HomeMy WebLinkAboutBaker PD for CEQA Consultant
Project Summary
1 PROJECT SETTING
1.1 PROJECT LOCATION
The project site is located southwest and southeast of the intersection of Baker Street and Pierce
Street in the City of Lake Elsinore. Regional access to the project site is provided by Interstate 15
(I-15) located 0.40 miles east of the site. Local access to the site is provided from Baker Street and
Pierce Street. The existing site and surrounding area are shown in Figure 1, Aerial Project Location.
The project site is identified by Assessor’s Parcel Numbers:
Industrial/ Onsite Development Area
378-020-014
378-020-015
378-020-016
378-020-028
378-020-029
378-020-030
378-020-031
378-020-036
378-020-037
378-020-048
Restoration
378-020-024
378-020-033
378-020-034
378-020-040
378-020-041
378-020-054
Offsite Improvements
378-020-012
378-020-038
378-020-039
378-020-042
378-020-043
378-114-064
389-080-058
389-080-013
1.2 EXISTING CONDITIONS
The project encompasses 24 parcels totaling approximately 123.33 acres. The area is currently
vacant and undeveloped with naturally occurring vegetation which consists of low lying shrubs and
grasses. The site has a sloping topography from the southwest portion of the site to the northeast
portion of the site, associated with the hills south of the site. There are also several dirt trails located
throughout the site that connect to and continue through the adjacent parcels. Steel power poles are
Project Summary
located along the project frontage on Baker Street. There are also existing power poles that run
southwest to northeast through the site as well.
Project activities include Baker Street and Pierce Street which are both currently undeveloped dirt
roads, as well as the segment of Nichols Road from Terra Cotta Road to Collier Avenue which is
developed as a Divided Collector roadway with two lanes.
1.3 EXISTING LAND USES AND ZONING DESIGNATION OF THE PROJECT SITE
The project site has General Plan Land Use designations of Limited Industrial and Floodway and
zoning designations of Limited Manufacturing (M-1), General Manufacturing (M-2), and Open
Space/Floodway (OS). As it relates to the proposed project, the Limited Industrial Land Use
designation provides “for industrial parks, warehouses, manufacturing, research and development,
public and quasi-public uses, and similar and compatible uses” at a maximum Floor Area Ratio
(FAR) of 0.45.
1.4 SURROUNDING GENERAL PLAN AND ZONING DESIGNATIONS
The surrounding land uses are described in Table 1 along with the General Plan Land Use and
Zoning designations.
Table 1: Surrounding Existing Land Use and Zoning Designations
Existing Use General Plan Zone
Northeast Vacant and
undeveloped
land/open space
Floodway,
Specific Plan
(Outlet Center)
Open Space/Floodway
(OS), Specific Plan
(Outlet Center)
Southeast Non-conforming
residence,
institutional facility,
open space
Limited Industrial,
Public Institutional
Limited Manufacturing
M-1, Public/Institutional
(PI)
Southwest Vacant and
undeveloped land.
Two single family
homes are located
adjacent to the
southwest most corner
of the site.
Low-Medium
Residential,
Hillside
Residential
Single Family Residential
(R-1), Hillside Single
Family Residential (RH)
Northwest Vacant and
undeveloped land.
Residential Mixed
Use
Residential Mixed Use
(RMU)
2 PROJECT DESCRIPTION
2.1 PROJECT OVERVIEW
The proposed project consists of four areas that are described below and shown in Figure 2, Project
Boundaries:
Project Summary
Industrial/Onsite Development Area – 65.81 acres
o Development of a 212,028 SF warehouse, a 788,423 SF warehouse, and truck
trailer parking lot.
Offsite Improvement Areas – 21.15 acres
o Right-of-way (ROW) improvements on Baker Street and Pierce Street and the
realignment of Baker Street to Nichols Road.
Restoration Area – 33.65 acres
o To be used for future restoration activities
Construction/Improvements Buffer – 2.72 acres
o Land between Baker Street and the restoration area to serve as a disturbance
buffer.
2.2 Industrial Development
The industrial/onsite development area of the project consists of construction and operation of two
new warehouse buildings totaling a combined 1,000,451 SF. Building 1 would be 212,028 SF,
inclusive of 5,000 SF of ground floor office, 5,000 SF of mezzanine, and include 23 dock doors
along the southwest side of the building. Building 2 would be 788,423 SF inclusive of 10,000 SF of
ground floor office, 10,000 SF of mezzanine, and include 110 dock doors along the northeast side
of the building. Building 1 would be located at the northwestern end of the site and Building 2
would be located at the southeastern end of the site. A breakdown of the building specifications is
provided in Table 2, Building Specifications. The conceptual site plan is provided as Figure 3,
Conceptual Site Plan.
