Loading...
HomeMy WebLinkAboutBaker Industrial Project DBESP Analysis (2)Determination of Biologically Equivalent or Superior Preservation (DBESP) Analysis For Impacts to MSHCP Riparian/Riverine Areas and Vernal Pools, and Narrow Endemic/Criteria Area Plants Baker Industrial Project Permittee City of Lake Elsinore Applicant Ecosystem Investment Partners 1505 Bridgeway, Suite 107 Sausalito, California 94965 Contact: Glen Williams Phone: (415) 465-4423 Consultant Glenn Lukos Associates, Inc. 1940 E. Deere Avenue, Suite 250 Santa Ana, California 92705 Contact: David Moskovitz Phone: (949) 340-2562 February 28, 2024 Revised, March 6, 2025 May 14, 2025 DBESP Report i Contents 1.0 EXECUTIVE SUMMARY ......................................................................................... 3 2.0 INTRODUCTION ...................................................................................................... 3 2.1 Project Area ....................................................................................................... 3 2.2 Project Description ............................................................................................. 4 2.3 Existing Conditions ............................................................................................. 9 3.0 RIPARIAN/RIVERINE MITIGATION (SECTION 6.1.2) .......................................... 10 3.1 Methods ........................................................................................................... 10 3.2 Results/Impacts ................................................................................................ 15 3.3 Mitigation and Equivalency............................................................................... 24 4.0 NARROW ENDEMIC PLANT SPECIES MITIGATION (SECTION 6.1.3) .............. 36 4.1 Methods ........................................................................................................... 36 4.2 Results/Impacts ................................................................................................ 37 4.3 Mitigation and Equivalency............................................................................... 40 5.0 ADDITIONAL SURVEY NEEDS (SECTION 6.3.2) ................................................ 42 5.1 Criteria Area Species Survey Area - Plants ..................................................... 42 5.2 Burrowing Owl .................................................................................................. 46 5.3 Mammals.......................................................................................................... 48 5.4 Amphibians ...................................................................................................... 48 6.0 DELHI SANDS FLOWER-LOVING FLY ................................................................. 48 7.0 REFERENCES....................................................................................................... 48 TABLES Table 2-1. Summary of Project Components ................................................................. 5 Table 2-2. Summary of Vegetation/Land Use Types for the Project Site ..................... 10 Table 3-1. Summary of Least Bell’s Vireo Surveys ...................................................... 14 Table 3-2. Summary of Southwestern Willow Flycatcher Surveys ............................... 15 Table 3-3. MSHCP Riparian/Riverine Areas at the Project site .................................... 16 DBESP Report ii Table 3-4. Impacts to MSHCP Riverine Areas ............................................................. 19 Table 3-5. MSHCP Vernal Pool Ponding Data ............................................................. 22 Table 3-6. Existing Watershed Hydrology Data for the Vernal Pools ............................ 23 Table 3-7. Impacts to Vernal Pools .............................................................................. 25 Table 3-8. Comparison of Existing and Proposed Hydrologic Conditions .................... 34 Table 5-1. Summary of Burrowing Owl Surveys ........................................................... 47 EXHIBITS Exhibit 1 Regional Map Exhibit 2 Vicinity Map Exhibit 3 Project Components Map Exhibit 4A MSHCP Overlay Map Exhibit 4B MSHCP Species Survey Area Map Exhibit 5 Vegetation Map Exhibit 6 Soils Map Exhibit 7 MSHCP Riparian/Riverine Areas and Vernal Pools Exhibit 8A Vernal Pool 1 Avoidance Map Exhibit 8B Vernal Pool 2 Proposed Mitigation Map Exhibit 8C Vernal Pool 3 Proposed Mitigation Map Exhibit 9 Rare Plants Map Exhibit 10 Plant Restoration Map Exhibit 11 Site Photographs Exhibit 12 Burrowing Owl Survey Map Exhibit 13 LBV Habitat with LTCV APPENDICES Appendix A Conceptual Grading Plan – Baker Industrial Project Appendix B Report of 2023 Dry Season Fairy Shrimp Surveys [Pending] Appendix C Report of 2023/2024 Wet Season Fairy Shrimp Surveys [Pending] Appendix D Report of 2020 Southwestern Willow Flycatcher and Least Bell’s Vireo Surveys Appendix E Baker Industrial Hydrology Memorandum