6
3X4
3X10
1.5X3 3X4
3X4
H0308 3X4
5X6
3X10(B1T)
3'8"8
280#
794#
11'0"10
794#
19'
280#
4'
$%Lbl:2HA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HA
Ply: 2
Qty: 1
SEQN: 74260 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T258
DrwNo: 167.23.1153.19633
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HA
Ply: 2
Qty: 1
SEQN: 74260 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T258
DrwNo: 167.23.1153.19633
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 45 9.71 16.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1482 /- /- /1228 /- /2003
G 1477 /- /- /1234 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
G Brg Wid = 3.5 Min Req = 1.6 (Truss)
Bearing G is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 184 - 2385
A - B 144 -3000
B - C 171 -2655
Chords Tens. Comp.
D - E 186 -2402
E - F 173 -2680
F - G 150 -3150
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 2688 -94
L - K 2690 - 96
K - J 2827 -97
Chords Tens. Comp.
J - I 2827 -97
I - H 2842 - 85
H - G 2843 - 84
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 44 -438
K - C 740 -16
K - D 98 -637
Webs Tens. Comp.
D - I 96 -612
E - I 774 -16
I - F 49 -544
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.127 D 999 240
VERT(CL): 0.295 D 999 180
HORZ(LL): 0.054 G - -
HORZ(TL): 0.105 G - -
Creep Factor: 2.0
Max TC CSI: 0.978
Max BC CSI: 0.938
Max Web CSI: 0.346
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HB
Ply: 1SEQN: 74261 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T259
DrwNo: 167.23.1155.06020
RDF / RTT 06/16/2023
26'8"8
4'10"5
4'10"5
9'8"3
4'9"14
13'2"8
3'6"5
16'8"13
3'6"5
21'6"11
4'9"14
26'8"8
5'1"13
4'10"5
4'10"5
9'4"5
4'6"
17'0"11
7'8"6
21'6"11
4'6"
26'8"8
5'1"13
5"8 4"14'5"15A
B
C DE
F
G
HIJKL
5 12
4X6(B1)1.5X3
3X4
3X8
4X6 3X4
H0308
4X6
3X8
3X4
1.5X3 4X6(A2)
9'11"11
134#
3'2"13
673#134#
9'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 45 9.71 16.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1482 /- /- /1228 /- /2003
G 1477 /- /- /1234 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
G Brg Wid = 3.5 Min Req = 1.6 (Truss)
Bearing G is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 184 - 2385
A - B 144 -3000
B - C 171 -2655
Chords Tens. Comp.
D - E 186 -2402
E - F 173 -2680
F - G 150 -3150
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 2688 -94
L - K 2690 - 96
K - J 2827 -97
Chords Tens. Comp.
J - I 2827 -97
I - H 2842 - 85
H - G 2843 - 84
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 44 -438
K - C 740 -16
K - D 98 -637
Webs Tens. Comp.
D - I 96 -612
E - I 774 -16
I - F 49 -544
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.127 D 999 240
VERT(CL): 0.295 D 999 180
HORZ(LL): 0.054 G - -
HORZ(TL): 0.105 G - -
Creep Factor: 2.0
Max TC CSI: 0.978
Max BC CSI: 0.938
Max Web CSI: 0.346
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HB
Ply: 1SEQN: 74261 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T259
DrwNo: 167.23.1155.06020
RDF / RTT 06/16/2023
26'8"8
4'10"5
4'10"5
9'8"3
4'9"14
13'2"8
3'6"5
16'8"13
3'6"5
21'6"11
4'9"14
26'8"8
5'1"13
4'10"5
4'10"5
9'4"5
4'6"
17'0"11
7'8"6
21'6"11
4'6"
26'8"8
5'1"13
5"8 4"14'5"15A
B
C DE
F
G
HIJKL
5 12
4X6(B1)1.5X3
3X4
3X8
4X6 3X4
H0308
4X6
3X8
3X4
1.5X3 4X6(A2)
9'11"11
134#
3'2"13
673#134#
9'11"11
$%Lbl:2HB?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2000 # ( 74.89 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 74.89 TC 0.00 26.71
2000 BC 0.29
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HB
Ply: 1
Qty: 1
SEQN: 74261 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T259
DrwNo: 167.23.1155.06020
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2000 # ( 74.89 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 74.89 TC 0.00 26.71
2000 BC 0.29
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HB
Ply: 1
Qty: 1
SEQN: 74261 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T259
DrwNo: 167.23.1155.06020
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 54 9.30 17.11
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1255 /- /- /751 /- /62
I 1255 /- /- /751 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
I Brg Wid = - Min Req = -
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 117 -2472
B - C 152 -2114
C - E 200 - 1892
Chords Tens. Comp.
E - G 200 -1892
G - H 153 -2114
H - I 118 -2472
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 2204 -81
N - M 2204 - 82
M - L 2089 -77
Chords Tens. Comp.
L - K 2089 - 77
K - J 2204 -59
J - I 2204 -57
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - M 30 -442
M - C 493 -12
Webs Tens. Comp.
G - K 493 -11
K - H 31 -442
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.096 E 999 240
VERT(CL): 0.229 E 999 180
HORZ(LL): 0.035 I - -
HORZ(TL): 0.084 I - -
Creep Factor: 2.0
Max TC CSI: 0.974
Max BC CSI: 0.882
Max Web CSI: 0.200
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HC
Ply: 1SEQN: 74262 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T260
DrwNo: 167.23.1155.49893
RDF / RTT 06/16/2023
26'5"
4'10"5
4'10"5
9'8"8
4'10"3
13'2"8
3'6"
15'2"5
1'11"13
17'0"11
1'10"6
21'6"11
4'6"
26'5"
4'10"5
4'10"5
4'10"5
9'4"5
4'6"
17'0"11
7'8"6
21'6"11
4'6"
26'5"
4'10"5
5"85'1"10A
B
C
D
EFG
H
I
JKLMN
5
12
3X6(B1)1.5X3 3X8
4X4 4X4
3X8 1.5X3 3X6(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 54 9.30 17.11
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1255 /- /- /751 /- /62
I 1255 /- /- /751 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
I Brg Wid = - Min Req = -
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 117 -2472
B - C 152 -2114
C - E 200 - 1892
Chords Tens. Comp.
E - G 200 -1892
G - H 153 -2114
H - I 118 -2472
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 2204 -81
N - M 2204 - 82
M - L 2089 -77
Chords Tens. Comp.
L - K 2089 - 77
K - J 2204 -59
J - I 2204 -57
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - M 30 -442
M - C 493 -12
Webs Tens. Comp.
G - K 493 -11
K - H 31 -442
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.096 E 999 240
VERT(CL): 0.229 E 999 180
HORZ(LL): 0.035 I - -
HORZ(TL): 0.084 I - -
Creep Factor: 2.0
Max TC CSI: 0.974
Max BC CSI: 0.882
Max Web CSI: 0.200
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HC
Ply: 1SEQN: 74262 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T260
DrwNo: 167.23.1155.49893
RDF / RTT 06/16/2023
26'5"
4'10"5
4'10"5
9'8"8
4'10"3
13'2"8
3'6"
15'2"5
1'11"13
17'0"11
1'10"6
21'6"11
4'6"
26'5"
4'10"5
4'10"5
4'10"5
9'4"5
4'6"
17'0"11
7'8"6
21'6"11
4'6"
26'5"
4'10"5
5"85'1"10A
B
C
D
EFG
H
I
JKLMN
5
12
3X6(B1)1.5X3 3X8
4X4 4X4
3X8 1.5X3 3X6(B1)
$%Lbl:2HC?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 45 11.33 15.08
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1304 /- /- /186 /- /-
H 1304 /- /- /186 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
H Brg Wid = - Min Req = -
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -2530
B - C 0 -2198
C - F 0 -1747
Chords Tens. Comp.
F - G 0 -2198
G - H 0 -2530
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 2240 0
O - N 2237 0
N - M 1747 0
M - L 1934 - 502
L - K 1793 0
Chords Tens. Comp.
L - K 142 - 504
K - J 1747 0
J - I 2237 0
I - H 2240 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 149 - 508
N - C 574 0
Webs Tens. Comp.
F - J 574 0
J - G 74 -508
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.139 F 999 240
VERT(CL): 0.493 F 637 180
HORZ(LL): 0.048 C - -
HORZ(TL): 0.171 C - -
Creep Factor: 2.0
Max TC CSI: 0.569
Max BC CSI: 0.893
Max Web CSI: 0.220
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HD
Ply: 1SEQN: 74263 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T261
DrwNo: 167.23.1156.45177
RDF / RTT 06/16/2023
B2
26'5"
6'9"6
6'9"6
11'8"14
4'11"8
13'5"5
1'8"7
15'2"10
1'9"5
19'7"10
4'4"15
26'5"
6'9"6
4'8"
4'8"
9'3"4
4'7"4
10'8"8
1'5"4
13'8"8
3'
15'8"8
2'
17'1"12
1'5"4
21'9"
4'7"4
26'5"
4'8"
5"83"85'10"6A
B
C
D E
F
G
H
IJKLMNO
5
12
3X6(B1)1.5X4
2X3 4X6 1.5X4 3X6(B1)
13'2"8
90#
13'2"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 45 11.33 15.08
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1304 /- /- /186 /- /-
H 1304 /- /- /186 /- /-
Wind reactions based on MWFRS
A Brg Wid = - Min Req = -
H Brg Wid = - Min Req = -
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 0 -2530
B - C 0 -2198
C - F 0 -1747
Chords Tens. Comp.
F - G 0 -2198
G - H 0 -2530
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 2240 0
O - N 2237 0
N - M 1747 0
M - L 1934 - 502
L - K 1793 0
Chords Tens. Comp.
L - K 142 - 504
K - J 1747 0
J - I 2237 0
I - H 2240 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 149 - 508
N - C 574 0
Webs Tens. Comp.
F - J 574 0
J - G 74 -508
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.139 F 999 240
VERT(CL): 0.493 F 637 180
HORZ(LL): 0.048 C - -
HORZ(TL): 0.171 C - -
Creep Factor: 2.0
Max TC CSI: 0.569
Max BC CSI: 0.893
Max Web CSI: 0.220
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2HD
Ply: 1SEQN: 74263 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T261
DrwNo: 167.23.1156.45177
RDF / RTT 06/16/2023
B2
26'5"
6'9"6
6'9"6
11'8"14
4'11"8
13'5"5
1'8"7
15'2"10
1'9"5
19'7"10
4'4"15
26'5"
6'9"6
4'8"
4'8"
9'3"4
4'7"4
10'8"8
1'5"4
13'8"8
3'
15'8"8
2'
17'1"12
1'5"4
21'9"
4'7"4
26'5"
4'8"
5"83"85'10"6A
B
C
D E
F
G
H
IJKLMNO
5
12
3X6(B1)1.5X4
2X3 4X6 1.5X4 3X6(B1)
13'2"8
90#
13'2"8
$%Lbl:2HD?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W10 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 7.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
#1 hip with 7-0-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.62 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 2954 /- /- /361 /- /-
I 2529 /- /- /313 /- /-
H 1008 /- /- /79 /- /-
Wind reactions based on MWFRS
Q Brg Wid = 3.5 Min Req = 1.6 (Truss)
I Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearings Q & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3056
A - B 0 -3333
C - D 0 -4052
Chords Tens. Comp.
D - E 0 -3471
E - F 0 -1839
F - G 0 -1839
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 3029 0
O - N 4039 0
N - M 4175 0
Chords Tens. Comp.
M - L 4175 0
L - K 4175 0
K - J 3404 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 0 -1206
B - O 832 0
D - K 0 -845
K - E 601 0
E - J 0 -1879
Webs Tens. Comp.
F - J 0 -483
J - P 2227 0
P - G 2109 0
G - H 0 -1231
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.151 M 999 240
VERT(CL): 0.349 M 883 180
HORZ(LL): 0.033 B - -
HORZ(TL): 0.077 B - -
Creep Factor: 2.0
Max TC CSI: 0.997
Max BC CSI: 0.651
Max Web CSI: 0.733
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JA
Ply: 2SEQN: 74370 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T296
DrwNo: 167.23.1157.27883
RDF / RTT 06/16/2023
2 Complete Trusses Required
W10
25'10"4 10"4
7'0"11
7'0"11
10'7"11
3'7"
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
25'8"8
2'10"14
26'8"8
1'
6'8"13
6'8"13
10'7"11
3'10"14
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
25'8"8
2'10"14
26'8"8
1'
4"1 2'11"113'3"5A
B CDEFG
HIJKLMNO
P
Q
5
12
4X6(A1)
5X6
3X4
3X4
3X4
3X8
1.5X3 5X6 3X4
4X6 1.5X3
6X10
1.5X3
1.5X3
3X8
3X10
669#
19'7"13
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W10 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 7.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
#1 hip with 7-0-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.62 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q 2954 /- /- /361 /- /-
I 2529 /- /- /313 /- /-
H 1008 /- /- /79 /- /-
Wind reactions based on MWFRS
Q Brg Wid = 3.5 Min Req = 1.6 (Truss)
I Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearings Q & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3056
A - B 0 -3333
C - D 0 -4052
Chords Tens. Comp.
D - E 0 -3471
E - F 0 -1839
F - G 0 -1839
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 3029 0
O - N 4039 0
N - M 4175 0
Chords Tens. Comp.
M - L 4175 0
L - K 4175 0
K - J 3404 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
O - C 0 -1206
B - O 832 0
D - K 0 -845
K - E 601 0
E - J 0 -1879
Webs Tens. Comp.
F - J 0 -483
J - P 2227 0
P - G 2109 0
G - H 0 -1231
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.151 M 999 240
VERT(CL): 0.349 M 883 180
HORZ(LL): 0.033 B - -
HORZ(TL): 0.077 B - -
Creep Factor: 2.0
Max TC CSI: 0.997
Max BC CSI: 0.651
Max Web CSI: 0.733
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JA
Ply: 2SEQN: 74370 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T296
DrwNo: 167.23.1157.27883
RDF / RTT 06/16/2023
2 Complete Trusses Required
W10
25'10"4 10"4
7'0"11
7'0"11
10'7"11
3'7"
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
25'8"8
2'10"14
26'8"8
1'
6'8"13
6'8"13
10'7"11
3'10"14
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
25'8"8
2'10"14
26'8"8
1'
4"1 2'11"113'3"5A
B CDEFG
HIJKLMNO
P
Q
5
12
4X6(A1)
5X6
3X4
3X4
3X4
3X8
1.5X3 5X6 3X4
4X6 1.5X3
6X10
1.5X3
1.5X3
3X8
3X10
669#
19'7"13
$%Lbl:2JA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.00 7.06
TC 41 7.06 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Building designer is responsible for conventional
framing.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JA
Ply: 2
Qty: 1
SEQN: 74370 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T296
DrwNo: 167.23.1157.27883
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.00 7.06
TC 41 7.06 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Building designer is responsible for conventional
framing.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JA
Ply: 2
Qty: 1
SEQN: 74370 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T296
DrwNo: 167.23.1157.27883
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x4 DF-L #2(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.00 8.64
TC 35 6.68 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1475 /- /- /885 /- /87
I 1459 /- /- /823 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.6 (Truss)
I Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 260 -2968
B - D 312 -2665
D - E 375 - 3477
Chords Tens. Comp.
E - F 327 -3086
F - G 204 -1863
G - H 204 -1863
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 2644 - 311
O - N 3460 - 379
N - M 3627 - 382
Chords Tens. Comp.
M - L 3627 -382
L - K 3627 - 382
K - J 3037 -328
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 702 -22
O - D 146 - 985
E - K 73 -657
K - F 467 0
Webs Tens. Comp.
F - J 150 -1424
G - J 105 - 389
J - H 2249 -246
H - I 178 -1424
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.152 M 999 240
VERT(CL): 0.362 M 880 180
HORZ(LL): 0.043 I - -
HORZ(TL): 0.102 I - -
Creep Factor: 2.0
Max TC CSI: 0.966
Max BC CSI: 0.850
Max Web CSI: 0.914
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JB
Ply: 1SEQN: 74374 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T297
DrwNo: 167.23.1158.09620
RDF / RTT 06/16/2023
T2
26'8"8
7'1"
7'1"
10'7"11
3'6"11
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
26'8"8
3'10"14
6'8"13
6'8"13
10'7"11
3'10"14
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
26'8"8
3'10"14
4"1 2'11"113'11"4A
B
C
DEFGH
IJKLMNO
5
12
4X6(A2)
4X6 3X8
1.5X3 H0308
4X4 1.5X3
6X10
5X6
4X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x4 DF-L #2(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 0.00 8.64
TC 35 6.68 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1475 /- /- /885 /- /87
I 1459 /- /- /823 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.6 (Truss)
I Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 260 -2968
B - D 312 -2665
D - E 375 - 3477
Chords Tens. Comp.
E - F 327 -3086
F - G 204 -1863
G - H 204 -1863
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 2644 - 311
O - N 3460 - 379
N - M 3627 - 382
Chords Tens. Comp.
M - L 3627 -382
L - K 3627 - 382
K - J 3037 -328
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 702 -22
O - D 146 - 985
E - K 73 -657
K - F 467 0
Webs Tens. Comp.
F - J 150 -1424
G - J 105 - 389
J - H 2249 -246
H - I 178 -1424
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.152 M 999 240
VERT(CL): 0.362 M 880 180
HORZ(LL): 0.043 I - -
HORZ(TL): 0.102 I - -
Creep Factor: 2.0
Max TC CSI: 0.966
Max BC CSI: 0.850
Max Web CSI: 0.914
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JB
Ply: 1SEQN: 74374 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T297
DrwNo: 167.23.1158.09620
RDF / RTT 06/16/2023
T2
26'8"8
7'1"
7'1"
10'7"11
3'6"11
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
26'8"8
3'10"14
6'8"13
6'8"13
10'7"11
3'10"14
14'8"5
4'0"10
18'9"
4'0"10
22'9"10
4'0"10
26'8"8
3'10"14
4"1 2'11"113'11"4A
B
C
DEFGH
IJKLMNO
5
12
4X6(A2)
4X6 3X8
1.5X3 H0308
4X4 1.5X3
6X10
5X6
4X6
$%Lbl:2JB?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 22 9.97 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1590 /- /- /174 /- /-
G 2088 /- /- /188 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.7 (Truss)
G Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 192 - 2679
A - B 145 -3423
Chords Tens. Comp.
B - C 178 -2973
D - E 156 -2455
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 3092 - 222
L - K 3091 - 223
K - J 3332 - 217
Chords Tens. Comp.
J - I 3332 -217
I - H 3332 - 217
H - G 2402 - 158
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 38 -534
K - C 765 0
K - D 77 -802
D - H 82 - 1066
Webs Tens. Comp.
H - E 706 0
E - G 192 -2923
F - G 47 -425
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.131 J 999 240
VERT(CL): 0.294 J 999 180
HORZ(LL): 0.051 G - -
HORZ(TL): 0.115 G - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.799
Max Web CSI: 0.882
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JC
Ply: 1SEQN: 74378 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T298
DrwNo: 167.23.1158.54467
RDF / RTT 06/16/2023
26'8"8
5'1"13
5'1"13
9'11"11
4'9"14
15'3"7
5'3"12
21'0"14
5'9"6
26'8"8
5'7"10
5'1"13
5'1"13
9'7"13
4'6"
15'3"7
5'7"10
21'0"14
5'9"6
26'8"8
5'7"10
4"1 4'2"44'5"15(a)
A
B
C DEF
GHIJKL
5 12
4X6(A2)1.5X3
3X4
3X8
4X6 3X8
1.5X3H0308 3X4
5X6 1.5X4
5X6
9'11"11
158#
4'
442#
12'8"13
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 22 9.97 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1590 /- /- /174 /- /-
G 2088 /- /- /188 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.7 (Truss)
G Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 192 - 2679
A - B 145 -3423
Chords Tens. Comp.
B - C 178 -2973
D - E 156 -2455
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - L 3092 - 222
L - K 3091 - 223
K - J 3332 - 217
Chords Tens. Comp.
J - I 3332 -217
I - H 3332 - 217
H - G 2402 - 158
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 38 -534
K - C 765 0
K - D 77 -802
D - H 82 - 1066
Webs Tens. Comp.
H - E 706 0
E - G 192 -2923
F - G 47 -425
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.131 J 999 240
VERT(CL): 0.294 J 999 180
HORZ(LL): 0.051 G - -
HORZ(TL): 0.115 G - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.799
Max Web CSI: 0.882
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JC
Ply: 1SEQN: 74378 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T298
DrwNo: 167.23.1158.54467
RDF / RTT 06/16/2023
26'8"8
5'1"13
5'1"13
9'11"11
4'9"14
15'3"7
5'3"12
21'0"14
5'9"6
26'8"8
5'7"10
5'1"13
5'1"13
9'7"13
4'6"
15'3"7
5'7"10
21'0"14
5'9"6
26'8"8
5'7"10
4"1 4'2"44'5"15(a)
A
B
C DEF
GHIJKL
5 12
4X6(A2)1.5X3
3X4
3X8
4X6 3X8
1.5X3H0308 3X4
5X6 1.5X4
5X6
9'11"11
158#
4'
442#
12'8"13
$%Lbl:2JC?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 48 9.59 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1276 /- /- /778 /- /97
H 1262 /- /- /720 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 139 -2655
B - C 179 -2179
Chords Tens. Comp.
C - E 216 -1947
E - F 164 -1522
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 2386 - 237
M - L 2384 - 239
L - K 2173 - 231
Chords Tens. Comp.
K - J 2173 -231
J - I 2173 -231
I - H 1481 - 165
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 28 -549
L - C 489 0
E - I 81 -791
Webs Tens. Comp.
I - F 578 0
F - H 201 -1803
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.084 K 999 240
VERT(CL): 0.200 K 999 180
HORZ(LL): 0.033 H - -
HORZ(TL): 0.079 H - -
Creep Factor: 2.0
Max TC CSI: 0.964
Max BC CSI: 0.717
Max Web CSI: 0.655
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JD
Ply: 1SEQN: 74382 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T299
DrwNo: 167.23.1159.16607
RDF / RTT 06/16/2023
26'8"8
5'1"13
5'1"13
10'
4'10"3
15'3"7
5'3"7
21'0"14
5'9"6
26'8"8
5'7"10
5'1"13
5'1"13
9'7"13
4'6"
15'3"7
5'7"10
21'0"14
5'9"6
26'8"8
5'7"10
4"1 4'2"44'11"10(a)
A
B
C
D
EFG
HIJKLM
5
12
4X6(A2)
3X4
3X8
4X4 3X8
3X4 3X4
4X6
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 1.5X3 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 48 9.59 26.71
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1276 /- /- /778 /- /97
H 1262 /- /- /720 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 139 -2655
B - C 179 -2179
Chords Tens. Comp.
C - E 216 -1947
E - F 164 -1522
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 2386 - 237
M - L 2384 - 239
L - K 2173 - 231
Chords Tens. Comp.
K - J 2173 -231
J - I 2173 -231
I - H 1481 - 165
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 28 -549
L - C 489 0
E - I 81 -791
Webs Tens. Comp.
I - F 578 0
F - H 201 -1803
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.084 K 999 240
VERT(CL): 0.200 K 999 180
HORZ(LL): 0.033 H - -
HORZ(TL): 0.079 H - -
Creep Factor: 2.0
Max TC CSI: 0.964
Max BC CSI: 0.717
Max Web CSI: 0.655
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JD
Ply: 1SEQN: 74382 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T299
DrwNo: 167.23.1159.16607
RDF / RTT 06/16/2023
26'8"8
5'1"13
5'1"13
10'
4'10"3
15'3"7
5'3"7
21'0"14
5'9"6
26'8"8
5'7"10
5'1"13
5'1"13
9'7"13
4'6"
15'3"7
5'7"10
21'0"14
5'9"6
26'8"8
5'7"10
4"1 4'2"44'11"10(a)
A
B
C
D
EFG
HIJKLM
5
12
4X6(A2)
3X4
3X8
4X4 3X8
3X4 3X4
4X6
4X4
$%Lbl:2JD?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 54 13.15 24.85
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1382 /- /- /169 /- /-
I 1260 /- /- /160 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
I Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 166 - 1585
B - C 95 -2565
Chords Tens. Comp.
C - D 147 -1821
E - F 132 -1109
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2288 - 177
O - N 2285 - 179
N - M 1522 - 148
Chords Tens. Comp.
M - L 1522 -148
L - K 1522 - 148
K - J 1075 -109
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 41 -780
N - D 393 0
E - K 63 -669
K - F 604 -7
Webs Tens. Comp.
F - J 134 -1241
J - H 1118 -93
H - I 105 -1248
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.072 C 999 240
VERT(CL): 0.170 C 999 180
HORZ(LL): 0.027 J - -
HORZ(TL): 0.065 J - -
Creep Factor: 2.0
Max TC CSI: 0.958
Max BC CSI: 0.801
Max Web CSI: 0.947
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JE
Ply: 1SEQN: 74386 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T300
DrwNo: 167.23.1159.31093
RDF / RTT 06/16/2023
26'8"8
6'8"11
6'8"11
13'1"7
6'4"12
16'10"10
3'9"3
21'1"6
4'2"13
24'10"9
3'9"3
26'8"8
1'9"15
6'8"11
6'8"11
12'9"9
6'0"14
16'10"10
4'1"1
21'1"6
4'2"13
25'2"7
4'1"1
26'8"8
1'6"11'2"
4"1 5'0"85'9"106'3"4A
B
C
D EFG
H
IJKLMNO
5 12
3X6(A1)1.5X3
3X4
3X8
4X4
3X4
3X8
1.5X3 3X4
4X4 3X4
5X8
4X4
4X4
13'1"7
9#
2"1320#2"13
9#
13'1"7
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 54 13.15 24.85
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1382 /- /- /169 /- /-
I 1260 /- /- /160 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
I Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 166 - 1585
B - C 95 -2565
Chords Tens. Comp.
C - D 147 -1821
E - F 132 -1109
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 2288 - 177
O - N 2285 - 179
N - M 1522 - 148
Chords Tens. Comp.
M - L 1522 -148
L - K 1522 - 148
K - J 1075 -109
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 41 -780
N - D 393 0
E - K 63 -669
K - F 604 -7
Webs Tens. Comp.
F - J 134 -1241
J - H 1118 -93
H - I 105 -1248
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.072 C 999 240
VERT(CL): 0.170 C 999 180
HORZ(LL): 0.027 J - -
HORZ(TL): 0.065 J - -
Creep Factor: 2.0
Max TC CSI: 0.958
Max BC CSI: 0.801
Max Web CSI: 0.947
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JE
Ply: 1SEQN: 74386 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T300
DrwNo: 167.23.1159.31093
RDF / RTT 06/16/2023
26'8"8
6'8"11
6'8"11
13'1"7
6'4"12
16'10"10
3'9"3
21'1"6
4'2"13
24'10"9
3'9"3
26'8"8
1'9"15
6'8"11
6'8"11
12'9"9
6'0"14
16'10"10
4'1"1
21'1"6
4'2"13
25'2"7
4'1"1
26'8"8
1'6"11'2"
4"1 5'0"85'9"106'3"4A
B
C
D EFG
H
IJKLMNO
5 12
3X6(A1)1.5X3
3X4
3X8
4X4
3X4
3X8
1.5X3 3X4
4X4 3X4
5X8
4X4
4X4
13'1"7
9#
2"1320#2"13
9#
13'1"7
$%Lbl:2JE?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 52 15.04 22.96
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1512 /- /- /172 /- /-
I 1389 /- /- /164 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.6 (Truss)
I Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 117 -1640
B - C 17 -2934
C - D 73 - 2464
Chords Tens. Comp.
D - E 110 -1886
F - G 96 -682
G - H 75 -780
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2636 -90
N - M 2634 - 92
M - L 2203 -80
Chords Tens. Comp.
L - K 1328 - 84
K - J 1328 -84
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 15 -467
D - L 37 -783
L - F 512 0
Webs Tens. Comp.
F - J 98 - 1095
J - H 1194 -53
H - I 88 - 1389
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.084 M 999 240
VERT(CL): 0.195 M 999 180
HORZ(LL): 0.029 J - -
HORZ(TL): 0.067 J - -
Creep Factor: 2.0
Max TC CSI: 0.970
Max BC CSI: 0.785
Max Web CSI: 0.575
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JF
Ply: 1SEQN: 74392 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T301
DrwNo: 167.23.1200.15927
RDF / RTT 06/16/2023
26'8"8
5'3"15
5'3"15
10'0"2
4'8"3
15'0"3
5'0"1
19'
3'11"13
22'11"13
3'11"13
26'8"8
3'8"11
5'3"15
5'3"15
10'0"2
4'8"3
14'8"5
4'8"3
23'3"11
8'7"6
26'8"8
3'4"131'2"
4"1 5'0"86'7"27'0"11(a)
A
B
C
D
E FG
H
IJKLMN
5
12
4X6(A2)1.5X3
3X4
3X4
3X4
3X8
4X4
3X4
3X4 3X4
5X8
4X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Bracing
(a) Continuous lateral restraint equally spaced on
member.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 52 15.04 22.96
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1512 /- /- /172 /- /-
I 1389 /- /- /164 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.6 (Truss)
I Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 117 -1640
B - C 17 -2934
C - D 73 - 2464
Chords Tens. Comp.
D - E 110 -1886
F - G 96 -682
G - H 75 -780
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - N 2636 -90
N - M 2634 - 92
M - L 2203 -80
Chords Tens. Comp.
L - K 1328 - 84
K - J 1328 -84
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 15 -467
D - L 37 -783
L - F 512 0
Webs Tens. Comp.
F - J 98 - 1095
J - H 1194 -53
H - I 88 - 1389
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.084 M 999 240
VERT(CL): 0.195 M 999 180
HORZ(LL): 0.029 J - -
HORZ(TL): 0.067 J - -
Creep Factor: 2.0
Max TC CSI: 0.970
Max BC CSI: 0.785
Max Web CSI: 0.575
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JF
Ply: 1SEQN: 74392 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T301
DrwNo: 167.23.1200.15927
RDF / RTT 06/16/2023
26'8"8
5'3"15
5'3"15
10'0"2
4'8"3
15'0"3
5'0"1
19'
3'11"13
22'11"13
3'11"13
26'8"8
3'8"11
5'3"15
5'3"15
10'0"2
4'8"3
14'8"5
4'8"3
23'3"11
8'7"6
26'8"8
3'4"131'2"
4"1 5'0"86'7"27'0"11(a)
A
B
C
D
E FG
H
IJKLMN
5
12
4X6(A2)1.5X3
3X4
3X4
3X4
3X8
4X4
3X4
3X4 3X4
5X8
4X4
4X4
$%Lbl:2JF?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JF
Ply: 1
Qty: 1
SEQN: 74392 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T301
DrwNo: 167.23.1200.15927
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2JF
Ply: 1
Qty: 1
SEQN: 74392 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T301
DrwNo: 167.23.1200.15927
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.62 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 3771 /- /- /461 /- /-
G 3770 /- /- /461 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
G Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3750
B - C 0 -4095
D - E 0 -4992
Chords Tens. Comp.
E - F 0 -3749
F - G 0 -4093
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 3725 0
M - L 5006 0
L - K 5006 0
Chords Tens. Comp.
