Loading...
HomeMy WebLinkAboutItem No. 10 - Change Order No.1 with Elsinore Valley Municipal Water District to Provide Const10)Change Order No.1 with Elsinore Valley Municipal Water District to Provide Construction Inspection Services for the Camino Del Norte Sewer Extension Project. EVMWD W.O. 2025-00164-INS Approve and authorize the City Manager to execute Change Order No. 1 with Elsinore Valley Municipal Water District for $76,240.00 to provide Inspection Construction Services for the Camino Del Norte Sewer Extension Project. Page 1 of 2 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Jason Simpson, City Manager Prepared by:Remon Habib, City Engineer Date:July 8, 2025 Subject: Change Order No.1 with Elsinore Valley Municipal Water District to Provide Construction Inspection Services for the Camino Del Norte Sewer Extension Project. EVMWD W.O. 2025-00164-INS Recommendation Approve and authorize the City Manager to execute Change Order No. 1 with Elsinore Valley Municipal Water District for $76,240.00 to provide Inspection Construction Services for the Camino Del Norte Sewer Extension Project. Background On January 28, 2025, the City Council approved a professional services agreement with Aneen Construction Inc. to provide Public Works Construction Services for the Camino Del Norte Sewer Extension Improvements Project. The City paid an initial Inspection deposit to EVMWD in the amount of $29,900.00 on March 18, 2025, at project commencement. During the field verification and construction survey staking, contractor Aneen Construction Inc. discovered that the Contract plans contained a major design error. The design plans were prepared by Ardurra Inc., an engineering design firm with experience working on Elsinore Valley Municipal Water District (EVMWD) facilities. The design plans were reviewed and approved by EVMWD in January of 2025 prior to the City advertising the project for construction. Additional inspection by EVMWD is now necessary due to the actual existing manhole depth changing from 12.2 feet on the plans to an actual depth of 25.2 feet observed in the field. Additional field conditions encountered include breaking up of boulders and chipping away rock that is much shallower than anticipated. These issues have contributed to a lower production rate and more inspection effort by EVMWD than originally anticipated. EVMWD is requesting that the City provide additional funding for construction inspection fees for the project to remain on track. The expected completion date is now July 2025. Inspection Funding Request EVMWD Page 2 of 2 Discussion The requested additional funds by the district will cover the following: •Facility Installation Inspections •Facility Testing Inspections •Punchlist Walk •As-Built Drawings •Record Notice of Completion •1-Year Warranty Inspection •Close out Fiscal Impact Inspection Change Order Funding Request No. 1 to EVMWD will result in a revised total inspection cost of $106,140.00. The original inspection amount was $64,000.00. Attachments Attachment 1- Change Order No. 1 Exhibit A - Additional Funds Request Letter Attachment 2 – Inspection Check Initial Funds Calculation Engineering CONSTRUCTION CONTRACT CHANGE ORDER Date 07/08/2025 C.C.O No. 1 951-674-3124 130 S. MAIN STREET LAKE ELSINORE, CA 92530 WWW.LAKE-ELSINORE.ORG CONTRACTOR: Elsinore Valley Municipal Water District (EVMWD) In conformance with and as part of the existing project the City of Lake Elsinore authorizes and directs changes to the Deposit as described below. 1) EXTRA WORK ORDER (EWO) (Unknown or Unforeseen Work not covered by Contract) a) Extra Work Item: Due to field depth errors that differed from the approved plans, the necessary field revisions for construction will create added inspections. •Facility Testing and Installation Inspections •Punchlist Walk •As-Built Drawings •1 Year Warranty Inspection TOTAL Lump Sum = $76,240 2) CHANGED WORK ORDER (CWO) (Significant increases in quantity of Unit-Price items; greater than 25%): a) Changed Work Item A i) Time impact is (+) additional Working Days. 3) CLOSING SUMMARY ORDER (CSO) (Final adjustment of original estimated contract quantities based on final measured quantities): a) Closing Summary Order: i) Payment for this work is paid as follows: Total = $76,240 AGREEMENT AMOUNT: Compensation as set forth in the Agreement and as amended by this and prior Contract Change Order(s) is: $106,140.00 Original Contract Amount: $29,900.00 Amount All Previous CCOs (+-): $0.00 Amount This CCO (+-): $76,240.00 Total Contract Amount: $106,140.00 CITY’S ACCEPTANCE: The above described work is hereby approved and directed to be completed in accordance with the Contract Documents. City of Lake Elsinore Rec.: _______________________________ City Engineer Date App.: _______________________________ City Manager Date CONTRACTOR’S ACCEPTANCE: Contractor agrees to perform the above work as directed, in accordance with the Contract Documents, and accept payment described above as full compensation for work described subject to additions and reductions of the quantities of various items. Contractor: Elsinore Valley Municipal Water District (EVMWD) By __________________________________________ Title: ________________________________________ Date: ________________________________________ 951-674-3146 | 31315 Chaney Street, Lake Elsinore, CA 92530 | www.evmwd.com BOARD OF DIRECTORS Darcy M. Burke, Treasurer Chance Edmondson, President Matthew Dobler, Director Harvey R. Ryan, Vice President GENERAL MANAGER LEGAL COUNSEL DISTRICT SECRETARY Andy Morris, Director Greg Thomas Best, Best & Krieger Christy Gonzalez June 11, 2025 City Of Lake Elsinore Attn: Carlos Norvani 130 S. Main Street Lake Elsinore, CA 92530 Subject: ADDITIONAL FUNDS REQUEST 1ST NOTICE CLE CAMINO DEL NORTE SEWER MAIN DIR APPLICATION # 2025-00164-INS Dear Mr. Norvani, Elsinore Valley Municipal Water District has reviewed the above referenced project account balance. The deposit submitted for Inspection is 183.59% depleted. The District kindly requests that a payment is made in the amount of $ 76,240.00 to bring the deposit account current and have sufficient funds to perform the remaining services on the project. It is our goal to help the project succeed and provide excellent services. We look forward in receiving the payment as soon as possible. Any remaining funds in the deposit account will be returned to the Developer (Responsible Party) upon project close-out. The additional funds requested above are an estimate of the funds required to cover services that have been performed or will be performed in the future to complete the project. Enclosed is the Payment Remittance Form that summaries the deposit(s) amount and estimated costs being billed towards the deposit account. There are three costs billed to the account noted as billed, unbilled and future costs. Billed Costs are services performed that have been billed to the account and are reflected in the enclosed Statement of Project Costs. Unbilled Costs are services performed that have not been reflected in the Statement of Project Costs due to processing durations. Future Costs are the estimated future charges for the remaining services that will be performed for the project. A brief list of services that may be remaining are as follows: • Facility Installation Inspection • Facility Testing Inspection • Punchlist Walk • As-Built/Record Drawings Review • Record Notice of Completion • 1 year Warranty Inspection • Close-out Processing • Misc. Administrative Activities City Of Lake Elsinore June 11, 2025 Page 2 Please make the payment online via credit card or ACH through the online permit portal at https://permits.evmwd.com/. Please reference the subject Application No. with any correspondence to the District. If you have any questions regarding the above information, please feel free to contact Engineering Services at (951) 674-3146 extension 6705. Sincerely, Mayra Cardenas Principal Engineer Development Services Attachment: None cc: Finance, File WO#2025-00164-INS Funds For:Inspections Total Deposit $28,411.76 Billed Costs1 $52,159.75 Unbilled Costs2 $0.00 Remaining Deposit ($23,747.99)Future Costs3 $52,484.85 Total Due4 $76,240.00 Notes: 4. Total Due is rounded to the nearest ten. 1. Billed Costs are the charges for the services that have been performed and have been billed to the project account. Please refer to your Rhythm Portal account for billing charges.2. Unbilled Costs are the charges for the services that have been performed and have not been billed to the project account due to processing durations.Please refer to your Rhythm Portal account for billing charges.3. Future Costs are the estimated future charges for the services that will be performed until project completion. Payment Remittance Form(Please remit this form with your payment) Payment Remittance Slip Payable to:Elsinore Valley Municipal Water DistrictEngineering Dept.31315 Chaney StreetLake Elsinore, CA 92531 Inspection Sewer (S) Project Name: WO#: Description Rate Hrs. Cost 52,159.75$ 52,159.75$ -$ -$ Meters Remaining (each) 41.50$ -$ Backflow Inspection (each) 41.50$ -$ Sewer Laterals Remaining (each) 41.50$ -$ Punchlist 290.00$ 8 2,320.00$ As-builts/Redlines 290.00$ 8 2,320.00$ CofO (Final) (each) 41.50$ -$ NOC and Grant Deed 86.00$ 1 86.00$ NOC Recording Fee (each) 101.00$ 1 101.00$ Warranty Inspection 290.00$ 8 2,320.00$ Engineering Manager 399.00$ -$ Senior Engineer Inspector 290.00$ 126 36,540.00$ Senior Civil Engineer 357.00$ -$ Development Service Representative 86.00$ -$ Field Maintenance Worker 244.00$ 8 1,952.00$ Close-Out 86.00$ -$ Contingency 45,639.00$ 15%6,845.85$ 52,484.85$ Total Deposit 28,411.76$ Billed Costs1 52,159.75$ Unbilled Costs2 -$ Remaining Deposit (23,747.99)$ Future Costs3 52,484.85$ Total Due (Rounded Up) 76,240.00$ Legend: Only fill-in the yellow cells Notes: 1. Billed Costs - This is the charges billed on the Billing Summary. It is the Total Costs on the billing summary 2. Unbilled Costs - This is the consultant charges that have not been billed in the Billing Summary 3. Future Costs - This is the costs for the remaining services that will be performed in the project 4. Total Due is rounded to the nearest ten. Water Inspection Additional Funds Request for Water and Sewer Projects Billed Costs Statement of Project Costs (Billing Summary) - Total Costs Billed Costs Sub-Total Unbilled Costs Unbilled Costs Sub-Total CLE Camino Del Norte Sewer Main DIR 2025-00164-INS Future Costs Sewer General Future Costs Sub-Total Summary of Costs Page 1 of 1 Application No: Project Name: QUANTITY UNIT ITEM UNIT COST COST EA Reports/Studies $5,000 -$ Planning Subtotal -$ QUANTITY UNIT ITEM UNIT COST COST LF 8" PVC Water Main 50.00$ -$ LF 12" DIP Water Main 65.00$ -$ EA 4" RW Gate Valve 1,800.00$ -$ EA 6" RW Gate Valve 2,000.00$ -$ EA 8" RW Gate Valve 2,200.00$ -$ EA 12" RW Gate Valve 3,000.00$ -$ EA Fire Hydrant (6") Super 6,500.00$ -$ EA Fire Hydrant (6") Standard/Blow-Off 5,500.00$ -$ EA 1" Water Service 1,100.00$ -$ EA 2" Water Service 3,000.00$ -$ EA 1" Air/Vac Assembly 2,500.00$ -$ EA 2" Air/Vac Assembly 4,000.00$ -$ EA Fire Double Check Detector Assmbly 10,000.00$ -$ Water Pipeline Subtotal -$ QUANTITY UNIT ITEM UNIT COST COST 1248 LF 8" Sewer Main 35.00$ 43,680.00$ LF 10" Sewer Main 45.00$ -$ LF 12" Sewer Main 50.00$ -$ LF 6" PVC Sewer Force Main 80.00$ -$ LF 8" PVC Sewer Force Main 120.00$ -$ LF 12" PVC Sewer Force Main 140.00$ -$ 6 EA 5' Manhole Depth 6,500.00$ 39,000.00$ Sewer Pipeline Subtotal 82,680.00$ QUANTITY UNIT ITEM UNIT COST COST 1 LS Complex Facility Description: -$ Complex Facility Subtotal -$ 82,680.00$ 16,536.00$ 99,216.00$ 14,882.40$ 14,882.40$ -$ 1,488.24$ Additional Inspection Deposit Required, Calculated from Contractor's Schedule 13,529.36$ 29,900.00$ Attach an engineer cost estimate prepared by the Registered Civil Engineer for the complex facility. Provide the lump sum amount below. Inspection Check Initial Funds Calculation 2024-00402-INS City of Lake Elsinore Camino del Norte Sewer Extension Project Planning (Water Analysis, Sewer Analysis, Preliminary Design Report, and Other Studies) A minimum $7,000 deposit is required Water Pipeline Sewer Pipeline Complex Facilities (Booster Station, Lift Station, Reservoir, Tranmission Main (>12"), Trunk Sewer Main (>12"), and Other) Initial Deposit Submitted Additional Initial Deposit Required Sub-Total Engineers Cost Estimate Contingency (20%) Total Engineers Cost Estimate 15% of Engineers Cost Estimate Total Inspection Check Deposit Required Mapping Fee Required Printed: 3/4/2025