DBESP Report 3 1.0 EXECUTIVE SUMMARY This document provides an analysis in support of a Determination of Biologically Equivalent or Superior Preservation (DBESP) for the Baker Industrial Project (the Project) located in the City of Lake Elsinore, Riverside County, California, in regard to the Multiple Species Habitat Conservation Plan (MSHCP) requirements for Protection of Species Associated with Riparian/Riverine Areas and Vernal Pools (MSHCP Volume I, Section 6.1.2). This document has been prepared following the MSHCP DBESP Report Template created by the Regional Conservation Authority (RCA), to demonstrate that with the appropriate mitigation, the Project will represent a “biologically equivalent or superior” alternative to avoidance. This document summarizes the findings of general biological surveys, habitat assessments, and vegetation mapping, as they relate to riparian and vernal pool resources, and species with MSHCP survey requirements. 2.0 INTRODUCTION 2.1 Project Area The Project site comprises approximately 136.01 acres in the City of Lake Elsinore, Riverside California [Exhibit 1 – Regional Map] and is located within an un-sectioned portion of Township 5 South, Range 5 West, of the U.S. Geological Survey (USGS) 7.5- minute quadrangle map Lake Elsinore, California [Exhibit 2 – Vicinity Map]. The Project site is located southwest of Interstate-15, the Lake Elsinore Outlet Center and Temescal Creek/Collier Marsh. The Project site includes the following Assessor’s Parcel Numbers (APNs): Onsite 378-020-014 378-020-015 378-020-016 378-020-028 378-020-029 378-020-030 378-020-031 378-020-036 378-020-037 378-020-048 DBESP Report 4 Offsite 378-020-012 378-020-038 378-020-039 378-020-042 378-020-043 378-114-064 389-080-058 389-110-010 RCA Conserved Lands 378-020-024 378-020-033 378-020-034 378-020-040 378-020-041 378-020-054 2.2 Project Description 2.2.1 General Description The overall Project site totals 136.01 acres and is presented here in five distinct components: 1. The Industrial Project development footprint (referred to as the “onsite” portion of the Project) 2. Baker Street Improvements (offsite) 3. A proposed City Maintenance Area (offsite) – to be located along the edge of Baker Street 4. Additional Street Improvements (offsite) – includes improvements to Pierce Street and Nichols Road, the installation of utilities in Terra Cotta Road and the installation of a force main in Collier Avenue from Nichols Road to Riverside Drive 5. RCA Conserved Lands – includes 33.66 acres of lands that have been conserved by the Project located northeast of the proposed City Maintenance Area and southeast of Pierce Street/Nichols Road All impacts will be permanent. There will be no temporary impacts. All construction staging will occur within the development footprint and/or the offsite improvements areas. The Project will not require additional impacts outside of the development footprint for staging. All fuel modification/weed abatement zones will be contained within the impact limits for both the onsite and offsite project components. The five DBESP Report 5 Project components are depicted on Exhibit 3 [Project Components Map]. Table 2-1 summarizes the acreages of these five components, broken out for portions inside versus outside of Criteria Cells. Table 2-1. Summary of Project Components Project Component Inside Criteria Cells (Acres) Outside Criteria Cells (Acres) Total (Acres) Industrial Project 34.25 31.56 65.81 Baker Street Improvements 4.45 1.66 6.11 City Maintenance Area 2.44 0.29 2.73 Additional Street Improvements 16.30 11.40 27.70 RCA Conserved Lands 32.00 1.66 33.66 Total 89.44 46.57 136.01 2.2.2 Industrial Project (Onsite) The Baker Industrial Project (Project) is proposing two industrial buildings for a total of approximately 1,002,000 square feet of industrial space. The proposed site plan provides adequate standard vehicle parking fields and an additional trailer parking field along the southern end of the property. The Project grading consists of a development pad graded to convey onsite and offsite stormwater northerly while maintaining the hydrologic regime of the property and surrounding tributaries. Larger slopes and associated retaining walls are located along the southerly property line. The Project will accept offsite flows from the southern tributaries (developed) through two flow-by basins also located along the southerly property line. Storm flows are then conveyed through the Project storm system and discharged in flow and quantity at their historical locations along the northern side of Baker Street. Onsite flows are collected through inlets/catch basins and conveyed through the proposed storm drain system to one of three underground storm chambers. With limited opportunities to infiltrate onsite storm flows, each chamber system will treat the pollutants of concern and discharge all treated flows consistent with historical quantities and flow characteristics along the northerly right-of-way