K - J 5006 0
J - I 4982 0
I - G 3723 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - D 0 -1503
C - M 916 0
Webs Tens. Comp.
E - I 0 -1489
I - F 926 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.252 J 999 240
VERT(CL): 0.592 J 602 180
HORZ(LL): 0.077 G - -
HORZ(TL): 0.182 G - -
Creep Factor: 2.0
Max TC CSI: 0.952
Max BC CSI: 0.997
Max Web CSI: 0.453
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2KA
Ply: 2SEQN: 74271 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T270
DrwNo: 167.23.1200.40997
RDF / RTT 06/16/2023
2 Complete Trusses Required
30'
7'11"11
7'11"11
12'6"
4'6"5
17'6"
4'11"15
22'0"5
4'6"5
30'
7'11"11
7'7"13
7'7"13
12'6"
4'10"3
17'6"
4'11"15
22'4"3
4'10"3
30'
7'7"131'2"1'2"
4"13'7"154'1"8A
B
C DEF
G
H
IJKLM
5
12
3X10(B1T)
5X8
4X4
4X8
1.5X3 H0310 3X4
4X4
4X4
5X8
3X10(B1T)
826#
14'0"10
826#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.62 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 3771 /- /- /461 /- /-
G 3770 /- /- /461 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
G Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3750
B - C 0 -4095
D - E 0 -4992
Chords Tens. Comp.
E - F 0 -3749
F - G 0 -4093
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 3725 0
M - L 5006 0
L - K 5006 0
Chords Tens. Comp.
K - J 5006 0
J - I 4982 0
I - G 3723 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - D 0 -1503
C - M 916 0
Webs Tens. Comp.
E - I 0 -1489
I - F 926 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.252 J 999 240
VERT(CL): 0.592 J 602 180
HORZ(LL): 0.077 G - -
HORZ(TL): 0.182 G - -
Creep Factor: 2.0
Max TC CSI: 0.952
Max BC CSI: 0.997
Max Web CSI: 0.453
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2KA
Ply: 2SEQN: 74271 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T270
DrwNo: 167.23.1200.40997
RDF / RTT 06/16/2023
2 Complete Trusses Required
30'
7'11"11
7'11"11
12'6"
4'6"5
17'6"
4'11"15
22'0"5
4'6"5
30'
7'11"11
7'7"13
7'7"13
12'6"
4'10"3
17'6"
4'11"15
22'4"3
4'10"3
30'
7'7"131'2"1'2"
4"13'7"154'1"8A
B
C DEF
G
H
IJKLM
5
12
3X10(B1T)
5X8
4X4
4X8
1.5X3 H0310 3X4
4X4
4X4
5X8
3X10(B1T)
826#
14'0"10
826#
$%Lbl:2KA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 9.97
TC 36 10.00 20.00
TC 24 20.03 31.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1765 /- /- /1060 /- /81
H 1765 /- /- /1060 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.9 (Truss)
H Brg Wid = 3.5 Min Req = 1.9 (Truss)
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 232 - 2610
B - C 176 -3447
C - D 218 - 2919
Chords Tens. Comp.
E - F 232 -2610
F - G 218 -2919
G - H 177 -3447
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3103 -95
O - N 3102 - 97
N - M 3164 - 99
M - L 3164 -99
Chords Tens. Comp.
L - K 3164 - 99
K - J 3102 -83
J - H 3103 -81
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 41 -580
N - D 766 - 12
N - E 97 -689
Webs Tens. Comp.
E - K 97 -689
F - K 766 -12
K - G 41 -580
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.159 L 999 240
VERT(CL): 0.375 L 950 180
HORZ(LL): 0.056 H - -
HORZ(TL): 0.131 H - -
Creep Factor: 2.0
Max TC CSI: 0.960
Max BC CSI: 0.780
Max Web CSI: 0.531
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2KB
Ply: 1SEQN: 74318 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T271
DrwNo: 167.23.1201.07220
RDF / RTT 06/16/2023
30'
5'1"13
5'1"13
9'11"11
4'9"14
15'
5'0"5
20'0"5
5'0"5
24'10"3
4'9"14
30'
5'1"13
5'1"13
5'1"13
9'7"13
4'6"
15'
5'4"3
20'4"3
5'4"3
24'10"3
4'6"
30'
5'1"131'2"1'2"
4"14'5"154'11"8A
B
C
D EF
G
H
I
JKLMNO
5
12
4X6(A2)1.5X3
3X4
3X8
4X6
H0308
3X8
1.5X3
4X6
3X8
3X4
1.5X3 4X6(A2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 24 -1.22 9.97
TC 36 10.00 20.00
TC 24 20.03 31.22
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1765 /- /- /1060 /- /81
H 1765 /- /- /1060 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.9 (Truss)
H Brg Wid = 3.5 Min Req = 1.9 (Truss)
Bearings B & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 232 - 2610
B - C 176 -3447
C - D 218 - 2919
Chords Tens. Comp.
E - F 232 -2610
F - G 218 -2919
G - H 177 -3447
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - O 3103 -95
O - N 3102 - 97
N - M 3164 - 99
M - L 3164 -99
Chords Tens. Comp.
L - K 3164 - 99
K - J 3102 -83
J - H 3103 -81
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - N 41 -580
N - D 766 - 12
N - E 97 -689
Webs Tens. Comp.
E - K 97 -689
F - K 766 -12
K - G 41 -580
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.159 L 999 240
VERT(CL): 0.375 L 950 180
HORZ(LL): 0.056 H - -
HORZ(TL): 0.131 H - -
Creep Factor: 2.0
Max TC CSI: 0.960
Max BC CSI: 0.780
Max Web CSI: 0.531
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2KB
Ply: 1SEQN: 74318 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T271
DrwNo: 167.23.1201.07220
RDF / RTT 06/16/2023
30'
5'1"13
5'1"13
9'11"11
4'9"14
15'
5'0"5
20'0"5
5'0"5
24'10"3
4'9"14
30'
5'1"13
5'1"13
5'1"13
9'7"13
4'6"
15'
5'4"3
20'4"3
5'4"3
24'10"3
4'6"
30'
5'1"131'2"1'2"
4"14'5"154'11"8A
B
C
D EF
G
H
I
JKLMNO
5
12
4X6(A2)1.5X3
3X4
3X8
4X6
H0308
3X8
1.5X3
4X6
3X8
3X4
1.5X3 4X6(A2)
$%Lbl:2KB?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L SS(g); T3 2x4 DF-L #2(g);
Bot chord 2x6 DF-L SS(g)
Webs 2x4 DF-L Standard(g) W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 31.28
BC: From 16 plf at 0.00 to 16 plf at 1.00
BC: From 616 plf at 1.00 to 616 plf at 21.00
BC: From 16 plf at 21.00 to 16 plf at 30.00
BC: From 4 plf at 30.00 to 4 plf at 31.28
BC: 926 lb Conc. Load at 22.96
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 98 10.92 19.08
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
S 9253 /- /- /1053 /- /69
I 6625 /- /- /921 /- /-
Wind reactions based on MWFRS
S Brg Wid = 3.5 Min Req = 3.3 (Truss)
I Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings S & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 65 - 4972
A - B 40 -7019
B - C 51 -6385
C - D 60 - 5441
Chords Tens. Comp.
E - F 64 -4633
F - G 59 - 5071
G - H 51 - 5282
H - I 38 - 5209
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 6466 -21
R - Q 6438 - 21
Q - P 5802 - 19
P - O 5597 -19
O - N 5597 - 19
Chords Tens. Comp.
N - M 5597 - 19
M - L 4852 -15
L - K 4796 - 15
K - I 4789 -15
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - B 497 0
B - Q 5 -642
Q - C 1030 0
C - P 11 - 1086
P - D 2163 -15
Webs Tens. Comp.
P - E 24 -1013
E - O 1050 0
E - M 24 -1153
F - M 1888 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.208 O 999 240
VERT(CL): 0.480 O 743 180
HORZ(LL): 0.056 I - -
HORZ(TL): 0.129 I - -
Creep Factor: 2.0
Max TC CSI: 0.491
Max BC CSI: 0.677
Max Web CSI: 0.879
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2KC
Ply: 3SEQN: 74358 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T287
DrwNo: 167.23.1201.43560
RDF / RTT 06/16/2023
3 Complete Trusses Required
T2
T3W8
30'
3'11"14
3'11"14
7'0"8
3'0"10
10'10"11
3'10"3
13'5"12
2'7"1
19'1"5
5'7"9
22'11"8
3'10"3
26'0"2
3'0"10
30'
3'11"14
3'11"14
3'11"14
7'0"8
3'0"10
10'4"6
3'3"14
13'5"12
3'1"6
19'7"10
6'1"14
22'11"8
3'3"14
26'0"2
3'0"10
30'
3'11"14 1'2"
4"14'10"85'4"1A
B
C
D EF
G
H
I
J
KLMNOPQRS
5
12
4X12(A8R)3X4
3X4
4X4
4X4
5X8
4X12 3X10
3X8 H0510
5X8
5X8
3X4
3X4
3X4
1.5X3 3X12(A6RT)
22'11"8
926#
7'0"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L SS(g); T3 2x4 DF-L #2(g);
Bot chord 2x6 DF-L SS(g)
Webs 2x4 DF-L Standard(g) W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 31.28
BC: From 16 plf at 0.00 to 16 plf at 1.00
BC: From 616 plf at 1.00 to 616 plf at 21.00
BC: From 16 plf at 21.00 to 16 plf at 30.00
BC: From 4 plf at 30.00 to 4 plf at 31.28
BC: 926 lb Conc. Load at 22.96
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 98 10.92 19.08
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
S 9253 /- /- /1053 /- /69
I 6625 /- /- /921 /- /-
Wind reactions based on MWFRS
S Brg Wid = 3.5 Min Req = 3.3 (Truss)
I Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings S & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 65 - 4972
A - B 40 -7019
B - C 51 -6385
C - D 60 - 5441
Chords Tens. Comp.
E - F 64 -4633
F - G 59 - 5071
G - H 51 - 5282
H - I 38 - 5209
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 6466 -21
R - Q 6438 - 21
Q - P 5802 - 19
P - O 5597 -19
O - N 5597 - 19
Chords Tens. Comp.
N - M 5597 - 19
M - L 4852 -15
L - K 4796 - 15
K - I 4789 -15
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - B 497 0
B - Q 5 -642
Q - C 1030 0
C - P 11 - 1086
P - D 2163 -15
Webs Tens. Comp.
P - E 24 -1013
E - O 1050 0
E - M 24 -1153
F - M 1888 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.208 O 999 240
VERT(CL): 0.480 O 743 180
HORZ(LL): 0.056 I - -
HORZ(TL): 0.129 I - -
Creep Factor: 2.0
Max TC CSI: 0.491
Max BC CSI: 0.677
Max Web CSI: 0.879
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2KC
Ply: 3SEQN: 74358 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T287
DrwNo: 167.23.1201.43560
RDF / RTT 06/16/2023
3 Complete Trusses Required
T2
T3W8
30'
3'11"14
3'11"14
7'0"8
3'0"10
10'10"11
3'10"3
13'5"12
2'7"1
19'1"5
5'7"9
22'11"8
3'10"3
26'0"2
3'0"10
30'
3'11"14
3'11"14
3'11"14
7'0"8
3'0"10
10'4"6
3'3"14
13'5"12
3'1"6
19'7"10
6'1"14
22'11"8
3'3"14
26'0"2
3'0"10
30'
3'11"14 1'2"
4"14'10"85'4"1A
B
C
D EF
G
H
I
J
KLMNOPQRS
5
12
4X12(A8R)3X4
3X4
4X4
4X4
5X8
4X12 3X10
3X8 H0510
5X8
5X8
3X4
3X4
3X4
1.5X3 3X12(A6RT)
22'11"8
926#
7'0"8
$%Lbl:2KC?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at 0.00 to 91 plf at 15.28
BC: From 19 plf at 0.00 to 19 plf at 14.00
BC: From 5 plf at 14.00 to 5 plf at 15.28
BC: 1304 lb Conc. Load at 0.71
BC: 1255 lb Conc. Load at 2.46
BC: 1482 lb Conc. Load at 4.00
BC: 3340 lb Conc. Load at 5.88
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.16 TC 0.00 14.00
800 BC 0.15
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 6066 /- /- /3607 /- /800
E 2971 /- /- /1852 /- /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 2.2 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 47 -3698
B - C 46 -2227
Chords Tens. Comp.
C - D 45 - 2228
D - E 44 - 2151
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 3405 -15
I - H 3340 - 15
Chords Tens. Comp.
H - G 1975 - 13
G - E 1967 - 12
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - B 1215 0
B - H 27 -1494
Webs Tens. Comp.
C - H 1589 - 13
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.055 I 999 240
VERT(CL): 0.128 I 999 180
HORZ(LL): 0.015 E - -
HORZ(TL): 0.035 E - -
Creep Factor: 2.0
Max TC CSI: 0.458
Max BC CSI: 0.869
Max Web CSI: 0.646
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2L
Ply: 3SEQN: 74275 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T274
DrwNo: 167.23.1202.53390
RDF / RTT 06/16/2023
3 Complete Trusses Required
14'
4'0"5
4'0"5
7'
2'11"11
9'11"11
2'11"11
14'
4'0"5
4'0"5
4'0"5
7'
2'11"11
9'11"11
2'11"11
14'
4'0"5 1'2"
4"13'3"13'8"10A
B
C
D
E
F
GHIJ
5
12
3X10(A1)3X8
4X6
4X4
4X8
3X4
1.5X3 4X4(A1T)
8"8
1304#
1'9"
1255#
1'6"8
1482#
1'10"8
3340#
8'1"8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at 0.00 to 91 plf at 15.28
BC: From 19 plf at 0.00 to 19 plf at 14.00
BC: From 5 plf at 14.00 to 5 plf at 15.28
BC: 1304 lb Conc. Load at 0.71
BC: 1255 lb Conc. Load at 2.46
BC: 1482 lb Conc. Load at 4.00
BC: 3340 lb Conc. Load at 5.88
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 57.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 57.16 TC 0.00 14.00
800 BC 0.15
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 6066 /- /- /3607 /- /800
E 2971 /- /- /1852 /- /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 2.2 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 47 -3698
B - C 46 -2227
Chords Tens. Comp.
C - D 45 - 2228
D - E 44 - 2151
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 3405 -15
I - H 3340 - 15
Chords Tens. Comp.
H - G 1975 - 13
G - E 1967 - 12
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - B 1215 0
B - H 27 -1494
Webs Tens. Comp.
C - H 1589 - 13
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.055 I 999 240
VERT(CL): 0.128 I 999 180
HORZ(LL): 0.015 E - -
HORZ(TL): 0.035 E - -
Creep Factor: 2.0
Max TC CSI: 0.458
Max BC CSI: 0.869
Max Web CSI: 0.646
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2L
Ply: 3SEQN: 74275 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T274
DrwNo: 167.23.1202.53390
RDF / RTT 06/16/2023
3 Complete Trusses Required
14'
4'0"5
4'0"5
7'
2'11"11
9'11"11
2'11"11
14'
4'0"5
4'0"5
4'0"5
7'
2'11"11
9'11"11
2'11"11
14'
4'0"5 1'2"
4"13'3"13'8"10A
B
C
D
E
F
GHIJ
5
12
3X10(A1)3X8
4X6
4X4
4X8
3X4
1.5X3 4X4(A1T)
8"8
1304#
1'9"
1255#
1'6"8
1482#
1'10"8
3340#
8'1"8
$%Lbl:2L?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 6.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
#1 hip with 5-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.62 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1718 /- /- /193 /- /-
E 1717 /- /- /193 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -1370
B - C 0 -1525
Chords Tens. Comp.
D - E 0 -1548
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1366 0
H - G 1386 0
Chords Tens. Comp.
G - E 1392 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.029 G 999 240
VERT(CL): 0.067 G 999 180
HORZ(LL): 0.011 E - -
HORZ(TL): 0.025 E - -
Creep Factor: 2.0
Max TC CSI: 0.304
Max BC CSI: 0.544
Max Web CSI: 0.076
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2LA
Ply: 2SEQN: 74274 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T273
DrwNo: 167.23.1203.14700
RDF / RTT 06/16/2023
2 Complete Trusses Required
14'
5'11"11
5'11"11
8'0"5
2'0"10
14'
5'11"11
5'7"13
5'7"13
8'4"3
2'8"6
14'
5'7"131'2"1'2"
4"12'9"153'3"8A
B
C D
E
F
GH
5 12
3X4(A1T)
3X4
3X4
6X8
1.5X3 3X4(A1T)
4'
280#
389#389#
6'
280#
4'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 6.50" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
#1 hip with 5-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.62 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1718 /- /- /193 /- /-
E 1717 /- /- /193 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -1370
B - C 0 -1525
Chords Tens. Comp.
D - E 0 -1548
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - H 1366 0
H - G 1386 0
Chords Tens. Comp.
G - E 1392 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.029 G 999 240
VERT(CL): 0.067 G 999 180
HORZ(LL): 0.011 E - -
HORZ(TL): 0.025 E - -
Creep Factor: 2.0
Max TC CSI: 0.304
Max BC CSI: 0.544
Max Web CSI: 0.076
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:2LA
Ply: 2SEQN: 74274 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T273
DrwNo: 167.23.1203.14700
RDF / RTT 06/16/2023
2 Complete Trusses Required
14'
5'11"11
5'11"11
8'0"5
2'0"10
14'
5'11"11
5'7"13
5'7"13
8'4"3
2'8"6
14'
5'7"131'2"1'2"
4"12'9"153'3"8A
B
C D
E
F
GH
5 12
3X4(A1T)
3X4
3X4
6X8
1.5X3 3X4(A1T)
4'
280#
389#389#
6'
280#
4'
$%Lbl:2LA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
500 # ( 200.08 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 500 200.08 TC 0.00 2.50
500 200.00 BC 0.00 2.50
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G* 176 /- /- /98 /36 /200
Wind reactions based on MWFRS
G Brg Wid = 30.0 Min Req = -
Bearing G is a rigid surface.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - E 503 - 496
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.008 B 999 240
VERT(CL): 0.010 B 999 180
HORZ(LL): -0.024 B - -
HORZ(TL): 0.029 B - -
Creep Factor: 2.0
Max TC CSI: 0.208
Max BC CSI: 0.098
Max Web CSI: 0.147
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A
Ply: 1SEQN: 74276 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T275
DrwNo: 167.23.1204.25930
/ RTT 06/16/2023
2'6"
1'2"
1'2"
2'6"
1'4"
1'2"
1'2"
2'6"
1'4"1'2"1'2'0"8A
B
D
EG
5
12
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have continuous lateral restraint (CLR), installed withdiagonal bracing installed on the CLR per BCSI sections B3, B7, or B10, as applicable. Apply plates to each face of truss and position asshown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions. Refer to job's GeneralNotes page for additional information.Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
500 # ( 200.08 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 500 200.08 TC 0.00 2.50
500 200.00 BC 0.00 2.50
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
G* 176 /- /- /98 /36 /200
Wind reactions based on MWFRS
G Brg Wid = 30.0 Min Req = -
Bearing G is a rigid surface.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
G - E 503 - 496
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): -0.008 B 999 240
VERT(CL): 0.010 B 999 180
HORZ(LL): -0.024 B - -
HORZ(TL): 0.029 B - -
Creep Factor: 2.0
Max TC CSI: 0.208
Max BC CSI: 0.098
Max Web CSI: 0.147
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A
Ply: 1SEQN: 74276 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T275
DrwNo: 167.23.1204.25930
/ RTT 06/16/2023
2'6"
1'2"
1'2"
2'6"
1'4"
1'2"
1'2"
2'6"
1'4"1'2"1'2'0"8A
B
D
EG
5
12
$%Lbl:3A?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 385 /- /- /177 /- /-
D 270 /- /- /20 /- /7
C74 /- /- /43 /- /38
Wind reactions based on MWFRS
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing E Fcperp = 625psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.000 B 999 180
HORZ(LL): 0.000 B - -
HORZ(TL): 0.000 B - -
Creep Factor: 2.0
Max TC CSI: 0.109
Max BC CSI: 0.262
Max Web CSI: 0.062
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A1
Ply: 1SEQN: 74277 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T276
DrwNo: 167.23.1204.40023
RDF / RTT 06/16/2023
2'6"
2'6"1'2"1'2'0"8A
B
C
DE
5
12
1.5X3
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 385 /- /- /177 /- /-
D 270 /- /- /20 /- /7
C74 /- /- /43 /- /38
Wind reactions based on MWFRS
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing E Fcperp = 625psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.000 B 999 180
HORZ(LL): 0.000 B - -
HORZ(TL): 0.000 B - -
Creep Factor: 2.0
Max TC CSI: 0.109
Max BC CSI: 0.262
Max Web CSI: 0.062
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A1
Ply: 1SEQN: 74277 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T276
DrwNo: 167.23.1204.40023
RDF / RTT 06/16/2023
2'6"
2'6"1'2"1'2'0"8A
B
C
DE
5
12
1.5X3
1.5X4
$%Lbl:3A1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 421 /- /- /216 /- /-
D 282 /- /- /32 /- /7
C 142 /- /- /77 /- /51
Wind reactions based on MWFRS
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing E Fcperp = 625psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.000 B 999 180
HORZ(LL): -0.000 B - -
HORZ(TL): 0.000 B - -
Creep Factor: 2.0
Max TC CSI: 0.243
Max BC CSI: 0.474
Max Web CSI: 0.071
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A2
Ply: 1SEQN: 74278 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T277
DrwNo: 167.23.1204.52610
RDF / RTT 06/16/2023
4'
4'1'2"1'2'8"A
B
C
DE
5
12
1.5X3
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
E 421 /- /- /216 /- /-
D 282 /- /- /32 /- /7
C 142 /- /- /77 /- /51
Wind reactions based on MWFRS
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing E Fcperp = 625psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 B 999 240
VERT(CL): 0.000 B 999 180
HORZ(LL): -0.000 B - -
HORZ(TL): 0.000 B - -
Creep Factor: 2.0
Max TC CSI: 0.243
Max BC CSI: 0.474
Max Web CSI: 0.071
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A2
Ply: 1SEQN: 74278 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T277
DrwNo: 167.23.1204.52610
RDF / RTT 06/16/2023
4'
4'1'2"1'2'8"A
B
C
DE
5
12
1.5X3
1.5X4
$%Lbl:3A2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 206.56 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 206.56 TC 0.00 3.87
800 BC 4.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
D 357 /- /- /124 /- /-
C 281 /- /- /31 /- /8
B 153 /- /- /81 /- /38
Wind reactions based on MWFRS
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 1.5 Min Req = -
B Brg Wid = 1.5 Min Req = -
Bearing D Fcperp = 625psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 A 999 240
VERT(CL): 0.000 A 999 180
HORZ(LL): -0.000 A - -
HORZ(TL): 0.000 A - -
Creep Factor: 2.0
Max TC CSI: 0.279
Max BC CSI: 0.455
Max Web CSI: 0.041
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A3
Ply: 1SEQN: 74473 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T278
DrwNo: 167.23.1205.03143
RDF / RTT 06/16/2023
3'10"8
3'10"81'0"102'8"A
B
CD
5
12
1.5X3
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 206.56 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 206.56 TC 0.00 3.87
800 BC 4.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
D 357 /- /- /124 /- /-
C 281 /- /- /31 /- /8
B 153 /- /- /81 /- /38
Wind reactions based on MWFRS
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 1.5 Min Req = -
B Brg Wid = 1.5 Min Req = -
Bearing D Fcperp = 625psi.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.000 A 999 240
VERT(CL): 0.000 A 999 180
HORZ(LL): -0.000 A - -
HORZ(TL): 0.000 A - -
Creep Factor: 2.0
Max TC CSI: 0.279
Max BC CSI: 0.455
Max Web CSI: 0.041
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A3
Ply: 1SEQN: 74473 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T278
DrwNo: 167.23.1205.03143
RDF / RTT 06/16/2023
3'10"8
3'10"81'0"102'8"A
B
CD
5
12
1.5X3
1.5X4
$%Lbl:3A3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 200.05 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 200.05 TC 0.00 4.00
800 BC 4.00
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 421 /- /- /229 /121 /-
G 311 /- /5 /74 /17 /2
F 134 /- /5 /374 /292 /801
Wind reactions based on MWFRS
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 1.5 Min Req = -
F Brg Wid = 1.5 Min Req = -
Bearing K Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 883 - 850
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.025 I 999 240
VERT(CL): 0.053 I 900 180
HORZ(LL): 0.010 D - -
HORZ(TL): 0.022 D - -
Creep Factor: 2.0
Max TC CSI: 0.243
Max BC CSI: 0.310
Max Web CSI: 0.060
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A4
Ply: 1SEQN: 74545 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T336
DrwNo: 167.23.1205.42157
RDF / RTT 06/16/2023
1'0"8
1'0"8
2'4"8
1'4"
3'8"8
1'4"
4'
3"8
1'0"8
1'0"8
2'4"8
1'4"
3'8"8
1'4"
4'
3"8
1'2"1'2'8"A
B
F
GK
5
12
1.5X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 200.05 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 200.05 TC 0.00 4.00
800 BC 4.00
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
K 421 /- /- /229 /121 /-
G 311 /- /5 /74 /17 /2
F 134 /- /5 /374 /292 /801
Wind reactions based on MWFRS
K Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 1.5 Min Req = -
F Brg Wid = 1.5 Min Req = -
Bearing K Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 883 - 850
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.025 I 999 240
VERT(CL): 0.053 I 900 180
HORZ(LL): 0.010 D - -
HORZ(TL): 0.022 D - -
Creep Factor: 2.0
Max TC CSI: 0.243
Max BC CSI: 0.310
Max Web CSI: 0.060
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A4
Ply: 1SEQN: 74545 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T336
DrwNo: 167.23.1205.42157
RDF / RTT 06/16/2023
1'0"8
1'0"8
2'4"8
1'4"
3'8"8
1'4"
4'
3"8
1'0"8
1'0"8
2'4"8
1'4"
3'8"8
1'4"
4'
3"8
1'2"1'2'8"A
B
F
GK
5
12
1.5X4
3X6
$%Lbl:3A4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A4
Ply: 1
Qty: 1
SEQN: 74545 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T336
DrwNo: 167.23.1205.42157
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3A4
Ply: 1
Qty: 1
SEQN: 74545 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T336
DrwNo: 167.23.1205.42157
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 260.94 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 260.94 TC 0.00 7.67
2000 BC 0.00
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 554 /- /- /862 /334 /2000
H 554 /- /- /862 /334 /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 858 -1309
Chords Tens. Comp.
D - F 859 -1310
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 1976 -1962
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - J 357 - 833
B - I 1165 - 807
Webs Tens. Comp.
I - F 1187 - 829
F - H 359 - 836
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.010 E 999 240
VERT(CL): 0.024 E 999 180
HORZ(LL): 0.019 C - -
HORZ(TL): 0.023 C - -
Creep Factor: 2.0
Max TC CSI: 0.171
Max BC CSI: 0.338
Max Web CSI: 0.460
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B
Ply: 1SEQN: 74280 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T279
DrwNo: 167.23.1206.23637
RDF / RTT 06/16/2023
7'8"
2'6"
2'6"
3'10"
1'4"
5'2"
1'4"
7'8"
2'6"
2'6"
2'6"
3'10"
1'4"
5'2"
1'4"
7'8"
2'6"1'2"1'2"1'2'7"3A
B
D
F
G
HIJ
5
12
3X4
3X6
4X4
3X10
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 260.94 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 260.94 TC 0.00 7.67
2000 BC 0.00
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 554 /- /- /862 /334 /2000
H 554 /- /- /862 /334 /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 858 -1309
Chords Tens. Comp.
D - F 859 -1310
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 1976 -1962
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - J 357 - 833
B - I 1165 - 807
Webs Tens. Comp.
I - F 1187 - 829
F - H 359 - 836
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.010 E 999 240
VERT(CL): 0.024 E 999 180
HORZ(LL): 0.019 C - -
HORZ(TL): 0.023 C - -
Creep Factor: 2.0
Max TC CSI: 0.171
Max BC CSI: 0.338
Max Web CSI: 0.460
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B
Ply: 1SEQN: 74280 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T279
DrwNo: 167.23.1206.23637
RDF / RTT 06/16/2023
7'8"
2'6"
2'6"
3'10"
1'4"
5'2"
1'4"
7'8"
2'6"
2'6"
2'6"
3'10"
1'4"
5'2"
1'4"
7'8"
2'6"1'2"1'2"1'2'7"3A
B
D
F
G
HIJ
5
12
3X4
3X6
4X4
3X10
3X4
3X6
$%Lbl:3B?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B
Ply: 1
Qty: 1
SEQN: 74280 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T279
DrwNo: 167.23.1206.23637
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B
Ply: 1
Qty: 1
SEQN: 74280 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T279
DrwNo: 167.23.1206.23637
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 509 /- /- /288 /- /36
F 514 /- /- /288 /- /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 117 - 456
Chords Tens. Comp.
C - D 117 - 456
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 154 - 440
B - G 390 -16
Webs Tens. Comp.
G - D 390 -16
D - F 154 - 440
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 C 999 240
VERT(CL): 0.010 G 999 180
HORZ(LL): 0.000 D - -
HORZ(TL): 0.001 D - -
Creep Factor: 2.0
Max TC CSI: 0.134
Max BC CSI: 0.351
Max Web CSI: 0.127
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B1
Ply: 1SEQN: 74281 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T280
DrwNo: 167.23.1206.27277
RDF / RTT 06/16/2023
7'8"
3'10"
3'10"
7'8"
3'10"
3'10"
3'10"
7'8"
3'10"1'2"1'2"1'2'7"3A
B
C
D
E
FGH
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 509 /- /- /288 /- /36
F 514 /- /- /288 /- /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 117 - 456
Chords Tens. Comp.
C - D 117 - 456
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 154 - 440
B - G 390 -16
Webs Tens. Comp.
G - D 390 -16
D - F 154 - 440
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.003 C 999 240
VERT(CL): 0.010 G 999 180
HORZ(LL): 0.000 D - -
HORZ(TL): 0.001 D - -
Creep Factor: 2.0
Max TC CSI: 0.134
Max BC CSI: 0.351
Max Web CSI: 0.127
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B1
Ply: 1SEQN: 74281 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T280
DrwNo: 167.23.1206.27277
RDF / RTT 06/16/2023
7'8"
3'10"
3'10"
7'8"
3'10"
3'10"
3'10"
7'8"
3'10"1'2"1'2"1'2'7"3A
B
C
D
E
FGH
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
$%Lbl:3B1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 260.94 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 260.94 TC 0.00 7.67
2000 BC 0.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 509 /- /- /862 /334 /2000
F 514 /- /- /862 /334 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 850 -1317
Chords Tens. Comp.
C - D 851 -1318
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 1978 - 1961
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 357 - 833
B - G 1168 - 800
Webs Tens. Comp.
