ENGINEERING DEPARTMENT
Project: Baker Street Industrial
Project No.: PA 2020-103 (PAR 2020-09)
DRC Comments:
1. Parcel Map required.
Reciprocal access easements required between Building 2 and Building 3.
2. Dedicate additional right-of-way on Baker Street for half-width total of 34’ along project frontage.
Baker Street is classified as Collector road.
3. Dedicate additional right-of-way on Pierce Street for half-width total of 30’ along project frontage.
Pierce Street is classified as Local road.
4. Half-width improvements for Baker Street
Includes but not limited to curb, gutter, sidewalk, pavement, streetlights, etc.
Acceptable to construct full width pavement improvements due to nature of project
5. Half-width improvements for Pierce Street
Includes but not limited to curb, gutter, sidewalk, pavement, streetlights, etc.
Acceptable to construct full width pavement improvements due to nature of project
6. Project lies within FEMA Special Flood Hazard Zone.
Meet all requirements of Lake Elsinore Municipal Code 15.64 regarding Flood Damage
Prevention.
7. Soil report required.
8. Preliminary Hydrology report required.
9. Complete and submit Traffic Scoping Agreement to City Traffic Engineer for review and approval.
10. Preliminary / Final WQMP required
Preliminary WQMP shall be approved by City prior to Planning Commission hearing
Final WQMP shall be approved prior to grading plan approval and permit issuance
11. Fees:
TUMF
Industrial – $1.84/sf
Commercial – $7.50/sf
Office – $2.38/sf
TIF
Industrial – $0.81/sf
Commercial – $3.84/sf
Office – $1.45/sf
Area Drainage
Nichols Street SE District – $3,005/gross acre
ENGINEERING DEPARTMENT
Project: Baker Street Industrial
Project No.: PA 2020-103 (PAR 2020-09)
Stephens Kangaroo Rat Fee – $500/gross acre
Plan Check and Permit fees varies.