HomeMy WebLinkAbout10-24-23 - Service Requirements - 23-062
951-674-3146 | 31315 Chaney Street, Lake Elsinore, CA 92530 | www.evmwd.com
BOARD OF DIRECTORS Harvey R. Ryan, Treasurer
Andy Morris, President Darcy M. Burke, Director
Chance Edmondson, Vice President
GENERAL MANAGER
LEGAL COUNSEL
DISTRICT SECRETARY
Jack T. Ferguson, Director
Greg Thomas
Best, Best & Krieger
Terese Quintanar
October 24, 2023
EPD Solutions
Attn: Dane Palanjian
3333 Michelson Drive
Irvine CA, 92612
SUBJECT: SERVICE REQUIREMENTS FOR BAKER INDUSTRIAL –
APPLICATION NO. 23-062
On June 12, 2023, a Due Diligence meeting was held with Elsinore Valley Municipal
Water District (District) and the Owner/Developer and/or Engineer of the subject
project to discuss the water and/or sewer requirements for this project. The project
consists of two industrial buildings 207,550 SF and 778,720 SF located at 378-020-014,
015, 016, 028, 029, 030, 031, 036, 037 and 048 . The project site plan is attached herein.
The Owner/Developer shall comply with the following preliminary requirements to obtain
water and/or sewer service from the District. A map of the existing water and/or sewer
facilities is attached herein.
Project Specific Requirements:
1. The Owner/Developer shall provide a hydraulic water study that analysis average
day demand, peak hour demand, max day demand and max day and fire flow
demand per the Water Master Plan criteria. The water study must be approved
prior to plan check submittal.
2. The Owner/Developer shall construct public water facilities as noted on the
approved Water and/or Sewer Studies.
3. The Owner/Developer shall construct a mastered planned (FT-17) public Zone
1434 36-inch transmission main in Baker Street from Nichols Road to the 14 34
Reservoir.
4. The Owner/Developer shall construct an offsite public Zone 1434 minimum 12-
inch watermain in Baker Street along the project’s frontage as shown in in exhibit
attached herein. The project team asked if they could connect to the 1434
transmission main instead of constructing a parallel 12-inch waterline , this can be
considered if proof is provided that no other development will need to connect to
the required 12-inch water main.
5. The Owner/Developer shall construct an onsite public Zone 1434 minimum 8-inch
looped watermain within the development.
6. The Owner/Developer shall construct an offsite public minimum 8-inch gravity
sewer main in Baker Steet from the project easternly boundary to the existing
temporary Nichols Rd Lift Station.
7. The project shall demonstrate to have sew er capa city allocated fo r the project to
the existing or upgrade of the Nichols Rd Lift Station through an agreement for
sewer services. If not, the Owner/Developer shall construct the mastered planned
(RLS-16) permanent Nichols Rd Lift Statio n.
General Requirements:
8. The Owner/Developer shall construct a public individual minimum 2-inch
domestic water service with backflow device for each building/suite.
9. The Owner/Developer shall construct a public individual minimum 2-inch
irrigation water service with backflow device for each parcel.
10. The Owner/Developer shall construct a private minimum 6 -inch sewer lateral for
each parcel.
11. The Owner/Developer shall submit a Fire Flow Test Application if required by the
Fire Department.
12. The Owner/Developer shall submit a Will Serve Application to quote the water and
sewer capacity fees.
13. The Owner/Developer shall dedicate to the District an easement for all public
water and sewer facilities constructed within the private property. A minimum 20-
ft wide easement is required for one utility. No building, fences, walls or other
structures of any kind, or trees, shall be installed, constructed, erected, placed
planted or maintained in any portion of the easement area, and no shrubs or other
plants or vegetation shall be placed, planted or maintained in the portion of
easement area.
14. The Owner/Developer shall record a Water Rights Grant Deed to grant the water
rights to the District.
15. The Owner/Developer shall submit a Plan Check application for the review of the
Water and Sewer Improvement Plans for the project.
16. The Owner/Developer shall submit an Inspection Application for the inspection of
the facilities to be constructed.
The District has assigned the following work order number to this project WO# 23-062.
All future correspondence to this project must include the work order number provided.
Attached as Exhibit A is a list of forms, application and fees required to comply with the
requirements mentioned above.
If you have any questions, please contact the Engineering Department at (951) 674-3146
Ext. 6705, engservices@evmwd.net.
EVMWD offers a variety of rebates and resources to help our customers save water. For
more information, visit our Water Efficiency page at www.evmwd.com/conservation or
contact our Water Efficiency Specialist at 951-674-3146 x8247.