G - D 1190 - 822
D - F 359 - 836
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 G 999 240
VERT(CL): 0.010 G 999 180
HORZ(LL): 0.017 C - -
HORZ(TL): 0.021 C - -
Creep Factor: 2.0
Max TC CSI: 0.134
Max BC CSI: 0.351
Max Web CSI: 0.378
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B2
Ply: 1SEQN: 74282 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T281
DrwNo: 167.23.1206.45687
RDF / RTT 06/16/2023
7'8"
3'10"
3'10"
7'8"
3'10"
3'10"
3'10"
7'8"
3'10"1'2"1'2"1'2'7"3A
B
C
D
E
FGH
5
12
3X4
3X6
4X4
3X10
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 260.94 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 260.94 TC 0.00 7.67
2000 BC 0.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 509 /- /- /862 /334 /2000
F 514 /- /- /862 /334 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 850 -1317
Chords Tens. Comp.
C - D 851 -1318
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 1978 - 1961
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 357 - 833
B - G 1168 - 800
Webs Tens. Comp.
G - D 1190 - 822
D - F 359 - 836
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 G 999 240
VERT(CL): 0.010 G 999 180
HORZ(LL): 0.017 C - -
HORZ(TL): 0.021 C - -
Creep Factor: 2.0
Max TC CSI: 0.134
Max BC CSI: 0.351
Max Web CSI: 0.378
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B2
Ply: 1SEQN: 74282 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T281
DrwNo: 167.23.1206.45687
RDF / RTT 06/16/2023
7'8"
3'10"
3'10"
7'8"
3'10"
3'10"
3'10"
7'8"
3'10"1'2"1'2"1'2'7"3A
B
C
D
E
FGH
5
12
3X4
3X6
4X4
3X10
3X4
3X6
$%Lbl:3B2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 423 /- /- /186 /- /22
D 429 /- /- /181 /- /-
Wind reactions based on MWFRS
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 E 999 240
VERT(CL): 0.006 E 999 180
HORZ(LL): -0.000 B - -
HORZ(TL): 0.001 B - -
Creep Factor: 2.0
Max TC CSI: 0.192
Max BC CSI: 0.340
Max Web CSI: 0.111
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B3
Ply: 1SEQN: 74283 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T282
DrwNo: 167.23.1207.05130
RDF / RTT 06/16/2023
6'6"
3'10"
3'10"
6'6"
2'8"
3'10"
3'10"
6'6"
2'8"1'1'5"132'7"3A
B
C
DEF
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 423 /- /- /186 /- /22
D 429 /- /- /181 /- /-
Wind reactions based on MWFRS
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 E 999 240
VERT(CL): 0.006 E 999 180
HORZ(LL): -0.000 B - -
HORZ(TL): 0.001 B - -
Creep Factor: 2.0
Max TC CSI: 0.192
Max BC CSI: 0.340
Max Web CSI: 0.111
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B3
Ply: 1SEQN: 74283 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T282
DrwNo: 167.23.1207.05130
RDF / RTT 06/16/2023
6'6"
3'10"
3'10"
6'6"
2'8"
3'10"
3'10"
6'6"
2'8"1'1'5"132'7"3A
B
C
DEF
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
$%Lbl:3B3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 392 /- /- /144 /- /15
D 392 /- /- /144 /- /-
Wind reactions based on MWFRS
F Brg Wid = 2.0 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 E 999 240
VERT(CL): 0.003 E 999 180
HORZ(LL): 0.000 C - -
HORZ(TL): 0.000 C - -
Creep Factor: 2.0
Max TC CSI: 0.085
Max BC CSI: 0.226
Max Web CSI: 0.081
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B4
Ply: 1SEQN: 74284 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T283
DrwNo: 167.23.1207.17857
RDF / RTT 06/16/2023
5'2"
2'6"
2'6"
5'2"
2'8"
2'6"
2'6"
5'2"
2'8"1'6"111'5"132'7"3A
B
C
DEF
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 392 /- /- /144 /- /15
D 392 /- /- /144 /- /-
Wind reactions based on MWFRS
F Brg Wid = 2.0 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 E 999 240
VERT(CL): 0.003 E 999 180
HORZ(LL): 0.000 C - -
HORZ(TL): 0.000 C - -
Creep Factor: 2.0
Max TC CSI: 0.085
Max BC CSI: 0.226
Max Web CSI: 0.081
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3B4
Ply: 1SEQN: 74284 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T283
DrwNo: 167.23.1207.17857
RDF / RTT 06/16/2023
5'2"
2'6"
2'6"
5'2"
2'8"
2'6"
2'6"
5'2"
2'8"1'6"111'5"132'7"3A
B
C
DEF
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
$%Lbl:3B4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 58.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 58.55 TC 0.00 13.67
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 896 /- /- /600 /- /800
J 896 /- /- /600 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 189 -1394
D - F 186 - 1141
Chords Tens. Comp.
F - H 186 -1141
H - J 189 -1394
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1233 -75
Q - P 1219 - 72
P - O 989 -20
Chords Tens. Comp.
O - N 989 -20
N - M 1219 - 73
M - J 1233 -76
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - P 101 - 564
F - O 419 - 52
Webs Tens. Comp.
N - H 101 - 564
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
Q - D 388 - 29
Gables Tens. Comp.
H - M 388 -29
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.49 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.032 E 999 240
VERT(CL): 0.076 P 999 180
HORZ(LL): 0.009 E - -
HORZ(TL): 0.024 E - -
Creep Factor: 2.0
Max TC CSI: 0.220
Max BC CSI: 0.436
Max Web CSI: 0.144
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3C
Ply: 1SEQN: 74285 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T284
DrwNo: 167.23.1209.20387
RDF / RTT 06/16/2023
13'8"
2'10"1'4"
(TYP)
6'10"
6'10"
13'8"
6'10"
13'8"
13'8"1'2"1'2"
4"13'2"33'7"13A
B
D
F
H
J
K
MNOPQ
5
12
3X4(A1)1.5X4
3X4
3X4
4X4
1.5X4 3X4
3X4
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 58.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 58.55 TC 0.00 13.67
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 896 /- /- /600 /- /800
J 896 /- /- /600 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 189 -1394
D - F 186 - 1141
Chords Tens. Comp.
F - H 186 -1141
H - J 189 -1394
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 1233 -75
Q - P 1219 - 72
P - O 989 -20
Chords Tens. Comp.
O - N 989 -20
N - M 1219 - 73
M - J 1233 -76
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - P 101 - 564
F - O 419 - 52
Webs Tens. Comp.
N - H 101 - 564
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
Q - D 388 - 29
Gables Tens. Comp.
H - M 388 -29
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.49 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.032 E 999 240
VERT(CL): 0.076 P 999 180
HORZ(LL): 0.009 E - -
HORZ(TL): 0.024 E - -
Creep Factor: 2.0
Max TC CSI: 0.220
Max BC CSI: 0.436
Max Web CSI: 0.144
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3C
Ply: 1SEQN: 74285 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T284
DrwNo: 167.23.1209.20387
RDF / RTT 06/16/2023
13'8"
2'10"1'4"
(TYP)
6'10"
6'10"
13'8"
6'10"
13'8"
13'8"1'2"1'2"
4"13'2"33'7"13A
B
D
F
H
J
K
MNOPQ
5
12
3X4(A1)1.5X4
3X4
3X4
4X4
1.5X4 3X4
3X4
1.5X4 3X4(A1)
$%Lbl:3C?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 58.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 58.55 TC 0.00 13.67
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 649 /- /- /547 /- /800
C 649 /- /- /547 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 164 -1040
Chords Tens. Comp.
B - C 164 -1040
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 906 -63
Chords Tens. Comp.
D - C 906 -63
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 387 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.76 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.015 D 999 240
VERT(CL): 0.047 A 999 180
HORZ(LL): 0.008 C - -
HORZ(TL): 0.023 A - -
Creep Factor: 2.0
Max TC CSI: 0.479
Max BC CSI: 0.719
Max Web CSI: 0.123
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3C1
Ply: 1SEQN: 74292 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T285
DrwNo: 167.23.1209.31963
RDF / RTT 06/16/2023
13'8"
6'10"
6'10"
13'8"
6'10"
6'10"
6'10"
13'8"
6'10"
4"13'2"3A
B
C
D
5
12
3X4(A1)
5X6
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 58.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 58.55 TC 0.00 13.67
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 649 /- /- /547 /- /800
C 649 /- /- /547 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
C Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & C are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 164 -1040
Chords Tens. Comp.
B - C 164 -1040
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - D 906 -63
Chords Tens. Comp.
D - C 906 -63
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 387 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.76 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.015 D 999 240
VERT(CL): 0.047 A 999 180
HORZ(LL): 0.008 C - -
HORZ(TL): 0.023 A - -
Creep Factor: 2.0
Max TC CSI: 0.479
Max BC CSI: 0.719
Max Web CSI: 0.123
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3C1
Ply: 1SEQN: 74292 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T285
DrwNo: 167.23.1209.31963
RDF / RTT 06/16/2023
13'8"
6'10"
6'10"
13'8"
6'10"
6'10"
6'10"
13'8"
6'10"
4"13'2"3A
B
C
D
5
12
3X4(A1)
5X6
1.5X4 3X4(A1)
$%Lbl:3C1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.55 TC 0.00 13.00
800 62.95 BC 0.15 12.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 131 /- /- /68 /- /4
Wind reactions based on MWFRS
B Brg Wid = 156 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 379 - 415
Chords Tens. Comp.
F - J 379 - 415
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 J 999 240
VERT(CL): 0.005 J 999 180
HORZ(LL): 0.002 F - -
HORZ(TL): 0.003 F - -
Creep Factor: 2.0
Max TC CSI: 0.141
Max BC CSI: 0.148
Max Web CSI: 0.023
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D
Ply: 1SEQN: 74853 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T290
DrwNo: 167.23.1210.37407
RDF / RTT 06/16/2023
13'
2'6"1'4"
(TYP)
6'6"
6'6"
13'
6'6"
13'
13'1'2"1'2"
4"13'0"93'6"2A
B
F
J
K
O
5
12
3X4(A1)
4X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.55 TC 0.00 13.00
800 62.95 BC 0.15 12.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 131 /- /- /68 /- /4
Wind reactions based on MWFRS
B Brg Wid = 156 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 379 - 415
Chords Tens. Comp.
F - J 379 - 415
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 J 999 240
VERT(CL): 0.005 J 999 180
HORZ(LL): 0.002 F - -
HORZ(TL): 0.003 F - -
Creep Factor: 2.0
Max TC CSI: 0.141
Max BC CSI: 0.148
Max Web CSI: 0.023
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D
Ply: 1SEQN: 74853 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T290
DrwNo: 167.23.1210.37407
RDF / RTT 06/16/2023
13'
2'6"1'4"
(TYP)
6'6"
6'6"
13'
6'6"
13'
13'1'2"1'2"
4"13'0"93'6"2A
B
F
J
K
O
5
12
3X4(A1)
4X4
3X4(A1)
$%Lbl:3D?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 719 /- /- /436 /- /49
D 719 /- /- /436 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 146 - 943
Chords Tens. Comp.
C - D 146 - 943
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 796 -20
Chords Tens. Comp.
F - D 796 -20
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.013 F 999 240
VERT(CL): 0.039 B 999 180
HORZ(LL): 0.006 D - -
HORZ(TL): 0.019 B - -
Creep Factor: 2.0
Max TC CSI: 0.397
Max BC CSI: 0.663
Max Web CSI: 0.118
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D1
Ply: 1SEQN: 74854 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T289
DrwNo: 167.23.1211.06557
RDF / RTT 06/16/2023
13'
6'6"
6'6"
13'
6'6"
6'6"
6'6"
13'
6'6"1'2"1'2"
4"13'0"93'6"2A
B
C
D
E
F
5
12
3X4(A1)
4X4(R1)
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 719 /- /- /436 /- /49
D 719 /- /- /436 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 146 - 943
Chords Tens. Comp.
C - D 146 - 943
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 796 -20
Chords Tens. Comp.
F - D 796 -20
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.013 F 999 240
VERT(CL): 0.039 B 999 180
HORZ(LL): 0.006 D - -
HORZ(TL): 0.019 B - -
Creep Factor: 2.0
Max TC CSI: 0.397
Max BC CSI: 0.663
Max Web CSI: 0.118
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D1
Ply: 1SEQN: 74854 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T289
DrwNo: 167.23.1211.06557
RDF / RTT 06/16/2023
13'
6'6"
6'6"
13'
6'6"
6'6"
6'6"
13'
6'6"1'2"1'2"
4"13'0"93'6"2A
B
C
D
E
F
5
12
3X4(A1)
4X4(R1)
1.5X4 3X4(A1)
$%Lbl:3D1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L SS(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 3.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 14.28
BC: From 16 plf at 0.00 to 16 plf at 13.00
BC: From 4 plf at 13.00 to 4 plf at 14.28
BC: 1790 lb Conc. Load at 1.33, 3.33
BC: 4543 lb Conc. Load at 4.81
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.55 TC 0.00 13.00
800 BC 0.00
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 6450 /- /- /3823 /11 /800
E 3010 /- /- /1873 /6 /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 2.3 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 54 -4249
B - C 50 -2343
Chords Tens. Comp.
C - D 49 - 2345
D - E 51 - 2203
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 3915 -23
I - H 3820 - 23
Chords Tens. Comp.
H - G 2028 - 22
G - E 2018 - 21
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - B 1652 0
B - H 28 -1930
Webs Tens. Comp.
C - H 1688 - 17
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.055 I 999 240
VERT(CL): 0.128 I 999 180
HORZ(LL): 0.013 E - -
HORZ(TL): 0.030 E - -
Creep Factor: 2.0
Max TC CSI: 0.335
Max BC CSI: 0.638
Max Web CSI: 0.686
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D2
Ply: 3SEQN: 74855 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T314
DrwNo: 167.23.1211.26467
RDF / RTT 06/16/2023
3 Complete Trusses Required
13'
3'9"5
3'9"5
6'6"
2'8"11
9'2"11
2'8"11
13'
3'9"5
3'9"5
3'9"5
6'6"
2'8"11
9'2"11
2'8"11
13'
3'9"5 1'2"
4"13'0"93'6"2A
B
C
D
E
F
GHIJ
5
12
3X10(A1)H0308
5X6
4X4
4X10
3X4
1.5X3 4X4(A1T)
1'4"
1790#
2'
1790#
1'5"12
4543#
8'2"4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L SS(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 3.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 14.28
BC: From 16 plf at 0.00 to 16 plf at 13.00
BC: From 4 plf at 13.00 to 4 plf at 14.28
BC: 1790 lb Conc. Load at 1.33, 3.33
BC: 4543 lb Conc. Load at 4.81
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.55 TC 0.00 13.00
800 BC 0.00
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 6450 /- /- /3823 /11 /800
E 3010 /- /- /1873 /6 /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 2.3 (Truss)
E Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 54 -4249
B - C 50 -2343
Chords Tens. Comp.
C - D 49 - 2345
D - E 51 - 2203
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 3915 -23
I - H 3820 - 23
Chords Tens. Comp.
H - G 2028 - 22
G - E 2018 - 21
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
I - B 1652 0
B - H 28 -1930
Webs Tens. Comp.
C - H 1688 - 17
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.055 I 999 240
VERT(CL): 0.128 I 999 180
HORZ(LL): 0.013 E - -
HORZ(TL): 0.030 E - -
Creep Factor: 2.0
Max TC CSI: 0.335
Max BC CSI: 0.638
Max Web CSI: 0.686
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D2
Ply: 3SEQN: 74855 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T314
DrwNo: 167.23.1211.26467
RDF / RTT 06/16/2023
3 Complete Trusses Required
13'
3'9"5
3'9"5
6'6"
2'8"11
9'2"11
2'8"11
13'
3'9"5
3'9"5
3'9"5
6'6"
2'8"11
9'2"11
2'8"11
13'
3'9"5 1'2"
4"13'0"93'6"2A
B
C
D
E
F
GHIJ
5
12
3X10(A1)H0308
5X6
4X4
4X10
3X4
1.5X3 4X4(A1T)
1'4"
1790#
2'
1790#
1'5"12
4543#
8'2"4
$%Lbl:3D2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.55 TC 0.00 13.00
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 719 /- /- /582 /- /800
D 719 /- /- /582 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 146 - 944
Chords Tens. Comp.
C - D 146 - 943
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 857 -20
Chords Tens. Comp.
F - D 857 -20
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.014 F 999 240
VERT(CL): 0.039 B 999 180
HORZ(LL): 0.007 D - -
HORZ(TL): 0.019 B - -
Creep Factor: 2.0
Max TC CSI: 0.397
Max BC CSI: 0.663
Max Web CSI: 0.118
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D3
Ply: 1SEQN: 74856 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T347
DrwNo: 167.23.1211.31030
RDF / RTT 06/16/2023
13'
6'6"
6'6"
13'
6'6"
6'6"
6'6"
13'
6'6"1'2"1'2"
4"13'0"93'6"2A
B
C
D
E
F
5
12
3X4(A1)
4X4(R1)
1.5X4 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.55 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.55 TC 0.00 13.00
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 719 /- /- /582 /- /800
D 719 /- /- /582 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 146 - 944
Chords Tens. Comp.
C - D 146 - 943
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 857 -20
Chords Tens. Comp.
F - D 857 -20
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.42 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.014 F 999 240
VERT(CL): 0.039 B 999 180
HORZ(LL): 0.007 D - -
HORZ(TL): 0.019 B - -
Creep Factor: 2.0
Max TC CSI: 0.397
Max BC CSI: 0.663
Max Web CSI: 0.118
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3D3
Ply: 1SEQN: 74856 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T347
DrwNo: 167.23.1211.31030
RDF / RTT 06/16/2023
13'
6'6"
6'6"
13'
6'6"
6'6"
6'6"
13'
6'6"1'2"1'2"
4"13'0"93'6"2A
B
C
D
E
F
5
12
3X4(A1)
4X4(R1)
1.5X4 3X4(A1)
$%Lbl:3D3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 8.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 48 4.50 8.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 4-5-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 993 /- /- /72 /- /-
D 1100 /- /- /72 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -919
A - B 0 -1016
Chords Tens. Comp.
C - D 0 -1017
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 918 0
G - F 916 0
Chords Tens. Comp.
F - D 918 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.018 G 999 240
VERT(CL): 0.042 G 999 180
HORZ(LL): 0.007 D - -
HORZ(TL): 0.016 D - -
Creep Factor: 2.0
Max TC CSI: 0.436
Max BC CSI: 0.318
Max Web CSI: 0.053
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DA
Ply: 2SEQN: 74857 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T337
DrwNo: 167.23.1211.49900
RDF / RTT 06/16/2023
2 Complete Trusses Required
13'
4'5"11
4'5"11
8'6"5
4'0"10
13'
4'5"11
4'1"13
4'1"13
8'10"3
4'8"6
13'
4'1"13 1'2"
4"12'2"72'8"A
B C
D
E
FG
5 12
3X4(A1)
3X4
3X4
6X8
1.5X3 3X4(A1T)
232#232#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 8.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 48 4.50 8.50
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 4-5-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 993 /- /- /72 /- /-
D 1100 /- /- /72 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings A & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -919
A - B 0 -1016
Chords Tens. Comp.
C - D 0 -1017
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - G 918 0
G - F 916 0
Chords Tens. Comp.
F - D 918 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.018 G 999 240
VERT(CL): 0.042 G 999 180
HORZ(LL): 0.007 D - -
HORZ(TL): 0.016 D - -
Creep Factor: 2.0
Max TC CSI: 0.436
Max BC CSI: 0.318
Max Web CSI: 0.053
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DA
Ply: 2SEQN: 74857 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T337
DrwNo: 167.23.1211.49900
RDF / RTT 06/16/2023
2 Complete Trusses Required
13'
4'5"11
4'5"11
8'6"5
4'0"10
13'
4'5"11
4'1"13
4'1"13
8'10"3
4'8"6
13'
4'1"13 1'2"
4"12'2"72'8"A
B C
D
E
FG
5 12
3X4(A1)
3X4
3X4
6X8
1.5X3 3X4(A1T)
232#232#
$%Lbl:3DA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DA
Ply: 2
Qty: 1
SEQN: 74857 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T337
DrwNo: 167.23.1211.49900
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DA
Ply: 2
Qty: 1
SEQN: 74857 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T337
DrwNo: 167.23.1211.49900
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 3.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 14.28
BC: From 16 plf at 0.00 to 16 plf at 13.00
BC: From 4 plf at 13.00 to 4 plf at 14.28
BC: 1790 lb Conc. Load at 1.33, 3.33
BC: 4543 lb Conc. Load at 4.81
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 12 6.00 7.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 6450 /- /- /3821 /4 /800
F 3010 /- /- /1871 /2 /-
Wind reactions based on MWFRS
L Brg Wid = 3.5 Min Req = 2.3 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings L & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 60 - 2796
A - B 62 -4334
B - C 59 -3079
Chords Tens. Comp.
D - E 59 - 2260
E - F 58 -2213
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 3996 -32
K - J 3921 -33
J - I 2085 -15
Chords Tens. Comp.
I - H 2035 - 30
H - F 2028 - 30
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - B 1152 0
B - J 23 -1302
Webs Tens. Comp.
J - C 1109 -6
J - D 1110 -6
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.31 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.055 J 999 240
VERT(CL): 0.126 J 999 180
HORZ(LL): 0.015 F - -
HORZ(TL): 0.034 F - -
Creep Factor: 2.0
Max TC CSI: 0.340
Max BC CSI: 0.942
Max Web CSI: 0.468
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DB
Ply: 3 Cust: R R6852JRef:1XQP68520001 T338 /
DrwNo: 171.23.1103.20550
RDF / RTT 06/20/2023
3 Complete Trusses Required
13'
3'4"3
3'4"3
5'11"11
2'7"8
7'0"5
1'0"10
9'7"13
2'7"8
13'
3'4"3
3'4"3
3'4"3
5'7"13
2'3"10
7'4"3
1'8"6
9'7"13
2'3"10
13'
3'4"3 1'2"
4"12'9"153'3"8A
B
C D
E
F
G
HIJKL
5 12
3X10(A1)3X8
4X6
5X8
4X6 8X8
3X4
3X4
1.5X3 4X4(A1T)
1'4"
1790#
2'
1790#
1'5"12
4543#
8'2"4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 3.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at 0.00 to 79 plf at 14.28
BC: From 16 plf at 0.00 to 16 plf at 13.00
BC: From 4 plf at 13.00 to 4 plf at 14.28
BC: 1790 lb Conc. Load at 1.33, 3.33
BC: 4543 lb Conc. Load at 4.81
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 12 6.00 7.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Top Chord overhang(s) may be field trimmed.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
L 6450 /- /- /3821 /4 /800
F 3010 /- /- /1871 /2 /-
Wind reactions based on MWFRS
L Brg Wid = 3.5 Min Req = 2.3 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings L & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 60 - 2796
A - B 62 -4334
B - C 59 -3079
Chords Tens. Comp.
D - E 59 - 2260
E - F 58 -2213
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - K 3996 -32
K - J 3921 -33
J - I 2085 -15
Chords Tens. Comp.
I - H 2035 - 30
H - F 2028 - 30
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - B 1152 0
B - J 23 -1302
Webs Tens. Comp.
J - C 1109 -6
J - D 1110 -6
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.31 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.055 J 999 240
VERT(CL): 0.126 J 999 180
HORZ(LL): 0.015 F - -
HORZ(TL): 0.034 F - -
Creep Factor: 2.0
Max TC CSI: 0.340
Max BC CSI: 0.942
Max Web CSI: 0.468
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DB
Ply: 3 Cust: R R6852JRef:1XQP68520001 T338 /
DrwNo: 171.23.1103.20550
RDF / RTT 06/20/2023
3 Complete Trusses Required
13'
3'4"3
3'4"3
5'11"11
2'7"8
7'0"5
1'0"10
9'7"13
2'7"8
13'
3'4"3
3'4"3
3'4"3
5'7"13
2'3"10
7'4"3
1'8"6
9'7"13
2'3"10
13'
3'4"3 1'2"
4"12'9"153'3"8A
B
C D
E
F
G
HIJKL
5 12
3X10(A1)3X8
4X6
5X8
4X6 8X8
3X4
3X4
1.5X3 4X4(A1T)
1'4"
1790#
2'
1790#
1'5"12
4543#
8'2"4
$%Lbl:3DB?$
06/20/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.54 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.54 TC 0.00 13.00
800 BC 0.00
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DB
Ply: 3
Qty: 1
SEQN: 8898 / CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQP68520001 T338
DrwNo: 171.23.1103.20550
RDF / RTT 06/20/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.54 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.54 TC 0.00 13.00
800 BC 0.00
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3DB
Ply: 3
Qty: 1
SEQN: 8898 / CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQP68520001 T338
DrwNo: 171.23.1103.20550
RDF / RTT 06/20/2023
06/20/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1400 # ( 36.97 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1400 36.97 TC 0.00 38.00
1400 37.13 BC 0.15 37.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 146 /- /- /63 /- /4
B /-171
AB /-171
Wind reactions based on MWFRS
B Brg Wid = 456 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 710 - 769
Chords Tens. Comp.
S -AB 710 -769
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AP 692 -669
Chords Tens. Comp.
AP-AB 692 -669
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 B 999 240
VERT(CL): 0.007 AB 999 180
HORZ(LL): 0.013 O - -
HORZ(TL): 0.022 O - -
Creep Factor: 2.0
Max TC CSI: 0.144
Max BC CSI: 0.192
Max Web CSI: 0.159
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E
Ply: 1SEQN: 74859 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T339
DrwNo: 167.23.1212.44780
RDF / RTT 06/16/2023
38'
3'1'4"
(TYP)
19'
19'
38'
19'
38'
38'1'2"1'2"
4"18'3"18'8"10A
B
K
O
S
AB
AC
AP
5 12
3X6(A1)
5X6
5X6
3X6
5X6
3X6(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1400 # ( 36.97 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1400 36.97 TC 0.00 38.00
1400 37.13 BC 0.15 37.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 146 /- /- /63 /- /4
B /-171
AB /-171
Wind reactions based on MWFRS
B Brg Wid = 456 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 710 - 769
Chords Tens. Comp.
S -AB 710 -769
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AP 692 -669
Chords Tens. Comp.
AP-AB 692 -669
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 B 999 240
VERT(CL): 0.007 AB 999 180
HORZ(LL): 0.013 O - -
HORZ(TL): 0.022 O - -
Creep Factor: 2.0
Max TC CSI: 0.144
Max BC CSI: 0.192
Max Web CSI: 0.159
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E
Ply: 1SEQN: 74859 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T339
DrwNo: 167.23.1212.44780
RDF / RTT 06/16/2023
38'
3'1'4"
(TYP)
19'
19'
38'
19'
38'
38'1'2"1'2"
4"18'3"18'8"10A
B
K
O
S
AB
AC
AP
5 12
3X6(A1)
5X6
5X6
3X6
5X6
3X6(A1)
$%Lbl:3E?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1146 /- /124
J 1952 /- /- /1146 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 142 -3971
C - D 179 - 3753
D - E 187 - 3044
E - F 236 -2982
Chords Tens. Comp.
F - G 236 -2980
G - H 187 -3044
H - I 179 -3753
I - J 142 -3971
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 3582 -52
R - Q 3093 - 23
Q - P 2233 0
P - O 2298 - 662
O - N 2217 0
Chords Tens. Comp.
O - N 83 -663
N - M 2233 0
M - L 3093 -5
L - J 3582 - 37
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - D 615 0
D - Q 115 - 744
Q - F 950 - 27
Webs Tens. Comp.
F - M 950 -27
M - H 116 -744
H - L 615 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.229 O 999 240
VERT(CL): 0.492 O 920 180
HORZ(LL): 0.068 J - -
HORZ(TL): 0.163 J - -
Creep Factor: 2.0
Max TC CSI: 0.909
Max BC CSI: 0.997
Max Web CSI: 0.418
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E1
Ply: 1SEQN: 74860 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T305
DrwNo: 167.23.1213.19840
RDF / RTT 06/16/2023
B2
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
16'6"
2'1"1
20'
3'6"
21'6"
1'6"
23'7"1
2'1"1
30'3"2
6'8"1
38'
7'8"141'2"1'2"
4"13"88'3"18'8"10A
B
C
D
E
F
G
H
I
J
K
LMNOPQR
5
12
3X10(A1)
1.5X3
3X4
3X4
3X6
4X4 4X4
2X3
5X6(R1)
2X3
H0308
4X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1146 /- /124
J 1952 /- /- /1146 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 142 -3971
C - D 179 - 3753
D - E 187 - 3044
E - F 236 -2982
Chords Tens. Comp.
F - G 236 -2980
G - H 187 -3044
H - I 179 -3753
I - J 142 -3971
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 3582 -52
R - Q 3093 - 23
Q - P 2233 0
P - O 2298 - 662
O - N 2217 0
Chords Tens. Comp.
O - N 83 -663
N - M 2233 0
M - L 3093 -5
L - J 3582 - 37
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - D 615 0
D - Q 115 - 744
Q - F 950 - 27
Webs Tens. Comp.
F - M 950 -27
M - H 116 -744
H - L 615 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.229 O 999 240
VERT(CL): 0.492 O 920 180
HORZ(LL): 0.068 J - -
HORZ(TL): 0.163 J - -
Creep Factor: 2.0
Max TC CSI: 0.909
Max BC CSI: 0.997
Max Web CSI: 0.418
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E1
Ply: 1SEQN: 74860 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T305
DrwNo: 167.23.1213.19840
RDF / RTT 06/16/2023
B2
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
16'6"
2'1"1
20'
3'6"
21'6"
1'6"
23'7"1
2'1"1
30'3"2
6'8"1
38'
7'8"141'2"1'2"
4"13"88'3"18'8"10A
B
C
D
E
F
G
H
I
J
K
LMNOPQR
5
12
3X10(A1)
1.5X3
3X4
3X4
3X6
4X4 4X4
2X3
5X6(R1)
2X3
H0308
4X4 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
19'
90#
19'
$%Lbl:3E1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2000 /- /- /1146 /- /124
J 2000 /- /- /1146 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 143 -4081
C - D 180 - 3862
D - E 183 - 3188
E - F 232 -3125
Chords Tens. Comp.
F - G 232 -3126
G - H 183 -3188
H - I 180 -3862
I - J 143 -4081
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3683 -53
P - O 3216 -22
O - N 2334 0
Chords Tens. Comp.
N - M 2334 0
M - L 3216 -3
L - J 3683 - 38
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P - D 620 -1
D - O 118 - 725
O - F 1013 - 25
Webs Tens. Comp.
F - M 1014 - 25
M - H 118 -724
H - L 620 -1
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.204 M 999 240
VERT(CL): 0.452 M 999 180
HORZ(LL): 0.068 J - -
HORZ(TL): 0.150 J - -
Creep Factor: 2.0
Max TC CSI: 0.784
Max BC CSI: 0.752
Max Web CSI: 0.407
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E2
Ply: 1SEQN: 74861 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T340
DrwNo: 167.23.1213.31643
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"141'2"1'2"
4"18'3"18'8"10A
B
C
D
E
F
G
H
I
J
K
LMNOP
5
12
3X10(A1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2000 /- /- /1146 /- /124
J 2000 /- /- /1146 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 143 -4081
C - D 180 - 3862
D - E 183 - 3188
E - F 232 -3125
Chords Tens. Comp.
