Loading...
HomeMy WebLinkAboutTraffic Scoping Agreement Traffic Impact Analysis -23- May 2022 Preparation Guide Exhibit B SCOPING AGREEMENT FOR TRAFFIC IMPACT STUDY This letter acknowledges the City of Lake Elsinore requirements for traffic impact analysis of the following project. The analysis must follow the City of Lake Elsinore Traffic Study Guidelines dated May 2020. Case No. (i.e. TR, PM, CUP, PP) Related Cases - SP No. Provide SP No. and list of other approved or active projects within the SP. EIR No. GPA No. CZ No. Project Name: Project Address: Project Description: Consultant Developer Name: Address: Telephone: A. Trip Generation Source: (ITE 11th Edition or other as approved) Current GP Land Use Proposed Land Use Current Zoning Proposed Zoning Current Trip Generation Proposed Trip Generation (PCE) In Out Total In Out Total AM Trips PM Trips Internal Trip Allowance Yes No ( % Trip Discount) Pass-By Trip Allowance Yes No ( % Trip Discount) Internal and Pass-By trip allowance percentages shall be per NCHRP 684 and the ITE Trip Generation Manual. The pass-by trips at adjacent study area intersections and project driveways shall be indicated on a report figure. Internal trips that use external streets shall be indicated on a report figure. B. Trip Geographic Distribution: N % S % E % W % (Attach exhibit for detailed assignment) C. Background Traffic Project Build-out Year: Phase Year(s), if needed: _____________________________ Annual Ambient Growth Rate: % Other area projects to be analyzed: (to be provided by the City planning department) Model/Forecast methodology Traffic Impact Analysis -24- May 2022 Preparation Guide Exhibit B – Scoping Agreement – Page 2 D. Study intersections: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.) 1. 2. 3. 4. 5. E. Study Roadway Segments: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments from other agencies.) 1. 2. 3. 4. 5. E. Other Jurisdictional Impacts Is this project within one-mile radius of another jurisdiction or a State Highway? Yes No If so, name of Agency: F. Site Plan (please attach figure) G. Specific issues to be addressed in the Study (in addition to the standard analysis described in the Guideline) (To be filled out by City) H. Existing Conditions Traffic count data must be new or recent within 1 calendar year. Provide traffic count dates if using other than new counts. Date of counts:__________________________________________________ I. Traffic Study Requirements Traffic Study Required: ___ ____________________________________________ Focused Study Required: ___ ____________________________________________ Exempt from Analysis: ___ ____________________________________________ Recommended by: _____________________________ ________ Consultant’s Representative Date Scoping Agreement Submitted on _____________ Revised on ___________________ Approved Scoping Agreement: _________________________ ________ City of Lake Elsinore Engineering Date Department 6. 7. 8. 9. 10. 6. 7. 8. 9. 10.