Loading...
HomeMy WebLinkAbout182522-35A Post Grade Report SIGNED - Earth Strata Geotechnical Services, Inc. Geotechnical, Environmental and Materials Testing Consultants October 15, 2021 Project No. 182522-35A Mr. Scott Hardesty Hardesty&Associates, Inc. 711 W. 17th Street, Unit D-2 Costa, CA Subject: Summary of Observations and Testing for the Sewer, Water, Storm Drain, and Dry Utility Backfill, Proposed C-Store, Car Wash and Gas Station, Assessor's Parcel Number 377-243-002 thru 377-243-007, Located on the Southeast Corner of North Main Street and West Flint Street, City of Lake Elsinore, Riverside County, California Per your request, Earth Strata Geotechnical Services Inc. has provided geotechnical observations and testing services during backfill operations for the subject utility trenches. The subject property is located on the southeast corner of North Main Street and West Flint Street in the City of Lake Elsinore, Riverside County, California. This report summarizes the geotechnical conditions observed and tested during post grading operations. Based on our part time observations and selective testing, it is our opinion that the backfill has been placed in general accordance with the recommendations of the geotechnical consultant of record and the geotechnical requirements of the City of Lake Elsinore and Riverside County. The test results reported herein were prepared in conformance with generally accepted professional engineering practices in this area at the time of this report and no further warranty is expressed or implied. Post grading operations began in May 2021 and were completed in October of 2021. SUMMARY OF OBSERVATIONS AND TESTING Sewer.Water,and Storm Drain Trench Backfill Sewer, water, joint, and storm drain trenches were backfilled with onsite earth materials. The backfill materials were watered or air-dried as necessary to achieve optimum or slightly above optimum moisture content and then compacted in 8±-inch thick lifts by either a compacting wheel connected to a trackhoe or by wheel-rolling with a loader or similar heavy equipment. The backfill was compacted to a minimum of 90 percent of the maximum dry density determined by ASTM D 1557. The depth of shading materials (sand) placed above the pipes varied from approximately 8 to 12 inches and was thoroughly jetted prior to placing the backfill materials. Maximum trench depths were on the order of 1 to 4± feet at the time of our observations and testing. Driveway and Street Subgrade and Aggregate Base Subgrade earth materials immediately below the curb and gutter areas were compacted to a minimum of 90 percent of the maximum dry density to a minimum depth of 12 inches. 