F - G 232 -3126
G - H 183 -3188
H - I 180 -3862
I - J 143 -4081
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3683 -53
P - O 3216 -22
O - N 2334 0
Chords Tens. Comp.
N - M 2334 0
M - L 3216 -3
L - J 3683 - 38
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
P - D 620 -1
D - O 118 - 725
O - F 1013 - 25
Webs Tens. Comp.
F - M 1014 - 25
M - H 118 -724
H - L 620 -1
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.204 M 999 240
VERT(CL): 0.452 M 999 180
HORZ(LL): 0.068 J - -
HORZ(TL): 0.150 J - -
Creep Factor: 2.0
Max TC CSI: 0.784
Max BC CSI: 0.752
Max Web CSI: 0.407
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E2
Ply: 1SEQN: 74861 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T340
DrwNo: 167.23.1213.31643
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"141'2"1'2"
4"18'3"18'8"10A
B
C
D
E
F
G
H
I
J
K
LMNOP
5
12
3X10(A1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(A1)
$%Lbl:3E2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,
W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 38.00
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2252 /- /- /1325 /- /135
L 2130 /- /- /1242 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
L Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 167 -4595
C - D 209 - 4336
D - E 216 - 3497
E - F 224 -3425
F - G 304 - 3509
Chords Tens. Comp.
G - H 304 -3512
H - I 225 -3428
I - J 217 -3500
J - K 217 -4362
K - L 175 -4622
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 4148 -94
S - R 3524 -39
R - Q 2544 0
Q - P 2564 - 685
P - O 2497 0
Chords Tens. Comp.
P - O 68 -689
O - N 2544 0
N - M 3531 - 24
M - L 4177 -81
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 100 - 465
S - D 690 -8
D - R 76 -676
R - G 1254 - 85
Webs Tens. Comp.
G - N 1261 - 86
N - J 78 -684
J - M 703 -13
M - K 102 -478
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.250 P 999 240
VERT(CL): 0.509 P 889 180
HORZ(LL): 0.069 L - -
HORZ(TL): 0.166 L - -
Creep Factor: 2.0
Max TC CSI: 0.953
Max BC CSI: 0.796
Max Web CSI: 0.384
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E3
Ply: 1SEQN: 74917 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T341
DrwNo: 167.23.1214.13003
RDF / RTT 06/16/2023
B2
W5
W6
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
16'6"
2'1"1
20'
3'6"
21'6"
1'6"
23'7"1
2'1"1
30'3"2
6'8"1
38'
7'8"141'2"
4"13"88'3"18'8"10A
B
C
D
E
F
G
H I
J
K
L
MNOPQRS
5
12
4X8(A2)
1.5X3
3X4
3X4
3X6
1.5X3
8X10 3X6
2X3
5X6
2X3
H0308
3X6 8X10
1.5X3
3X6
3X4
3X4
1.5X3
4X8(A2)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g) W5,
W6 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 38.00
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
In lieu of structural panels use purlins to brace TC @
24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2252 /- /- /1325 /- /135
L 2130 /- /- /1242 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
L Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 167 -4595
C - D 209 - 4336
D - E 216 - 3497
E - F 224 -3425
F - G 304 - 3509
Chords Tens. Comp.
G - H 304 -3512
H - I 225 -3428
I - J 217 -3500
J - K 217 -4362
K - L 175 -4622
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 4148 -94
S - R 3524 -39
R - Q 2544 0
Q - P 2564 - 685
P - O 2497 0
Chords Tens. Comp.
P - O 68 -689
O - N 2544 0
N - M 3531 - 24
M - L 4177 -81
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 100 - 465
S - D 690 -8
D - R 76 -676
R - G 1254 - 85
Webs Tens. Comp.
G - N 1261 - 86
N - J 78 -684
J - M 703 -13
M - K 102 -478
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.250 P 999 240
VERT(CL): 0.509 P 889 180
HORZ(LL): 0.069 L - -
HORZ(TL): 0.166 L - -
Creep Factor: 2.0
Max TC CSI: 0.953
Max BC CSI: 0.796
Max Web CSI: 0.384
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E3
Ply: 1SEQN: 74917 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T341
DrwNo: 167.23.1214.13003
RDF / RTT 06/16/2023
B2
W5
W6
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
16'6"
2'1"1
20'
3'6"
21'6"
1'6"
23'7"1
2'1"1
30'3"2
6'8"1
38'
7'8"141'2"
4"13"88'3"18'8"10A
B
C
D
E
F
G
H I
J
K
L
MNOPQRS
5
12
4X8(A2)
1.5X3
3X4
3X4
3X6
1.5X3
8X10 3X6
2X3
5X6
2X3
H0308
3X6 8X10
1.5X3
3X6
3X4
3X4
1.5X3
4X8(A2)
19'
90#
19'
$%Lbl:3E3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
B3 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1954 /- /- /1146 /- /117
J 1848 /- /- /1074 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 142 -3977
C - D 180 - 3758
D - E 188 - 3049
E - F 237 -2987
Chords Tens. Comp.
F - G 238 -2988
G - H 189 -3052
H - I 186 -3779
I - J 149 -3999
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3587 -75
Q - P 3098 - 47
P - O 2238 0
O - N 2300 - 661
N - M 2243 0
Chords Tens. Comp.
N - M 67 -686
M - L 2238 0
L - K 3104 - 26
K - J 3611 -68
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - D 615 0
D - P 115 - 743
P - F 949 -27
Webs Tens. Comp.
F - L 955 -27
L - H 117 - 750
H - K 625 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.223 N 999 240
VERT(CL): 0.479 N 943 180
HORZ(LL): 0.064 J - -
HORZ(TL): 0.154 J - -
Creep Factor: 2.0
Max TC CSI: 0.914
Max BC CSI: 0.997
Max Web CSI: 0.422
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E4
Ply: 1SEQN: 74863 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T342
DrwNo: 167.23.1215.05780
RDF / RTT 06/16/2023
B2
B3
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
16'6"
2'1"1
20'
3'6"
21'6"
1'6"
23'7"1
2'1"1
30'3"2
6'8"1
38'
7'8"141'2"
4"13"88'3"18'8"10A
B
C
D
E
F
G
H
I
J
KLMNOPQ
5
12
3X10(A1)
1.5X3
3X4
3X4
3X6
4X4 4X4
2X3
5X6(R1)
2X3
H0308
4X4 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
B3 2x4 DF-L #1&Bet.(g);
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1954 /- /- /1146 /- /117
J 1848 /- /- /1074 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 142 -3977
C - D 180 - 3758
D - E 188 - 3049
E - F 237 -2987
Chords Tens. Comp.
F - G 238 -2988
G - H 189 -3052
H - I 186 -3779
I - J 149 -3999
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3587 -75
Q - P 3098 - 47
P - O 2238 0
O - N 2300 - 661
N - M 2243 0
Chords Tens. Comp.
N - M 67 -686
M - L 2238 0
L - K 3104 - 26
K - J 3611 -68
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
Q - D 615 0
D - P 115 - 743
P - F 949 -27
Webs Tens. Comp.
F - L 955 -27
L - H 117 - 750
H - K 625 -2
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.223 N 999 240
VERT(CL): 0.479 N 943 180
HORZ(LL): 0.064 J - -
HORZ(TL): 0.154 J - -
Creep Factor: 2.0
Max TC CSI: 0.914
Max BC CSI: 0.997
Max Web CSI: 0.422
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E4
Ply: 1SEQN: 74863 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T342
DrwNo: 167.23.1215.05780
RDF / RTT 06/16/2023
B2
B3
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
16'6"
2'1"1
20'
3'6"
21'6"
1'6"
23'7"1
2'1"1
30'3"2
6'8"1
38'
7'8"141'2"
4"13"88'3"18'8"10A
B
C
D
E
F
G
H
I
J
KLMNOPQ
5
12
3X10(A1)
1.5X3
3X4
3X4
3X6
4X4 4X4
2X3
5X6(R1)
2X3
H0308
4X4 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
19'
90#
19'
$%Lbl:3E4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2400 # ( 63.17 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2400 63.17 TC 0.00 38.00
2400 BC 0.15
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1898 /- /- /1549 /- /2400
I 1898 /- /- /1549 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -4114
B - C 192 -3894
C - D 189 - 3201
D - E 238 - 3139
Chords Tens. Comp.
E - F 238 -3139
F - G 189 -3201
G - H 192 -3894
H - I 155 -4114
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3717 -85
N - M 3232 - 50
M - L 2439 0
Chords Tens. Comp.
L - K 2439 0
K - J 3232 -28
J - I 3717 -73
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - C 631 - 8
C - M 120 - 732
M - E 1018 -27
Webs Tens. Comp.
E - K 1019 -27
K - G 120 -732
G - J 631 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.30 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.203 K 999 240
VERT(CL): 0.452 K 999 180
HORZ(LL): 0.076 I - -
HORZ(TL): 0.150 I - -
Creep Factor: 2.0
Max TC CSI: 0.789
Max BC CSI: 0.753
Max Web CSI: 0.411
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E5
Ply: 1SEQN: 74864 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T343
DrwNo: 167.23.1215.33467
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"14
4"18'3"1A
B
C
D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2400 # ( 63.17 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2400 63.17 TC 0.00 38.00
2400 BC 0.15
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1898 /- /- /1549 /- /2400
I 1898 /- /- /1549 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -4114
B - C 192 -3894
C - D 189 - 3201
D - E 238 - 3139
Chords Tens. Comp.
E - F 238 -3139
F - G 189 -3201
G - H 192 -3894
H - I 155 -4114
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3717 -85
N - M 3232 - 50
M - L 2439 0
Chords Tens. Comp.
L - K 2439 0
K - J 3232 -28
J - I 3717 -73
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - C 631 - 8
C - M 120 - 732
M - E 1018 -27
Webs Tens. Comp.
E - K 1019 -27
K - G 120 -732
G - J 631 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.30 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.203 K 999 240
VERT(CL): 0.452 K 999 180
HORZ(LL): 0.076 I - -
HORZ(TL): 0.150 I - -
Creep Factor: 2.0
Max TC CSI: 0.789
Max BC CSI: 0.753
Max Web CSI: 0.411
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E5
Ply: 1SEQN: 74864 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T343
DrwNo: 167.23.1215.33467
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"14
4"18'3"1A
B
C
D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
$%Lbl:3E5?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1898 /- /- /1074 /- /107
I 1898 /- /- /1074 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -4114
B - C 192 -3894
C - D 189 - 3201
D - E 238 - 3139
Chords Tens. Comp.
E - F 238 -3139
F - G 189 -3201
G - H 192 -3894
H - I 155 -4114
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3717 -85
N - M 3232 - 50
M - L 2344 0
Chords Tens. Comp.
L - K 2344 0
K - J 3232 -28
J - I 3717 -73
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - C 631 - 8
C - M 120 - 732
M - E 1018 -27
Webs Tens. Comp.
E - K 1019 -27
K - G 120 -732
G - J 631 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.30 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.203 K 999 240
VERT(CL): 0.452 K 999 180
HORZ(LL): 0.068 I - -
HORZ(TL): 0.150 I - -
Creep Factor: 2.0
Max TC CSI: 0.789
Max BC CSI: 0.753
Max Web CSI: 0.411
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E6
Ply: 1SEQN: 74865 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T344
DrwNo: 167.23.1215.51640
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"14
4"18'3"1A
B
C
D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1898 /- /- /1074 /- /107
I 1898 /- /- /1074 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -4114
B - C 192 -3894
C - D 189 - 3201
D - E 238 - 3139
Chords Tens. Comp.
E - F 238 -3139
F - G 189 -3201
G - H 192 -3894
H - I 155 -4114
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3717 -85
N - M 3232 - 50
M - L 2344 0
Chords Tens. Comp.
L - K 2344 0
K - J 3232 -28
J - I 3717 -73
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - C 631 - 8
C - M 120 - 732
M - E 1018 -27
Webs Tens. Comp.
E - K 1019 -27
K - G 120 -732
G - J 631 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.30 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.203 K 999 240
VERT(CL): 0.452 K 999 180
HORZ(LL): 0.068 I - -
HORZ(TL): 0.150 I - -
Creep Factor: 2.0
Max TC CSI: 0.789
Max BC CSI: 0.753
Max Web CSI: 0.411
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E6
Ply: 1SEQN: 74865 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T344
DrwNo: 167.23.1215.51640
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"14
4"18'3"1A
B
C
D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
$%Lbl:3E6?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1899 /- /- /1074 /- /107
I 1897 /- /- /1073 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -4117
B - C 192 -3897
C - D 189 - 3204
D - E 238 - 3141
Chords Tens. Comp.
E - F 238 -3143
F - G 189 -3205
G - H 192 -3908
H - I 155 -4129
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3720 -85
N - M 3235 - 50
M - L 2347 0
Chords Tens. Comp.
L - K 2347 0
K - J 3238 -28
J - I 3732 -73
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - C 631 - 8
C - M 120 - 732
M - E 1019 -27
Webs Tens. Comp.
E - K 1022 -27
K - G 120 -736
G - J 637 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.30 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.204 K 999 240
VERT(CL): 0.453 K 999 180
HORZ(LL): 0.068 I - -
HORZ(TL): 0.151 I - -
Creep Factor: 2.0
Max TC CSI: 0.792
Max BC CSI: 0.754
Max Web CSI: 0.414
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E7
Ply: 1SEQN: 74866 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T345
DrwNo: 167.23.1215.55077
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"14
4"18'3"1A
B
C
D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g) W4,
W5 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1899 /- /- /1074 /- /107
I 1897 /- /- /1073 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 155 -4117
B - C 192 -3897
C - D 189 - 3204
D - E 238 - 3141
Chords Tens. Comp.
E - F 238 -3143
F - G 189 -3205
G - H 192 -3908
H - I 155 -4129
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - N 3720 -85
N - M 3235 - 50
M - L 2347 0
Chords Tens. Comp.
L - K 2347 0
K - J 3238 -28
J - I 3732 -73
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
N - C 631 - 8
C - M 120 - 732
M - E 1019 -27
Webs Tens. Comp.
E - K 1022 -27
K - G 120 -736
G - J 637 -8
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.30 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.204 K 999 240
VERT(CL): 0.453 K 999 180
HORZ(LL): 0.068 I - -
HORZ(TL): 0.151 I - -
Creep Factor: 2.0
Max TC CSI: 0.792
Max BC CSI: 0.754
Max Web CSI: 0.414
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E7
Ply: 1SEQN: 74866 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T345
DrwNo: 167.23.1215.55077
RDF / RTT 06/16/2023
W4
W5
38'
6'3"3
6'3"3
11'6"10
5'3"6
19'
7'5"6
26'5"6
7'5"6
31'8"13
5'3"6
38'
6'3"3
7'8"14
7'8"14
14'4"15
6'8"1
23'7"1
9'2"1
30'3"2
6'8"1
38'
7'8"14
4"18'3"1A
B
C
D
E
F
G
H
I
JKLMN
5
12
3X10(B1)
1.5X3
3X4
3X4
3X6
4X4
5X6
H0308 4X4
3X6
3X4
3X4
1.5X3
3X10(B1)
$%Lbl:3E7?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1400 # ( 36.97 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1400 36.97 TC 0.00 38.00
1400 37.13 BC 0.15 37.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 143 /- /- /62 /- /3
B /-170
AB /-241
Wind reactions based on MWFRS
B Brg Wid = 456 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 707 - 771
Chords Tens. Comp.
S -AB 711 -768
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AO 694 -667
Chords Tens. Comp.
AO-AB 695 -666
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 AB 999 240
VERT(CL): 0.008 AB 999 180
HORZ(LL): -0.013 O - -
HORZ(TL): 0.022 O - -
Creep Factor: 2.0
Max TC CSI: 0.162
Max BC CSI: 0.203
Max Web CSI: 0.156
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E8
Ply: 1SEQN: 74867 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T346
DrwNo: 167.23.1216.26523
RDF / RTT 06/16/2023
38'
3'1'4"
(TYP)
19'
19'
38'
19'
38'
38'1'2"
4"18'3"18'8"10A
B
K
O
S
AB
AO
5
12
3X4(A1)
5X6
5X6
3X6
5X6
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
1400 # ( 36.97 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 1400 36.97 TC 0.00 38.00
1400 37.13 BC 0.15 37.85
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 143 /- /- /62 /- /3
B /-170
AB /-241
Wind reactions based on MWFRS
B Brg Wid = 456 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - K 707 - 771
Chords Tens. Comp.
S -AB 711 -768
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B -AO 694 -667
Chords Tens. Comp.
AO-AB 695 -666
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 24.03 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 AB 999 240
VERT(CL): 0.008 AB 999 180
HORZ(LL): -0.013 O - -
HORZ(TL): 0.022 O - -
Creep Factor: 2.0
Max TC CSI: 0.162
Max BC CSI: 0.203
Max Web CSI: 0.156
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3E8
Ply: 1SEQN: 74867 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T346
DrwNo: 167.23.1216.26523
RDF / RTT 06/16/2023
38'
3'1'4"
(TYP)
19'
19'
38'
19'
38'
38'1'2"
4"18'3"18'8"10A
B
K
O
S
AB
AO
5
12
3X4(A1)
5X6
5X6
3X6
5X6
3X4(A1)
$%Lbl:3E8?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 55 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 4650 /- /- /424 /- /-
K 4544 /- /- /420 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
K Brg Wid = 3.5 Min Req = 1.6 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3229
B - C 0 -3507
D - E 0 -4402
E - F 0 -5033
F - G 0 -5032
Chords Tens. Comp.
G - H 0 -4406
H - I 0 -4406
I - J 0 -3209
J - K 0 -3489
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 3204 0
S - R 4347 0
R - Q 5012 0
Q - P 5246 0
P - O 5246 0
Chords Tens. Comp.
O - N 5246 0
N - M 5010 0
M - L 4352 0
L - K 3182 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - D 0 -1492
C - S 1028 0
D - R 582 0
R - E 0 -806
Webs Tens. Comp.
G - M 0 -798
M - I 572 0
I - L 0 -1522
L - J 1056 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.377 O 999 240
VERT(CL): 0.887 O 509 180
HORZ(LL): 0.095 K - -
HORZ(TL): 0.223 K - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.908
Max Web CSI: 0.429
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EA
Ply: 3SEQN: 74869 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T291
DrwNo: 167.23.1217.43873
RDF / RTT 06/16/2023
3 Complete Trusses Required
38'
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
38'
7'11"11
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
38'
7'7"131'2"
4"13'7"154'1"8A
B
C DE F GHIJ
K
LMNOPQRS
5
12
4X6(A2T)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(A2)
794#
22'0"10
794#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 55 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 4650 /- /- /424 /- /-
K 4544 /- /- /420 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
K Brg Wid = 3.5 Min Req = 1.6 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3229
B - C 0 -3507
D - E 0 -4402
E - F 0 -5033
F - G 0 -5032
Chords Tens. Comp.
G - H 0 -4406
H - I 0 -4406
I - J 0 -3209
J - K 0 -3489
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 3204 0
S - R 4347 0
R - Q 5012 0
Q - P 5246 0
P - O 5246 0
Chords Tens. Comp.
O - N 5246 0
N - M 5010 0
M - L 4352 0
L - K 3182 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - D 0 -1492
C - S 1028 0
D - R 582 0
R - E 0 -806
Webs Tens. Comp.
G - M 0 -798
M - I 572 0
I - L 0 -1522
L - J 1056 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.377 O 999 240
VERT(CL): 0.887 O 509 180
HORZ(LL): 0.095 K - -
HORZ(TL): 0.223 K - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.908
Max Web CSI: 0.429
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EA
Ply: 3SEQN: 74869 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T291
DrwNo: 167.23.1217.43873
RDF / RTT 06/16/2023
3 Complete Trusses Required
38'
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
38'
7'11"11
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
38'
7'7"131'2"
4"13'7"154'1"8A
B
C DE F GHIJ
K
LMNOPQRS
5
12
4X6(A2T)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(A2)
794#
22'0"10
794#
$%Lbl:3EA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EA
Ply: 3
Qty: 1
SEQN: 74869 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T291
DrwNo: 167.23.1217.43873
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EA
Ply: 3
Qty: 1
SEQN: 74869 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T291
DrwNo: 167.23.1217.43873
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 56 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 4617 /- /- /417 /- /-
K 4543 /- /- /413 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.6 (Truss)
K Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3204
B - C 0 -3480
D - E 0 -4362
E - F 0 -4979
F - G 0 -4951
Chords Tens. Comp.
G - H 0 -4315
H - I 0 -4315
I - J 0 -3096
J - K 0 -3374
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 3179 0
S - R 4308 0
R - Q 4959 0
Q - P 5179 0
P - O 5179 0
Chords Tens. Comp.
O - N 5179 0
N - M 4929 0
M - L 4257 0
L - K 3071 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - D 0 -1474
C - S 1016 0
D - R 571 0
R - E 0 -789
Webs Tens. Comp.
G - M 0 -812
M - I 614 0
I - L 0 -1545
L - J 1002 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.377 O 999 240
VERT(CL): 0.886 O 506 180
HORZ(LL): 0.098 K - -
HORZ(TL): 0.231 K - -
Creep Factor: 2.0
Max TC CSI: 0.991
Max BC CSI: 0.976
Max Web CSI: 0.413
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EAA
Ply: 3SEQN: 74894 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T335
DrwNo: 167.23.1218.57300
RDF / RTT 06/16/2023
3 Complete Trusses Required
37'8"8
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
37'8"8
7'8"3
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
37'8"8
7'4"51'2"
4"1 5"83'7"154'1"8A
B
C DE F GHIJ
K
LMNOPQRS
5
12
4X6(A2T)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(B10R)
794#
22'0"10
794#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 56 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 4617 /- /- /417 /- /-
K 4543 /- /- /413 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.6 (Truss)
K Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3204
B - C 0 -3480
D - E 0 -4362
E - F 0 -4979
F - G 0 -4951
Chords Tens. Comp.
G - H 0 -4315
H - I 0 -4315
I - J 0 -3096
J - K 0 -3374
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 3179 0
S - R 4308 0
R - Q 4959 0
Q - P 5179 0
P - O 5179 0
Chords Tens. Comp.
O - N 5179 0
N - M 4929 0
M - L 4257 0
L - K 3071 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
S - D 0 -1474
C - S 1016 0
D - R 571 0
R - E 0 -789
Webs Tens. Comp.
G - M 0 -812
M - I 614 0
I - L 0 -1545
L - J 1002 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.377 O 999 240
VERT(CL): 0.886 O 506 180
HORZ(LL): 0.098 K - -
HORZ(TL): 0.231 K - -
Creep Factor: 2.0
Max TC CSI: 0.991
Max BC CSI: 0.976
Max Web CSI: 0.413
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EAA
Ply: 3SEQN: 74894 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T335
DrwNo: 167.23.1218.57300
RDF / RTT 06/16/2023
3 Complete Trusses Required
37'8"8
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
37'8"8
7'8"3
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
37'8"8
7'4"51'2"
4"1 5"83'7"154'1"8A
B
C DE F GHIJ
K
LMNOPQRS
5
12
4X6(A2T)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(B10R)
794#
22'0"10
794#
$%Lbl:3EAA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EAA
Ply: 3
Qty: 1
SEQN: 74894 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T335
DrwNo: 167.23.1218.57300
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EAA
Ply: 3
Qty: 1
SEQN: 74894 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T335
DrwNo: 167.23.1218.57300
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 10.00 28.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1909 /- /- /1133 /- /66
J 1803 /- /- /1060 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
J Brg Wid = 3.5 Min Req = 1.9 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 305 - 3144
B - C 326 -3916
C - D 295 - 3496
E - F 377 -4087
Chords Tens. Comp.
F - G 377 -4091
G - H 306 -3156
H - I 297 -3510
I - J 330 -3942
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3545 - 263
P - O 4065 - 242
O - N 4363 - 244
N - M 4363 - 244
Chords Tens. Comp.
M - L 4363 -244
L - K 4069 - 220
K - J 3574 -245
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 107 - 428
P - D 1087 -42
P - E 139 -1216
O - F 46 -415
Webs Tens. Comp.
F - L 44 -413
G - K 137 -1207
H - K 1096 - 44
K - I 111 -447
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.15 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.269 M 999 240
VERT(CL): 0.637 M 710 180
HORZ(LL): 0.078 J - -
HORZ(TL): 0.183 J - -
Creep Factor: 2.0
Max TC CSI: 0.932
Max BC CSI: 0.841
Max Web CSI: 0.774
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EB
Ply: 1SEQN: 74870 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T292
DrwNo: 167.23.1219.23583
RDF / RTT 06/16/2023
38'
5'1"13
5'1"13
9'11"11
4'9"14
14'3"
4'3"5
19'
4'9"
23'9"
4'9"
28'0"5
4'3"5
32'10"3
4'9"14
38'
5'1"13
9'7"13
9'7"13
14'3"
4'7"4
19'
4'9"
23'9"
4'9"
28'4"3
4'7"4
38'
9'7"131'2"
4"14'5"154'11"8A
B
C
D EFGH
I
J
KLMNOP
5
12
3X10(A1)
1.5X3
3X10
5X6 3X4
3X4 H0308
3X8
1.5X3 3X4
3X4 5X6
3X10
1.5X3
3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 10.00 28.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1909 /- /- /1133 /- /66
J 1803 /- /- /1060 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
J Brg Wid = 3.5 Min Req = 1.9 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 305 - 3144
B - C 326 -3916
C - D 295 - 3496
E - F 377 -4087
Chords Tens. Comp.
F - G 377 -4091
G - H 306 -3156
H - I 297 -3510
I - J 330 -3942
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3545 - 263
P - O 4065 - 242
O - N 4363 - 244
N - M 4363 - 244
Chords Tens. Comp.
M - L 4363 -244
L - K 4069 - 220
K - J 3574 -245
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 107 - 428
P - D 1087 -42
P - E 139 -1216
O - F 46 -415
Webs Tens. Comp.
F - L 44 -413
G - K 137 -1207
H - K 1096 - 44
K - I 111 -447
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.15 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.269 M 999 240
VERT(CL): 0.637 M 710 180
HORZ(LL): 0.078 J - -
HORZ(TL): 0.183 J - -
Creep Factor: 2.0
Max TC CSI: 0.932
Max BC CSI: 0.841
Max Web CSI: 0.774
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EB
Ply: 1SEQN: 74870 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T292
DrwNo: 167.23.1219.23583
RDF / RTT 06/16/2023
38'
5'1"13
5'1"13
9'11"11
4'9"14
14'3"
4'3"5
19'
4'9"
23'9"
4'9"
28'0"5
4'3"5
32'10"3
4'9"14
38'
5'1"13
9'7"13
9'7"13
14'3"
4'7"4
19'
4'9"
23'9"
4'9"
28'4"3
4'7"4
38'
9'7"131'2"
4"14'5"154'11"8A
B
C
D EFGH
I
J
KLMNOP
5
12
3X10(A1)
1.5X3
3X10
5X6 3X4
3X4 H0308
3X8
1.5X3 3X4
3X4 5X6
3X10
1.5X3
3X10(B1)
$%Lbl:3EB?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1909 /- /- /1138 /- /76
I 1803 /- /- /1066 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 1.9 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 304 - 2976
B - C 270 -3897
C - D 293 - 3324
E - F 338 -3639
Chords Tens. Comp.
F - G 305 -2982
G - H 294 -3331
H - I 274 -3925
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3518 - 205
P - O 3517 - 207
O - N 3643 - 181
N - M 3643 - 181
Chords Tens. Comp.
M - L 3643 -181
L - K 3634 - 163
K - J 3545 -189
J - I 3547 -187
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 72 -616
O - D 962 - 39
O - E 102 - 897
Webs Tens. Comp.
F - K 102 - 888
G - K 975 -41
K - H 77 -629
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.50 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.234 N 999 240
VERT(CL): 0.554 N 817 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.190 I - -
Creep Factor: 2.0
Max TC CSI: 0.976
Max BC CSI: 0.813
Max Web CSI: 0.735
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EC
Ply: 1SEQN: 74871 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T293
DrwNo: 167.23.1219.41137
RDF / RTT 06/16/2023
38'
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
38'
5'11"13
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
38'
5'11"131'2"
4"15'2"45'7"13A
B
C
D EFG
H
I
JKLMNOP
5
12
3X10(A1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 3X10(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1909 /- /- /1138 /- /76
I 1803 /- /- /1066 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 1.9 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 304 - 2976
B - C 270 -3897
C - D 293 - 3324
E - F 338 -3639
Chords Tens. Comp.
F - G 305 -2982
G - H 294 -3331
H - I 274 -3925
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3518 - 205
P - O 3517 - 207
O - N 3643 - 181
N - M 3643 - 181
Chords Tens. Comp.
M - L 3643 -181
L - K 3634 - 163
K - J 3545 -189
J - I 3547 -187
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 72 -616
O - D 962 - 39
O - E 102 - 897
Webs Tens. Comp.
F - K 102 - 888
G - K 975 -41
K - H 77 -629
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.50 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.234 N 999 240
VERT(CL): 0.554 N 817 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.190 I - -
Creep Factor: 2.0
Max TC CSI: 0.976
Max BC CSI: 0.813
Max Web CSI: 0.735
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EC
Ply: 1SEQN: 74871 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T293
DrwNo: 167.23.1219.41137
RDF / RTT 06/16/2023
38'
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
38'
5'11"13
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
38'
5'11"131'2"
4"15'2"45'7"13A
B
C
D EFG
H
I
JKLMNOP
5
12
3X10(A1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 3X10(B1)
$%Lbl:3EC?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 47 13.67 24.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1954 /- /- /1143 /- /87
I 1848 /- /- /1070 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 293 - 2901
B - C 238 -3966
C - D 273 - 3251
E - F 297 -3253
Chords Tens. Comp.
F - G 294 -2904
G - H 273 -3256
H - I 242 -3989
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3572 - 165
P - O 3569 - 167
O - N 3247 - 110
N - M 3240 - 122
M - L 2373 -35
Chords Tens. Comp.
M - L 866 -79
L - K 3247 - 109
K - J 3593 -148
J - I 3596 -146
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 71 -745
O - D 993 - 61
O - E 105 - 895
Webs Tens. Comp.
F - K 103 - 888
G - K 995 -62
K - H 75 -767
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.91 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.210 M 999 240
VERT(CL): 0.481 L 940 180
HORZ(LL): 0.074 I - -
HORZ(TL): 0.178 I - -
Creep Factor: 2.0
Max TC CSI: 0.992
Max BC CSI: 0.943
Max Web CSI: 0.593
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ED
Ply: 1SEQN: 74872 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T294
DrwNo: 167.23.1220.02450
RDF / RTT 06/16/2023
T2
B2
38'
6'11"13
6'11"13
13'7"11
6'7"14
16'4"4
2'8"9
21'7"12
5'3"8
24'4"5
2'8"9
31'0"3
6'7"14
38'
6'11"13
6'11"13
6'11"13
13'1"6
6'1"10
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'0"3
6'1"10
38'
6'11"131'2"
4"13"86'0"46'5"13A
B
C
D EFG
H
I
JKLMNOP
5 12
3X10(A1)1.5X3
3X4
3X8
4X6 3X4
3X6 2X32X3H0308
3X6
3X4 4X6
3X8
3X4
1.5X3 3X10(B1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 47 13.67 24.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1954 /- /- /1143 /- /87
I 1848 /- /- /1070 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 293 - 2901
B - C 238 -3966
C - D 273 - 3251
E - F 297 -3253
Chords Tens. Comp.
