Loading...
HomeMy WebLinkAboutPA-2020-103 Letter of Incomplete #1 (No Attachment) (2) VIA MAIL: heather@epdsolutions.com October 13, 2023 Riverside Legacy IV Nichols Road, LLC Attn: Heath Rushing 5550 Newbury Street, Suite B Baltimore, MD 21209 RE: Planning Application No. 2020-103, Baker Street Industrial Dear Heath Rushing; We have completed an initial review of the above-mentioned application you submitted requesting the following entitlements: Zone Change (ZC-2023-04) to change a portion of the project site currently Limited Manufacturing (M-1) to General Manufacturing (M-2); a Tentative Parcel Map (TPM 38812) to subdivide the approximately 65.81-acre site into three (3) parcels ranging in size from 10.41 acres to 43.73 acres and two (2) lettered lots for right-of-way purposes; Industrial Design Review (IDR-2023-03) to construct two (2) warehouse/logistics buildings totaling 1,000,451 sq. ft.; and a Conditional Use Permit (CUP-2023-10) to establish warehouse/logistics. The project site is located at the southeast corner of Pierce Street and Baker Street. (APNs: 378-020-014, 015, 016, 028, 029, 030, 031, 036, 037, and 048). This letter is our determination that your application referenced above is INCOMPLETE in accordance with Government Code Section 65920 (Permit Streamlining Act). Furthermore, this letter specifies the incomplete parts of your application and provides you with the requirements to complete your application. You must address all items included in the attachment(s) for our division to continue processing the application and to begin environmental evaluation of the proposed project pursuant to the California Environmental Quality Act (CEQA). In response to this letter, please resubmit all application materials, including all required fees, plans, and supporting exhibits. For further instructions, forms, and information, visit www.lake-elsinore.org. If you have questions about this letter, please contact me at (951) 674-3124 ext. 273 or jmendoza@lake- elsinore.org. Joey Mendoza Associate Planner, City of Lake Elsinore CC: EPD Solutions Attn: Heather Roberts 3333 Michelson Drive, Suite 500 Irvine, CA 92612 PA-2023-103 (Baker St. Industrial) DRC #1 LOI 10/13/2023 Page 2 of 7 PLANNING DIVISION COMMENTS 1. The project is located within a Western Riverside Multiple Species Habitat Conservation Plan (MSHCP) Criteria Cell # 4166. An application for MSHCP Consistency Determination (LEAP) along with the required fee should be submitted for review. The application form is available online: LEAP - Consistency Analysis Application Form 2. The current General Plan Land Use Designation for the project site is Limited Industrial (LI). The LI designation provides for industrial parks, warehouses, manufacturing, research and development, public and quasi-public uses, and similar and compatible uses. The Floor Area Ratio (FAR) shall not exceed 0.45. 3. The current zoning for the subject site is Limited Manufacturing (M-1) and General Manufacturing (M- 2). To create zoning classification consistency at the proposed site, the project includes a Zone Change to change a portion of the project from Limited Manufacturing (M-1) to General Manufacturing (M-2). 4. The proposed project shall comply with the following development standards as outlined in the M-2 zone: Development Standard Required Minimum net lot area One (1) acre net Street frontage width 100 ft. Front Setback Min. 15 ft. Average 20 ft. Side Yard (ROW) Min. 15 ft. Average 20 ft. Building Height 45 ft. Landscape improvement Adjacent to Street Min. 15 ft. Average 20 ft. Landscape Coverage 12% 5. The project includes a warehouse building that exceeds 250,000 sq. ft. in size and is therefore subject to Council Policy No. 400-16, “Good Neighbor Policy” for Warehousing, Logistics, and Distribution Uses (GNP) adopted by the City Council on April 25, 2023 (attached to this letter). The applicant shall provide written justification for the project, addressing how the project satisfies all GNP standards for review upon resubmittal. 6. Zone Change. Please provide a Zone Change map and letter of justification as follows: a. Zone Change Exhibit. The following information shall be included on the plan:  Name, address, and phone numbers of the owners of record, applicant, architect and/or engineer  Graphic scale (with bar scale) and north arrow  Vicinity map  Legal description of the property  Assessor’s Parcel Numbers for the entire project  Existing land uses  Existing Zoning designation  Proposed Zoning designation  Total gross and net area: square feet/acres PA-2023-103 (Baker St. Industrial) DRC #1 LOI 10/13/2023 Page 3 of 7  Existing land uses within 100 feet from proposed change(s)  Proposed area to be changed shall be shaded in a manner that will make the change(s) prominent b. Letter of Justification. Provide written justification and rationale outlining the request for a Zone Change. This justification must also answer the following questions. Please provide a thorough explanation of your responses.  How is the proposed zone change consistent with the City’s current General Plan?  How will the proposed zone change ensure the health, safety, comfort, and general welfare of the persons residing or working within the neighborhood of the proposed change?  How will the proposed zone change be non-injurious to property or improvements in the neighborhood? 