42184 REMINGTON AVENUE, TEMECULA, CA 92590 951-461-4028, ESGSINC.COM Subgrade earth materials immediately below the driveway areas were compacted to a minimum of 95 percent of the maximum dry density to a minimum depth of 12 inches. Aggregate base was compacted to a minimum of 95 percent of the maximum dry density. Field Testing Field density and moisture content tests utilizing nuclear gauge methods were performed in accordance with ASTM D 6938. Visual classification of the earth materials in the field was the basis for determining which maximum dry density value was applicable for a given density test. Test results are shown on the attached Table 1. Field density tests were taken at vertical intervals of approximately 2 feet for approximately every 200 linear feet of trench. The actual number of tests taken per day varied depending on the site conditions and the quantity and type of equipment utilized. When field density tests yielded results less than the minimum required density, the approximate limits of the substandard fill were established. The substandard area was then reworked (most common) or removed, moisture conditioned, recompacted, and retested until the minimum density was achieved. In most cases, failed density tests were noted then retested in the same general vicinity at nearly the same elevation as the failed test. Laboratory Testing The maximum dry density and optimum moisture content for each major type of earth material encountered during backfilling was determined using the guidelines of ASTM D 1557. The Proctor Table below presents the pertinent test values. Proctor Table SAMPLE NO. DESCRIPTION OPTIMUM MOISTURE MAXIMUM DRY CONTENT % DENSITY c 1 Silty SAND 10.5 128.5 2 Silty SAND 13.0 124.5 3 Silty SAND 11.0 127.5 4 Silty SAND 12.5 126.0 AB-1 Aggregate Base 6.5 146.5 1EA\1UF1H1 S F]R A,' FA\ G1E0 F1EC1HNT11 CA\1L 551ElKVI C1ES Page 2 Project No. 182522-35A October 15, 2021 GRADING AND CONSTRUCTION RESPONSIBILITY It is the responsibility of the contractor or his subcontractors to meet or exceed the project specifications for grading and construction. The responsibilities of Earth-Strata did not include the supervision or direction of the contractor's personnel, equipment, or subcontractors performing the actual work. Our field representative onsite was intended to provide the owner with professional advice, opinions, and recommendations based on limited observations and limited testing of the contractor's work. Our services do not relieve the contractor or his subcontractors of their responsibility, should defects in their work be discovered. The conclusions and recommendations herein are based on the observations and test results for the areas tested, and represent our engineering opinion as to the contractor's compliance with the project specifications. REPORT LIMITATIONS The test results reported herein were prepared in conformance with generally accepted professional engineering practices in this area at the time of this report and no further warranty is expressed or implied. This report has not been prepared for use by parties or projects other than those named or described herein. This report may not contain sufficient information for other parties or other purposes. This report is subject to review by the controlling authorities for this project. Earth-Strata sincerely appreciates