F - G 294 -2904
G - H 273 -3256
H - I 242 -3989
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3572 - 165
P - O 3569 - 167
O - N 3247 - 110
N - M 3240 - 122
M - L 2373 -35
Chords Tens. Comp.
M - L 866 -79
L - K 3247 - 109
K - J 3593 -148
J - I 3596 -146
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 71 -745
O - D 993 - 61
O - E 105 - 895
Webs Tens. Comp.
F - K 103 - 888
G - K 995 -62
K - H 75 -767
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.91 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.210 M 999 240
VERT(CL): 0.481 L 940 180
HORZ(LL): 0.074 I - -
HORZ(TL): 0.178 I - -
Creep Factor: 2.0
Max TC CSI: 0.992
Max BC CSI: 0.943
Max Web CSI: 0.593
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ED
Ply: 1SEQN: 74872 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T294
DrwNo: 167.23.1220.02450
RDF / RTT 06/16/2023
T2
B2
38'
6'11"13
6'11"13
13'7"11
6'7"14
16'4"4
2'8"9
21'7"12
5'3"8
24'4"5
2'8"9
31'0"3
6'7"14
38'
6'11"13
6'11"13
6'11"13
13'1"6
6'1"10
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'0"3
6'1"10
38'
6'11"131'2"
4"13"86'0"46'5"13A
B
C
D EFG
H
I
JKLMNOP
5 12
3X10(A1)1.5X3
3X4
3X8
4X6 3X4
3X6 2X32X3H0308
3X6
3X4 4X6
3X8
3X4
1.5X3 3X10(B1)
19'
90#
19'
$%Lbl:3ED?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 39.28
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: From 5 plf at 38.00 to 5 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2250 /- /- /1324 /- /121
K 2250 /- /- /1324 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
K Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 281 -4561
C - D 333 - 3756
D - F 408 - 3361
F - G 394 - 3730
Chords Tens. Comp.
G - I 408 -3361
I - J 333 -3756
J - K 282 -4561
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 4106 - 184
S - R 4103 - 186
R - Q 3723 - 120
Q - P 3715 - 149
P - O 2705 -38
Chords Tens. Comp.
P - O 1009 -99
O - N 3723 - 118
N - M 4103 - 152
M - K 4106 -149
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 64 -821
R - D 1091 - 81
R - F 143 - 988
Webs Tens. Comp.
G - N 143 - 988
I - N 1091 - 81
N - J 64 -821
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.33 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.233 P 999 240
VERT(CL): 0.531 O 852 180
HORZ(LL): 0.085 K - -
HORZ(TL): 0.205 K - -
Creep Factor: 2.0
Max TC CSI: 0.971
Max BC CSI: 0.968
Max Web CSI: 0.654
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EE
Ply: 1SEQN: 74873 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T303
DrwNo: 167.23.1220.28467
RDF / RTT 06/16/2023
T2
B2
38'
6'10"10
6'10"10
13'8"
6'9"6
16'4"4
2'8"4
21'7"12
5'3"8
22'4"5
8"9
24'10"10
2'6"5
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"1'2"
4"13"86'10"47'3"13A
B
C
D
E
FGHI
J
K
L
MNOPQRS
5 12
4X8(A2)1.5X3 4X8
5X6
3X6 2X3 H0308
3X6
5X6
4X8 1.5X3 4X8(A2)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 39.28
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: From 5 plf at 38.00 to 5 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2250 /- /- /1324 /- /121
K 2250 /- /- /1324 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
K Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 281 -4561
C - D 333 - 3756
D - F 408 - 3361
F - G 394 - 3730
Chords Tens. Comp.
G - I 408 -3361
I - J 333 -3756
J - K 282 -4561
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 4106 - 184
S - R 4103 - 186
R - Q 3723 - 120
Q - P 3715 - 149
P - O 2705 -38
Chords Tens. Comp.
P - O 1009 -99
O - N 3723 - 118
N - M 4103 - 152
M - K 4106 -149
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 64 -821
R - D 1091 - 81
R - F 143 - 988
Webs Tens. Comp.
G - N 143 - 988
I - N 1091 - 81
N - J 64 -821
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.33 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.233 P 999 240
VERT(CL): 0.531 O 852 180
HORZ(LL): 0.085 K - -
HORZ(TL): 0.205 K - -
Creep Factor: 2.0
Max TC CSI: 0.971
Max BC CSI: 0.968
Max Web CSI: 0.654
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EE
Ply: 1SEQN: 74873 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T303
DrwNo: 167.23.1220.28467
RDF / RTT 06/16/2023
T2
B2
38'
6'10"10
6'10"10
13'8"
6'9"6
16'4"4
2'8"4
21'7"12
5'3"8
22'4"5
8"9
24'10"10
2'6"5
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"1'2"
4"13"86'10"47'3"13A
B
C
D
E
FGHI
J
K
L
MNOPQRS
5 12
4X8(A2)1.5X3 4X8
5X6
3X6 2X3 H0308
3X6
5X6
4X8 1.5X3 4X8(A2)
19'
90#
19'
$%Lbl:3EE?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g); T3,T4 2x4 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 39.28
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: From 5 plf at 38.00 to 5 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.62 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
Laterally brace TC below filler at 24" oc. (D-G)
In lieu of structural panels use purlins to brace all
sloping TC @ 24" oc; all flat TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2250 /- /- /1326 /- /136
I 2250 /- /- /1326 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
I Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 121 -4565
C - D 174 - 3750
D - E 114 - 1378
Chords Tens. Comp.
F - G 115 -1378
G - H 174 -3750
H - I 121 -4565
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 4111 -19
Q - P 4107 - 22
P - O 3320 0
O - N 3388 - 26
N - M 2418 0
Chords Tens. Comp.
N - M 971 -32
M - L 3320 0
L - K 4107 - 3
K - I 4111 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 63 -843
P - D 496 0
D - R 167 - 2177
R - S 138 - 2150
S - T 138 -2159
Webs Tens. Comp.
E - F 119 -1168
T - U 139 -2150
U - G 168 -2177
G - L 496 0
L - H 63 -843
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.88 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.212 N 999 240
VERT(CL): 0.480 M 941 180
HORZ(LL): 0.083 I - -
HORZ(TL): 0.199 I - -
Creep Factor: 2.0
Max TC CSI: 0.847
Max BC CSI: 0.955
Max Web CSI: 0.659
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EF
Ply: 1SEQN: 10849 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T379
DrwNo: 167.23.1249.07830
RDF / RTT 06/16/2023
T2
T3 T4
B2
18'3"8 1'5"18'3"8
38'
6'10"10
6'10"10
13'5"14
6'7"5
18'3"3
4'9"5
20'0"11
1'9"8
24'10"10
4'9"14
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"1'2"
4"15'11"83"87'11"68'4"15A
B
C
D
EF
G
H
I
J
KLMNOPQ
RS TU
5 12
4X8(A2)1.5X3 3X8
5X16
3X6
1.5X3
2X32X3H0308
1.5X3
3X6
5X16
3X8 1.5X3 4X8(A2)
19'
90#
18'3"3
29#
8"1377#8"13
29#
18'3"3
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g); T3,T4 2x4 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 39.28
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: From 5 plf at 38.00 to 5 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.62 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
Laterally brace TC below filler at 24" oc. (D-G)
In lieu of structural panels use purlins to brace all
sloping TC @ 24" oc; all flat TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2250 /- /- /1326 /- /136
I 2250 /- /- /1326 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
I Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 121 -4565
C - D 174 - 3750
D - E 114 - 1378
Chords Tens. Comp.
F - G 115 -1378
G - H 174 -3750
H - I 121 -4565
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 4111 -19
Q - P 4107 - 22
P - O 3320 0
O - N 3388 - 26
N - M 2418 0
Chords Tens. Comp.
N - M 971 -32
M - L 3320 0
L - K 4107 - 3
K - I 4111 -1
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 63 -843
P - D 496 0
D - R 167 - 2177
R - S 138 - 2150
S - T 138 -2159
Webs Tens. Comp.
E - F 119 -1168
T - U 139 -2150
U - G 168 -2177
G - L 496 0
L - H 63 -843
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.88 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.212 N 999 240
VERT(CL): 0.480 M 941 180
HORZ(LL): 0.083 I - -
HORZ(TL): 0.199 I - -
Creep Factor: 2.0
Max TC CSI: 0.847
Max BC CSI: 0.955
Max Web CSI: 0.659
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EF
Ply: 1SEQN: 10849 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T379
DrwNo: 167.23.1249.07830
RDF / RTT 06/16/2023
T2
T3 T4
B2
18'3"8 1'5"18'3"8
38'
6'10"10
6'10"10
13'5"14
6'7"5
18'3"3
4'9"5
20'0"11
1'9"8
24'10"10
4'9"14
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"1'2"
4"15'11"83"87'11"68'4"15A
B
C
D
EF
G
H
I
J
KLMNOPQ
RS TU
5 12
4X8(A2)1.5X3 3X8
5X16
3X6
1.5X3
2X32X3H0308
1.5X3
3X6
5X16
3X8 1.5X3 4X8(A2)
19'
90#
18'3"3
29#
8"1377#8"13
29#
18'3"3
19'
$%Lbl:3EF?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (D-K) 68 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1146 /- /119
M 1952 /- /- /1146 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
M Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 32 -3981
C - D 74 - 3321
D - E 0 -1590
E - F 0 -1555
Chords Tens. Comp.
I - J 44 - 1555
J - K 24 -1590
K - L 86 -3321
L - M 46 - 3981
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 3590 0
U - T 3587 0
T - S 3003 0
S - R 2998 -45
R - Q 2196 0
Chords Tens. Comp.
R - Q 801 -45
Q - P 3003 0
P - O 3587 0
O - M 3590 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 57 -683
T - D 488 0
D - V 166 - 1548
V - W 163 -1562
F - X 39 - 1414
W - Y 121 - 1599
Webs Tens. Comp.
X - I 39 - 1414
Y - Z 121 -1599
Z -AA 155 -1562
AA- K 154 -1548
K - P 494 0
P - L 52 -686
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.86 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.194 Y 999 240
VERT(CL): 0.452 S 999 180
HORZ(LL): 0.072 M - -
HORZ(TL): 0.174 M - -
Creep Factor: 2.0
Max TC CSI: 0.985
Max BC CSI: 0.876
Max Web CSI: 0.479
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EG
Ply: 1SEQN: 74875 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T312
DrwNo: 167.23.1253.02450
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
13'5"14
5"14
18'2"3
4'8"5
25'6"10
7'4"7
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"1'2"
4"15'11"83"87'10"158'4"9A
B
C
D E
F
GH
I
J K
L
M
N
OPQRSTU
VW
X
YZAA
5
12
3X10(A1)1.5X3
3X4
3X8
1.5X4
3X4
3X4
2X3
1.5X31.5X3
2X3
3X4
3X4
1.5X4
3X8
3X4
1.5X3 3X10(A1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (D-K) 68 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1146 /- /119
M 1952 /- /- /1146 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
M Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 32 -3981
C - D 74 - 3321
D - E 0 -1590
E - F 0 -1555
Chords Tens. Comp.
I - J 44 - 1555
J - K 24 -1590
K - L 86 -3321
L - M 46 - 3981
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - U 3590 0
U - T 3587 0
T - S 3003 0
S - R 2998 -45
R - Q 2196 0
Chords Tens. Comp.
R - Q 801 -45
Q - P 3003 0
P - O 3587 0
O - M 3590 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - T 57 -683
T - D 488 0
D - V 166 - 1548
V - W 163 -1562
F - X 39 - 1414
W - Y 121 - 1599
Webs Tens. Comp.
X - I 39 - 1414
Y - Z 121 -1599
Z -AA 155 -1562
AA- K 154 -1548
K - P 494 0
P - L 52 -686
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.86 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.194 Y 999 240
VERT(CL): 0.452 S 999 180
HORZ(LL): 0.072 M - -
HORZ(TL): 0.174 M - -
Creep Factor: 2.0
Max TC CSI: 0.985
Max BC CSI: 0.876
Max Web CSI: 0.479
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EG
Ply: 1SEQN: 74875 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T312
DrwNo: 167.23.1253.02450
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
13'5"14
5"14
18'2"3
4'8"5
25'6"10
7'4"7
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"1'2"
4"15'11"83"87'10"158'4"9A
B
C
D E
F
GH
I
J K
L
M
N
OPQRSTU
VW
X
YZAA
5
12
3X10(A1)1.5X3
3X4
3X8
1.5X4
3X4
3X4
2X3
1.5X31.5X3
2X3
3X4
3X4
1.5X4
3X8
3X4
1.5X3 3X10(A1)
19'
90#
19'
$%Lbl:3EG?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.52 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.52 TC 1.08 14.09
800 52.75 BC 0.00 15.17
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
See DWG VALTN160118 for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q* 114 /- /- /56 /- /3
Wind reactions based on MWFRS
Q Brg Wid = 182 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 440 - 373
Chords Tens. Comp.
E - I 439 -372
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 I 999 240
VERT(CL): 0.022 I 999 180
HORZ(LL): -0.002 D - -
HORZ(TL): 0.007 I - -
Creep Factor: 2.0
Max TC CSI: 0.163
Max BC CSI: 0.216
Max Web CSI: 0.035
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EG0V
Ply: 1SEQN: 74868 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T315
DrwNo: 167.23.1254.00717
RDF / RTT 06/16/2023
15'2"
3'7"1'4"
(TYP)
7'7"
7'7"
15'2"
7'7"
15'2"
15'2"3'1"15A
E
I
M
Q
5
12
3X4(D1)
4X4
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 61.52 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 61.52 TC 1.08 14.09
800 52.75 BC 0.00 15.17
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
See DWG VALTN160118 for valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
Q* 114 /- /- /56 /- /3
Wind reactions based on MWFRS
Q Brg Wid = 182 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 440 - 373
Chords Tens. Comp.
E - I 439 -372
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 I 999 240
VERT(CL): 0.022 I 999 180
HORZ(LL): -0.002 D - -
HORZ(TL): 0.007 I - -
Creep Factor: 2.0
Max TC CSI: 0.163
Max BC CSI: 0.216
Max Web CSI: 0.035
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EG0V
Ply: 1SEQN: 74868 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T315
DrwNo: 167.23.1254.00717
RDF / RTT 06/16/2023
15'2"
3'7"1'4"
(TYP)
7'7"
7'7"
15'2"
7'7"
15'2"
15'2"3'1"15A
E
I
M
Q
5
12
3X4(D1)
4X4
3X4(D1)
$%Lbl:3EG0V?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC(D-G) 53 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2054 /- /- /155 /- /-
I 2054 /- /- /155 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.2 (Truss)
I Brg Wid = 3.5 Min Req = 2.2 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 143 -4232
C - D 187 - 3586
D - E 71 - 1566
Chords Tens. Comp.
F - G 73 - 1566
G - H 188 -3586
H - I 144 -4232
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3820 -56
Q - P 3817 - 58
P - O 3337 -6
O - N 3333 - 36
N - M 2313 0
Chords Tens. Comp.
N - M 1019 - 41
M - L 3337 -4
L - K 3817 - 42
K - I 3820 -40
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 52 -663
P - D 604 -7
P - S 118 - 497
D - R 185 - 1841
R - S 184 - 1857
E - T 75 -1362
S - U 173 -1980
T - U 61 -562
Webs Tens. Comp.
T - F 75 - 1362
U - V 173 -1980
V - W 186 -1857
V - L 118 -497
W - G 187 - 1841
G - L 604 -6
L - H 52 -663
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.44 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.236 U 999 240
VERT(CL): 0.550 U 822 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.187 I - -
Creep Factor: 2.0
Max TC CSI: 0.975
Max BC CSI: 0.885
Max Web CSI: 0.463
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EH
Ply: 1SEQN: 74876 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T311
DrwNo: 167.23.1255.09090
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
16'2"8
3'2"8
21'9"13
5'7"5
25'6"10
3'8"13
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"1'2"
4"13"87'0"157'6"9A
B
C
D
EF
G
H
I
J
KLMNOPQ
RS
T
UVW512
3X10(A1)1.5X3 3X8
3X6
3X6 2X3
1.5X31.5X3
2X3H0308
3X6
3X6
3X8 1.5X3 3X10(A1)
16'2"3
111#
2'9"13
505#
2'9"13
111#
19'19'
90#
16'2"3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC(D-G) 53 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2054 /- /- /155 /- /-
I 2054 /- /- /155 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.2 (Truss)
I Brg Wid = 3.5 Min Req = 2.2 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 143 -4232
C - D 187 - 3586
D - E 71 - 1566
Chords Tens. Comp.
F - G 73 - 1566
G - H 188 -3586
H - I 144 -4232
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3820 -56
Q - P 3817 - 58
P - O 3337 -6
O - N 3333 - 36
N - M 2313 0
Chords Tens. Comp.
N - M 1019 - 41
M - L 3337 -4
L - K 3817 - 42
K - I 3820 -40
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 52 -663
P - D 604 -7
P - S 118 - 497
D - R 185 - 1841
R - S 184 - 1857
E - T 75 -1362
S - U 173 -1980
T - U 61 -562
Webs Tens. Comp.
T - F 75 - 1362
U - V 173 -1980
V - W 186 -1857
V - L 118 -497
W - G 187 - 1841
G - L 604 -6
L - H 52 -663
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.44 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.236 U 999 240
VERT(CL): 0.550 U 822 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.187 I - -
Creep Factor: 2.0
Max TC CSI: 0.975
Max BC CSI: 0.885
Max Web CSI: 0.463
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EH
Ply: 1SEQN: 74876 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T311
DrwNo: 167.23.1255.09090
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
16'2"8
3'2"8
21'9"13
5'7"5
25'6"10
3'8"13
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"1'2"
4"13"87'0"157'6"9A
B
C
D
EF
G
H
I
J
KLMNOPQ
RS
T
UVW512
3X10(A1)1.5X3 3X8
3X6
3X6 2X3
1.5X31.5X3
2X3H0308
3X6
3X6
3X8 1.5X3 3X10(A1)
16'2"3
111#
2'9"13
505#
2'9"13
111#
19'19'
90#
16'2"3
$%Lbl:3EH?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 38 14.88 23.13
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2102 /- /- /1673 /- /2401
I 2208 /- /- /1728 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.2 (Truss)
I Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 274 - 3342
A - B 202 -4672
B - C 242 -4243
C - D 262 - 3701
Chords Tens. Comp.
E - F 274 -3339
F - G 263 -3697
G - H 241 -4233
H - I 197 -4639
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 4238 - 127
R - Q 4237 - 129
Q - P 3842 - 101
P - O 3793 -50
O - N 3793 - 50
Chords Tens. Comp.
N - M 3793 - 50
M - L 3834 -82
L - K 4203 - 105
K - I 4204 -103
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 40 -517
Q - C 436 0
C - P 80 -689
P - D 1154 -45
P - E 66 -759
Webs Tens. Comp.
E - M 67 -765
F - M 1154 - 44
M - G 79 -683
G - L 431 0
L - H 32 -502
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.16 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.254 O 999 240
VERT(CL): 0.587 O 770 180
HORZ(LL): 0.094 I - -
HORZ(TL): 0.214 I - -
Creep Factor: 2.0
Max TC CSI: 0.999
Max BC CSI: 0.953
Max Web CSI: 0.737
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EJ
Ply: 1SEQN: 74981 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T310
DrwNo: 167.23.1256.04517
RDF / RTT 06/16/2023
38'
5'3"5
5'3"5
9'10"13
4'7"8
14'10"3
4'11"6
19'
4'1"13
23'1"13
4'1"13
28'1"3
4'11"6
32'8"11
4'7"8
38'
5'3"5
5'3"5
5'3"5
9'10"13
4'7"8
14'6"5
4'7"8
19'
4'5"11
23'5"11
4'5"11
28'1"3
4'7"8
32'8"11
4'7"8
38'
5'3"5 1'2"
4"16'6"56'11"14A
B
C
D EF
G
H
I
J
KLMNOPQR
5
12
4X8(A2)1.5X3
3X4
3X4
3X4
3X8
5X6 3X8
1.5X3H0308
5X6
3X8
3X4
3X4
3X4
1.5X3 4X8(A2)
14'10"3
158#
4'
442#3"10
442#
4'
158#
14'10"3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 38 14.88 23.13
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2102 /- /- /1673 /- /2401
I 2208 /- /- /1728 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.2 (Truss)
I Brg Wid = 3.5 Min Req = 2.4 (Truss)
Bearings A & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 274 - 3342
A - B 202 -4672
B - C 242 -4243
C - D 262 - 3701
Chords Tens. Comp.
E - F 274 -3339
F - G 263 -3697
G - H 241 -4233
H - I 197 -4639
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 4238 - 127
R - Q 4237 - 129
Q - P 3842 - 101
P - O 3793 -50
O - N 3793 - 50
Chords Tens. Comp.
N - M 3793 - 50
M - L 3834 -82
L - K 4203 - 105
K - I 4204 -103
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - Q 40 -517
Q - C 436 0
C - P 80 -689
P - D 1154 -45
P - E 66 -759
Webs Tens. Comp.
E - M 67 -765
F - M 1154 - 44
M - G 79 -683
G - L 431 0
L - H 32 -502
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.16 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.254 O 999 240
VERT(CL): 0.587 O 770 180
HORZ(LL): 0.094 I - -
HORZ(TL): 0.214 I - -
Creep Factor: 2.0
Max TC CSI: 0.999
Max BC CSI: 0.953
Max Web CSI: 0.737
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EJ
Ply: 1SEQN: 74981 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T310
DrwNo: 167.23.1256.04517
RDF / RTT 06/16/2023
38'
5'3"5
5'3"5
9'10"13
4'7"8
14'10"3
4'11"6
19'
4'1"13
23'1"13
4'1"13
28'1"3
4'11"6
32'8"11
4'7"8
38'
5'3"5
5'3"5
5'3"5
9'10"13
4'7"8
14'6"5
4'7"8
19'
4'5"11
23'5"11
4'5"11
28'1"3
4'7"8
32'8"11
4'7"8
38'
5'3"5 1'2"
4"16'6"56'11"14A
B
C
D EF
G
H
I
J
KLMNOPQR
5
12
4X8(A2)1.5X3
3X4
3X4
3X4
3X8
5X6 3X8
1.5X3H0308
5X6
3X8
3X4
3X4
3X4
1.5X3 4X8(A2)
14'10"3
158#
4'
442#3"10
442#
4'
158#
14'10"3
$%Lbl:3EJ?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2400 # ( 63.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2400 63.16 TC 0.00 38.00
2400 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EJ
Ply: 1
Qty: 1
SEQN: 74981 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T310
DrwNo: 167.23.1256.04517
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2400 # ( 63.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2400 63.16 TC 0.00 38.00
2400 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EJ
Ply: 1
Qty: 1
SEQN: 74981 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T310
DrwNo: 167.23.1256.04517
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 34 13.00 25.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2178 /- /- /157 /- /-
H 2178 /- /- /157 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.3 (Truss)
H Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings A & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 305 - 3746
A - B 257 -4829
B - C 286 -4173
D - E 321 - 4488
Chords Tens. Comp.
E - F 306 -3746
F - G 287 -4173
G - H 258 -4829
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 4373 - 187
O - N 4370 - 189
N - M 4483 - 144
M - L 4498 - 125
Chords Tens. Comp.
L - K 4498 - 125
K - J 4498 -125
J - I 4370 -167
I - H 4373 - 165
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 73 -676
N - C 1361 - 46
N - D 85 - 1215
Webs Tens. Comp.
E - J 84 -1211
F - J 1345 - 45
J - G 73 -675
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.04 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.272 K 999 240
VERT(CL): 0.628 K 720 180
HORZ(LL): 0.102 H - -
HORZ(TL): 0.235 H - -
Creep Factor: 2.0
Max TC CSI: 0.962
Max BC CSI: 0.934
Max Web CSI: 0.847
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EK
Ply: 1SEQN: 74878 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T309
DrwNo: 167.23.1257.11557
RDF / RTT 06/16/2023
T2
38'
6'6"10
6'6"10
12'11"11
6'5"1
16'2"8
3'2"13
21'6"
5'3"8
25'0"5
3'6"5
31'5"6
6'5"1
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'2"8
3'9"2
21'6"
5'3"8
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"10
4"15'8"15A
B
C DEF
G
H
IJKLMNO
5 12
3X12(B3)1.5X3
3X4
4X8
3X12 3X4
3X4 H0310
4X8
1.5X3
3X12
4X8
3X4
1.5X3 3X12(B3)
12'11"11
158#
4'
442#
4'0"10
442#
4'
158#
12'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 34 13.00 25.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 2178 /- /- /157 /- /-
H 2178 /- /- /157 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 2.3 (Truss)
H Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings A & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 305 - 3746
A - B 257 -4829
B - C 286 -4173
D - E 321 - 4488
Chords Tens. Comp.
E - F 306 -3746
F - G 287 -4173
G - H 258 -4829
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 4373 - 187
O - N 4370 - 189
N - M 4483 - 144
M - L 4498 - 125
Chords Tens. Comp.
L - K 4498 - 125
K - J 4498 -125
J - I 4370 -167
I - H 4373 - 165
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 73 -676
N - C 1361 - 46
N - D 85 - 1215
Webs Tens. Comp.
E - J 84 -1211
F - J 1345 - 45
J - G 73 -675
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.04 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.272 K 999 240
VERT(CL): 0.628 K 720 180
HORZ(LL): 0.102 H - -
HORZ(TL): 0.235 H - -
Creep Factor: 2.0
Max TC CSI: 0.962
Max BC CSI: 0.934
Max Web CSI: 0.847
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EK
Ply: 1SEQN: 74878 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T309
DrwNo: 167.23.1257.11557
RDF / RTT 06/16/2023
T2
38'
6'6"10
6'6"10
12'11"11
6'5"1
16'2"8
3'2"13
21'6"
5'3"8
25'0"5
3'6"5
31'5"6
6'5"1
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'2"8
3'9"2
21'6"
5'3"8
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"10
4"15'8"15A
B
C DEF
G
H
IJKLMNO
5 12
3X12(B3)1.5X3
3X4
4X8
3X12 3X4
3X4 H0310
4X8
1.5X3
3X12
4X8
3X4
1.5X3 3X12(B3)
12'11"11
158#
4'
442#
4'0"10
442#
4'
158#
12'11"11
$%Lbl:3EK?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1792 /- /- /1059 /- /66
H 1790 /- /- /1055 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.9 (Truss)
H Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 310 - 2957
A - B 280 -3898
B - C 300 -3304
D - E 345 - 3585
Chords Tens. Comp.
E - F 308 -2919
F - G 297 -3257
G - H 270 -3720
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 3523 - 219
O - N 3520 - 221
N - M 3607 - 192
M - L 3607 - 192
Chords Tens. Comp.
L - K 3607 - 192
K - J 3579 -173
J - I 3342 -188
I - H 3342 - 186
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 76 -630
N - C 956 - 42
N - D 103 - 875
Webs Tens. Comp.
E - J 105 -900
F - J 934 -42
J - G 68 -521
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.76 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.231 K 999 240
VERT(CL): 0.550 K 817 180
HORZ(LL): 0.081 H - -
HORZ(TL): 0.192 H - -
Creep Factor: 2.0
Max TC CSI: 0.958
Max BC CSI: 0.964
Max Web CSI: 0.739
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EL
Ply: 1SEQN: 74879 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T308
DrwNo: 167.23.1257.15960
RDF / RTT 06/16/2023
37'8"8
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
37'8"8
5'8"5
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
37'8"8
5'8"5
4"1 5"85'2"4A
B
C DEF
G
H
IJKLMNO
5
12
3X10(B1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 5X6(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1792 /- /- /1059 /- /66
H 1790 /- /- /1055 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.9 (Truss)
H Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 310 - 2957
A - B 280 -3898
B - C 300 -3304
D - E 345 - 3585
Chords Tens. Comp.
E - F 308 -2919
F - G 297 -3257
G - H 270 -3720
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 3523 - 219
O - N 3520 - 221
N - M 3607 - 192
M - L 3607 - 192
Chords Tens. Comp.
L - K 3607 - 192
K - J 3579 -173
J - I 3342 -188
I - H 3342 - 186
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - N 76 -630
N - C 956 - 42
N - D 103 - 875
Webs Tens. Comp.
E - J 105 -900
F - J 934 -42
J - G 68 -521
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.76 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.231 K 999 240
VERT(CL): 0.550 K 817 180
HORZ(LL): 0.081 H - -
HORZ(TL): 0.192 H - -
Creep Factor: 2.0
Max TC CSI: 0.958
Max BC CSI: 0.964
Max Web CSI: 0.739
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EL
Ply: 1SEQN: 74879 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T308
DrwNo: 167.23.1257.15960
RDF / RTT 06/16/2023
37'8"8
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
37'8"8
5'8"5
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
37'8"8
5'8"5
4"1 5"85'2"4A
B
C DEF
G
H
IJKLMNO
5
12
3X10(B1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 5X6(B1)
$%Lbl:3EL?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 9.67 28.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1792 /- /- /1052 /- /55
I 1790 /- /- /1049 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.9 (Truss)
I Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 315 - 3163
A - B 339 -3923
B - C 307 -3515
D - E 395 - 4186
Chords Tens. Comp.
E - F 392 -4157
F - G 309 -3083
G - H 301 -3420
H - I 329 -3754
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 3557 - 282
O - N 4163 - 268
N - M 4472 - 272
M - L 4472 - 272
Chords Tens. Comp.
L - K 4472 - 272
K - J 4131 -243
J - I 3375 -249
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 107 - 420
O - C 1094 - 47
O - D 145 - 1283
N - E 47 -423
Webs Tens. Comp.
E - K 49 -446
K - F 386 0
F - J 149 -1344
G - J 1039 - 44
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.35 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.279 M 999 240
VERT(CL): 0.663 M 677 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.191 I - -
Creep Factor: 2.0
Max TC CSI: 0.984
Max BC CSI: 0.817
Max Web CSI: 0.869
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EM
Ply: 1SEQN: 74880 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T307
DrwNo: 167.23.1257.21410
RDF / RTT 06/16/2023
37'8"8
4'11"13
4'11"13
9'7"11
4'7"14
14'1"
4'5"5
19'
4'11"
23'11"
4'11"
28'4"5
4'5"5
33'0"3
4'7"14
37'8"8
4'8"5
9'3"13
9'3"13
14'1"
4'9"4
19'
4'11"
23'11"
4'11"
28'8"3
4'9"4
37'8"8
9'0"5
4"1 5"84'4"4A
B
C DEFG
H
I
JKLMNO
5
12
3X10(B1)
1.5X3
3X10
5X6 4X4
3X4
3X8
1.5X3H0308 3X4
4X4 5X6
4X8
1.5X3
5X6(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 9.67 28.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 1792 /- /- /1052 /- /55
I 1790 /- /- /1049 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.9 (Truss)
I Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 315 - 3163
A - B 339 -3923
B - C 307 -3515
D - E 395 - 4186
Chords Tens. Comp.
