HomeMy WebLinkAboutNotice Inviting Bid_City_Hall_Steel THE PRESS-ENTERPRISE
KEEP YOUR EYES ON TI I K TRISE
pe.com
3512 14 Street
Riverside, California 92501
(951) 368-9229
neller@scng.com
City of Lake Elsinore
130 South Main Street
Lake Elsinore, California 92530
Account Number: 5209153
Ad Order Number: 0011649570
Customer's Reference/PO Number:
Publication: The Press-Enterprise
Publication Dates: 02/20/2024
Total Amount: $726.16
Payment Amount: $0.00
Amount Due: $726.16
Notice ID: eYhyi31AMCSbjSngVLIu
Invoice Text: [https://res.cloudinary.com/dggg2xsfd/image/upload/q_auto:best/enotice-
production/documentcloud/notices/1708020706360/city_logo_for_notices.png]
NOTICE INVITING BIDS NOTICE IS HEREBY GIVEN THAT THE CITY OF LAKE
ELSINORE, hereinafter referred to as"the City"or"City,"will receive through the bid
management system PlanetBids prior to the deadline established below qualification
proposals for the engineering plan check services and building inspector services by
an ICC certified building Inspector for the work generally described as: CITY HALL
BUILDING STEEL CIP PROJECT NO. Z20006 BID OPENING:Wednesday, March
13, 2024, no later than 2:00 p.m.via e-Procurement system PlanetBids.A mandatory
job walk will be held at the project site on Wednesday, February 28, 2024, at
10:OOAM. PURPOSE: The City of Lake Elsinore is building a 38,000 square foot City
Hall at 130 South Main Street, Lake Elsinore Ca. 92530. In short, the project will
include the construction of a four-story City Hall with an open roof top on the fourth
story. The building will have a steel structure and lightweight concrete flooring.
SCOPE: The contractor will furnish a proposal and price for all materials, labor and
equipment to complete the job and deliver the scope. The contractor must familiarize
himself with the site, all details of the work required, and existing conditions. The
contractor must be a going entity for at least 3 years, and produce a valid certificate of
liability insurance,which must be on hand before work begins. The Contractor shall
perform on the site, and with its own organization,work equivalent to at least 60%
[sixty) percent of the total amount of work to be performed under the contract.This
percentage may be reduced by a supplemental agreement to this contract if, during
Bid City Hall Steel - Page 1 of 2
THE PRESS-ENTERPRISE
KEEP YFII'R EYES n\'11111 PRISE
pe.com
The Press-Enterprise I OI
3512 14 Street LAKL j5LS1N0P E
Riverside,California 92501 V
951 368-9229
City of Lake Elsinore NOTICE INVITING BIDS
130 South Main Street NOTICE IS HEREBY GIVEN THAT THE CITY OF LAKE ELSINORE,
hereinafter referred to as "the City"or"City,"will receive through
Lake Elsinore, California 92530 the bld management system PlanetBlds prior to the deadline
established below qualification proposals for the engineering plan
check services and building Inspector services by an [CC certified
Publication:The Press-Enterprise building Inspector for the work generally described as:
CITY HALL BUILDING STEEL
PROOF OF PUBLICATION OF CIP PROJECT NO.Z20006
Ad Desc: 0011649570 BID OPENING: Wednesday, March 13, 2024, no later than 2:00 p.m.
via e-Procurement systern PlanetBlds.A mandatory lob walk will be
held at the prolect site on Wednesday, February 28,2024,at 10:00AM.
FILE NO.0011649570 PURPOSE: The City of Lake Elsinore Is building a 38,000 square foot
City Hall at 130 South Main Street, Lake Elsinore Co.92530. In short,
the protect will Include the construction of a four-story City Hall with
PROOF OF PUBLICATION an open roof top on the fourth story. The building will have a steel
structure and lightweight concrete flooring.