the opportunity to provide our services and advice on this project. Respectfully submitted, ]EAVRLL F)H[ 5'FIKA0FA\ G1E0 F1E1C1H1N1[(C__AJL S]E)KVI(C1ES, I[NC.. @RpFESs/0 ��t���t►�CF(q Stephen M. Poole, PE, GE t9 No. 692 m P g Principal Engineer w W m SMP/jmr d'1OrL�CNN\0O' OF�S 0. Attachments: Table 1 - Summaryi y Tests Map B-Retaining Wall and Alley Map C-Sidewalks,Curbs,and Gutters Map D -Drives and Parking Map E -Storm Drain,Sewer Line,Grease Trap,and Utility Trench Distribution: (2)Addressee ]EAUK"]['1H[ S']['1[LA\TA\ G1EOTIECHINICA\1L S1ERV11C1ES Page 3 Project No. 182522-35A October 15, 2021 TABLE 1 SUMMARY OF FIELD DENSITY TESTS TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density o 0 (pcf) (/o) (pcf) (/o) RETAINING WALL FOOTING; 1. N 3/25/2021 SG -3 2 115.1 4.3 127.5 BOTTOM, SOUTHEAST END 2. N 3/25/2021 SG RETAINING WALL FOOTING; 30 -3 2 116 4 127.5 FEET NORTH OF TEST#1 3. N 3/25/2021 SG RETAINING WALL FOOTING; 30 -3 1 115 4 124.5 FEET NORTH OF TEST#2 4. N 3/25/2021 SG RETAINING WALL FOOTING; 30 -3 1 117.2 3 124.5 FEET NORTH OF TEST#3 RETAINING WALL FOOTING; OVER- 5. N 3/25/2021 SG -3 1 113.1 7 124.5 91 EX BOTTOM, SOUTH END RETAINING WALL FOOTING; OVER- 6. N 3/25/2021 SG -3 1 112.9 8 124.5 91 EX BOTTOM RETAINING WALL FOOTING; OVER- 7. N 3/25/2021 SG -3 1 114.3 7 124.5 92 EX BOTTOM 8. N 3/25/2021 SG TEST#1 -3 2 115.6 5 127.5 91 9. N 3/25/2021 SG TEST#2 -3 2 116.1 6 127.5 91 RETAINING WALL FOOTING; 10. N 3/25/2021 CF FOOTING, OVER-EX, COMPACTED -2 2 125.8 7 127.5 99 FILL 11. N 3/25/2021 CF RETAINING WALL FOOTING; 30 -2 2 124.4 6 127.5 FEET EAST OF TEST#10 12. N 3/25/2021 CF RETAINING WALL FOOTING; 30 2 2 122.2 5.8 127.5 96 FEET NORTH OF TEST#11 13. N 3/25/2021 CF FOOTING COMPACTED FILL FG 2 122 7 127.5 96 14. N 3/25/2021 CF FOOTING COMPACTED FILL FG 2 123.5 7 127.5 97 15. N 5/26/2021 CF WESTERN SIDE OF TRENCH FG 3 102.3 11.3 127.5 80 16. N 5/26/2021 CF RETEST OF TEST#15 FG 3 118.4 10.9 127.5 93 17. N 6/14/2021 CF SEWER TRENCH ON -4 4 114.6 14.2 126.0 SOUTHEASTERN CORNER OF BLDG SEWER TRENCH ON 18. N 6/14/2021 CF SOUTHEASTERN CORNER OF BLDG -4 4 115.2 13.5 126.0 (5 FEET FROM TEST#17) SEWER TRENCH BEHIND BLDG 19. N 6/29/2021 CF (East), NORTHERN CORNER OF -2 4 115 12.1 126.0 BLDG 20. N 6/29/2021 CF MIDDLE OF SEWER TRENCH -2 4 115.2 11.4 126.0 BEHIND BLDG (EAST), RUNNING N-S N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density o 0 (pcf) (/o) (pcf) (/o) 21. N 6/29/2021 CF MIDDLE OF SEWER TRENCH BEHIND FG 4 115.5 13.2 126.0 92 BLDG (EAST), RUNNING N-S SEWER TRENCH BEHIND BLDG 22. N 6/29/2021 CF (East), SOUTHERN CORNER OF -2 4 116 13.1 126.0 92 BLDG SEWER TRENCH BEHIND BLDG 23. N 6/29/2021 CF (East), SOUTHERN CORNER OF FG 4 114.7 12.9 126.0 91 BLDG SEWER LATERAL NEAR BLDG 24. N 6/30/2021 CF (SOUTH SIDE), SOUTHWESTERN FG 4 116.2 9.8 126.0 92 CORNER OF BLDG SEWER LATERAL NEAR ON EAST 25. N 6/30/2021 CF SIDE OF TRASH FG 4 115.2 10.4 126.0 91 ENCLOSURE(SOUTHERN ENTRANCE OF CARWASH DRIVE AISLE W STORM COLLECTOR BOX, 26. N 6/30/2021 CF -2 4 115.8 10 126.0 92 