HomeMy WebLinkAboutBid Ad proof City of Lake Elsinore Page 1 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Bid Detail Project Title ATP Cycle 4 Murrieta Creek Multi-Use Trail Project Invitation# ATPL-5074(021)/CIP No.Z30010 Bid Posting Date 05/13/2025 9:44 AM(PDT) Project Stage Awarded Project Due Date 06/17/2025 2:00 PM(PDT) Response Format Electronic only Link to Project https://vendors.planetbids.com/portal/l4272/bo/bo-detail/129811 Reference ID Project Type Bid Response Types Line Items Subcontractor Bid Bond General Attachment(required) Type of Award Lump Sum Categories 91223-Construction,General(Backfill Services,Digging,Ditching,Road Grading,Rock Stabilization,Etc.) 91394-Paving/Resurfacing,Alley And Parking Lot 91430-Concrete 98832-Grading(Of Parking Lots,Etc.-Not Road Building) License Class A or a combination Specialty Class C Requirements Restriction eBid Only Restricted To CADIR-Registered DIR Public Works Contractor 99999-Plan Rooms Department Engineering Address 130 S.Main Street Lake Elsinore,California 92530 County Riverside Bid Valid Liquidated Damages $2500 PER CALENDAR DAY Engineer's Estimate Estimated Bid Value NO ENGINEER'S ESTIMATE Start/Delivery Date Project Duration 200 WORKING DAYS Prevailing Wage Yes Cooperative Bid No Piggy-backable No eBid Notes Bid Bond Bid Bond 10% Payment Bond 100% Performance Bond 100% Pre-Bid Meeting Information Pre-Bid Meeting No City of Lake Elsinore Page 2 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Online Q&A Online Q&A Yes Q&A Deadline 05/27/2025 3:00 PM(PDT) Contact Information Contact Info Nicole McCalmont 951-674-3124 x245 nmccalmont@lake-elsinore.org Bids to PlanetBids Owner's Agent City of Lake Elsinore - City Clerk Description Scope of Services In general, this project will consist of construction of 1.3-mile multi-use trail at in the back basin area of the City of Lake Elsinore. The work involves construction of hot mix asphalt pavement, grading, retaining walls (Caltrans STD B3-7A), concrete brow ditch, PCC pavement, storm drain RCP and headwall, prefabricated pedestrian bridge, abutment and foundation, wood post fence and chain-link fence, wayfinding signage and headwall, temporary water pollution control, signing and marking, and any other work as may be required. Other Details Notes Special Notices <font color="#FF0000">If you would like to purchase the Bid Documents via the"DOWNLOAD"option you must enter your CA DIR information in your vendor profile first;otherwise,you will be unable to purchase using the download option.</font> Local Programs& Policies Documents File Title File Name Status Final Plan Set MCT ATPL 5074(021)-City No Z30010 Murrieta Creek Multi-Use Trail Final Plans_signed.pdf On Server Final Spec Book MCT ATP Cycle 4 Murrieta Creek Multi Use Trail Spec Book-final signatures.pdf On Server Final Geotechnical Report MCT Geotech Final Report 9-29-23.pdf On Server Download Cost $10.00 Pla ,Rds City of Lake Elsinore Page 3 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Addenda None PlanetBids City of Lake Elsinore Page 4 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Released Questions Set 1 1.1 Submitted 05/14/2025 10:21 AM(PDT) Does the bidder need to be identified on the prequalified contractors... Vendor Empire Equipment Service,Inc. Question Does the bidder need to be identified on the prequalified contractors list to submit a bid for this solicitation? Answer No. 1.2 Submitted 05/14/2025 8:36 AM(PDT) Please advise if there is a DBE goal or Good Faith Efforts required? Vendor Beador Construction Company,Inc. Question Please advise if there is a DBE goal or Good Faith Efforts required? Answer No. Pla ,Rds City of Lake Elsinore Page 5 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Set 2 2.1 Submitted 05/19/2025 9:54 AM(PDT) Must line item prices be entered through PlanetBids and also written o... Vendor Environmental Construction,Inc Question Must line item prices be entered through PlanetBids and also written on the bid Form and uploaded? Answer YES. PlanetBids City of Lake Elsinore Page 6 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Set 3 3.1 Submitted 05/22/2025 8:40 AM(PDT) Are there details For the bridge foundations? Vendor GeoStabilizaLion International LLC Question Are there details for the bridge foundations? Answer Yes.The structural plans start from sheet 32 of36 in the final plan set 3.2 Submitted 05/19/2025 9:58 AM(PDT) Please confirm that Professional Liability Insurance is required of th... Vendor Environmental Construction,Inc Question Please confirm that Professional Liability Insurance is required of the prime contractor.This is unusual because no design services are part of the scope.Requiring Professional Liability Insurance will increase costs to bidders. Answer Yes this is part of the requirement PlanelBlds City of Lake Elsinore Page 7 of 7 ATP Cycle 4 Murrieta Creek Multi-Use Trail Project(ATPL-5074(021)/CIP No.Z30010),bidding on 06/17/2025 2:00 PM(PDT) Printed 03/30/2026 Set 4 4.1 Submitted 05/27/2025 1:53 PM(PDT) Section 300-12.3 Construction Management Plan of the Special Provision... Vendor Riverside Construction Company,Inc. Question Section 300-12.3 Construction Management Plan of the Special Provisions requires contractor to maintain noise limit of 75 dBA at the boundary line of any occupied property.There's well over 3000 LF of occupied property adjacent to the proposed trail.Using conventional earthwork equipment which exceeds 75 dBA,will temporary sound barriers be required to maintain noise limits? Answer In accordance with the Municipal Code,the Contractor shall minimize noise adjacent to occupied properties to the maximum extent technically feasible and economically reasonable.The Contractor shall similarly minimize noise adjacent to sensitive or occupied habitat,as described in Section 300-12.1 of the Specifications.The Contractor's noise-control methods shall be detailed in the Construction Management Plan submitted to the Engineer for review and approval. 4.2 Submitted 05/27/2025 1:17 PM(PDT) The Arizona Crossing Detail on plan sheet 03 shows 2'cut-off walls at... Vendor Riverside Construction Company,Inc. Question The Arizona Crossing Detail on plan sheet 03 shows 2'cut-off walls along the longitudinal sides of the crossing. Please indicate how this work is quantified and paid. Answer Payment for the 2 ft cutoff walls is included within the SF unit price paid for Bid Item#31 (Construct 6" Reinforced PCC pavement). PlanetBids