HomeMy WebLinkAboutBid Ad proof City of Lake Elsinore Page 1 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Bid Detail
Project Title ATP Cycle 4 Murrieta Creek Multi-Use Trail Project
Invitation# ATPL-5074(021)/CIP No.Z30010
Bid Posting Date 05/13/2025 9:44 AM(PDT)
Project Stage Awarded
Project Due Date 06/17/2025 2:00 PM(PDT)
Response Format Electronic only
Link to Project https://vendors.planetbids.com/portal/l4272/bo/bo-detail/129811
Reference ID
Project Type Bid
Response Types Line Items
Subcontractor
Bid Bond
General Attachment(required)
Type of Award Lump Sum
Categories 91223-Construction,General(Backfill Services,Digging,Ditching,Road Grading,Rock Stabilization,Etc.)
91394-Paving/Resurfacing,Alley And Parking Lot
91430-Concrete
98832-Grading(Of Parking Lots,Etc.-Not Road Building)
License Class A or a combination Specialty Class C
Requirements
Restriction eBid Only
Restricted To CADIR-Registered DIR Public Works Contractor
99999-Plan Rooms
Department Engineering
Address 130 S.Main Street
Lake Elsinore,California
92530
County Riverside
Bid Valid
Liquidated Damages $2500 PER CALENDAR DAY
Engineer's Estimate
Estimated Bid Value NO ENGINEER'S ESTIMATE
Start/Delivery Date
Project Duration 200 WORKING DAYS
Prevailing Wage Yes
Cooperative Bid No
Piggy-backable No
eBid Notes
Bid Bond
Bid Bond 10%
Payment Bond 100%
Performance Bond 100%
Pre-Bid Meeting Information
Pre-Bid Meeting No
City of Lake Elsinore Page 2 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Online Q&A
Online Q&A Yes
Q&A Deadline 05/27/2025 3:00 PM(PDT)
Contact Information
Contact Info Nicole McCalmont 951-674-3124 x245
nmccalmont@lake-elsinore.org
Bids to PlanetBids
Owner's Agent City of Lake Elsinore - City Clerk
Description
Scope of Services In general, this project will consist of construction of 1.3-mile multi-use trail at in
the back basin area of the City of Lake Elsinore. The work involves construction of hot
mix asphalt pavement, grading, retaining walls (Caltrans STD B3-7A), concrete brow
ditch, PCC pavement, storm drain RCP and headwall, prefabricated pedestrian bridge,
abutment and foundation, wood post fence and chain-link fence, wayfinding signage and
headwall, temporary water pollution control, signing and marking, and any other work as
may be required.
Other Details
Notes
Special Notices <font color="#FF0000">If you would like to purchase the Bid Documents via the"DOWNLOAD"option you
must enter your CA DIR information in your vendor profile first;otherwise,you will be unable to purchase
using the download option.</font>
Local Programs&
Policies
Documents
File Title File Name Status
Final Plan Set MCT ATPL 5074(021)-City No Z30010 Murrieta Creek Multi-Use Trail Final Plans_signed.pdf On Server
Final Spec Book MCT ATP Cycle 4 Murrieta Creek Multi Use Trail Spec Book-final signatures.pdf On Server
Final Geotechnical Report MCT Geotech Final Report 9-29-23.pdf On Server
Download Cost $10.00
Pla ,Rds
City of Lake Elsinore Page 3 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Addenda
None
PlanetBids
City of Lake Elsinore Page 4 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Released Questions
Set 1
1.1 Submitted 05/14/2025 10:21 AM(PDT) Does the bidder need to be identified on the prequalified contractors...
Vendor Empire Equipment Service,Inc.
Question Does the bidder need to be identified on the prequalified contractors list to submit a bid for this solicitation?
Answer No.
1.2 Submitted 05/14/2025 8:36 AM(PDT) Please advise if there is a DBE goal or Good Faith Efforts required?
Vendor Beador Construction Company,Inc.
Question Please advise if there is a DBE goal or Good Faith Efforts required?
Answer No.
Pla ,Rds
City of Lake Elsinore Page 5 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Set 2
2.1 Submitted 05/19/2025 9:54 AM(PDT) Must line item prices be entered through PlanetBids and also written o...
Vendor Environmental Construction,Inc
Question Must line item prices be entered through PlanetBids and also written on the bid Form and uploaded?
Answer YES.
PlanetBids
City of Lake Elsinore Page 6 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Set 3
3.1 Submitted 05/22/2025 8:40 AM(PDT) Are there details For the bridge foundations?
Vendor GeoStabilizaLion International LLC
Question Are there details for the bridge foundations?
Answer Yes.The structural plans start from sheet 32 of36 in the final plan set
3.2 Submitted 05/19/2025 9:58 AM(PDT) Please confirm that Professional Liability Insurance is required of th...
Vendor Environmental Construction,Inc
Question Please confirm that Professional Liability Insurance is required of the prime contractor.This is unusual because
no design services are part of the scope.Requiring Professional Liability Insurance will increase costs to
bidders.
Answer Yes this is part of the requirement
PlanelBlds
City of Lake Elsinore Page 7 of 7
ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026
Set 4
4.1 Submitted 05/27/2025 1:53 PM(PDT) Section 300-12.3 Construction Management Plan of the Special Provision...
Vendor Riverside Construction Company,Inc.
Question Section 300-12.3 Construction Management Plan of the Special Provisions requires contractor to maintain
noise limit of 75 dBA at the boundary line of any occupied property.There's well over 3000 LF of occupied
property adjacent to the proposed trail.Using conventional earthwork equipment which exceeds 75 dBA,will
temporary sound barriers be required to maintain noise limits?
Answer In accordance with the Municipal Code,the Contractor shall minimize noise adjacent to occupied properties to
the maximum extent technically feasible and economically reasonable.The Contractor shall similarly minimize
noise adjacent to sensitive or occupied habitat,as described in Section 300-12.1 of the Specifications.The
Contractor's noise-control methods shall be detailed in the Construction Management Plan submitted to the
Engineer for review and approval.
4.2 Submitted 05/27/2025 1:17 PM(PDT) The Arizona Crossing Detail on plan sheet 03 shows 2'cut-off walls at...
Vendor Riverside Construction Company,Inc.
Question The Arizona Crossing Detail on plan sheet 03 shows 2'cut-off walls along the longitudinal sides of the crossing.
Please indicate how this work is quantified and paid.
Answer Payment for the 2 ft cutoff walls is included within the SF unit price paid for Bid Item#31 (Construct 6"
Reinforced PCC pavement).