of Baker Street. DBESP Report 6 The Project includes the preparation of a Preliminary Hydrology Study to analyze the existing condition storm flows across the property as well as the proposed condition conveyances to existing discharge locations. The hydrology study will confirm flow values based on standard storm intensities and discharge volumes, flow rates, and velocities. The Project also includes a Preliminary Water Quality Management Plan (WQMP) that identifies the Best Management Practices (BMPs) proposed to be implemented to treat project related pollutants for onsite and offsite impervious improvements. The WQMP will identify the post-construction treatment control and site design BMPs to treat specific pollutants from onsite impervious areas as well as the public right-of-way prior to discharge at historical locations on the northern side of the proposed Baker Street corridor improvements. BMPs located within the public right-of- way of Baker Street and Nichols Road will treat roadway specific pollutants within bio- retention/modular wetland facilities upstream of the specified discharge locations. A Storm Water Pollution Prevention Plan (SWPPP) will be prepared and implemented prior to onsite and offsite project construction disturbance. The SWPPP will focus on the design, installation, and treatment of construction related pollutants. The SWPPP document will be approved through the State of California and the Project will be registered as required by the Construction General Permit. The Project will be monitored before, during and after rain events to ensure BMP implementation and effectiveness in protecting downstream habitats and receiving water bodies. The Project proposes to construct an 8-inch sewer pipeline within Baker Street to convey wastewater flows north westerly to the existing Nichols Road Lift Station. The pipeline is proposed at standard depth and will connect to the existing Elsinore Valley Municipal Water District (EVMWD) 15-inch sewer line constructed within the Pierce and Baker intersection. The Nichols Lift Station will require an upgrade to its ultimate build- out capacity. The lift station upgrades will occur within the existing EVMWD parcel and will also require an upsized force main between the lift station and the discharge manhole within the Nichols and Collier intersection. EVMWD has master planned a new force main from the permanent lift station to convey flow south in Baker Street to Turnbull Avenue. From there a new gravity sewer line is identified in Turnbull Avenue and south to the Regional Wastewater Treatment Plant. The gravity sewer alignment would require construction of many sections of the gravity sewer line in private streets and private property where easements would need to be acquired. The EVMWD Master Plan exhibit in Attachment 2 provides the proposed alignment of the force main and downstream gravity sewer. An alternative sewer force main alignment was studied by KWC Engineers in 2015 that would route the force main in Collier Avenue. The force main and downstream gravity sewer improvements under the revised alignment would keep all improvements within existing public right-of-way. The Collier Avenue alignment would also allow the improvements to be phased by constructing a force main with the first phase of the permanent lift station and then constructing a parallel or replacement force main when the lift station is expanded to its ultimate capacity. The Collier Avenue alignment alternative was reviewed with EVMWD staff recently and they take no objection to DBESP Report 7 proceeding with that alignment. EVMWD did, however, note that they will need to evaluate the downstream impacts of flows routed down Collier Avenue and that depending on the extent of required downstream improvements, not all the improvements may be eligible for fee credits. Once the capacity study currently being reviewed by EVMWD is approved, KWC will initiate the PDR for the lift station and coordinate with EVMWD on the downstream sewer system analysis. For water service, an EVMWD 36-inch 1434 Zone CIP line is proposed to be installed in Nichols Road from Terra Cotta Road to Baker Street and in Baker Street to the existing 20-inch line that supplies the Baker Reservoir. The Project proposes to receive water service by making two connections to the proposed transmission line in Baker Street and constructing a looped piping system onsite between the two connections. EVMWD does not allow fire hydrants to be served off private systems so the onsite loop will need to be public. The onsite line will be located in an easement and be located in accordance with EVMWD requirements which includes not locating the line beneath landscaped medians or parking stalls. The 1434 Zone has a large surplus of reservoir storage capacity and additional storage is not required to provide service to the Project. The 1434 Zone has a large surplus of reservoir storage capacity and additional storage is not required to provide service to the Project. 