E - F 392 -4157
F - G 309 -3083
G - H 301 -3420
H - I 329 -3754
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - O 3557 - 282
O - N 4163 - 268
N - M 4472 - 272
M - L 4472 - 272
Chords Tens. Comp.
L - K 4472 - 272
K - J 4131 -243
J - I 3375 -249
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - O 107 - 420
O - C 1094 - 47
O - D 145 - 1283
N - E 47 -423
Webs Tens. Comp.
E - K 49 -446
K - F 386 0
F - J 149 -1344
G - J 1039 - 44
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.35 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.279 M 999 240
VERT(CL): 0.663 M 677 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.191 I - -
Creep Factor: 2.0
Max TC CSI: 0.984
Max BC CSI: 0.817
Max Web CSI: 0.869
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EM
Ply: 1SEQN: 74880 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T307
DrwNo: 167.23.1257.21410
RDF / RTT 06/16/2023
37'8"8
4'11"13
4'11"13
9'7"11
4'7"14
14'1"
4'5"5
19'
4'11"
23'11"
4'11"
28'4"5
4'5"5
33'0"3
4'7"14
37'8"8
4'8"5
9'3"13
9'3"13
14'1"
4'9"4
19'
4'11"
23'11"
4'11"
28'8"3
4'9"4
37'8"8
9'0"5
4"1 5"84'4"4A
B
C DEFG
H
I
JKLMNO
5
12
3X10(B1)
1.5X3
3X10
5X6 4X4
3X4
3X8
1.5X3H0308 3X4
4X4 5X6
4X8
1.5X3
5X6(B1)
$%Lbl:3EM?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 56 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 4513 /- /- /406 /- /-
J 4543 /- /- /405 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.6 (Truss)
J Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3185
A - B 0 -3463
C - D 0 -4367
D - E 0 -4978
E - F 0 -4951
Chords Tens. Comp.
F - G 0 -4315
G - H 0 -4315
H - I 0 -3096
I - J 0 -3374
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 3158 0
R - Q 4314 0
Q - P 4958 0
P - O 5179 0
O - N 5179 0
Chords Tens. Comp.
N - M 5179 0
M - L 4929 0
L - K 4257 0
K - J 3071 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - C 0 -1503
B - R 1045 0
C - Q 561 0
Q - D 0 -781
Webs Tens. Comp.
F - L 0 -812
L - H 614 0
H - K 0 -1545
K - I 1002 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.376 N 999 240
VERT(CL): 0.885 N 507 180
HORZ(LL): 0.098 J - -
HORZ(TL): 0.231 J - -
Creep Factor: 2.0
Max TC CSI: 0.995
Max BC CSI: 0.976
Max Web CSI: 0.425
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EN
Ply: 3SEQN: 74881 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T306
DrwNo: 167.23.1257.47577
RDF / RTT 06/16/2023
3 Complete Trusses Required
37'8"8
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
37'8"8
7'8"3
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
37'8"8
7'4"5
4"1 5"83'7"15A
B CD E FGHI
J
KLMNOPQR
5
12
4X6(A2)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(B10R)
794#
22'0"10
794#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 56 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 4513 /- /- /406 /- /-
J 4543 /- /- /405 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.6 (Truss)
J Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -3185
A - B 0 -3463
C - D 0 -4367
D - E 0 -4978
E - F 0 -4951
Chords Tens. Comp.
F - G 0 -4315
G - H 0 -4315
H - I 0 -3096
I - J 0 -3374
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - R 3158 0
R - Q 4314 0
Q - P 4958 0
P - O 5179 0
O - N 5179 0
Chords Tens. Comp.
N - M 5179 0
M - L 4929 0
L - K 4257 0
K - J 3071 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
R - C 0 -1503
B - R 1045 0
C - Q 561 0
Q - D 0 -781
Webs Tens. Comp.
F - L 0 -812
L - H 614 0
H - K 0 -1545
K - I 1002 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.376 N 999 240
VERT(CL): 0.885 N 507 180
HORZ(LL): 0.098 J - -
HORZ(TL): 0.231 J - -
Creep Factor: 2.0
Max TC CSI: 0.995
Max BC CSI: 0.976
Max Web CSI: 0.425
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EN
Ply: 3SEQN: 74881 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T306
DrwNo: 167.23.1257.47577
RDF / RTT 06/16/2023
3 Complete Trusses Required
37'8"8
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
37'8"8
7'8"3
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
37'8"8
7'4"5
4"1 5"83'7"15A
B CD E FGHI
J
KLMNOPQR
5
12
4X6(A2)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(B10R)
794#
22'0"10
794#
$%Lbl:3EN?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 55 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 4650 /- /- /424 /- /-
K 4648 /- /- /423 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
K Brg Wid = 3.5 Min Req = 1.7 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3229
B - C 0 -3507
D - E 0 -4402
E - F 0 -5033
F - G 0 -5033
Chords Tens. Comp.
G - H 0 -4402
H - I 0 -4402
I - J 0 -3228
J - K 0 -3506
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 3204 0
T - S 4347 0
S - R 5012 0
R - Q 5245 0
Q - P 5245 0
Chords Tens. Comp.
P - O 5245 0
O - N 5011 0
N - M 4347 0
M - K 3203 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - D 0 -1492
C - T 1028 0
D - S 582 0
S - E 0 -806
Webs Tens. Comp.
G - N 0 -807
N - I 583 0
I - M 0 -1492
M - J 1028 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.378 P 999 240
VERT(CL): 0.889 P 509 180
HORZ(LL): 0.095 K - -
HORZ(TL): 0.224 K - -
Creep Factor: 2.0
Max TC CSI: 0.995
Max BC CSI: 0.908
Max Web CSI: 0.418
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EO
Ply: 3SEQN: 74882 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T322
DrwNo: 167.23.1312.40200
RDF / RTT 06/16/2023
3 Complete Trusses Required
38'
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
38'
7'11"11
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
38'
7'7"131'2"1'2"
4"13'7"154'1"8A
B
C DE F GHIJ
K
L
MNOPQRST
5
12
4X6(A2T)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(A2T)
794#
22'0"10
794#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 5.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Repeat nailing as each layer is applied. Use equal
spacing between rows and stagger nails in each row
to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 55 8.00 30.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 7-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 4650 /- /- /424 /- /-
K 4648 /- /- /423 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.7 (Truss)
K Brg Wid = 3.5 Min Req = 1.7 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 0 -3229
B - C 0 -3507
D - E 0 -4402
E - F 0 -5033
F - G 0 -5033
Chords Tens. Comp.
G - H 0 -4402
H - I 0 -4402
I - J 0 -3228
J - K 0 -3506
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 3204 0
T - S 4347 0
S - R 5012 0
R - Q 5245 0
Q - P 5245 0
Chords Tens. Comp.
P - O 5245 0
O - N 5011 0
N - M 4347 0
M - K 3203 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
T - D 0 -1492
C - T 1028 0
D - S 582 0
S - E 0 -806
Webs Tens. Comp.
G - N 0 -807
N - I 583 0
I - M 0 -1492
M - J 1028 0
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.73 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Yes
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.378 P 999 240
VERT(CL): 0.889 P 509 180
HORZ(LL): 0.095 K - -
HORZ(TL): 0.224 K - -
Creep Factor: 2.0
Max TC CSI: 0.995
Max BC CSI: 0.908
Max Web CSI: 0.418
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EO
Ply: 3SEQN: 74882 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T322
DrwNo: 167.23.1312.40200
RDF / RTT 06/16/2023
3 Complete Trusses Required
38'
7'11"11
7'11"11
11'4"1
3'4"6
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'0"5
3'4"6
38'
7'11"11
7'7"13
7'7"13
11'4"1
3'8"4
15'2"
3'10"
19'
3'10"
22'10"
3'10"
26'7"15
3'10"
30'4"3
3'8"4
38'
7'7"131'2"1'2"
4"13'7"154'1"8A
B
C DE F GHIJ
K
L
MNOPQRST
5
12
4X6(A2T)
5X6
4X4
4X4
3X4
3X4
3X4 H0310
3X8
1.5X3 3X4
3X43X6
3X4
4X4
4X4
5X6
4X6(A2T)
794#
22'0"10
794#
$%Lbl:3EO?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EO
Ply: 3
Qty: 1
SEQN: 74882 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T322
DrwNo: 167.23.1312.40200
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EO
Ply: 3
Qty: 1
SEQN: 74882 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T322
DrwNo: 167.23.1312.40200
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 34 10.00 28.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1907 /- /- /1132 /- /73
J 1907 /- /- /1132 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 304 - 3139
B - C 325 -3911
C - D 294 - 3491
E - F 375 -4080
Chords Tens. Comp.
F - G 375 -4079
G - H 304 -3139
H - I 294 -3491
I - J 325 -3911
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3541 - 240
Q - P 4057 - 218
P - O 4353 - 219
O - N 4353 - 219
Chords Tens. Comp.
N - M 4353 - 219
M - L 4057 -200
L - J 3541 - 222
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 107 - 428
Q - D 1085 - 42
Q - E 139 - 1213
P - F 45 -413
Webs Tens. Comp.
F - M 45 -414
G - L 139 -1213
H - L 1085 - 42
L - I 108 - 428
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.15 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.270 N 999 240
VERT(CL): 0.636 N 711 180
HORZ(LL): 0.078 J - -
HORZ(TL): 0.183 J - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.834
Max Web CSI: 0.772
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EP
Ply: 1SEQN: 74883 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T323
DrwNo: 167.23.1313.06890
RDF / RTT 06/16/2023
38'
5'1"13
5'1"13
9'11"11
4'9"14
14'3"
4'3"5
19'
4'9"
23'9"
4'9"
28'0"5
4'3"5
32'10"3
4'9"14
38'
5'1"13
9'7"13
9'7"13
14'3"
4'7"4
19'
4'9"
23'9"
4'9"
28'4"3
4'7"4
38'
9'7"131'2"1'2"
4"14'5"154'11"8A
B
C
D EFGH
I
J
K
LMNOPQ
5
12
3X10(A1)
1.5X3
3X10
5X6 3X4
3X4 H0308
3X8
1.5X3 3X4
3X4 5X6
3X10
1.5X3
3X10(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 34 10.00 28.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1907 /- /- /1132 /- /73
J 1907 /- /- /1132 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
J Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 304 - 3139
B - C 325 -3911
C - D 294 - 3491
E - F 375 -4080
Chords Tens. Comp.
F - G 375 -4079
G - H 304 -3139
H - I 294 -3491
I - J 325 -3911
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3541 - 240
Q - P 4057 - 218
P - O 4353 - 219
O - N 4353 - 219
Chords Tens. Comp.
N - M 4353 - 219
M - L 4057 -200
L - J 3541 - 222
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 107 - 428
Q - D 1085 - 42
Q - E 139 - 1213
P - F 45 -413
Webs Tens. Comp.
F - M 45 -414
G - L 139 -1213
H - L 1085 - 42
L - I 108 - 428
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.15 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.270 N 999 240
VERT(CL): 0.636 N 711 180
HORZ(LL): 0.078 J - -
HORZ(TL): 0.183 J - -
Creep Factor: 2.0
Max TC CSI: 0.998
Max BC CSI: 0.834
Max Web CSI: 0.772
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EP
Ply: 1SEQN: 74883 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T323
DrwNo: 167.23.1313.06890
RDF / RTT 06/16/2023
38'
5'1"13
5'1"13
9'11"11
4'9"14
14'3"
4'3"5
19'
4'9"
23'9"
4'9"
28'0"5
4'3"5
32'10"3
4'9"14
38'
5'1"13
9'7"13
9'7"13
14'3"
4'7"4
19'
4'9"
23'9"
4'9"
28'4"3
4'7"4
38'
9'7"131'2"1'2"
4"14'5"154'11"8A
B
C
D EFGH
I
J
K
LMNOPQ
5
12
3X10(A1)
1.5X3
3X10
5X6 3X4
3X4 H0308
3X8
1.5X3 3X4
3X4 5X6
3X10
1.5X3
3X10(A1)
$%Lbl:3EP?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1907 /- /- /1138 /- /82
I 1907 /- /- /1138 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 303 - 2972
B - C 269 -3892
C - D 291 - 3318
E - F 337 -3629
Chords Tens. Comp.
F - G 303 -2971
G - H 291 -3318
H - I 269 -3892
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3514 - 182
Q - P 3512 - 184
P - O 3635 - 158
O - N 3635 - 158
Chords Tens. Comp.
N - M 3635 - 158
M - L 3624 -140
L - K 3512 - 166
K - I 3514 -164
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 72 -616
P - D 960 -38
P - E 101 - 893
Webs Tens. Comp.
F - L 102 - 889
G - L 968 -40
L - H 73 -616
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.50 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.235 M 999 240
VERT(CL): 0.553 M 817 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.189 I - -
Creep Factor: 2.0
Max TC CSI: 0.973
Max BC CSI: 0.807
Max Web CSI: 0.733
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EQ
Ply: 1SEQN: 74884 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T324
DrwNo: 167.23.1313.15710
RDF / RTT 06/16/2023
38'
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
38'
5'11"13
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
38'
5'11"131'2"1'2"
4"15'2"45'7"13A
B
C
D EFG
H
I
J
KLMNOPQ
5
12
3X10(A1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 3X10(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1907 /- /- /1138 /- /82
I 1907 /- /- /1138 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 303 - 2972
B - C 269 -3892
C - D 291 - 3318
E - F 337 -3629
Chords Tens. Comp.
F - G 303 -2971
G - H 291 -3318
H - I 269 -3892
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3514 - 182
Q - P 3512 - 184
P - O 3635 - 158
O - N 3635 - 158
Chords Tens. Comp.
N - M 3635 - 158
M - L 3624 -140
L - K 3512 - 166
K - I 3514 -164
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 72 -616
P - D 960 -38
P - E 101 - 893
Webs Tens. Comp.
F - L 102 - 889
G - L 968 -40
L - H 73 -616
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.50 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.235 M 999 240
VERT(CL): 0.553 M 817 180
HORZ(LL): 0.080 I - -
HORZ(TL): 0.189 I - -
Creep Factor: 2.0
Max TC CSI: 0.973
Max BC CSI: 0.807
Max Web CSI: 0.733
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EQ
Ply: 1SEQN: 74884 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T324
DrwNo: 167.23.1313.15710
RDF / RTT 06/16/2023
38'
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
38'
5'11"13
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
38'
5'11"131'2"1'2"
4"15'2"45'7"13A
B
C
D EFG
H
I
J
KLMNOPQ
5
12
3X10(A1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 3X10(A1)
$%Lbl:3EQ?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 47 13.67 24.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1142 /- /94
I 1952 /- /- /1142 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
I Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 292 - 2896
B - C 237 -3961
C - D 271 - 3246
E - F 295 -3246
Chords Tens. Comp.
F - G 292 -2896
G - H 272 -3246
H - I 237 -3961
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3567 - 142
Q - P 3565 - 144
P - O 3240 -86
O - N 3232 - 100
N - M 2368 - 22
Chords Tens. Comp.
N - M 864 -71
M - L 3240 -85
L - K 3565 - 125
K - I 3567 -123
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 71 -745
P - D 990 -61
P - E 104 - 891
Webs Tens. Comp.
F - L 104 - 890
G - L 990 -61
L - H 71 -745
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.91 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.211 N 999 240
VERT(CL): 0.480 M 942 180
HORZ(LL): 0.074 I - -
HORZ(TL): 0.178 I - -
Creep Factor: 2.0
Max TC CSI: 0.988
Max BC CSI: 0.929
Max Web CSI: 0.589
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ER
Ply: 1SEQN: 74885 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T325
DrwNo: 167.23.1313.27960
RDF / RTT 06/16/2023
T2
B2
38'
6'11"13
6'11"13
13'7"11
6'7"14
16'4"4
2'8"9
21'7"12
5'3"8
24'4"5
2'8"9
31'0"3
6'7"14
38'
6'11"13
6'11"13
6'11"13
13'1"6
6'1"10
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'0"3
6'1"10
38'
6'11"131'2"1'2"
4"13"86'0"46'5"13A
B
C
D EFG
H
I
J
KLMNOPQ
5
12
3X10(A1)1.5X3
3X4
3X8
4X6 3X4
3X6 2X32X3H0308
3X6
3X4 4X6
3X8
3X4
1.5X3 3X10(A1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 39.28
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: From 4 plf at 38.00 to 4 plf at 39.28
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 47 13.67 24.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1952 /- /- /1142 /- /94
I 1952 /- /- /1142 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
I Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 292 - 2896
B - C 237 -3961
C - D 271 - 3246
E - F 295 -3246
Chords Tens. Comp.
F - G 292 -2896
G - H 272 -3246
H - I 237 -3961
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 3567 - 142
Q - P 3565 - 144
P - O 3240 -86
O - N 3232 - 100
N - M 2368 - 22
Chords Tens. Comp.
N - M 864 -71
M - L 3240 -85
L - K 3565 - 125
K - I 3567 -123
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 71 -745
P - D 990 -61
P - E 104 - 891
Webs Tens. Comp.
F - L 104 - 890
G - L 990 -61
L - H 71 -745
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.91 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.211 N 999 240
VERT(CL): 0.480 M 942 180
HORZ(LL): 0.074 I - -
HORZ(TL): 0.178 I - -
Creep Factor: 2.0
Max TC CSI: 0.988
Max BC CSI: 0.929
Max Web CSI: 0.589
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ER
Ply: 1SEQN: 74885 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T325
DrwNo: 167.23.1313.27960
RDF / RTT 06/16/2023
T2
B2
38'
6'11"13
6'11"13
13'7"11
6'7"14
16'4"4
2'8"9
21'7"12
5'3"8
24'4"5
2'8"9
31'0"3
6'7"14
38'
6'11"13
6'11"13
6'11"13
13'1"6
6'1"10
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'0"3
6'1"10
38'
6'11"131'2"1'2"
4"13"86'0"46'5"13A
B
C
D EFG
H
I
J
KLMNOPQ
5
12
3X10(A1)1.5X3
3X4
3X8
4X6 3X4
3X6 2X32X3H0308
3X6
3X4 4X6
3X8
3X4
1.5X3 3X10(A1)
19'
90#
19'
$%Lbl:3ER?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 38.00
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2252 /- /- /1325 /- /114
K 2130 /- /- /1241 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
K Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 282 -4567
C - D 335 - 3762
D - F 409 - 3366
F - G 397 - 3738
Chords Tens. Comp.
G - I 409 -3371
I - J 335 -3768
J - K 287 -4593
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4112 - 211
R - Q 4108 - 213
Q - P 3731 - 148
P - O 3723 - 175
O - N 2711 - 53
Chords Tens. Comp.
O - N 1011 - 107
N - M 3731 - 146
M - L 4136 -178
L - K 4139 - 176
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 63 -821
Q - D 1095 - 81
Q - F 144 - 994
Webs Tens. Comp.
G - M 142 - 985
I - M 1097 - 82
M - J 68 -847
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.33 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.232 O 999 240
VERT(CL): 0.532 N 850 180
HORZ(LL): 0.085 K - -
HORZ(TL): 0.205 K - -
Creep Factor: 2.0
Max TC CSI: 0.980
Max BC CSI: 0.984
Max Web CSI: 0.662
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ES
Ply: 1SEQN: 74886 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T326
DrwNo: 167.23.1313.50357
RDF / RTT 06/16/2023
T2
B2
38'
6'10"10
6'10"10
13'8"
6'9"6
16'4"4
2'8"4
21'7"12
5'3"8
22'4"5
8"9
24'10"10
2'6"5
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"
4"13"86'10"47'3"13A
B
C
D
E
FGHI
J
K
LMNOPQR
5 12
4X8(A2)1.5X3 4X8
5X6
3X6 2X3 H0308
3X6
5X6
4X8 1.5X3 4X8(A2)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 38.00
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2252 /- /- /1325 /- /114
K 2130 /- /- /1241 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
K Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 282 -4567
C - D 335 - 3762
D - F 409 - 3366
F - G 397 - 3738
Chords Tens. Comp.
G - I 409 -3371
I - J 335 -3768
J - K 287 -4593
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4112 - 211
R - Q 4108 - 213
Q - P 3731 - 148
P - O 3723 - 175
O - N 2711 - 53
Chords Tens. Comp.
O - N 1011 - 107
N - M 3731 - 146
M - L 4136 -178
L - K 4139 - 176
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 63 -821
Q - D 1095 - 81
Q - F 144 - 994
Webs Tens. Comp.
G - M 142 - 985
I - M 1097 - 82
M - J 68 -847
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.33 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.232 O 999 240
VERT(CL): 0.532 N 850 180
HORZ(LL): 0.085 K - -
HORZ(TL): 0.205 K - -
Creep Factor: 2.0
Max TC CSI: 0.980
Max BC CSI: 0.984
Max Web CSI: 0.662
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ES
Ply: 1SEQN: 74886 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T326
DrwNo: 167.23.1313.50357
RDF / RTT 06/16/2023
T2
B2
38'
6'10"10
6'10"10
13'8"
6'9"6
16'4"4
2'8"4
21'7"12
5'3"8
22'4"5
8"9
24'10"10
2'6"5
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"
4"13"86'10"47'3"13A
B
C
D
E
FGHI
J
K
LMNOPQR
5 12
4X8(A2)1.5X3 4X8
5X6
3X6 2X3 H0308
3X6
5X6
4X8 1.5X3 4X8(A2)
19'
90#
19'
$%Lbl:3ES?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g); T3,T4 2x4 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 38.00
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.62 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
Laterally brace TC below filler at 24" oc. (D-G)
In lieu of structural panels use purlins to brace all
sloping TC @ 24" oc; all flat TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2252 /- /- /1327 /- /128
I 2130 /- /- /1243 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
I Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 122 -4571
C - D 176 - 3756
D - E 116 - 1381
Chords Tens. Comp.
F - G 117 -1381
G - H 176 -3761
H - I 129 -4597
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 4116 -46
P - O 4113 -48
O - N 3328 0
N - M 3396 - 34
M - L 2423 0
Chords Tens. Comp.
M - L 973 -41
L - K 3328 0
K - J 4140 -32
J - I 4144 -30
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 63 -843
O - D 497 0
D - Q 167 - 2180
Q - R 138 - 2155
R - S 137 - 2164
Webs Tens. Comp.
E - F 121 -1171
S - T 139 -2155
T - G 168 -2184
G - K 498 0
K - H 70 -869
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.88 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.211 M 999 240
VERT(CL): 0.482 L 939 180
HORZ(LL): 0.083 I - -
HORZ(TL): 0.199 I - -
Creep Factor: 2.0
Max TC CSI: 0.899
Max BC CSI: 0.971
Max Web CSI: 0.679
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ET
Ply: 1SEQN: 10857 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T327
DrwNo: 167.23.1346.16687
RDF / RTT 06/16/2023
T2
T3 T4
B2
18'3"8 1'5"18'3"8
38'
6'10"10
6'10"10
13'5"14
6'7"5
18'3"3
4'9"5
20'0"11
1'9"8
24'10"10
4'9"14
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"
4"15'11"83"87'11"68'4"15A
B
C
D
EF
G
H
I
JKLMNOP
QR ST
5 12
4X8(A2)1.5X3 3X8
5X16
3X6
1.5X3
2X3 2X3H0308
1.5X3
3X6
5X16
3X8 1.5X3 4X8(A2)
19'
90#
18'3"3
29#
8"1377#8"13
29#
18'3"3
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #1&Bet.(g)
T2 2x6 DF-L #2(g); T3,T4 2x4 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 91 plf at -1.28 to 91 plf at 38.00
BC: From 5 plf at -1.28 to 5 plf at 0.00
BC: From 19 plf at 0.00 to 19 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
Loading
Use this design for common hip trusses @ 27.8" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.62 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 6-6-8 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Purlins
Laterally brace TC below filler at 24" oc. (D-G)
In lieu of structural panels use purlins to brace all
sloping TC @ 24" oc; all flat TC @ 24" oc.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2252 /- /- /1327 /- /128
I 2130 /- /- /1243 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
I Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 122 -4571
C - D 176 - 3756
D - E 116 - 1381
Chords Tens. Comp.
F - G 117 -1381
G - H 176 -3761
H - I 129 -4597
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 4116 -46
P - O 4113 -48
O - N 3328 0
N - M 3396 - 34
M - L 2423 0
Chords Tens. Comp.
M - L 973 -41
L - K 3328 0
K - J 4140 -32
J - I 4144 -30
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 63 -843
O - D 497 0
D - Q 167 - 2180
Q - R 138 - 2155
R - S 137 - 2164
Webs Tens. Comp.
E - F 121 -1171
S - T 139 -2155
T - G 168 -2184
G - K 498 0
K - H 70 -869
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 27.8 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.88 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.211 M 999 240
VERT(CL): 0.482 L 939 180
HORZ(LL): 0.083 I - -
HORZ(TL): 0.199 I - -
Creep Factor: 2.0
Max TC CSI: 0.899
Max BC CSI: 0.971
Max Web CSI: 0.679
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3ET
Ply: 1SEQN: 10857 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T327
DrwNo: 167.23.1346.16687
RDF / RTT 06/16/2023
T2
T3 T4
B2
18'3"8 1'5"18'3"8
38'
6'10"10
6'10"10
13'5"14
6'7"5
18'3"3
4'9"5
20'0"11
1'9"8
24'10"10
4'9"14
31'1"6
6'2"13
38'
6'10"10
6'10"10
6'10"10
13'1"6
6'2"13
16'6"
3'4"10
20'
3'6"
21'6"
1'6"
24'10"10
3'4"10
31'1"6
6'2"13
38'
6'10"101'2"
4"15'11"83"87'11"68'4"15A
B
C
D
EF
G
H
I
JKLMNOP
QR ST
5 12
4X8(A2)1.5X3 3X8
5X16
3X6
1.5X3
2X3 2X3H0308
1.5X3
3X6
5X16
3X8 1.5X3 4X8(A2)
19'
90#
18'3"3
29#
8"1377#8"13
29#
18'3"3
19'
$%Lbl:3ET?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (D-K) 68 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1954 /- /- /1147 /- /112
M 1848 /- /- /1074 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
M Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 33 -3986
C - D 75 - 3326
D - E 0 -1594
E - F 0 -1559
Chords Tens. Comp.
I - J 47 - 1559
J - K 27 -1594
K - L 89 -3331
L - M 54 - 4011
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 3595 -19
T - S 3592 - 20
S - R 3010 0
R - Q 3004 - 45
Q - P 2200 0
Chords Tens. Comp.
Q - P 803 -45
P - O 3010 0
O - N 3617 0
N - M 3620 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 56 -683
S - D 489 0
D - U 164 - 1549
U - V 161 - 1563
F - W 42 - 1418
V - X 119 -1603
Webs Tens. Comp.
W - I 42 -1418
X - Y 119 -1603
Y - Z 154 -1567
Z - K 153 -1553
K - O 499 0
O - L 59 -709
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.86 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.193 X 999 240
VERT(CL): 0.450 R 999 180
HORZ(LL): 0.072 M - -
HORZ(TL): 0.175 M - -
Creep Factor: 2.0
Max TC CSI: 0.988
Max BC CSI: 0.890
Max Web CSI: 0.495
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EU
Ply: 1SEQN: 74888 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T329
DrwNo: 167.23.1315.10160
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
13'5"14
5"14
18'2"3
4'8"5
25'6"10
7'4"7
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"
4"15'11"83"87'10"158'4"9A
B
C
D E
F
GH
I
J K
L
M
NOPQRST
UV
W
XYZ
5 12
3X10(A1)1.5X3
3X4
3X8
1.5X4
3X4
3X4
2X3
1.5X31.5X3
2X3
3X4
3X4
1.5X4
3X8
3X4
1.5X3 3X10(B1)
19'
90#
19'
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
BC: 90 lb Conc. Load at 19.00
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X6 except as noted.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (D-K) 68 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1954 /- /- /1147 /- /112
M 1848 /- /- /1074 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.1 (Truss)
M Brg Wid = 3.5 Min Req = 2.0 (Truss)
Bearings B & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 33 -3986
C - D 75 - 3326
D - E 0 -1594
E - F 0 -1559
Chords Tens. Comp.
I - J 47 - 1559
J - K 27 -1594
K - L 89 -3331
L - M 54 - 4011
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 3595 -19
T - S 3592 - 20
S - R 3010 0
R - Q 3004 - 45
Q - P 2200 0
Chords Tens. Comp.
Q - P 803 -45
P - O 3010 0
O - N 3617 0
N - M 3620 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 56 -683
S - D 489 0
D - U 164 - 1549
U - V 161 - 1563
F - W 42 - 1418
V - X 119 -1603
Webs Tens. Comp.
W - I 42 -1418
X - Y 119 -1603
Y - Z 154 -1567
Z - K 153 -1553
K - O 499 0
O - L 59 -709
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.86 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.193 X 999 240
VERT(CL): 0.450 R 999 180
HORZ(LL): 0.072 M - -
HORZ(TL): 0.175 M - -
Creep Factor: 2.0
Max TC CSI: 0.988
Max BC CSI: 0.890
Max Web CSI: 0.495
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EU
Ply: 1SEQN: 74888 SPEC
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T329
DrwNo: 167.23.1315.10160
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
13'5"14
5"14
18'2"3
4'8"5
25'6"10
7'4"7
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"
4"15'11"83"87'10"158'4"9A
B
C
D E
F
GH
I
J K
L
M
NOPQRST
UV
W
XYZ
5 12
3X10(A1)1.5X3
3X4
3X8
1.5X4
3X4
3X4
2X3
1.5X31.5X3
2X3
3X4
3X4
1.5X4
3X8
3X4
1.5X3 3X10(B1)
19'
90#
19'
$%Lbl:3EU?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 16.18
TC: From 2 plf at 16.18 to 2 plf at 21.82
TC: From 79 plf at 21.82 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
TC: 111 lb Conc. Load at 16.18,21.82
TC: 505 lb Conc. Load at 19.00
BC: 90 lb Conc. Load at 19.08
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
(I) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (D-G) 52 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
California hip common load case modified
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2101 /- /- /182 /- /-
I 1995 /- /- /181 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.2 (Truss)
I Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 144 -4348
C - D 189 - 3705
D - E 73 - 1641
Chords Tens. Comp.
F - G 76 - 1641
G - H 190 -3712
H - I 149 -4374
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3927 -79
P - O 3924 -81
O - N 3468 - 29
N - M 3461 - 44
M - L 2518 0
Chords Tens. Comp.
M - L 942 -48
L - K 3468 - 28
K - J 3951 -65
J - I 3953 -63
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 52 -659
O - D 626 - 7
O - R 86 -530
D - Q 184 - 1882
Q - E 396 - 2
Q - R 182 - 1899
E - S 78 -1429
R - T 172 - 2046
S - T 61 -565
Webs Tens. Comp.