SOUTHEAST SIDE OF GAS CANOPY STORM COLLECTOR BOX, 27. N 6/30/2021 CF SOUTHEAST SIDE OF GAS CANOPY -2 4 114.3 9.7 126.0 91 10 FEET FROM TEST#26 STORM COLLECTOR BOX, 28. N 6/30/2021 CF -1 4 115.5 10.2 126.0 92 NORTHEAST SIDE OF GAS CANOPY STORM COLLECTOR BOX, 29. N 6/30/2021 CF NORTHWEST SIDE OF GAS CANOPY -1 4 115.2 10.1 126.0 91 10 FEET FROM TEST#28 GREASE TRAP IN THE MIDDLE OF 30. N 7/1/2021 CF THE 2 EASTERN MOST BOXES, ON -2 1 114.7 12.2 126.0 91 THE NORTH SIDE OF THE CARWASH GREASE TRAP ON THE SOUTHERN 31. N 7/1/2021 CF SIDE OF EASTERN MOST BOXES, ON -4 1 115.1 12 126.0 91 THE NORTH SIDE OF THE CARWASH N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density o 0 (pcf) (/o) (pcf) (/o) GREASE TRAP ON THE NORTHERN 32. N 7/1/2021 CF SIDE OF EASTERN MOST BOXES, ON FG 1 115.4 13.6 126.0 92 THE NORTH SIDE OF THE CARWASH GREASE TRAP ON THE SOUTHWEST 33. N 7/8/2021 CF CORNER OF THE WESTERN MOST -4 1 114 13.1 126.0 90 BOX, ON THE NORTH SIDE OF THE CARWASH GREASE TRAP IN THE MIDDLE OF 34. N 7/8/2021 CF THE 2 EASTERN MOST BOXES, ON -2 1 113.7 14.8 126.0 THE NORTH SIDE OF THE CARWASH GREASE TRAP ON THE 35. N 7/8/2021 CF NORTHWESTERN CORNER OF THE FG 1 115.2 12.9 126.0 WESTERN MOST BOX, ON THE NORTH SIDE OF THE CARWASH E-W STORM DRAIN ON EASTERN 36. N 7/8/2021 CF FG 4 113.7 12.6 126.0 END OF THE GREASE TRAPS CURB AND GUTTER ON THE 37. N 8/5/2021 CF SOUTHWEST END OF THE WESTERN FG 4 101.1 13.2 126.0 ENTRANCE (MAIN ST.) CURB AND GUTTER ON THE 38. N 8/5/2021 CF SOUTHWEST CORNER OF THE FG 4 114.9 12.9 126.0 WESTERN ENTRANCE (MAIN ST.) 39. N 8/6/2021 CF RETEST OF TEST#37 FG 4 123.5 10 126.0 CURB AND GUTTER IN THE MIDDLE 41. N 8/6/2021 CF OF THE WESTERN DRIVEWAY FG 4 122.2 12 126.0 ENTRANCE (MAIN ST.) CURB AND GUTTER ON THE 42. N 8/6/2021 CF NORTHEAST CORNER OF THE FG 4 121.5 11.8 126.0 WESTERN ENTRANCE (MAIN ST.) CURB AND GUTTER SOUTHWEST 43. N 8/6/2021 CF MIDDLE BETWEEN EAST AND WEST FG 4 121.8 11 126.0 DRIVEWAYS (MAIN ST.) CURBS AND GUTTER SOUTHWEST 44. N 8/6/2021 CF CORNER OF THE EAST DRIVEWAY FG 4 115.4 9.9 126.0 (MAIN ST.) N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density (pcf) (%) (pcf) (%) CURB AND GUTTER NORTHEAST 45. N 8/6/2021 CF CORNER OF THE EAST DRIVEWAY FG 4 113.5 8.9 126.0 90 (MAIN ST.) CURB AND GUTTER NORTHEAST 46. N 8/6/2021 CF SIDE OF THE EAST DRIVEWAY FG 4 121.2 12.3 126.0 96 (MAIN ST.) CURB AND GUTTER EASTERN MOST 47. N 8/6/2021 CF SIDE OF THE EAST DRIVEWAY FG 4 122.6 11.1 126.0 (MAIN ST.) NORTHWEST DRIVE, BASE-EASTERN 48. N 8/6/2021 CF FG 4 131.5 12.1 132.0 DRIVEWAY ENTRY (MIDDLE) SOUTHWEST, BASE-WESTERN 49. N 8/6/2021 AB DRIVEWAY ENTRY(MIDDLE) FG 1 130.9 11.2 132.0 ENTRANCE 50. N 8/9/2021 AB EAST DRIVE APPROACH, EAST SIDE FG 3 126 8.3 127.5 51. N 8/9/2021 AB EAST DRIVE APPROACH, WEST SIDE FG 3 126.2 6.4 127.5 52. N 8/9/2021 AB EAST DRIVE APPROACH, EAST SIDE FG 3 126 8.3 130.0 53. N 8/9/2021 AB EAST DRIVE APPROACH, WEST SIDE FG 3 128 6.4 130.0 EASTERN MOST SIDEWALK (EAST 54. N 8/18/2021 CF FG 4 120.7 10.5 126.0 OF EASTERN DRIVEWAY) EASTERN MIDDLE OF SIDEWALK 