7. Site Plan: Please revise the site plan that to show the following information:  Include the General Plan Designation for the project site  Show the Zoning Designation for the project site (both existing and proposed)  Show the General Plan land use designation, zoning district classification and land use or uses of the adjoining property within one hundred (100) feet of the proposed project, including that which is across any streets. Indicate the distances from all property lines and use of any structures on adjoining property.  Revise the site plan exhibit to clearly show the proposed property lines per the Tentative Parcel Map  Include total gross and net acreage for the project site.  Include proposed lot area breakdown on the site plan  Verify the setback and landscaped area from the parking area to the public right-of-way along Baker Street. There shall be a minimum setback of 15 feet and an average of 20 feet from the public right-of-way. It appears that the setback is less than 15 feet in some instances.  Please update the plans to note the required and the provided parking spaces. Per Section 17.148.030.C of the LEMC, the following standards apply: o In manufacturing districts; except the Commercial Manufacturing District, one parking space shall be provided for each 500 square feet of unit area for up to 20,000 square feet, plus one space for each 1,000 square feet of unit area over 20,000 square feet, and one parking space for every 1,000 square feet of warehousing floor area. o The Overall Site Plan exhibit (Sheet A1-1P) provides a mezzanine area, office area, and warehouse area floor area breakdown inconsistent with the Building 1 and 2 floorplans. Please correct the Building 1 and 2 floorplans to reflect office areas in the floor area breakdown. o The proposed project is not providing sufficient parking stalls per LEMC Section 17.148.030.C. To request a reduction in the number of required parking spaces, the applicant shall complete a Parking Study as outlined in LEMC 17.148.030.D.  Show the number of loading spaces required and provided per Section 17.148.050 Loading Space requirements of the LEMC. PA-2023-103 (Baker St. Industrial) DRC #1 LOI 10/13/2023 Page 4 of 7  Show the square footage and percent of the site devoted to building, landscaping, and paved areas for parking and circulation.  Show setbacks and distances between buildings and property lines (including proposed)  Location of all trash enclosures, transformers and any equipment outside of building  Location of all existing fire hydrants  Location, height, and materials of all walls and fences  Proposed phases of the project (if any) 8. Tentative Parcel Map: Please revise the tentative map that to show the following information:  Show the correct Land Use Designation for the site (should be Limited Industrial (LI)). Update both the General Notes section as well as on the map  Show both existing and proposed zoning designation for the portion of the property subject to the zone change  Parcel 3 appears to be landlocked. Please show reciprocal access easements on the tentative map  Parcel 3 is currently proposed as a parking lot only. Staff is concerned about a stand-alone parking lot without a primary use 9. Preliminary Grading Plan: Please revise the preliminary grading plan to include the following information:  The total gross acreage calculation under General Notes does not match the Tentative Map. Please revise accordingly  Show the correct Land Use Designation for the site (should be Limited Industrial (LI)). Update both the General Notes section as well as on the map  Show both existing and proposed zoning designation for the portion of the property subject to the zone change  Estimated quantities of earth to be moved 10. Wall and Fence Plan: Please provide a wall and fence plan that includes the following information:  Legend (indicating all existing and proposed walls, fences and gates)  Location of all types of fencing being proposed with dimensions from building and property lines  Dimensioned elevation drawings with details of all types of fencing, walls, and gates proposed, including colors and materials  Show dimensioned details of all proposed entry statements and gates, including colors, materials, sign envelope areas, and dimensions. 11. Building Elevations: Please revise the building elevation plans to include the following information:  Verify the correct building elevations. Currently both elevation Sheets provided are labeled as Building 1, Sheet A3-1P-1. PA-2023-103 (Baker St. Industrial) DRC #1 LOI 10/13/2023 Page 5 of 7  Per LEMC Section 17.140.090, the maximum building height for the M-2 zone is 45 feet. Currently, the elevation plans are showing heights exceeding the height limitation (150 ft., 50 ft., and 46 ft.). Please revise plans accordingly.  Show cross-sections of all proposed buildings  Spot elevations or other cross-sections necessary to verify that mechanical equipment is fully screened.  Label specific type of architectural style proposed for the buildings  Architectural elevations for the buildings shall comply with LEMC Section 17.112.110.B and GNP Policy No. 5. o Buildings shall be employ treatments, such as the staggering of planes along exterior walls to create pockets of light and shadow, to break up the mass and provide relief from monotonous, uninterrupted expanses of wall. o Building planes visible from public view shall be articulated by changes in exterior building materials, color, decorative accents, and/or articulated features. o Pedestrian and ground-level building entries accessible to visitors should be designed using recessed entries, covered entries, projections, or roofs to provide shade and visual relief at a pedestrian scale. o Detailed articulation and decorative accents shall be implemented in greater proportion than currently shown to mitigate the proposed project’s visual impact. o Visual articulation and design impact shall be emphasized in the A-A and F-F sections of the DRC exhibits. o Consider a new color palette for the building elevations and decorative accents to blend in with the natural hilly landscape of the area. A neutral to “earthy” color pallet should be used when selecting colors for the elevations and accents. 