HomeMy WebLinkAboutPA 2021-19 Rome Hill Comm 2nd review hyd gate access phasing comments (2)
Planning Case Comments
DATE: 9/30/2022
CASE: PA 2021-19
Rome Hill Commercial
2nd Review
APN 371-150-001, -002
PLANNER: Mathew Evans, Principal Planner
REVIEWED BY: Steve Payne, Assistant Fire Marshal
The Fire Department has reviewed this submittal and provides the
following comments.
1. The applicant or developer shall provide fire hydrants in
accordance with the following:
a. Prior to placing any combustibles on site, provide an
approved water source for firefighting purposes.
b. Prior to building permit issuance, submit plans to the water
district for a water system capable of delivering fire flow as
required by the California Fire Code and Fire Department
standards. Fire hydrants shall be spaced in accordance
with the California Fire Code. Hydrants must produce the
required fire flow per the California Fire Code.
c. Required fire flow is estimated to be 2,125 GPM at 20 PSI
for a 2-hour duration based on 2019 California Fire Code
and 41,296 square foot building area with Type II-B
construction.
2. Prior to building permit issuance, install the approved water
system, approved access roads, and contact the Fire Department
for a verification inspection.
In Cooperation With
The California Department of Forestry and Fire Protection
130 South Main Street, Lake Elsinore, CA 92530 • Phone (951) 674-3124
www.rvcfire.org
Proudly serving the
unincorporated areas
of riverside county
and the cities of:
Banning
Beaumont
Coachella
Desert Hot Springs
Eastvale
Indian Wells
Indio
Jurupa Valley
Lake Elsinore
La Quinta
Menifee
Moreno Valley
Norco
Palm Desert
Perris
Rancho Mirage
Rubidoux CSD
San Jacinto
Temecula
Wildomar
BOARD OF
SUPERVISORS:
Kevin Jeffries
District 1
Karen Spiegel
District 2
CHARLES WASHINGTON
District 3
V. Manual Perez
District 4
Jeff Hewitt
District 5
3. Gates must meet Fire Department standards at the time of building
permit application. Current standards require that gates have a
Knox rapid entry system, an infrared gate opener, and be set back
up to 35 feet allow emergency vehicles to safely stop away from
traffic flow.
4. If the project is to be developed in phases, each phase of
development must meet applicable standards prior to occupancy.
These comments are preliminary; further review will occur upon
receiving building plans. Additional conditions may be necessary at
that time.
Please feel free to contact me with any questions.