Respectfully,
Mayra A. Cabrera
Principal Engineer – Development Services
CC: File; City of Lake Elsinore
Attachments: Forms, Applications and Fees
Site Plan
Water and Sewer Map
951-674-3146 | 31315 Chaney Street, Lake Elsinore, CA 92530 | www.evmwd.com
Forms, Applications and Fees
The list below details all the typical forms, application and fees that are submitted to Engineering
Department. ONLY THE CHECKED ITEMS ARE REQUIRED FOR THIS PROJECT.
The application and forms may be downloaded by clicking the hyperlinks below or by visiting the
following website: https://evmwd.com/development/forms-applications-and-related-documents/
1 The fees and deposits noted are the rates at issuance of this letter. The Owner/Developer will be
responsible to pay the most current rates published by the District at the time of payment.
Req.
Items Name Description Fees/Deposit 1
Plan Review
☒ Utility Request Form This form is required to obtain existing
record drawings.
No Fee
Duration – 3-5 days
☒ Studies (Plan Check
Application)
This application is required to initiate
the review of water and sewer studies.
Use the following templates:
Water Study Template
Sewer Study Template
Deposit – min. $5,000.00
Duration – 4 weeks
☒ Plans (Plan Check
Application)
This application is required to initiate
the plan review of the water, sewer and
or recycled water improvement plans.
The plans must conform to the District’s
Standards and Title Block requirements.
Use the following templates:
Easement Template – Required for
public water and/or facilities within
private property.
Water Rights Grant Deed Template –
Required for all multi-family,
commercial, and industrial projects.
Deposit - 3% of Engineers Cost
Estimate (min. $3,500.00)
Duration – 4 weeks
☒ Fire Flow Application
This application is required to request
Fire Flow information from a specific
hydrant within the water system.
Application Fee - $125.00
Fire Flow Credit Card Form
Duration – 3 weeks
☒ Will Serve Application
This application is required to determine
the water and sewer capacity fees for
residential developments. These capacity
fees will be due prior to water meter
installation.
Application Fee - $170.00 for Single
Family Residence or $340.00 for Tract
Fee – Refer to Capacity Fees
Duration – 6 weeks
☒ Commercial Industrial
Information Form
This application initiates the review of
regulatory environmental compliance of
discharges into the sewer system for
commercial and industrial
developments.
No initial fees. Fees will be determined
after application had been reviewed.
Construction
☒ Inspection Application
This application initiates the inspection
for the construction of the project.
Deposit – 16.5% of Engineers Cost
Estimate (15% for inspection services
and 1.5% fee for mapping services) (min.
$7,000.00)
Duration – 3 weeks (Materials
Submittals)
BLDG. 1207,550 s.f.BLDG. 2778,720 s.f.FLOOD P
L
A
I
N
SAWPABAKER ST.NICHOLS RD.PIERCE ST.BAKER INDUSTRIAL CONCEPT SITE PLANLAKE ELSINORE, CA
Sou rces : Esr i, H ER E, Garm i n , In te r m ap , incr em ent P C o r p ., GEBC O, U SGS, FAO , NPS , NR C AN ,Geo Base , IGN , Kada ster NL, O rdn ance Su r vey, Esr i Ja p an, M ET I, E sri C hina (H ong Kon g), (c)Ope n Stree tM ap contr ibu to rs , and the G IS Us e r C om m un ity
Date: 5 /2 3/2 023
Vicinity Ma p - Bak er Indu str ia l - 2 Industrial Buildings - Wa ter & Se we r
±
0.3 0.30 mi
Dat a S ources: EV MWD, Count y of Riverside Time: 11 :25 :2 6 AM
Le ge n d
Parce ls _Que ry res ul t
EVMWD B ou nd ary
EVMWD S ph ere of In flu en ce
Hig hw a ys
Str ee t C en te rli ne s
Parce ls
Non Po table Pr es sur e Ma ins
Air R ele as e
Blo wo ff
Dis tri bu tio n Ma in
Hyd ran t L ate ral
Samp li ng Poi nt
Tra nsm issi on Mai n
Dra in L in e
Fe e C red it s Se we r
Fe e C red its Water
Re imb urs eme nts - Se we r
Re imb urs eme nts - Water
Fo rce M ai n
Gr avi ty M ain s
Lift Statio n
Ag Line
Ag L ine
Op en Ca na l
Sip ho n
Ant hony M . Vazq uez