I am a citizen of the United States. I SCOPE: The contractor will furnish a proposal and price for all
materials, labor and equipment to complete the lob and deliver the
am over the age of eighteen years and scope. The contractor must familiarize himself with the site, all
not art to or interested in the above details of the work required,and existing conditions. The contractor
party must be a going entity for at least 3 years, and produce a valid
entitled matter. I am an authorized certificate of liability Insurance, which must be on hand before
representative of THE PRESS work begins. The Contractor shall perform on the site, and with Its
re
p own organization,work equivalent to at least 60/o [sixty) percent of
ENTERPRISE, a newspaper of general the total amount of work to be performed under the contract. This
Percentage may be reduced by a supplemental agreement to this
circulation, printed and published daily contract If, during performing the work, the Contractor requests a
in the County of Riverside, and which reduction and the City determines that the reduction would be to the
newspaper has been adjudicated a advantage of the City.
newspaper of general circulation by the General Requirements:
Superior Court of the County of o Mobilization& Demobilization Including Construction Schedules
Riverside, State of California, under o (Not To Exceed 3%of Total BId)
date of April 25, 1952, Case Number
54446, under date of March 29, 1957, o Labor Material and Performance Bonds
Case Number 65673, under date of o steel Structure
August 25, 1995, Case Number o Safety Netting (to rernaln In place)
267864, and under date of September o Back Stairs (secondary stairs)
16, 2013, Case Number RIC 1309013;
that the notice, of which the annexed is o Roof
a printed copy, has been published in o Metal Decking
said newspaper in accordance with the
Qualifications:
instructions of the person(s) requesting
publication, and not in any supplement All bidders must have an"A" license C-51,qualified,and understand
how to Identify the most effective and efficient construction methods
thereof on the following dates,to wit: to complete the prolect.
ANTICIPATED CONTRACT TIME: 140 DAYS FROM NOTICE TO
0212012024 PROCEED OR LETTER OF INTENT
I certify (or declare) under the penalty OBTAINING BID DOCUMENTS: The City of Lake Elsinore utilizes
of perjury that the foregoing is true and PlanetBlds, Inc. to administer Its Onilne Bidding System.
PlanetBlds requires potential vendors and bidders to register
correct. https://www.planetblds.corn/portal/portal.cfm?Companyl D=14272#
In order to download contract and bid proposal documents, thereby
Date: February 20, 2024. assuring a means of notifying vendors and bidders are Identified as
y "Planhoiders"of all subsequent Information and addenda Issued by
At: Riverside, California the City. only the electronic documents downloaded directly from
PlanetBlds will be considered to be official documents of the City of
Lake Elsinore.
All bids must be made In accordance with and as directed In the
Specifications,and all bidders shall comply with Federal, State,and
Signature local laws applicable thereto. It is the sole responsibility of the bidder
g to ensure that the bid Is received In proper time through PlanetBlds
by the date and tlrne set forth. The electronic bid management
system will not accept late bids. No facsimile bids shall be accepted by
the City. All bids must be placed in Planetbids by 2:00 p.m. on Wednesday,
March 13,2024.
Bid City Hall Steel - Page 1 of 2
In compllance with S13 854,bids from contractors or subcontractors
that are not currently
registered as required will be deemed nonresponsive, and no
contractor or subcontractor will be allowed to work on a City protect
unless they are registered with the DIR pursuant to Labor Code
Section 1725.5.
BIDDING PROCESS: The City Council reserves the right to reject
any or all bids,to waive any Irregularities In a bid and to award the
Contract as may best serve the Interests of the City.All proposals are
binding for a period of sixty(60)days after they are opened and may
be retained by the City for examination and comparison.
All questlonssholl bed]rected to the Q&A section on thee-Procurement
System Planetl3lds. No phone calls. Contacting the City of Lake
Elsinore personnel directly regarding this bid Is prohibited and may
be grounds for elimination from the selection process. All questions
regarding this bid must be submitted through the e-Procurement system
Planet Bids no later than 2:00 p.m.on Thursday February 29,2024.Questions
received after this date may not be considered.
Candice Alvarez,MMC
City Clerk
The Press-Enterprise
Published:2(20/24
Bid City Hall Steel - Page 2 of 2