55. N 8/18/2021 CF (EAST OF EASTERN DRIVEWAY) 30 FG 4 121.5 10.1 126.0 FEET FROM TEST#54 SOUTHWESTERN MIDDLE SECTION 56. N 8/18/2021 CF OF SIDEWALK (WEST OF EASTERN FG 4 125.5 12 126.0 DRIVEWAY) SOUTHEASTERN MIDDLE SECTION 57. N 8/18/2021 CF OF SIDEWALK (EAST OF WESTERN FG 4 120.4 9.9 126.0 DRIVEWAY) 25 FEET FROM TEST #56 58. N 8/20/2021 CF ALLEY 10 FEET FROM NORTHEAST FG 4 118.1 3.2 126.0 RETAINING WALL CORNER 59. N 8/20/2021 CF ALLEY 40 FEET EAST OF TEST#58 FG 4 1 117.9 6.9 1 126.0 60. N 8/20/2021 CF I ALLEY 40 FEET EAST OF TEST#59 FG 1 4 1 122.2 10.5 1 126.0 N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density o 0 (pcf) (/o) (pcf) ( ) 61. N 8/20/2021 CF ALLEY 40 FEET EAST OF TEST#60 FG 4 119.2 8.4 126.0 95 62. N 8/20/2021 CF ALLEY 40 FEET EAST OF TEST#61 FG 4 114.9 3 126.0 91 63. N 8/20/2021 CF ALLEY 40 FEET EAST OF TEST#62 FG 4 118.2 7.1 126.0 94 V GUTTER FOR ALLEY-BASE North 64. N 8/20/2021 CF FG 5 140 4.9 146.5 end 65. N 8/20/2021 CF V GUTTER FOR ALLEY-BASE 5 FEET FG 5 139.5 6.8 146.5 EAST OF TEST#64 66. N 8/20/2021 CF V GUTTER FOR ALLEY-BASE 5 FEET FG 5 138.1 4.8 146.5 EAST OF TEST#65 67. N 8/20/2021 CF V GUTTER FOR ALLEY-BASE 5 FEET FG 5 138.2 5.2 146.5 EAST OF TEST#66 68. N 8/20/2021 CF V GUTTER FOR ALLEY-BASE 5 FEET FG 5 137.6 5.7 146.5 EAST OF TEST#67 69. N 8/24/2021 CF EAST SIDE OF BLDG, MIDDLE FG 4 121.8 8.7 126.0 70. N 8/24/2021 CF SOUTHEAST CORNER OF BLDG FG 4 120.5 8.6 126.0 71. N 8/24/2021 CF SOUTH SIDE OF BLDG, MIDDLE FG 4 120.1 7.8 126.0 72. N 8/24/2021 CF W SIDE OF BLDG, S PARKING STALL FG 4 121.2 8.1 126.0 73. N 8/25/2021 CF N-S UTILITY TRENCH ON FG 1 113.8 11.4 126.0 SOUTHEAST CORNER OF STORE 74. N 8/26/2021 CF MONOLITHIC SIDEWALK- FG 4 110.1 12.3 126.0 87 SOUTHEASTERN MIDDLE OF STORE 30 FEET EAST OF TEST#74- 75. N 8/26/2021 CF SOUTHWESTERN CORNER OF FG 4 110.9 12.5 126.0 88 STORE 76. N 8/26/2021 CF RETEST OF TEST#74 FG 4 115 11.9 126.0 91 77. N 8/26/2021 CF RETEST OF TEST#75 FG 4 117.3 12 126.0 93 78. N 8/26/2021 CF CURB RUNNING N-S ON THE EAST FG 4 107.4 11.4 126.0 85 DRIVEWAY ENTRANCE CURB RUNNING N-S ON THE EAST 79. N 8/26/2021 CF DRIVEWAY ENTRANCE- 15 FEET FG 4 108.9 11.9 126.0 86 FROM TEST#78 80. N 8/26/2021 CF RETEST OF TEST#78 FG 4 113.7 12.1 126.0 90 81. N 8/26/2021 CF RETEST OF TEST#79 FG 4 114.7 11.7 126.0 91 82. N 8/26/2021 CF CARWASH EXIT CURB, NORTH SIDE FG 4 109.9 12.2 126.0 87 (RUNNING E-W) 83. N 8/26/2021 CF CARWASH EXIT CURB, SOUTH SIDE FG 4 108.9 12.4 126.0 86 (RUNNING E-W) 84. N 8/26/2021 CF RETEST OF TEST#82 FG 4 114.5 11.8 126.0 91 N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density (pcf) (%) (pcf) (%) 85. N 8/26/2021 CF RETEST OF TEST#83 FG 4 115.8 12 126.0 92 86. N 8/26/2021 CF CURB RUNNING N-S BETWEEN FG 4 107.2 12.1 126.0 85 CARWASH AND STORE 87. N 8/26/2021 CF RETEST OF TEST#86 FG 4 109.2 12.6 126.0 -- CURB RUNNING E-W ON SOUTH 88. N 8/26/2021 CF SIDE OF PARKING STALLS (FACING FG 4 114.8 13.4 126.0 CARWASH) CURB RUNNING E-W ON NORTH 89. N 8/26/2021 CF SIDE OF PARKING STALLS (FACING FG 4 116.4 13.1 126.0 RETAINING