Table 2: Proposed Building Specifications
Warehouse
SF
Ground
Floor
Office SF
Mezzanine
Office SF
Total SF FAR
Coverage
Truck Trailer
Parking
Vehicle
Parking
Building 1 202,028 5,000 5,000 212,028 38.74% 31 174
Building 2 768,423 10,000 10,000 788,423 42.25% 219 232
Total 970,451 15,000 15,000 1,000,451 34.90% 250 406
The proposed project would be accessible via four new driveways. Three driveways would be
constructed along Baker Street and one driveway would be along Pierce Street. Building 1 would
be accessible via the vehicle driveway along Pierce Street and one 53-foot truck access driveway
along Baker Street. Building 2 would be accessible via two driveways along Baker Street. Trucks
would utilize the northern and southern most 50-foot driveways to access the Building 2. In addition,
the two buildings would be accessible via a reciprocal access agreement as the drive aisle behind
the rear of Building 2 would extend to the Building 1 site for access to Pierce Street. The reciprocal
access agreement would largely be intended to provide a secondary point of emergency access
for Building 2.
Circulation to and from the site would be from the section of Pierce Street northeast of the site that
connects to Nichols Road. Operational project trips would not come from or leave the site on the
section of Pierce Street southwest of the site.
Project Summary
As shown in Table 2, the proposed project includes a total of 406 vehicle parking stalls combined
between the two proposed buildings. Building 1 would have 174 vehicle parking stalls located
along the northeastern, northwestern, and southwestern perimeters of the site. Building 1 would also
have 31 trailer stalls located opposite the dock doors at the southwestern end of the building.
Building 2 would have 232 associated vehicle parking stalls located largely to the southwest of the
building, and a few stalls will be located northeast of the building. Additionally, Building 2 would
have 219 trailer parking stalls located to the northwest and northeast of the building. The project
also proposes a trailer parking lot at the southeast most part of the project site which would allow
for 149 trailer parking stalls. Loading and unloading activity within the truck court of both buildings
would be secured by a gate at all points of entry.
The project has been designed to screen loading and unloading activities away from adjacent
residential land uses. Building 1 is designed for the truck court to be screened from the adjacent
residences west of the building. Building 2 is designed for loading and unloading activity to be
located northeast of the building in order to screen truck activities away from the residentially
related land uses southwest of the building. The proposed project would also include landscaping
along Baker Street to screen the project from the right-of-way. Building 1 would contain 26.45%
landscape coverage and Building 2 would contain 27.18% landscape coverage. Additionally, the
trailer parking lot would contain 52.34% landscape coverage, for a total site landscape coverage
of 31%.
The project will include an onsite lighting design that provides the required lighting levels for normal
operation onsite. Exterior lighting can be designed as downward facing to prevent unnecessary
foot candles outside of the Project boundary. The project includes installation of new public
streetlights. The City of Lake Elsinore requires public streetlights every 200 feet on both sides of
newly constructed public roadways per Lake Elsinore standards 503 and 508.
The onsite development portion of the project has a General Plan land use designation of Limited
Industrial and is located zoned for M-1 and M-2. As part of the project, the M-1 designated portion
of the site is proposed to be amended to M-2 to achieve consistent zoning of the proposed
development area.
The project includes a tentative parcel map to merge the 10 proposed development parcels into 3
parcels. Building 1 and Building 2 would each be located on a single parcel, and the trailer parking
lot would be the third parcel. A breakdown of the site areas for the three new parcels is provided
in Table 3, Site Acreages.
Table 3: Site Acreages
Site Acreage
Building 1 12.56
Building 2 42.84
Parking Lot 10.41
Table 4 and Table 5 below shows the proposed project’s consistency with the City of Lake Elsinore’s
development standards with the M-2 zone.
Project Summary
Table 4: Building 1 Consistency with M-2 Development Standards
Development Standard Required Provided
Parking Office: 1/250 SF
Warehouse 1-20K SF: 1/500 SF
Warehouse 20,001 SF+: 1/100 SF
262 spaces required
174 spaces
FAR 0.45 0.39
Maximum Structure Height 45’ Will Meet Standard
Front Setback (to building or
parking area)
Shall average 20’, but not be less
than 15’. 10’ reduction to parking
may be allowed by City Council if
a decorative wall, artwork, or
public amenity is installed.
15’ from parking lot,
95’ from building
Interior Setback N/A unless adjacent to residential
use or public right-of-way in which
the front setback requirement
applies
48’ from parking lot,
98’ from building
Landscape Coverage 12% 26.45%
Table 5: Building 2 Consistency with M-2 Development Standards
Development Standard Required Provided
Parking Office: 1/250 SF
Warehouse 1-20K SF: 1/500 SF
Warehouse 20,001 SF+: 1/100 SF
868 spaces required
232 spaces
FAR 0.45 0.42
Maximum Structure Height 45’ Will Meet Standard
Front Setback (to building or
parking area)
Shall average 20’, but not be less
than 15’. 10’ reduction to parking
may be allowed by City Council if
a decorative wall, artwork, or
public amenity is installed.