2.2.3 Baker Street (Offsite) Existing Baker Street is an unimproved dirt road with a 60-foot-wide right-of-way. The Project proposes to dedicate four feet on each side of Baker Street to the ultimate 68 feet right-of-way required by the City of Lake Elsinore’s (City) Collector roadway designation and as listed within the City’s circulation element. The Project will also be realigning Baker Street for a direct connection and new intersection with Nichols Road, which is discussed below under “Additional Street Improvements”. The Baker Street Collector section consists of a six-inch curb and gutter, a five-foot-wide sidewalk within a 10-foot parkway and 22 feet of pavement from centerline to lip of gutter on each side of the street. Baker Street is proposed to be elevated an average of five feet above its existing elevations to support drainage conveyance and flood protection of the public right-of-way. The northeast parkway of Baker Street will slope down from the proposed five-foot sidewalk to daylight within the northerly properties. The Project proposes to elevate the road surface of Baker Street to support drainage protection and conveyance. Along the northern edge of Baker Street, a graded and landscaped slope will daylight to existing ground within the parcels north of existing Baker Street right-of-way. The proposed slope will provide areas to safely construct storm drain outlets that will convey historical storm flows to existing flow lines and environmentally sensitive areas identified within the Project studies of these properties. The storm outlets will include energy dissipation improvements to control the storm water outlet depth and velocity to mimic existing conditions. DBESP Report 8 2.2.4 City Maintenance Area (Offsite) As noted above, the Project proposes to elevate the road surface of Baker Street to support drainage protection and conveyance. Along the northern edge of Baker Street, a graded and landscaped slope will daylight to existing ground within the parcels north of existing Baker Street right-of-way. The proposed slope will provide areas to safely construct storm drain outlets that will convey historical storm flows to existing flow lines and environmentally sensitive areas identified within the Project studies of these properties. The storm outlets will include energy dissipation improvements to control the storm water outlet depth and velocity to mimic existing conditions. Specifically, the Project proposes to construct three water spreading structures that are designed to mimic the existing sheet flow conditions into the adjacent open space [Sheets 1 and 2 of Appendix E]. The spreading structures will be constructed on the northeastern side of Baker Street adjacent to each of the three vernal pools described below. The pre- and post-Project hydrology relative to the three vernal pools are summarized below in the impact analysis as well as being presented in Appendix E. A maintenance access road is proposed along the toe-of-slope for ongoing maintenance of the slope, the associated landscaping, any required fencing, and the outlet structures. Where sensitive environmental areas exist (vernal pools identified within the Project environmental studies), the improvements are proposed to be scaled back to minimize or eliminate impacts in and adjacent to the defined zones. Construction buffers will be implemented to reduce accidental disturbance and the areas will be clearly delineated and recognizable to construction crews/personnel. 2.2.5 Additional Street Improvements (Offsite) In addition to the Baker Street improvements described above, the Project will also improve Pierce Street and Nichols Road. The Project will realign Baker Street for a direct connection and new intersection with Nichols Road. The intersection design will likely consist of signal pole placement consistent with the ultimate build-out of Nichols Road (Urban Arterial Highway – 120’ right-of-way). Nichols Road improvements will likely consist of an interim intersect with appropriate pavement tapering to the east and west leading away from the new intersection with Baker Street. Minor roadway resurfacing may be required along the existing Nichols Road segment between the Baker Street intersection and the Collier Avenue intersection. The Nichols and Collier intersection may also include minor surface improvements, revised lane striping and potential traffic control/signage improvements. Pierce Street would be improved to its ultimate 60-foot full-width right-of-way per the City’s General Plan Circulation Element standard for a Collector Street with a 6-inch curb, standard gutter, 5-foot-wide sidewalk within an overall 10-foot parkway, and 18 feet of pavement from centerline to lip-of-gutter on each side of the street from Nichols Road southwest past the project frontage to connect to Hoff Avenue, creating a second means of emergency access. The section of Pierce Street from the project frontage to