WALL) CURB RUNNING N-S ON EAST SIDE 90. N 8/26/2021 CF OF PARKING STALLS (SOUTH END FG 4 115.9 12.8 126.0 92 OF STORE FRONT) CURB RUNNING N-S ON EAST SIDE 91. N 8/26/2021 CF OF PARKING STALLS (SOUTH END FG 4 115.4 12.2 126.0 92 OF STORE FRONT) 92. N 8/26/2021 CF RETEST OF TEST#86 FG 4 114.4 1 11.9 126.0 91 93. N 9/8/2021 CF CAR WASH ENTRANCE, MIDDLE FG 4 123.5 10.2 126.0 98 94. N 9/8/2021 CF NORTH END OF EASTERN DRIVE FG 4 122.8 9.8 126.0 97 AISLE 95. N 9/8/2021 CF SOUTHEAST END DRIVE AISLE FG 4 123.3 8.7 126.0 98 96. N 9/8/2021 CF SOUTHWEST END DRIVE AISLE FG 4 124.4 9.3 126.0 99 97. N 9/8/2021 CF CARWASH EXIT, MIDDLE FG 4 124.8 8.9 126.0 99 98. N 9/8/2021 CF NORTH END OF PARKING STALLS FG 4 125.2 8.8 126.0 99 (STORE FRONT) 99. N 9/8/2021 CF SOUTH END OF PARKING STALLS FG 4 122.1 9.2 126.0 97 (STORE FRONT) N 9/9/2021 AB CARWASH EXIT, MIDDLE FG 5 120.6 6.6 146.5 82 N 9/9/2021 AB 5 FEET EAST OF TEST#100 FG 5 121.8 6 146.5 N 9/9/2021 AB CARWASH ENTRANCE, MIDDLE FG 5 122.9 5.9 146.5 N 9/9/2021 AB RETEST OF TEST#100 FG 5 125.9 6.1 146.5 N 9/9/2021 AB MIDDLE OF PARKING STALLS FG 5 133.9 4.3 146.5 (BUILDING FRONT) N 9/9/2021 AB CARWASH EXIT, MIDDLE FG 5 131.2 4.5 146.5 N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density o 0 (pcf) (pcf) (�o) N 9/9/2021 AB CARWASH ENTRANCE, MIDDLE FG 5 138.4 6.1 146.5 94 N 9/9/2021 AB NORTHEAST BEND OF CARWASH FG 5 137.5 5.8 146.5 94 DRIVE AISLE N 9/9/2021 AB SOUTHEAST BEND OF CARWASH FG 5 138.4 6.9 146.5 94 DRIVE AISLE 109. SOUTHERN MIDDLE OF CARWASH N 9/9/2021 AB DRIVE AISLE (SOUTH END OF FG 5 137.1 7.9 146.5 94 STORE) N 9/9/2021 AB RETEST OF TEST#104 FG 5 139.9 7.8 146.5 95 N 9/9/2021 AB RETEST OF TEST#105 FG 5 143.5 7 146.5 98 N 9/9/2021 AB RETEST OF TEST#106 FG 5 142.3 8.1 146.5 97 113. N 9/9/2021 AB RETEST OF TEST#107 FG 5 140.6 5.8 146.5 96 114. N 9/9/2021 AB RETEST OF TEST#108 FG 5 141.2 6.7 146.5 96 115. N 9/9/2021 AB RETEST OF TEST#109 FG 5 143.9 5.2 146.5 98 116. CURB-20 FT WEST FROM TRASH N 9/27/2021 CF FG 4 119.8 11.2 126.0 95 ENCLOSURE RUNNING E-W N 9/27/2021 CF CURB-20 FEET WEST OF TEST#116 FG 4 119.6 10.9 126.0 95 118. N 9/27/2021 CF CURB-20 FEET WEST OF TEST#117 FG 4 121.3 11.7 126.0 96 119. N 9/27/2021 CF CURB-20 FEET WEST OF TEST#118 FG 4 118.6 11.5 126.0 94 N 9/27/2021 CF CURB RUNNING N-S 20 FEET FG 4 117.4 10.8 126.0 93 NORTHWEST OF TEST#119 CURB-20 FEET NORTH OF TEST N 9/27/2021 CF FG 4 122.3 11.9 126.0 97 #120122. CURB-20 FEET NORTH OF TEST N 9/27/2021 CF FG 4 122.6 11.6 126.0 97 #121 N 9/27/2021 CF CURB-20 FEET NORTH OF TEST FG 4 121.E 12.1 126.0 97 #122 N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density o 0 (pcf) (/o) (pcf) (/o) 124. DRIVE PATH IN THE MIDDLE OF N 10/4/2021 CF EASTERN ENTRANCE, NORTHEAST FG 4 123.8 8.1 126.0 98 CORNER OF GAS CANOPY N 10/4/2021 CF DRIVE PATH, SOUTHEAST CORNER FG 4 124.5 7.4 126.0 99 OF GAS CANOPY 126. N 10/4/2021 CF DRIVE PATH ON SOUTHEAST FG 4 125.2 9.3 126.0 MIDDLE OF GAS CANOPY 121. N 10/4/2021 CF DRIVE PATH ON SOUTHWEST FG 4 123.3 8.2 126.0 MIDDLE OF GAS CANOPY 128. N 