Loading...
HomeMy WebLinkAboutCC 09-22-09 Item 08CITY OF LADE LSII`IOPU DREAM EXTREME. REPORT TO CITY COUNCIL TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: ROBERT A. BRADY CITY MANAGER DATE: SEPTEMBER 22, 2009 SUBJECT: LAKESHORE DRIVE OVERLAY - REALLOCATION OF FUNDING AND AUTHORIZATION TO ADVERTISE Background Lakeshore Drive between Illinois Street and Viscaya Way is in need of pavement reconstruction. Originally, the project was included in the Capital Improvement Program for unfunded projects; however, due to the condition of the roadway, staff has identified a funding source and would recommend moving forward with the improvements to the roadway segment. On April 14, 2009, Council approved the contract award of professional services to Winzler & Kelly for the preparation of engineering plans for pavement repair. Discussion The consultant Winzler & Kelly has completed plans, specifications and cost estimate for Lakeshore Drive between Illinois Street and Viscaya Way. Funds for project design in the amount of $80,000 were budgeted in FY 2009/2010. Staff is recommending the transfer of unused FY 2008/2009 Pavement Management Program funds in the amount of $530,000 for construction, contingency, inspection, surveys and soil testing. Fiscal Impact Staff is requesting the use of $530,000 of Measure A funds from FY 2008/2009 Pavement Management Program to fund the construction and the associated activities needed to complete the project. The engineer's cost estimate for construction is $495,000. Design costs were $80,000 paid through the use of Proposition 113 and the construction administration, testing and inspection is estimated to be approximately $35,000. In total, the project cost estimate is $610,000. CC September 22, 2009 Item No. 8 Page 1 of 3 Reallocation of Funding and Advertising September 22, 2009 Page 2 Recommendations 1. Approve the transfer of $530,000 from the 2008/2009 Pavement Management Program funds to the Lakeshore Drive Overlay Project. 2. Direct staff to advertise forbids for the Lakeshore Drive Overlay Project. Prepared by: David S. Solomon yli / Project Engineer Ken A. Seumalo 017 Director of Public Works Approved by: Robert A. Brady City Manager Attachment: Vicinity Map CC September 22, 2009 Item No. 8 Page 2 of 3 ~°F G - Gp 6 FFt > F I r 1L~~0`5 0` . Fs SY OFF sG yJ , < 45 94 ' ~Cl 54' BFI dom. , ~~Gp~ 0~ / ~54 F ~p~ i,T r YYti ^ • T~5 ~ LF, `r ~G~V•~~ / Jf s .:i' \I 4t- Tom 10 .s 0 4 - I'I ✓0 9pF r f, LAKESHORE DRIVE REHABILITATION AWARD OF DESIGN CONTRACT CITY COUNCIL c~rv of CITY OF LAKE ELSINORE LAKE nLSI110 E April 14th, 2009 i i °REq CC September 22, 2009 Item No. 8 Page 3 of 3