S - F 78 -1429
T - U 172 -2046
U - V 185 -1904
U - K 91 -522
F - V 396 -2
V - G 186 -1887
G - K 628 -7
K - H 58 -682
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.44 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.237 T 999 240
VERT(CL): 0.568 T 796 180
HORZ(LL): 0.081 I - -
HORZ(TL): 0.194 I - -
Creep Factor: 2.0
Max TC CSI: 0.979
Max BC CSI: 0.911
Max Web CSI: 0.476
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EV
Ply: 1SEQN: 10865 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T330
DrwNo: 167.23.1351.06343
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
16'2"8
3'2"8
21'9"13
5'7"5
25'6"10
3'8"13
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"
4"13"87'0"157'6"9A
B
C
D
EF
G
H
I
JKLMNOP
QR
S
TUV
5 12
3X10(A1)1.5X3 3X8
3X6
3X6 2X3
1.5X31.5X3
2X3H0308
3X6
3X6
3X8 1.5X3 3X10(B1)(I)
16'2"3
111#
2'9"13
505#
19'0"15
90#
2'9"13
111#
16'2"3
18'11"1
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g) B2 2x6 DF-L #2(g);
Webs 2x4 DF-L Standard(g)
Filler 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 79 plf at -1.28 to 79 plf at 16.18
TC: From 2 plf at 16.18 to 2 plf at 21.82
TC: From 79 plf at 21.82 to 79 plf at 38.00
BC: From 4 plf at -1.28 to 4 plf at 0.00
BC: From 16 plf at 0.00 to 16 plf at 38.00
TC: 111 lb Conc. Load at 16.18,21.82
TC: 505 lb Conc. Load at 19.00
BC: 90 lb Conc. Load at 19.08
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 3X4 except as noted.
(I) - plates so marked were sized using 0% Fabrication
Tolerance, 0 degrees Rotational Tolerance, and/or
zero Positioning Tolerance.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC (D-G) 52 12.39 25.61
TC 77 15.80 22.20
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
California hip common load case modified
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2101 /- /- /182 /- /-
I 1995 /- /- /181 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.2 (Truss)
I Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 144 -4348
C - D 189 - 3705
D - E 73 - 1641
Chords Tens. Comp.
F - G 76 - 1641
G - H 190 -3712
H - I 149 -4374
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3927 -79
P - O 3924 -81
O - N 3468 - 29
N - M 3461 - 44
M - L 2518 0
Chords Tens. Comp.
M - L 942 -48
L - K 3468 - 28
K - J 3951 -65
J - I 3953 -63
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 52 -659
O - D 626 - 7
O - R 86 -530
D - Q 184 - 1882
Q - E 396 - 2
Q - R 182 - 1899
E - S 78 -1429
R - T 172 - 2046
S - T 61 -565
Webs Tens. Comp.
S - F 78 -1429
T - U 172 -2046
U - V 185 -1904
U - K 91 -522
F - V 396 -2
V - G 186 -1887
G - K 628 -7
K - H 58 -682
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.44 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.237 T 999 240
VERT(CL): 0.568 T 796 180
HORZ(LL): 0.081 I - -
HORZ(TL): 0.194 I - -
Creep Factor: 2.0
Max TC CSI: 0.979
Max BC CSI: 0.911
Max Web CSI: 0.476
VIEW Ver: 23.01.01.0530.11
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EV
Ply: 1SEQN: 10865 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T330
DrwNo: 167.23.1351.06343
RDF / RTT 06/16/2023
T2
B2
16'2"8 5'7"16'2"8
38'
6'6"10
6'6"10
13'
6'5"6
16'2"8
3'2"8
21'9"13
5'7"5
25'6"10
3'8"13
31'5"6
5'10"13
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'6"
4'0"10
20'
3'6"
21'6"
1'6"
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"
4"13"87'0"157'6"9A
B
C
D
EF
G
H
I
JKLMNOP
QR
S
TUV
5 12
3X10(A1)1.5X3 3X8
3X6
3X6 2X3
1.5X31.5X3
2X3H0308
3X6
3X6
3X8 1.5X3 3X10(B1)(I)
16'2"3
111#
2'9"13
505#
19'0"15
90#
2'9"13
111#
16'2"3
18'11"1
$%Lbl:3EV?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EV
Ply: 1
Qty: 1
SEQN: 10865 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T330
DrwNo: 167.23.1351.06343
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EV
Ply: 1
Qty: 1
SEQN: 10865 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T330
DrwNo: 167.23.1351.06343
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 38 14.88 23.13
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2208 /- /- /1674 /- /2401
J 2102 /- /- /1674 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
J Brg Wid = 3.5 Min Req = 2.2 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 274 -3346
B - C 196 -4640
C - D 240 - 4231
D - E 262 - 3700
Chords Tens. Comp.
F - G 274 -3342
G - H 263 -3701
H - I 242 -4243
I - J 202 -4672
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4205 - 143
R - Q 4204 - 145
Q - P 3832 - 123
P - O 3792 -73
O - N 3792 - 73
Chords Tens. Comp.
N - M 3792 - 73
M - L 3842 -101
L - K 4237 - 128
K - J 4238 -126
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 32 -504
Q - D 432 0
D - P 79 -669
P - E 1131 -44
P - F 67 -749
Webs Tens. Comp.
F - M 66 -756
G - M 1152 - 44
M - H 80 -689
H - L 436 0
L - I 40 -517
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.16 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.254 O 999 240
VERT(CL): 0.587 O 771 180
HORZ(LL): 0.094 J - -
HORZ(TL): 0.214 J - -
Creep Factor: 2.0
Max TC CSI: 0.981
Max BC CSI: 0.955
Max Web CSI: 0.729
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EW
Ply: 1SEQN: 74983 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T362
DrwNo: 167.23.1316.01267
RDF / RTT 06/16/2023
38'
5'3"5
5'3"5
9'10"13
4'7"8
14'10"3
4'11"6
19'
4'1"13
23'1"13
4'1"13
28'1"3
4'11"6
32'8"11
4'7"8
38'
5'3"5
5'3"5
5'3"5
9'10"13
4'7"8
14'6"5
4'7"8
19'
4'5"11
23'5"11
4'5"11
28'1"3
4'7"8
32'8"11
4'7"8
38'
5'3"51'2"
4"16'6"56'11"14A
B
C
D
E FG
H
I
J
KLMNOPQR
5
12
4X8(A2)1.5X3
3X4
3X4
3X4
3X8
5X6 3X8
1.5X3H0308
5X6
3X8
3X4
3X4
3X4
1.5X3 4X8(A2)
14'10"3
158#
4'
442#3"10
442#
4'
158#
14'10"3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 38 14.88 23.13
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2208 /- /- /1674 /- /2401
J 2102 /- /- /1674 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
J Brg Wid = 3.5 Min Req = 2.2 (Truss)
Bearings B & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 274 -3346
B - C 196 -4640
C - D 240 - 4231
D - E 262 - 3700
Chords Tens. Comp.
F - G 274 -3342
G - H 263 -3701
H - I 242 -4243
I - J 202 -4672
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 4205 - 143
R - Q 4204 - 145
Q - P 3832 - 123
P - O 3792 -73
O - N 3792 - 73
Chords Tens. Comp.
N - M 3792 - 73
M - L 3842 -101
L - K 4237 - 128
K - J 4238 -126
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 32 -504
Q - D 432 0
D - P 79 -669
P - E 1131 -44
P - F 67 -749
Webs Tens. Comp.
F - M 66 -756
G - M 1152 - 44
M - H 80 -689
H - L 436 0
L - I 40 -517
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 23.16 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.254 O 999 240
VERT(CL): 0.587 O 771 180
HORZ(LL): 0.094 J - -
HORZ(TL): 0.214 J - -
Creep Factor: 2.0
Max TC CSI: 0.981
Max BC CSI: 0.955
Max Web CSI: 0.729
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EW
Ply: 1SEQN: 74983 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T362
DrwNo: 167.23.1316.01267
RDF / RTT 06/16/2023
38'
5'3"5
5'3"5
9'10"13
4'7"8
14'10"3
4'11"6
19'
4'1"13
23'1"13
4'1"13
28'1"3
4'11"6
32'8"11
4'7"8
38'
5'3"5
5'3"5
5'3"5
9'10"13
4'7"8
14'6"5
4'7"8
19'
4'5"11
23'5"11
4'5"11
28'1"3
4'7"8
32'8"11
4'7"8
38'
5'3"51'2"
4"16'6"56'11"14A
B
C
D
E FG
H
I
J
KLMNOPQR
5
12
4X8(A2)1.5X3
3X4
3X4
3X4
3X8
5X6 3X8
1.5X3H0308
5X6
3X8
3X4
3X4
3X4
1.5X3 4X8(A2)
14'10"3
158#
4'
442#3"10
442#
4'
158#
14'10"3
$%Lbl:3EW?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2400 # ( 63.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2400 63.16 TC 0.00 38.00
2400 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EW
Ply: 1
Qty: 1
SEQN: 74983 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T362
DrwNo: 167.23.1316.01267
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Loading
Truss transfers a maximum horizontal load of
2400 # ( 63.16 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2400 63.16 TC 0.00 38.00
2400 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 24" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EW
Ply: 1
Qty: 1
SEQN: 74983 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T362
DrwNo: 167.23.1316.01267
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 34 13.00 25.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 0" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2282 /- /- /163 /- /-
I 2176 /- /- /161 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
I Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 300 - 3746
B - C 248 -4796
C - D 281 - 4168
E - F 316 -4477
Chords Tens. Comp.
F - G 301 -3742
G - H 282 -4168
H - I 253 -4823
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 4339 - 179
P - O 4337 - 181
O - N 4473 - 139
N - M 4492 - 121
Chords Tens. Comp.
M - L 4492 -121
L - K 4492 - 121
K - J 4366 -163
J - I 4368 -161
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 68 -652
O - D 1332 - 43
O - E 84 - 1197
Webs Tens. Comp.
F - K 83 - 1209
G - K 1344 - 43
K - H 72 -675
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.77 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.273 L 999 240
VERT(CL): 0.627 L 721 180
HORZ(LL): 0.102 I - -
HORZ(TL): 0.234 I - -
Creep Factor: 2.0
Max TC CSI: 0.964
Max BC CSI: 0.970
Max Web CSI: 0.842
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EX
Ply: 1SEQN: 74891 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T332
DrwNo: 167.23.1317.25880
RDF / RTT 06/16/2023
T2
38'
6'6"10
6'6"10
12'11"11
6'5"1
16'2"8
3'2"13
21'6"
5'3"8
25'0"5
3'6"5
31'5"6
6'5"1
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'2"8
3'9"2
21'6"
5'3"8
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"
4"15'8"156'2"8A
B
C
D EFG
H
I
JKLMNOP
5
12
3X12(B3)1.5X3
3X4
4X8
5X6 3X4
3X4 H0310
4X8
1.5X3
3X12
4X8
3X4
1.5X3 3X12(B3)
12'11"11
158#
4'
442#
4'0"10
442#
4'
158#
12'11"11
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g) T2 2x6 DF-L #2(g);
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 34 13.00 25.00
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Use this design for common hip trusses @ 24.0" oc.
Extend sloping TC of truss and jacks to hip rafter.
Support extensions every 4.00 ft to flat TC. Spacing of
supports originates from #1 hip. Attach 2x4 lateral
bracing to flat TC @ 0" oc with 2-16d Box or Gun
nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 2282 /- /- /163 /- /-
I 2176 /- /- /161 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.4 (Truss)
I Brg Wid = 3.5 Min Req = 2.3 (Truss)
Bearings B & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 300 - 3746
B - C 248 -4796
C - D 281 - 4168
E - F 316 -4477
Chords Tens. Comp.
F - G 301 -3742
G - H 282 -4168
H - I 253 -4823
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 4339 - 179
P - O 4337 - 181
O - N 4473 - 139
N - M 4492 - 121
Chords Tens. Comp.
M - L 4492 -121
L - K 4492 - 121
K - J 4366 -163
J - I 4368 -161
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 68 -652
O - D 1332 - 43
O - E 84 - 1197
Webs Tens. Comp.
F - K 83 - 1209
G - K 1344 - 43
K - H 72 -675
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.77 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.80 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.273 L 999 240
VERT(CL): 0.627 L 721 180
HORZ(LL): 0.102 I - -
HORZ(TL): 0.234 I - -
Creep Factor: 2.0
Max TC CSI: 0.964
Max BC CSI: 0.970
Max Web CSI: 0.842
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EX
Ply: 1SEQN: 74891 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T332
DrwNo: 167.23.1317.25880
RDF / RTT 06/16/2023
T2
38'
6'6"10
6'6"10
12'11"11
6'5"1
16'2"8
3'2"13
21'6"
5'3"8
25'0"5
3'6"5
31'5"6
6'5"1
38'
6'6"10
6'6"10
6'6"10
12'5"6
5'10"13
16'2"8
3'9"2
21'6"
5'3"8
25'6"10
4'0"10
31'5"6
5'10"13
38'
6'6"101'2"
4"15'8"156'2"8A
B
C
D EFG
H
I
JKLMNOP
5
12
3X12(B3)1.5X3
3X4
4X8
5X6 3X4
3X4 H0310
4X8
1.5X3
3X12
4X8
3X4
1.5X3 3X12(B3)
12'11"11
158#
4'
442#
4'0"10
442#
4'
158#
12'11"11
$%Lbl:3EX?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1896 /- /- /1131 /- /75
I 1788 /- /- /1055 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 305 - 2946
B - C 270 -3865
C - D 294 - 3291
E - F 339 -3578
Chords Tens. Comp.
F - G 303 -2914
G - H 292 -3252
H - I 265 -3715
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3489 - 209
P - O 3487 - 211
O - N 3597 - 187
N - M 3597 - 187
Chords Tens. Comp.
M - L 3597 -187
L - K 3572 - 168
K - J 3338 -184
J - I 3337 -182
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 71 -617
O - D 949 - 39
O - E 102 - 876
Webs Tens. Comp.
F - K 103 - 897
G - K 931 -41
K - H 68 -521
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.50 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.232 L 999 240
VERT(CL): 0.549 L 818 180
HORZ(LL): 0.081 I - -
HORZ(TL): 0.191 I - -
Creep Factor: 2.0
Max TC CSI: 0.955
Max BC CSI: 0.963
Max Web CSI: 0.736
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EY
Ply: 1SEQN: 74892 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T333
DrwNo: 167.23.1317.30357
RDF / RTT 06/16/2023
37'8"8
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
37'8"8
5'8"5
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
37'8"8
5'8"51'2"
4"1 5"85'2"45'7"13A
B
C
D EFG
H
I
JKLMNOP
5
12
3X10(A1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 5X6(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 35 11.67 26.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1896 /- /- /1131 /- /75
I 1788 /- /- /1055 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
I Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 305 - 2946
B - C 270 -3865
C - D 294 - 3291
E - F 339 -3578
Chords Tens. Comp.
F - G 303 -2914
G - H 292 -3252
H - I 265 -3715
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3489 - 209
P - O 3487 - 211
O - N 3597 - 187
N - M 3597 - 187
Chords Tens. Comp.
M - L 3597 -187
L - K 3572 - 168
K - J 3338 -184
J - I 3337 -182
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - O 71 -617
O - D 949 - 39
O - E 102 - 876
Webs Tens. Comp.
F - K 103 - 897
G - K 931 -41
K - H 68 -521
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.50 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.232 L 999 240
VERT(CL): 0.549 L 818 180
HORZ(LL): 0.081 I - -
HORZ(TL): 0.191 I - -
Creep Factor: 2.0
Max TC CSI: 0.955
Max BC CSI: 0.963
Max Web CSI: 0.736
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EY
Ply: 1SEQN: 74892 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T333
DrwNo: 167.23.1317.30357
RDF / RTT 06/16/2023
37'8"8
5'11"13
5'11"13
11'7"11
5'7"14
16'4"11
4'9"
21'7"5
5'2"10
26'4"5
4'9"
32'0"3
5'7"14
37'8"8
5'8"5
5'11"13
5'11"13
11'3"13
5'4"
16'4"11
5'0"14
21'7"5
5'2"10
26'8"3
5'0"14
32'0"3
5'4"
37'8"8
5'8"51'2"
4"1 5"85'2"45'7"13A
B
C
D EFG
H
I
JKLMNOP
5
12
3X10(A1)1.5X3
3X4
3X8
5X6 3X8
1.5X3 H0308 3X4
3X4 5X6
3X8
3X4
1.5X3 5X6(B1)
$%Lbl:3EY?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 9.67 28.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1896 /- /- /1124 /- /63
J 1788 /- /- /1048 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
J Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 308 - 3146
B - C 329 -3891
C - D 300 - 3495
E - F 388 -4174
Chords Tens. Comp.
F - G 386 -4150
G - H 304 -3078
H - I 296 -3415
I - J 323 -3750
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3523 - 272
P - O 4151 - 262
O - N 4461 - 266
N - M 4461 - 266
Chords Tens. Comp.
M - L 4461 -266
L - K 4124 - 237
K - J 3371 -244
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 103 - 400
P - D 1083 -42
P - E 145 -1289
O - F 47 -424
Webs Tens. Comp.
F - L 48 -444
L - G 385 0
G - K 147 -1341
H - K 1037 - 43
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.08 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.280 N 999 240
VERT(CL): 0.663 N 677 180
HORZ(LL): 0.081 J - -
HORZ(TL): 0.190 J - -
Creep Factor: 2.0
Max TC CSI: 0.979
Max BC CSI: 0.809
Max Web CSI: 0.867
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EZ
Ply: 1SEQN: 74893 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T334
DrwNo: 167.23.1317.33897
RDF / RTT 06/16/2023
37'8"8
4'11"13
4'11"13
9'7"11
4'7"14
14'1"
4'5"5
19'
4'11"
23'11"
4'11"
28'4"5
4'5"5
33'0"3
4'7"14
37'8"8
4'8"5
9'3"13
9'3"13
14'1"
4'9"4
19'
4'11"
23'11"
4'11"
28'8"3
4'9"4
37'8"8
9'0"51'2"
4"1 5"84'4"44'9"13A
B
C
D EFGH
I
J
KLMNOP
5
12
3X10(A1)
1.5X3
3X10
5X6 4X4
3X4
3X8
1.5X3H0308 3X4
4X4 5X6
4X8
1.5X3
5X6(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #1&Bet.(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 33 9.67 28.33
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 1896 /- /- /1124 /- /63
J 1788 /- /- /1048 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 2.0 (Truss)
J Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 308 - 3146
B - C 329 -3891
C - D 300 - 3495
E - F 388 -4174
Chords Tens. Comp.
F - G 386 -4150
G - H 304 -3078
H - I 296 -3415
I - J 323 -3750
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - P 3523 - 272
P - O 4151 - 262
O - N 4461 - 266
N - M 4461 - 266
Chords Tens. Comp.
M - L 4461 -266
L - K 4124 - 237
K - J 3371 -244
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 103 - 400
P - D 1083 -42
P - E 145 -1289
O - F 47 -424
Webs Tens. Comp.
F - L 48 -444
L - G 385 0
G - K 147 -1341
H - K 1037 - 43
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.08 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.77 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.280 N 999 240
VERT(CL): 0.663 N 677 180
HORZ(LL): 0.081 J - -
HORZ(TL): 0.190 J - -
Creep Factor: 2.0
Max TC CSI: 0.979
Max BC CSI: 0.809
Max Web CSI: 0.867
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3EZ
Ply: 1SEQN: 74893 CHIP
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T334
DrwNo: 167.23.1317.33897
RDF / RTT 06/16/2023
37'8"8
4'11"13
4'11"13
9'7"11
4'7"14
14'1"
4'5"5
19'
4'11"
23'11"
4'11"
28'4"5
4'5"5
33'0"3
4'7"14
37'8"8
4'8"5
9'3"13
9'3"13
14'1"
4'9"4
19'
4'11"
23'11"
4'11"
28'8"3
4'9"4
37'8"8
9'0"51'2"
4"1 5"84'4"44'9"13A
B
C
D EFGH
I
J
KLMNOP
5
12
3X10(A1)
1.5X3
3X10
5X6 4X4
3X4
3X8
1.5X3H0308 3X4
4X4 5X6
4X8
1.5X3
5X6(B1)
$%Lbl:3EZ?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 80.01 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 80.01 TC 0.00 10.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
(S) 2x4 x 5'4" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 702 /- /- /675 /3 /800
J 623 /- /- /328 /9 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 400 -1190
Chords Tens. Comp.
F - I 365 - 428
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 757 - 163
Chords Tens. Comp.
M - J 739 -158
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - F 378 -58
Webs Tens. Comp.
F - J 183 - 854
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.023 O 999 240
VERT(CL): 0.080 O 999 180
HORZ(LL): 0.009 D - -
HORZ(TL): 0.032 D - -
Creep Factor: 2.0
Max TC CSI: 0.306
Max BC CSI: 0.393
Max Web CSI: 0.587
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3F
Ply: 1SEQN: 74896 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T317
DrwNo: 167.23.1321.20700
RDF / RTT 06/16/2023
10'
2'1'4"
(TYP)
5'3"14
5'3"14
10'
4'8"2
5'3"14
5'3"14
10'
4'8"21'2"
4"1 4'6"14'11"10A
B
F
I
JM
5
12
3X4(A1)1.5X4
3X4
3X4
(S)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 80.01 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 80.01 TC 0.00 10.00
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
(S) 2x4 x 5'4" DF-L #2 or better field
applied scab required to allow notches 1.5" deep.
Align scab 1.5" below top edge and attach to one
face of truss with 10d nails (0.128"x3") at 6" o/c.
Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 702 /- /- /675 /3 /800
J 623 /- /- /328 /9 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
J Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 400 -1190
Chords Tens. Comp.
F - I 365 - 428
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - M 757 - 163
Chords Tens. Comp.
M - J 739 -158
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
M - F 378 -58
Webs Tens. Comp.
F - J 183 - 854
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.023 O 999 240
VERT(CL): 0.080 O 999 180
HORZ(LL): 0.009 D - -
HORZ(TL): 0.032 D - -
Creep Factor: 2.0
Max TC CSI: 0.306
Max BC CSI: 0.393
Max Web CSI: 0.587
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3F
Ply: 1SEQN: 74896 GABL
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T317
DrwNo: 167.23.1321.20700
RDF / RTT 06/16/2023
10'
2'1'4"
(TYP)
5'3"14
5'3"14
10'
4'8"2
5'3"14
5'3"14
10'
4'8"21'2"
4"1 4'6"14'11"10A
B
F
I
JM
5
12
3X4(A1)1.5X4
3X4
3X4
(S)
$%Lbl:3F?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3F
Ply: 1
Qty: 1
SEQN: 74896 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T317
DrwNo: 167.23.1321.20700
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3F
Ply: 1
Qty: 1
SEQN: 74896 GABL
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T317
DrwNo: 167.23.1321.20700
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 592 /- /- /379 /- /96
E 517 /- /- /300 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 17 -701
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 608 - 135
Chords Tens. Comp.
F - E 594 - 137
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 153 - 664
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.009 F 999 240
VERT(CL): 0.024 B 999 180
HORZ(LL): 0.003 E - -
HORZ(TL): 0.011 B - -
Creep Factor: 2.0
Max TC CSI: 0.370
Max BC CSI: 0.527
Max Web CSI: 0.285
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3F1
Ply: 1SEQN: 74895 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T316
DrwNo: 167.23.1321.23837
RDF / RTT 06/16/2023
10'
5'3"14
5'3"14
10'
4'8"2
5'3"14
5'3"14
10'
4'8"21'2"
4"1 4'6"14'11"10A
B
C
D
EF
5
12
3X4(A1)1.5X3
3X4
1.5X3
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 592 /- /- /379 /- /96
E 517 /- /- /300 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 17 -701
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 608 - 135
Chords Tens. Comp.
F - E 594 - 137
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - E 153 - 664
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.009 F 999 240
VERT(CL): 0.024 B 999 180
HORZ(LL): 0.003 E - -
HORZ(TL): 0.011 B - -
Creep Factor: 2.0
Max TC CSI: 0.370
Max BC CSI: 0.527
Max Web CSI: 0.285
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3F1
Ply: 1SEQN: 74895 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T316
DrwNo: 167.23.1321.23837
RDF / RTT 06/16/2023
10'
5'3"14
5'3"14
10'
4'8"2
5'3"14
5'3"14
10'
4'8"21'2"
4"1 4'6"14'11"10A
B
C
D
EF
5
12
3X4(A1)1.5X3
3X4
1.5X3
3X4
$%Lbl:3F1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 230.82 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 230.82 TC 0.00 8.67
2000 BC 0.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 537 /- /- /869 /286 /2000
F 541 /- /- /869 /286 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 805 -1361
Chords Tens. Comp.
C - D 807 -1363
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 1979 - 1953
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 311 - 837
B - G 1195 - 759
Webs Tens. Comp.
G - D 1220 - 784
D - F 314 - 839
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 G 999 240
VERT(CL): 0.012 G 999 180
HORZ(LL): 0.019 C - -
HORZ(TL): 0.024 C - -
Creep Factor: 2.0
Max TC CSI: 0.186
Max BC CSI: 0.406
Max Web CSI: 0.387
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3G
Ply: 1SEQN: 74898 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T319
DrwNo: 167.23.1321.27690
RDF / RTT 06/16/2023
8'8"
4'4"
4'4"
8'8"
4'4"
4'4"
4'4"
8'8"
4'4"1'2"1'2"1'2'9"11A
B
C
D
E
FGH
5
12
3X4
3X6
4X4
4X8
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 230.82 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 230.82 TC 0.00 8.67
2000 BC 0.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
H 537 /- /- /869 /286 /2000
F 541 /- /- /869 /286 /-
Wind reactions based on MWFRS
H Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings H & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 805 -1361
Chords Tens. Comp.
C - D 807 -1363
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
H - G 1979 - 1953
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 311 - 837
B - G 1195 - 759
Webs Tens. Comp.
G - D 1220 - 784
D - F 314 - 839
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 G 999 240
VERT(CL): 0.012 G 999 180
HORZ(LL): 0.019 C - -
HORZ(TL): 0.024 C - -
Creep Factor: 2.0
Max TC CSI: 0.186
Max BC CSI: 0.406
Max Web CSI: 0.387
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3G
Ply: 1SEQN: 74898 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T319
DrwNo: 167.23.1321.27690
RDF / RTT 06/16/2023
8'8"
4'4"
4'4"
8'8"
4'4"
4'4"
4'4"
8'8"
4'4"1'2"1'2"1'2'9"11A
B
C
D
E
FGH
5
12
3X4
3X6
4X4
4X8
3X4
3X6
$%Lbl:3G?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 307.88 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 307.88 TC 0.00 6.50
2000 BC 0.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 423 /- /- /1041 /684 /2000
D 429 /- /- /763 /406 /-
Wind reactions based on MWFRS
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1438 -1781
Chords Tens. Comp.
B - C 408 -708
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 1977 - 1939
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 707 -1004
A - E 1573 -1347
Webs Tens. Comp.
E - C 803 -478
C - D 419 - 763
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.008 E 999 240
VERT(CL): 0.009 E 999 180
HORZ(LL): -0.023 B - -
HORZ(TL): 0.026 B - -
Creep Factor: 2.0
Max TC CSI: 0.252
Max BC CSI: 0.385
Max Web CSI: 0.500
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3G1
Ply: 1SEQN: 74899 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T320
DrwNo: 167.23.1321.30587
RDF / RTT 06/16/2023
6'6"
4'4"
4'4"
6'6"
2'2"
4'4"
4'4"
6'6"
2'2"1'1'10"132'9"11A
B
C
DEF
5
12
4X4
3X6
4X4
5X8
3X4
3X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 307.88 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 307.88 TC 0.00 6.50
2000 BC 0.00
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 423 /- /- /1041 /684 /2000
D 429 /- /- /763 /406 /-
Wind reactions based on MWFRS
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1438 -1781
Chords Tens. Comp.
B - C 408 -708
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - E 1977 - 1939
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 707 -1004
A - E 1573 -1347
Webs Tens. Comp.
E - C 803 -478
C - D 419 - 763
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.008 E 999 240
VERT(CL): 0.009 E 999 180
HORZ(LL): -0.023 B - -
HORZ(TL): 0.026 B - -
Creep Factor: 2.0
Max TC CSI: 0.252
Max BC CSI: 0.385
Max Web CSI: 0.500
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3G1
Ply: 1SEQN: 74899 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T320
DrwNo: 167.23.1321.30587
RDF / RTT 06/16/2023
6'6"
4'4"
4'4"
6'6"
2'2"
4'4"
4'4"
6'6"
2'2"1'1'10"132'9"11A
B
C
DEF
5
12
4X4
3X6
4X4
5X8
3X4
3X6
$%Lbl:3G1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 392 /- /- /146 /- /17
D 392 /- /- /144 /- /-
Wind reactions based on MWFRS
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 E 999 240
VERT(CL): 0.003 E 999 180
HORZ(LL): -0.000 B - -
HORZ(TL): 0.000 B - -
Creep Factor: 2.0
Max TC CSI: 0.116
Max BC CSI: 0.256
Max Web CSI: 0.082
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3G2
Ply: 1SEQN: 74900 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T321
DrwNo: 167.23.1321.33290
RDF / RTT 06/16/2023
5'2"
3'
3'
5'2"
2'2"
3'
3'
5'2"
2'2"1'6"111'10"132'9"11A
B
C
DEF
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 392 /- /- /146 /- /17
D 392 /- /- /144 /- /-
Wind reactions based on MWFRS
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.001 E 999 240
VERT(CL): 0.003 E 999 180
HORZ(LL): -0.000 B - -
HORZ(TL): 0.000 B - -
Creep Factor: 2.0
Max TC CSI: 0.116
Max BC CSI: 0.256
Max Web CSI: 0.082
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3G2
Ply: 1SEQN: 74900 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T321
DrwNo: 167.23.1321.33290
RDF / RTT 06/16/2023
5'2"
3'
3'
5'2"
2'2"
3'
3'
5'2"
2'2"1'6"111'10"132'9"11A
B
C
DEF
5
12
3X4
1.5X4
4X4
3X8
3X4
1.5X4
$%Lbl:3G2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 9.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 8 4.00 4.67
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 3-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 723 /- /- /81 /- /-
G 723 /- /- /81 /- /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -424
Chords Tens. Comp.
D - E 0 -420
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 C 999 240
VERT(CL): 0.009 C 999 180
HORZ(LL): 0.001 E - -
HORZ(TL): 0.001 E - -
Creep Factor: 2.0
Max TC CSI: 0.120
Max BC CSI: 0.156
Max Web CSI: 0.147
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3GA
Ply: 2SEQN: 74897 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T318
DrwNo: 167.23.1321.54003
RDF / RTT 06/16/2023
2 Complete Trusses Required
8'8"
3'11"11
3'11"11
4'8"5
8"10
8'8"
3'11"11
3'7"13
3'7"13
5'0"3
1'4"6
8'8"
3'7"131'2"1'2"1'2'7"14A
B
C D
E
F
GHIJ
5
12
3X4
1.5X3 3X8
3X4 6X8
3X4
3X4
1.5X3
161#161#
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @ 9.00" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Purlins
In lieu of structural panels or rigid ceiling use purlins
to laterally brace chords as follows:
Chord Spacing(in oc) Start(ft) End(ft)
TC 8 4.00 4.67
Apply purlins to any chords above or below fillers
at 24" OC unless shown otherwise above.