10/4/2021 CF DRIVE PATH ON SOUTHWEST FG 4 124.9 8.9 126.0 CORNER OF GAS CANOPY 129. DRIVE PATH IN THE MIDDLE OF N 10/4/2021 CF WESTERN ENTRANCE, NORTHWEST FG 4 122.5 9.4 126.0 CORNER OF GAS CANOPY 130. DRIVE PATH IN THE MIDDLE OF N 10/5/2021 AB EASTERN ENTRANCE, NORTHEAST FG 5 140.9 4 146.5 CORNER OF GAS CANOPY 131. N 10/5/2021 AB DRIVE PATH, EAST SIDE OF GAS FG 5 143.4 7.1 146.5 CANOPY N 10/5/2021 AB DRIVE PATH, SOUTHEAST CORNER FG 5 140.4 5.8 146.5 OF GAS CANOPY N 10/5/2021 AB DRIVE PATH SOUTHERN MIDDLE OF FG 5 142.5 7.1 146.5 GAS CANOPY 134. DRIVE PATH 5 FEET FROM N 10/6/2021 AB SOUTHERN MIDDLE OF GAS FG 5 128.9 6.1 146.5 CANOPY 135. N 10/6/2021 AB DRIVE PATH 25 FEET SOUTHWEST FG 5 129.7 5.4 146.5 FROM TEST#134 136. N 10/6/2021 AB PARKING SPOTS, 30 FEET EAST OF FG 5 140.4 5.6 146.5 TRASH ENCLOSURE N 10/6/2021 AB PARKING SPOTS, 40 FEET WEST FG 5 142.3 6.3 146.5 FROM TEST#136 138. N 10/6/2021 AB DRIVE PATH WESTERN MIDDLE OF FG 5 139.3 5.1 146.5 GAS CANOPY 139. DRIVE PATH ENTRANCE OF N 10/6/2021 AB WESTERN DRIVEWAY 50 FEET FG 5 142.1 5.2 146.5 FROM TEST#138 N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill TABLE 1 SUMMARY OF FIELD DENSITY TESTS Test Test Test Elevation Soil Dry Moisture Max. Rel. No. Type Test Date of Test Location (feet) Type Density Content Density Density (pcf) (%) (pcf) (%) N 10/6/2021 AB RETEST OF TEST#134 FG 5 139.3 5.8 146.5 95 141. N 10/6/2021 AB RETEST OF TEST#135 FG 5 140.0 6.0 146.5 142. STORM COLLECTOR BOX, N 5/26/2021 CF FG 1 102.3 11.3 127.5 SOUTHEAST SIDE OF GAS CANOPY 143. STORM COLLECTOR BOX, N 5/26/2021 CF SOUTHEAST SIDE OF GAS CANOPY FG 1 118.4 10.9 127.5 10 FEET FROM TEST# N - Nuclear Test Method FG - Finish Grade Project No.: 182522-35A SG - Subgrade Material November 2021 CF - Compacted Fill Map B - RETAINING WALL & ALLEY LEGEND Locations are Approximate N. MAIN STREET Symbols Limits of Report 1t 11 - Density Test Locations ROW DEDICATION 300 ROW DEDICATION x x x X X X X X X rmn p MONUMENT �A( PRICE SIaN DRAINAGE �— ESCAPE LANE �— PYLON / ° BIOSVVALE SIGN P DRAINAGE BIO-)WALE= o UNDERGROUND ° o CAR WASH QQ STORAGE TANKS — — — — — — — — — 1,125 SF 49' 10' 12 I O O 8 O O I I ® 1 MPDs 8 - - - - - - - _ _ ® C-STORE 5 Q 36' 121' 35' 20' 7' 3,000 SF 2 6 0 r 5 3 GEOTECHNICAL MAP OLOCATED ON THE NORTHEAST CORNER OF NORTH MAIN STREET AND WEST FLINT STREET CITY OF LAKE ELSINORE,RIVERSIDE COUNTY, CALIFORNIA r r 9 ( U U Z APN 377-243-002 THROUGH 377-243-007 • > • > • 3 PROJECT CONVENIENCE STORE& CAR WASH CLIENT HARDESTY&ASSOCIATES, INC PROJECT NO. 18-2522-35A 063 062 061 • 0 • • DATE OCTOBER 28, 2021 • 68 067 066 0 0 SCALE 1:30 DWG XREFS REVISION DRAWN BY JDG PLATE 1 OF 1 -A Earth Strata Geotechnical Services, Inc. Geotechnical,Environmental and Materials Testing Consultants www.ESGSINC.com (951)397-8315 Map C - SIDEWALKS, CURBS & GUTTERS LEGEND Locations are Approximate N. MAIN STREET Symbols Limits of Report 37 8 1 �41 43 1 1 46 • 47 f Density Test Locations ROW DEDICATION 00' ROW DEDICATION x X X x x x x x x x P 36' 36' rmn P MONUMENT �A