12. Floor plans: Please revise the floor plans to include the following information:  Proposed use for each room. The site plan indicates that the buildings would have office areas, warehouse areas, and mezzanine areas. The floor plans should be revised to match the site plan.  Proposed square footage for each room  Exits  Bathrooms  Elevators  Fire sprinkler riser room with direct exterior access  Location of Knox Box 13. Tract Maintenance Plan: Provide at Tract Maintenance Plan (including and map and written summary table) which identifies the responsible parties for the construction, ownership and maintenance of the following improvements:  Public and/or private streets  Common landscape areas  Maintained and/or natural common slope areas PA-2023-103 (Baker St. Industrial) DRC #1 LOI 10/13/2023 Page 6 of 7  Flow control and drainage facilities and structures  Other onsite utilities 14. Lighting Plan: Provide a detailed exterior lighting plan addressing building and parking lot lighting. Building lighting should utilize decorative downlighting or recessed lighting, including at all common areas, public entrances, stairwells, exterior doors, and patios. Parking lot lighting should be decorative and provide adequate lighting at all driveway intersections and entrances. In addition to these requirements, parking lot lighting must meet the minimum standards of LEMC Code Section 17.148.110 (Lighting). 15. Please provide a line of sight analysis and view simulations to show the view from the surrounding neighborhood as well as from the streets. The preliminary grading plan shows that there will be significant between the project site and the adjacent properties. The light of sight/view simulation should also include views for areas impacted by the grading. 16. Per LEMC 17.112.120, Trash enclosures shall be constructed pursuant to the City’s standard design on file with the Department of Building and Safety. Said enclosures shall be provided based on a minimum ratio of one three-cubic-yard container enclosure for each.  Upon resubmittal, the applicant shall include trash enclosures on the site plan and label them as a plan feature.  Upon resubmittal, the applicant shall update the elevations to include a trash enclosure elevation demonstrating compliance with city standards. o The proposed project is a two-story project. If the required trash enclosures are located within view of a second-floor window, the following policy shall be followed [Ord. 772 § 17.38.120, 1986. Code 1987 § 17.38.120]:  A decorative trellis work shall be incorporated into the design of any enclosure located within 25 feet of a two-story building having windows overlooking the enclosure. 17. A fiscal impact analysis should be prepared for City review. 18. The Developer shall submit a Due Diligence application to Elsinore Valley Municipal Water District (EVMWD) at engservices@evmwd.net and attend a Due Diligence meeting to obtain the project’s requirements for water and/or sewer service. 19. Coordinate early and often with utilities to understand requirements and the presence of existing utilities that may affect project feasibility. 20. Public outreach is strongly encouraged. A public outreach plan should be submitted for department review. 21. The project will be subject to Assembly Bill No. 52 (SB52) Tribal Consultations. 22. The City contracts with an approved consulting firm to provide California Environmental Quality Act (CEQA) documentation and compliance. The applicant for the proposed project is responsible for the costs related to CEQA review. An Initial Study will be required for this project, and it is anticipated that following technical studies will be required: - Air Quality Analysis - Biological Resources/MSHCP Consistency Analysis PA-2023-103 (Baker St. Industrial) DRC #1 LOI 10/13/2023 Page 7 of 7 - Cultural Resources Assessment - Energy Analysis - Geotechnical/Soils evaluation - Greenhouse Gas Analysis - Health Risk Assessment - Hydrology Study - Noise Impact Analysis - Paleontological Resources - Phase I Environmental Site Assessment - Public Service Demand Study - Traffic Impact Study - Water Quality Management Plan - Wildfire Protection Plan and Report - Utility/Services Systems Study (i.e., Will-Serve Letters) - Vehicle Miles Traveled (VMT) Analysis - Visual Impact Study - Parking Study - Additional technical studies, engineering reports, or other information may be required 23. Pending Comments a. Comments from the following Agencies are pending and will be delivered upon receipt: i. Elsinore Valley Municipal Water District (EVMWD) 24. Interagency Comments a. Comments from the following City Departments regarding this project are attached to this letter: i. Engineering Department, Dated September 21, 2023 ii. Fire Department, Dated September 20, 2023 iii. Building & Safety Department Conditions b. Please direct specific questions to the following DRC members as applicable: i. Fire: Traci Williams, Ext. 228 or twilliams@lake-elsinore.org ii. Building & Safety: Bill Belvin, Ext. 286 or bbelvin@lake-elsinore.org iii. Engineering: Paul Fizer, Ext. 804 or pfizer@lake-elsinore.org