Loading
#1 hip with 3-11-11 setback supports jack trusses or
rafters and joists. Corner(s) framed with a hip rafter
supporting corner rafters or jack top chords. Corner
jack bottom chords or ceiling joists span between this
truss and the end wall.
Extend sloping top chord of truss and jacks to hip
rafter. Support extensions every 4.00 ft to flat TC.
Spacing of supports originates from #1 hip. Attach 2x4
lateral bracing to flat TC @ 24" oc with 2-16d Box or
Gun nails(0.135"x3.5",min.) and diagonally brace per
DWG. BRCALHIP0118. Support hip rafter with
cripples at 5-7-14 oc.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
J 723 /- /- /81 /- /-
G 723 /- /- /81 /- /-
Wind reactions based on MWFRS
J Brg Wid = 3.5 Min Req = 1.5 (Truss)
G Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings J & G are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 0 -424
Chords Tens. Comp.
D - E 0 -420
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: No
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.004 C 999 240
VERT(CL): 0.009 C 999 180
HORZ(LL): 0.001 E - -
HORZ(TL): 0.001 E - -
Creep Factor: 2.0
Max TC CSI: 0.120
Max BC CSI: 0.156
Max Web CSI: 0.147
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3GA
Ply: 2SEQN: 74897 CHIP
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T318
DrwNo: 167.23.1321.54003
RDF / RTT 06/16/2023
2 Complete Trusses Required
8'8"
3'11"11
3'11"11
4'8"5
8"10
8'8"
3'11"11
3'7"13
3'7"13
5'0"3
1'4"6
8'8"
3'7"131'2"1'2"1'2'7"14A
B
C D
E
F
GHIJ
5
12
3X4
1.5X3 3X8
3X4 6X8
3X4
3X4
1.5X3
161#161#
$%Lbl:3GA?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3GA
Ply: 2
Qty: 1
SEQN: 74897 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T318
DrwNo: 167.23.1321.54003
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Building designer is responsible for conventional
framing.
Top Chord overhang(s) may be field trimmed.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3GA
Ply: 2
Qty: 1
SEQN: 74897 CHIP
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T318
DrwNo: 167.23.1321.54003
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Brace all exposed vertical surfaces for lateral
wind forces. Anchor the perimeter of exposed
vertical surfaces and support lower roof using
sistered truss or nailer at edge of lower roof
diaphragm. All diaphragms, braces, and connec-
tions shall be designed by the engineer of record.Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 208 /- /- /98 /- /7
R 813 /- /- /468 /- /-
Wind reactions based on MWFRS
B Brg Wid = 151 Min Req = -
R Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & R are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - R 83 - 1013
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 603 0
U - T 603 0
Chords Tens. Comp.
T - R 836 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V -AP 107 -1061
L -AP 586 - 26
Webs Tens. Comp.
AP- T 391 0
AP- Q 58 -679
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
L -AK 0 -527
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.71 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.016 R 999 240
VERT(CL): 0.061 R 999 180
HORZ(LL): -0.005 R - -
HORZ(TL): 0.024 R - -
Creep Factor: 2.0
Max TC CSI: 0.687
Max BC CSI: 0.826
Max Web CSI: 0.572
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3H
Ply: 1SEQN: 74901 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T133
DrwNo: 167.23.1325.07223
RDF / RTT 06/16/2023
25'4"
2'1'4"
(TYP)
6'7"14
6'7"14
12'8"
6'0"2
18'6"7
5'10"7
25'4"
6'9"9
8'7"15
8'7"15
12'7"4
3'11"5
16'8"1
4'0"13
25'4"
8'7"151'2"1'2"
4"15'7"66'0"158'9"2
A
B
G
L
Q
R
S
TUV
Y
AK
AP
5 12
3X4(A1)
8X8
1.5X4(**)
4X8(R1)
3X43X4
3X4
3X4(A1)
(NNL)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord must not be
cut or notched, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11530ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Brace all exposed vertical surfaces for lateral
wind forces. Anchor the perimeter of exposed
vertical surfaces and support lower roof using
sistered truss or nailer at edge of lower roof
diaphragm. All diaphragms, braces, and connec-
tions shall be designed by the engineer of record.Top chord may be notched 1.5" deep x 3.5" wide
periodically along top edge, only in the area above
the let-in studs. DO NOT OVERCUT. No knots or
other lumber defects allowed within 12" of notches.
Do not notch in marked NNL lengths, at plates,
or in overhang or heel (first) panels.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 208 /- /- /98 /- /7
R 813 /- /- /468 /- /-
Wind reactions based on MWFRS
B Brg Wid = 151 Min Req = -
R Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & R are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Q - R 83 - 1013
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - U 603 0
U - T 603 0
Chords Tens. Comp.
T - R 836 0
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
V -AP 107 -1061
L -AP 586 - 26
Webs Tens. Comp.
AP- T 391 0
AP- Q 58 -679
Maximum Gable Forces Per Ply (lbs)
Gables Tens.Comp.
L -AK 0 -527
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.71 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.016 R 999 240
VERT(CL): 0.061 R 999 180
HORZ(LL): -0.005 R - -
HORZ(TL): 0.024 R - -
Creep Factor: 2.0
Max TC CSI: 0.687
Max BC CSI: 0.826
Max Web CSI: 0.572
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3H
Ply: 1SEQN: 74901 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T133
DrwNo: 167.23.1325.07223
RDF / RTT 06/16/2023
25'4"
2'1'4"
(TYP)
6'7"14
6'7"14
12'8"
6'0"2
18'6"7
5'10"7
25'4"
6'9"9
8'7"15
8'7"15
12'7"4
3'11"5
16'8"1
4'0"13
25'4"
8'7"151'2"1'2"
4"15'7"66'0"158'9"2
A
B
G
L
Q
R
S
TUV
Y
AK
AP
5 12
3X4(A1)
8X8
1.5X4(**)
4X8(R1)
3X43X4
3X4
3X4(A1)
(NNL)
$%Lbl:3H?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W5 2x6 DF-L #2(g);
W6,W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 5.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 31.58 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 31.58 TC 0.00 25.33
800 BC 0.15
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Bearing Block(s)
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 12.333' 1 12" 13 DF-L Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
N - /-991 /- /427 /16 /800
K 8339 /- /- /1081 /129 /-
G 3864 /- /- /328 /71 /-
Wind reactions based on MWFRS
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
K Brg Wid = 3.5 Min Req = -
G Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings N & G are a rigid surface.
Bearing K Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1355 - 396
B - C 1363 - 327
C - D 1650 - 143
Chords Tens. Comp.
D - E 136 - 914
E - F 66 -3620
F - G 70 - 3650
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 261 -1238
M - L 188 -1373
L - K 55 - 1593
K - J 54 -1521
Chords Tens. Comp.
J - I 54 -1521
I - H 1721 - 76
H - G 3356 - 62
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - D 72 -3597
D - I 3710 - 61
Webs Tens. Comp.
I - E 53 - 1451
E - H 2520 -30
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.98 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.059 H 999 240
VERT(CL): 0.139 H 999 180
HORZ(LL): 0.016 D - -
HORZ(TL): 0.039 D - -
Creep Factor: 2.0
Max TC CSI: 0.557
Max BC CSI: 0.957
Max Web CSI: 0.656
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3H1
Ply: 2SEQN: 74902 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T138
DrwNo: 167.23.1325.20860
RDF / RTT 06/16/2023
2 Complete Trusses Required
W5 W6
W8
BL1
12'5"12 12'10"4
4'2"10
4'2"10
6'6"4
2'3"9
12'8"
6'1"12
18'9"13
6'1"13
21'1"6
2'3"9
25'4"
4'2"10
4'2"10
4'2"10
8'7"15
4'5"5
16'8"1
8'0"2
21'1"6
4'5"5
25'4"
4'2"10
4"15'7"6A
B
C
D
E
F
G
HIJKLMN
5
12
3X4(A1)
1.5X3
3X4
3X4
3X4 H0308
8X8
4X46X10
5X6
6X8
1.5X3
3X10(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x6 DF-L #2(g)
Webs 2x4 DF-L Standard(g) W5 2x6 DF-L #2(g);
W6,W8 2x4 DF-L #2(g);
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Nailnote
Nail Schedule:0.131"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 5.00" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
800 # ( 31.58 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 31.58 TC 0.00 25.33
800 BC 0.15
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Bearing Block(s)
Brg blocks:0.131"x3", min. nails
brg x-loc #blocks length/blk #nails/blk wall plate
2 12.333' 1 12" 13 DF-L Standard
Brg block to be same size and species as chord.
Refer to drawing CNNAILSP1014 for more information.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
N - /-991 /- /427 /16 /800
K 8339 /- /- /1081 /129 /-
G 3864 /- /- /328 /71 /-
Wind reactions based on MWFRS
N Brg Wid = 3.5 Min Req = 1.5 (Truss)
K Brg Wid = 3.5 Min Req = -
G Brg Wid = 3.5 Min Req = 2.1 (Truss)
Bearings N & G are a rigid surface.
Bearing K Fcperp = 625psi.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1355 - 396
B - C 1363 - 327
C - D 1650 - 143
Chords Tens. Comp.
D - E 136 - 914
E - F 66 -3620
F - G 70 - 3650
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - M 261 -1238
M - L 188 -1373
L - K 55 - 1593
K - J 54 -1521
Chords Tens. Comp.
J - I 54 -1521
I - H 1721 - 76
H - G 3356 - 62
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
K - D 72 -3597
D - I 3710 - 61
Webs Tens. Comp.
I - E 53 - 1451
E - H 2520 -30
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 0.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 22.98 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.059 H 999 240
VERT(CL): 0.139 H 999 180
HORZ(LL): 0.016 D - -
HORZ(TL): 0.039 D - -
Creep Factor: 2.0
Max TC CSI: 0.557
Max BC CSI: 0.957
Max Web CSI: 0.656
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3H1
Ply: 2SEQN: 74902 COMN
FROM: KD
Page 1 of 2
Cust: R 6852 JRef:1XQK68520002 T138
DrwNo: 167.23.1325.20860
RDF / RTT 06/16/2023
2 Complete Trusses Required
W5 W6
W8
BL1
12'5"12 12'10"4
4'2"10
4'2"10
6'6"4
2'3"9
12'8"
6'1"12
18'9"13
6'1"13
21'1"6
2'3"9
25'4"
4'2"10
4'2"10
4'2"10
8'7"15
4'5"5
16'8"1
8'0"2
21'1"6
4'5"5
25'4"
4'2"10
4"15'7"6A
B
C
D
E
F
G
HIJKLMN
5
12
3X4(A1)
1.5X3
3X4
3X4
3X4 H0308
8X8
4X46X10
5X6
6X8
1.5X3
3X10(A1)
$%Lbl:3H1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Minimum Required bearing length for support points
with bearing plates (BP) and/or bearing blocks (BLn)
is equal to the nominal Brg Width shown.
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3H1
Ply: 2
Qty: 1
SEQN: 74902 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T138
DrwNo: 167.23.1325.20860
RDF / RTT 06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Additional Notes
Minimum Required bearing length for support points
with bearing plates (BP) and/or bearing blocks (BLn)
is equal to the nominal Brg Width shown.
Uplift connections required. See uplifts in R- and U
columns of Maximum Reactions table.
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3H1
Ply: 2
Qty: 1
SEQN: 74902 COMN
FROM: KD
Page 2 of 2
Cust: R 6852 JRef:1XQK68520002 T138
DrwNo: 167.23.1325.20860
RDF / RTT 06/16/2023
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
500 # ( 125.03 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 500 125.03 TC 0.00 4.00
500 129.73 BC 0.15 4.00
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 137 /- /- /86 /28 /125
E4 /-1/- /2/2/-
Wind reactions based on MWFRS
B Brg Wid = 48.0 Min Req = -
E Brg Wid = 1.5 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 438 - 431
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 F 999 240
VERT(CL): 0.005 F 765 180
HORZ(LL): 0.001 F - -
HORZ(TL): 0.002 B - -
Creep Factor: 2.0
Max TC CSI: 0.141
Max BC CSI: 0.136
Max Web CSI: 0.017
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J
Ply: 1SEQN: 74903 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T141
DrwNo: 167.23.1325.40427
RDF / RTT 06/16/2023
2'4"8
2'4"8
3'8"8
1'4"
4'
3"8
2'4"8
2'4"8
3'8"8
1'4"
4'
3"8
1'2"1'8"44"1 2'0"12'5"10A
B
D E
F
G
5
12
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
500 # ( 125.03 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 500 125.03 TC 0.00 4.00
500 129.73 BC 0.15 4.00
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B* 137 /- /- /86 /28 /125
E4 /-1/- /2/2/-
Wind reactions based on MWFRS
B Brg Wid = 48.0 Min Req = -
E Brg Wid = 1.5 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 438 - 431
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 F 999 240
VERT(CL): 0.005 F 765 180
HORZ(LL): 0.001 F - -
HORZ(TL): 0.002 B - -
Creep Factor: 2.0
Max TC CSI: 0.141
Max BC CSI: 0.136
Max Web CSI: 0.017
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J
Ply: 1SEQN: 74903 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T141
DrwNo: 167.23.1325.40427
RDF / RTT 06/16/2023
2'4"8
2'4"8
3'8"8
1'4"
4'
3"8
2'4"8
2'4"8
3'8"8
1'4"
4'
3"8
1'2"1'8"44"1 2'0"12'5"10A
B
D E
F
G
5
12
3X4(A1)
$%Lbl:3J?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 437 /- /- /208 /- /43
D 283 /- /- /34 /- /-
C 124 /- /- /73 /0 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.004 B - -
HORZ(TL): 0.009 B - -
Creep Factor: 2.0
Max TC CSI: 0.183
Max BC CSI: 0.367
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J1
Ply: 1SEQN: 74904 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T142
DrwNo: 167.23.1325.44637
RDF / RTT 06/16/2023
4'
4'1'2"
4"1 2'0"12'5"10A
B
C
D
5
12
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 437 /- /- /208 /- /43
D 283 /- /- /34 /- /-
C 124 /- /- /73 /0 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.004 B - -
HORZ(TL): 0.009 B - -
Creep Factor: 2.0
Max TC CSI: 0.183
Max BC CSI: 0.367
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J1
Ply: 1SEQN: 74904 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T142
DrwNo: 167.23.1325.44637
RDF / RTT 06/16/2023
4'
4'1'2"
4"1 2'0"12'5"10A
B
C
D
5
12
3X4(A1)
$%Lbl:3J1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 409 /- /- /172 /- /30
D 266 /- /- /17 /- /-
C 62 /- /- /35 /1 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 B - -
HORZ(TL): 0.003 B - -
Creep Factor: 2.0
Max TC CSI: 0.110
Max BC CSI: 0.178
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J2
Ply: 1SEQN: 74905 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T216
DrwNo: 167.23.1325.58397
RDF / RTT 06/16/2023
2'6"
2'6"1'2"
4"1 1'4"91'10"2A
B
C
D
5
12
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 409 /- /- /172 /- /30
D 266 /- /- /17 /- /-
C 62 /- /- /35 /1 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 1.5 Min Req = -
C Brg Wid = 1.5 Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 B - -
HORZ(TL): 0.003 B - -
Creep Factor: 2.0
Max TC CSI: 0.110
Max BC CSI: 0.178
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J2
Ply: 1SEQN: 74905 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T216
DrwNo: 167.23.1325.58397
RDF / RTT 06/16/2023
2'6"
2'6"1'2"
4"1 1'4"91'10"2A
B
C
D
5
12
3X4(A1)
$%Lbl:3J2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 327 /- /- /73 /- /20
C 272 /- /- /23 /- /-
B 80 /- /- /48 /0 /-
Wind reactions based on MWFRS
A Brg Wid = 2.0 Min Req = 1.5 (Truss)
C Brg Wid = 1.5 Min Req = -
B Brg Wid = 1.5 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 A - -
HORZ(TL): 0.003 A - -
Creep Factor: 2.0
Max TC CSI: 0.096
Max BC CSI: 0.191
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J3
Ply: 1SEQN: 74912 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T348
DrwNo: 167.23.1326.09577
RDF / RTT 06/16/2023
2'4"8
2'4"8
4"11 1'4"9A
B
C
5
12
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 327 /- /- /73 /- /20
C 272 /- /- /23 /- /-
B 80 /- /- /48 /0 /-
Wind reactions based on MWFRS
A Brg Wid = 2.0 Min Req = 1.5 (Truss)
C Brg Wid = 1.5 Min Req = -
B Brg Wid = 1.5 Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): NA
VERT(CL): NA
HORZ(LL): 0.002 A - -
HORZ(TL): 0.003 A - -
Creep Factor: 2.0
Max TC CSI: 0.096
Max BC CSI: 0.191
Max Web CSI: 0.000
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3J3
Ply: 1SEQN: 74912 MONO
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T348
DrwNo: 167.23.1326.09577
RDF / RTT 06/16/2023
2'4"8
2'4"8
4"11 1'4"9A
B
C
5
12
3X4(A1)
$%Lbl:3J3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 97.98 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 97.98 TC 0.00 8.17
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 558 /- /- /451 /54 /801
F 558 /- /- /451 /54 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 153 - 682
Chords Tens. Comp.
D - F 153 - 657
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 643 - 134
Chords Tens. Comp.
I - F 643 - 134
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.012 H 999 240
VERT(CL): 0.037 H 999 180
HORZ(LL): 0.005 C - -
HORZ(TL): 0.014 C - -
Creep Factor: 2.0
Max TC CSI: 0.164
Max BC CSI: 0.277
Max Web CSI: 0.105
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K
Ply: 1SEQN: 74906 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T349
DrwNo: 167.23.1327.32683
RDF / RTT 06/16/2023
8'2"
2'9"1'4"
(TYP)
4'1"
4'1"
8'2"
4'1"
8'2"
8'2"1'2"1'2"
4"12'0"72'6"1A
B
D
F
G
I
5
12
3X4(A1)
4X4
3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
All plates are 1.5X3 except as noted.
Loading
Truss transfers a maximum horizontal load of
800 # ( 97.98 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 97.98 TC 0.00 8.17
800 BC 0.15
Truss designed to support 1-0-0 top chord outlookers
and cladding load not to exceed 10.00 PSF one face
and 24.0" span opposite face. Top chord may be
notched 1.5" deep X 3.5" at 48" o/c along top edge.
DO NOT OVERCUT. No knots or other lumber
defects allowed within 12" of notches. Do not notch
in overhang or heel panel, unless specified otherwise.
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Gable Studs
Gable studs (dashed members) may be installed at 16"
oc with Wave plates. In lieu of plates use (3) 16 ga.
1/2" x 1.75" wire staples (0.064 Dia.) Toe nailed
through chord into web & web into chord on one face
for a total of (6) staples per connection.
Additional Notes
See DWGS A11515ENC160118, GBLLETIN0118, &
GABRST160118 for gable wind bracing and other
requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 558 /- /- /451 /54 /801
F 558 /- /- /451 /54 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
F Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - D 153 - 682
Chords Tens. Comp.
D - F 153 - 657
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - I 643 - 134
Chords Tens. Comp.
I - F 643 - 134
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.012 H 999 240
VERT(CL): 0.037 H 999 180
HORZ(LL): 0.005 C - -
HORZ(TL): 0.014 C - -
Creep Factor: 2.0
Max TC CSI: 0.164
Max BC CSI: 0.277
Max Web CSI: 0.105
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K
Ply: 1SEQN: 74906 GABL
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T349
DrwNo: 167.23.1327.32683
RDF / RTT 06/16/2023
8'2"
2'9"1'4"
(TYP)
4'1"
4'1"
8'2"
4'1"
8'2"
8'2"1'2"1'2"
4"12'0"72'6"1A
B
D
F
G
I
5
12
3X4(A1)
4X4
3X4(A1)
$%Lbl:3K?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 532 /- /- /306 /- /37
D 532 /- /- /306 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 116 - 593
Chords Tens. Comp.
C - D 116 - 593
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 523 -10
Chords Tens. Comp.
F - D 523 -10
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 F 999 240
VERT(CL): 0.016 F 999 180
HORZ(LL): 0.002 B - -
HORZ(TL): 0.006 B - -
Creep Factor: 2.0
Max TC CSI: 0.129
Max BC CSI: 0.362
Max Web CSI: 0.096
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K1
Ply: 1SEQN: 74907 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T350
DrwNo: 167.23.1327.35440
RDF / RTT 06/16/2023
8'2"
4'1"
4'1"
8'2"
4'1"
4'1"
4'1"
8'2"
4'1"1'2"1'2"
4"12'0"72'6"1A
B
C
D
E
F
5
12
3X4(A1)
4X4
1.5X3 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 532 /- /- /306 /- /37
D 532 /- /- /306 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 116 - 593
Chords Tens. Comp.
C - D 116 - 593
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 523 -10
Chords Tens. Comp.
F - D 523 -10
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 F 999 240
VERT(CL): 0.016 F 999 180
HORZ(LL): 0.002 B - -
HORZ(TL): 0.006 B - -
Creep Factor: 2.0
Max TC CSI: 0.129
Max BC CSI: 0.362
Max Web CSI: 0.096
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K1
Ply: 1SEQN: 74907 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T350
DrwNo: 167.23.1327.35440
RDF / RTT 06/16/2023
8'2"
4'1"
4'1"
8'2"
4'1"
4'1"
4'1"
8'2"
4'1"1'2"1'2"
4"12'0"72'6"1A
B
C
D
E
F
5
12
3X4(A1)
4X4
1.5X3 3X4(A1)
$%Lbl:3K1?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 244.96 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 244.96 TC 0.00 8.17
2000 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 532 /- /- /712 /157 /2001
D 532 /- /- /712 /157 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 661 -1260
Chords Tens. Comp.
C - D 598 -1197
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1223 - 717
Chords Tens. Comp.
F - D 1223 - 717
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.015 F 999 240
VERT(CL): 0.016 F 999 180
HORZ(LL): 0.012 D - -
HORZ(TL): 0.015 D - -
Creep Factor: 2.0
Max TC CSI: 0.140
Max BC CSI: 0.362
Max Web CSI: 0.096
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K2
Ply: 1SEQN: 74908 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T351
DrwNo: 167.23.1327.43657
RDF / RTT 06/16/2023
8'2"
4'1"
4'1"
8'2"
4'1"
4'1"
4'1"
8'2"
4'1"1'2"1'2"
4"12'0"72'6"1A
B
C
D
E
F
5
12
3X4(A1)
4X4
1.5X3 3X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors.
Loading
Truss transfers a maximum horizontal load of
2000 # ( 244.96 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 2000 244.96 TC 0.00 8.17
2000 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 532 /- /- /712 /157 /2001
D 532 /- /- /712 /157 /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = 3.5 Min Req = 1.5 (Truss)
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 661 -1260
Chords Tens. Comp.
C - D 598 -1197
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - F 1223 - 717
Chords Tens. Comp.
F - D 1223 - 717
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.015 F 999 240
VERT(CL): 0.016 F 999 180
HORZ(LL): 0.012 D - -
HORZ(TL): 0.015 D - -
Creep Factor: 2.0
Max TC CSI: 0.140
Max BC CSI: 0.362
Max Web CSI: 0.096
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K2
Ply: 1SEQN: 74908 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T351
DrwNo: 167.23.1327.43657
RDF / RTT 06/16/2023
8'2"
4'1"
4'1"
8'2"
4'1"
4'1"
4'1"
8'2"
4'1"1'2"1'2"
4"12'0"72'6"1A
B
C
D
E
F
5
12
3X4(A1)
4X4
1.5X3 3X4(A1)
$%Lbl:3K2?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 494 /- /- /267 /- /30
E 414 /- /- /167 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 102 - 401
Chords Tens. Comp.
C - D 108 - 403
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F - D 382 - 75
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 B 999 240
VERT(CL): 0.014 B 999 180
HORZ(LL): 0.002 B - -
HORZ(TL): 0.006 B - -
Creep Factor: 2.0
Max TC CSI: 0.135
Max BC CSI: 0.350
Max Web CSI: 0.121
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K3
Ply: 1SEQN: 74909 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T352
DrwNo: 167.23.1328.02980
RDF / RTT 06/16/2023
6'4"
4'1"
4'1"
6'4"
2'3"
4'1"
4'1"
6'4"
2'3"1'2"
4"1 1'1"32'0"72'6"1A
B
C
D
EF
5
12
3X4(A1)
4X4
3X4
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
B 494 /- /- /267 /- /30
E 414 /- /- /167 /- /-
Wind reactions based on MWFRS
B Brg Wid = 3.5 Min Req = 1.5 (Truss)
E Brg Wid = - Min Req = -
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 102 - 401
Chords Tens. Comp.
C - D 108 - 403
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
F - D 382 - 75
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.005 B 999 240
VERT(CL): 0.014 B 999 180
HORZ(LL): 0.002 B - -
HORZ(TL): 0.006 B - -
Creep Factor: 2.0
Max TC CSI: 0.135
Max BC CSI: 0.350
Max Web CSI: 0.121
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K3
Ply: 1SEQN: 74909 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T352
DrwNo: 167.23.1328.02980
RDF / RTT 06/16/2023
6'4"
4'1"
4'1"
6'4"
2'3"
4'1"
4'1"
6'4"
2'3"1'2"
4"1 1'1"32'0"72'6"1A
B
C
D
EF
5
12
3X4(A1)
4X4
3X4
3X4
1.5X4
$%Lbl:3K3?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss transfers a maximum horizontal load of
800 # ( 126.40 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 126.40 TC 0.00 6.33
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 434 /- /- /434 /78 /800
D 420 /- /- /330 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 351 - 764
Chords Tens. Comp.
B - C 122 -419
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 382 -89
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - C 400 -89
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 A 999 240
VERT(CL): 0.016 A 999 180
HORZ(LL): 0.003 A - -
HORZ(TL): 0.007 A - -
Creep Factor: 2.0
Max TC CSI: 0.161
Max BC CSI: 0.363
Max Web CSI: 0.127
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K4
Ply: 1SEQN: 74910 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T353
DrwNo: 167.23.1328.05687
RDF / RTT 06/16/2023
6'4"
4'1"
4'1"
6'4"
2'3"
4'1"
4'1"
6'4"
2'3"
4"1 1'1"32'0"7A
B
C
DE
5
12
3X4(A1)
4X4
3X4
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
Loading
Truss transfers a maximum horizontal load of
800 # ( 126.40 plf ) along top chord, from either
direction, to supports where indicated. Diaphragm and
connections are to be designed by Engineer of Record.
Drag Loads: Force(#) (PLF) Mbr Start End
Case 1: 800 126.40 TC 0.00 6.33
800 BC 0.15
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
A 434 /- /- /434 /78 /800
D 420 /- /- /330 /- /-
Wind reactions based on MWFRS
A Brg Wid = 3.5 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 351 - 764
Chords Tens. Comp.
B - C 122 -419
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - E 382 -89
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - C 400 -89
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.007 A 999 240
VERT(CL): 0.016 A 999 180
HORZ(LL): 0.003 A - -
HORZ(TL): 0.007 A - -
Creep Factor: 2.0
Max TC CSI: 0.161
Max BC CSI: 0.363
Max Web CSI: 0.127
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K4
Ply: 1SEQN: 74910 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T353
DrwNo: 167.23.1328.05687
RDF / RTT 06/16/2023
6'4"
4'1"
4'1"
6'4"
2'3"
4'1"
4'1"
6'4"
2'3"
4"1 1'1"32'0"7A
B
C
DE
5
12
3X4(A1)
4X4
3X4
3X4
1.5X4
$%Lbl:3K4?$
06/16/2023
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 400 /- /- /157 /- /18
D 400 /- /- /152 /- /-
Wind reactions based on MWFRS
F Brg Wid = 2.0 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 E 999 240
VERT(CL): 0.005 E 999 180
HORZ(LL): -0.000 A - -
HORZ(TL): 0.001 A - -
Creep Factor: 2.0
Max TC CSI: 0.134
Max BC CSI: 0.283
Max Web CSI: 0.106
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K5
Ply: 1SEQN: 74911 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T354
DrwNo: 167.23.1328.07647
RDF / RTT 06/16/2023
5'5"8
3'2"8
3'2"8
5'5"8
2'3"
3'2"8
3'2"8
5'5"8
2'3"8"71'1"32'0"7A
B
C
DEF
5
12
3X4
1.5X4(**)
4X4
3X8
3X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!
**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org
Inland Empire Truss
275 West Rider St
Perris CA 92571
(951)300-1758
155 Harlem Ave
North Building, 4th Floor
Glenview, IL 60025
Lumber
Top chord 2x4 DF-L #2(g)
Bot chord 2x4 DF-L #2(g)
Webs 2x4 DF-L Standard(g)
Lumber shall be dried to a maximum moisture content
of 19% prior to installation.
Plating Notes
Connectors in green lumber (g) designed using
NDS/TPI reduction factors. Hangers shall be installed
after lumber has air-dried to 19% or less moisture
content.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Bottom chord checked for 10.00 psf non-concurrent
live load.
Truss checked for 250# movable concentrated load
along Bottom Chord, nonconcurrent with design
gravity loads.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+ / R- / Rh / Rw / U / RL
F 400 /- /- /157 /- /18
D 400 /- /- /152 /- /-
Wind reactions based on MWFRS
F Brg Wid = 2.0 Min Req = 1.5 (Truss)
D Brg Wid = - Min Req = -
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL: 20.00
TCDL: 18.00
BCLL: 0.00
BCDL: 8.00
Des Ld: 46.00
NCBCLL: 10.00
Soffit: 2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std: ASCE 7-16
Speed: 100 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 10.8 psf
BCDL: 4.8 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
IBC 2021
TPI Std: 2014
Rep Fac: Varies by Ld Case
FT/RT:8(0)/10(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL): 0.002 E 999 240
VERT(CL): 0.005 E 999 180
HORZ(LL): -0.000 A - -
HORZ(TL): 0.001 A - -
Creep Factor: 2.0
Max TC CSI: 0.134
Max BC CSI: 0.283
Max Web CSI: 0.106
VIEW Ver: 21.02.00.1005.17
Job Number:RE1536_DV
FAIRFIELD @ ALBERHILL RANCH
Truss Label:3K5
Ply: 1SEQN: 74911 COMN
FROM: KD
Cust: R 6852 JRef:1XQK68520002 T354
DrwNo: 167.23.1328.07647
RDF / RTT 06/16/2023
5'5"8
3'2"8
3'2"8
5'5"8
2'3"
3'2"8
3'2"8
5'5"8
2'3"8"71'1"32'0"7A
B
C
DEF
5
12
3X4
1.5X4(**)
4X4
3X8
3X4
1.5X4
$%Lbl:3K5?$
06/16/2023
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:BRCLBSUB0119?$
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:A11515ENC160118?$
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:GABRST160118?$
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:GBLLETIN0118?$06/16/2023
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:A11530ENC160118?$
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:CNNAILSP1014?$
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:BRCALHIP0118?$06/16/2023
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:VALTN160118?$06/16/2023
155 Harlem AveNorth Building, 4th FloorGlenview, IL 60025#%DETAIL?$$%Lbl:S11515ENC160118?$06/16/2023