PRICE SIaN DRAINAGE �— ESCAPE LANE �— PYLON / ° 4 BIOSVVALE84 SIGN P DRAINAGE BIO-)WALE= o UNDERGROUND ° o • 103 AR WASH 422 STORAGE TANKS — — — — — — — — — 1,17-5 SF 12' S' 92 4 o o I 49 10 1p I o 0 8 0 o I ® 89 ( 124 f e MPDS _ rn _ i 1 - - - - - - - - _ ® C-STORE 51 36' 121' 35' 3,000 SF 2 Q 20' 7' l �- 0 5 3 GEOTECHNICAL MAP 1 76 LOCATED ON THE NORTHEAST CORNER OF NORTH MAIN STREET AND WEST FLINT STREET • �0 CITY OF LAKE ELSINORE, RIVERSIDE COUNTY, CALIFORNIA ( 12 1 APN 377-243-002 THROUGH 377-243-007 1 N • > > • 1Ah 18 1 a PROJECT CONVENIENCE STORE& CAR WASH 'n CLIENT HARDESTY&ASSOCIATES,INC PROJECT NO. 18-2522-35A DATE OCTOBER 28, 2021 SCALE 1:30 DWG XREFS REVISION DRAWN BY JDG IPLATE 1 OF 1 Earth Strata Geotechnical Services, Inc. Geotechnical,Environmental and Materials Testing Consultants www.ESGSINC.com (951)397-8315 Map D - DRIVES, PARKING & SOME CURBS N. MAIN STREET Symbols 48 Limits of Report 9 55 39 40 56 i Ot 45 47 54 f Density Test Locations ROW DEDICATION 300 ROW DEDIC ON X x x A X Q 1 36 36' r,n a--a—a—8 a— m P MO�MIvT �A PRICE SIaN o DRAINAGE ESCAPE LANE 4 PYLON PDRAINAGE BIO'WALI- 2 o �— BI�IVALE111 85 SIGN P1 UN RGRaUND o ® � � � 124 4 CAR WASH STO E TANKS — — — — — — — — — 1,12$ SF 09 — — — 130 - 1 3 p 138 _ Q • ° ° ° I 49 10' l� 121 I ? o $ o °° 0 MPDs _ - - - - - � — [fl10 Jys C-STORE ' 1436.0128 121' 35' 3 20 ,000 SF Z 125 12 132 5 GEOTECHNICAL MAP oO /� Q 139 133 96 7 9 LOCATED ON THE NORTHEAST CORNER OF NORTH MAIN STREET AND WEST FLINT STREET ( 136 \`/� �`/ 7 7 io CITY OF LAKE ELSINORE, RIVERSIDE COUNTY, CALIFORNIA Q Q 1 9 1 1 5 APN 377-243-002 THROUGH 377-243-007 • > • > • 7 ' ' PROJECT CONVENIENCE STORE& CAR WASH CLIENT HARDESTY&ASSOCIATES,INC 116 PROJECT NO. 18-2522-35A DATE OCTOBER 28, 2021 SCALE 1:30 DWG XREFS REVISION DRAWN BY JDG IPLATE 1 OF 1 Earth Strata Geotechnical Services, Inc. Geotechnical,Environmental and Materials Testing Consultants www.ESGSINC.com (951)397-8315 Map E - STORM DRAIN, SEWER LINE, GREASE TRAP & UTILITY TRENCH LEGEND Locations are Approximate N. MAIN STREET Symbols Limits of Report ♦ f • Density Test Locations O ROW DEDICATION"( b�300' ROW DEDICATION X x x X x3 • •--36 36' �-a a —o——a a a--a 30 rmn MONUMENT PRICE SI jN o DRAINAGE ♦— ESCAPE LANE 2 L / BIOSVVALE SIGN P DRAINAGE BIO-)WAL1= o UNDERGROUND 10 CAR WASH Q STORAGE TANKS — — — — — — — — 1,125 SF 12' 5' (� 27 28 49' 10' ? o 0 8 0 o I I f ® 4 1 i I - e MPDs p26 - - = - - - - - = 9 ® C-STORE 121' 35' , 3000 SF Z Q ♦_ 20 7 , 2 ( o rn S 21 3 I GEOTECHNICAL MAP OLOCATED ON THE NORTHEAST CORNER OF NORTH MAIN STREET AND WEST FLINT STREET or Cr �p CITY OF LAKE ELSINORE, RIVERSIDE COUNTY, CALIFORNIA Q Q r . r • 1 A• • APN 377-243-002 THROUGH 377-243-007 • > IF-4• > • 0 0 1 18 7 PROJECT CONVENIENCE STORE& CAR WASH CLIENT HARDESTY&ASSOCIATES,INC PROJECT NO. 18-2522-35A DATE OCTOBER 28, 2021 SCALE 1:30 DWG XREFS REVISION DRAWN BY JDG IPLATE 1 OF 1 Earth Strata Geotechnical Services, Inc. Geotechnical,Environmental and Materials Testing Consultant www.ESGSINC.com (951)397-8315