Loading...
HomeMy WebLinkAboutAlberhill - Rough Grading Permit 8.8.22 PERMIT NUMBER: ENG-2021-00362 LAKE C LSInOKE PERMIT STATUS: ISSUED —,-` DREAM EXTREME Effective Date:8/8/22 Expiration Date:2/6/23 130 S MAIN LAKE ELSINORE,CA 92530 TEL:(951)674-3124 WWW.LAKE-ELSINORE.ORG PERMITTEE: MATTHEW MATSON CONTACT: MATT MATSON ADDRESS: 27401 LOS ATLOS UNIT 400 WORK DESCRIPTION: TR 28214-9 ALBERHILL ROUGH GRADE PROJECT PERMIT SPECIFIC CONDITIONS-RESTRICTIONS: THIS IS YOUR RECEIPT WHEN MACHINE VALIDATED LOCATION: ALBERHILL RANCH LAKE ELSINORE, OTHER ID: PERMIT FEES: FEES CHARGES FEES: FEES PAID: FEES: ADMINISTRATIVE CHARGE ($200) $200.00 ADMINISTRATIVE CHARGE ($: $200.00 REPRODUCTIONS-COPYING $8.25 REPRODUCTIONS-COPYING $8.25 GRADING PERMIT(TOTAL CUBIC YAF $10,416.46 GRADING PERMIT(TOTAL CU $10,416.46 KANGAROO RAT HABITAT $67,050.00 KANGAROO RAT HABITAT $67,050.00 IMPROVEMENT INSPECTION FEE $42,220.60 IMPROVEMENT INSPECTION $42,220.60 DIF DRAINAGE FEE- RICE CANYON $178,140.05 DIF DRAINAGE FEE- RICE CAP $178,140.05 DIF DRAINAGE FEE-NICHOLS STREE- $689,897.60 DIF DRAINAGE FEE- NICHOLS $689,897.60 TOTAL FEES: $0.00 ISSU ISSUED DATE: 08/08/2022 Owner / Applicant / Contractor / Agent NOTES & CONDITIONS Call either of the Engineering Inspectors: Scott Rippstein at 951-538-9116,or Mike Payment at 951-805-9835 WITHIN 24 HOURS of RECEIVING THIS PERMITto schedule a preconstruction meeting. A copy of this PERMIT,approved plans and SWPPP &applicable REAP must remain onsite at all times or a STOP WORK NOTICE will be issued. Monday,August 8,2022 City of Lake Elsinore,Engineering Division Please read and initial: —1- I am Licensed under the provisions of Business and Professional Post in conspicuous place on the job Code Section 7000 et seq.and my license is in full force. Permit Card/Approved Plans must be available for each inspection or inspection will not be made _2. I,as owner of the property,or my employees w/wages as their You must furnish PERMIT NUMBER and the JOB ADDRESS far sole compensation will do the work and the structure is not intended or offered for sale. each respective inspection: CONTACT Engineering Inspector listed on front to schedule inspection /03. I,as owner of the property,am exclusively contracting with licensed contractors to construct the project. _4. 1 have a certificate of consent to self-insure or a Certificate of Worker's Compensation Insurance or a certified copy thereof. DEPARTMENT USE ONLY _5. 1 shall not employ any person in any manner so as to become - subject to Worker's Compensation laws in the performance of the work for Inspection Item Ins ector Date which this permit is issued. Soil Stripping/Clearing Dry Weather Earthwork _ Note: If you should become subject to Worker's Compensation after .......... _...._........ making this certification,you must forthwith comply with such provisions or Wet Weather Earthwork this permit shall be deemed revoked. Fill/Landscape Stockpiles Cut Sloped 2H:1 V or Flatter Rough Footing Excavation Inspection Item Inspector Date -Conventional TYP Retaining Wall-separate permit required _. .--.__ _. - Piers&Caisson Driveway/Private Road Trenching — Sub-Grade Preparation Trench Plates Approach Grades/Width I Other: Vertical Clearance Fills _Turning Radiusfrurnouts Setbacks — _ Structural Section - — Preparation of Ground Portland Concrete(Rigid) Approved Fill Material - p Asphalt Concrete(Flexible) Fill Sloes 2H:1V or Fla - tter -Crushed rock or Gravel Toe Bench/Keys -Other Unpaved Compaction of Ground Road Drainage Other Code Violations 1 Drainage I Terracing Non-Stormwater Discharge-note on separate form Positive Drainage from Bldg Illegal Storm Drain Connection-note on separate form E Culverts/Catch Basins Hazardous Conditions i. Drainage for Cut/Fill Slopes Grading w/o Permit Terraces/Swales Intermediate Reports Subsurface Drainage Compaction Test Summary Interceptor Drains Elevation Certificate(SFHA)for Pad I. Erosion Control BMP's - Progress Grading Report SWPPP ONSITE Final Grading&Reports i Short Term: Soils Grading Report Silt Fence/Plastic Covering As-Graded Plan redline Straw balelGravel bag Barrier Geologic Grading Report Sediment Basin/Traps Elevation Certificate(SFHA)w/photo Check Dam/Gravel Bag Berm Notice of Completion-recorded Fiber Rolis/Jute Netting Notice of Termination Rock/gravel Constr. Entrance Wind/Dust Control ;! Long Term Hydro-mulching RELEASE Straw/Wood Mulch Division .......... _... Geotextiles& Mats FIELD INSPECTION Energy Dissipation Devices IN HOUSE TECHNICIAN Stream Bank Stabihlzation ., DISTRIBUTION: APPLICANT,FILE,INSPECTOR,NPDES COORDINATOR.-,.-,_ https://lakeelsinore.sharepoiiit.com/eng/Shared Documents/Engr/Forms/Engineering Forms/Grading permit form Energov 20171205.doc