HomeMy WebLinkAboutLeonida PRR001 Labor Commissioner,State of California
Department of Industrial Relations Gavin Newsom,Governor
Division of Labor Standards Enforcement
Bureau of Field Enforcement-Public Works `�• �� ,,
2031 Howe Ave.Ste 100 a
Sacramento,CA 95825-0196 as g
TEL: 916-518-2328 EMAIL: k wal a ir.ca. ov
City of Lake Elsinore
130 S Main St
Lake Elsinore,CA 92530
DATE- NR ph K�to Ci N,
January 30,2026 40-86530-937
REQUEST FOR INFORMATION,AWARDING BODY
P",1w N— A,.mhnp Eidc Ih t Nu. DIR N,3w ID
Lakeshore Dnve ADA Sidewalk Im overnmt Project Crn of lake Elsinore 0 20250580287
r7L.—
LEONIDA BUILDERS,INC
Sub..w.kr
This office is currently conducting an investigation to determine if the above-mentioned contractor(s)arc
in violation of the Public Work Laws,Labor Code Sections 1720 through 1861 and/or Skilled and Trained Workforce
(STW)Requirements.Public Contract Code sections 2600 through 2602.
To assist us in our investigation,copies of the noted(X)documents and information are hereby requested:
X Contract(including scope of work)
�(X Performance Bond and Payment Bond(Labor/Material Bond)
X Bid Advertisement and Date First Published(attach copy of Newspaper/Online e Ad)- `-�O-Zs
X Page(s)Listing Prevailing Wage Rate for the Project t fj (,bw�" �>�•y
x X Page(s)Advising Contractor ofT.—cggRequirements to Pay Prevailing Wage
1 j Page(s)Advising Contractor of Legal Requirements to utilize Skilled and Trained Workforce
�l X LEONIDA BUILDERS.INC. monthly report(s)demonstrating compliance with STW requirements 1/
X LEONIDA BUILDERS.INC. plan(s)to achieve"substantial compliance"and reponse(s)(if any)
X Name(s)and Address(es)of all Subcontractor(s)performing work on this project-.K Cvvvkwra.I
�( X Certified Payroll Records received by your agency for work performed by LEONIDA BUILDERS.INC.
)(C Valid Notice of Completion(county recorder filing)or document evidencing your agency's acceptance of the
project completed"a particular date(attach copy)
Date Project Began .,! ' 4 ,ZCL,5— N0U
Completion Date l2 IF NOT,Estimated Date
X Total amount of retention being held by your agency for project S (v 21 T!51• C 1 —P of l n9 Q e -
X Total amount behing withhel by your agency pursuant to Public Contract Code section 2602 5
X Date of Final Payment 2 N
XX Inspector's Daily Log(s)
-T Physical Address of Project
X Please advise if this project's funding requires the use of an approved Labor Compliance Program- 10
Other
Please be assured that the above requested information will be utilized for official purposes only.
**YOU MAY ALSO EMAIL THE RECORDS TO k�rc��al a dir.ca.�u�
STATE LABOR COMMISSIONER
By re 04'.1
Keerat Grewal
Analyst I
Pw 6 ,a W2.1
i
• -ti
.'.
I
I
Labor Commissioner,State of California
Department of Industrial Relations Gavin Newsom.Governor
Division of Labor Standards Enforcement
4`�l Or T4
Bureau of Field Enforcement-Public Works `
2031 Howe Ave.Ste 100
Sacramento,CA 95825-0196 ffi�
TEL: 916-518-2428 EMAIL: kgrcwal@dir.ca.gov o
LEONIDA BUILDERS,INC.
32023 CROWN VALLEY ROAD
ACTON,CA 93510
DATE In Reply Refer to Case No
January 30,2026 40-86530-937
NOTICE OF INVESTIGATION
Project Name Awarding Rudy Prgea No. DIR Projea ID
Lakeshore Drive ADA Sidewalk Im rovement Project City of fake Elsinore 0 20250590287
Pnme Contractor
LEONIDA BUILDERS,INC.
Subs trwor
You are hereby advised that the Division of Labor Standards Enforcement is commencing an investigation to confirm
compliance with the Public Work Laws(Califonia Labor Code,Division 2,Part 7)by the above-named contractor(s).
After an investigation, if it is determined that wages and/or penalties are due,a Civil Wage and Penalty Assessment will be
issued pursuant to Labor Code section 1741.
STATE LABOR COMMISSIONER
By <i.tt>,i wad
Keerat Grewal
Analyst I
PW l l txr�eo�uu