Loading...
HomeMy WebLinkAboutZCPC-2025-0028 Approval Letter CITY OF LADE L LSII`IORE ` DREAM EXTREME- July 28, 2025 Attn: Kelly Adams 31077 Illinois St Lake Elsinore, CA 92530 RE: ZCPC-2025-0028 Dear Kelly Adams, Thank you for submitting the above-referenced application requesting Zoning Compliance Plan Check Approval for the construction of a new 400 sq ft attached garage to an existing single-family residence. The project is located at 31077 Illinois St (APN: 379-212-010). We have reviewed your application for compliance with applicable city zoning requirements and design development standards. This letter is our determination that your application meets applicable zoning requirements and design development standards and is hereby APPROVED pursuant to Section 17.415.060.0 of the Lake Elsinore Municipal Code. Most construction projects will often require the following permits and approvals prior to beginning construction activities: • Building Permit (City Building & Safety Division) • Grading Permit (City Engineering Division) • Lot Line Adjustments, Parcel Mergers, Dedications, WQMP (Engineering Division) • Water Meters and Sewer Connections (Elsinore Valley Municipal Water District) • Septic System (Riverside County Department of Environmental Health) City building and engineering permit applications may be submitted online using the Citizen Self-Service Portal at http://www.lake-elsinore.org/city-services/online-services/citizen-self-service-portal. It's strongly encouraged that you coordinate with any other public agencies and/or utility providers to understand additional requirements affecting your project. If you have questions about this letter, please contact me at (951) 777-7454 or Jrodriguez(a)Iake-elsinore.org. Sincerely, Jesse Rodriguez Assistant Planner City of Lake Elsinore CC: Case File BUILDING AND SA FETY DEPAR TMENT General Conditions B-1. Final Building and Safety Conditions. Final Building and Safety Conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy,use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. Solar will be required. B-2. Compliance with Code. All design components shall comply with applicable provisions of the 2022 edition of the California Building,Plumbing and Mechanical Codes: 2022 California Electrical Code; California Administrative Code, 2022 California Energy Codes, 2022 California Green Building Standards, California Title 24 Disabled Access Regulations, and Lake Elsinore Municipal Code. B-3. Street Addressing. Applicants must obtain street addresses for all proposed buildings. Request by submitting a site plan for commercial, single- family residential tracts or multi-family residential projects and or a recorded final map with approval from Council. Single family homes need zoning compliance approval. It takes 10 days for addressing to be approved please submit to Jonathan Oronia Joroniaglake-elsinore.Org B-4. Clearance from LEUSD. A School certificate from the Lake Elsinore School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. B-5. Obtain Approvals Prior to Construction. Applicants must obtain all building plans and permit approvals prior to commencement of any construction work. B-6. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, Solar and any block walls will require separate approvals and permits. B-7. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. Septic systems will need to be approved by Riverside County Environmental Health Department before permit issuance. At Plan Review Submittal B-8. Submitting Plans and Calculations. Applicant must submit to Building and Safety online portal for electronic plan check and permitting: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b. A Sound Transmission Control Study in accordance with the provisions of the 2022 edition of the California Building Code Section 1207. c. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. d. Solar will be required. Prior to Issuance of Grading Permit(s)grading plans must be submitted to Engineering prior to submitting plans to Building. B-9. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. B-10. Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Any structure built before requires a lead and asbestos report. Prior to Issuance of Building Permits) B-11. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Provide C.D. of approved plans to Building Division. Prior to Beginning of Construction B-12. Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction.