HomeMy WebLinkAboutDel Vino SFR Grading Permit-issued CITY OF ,� ' / ! ' ' A
P
LAuE �� LSIIY� E Rlllll ` UMBER:ENG-2021-00154
l� PERMIT STATUS: ISSUED
DREAM EXTREME Effective Date:7/11/22 Expiration Date:1/9/23
130 S MAIN LAKE ELSINORE,CA 9ZS30
TEL-(9S3)674-3124
W W W.LAKE-ELSIN ORE.ORG
PERMITTEE Nathan Hilbig CONTACT: NATHAN HILBIG
ADDRESS: CONTACT PHONE: 858-602-9521
PERMITTEE EMAIL CONTACT EMERGENCY PHONE:
WORK DESCRIPTION: °
DEL VINO DEVELOPMENT-SFR PGP
PROJECT PERMIT SPECIFIC CONDITIONS-RESTRICTIONS: THIS IS YOUR RECEIPT WHEN MACHINE VALIDATED
LOCATION:
APN(s):374-083-033&034 SFR PGP @ Sumner Ave./Lowell St.
LAKE ELSINORE,
OTHER ID:
PERMIT FEES:
FEES CHARGES FEES: FEES PAID: FEES:
PUBLIC WORKS IMPROVEMENT PLAI $1,374.88 PUBLIC WORKS IMPROVEMEI $1,374.88
ADMINISTRATIVE CHARGE(S200) $200.00 ADMINISTRATIVE CHARGE IS: $200.00
GRADING PLAN CHECK $819.00 GRADING PLAN CHECK $819.00
KANGAROO RAT HABITAT $190.00 KANGAROO RAT HABITAT $190.00
REFUNDABLE SECURITY GRADING DE $500.00 REFUNDABLE SECURITY GRA[ $500.00
ADMINISTRATIVE CHARGE(S200) $200•00 ADMINISTRATIVE CHARGE(S: $200.00
REPRODUCTIONS-COPYING $3.50 REPRODUCTIONS-COPYING $3.50
GRADING PERMIT(TOTAL CUBIC YAF $620.00 GRADING PERMIT(TOTAL CU $620.00
DIF DRAINAGE FEE-TOWN#6 $1,043.10 DIF DRAINAGE FEE-TOWN#1 $1,043.10
TOTAL FEES: $0.00
ISSUED ISSUED DATE: 07/11/2022
Owner / Applicant / Co tractor / Agent
NOTES&CONDITIONS
Call either of the Engineering Inspectors: Scott Rippstein at 951-538-9116,or Mike Payment at 951-805-9835
WITHIN 24 HOURS of RECEIVING THIS PERMIT to schedule a preconstruction meeting.
A copy of this PERMIT,approved plans and SWPPP&applicable REAP must remain onsite at all times or a STOP
WORK NOTICE will be issued.
Monday,July 11,2022
City of Lake Elsinore,Engineering Division Please read and initial:
_1, 1 am Licensed under the provisions of Business and Professional
Post in conspicuous place on the job Code Section 7000 et seq.and my license is in full force.
Permit Card/Approved Plans must be available for each inspection
or inspection will not be made _2. 1,as owner of the property,or my employees w/wages as their
You must furnish PERMIT NUMBER and the JOB ADDRESS for sole compensation will do the work and the structure is not intended or
Aotfffeed for sale.
each respective inspection: CONTACT Engineering Inspector
listed on front to schedule inspection �I,as owner of the property,am exclusively contracting with
licensed contractors to construct the project.
_4. 1 have a certificate of consent to self-insure or a Certificate of
Worker's Compensation Insurance or a certified copy thereof.
DEPARTMENT USE ONLY _5. 1 shall not employ any person in any manner so as to become
subject to Worker's Compensation laws in the performance of the work for
Inspection Item Inspector Date which this permit is issued.
Soil Stripping/Clearing
Dry Weather Earthwork Note: If you should become subject to Worker's Compensation after
making this certification,you must forthwith comply with such provisions or
Wet Weather Earthwork this permit shall be deemed revoked.
Fill/Landscape Stockpiles
Cut Sloped 2H:1 V or Flatter
Rough Footing Excavation Ins ection Item Inspector Date
-Conventional,TYP Retaining Wall-separate permit required
-Piers&Caisson Driveway/Private Road
Trenching Sub-Grade Preparation
Trench Plates Approach Grades/Width
Other. Vertical Clearance
Fills Turning Radius/Turnouts
Setbacks Structural Section
Preparation of Ground Portland Concrete(Rigid)
Approved Fill Material Asphalt Concrete(Flexible)
Fill Slopes 2H:1 V or Flatter Crushed rock or Gravel
Toe Bench/Keys Other Unpaved
Compaction of Ground Road Drainage
Other Code Violations
Drainage/Terracing Non-Stormwater Discharge-note on separate form
Positive Drainage from Bldg Illegal Storm Drain Connection-note on separate form
Culverts/Catch Basins Hazardous Conditions
Drainage for Cut/Fill Slopes Grading w/o Permit
Terraces/Swales Intermediate Reports
-Subsurface Drainage Compaction Test Summary
-Interceptor Drains Elevation Certificate(SFHA)for Pad
Erosion Control BMP's Progress Grading Report
SWPPP ONSITE Final Grading&Reports
Short Term: Soils Grading Report
Silt Fence/Plastic Covering As-Graded Plan(redline)
Straw bale/Gravel bag Barrier Geologic Grading Report
Sediment Basin/Traps Elevation Certificate(SFHA)w/photo
Check Dam/Gravel Bag Berm Notice of Completion-recorded
Fiber Rolls/Jute Netting Notice of Termination
Rock/gravel Constr.Entrance
Wind/Dust Control j
Long Term 1
Hydro-mulching RELEASE
Slraw/Wood Mulch Division Date Staff
Geotextiles&Mats FIELD INSPECTION
Energy Dissipation Devices IN HOUSE TECHNICIAN
Stream Bank Stabililzation —
DISTRIBUTION: APPLICANT FILE INSPECTOR,NPDES COORDINATOR
hops://lakeclsinore.sliarepoiiit.com/eng/Shared Documents/Gngr/Forms/Engincering Forms/Grading pcnnit form Fncrgov 20171205.doe