24’ from parking lot,
147’ from building
Interior Setback/Side Setback N/A unless adjacent to residential
use or public right-of-way in which
the front setback requirement
applies
181’ from building
Landscape Coverage 12% 27.18%
The proposed buildings are designed to function as two high cube warehouse buildings. Typical
operational characteristics include employees traveling to and from the site, delivery of materials
and supplies to the site and truck loading and unloading. The project is assumed to operate 24/7;
however, this may shift depending on tenant as hours of operation are unknown.
Project Summary
2.3 Offsite Improvement Areas
The proposed project includes right-of-way (ROW) improvements along Baker Street and Pierce
Street.
Baker Street is currently an unimproved dirt road with a 60-foot-wide right-of-way. The project
would dedicate 4 feet on each side of Baker Street to the ultimate 68 foot right-of-way required
by the City’s Collector roadway designation per the General Plan Circulation Element. The Baker
Street Collector roadway section consists of a 6-inch curb and gutter, a 5 feet wide sidewalk within
a 10-foot parkway and 22 feet of pavement from centerline to lip of gutter on each side of the
street.
Baker Street is proposed to be elevated an average of 5 feet above its existing elevations to
support drainage conveyance and flood protection of public right-of-way. The northeast parkway
of Baker Street would slope down from the proposed 5-foot wide sidewalk to daylight within the
northerly properties.
Existing Pierce Street varies in right-of-way width along the Project’s frontage. The ultimate ROW
for Pierce Street is 60 feet. The ultimate street section would include a 6-inch curb, standard gutter,
5-foot-wide sidewalk within an overall 10-foot parkway and 18 feet of pavement from centerline
to lip-of-gutter on each side of the street.
As part of the proposed project, Baker Street would be extended to connect to Nichols Road. The
project would need to obtain right of way from the adjacent property owner to implement the
improvement.
2.4 Restoration Area
As show in Figure 4, opposite of the Industrial Development Area, on the other side of Baker Street,
is 33.65 acres of the project site that is proposed for habitat restoration activities This area may
be conveyed in the future to the Western Riverside County Regional Conservation Authority (RCA)
or may be retained by the applicant as a mitigation bank.
2.5 Construction/Improvements Buffer
The Construction/Improvements Buffer (Construction Buffer) would be located within the project
area between the Baker Street ROW improvements and the Restoration Area. The Construction
Buffer is included as part of the project to ensure that any disturbance adjacent to the ROW
improvements would not encroach onto the Restoration Area. This Construction Buffer would be
separate parcel from the Restoration Area.
2.6 DISCRETIONARY APPROVALS, PERMITS, AND STUDIES
The following discretionary approval, permits, and studies are anticipated to be necessary for
implementation of the proposed project:
Project Summary
City of Lake Elsinore
Design Review
o The project is required to undergo a Design Review “to ensure that new development
occurs in a manner which enhances the character and quality of surrounding
properties and that the scale, special relationship and architectural treatment of
structures including materials, colors, and design, visually contribute to the area and
environment in which they are located”. The Planning Commission would be the
approving authority for the Design Review.
Conditional Use Permit (required for allowed uses within 300 feet of a residential
district)
o The proposed use of the project is an allowable use in the M-2 zone. However, as
the project is within 300 feet of a residential district, the project would seek the
approval of a Conditional Use Permit.
Tentative Parcel Map
o The project includes a Tentative Parcel Map to merge the 10 parcels that are
proposed for industrial development into 3 separate parcels. Building 1 and
Building 2 would each be located on a single parcel, and the trailer parking lot
would be the third parcel.
Zone Change
o The onsite development portion of the project has a General Plan land use
designation of Limited Industrial and is zoned as M-1 and M-2. The project would
amend the zoning of the M-1 portion of the site to be M-2 to have consistent zoning
within the development area.
Environmental Impact Report
o As part of the project, an Environmental Impact Report would be required and would
include the technical studies and analysis listed in section 2.7, Technical Studies,
below.
2.7 Technical Studies
As part of the proposed project, the following technical studies will be prepared for the EIR.
The following technical studies were completed or will be completed by the applicant and will need
to be peer reviewed by the CEQA consultant for CEQA and technical adequacy :
- Air Quality/Energy/GHG/HRA
- Biological Resources/MSCHP Consistency Analysis
- Cultural Resources Assessment
- Noise and Vibration Study
- Paleontological Resources
- Phase I Environmental Site Assessment
- Visual Impact Study
The following technical studies were completed or will be completed by the applicant and will be
reviewed by the CEQA consultant for CEQA adequacy, but will be approved by the City :
Project Summary
- Geotechnical/Soils Evaluation
- Hydrology Study
- Parking Study
- Public Service Demand Study (to touch base with City regarding requirements)
- Traffic Impact Study
- Utility/Services System Study (will serve letters)
- Vehicle Miles Traveled (VMT) Analysis (may screen out)
- Water Quality Management Plan
- Wildfire Protection Plan and Report
Project Summary
Figure 1 – Aerial Project Location
Project site
Project Summary
Figure 2 – Project Boundaries
Project Summary
Figure 3 – Conceptual Site Plan