Loading...
HomeMy WebLinkAbout31941 CORYDON ST_ qVG COMPACTION REPORT PROJECT : C-8696-82 V 1 PROJECT SITE• OFF CORYDON STREET, LAKE ELSINORE, CA LEGAL DESCRIPTION: PORTION OF LOT 19, BLOCK "F" , BOOK 6, `G PAGE 296, WITH AP# 370-080-015 , RIVERSIDE COUNTY,CA J DATE: MAY 25, 1982 ~- RECEIVED JUN 04, . ,2 Dept. Of Bldg. & Safety PREPARED FOR: RONEY' S HEAVY EQUIPMENT P. 0. BOX 363 NORCO, CA 91760 714/737-88.16' 18,340 Grand Ave. , Lake Elsinore, CA.92330 i (714-S!,9-4066 (714)678-4300 Y PROJECT #: C-R696-82 ACADE,'M�� ME 21. 19 F z �SOILS ENGIM!'ERING Roney's Heavy Equipment P. O. Box. 363 Norco, California 91760 714/737-8816 ing for the property located off of Corydon Subject: Compaction test Portion of Lot 19, Block 'IF" , Book 6, Street, Lake Elsinore, aRiverside County, California.aliforniPage 296, AP# 370-080-015, Dear Sirs: your re nest , we hav^ investigated the compaction In response to R on the above site , and compaction i,luttl1)1an . }1C1 formed at the approximate locations shown ory Based on our findings from isefound to held analysis , dcompacted. Enclosed the proposed building area and recommendations . are the results of our findings , If we can be of further assistance t ;you , please feel free to contact our office at your convenien,;e . Respectfully submitted , aCADEr'tY SOILS ENGINEERING Project Coorc inatar e a� cIIark 30527 18040 Grand Ave. , Lake Fisinore , CA 92330 (714) 559-40661678-4300 • ACA DEMYS PROJECT # : C-8696-82 MAY 259982 EKING PAGE 2 INTRODUCTION Tnis report presents a summary of the laboratory and testing procedures , final compaction results , and a plot plan, showing the approximate location of compaction tests . COMPACTION TESTING Field density tests were taken in accordance with the ASTM DES: D - 15S6 - 64. Field density tests were taken at approximately 0. 5 to 1. 0 feet below the surface area. Maximum dry density was obtained- by using the laboratory procedure ASTM DES : D - 15S7 - 70 . Field testing for compaction was started after the completion of the proposed building pad. GENERAL GRADING CONSIDERATIONS 1 . Any additional grading must be done under the supervision of a soil engineer. 2. Ponding of water should not be allowed anywhere on the building pad. A minimum gradient of one percent should be maintained away from the found;3tion and slopes at all times . 3. The faces of cut and fill slopes should always be maintained against errosion , either by effective planting , or by installation of non-errosive materials when necessary. 18040 Grand Ave. , Lake Elsinore, CA 92330 (714) 559-40661678-4300 PROJECT #: C-869E-82 ACA►DE� Y sops 'r MAY 21982 PAGE COMPACTION TEST RESULTS MAX. DV'SITY DRY DENSITY % FIELD % RELATIVE TEST # DATE TEST DEPTH Lb / Fi'3 I,B / FT3 - MOISTURE COMPACTION o 1 5/20 -1" 124.5 112.3 5.9 90.2 2 5/20 -l" 124.5 115.2 6.2 92.5 3 5/20 -l" 124.5 114.6 6.0 92.0 4 5/20 -1" 124.5 113.2 6.4 90 .9 5 5/20 -6" 124.5 116.7 6 93 .7 6 5/20 -6" 124.5 118.6 6 95 .3 7 5/20 -6" 124.5 116.0 5.8 93 .2 e. 5/20 --6" 124.5 114 .7 5.8 92.1 SOIL TYPE: Silty sand, fine to coarse grain, mostly fine and medium grain, tan brown in color, relatively dry. Max. Density: 124 .5 Opt. Moisture: 8.5% *NOTE: MAXIMUM DENSITY WAS ACQUIRED THROUGH COMPACTION METHOD ASTM DES: D - 1557 - 70 , METHOD A. 18040 Grand Ave. , Lake Elsinore, CA .92330 (714) 559-4066 (714)678-4300 PROJECT #: C-8696-82 MAY 25*982 PAGE 4 COMPACT ONETESTSTION OF NOr_ MAX. FILL: 1.5'-2.0' OPT. MOISTURE: 8.5% 14HEEL ROLLED Z SO. 2.3 r-- tj n. 1 �r C� �fl I I •1 I I •6 20 o' ------ 1#010 Grand AVO. , L.k. Slsinors, Oa•92330 (714) 559-4066 1714) 678-4300 ACAMMY PROJECT #: C-8696-82 'son.-.; ME 25 , 1902 S CONCLUSION AND I(ECOMMENDATIONS According to our findings . it is our opinion that the subject site is compacted. This conclusion is "h:iscd on field ohservations , laboratory analysis , and the compaction test results at the ap- proximate locations indicated on the plot plan. The field compaction results , obtained through field testing, are above 90 percent of the maximum dry density. Our findings and recommendations contained in this report are based on the results of field investigation, laboratory testing , and generally accepted engineering practices , and are based on the assumption that the soil condition: will remain consistent throughout the area, with those enclosed in this report. No other warranty , expressed or implied . If any variations in the soil condition exist or occur durir:l; ..he development of this site , this office should be notified immediately so that supplemental recommendations may be provided . Respectfully submitted, ACADEMY SOILS rNGINEERING i" 18040 Grand Ave. , Lake Elsinore , CA 92330 (714) 559-40661678-4300