Loading...
HomeMy WebLinkAboutNV5_FEE_Lake Elsinore_Building Plan Check and Inspection Services_04.01.24FEE PROPOSAL Building Plan Check and Inspection Services PLAN REVIEW FIXED PERCENTAGE FEE OPTION The following fees include all rechecks, plan check conferences, and plan check coordination, and will remain in effect throughout the term of this Agreement: 1. NV5’s fee per plan review will be 70% of the plan review fees collected by the City. The initial plan review fee includes two rechecks. Additional rechecks can be performed on a time-and-material basis according to the hourly rates outlined below. 2. NV5’s fee per structural-only plan review shall be 40% of the fees collected by the City. The initial plan review fee includes two rechecks. Additional rechecks can be performed on a time and material basis according to the hourly rates outlined below. 3. Expedited plan check shall be an additional 25% of the regular fees listed in 1 through 2 above. The minimum plan check fee will be $250. HOURLY RATE OPTION Included below is NV5’s hourly fee schedule. Rates will be effective through the first year of the agreement. Rates will automatically increase by 3% at the beginning of each additional yearly term. CLASSIFICATION HOURLY RATE** Project Manager $225 Senior Plan Reviewer III $210 Senior Plan Reviewer II $190 Senior Plan Reviewer I $170 Plan Reviewer III $160 Plan Reviewer II $145 Plan Reviewer I $135 Supervising Inspector $180 Senior ICC Certified Inspector $150 ICC Certified Inspector $140 Plan Check Coordination/Permit Technician $105 REIMBURSABLE EXPENSES COST Other Direct Costs (ODCs) + Subconsultant Services Cost + 15% Automobile Transportation per IRS standard ** Regular rates. Work in excess of 8 hours and work on Saturdays will be billed at 1.5 times the regular rate. Work in excess of 12 hours and work on Sundays and Holidays will be billed at 2 times the regular rate. The minimum plan check fee will be $250. City of Lake Elsinore | Building Plan Check and Inspection Services NV5 FEE PROPOSAL Page | 1 of 2 HR Green Pacific, Inc. 2024 Fee Schedule Personnel Classification Hourly Billing Rate Principal-in-Charge/Program Manager $220-360 Project Manager $215-330 QA/QC Manager $210-285 Building and Safety Official $180-235 Deputy Building Official $155-210 Structural Plan Review Engineer $190-250 Building Plan Check Engineer $135-175 Senior Building Plan Checker $120-165 Building Plan Checker $100-155 Senior Building Inspector $130-165 Building Inspector (Combination) $115-160 CASp Reviewer/Inspector $140-200 Code Enforcement Supervisor $105-160 Code Enforcement Officer $ 95-155 Permit Technician $ 95-135 Administrative Assistant $ 85-125 Note: 1. Other classifications are available based upon the needs of the agency. Professional Reimbursement / Hourly and Overtime Rates: The hourly billing rates include the cost of salaries of the HR Green employees, plus sick leave, vacation, holiday and other fringe benefits. The percentage added to salary costs includes indirect overhead costs and fee (profit). All employees classified as “non-exempt” by the U.S. Department of Labor will be compensated at 1.5 times salary, as per state and Federal wage and hour for overtime hours. Billing rates will be calculated accordingly for overtime hours. Direct/Reimbursable Expenses and Subconsultants: Reimbursement for direct expenses, as listed below, incurred in connection with the work, will be at cost plus 15% for items such as: a. Maps, photographs, reproductions, printing, equipment rental and special supplies related to the work. b. Subconsultants and other outside services, if needed. c. Specific telecommunications and delivery charges. d. Special fees, insurance, permits, and licenses applicable to the work. e. Outside computer processing, computation, and proprietary programs purchased for the work. f. Mileage and vehicle costs directly related to agency services. g. Daily rate of $85 for construction field inspection vehicles. h. Travel expenses (e.g., hotel, meals, transportation, etc.). Our hourly fees/rates shall remain effective through December 31, 2024 and may be adjusted annually thereafter as negotiated with and agreed to by the agency. City of Lake Elsinore | Building Plan Check and Inspection Services NV5 | 2