Loading...
HomeMy WebLinkAboutEng Comments1 Nancy Huynh From:Paul Fizer Sent:Tuesday, November 19, 2024 8:01 AM To:Nancy Huynh Cc:Yu Tagai Subject:RE: DRC Transmittal | PA-2019-19 Rome Hill (REVISED SCOPE) Attachments:202273-GradnAve&KathrynWay-Grading-EXHIBIT (2).pdf Follow Up Flag:Follow up Flag Status:Flagged Gotcha! No worries. If they could provide an updated cut and fill exhibit, it’d be appreciated. AƩached is what they had iniƟally, an updated version is recommended. Also, the benchmark info is important, too, because of the floodplain. So, in summary to determine preliminary engineering feasibility:  Benchmark InformaƟon updated on the grading plans. Include conversion informaƟon if any conversion uƟlized.  Add elevaƟon in feet to the exisƟng contour lines on the grading plan. Every five feet is fine. Cannot properly review the grading plan without this informaƟon.  Color-coded cut and fill exhibit, similar to the aƩached previously provided exhibit. So, please provide a “heat map” showing cut extents and fill extents along with associated depths (i.e., rainbow color coded exhibit displaying extent of depths cut/fill elevaƟons). o Notate if the hill is geƫng cut at all and confirm that porƟon of cut will only be used to raise the porƟon outside of the floodplain on the grading plans or on the cut/fill exhibit.  Some general locaƟon of the MDP line that flood is requiring them to construct. Best Regards, Paul Fizer, PE Senior Engineer City of Lake Elsinore Ph: (951)-674-3124 ext. 804 From: Nancy Huynh <nhuynh@lake-elsinore.org> Sent: Tuesday, November 19, 2024 7:07 AM To: Paul Fizer <pfizer@Lake-Elsinore.org> Cc: Yu Tagai <ytagai@Lake-Elsinore.org> Subject: RE: DRC Transmittal | PA-2019-19 Rome Hill (REVISED SCOPE) Morning Paul! The applicant met with Planning prior to submitting these revised plans/scope. It was discussed that they should hold oƯ on revising their tech studies until we’ve had the chance to review the revised plans/scope. So my bad for not letting you know that tech studies will be revised/resub once the City departments have reviewed the feasibility of the revised plans/scope.