Loading...
HomeMy WebLinkAboutItem No 2 - Preliminary Capital Improvement Plan (CIP) Budget for Fiscal Years 2025-26 to 202)Preliminary Capital Improvement Plan (CIP) Budget for Fiscal Years 2025-26 to 2029- 30 Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT THE FISCAL YEAR (FY) 2025-26 THROUGH FY2029-30 CAPITAL IMPROVEMENT PLAN (CIP) BUDGET CONFORMS TO THE LAKE ELSINORE GENERAL PLAN. Page 1 of 3 REPORT TO PLANNING COMMISSION To:Honorable Chair and Members of the Planning Commission From:Damaris Abraham, Community Development Director Prepared by:Shannon Buckley, Assistant City Manager Date:June 3, 2025 Subject:Preliminary Capital Improvement Plan (CIP) Budget for Fiscal Years 2025-26 to 2029-30 Recommendation Adopt A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT THE FISCAL YEAR (FY) 2025-26 THROUGH FY2029-30 CAPITAL IMPROVEMENT PLAN (CIP) BUDGET CONFORMS TO THE LAKE ELSINORE GENERAL PLAN. Background By direction of the City Council (Council), City staff updates and maintains a Five-Year CIP in conjunction with the annual budget cycle. Included in the CIP are construction projects, facility improvements, and purchases. Utilizing input from Council, City staff, and the public, various projects were developed and proposed in this Cycle of the CIP. Following the Planning Commission meeting, City staff will schedule the City Council public hearing at their regular meeting on June 24, 2025 to bring the FY2025-26 to FY2029-30 CIP for the Council’s review. CIP Projects have been classified into two types of projects, Construction and Non-Construction CIP, and four categories: Circulation, Facilities, Infrastructure, and Parks. The Construction CIP are projects concerning major infrastructure or specific improvement projects. The Non- Construction CIP are major purchases by the City or recurring street improvements, studies, plans, or equipment (i.e., annual slurry seal, traffic lights, etc.). Discussion This CIP budget document was developed by incorporating input from the Council and key management team members, based on community comments and feedback received throughout the year. This team then, through several internal workshops, identified and evaluated community needs in the areas of roads/streets, bridges, public buildings, parks and recreation facilities Proposed FY2025-26 to FY2029-30 CIP Page 2 of 3 1 8 8 0 projects. Each proposed project was reviewed and discussed to ensure funding, timing, and necessity were appropriately addressed. All projects were evaluated to ensure consistency with the City of Lake Elsinore General Plan, while considering the City’s long-term vision as developed by the Council. Projects in this document have been scheduled in each of the five fiscal years based on community needs, as determined by the Council and availability of funding. Additionally, since many projects in the CIP are conceptual in nature, the general outline for cost estimates provided in last year’s CIP document was revised and utilized as shown on the Parameters for CIP Budget Cost page. The Preliminary FY2025-26 to FY2029-30 Capital Improvement Plan identifies 76 projects consisting of 38 Circulation Projects totaling $489,682,337 ($57,831,724 for FY2025-26); 12 Facilities Projects totaling $129,076,267; 9 Infrastructure Projects totaling $16,921,815; and 17 Park Projects totaling $100,776,265. The total cost to complete all the proposed projects is $736,456,684 of which $93,513,349 are programmed for FY2025-26. These projects have been identified as necessary infrastructure for the City and will require that funding sources be identified before the projects can commence. Inclusion of those with funding still needed in the document assists staff with seeking grants and negotiating improvements with potential third parties. Other key elements to the CIP are: Projects completed during the last year include: Highway Safety Improvements – Cycle 9 Avenues Master Plan Storm Drain Ongoing Projects include: Broadway Tract Paving City Park Improvements City Hall City Library Downtown Main Street Parking & Landscape Improvements Highway Safety Improvements – Cycle 11 Lake Community Center Kitchen Lakeshore Paving Rehab Lakeshore Sidewalk Improvements Main Street Pedestrian Safety and IT Infrastructure Improvements Murrieta Creek Regional Trail Connection Railroad Canyon Road Safety Improvements Terra Cotta Road Street Improvements New Projects include: Dream Extreme Neighborhood Center Computer Room and Expansion Highway Safety Improvements – Cycle 12 Limited Street Sidewalk Improvements Proposed FY2025-26 to FY2029-30 CIP Page 3 of 3 1 8 8 0 Riverwalk Lighting and Landscape Improvements Fiscal Impact None for this action by the Planning Commission, since they are only making a finding in conformance with the General Plan regarding Proposed CIP for FY2025-26 to 2029-30, which includes improvements throughout the City. Total CIP cost is $93,513,349 for FY 2025-26. Funding sources include, but are not limited to, development fees from TIF and Area Drainage; grants including CDBG, Measure A, Measure Z, and Gas Tax; and assessment districts for specific project areas. Attachments Attachment 1 – CIP Resolution Attachment 2 – Proposed FY2025-26 to FY2029-30 CIP Budget RESOLUTION NO. 2025-___ A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT THE FISCAL YEAR (FY) 2025-26 THROUGH FY2029-30 CAPITAL IMPROVEMENT PROGRAM (CIP) BUDGET CONFORMS TO THE LAKE ELSINORE GENERAL PLAN Whereas, the City Council (Council) of the City of Lake Elsinore (City) has directed Staff to assemble a five (5) year program of Capital Improvement Projects (CIP) to be used as a guideline for construction of City facilities and infrastructure; Whereas, this program of Projects is collectively called the CIP; Whereas, the list of construction Projects and improvements either enhances existing facilities or provides for new facilities in accordance with the guidelines and requirements contained in the Lake Elsinore General Plan (GP); Whereas, staff has reviewed all Projects both funded and unfunded and finds them to be consistent with the guidelines set forth in the GP; Whereas, pursuant to California Government Code Section 65401, the Planning Commission (Commission), as a recommending body, must make a finding that proposed Capital Projects conform with the GP; Whereas, the Commission shall submit a report to the Council regarding the Capital Projects conformity with the GP in accordance with California Government Code Section 65401; and, Whereas, on June 3, 2025, at its Regularly scheduled meeting the Commission has considered evidence presented by City staff and other interested parties with respect to this item. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1: The Commission has considered the CIP and has determined that the CIP conforms to the GP based upon the following findings: 1.The FY2025-26 to FY2029-30 CIP is consistent with the goals, policies and restrictions of the City's 2011 GP and facilitates upgrades and improvements to existing facilities and related amenities throughout the various elements of the GP, thereby enhancing the quality of life in Lake Elsinore. 2.The CIP includes Master Plan studies which provide for organized development of future facilities appropriate to the various elements of the GP, thereby enhancing the quality of life in Lake Elsinore. Section 2: This Resolution shall take effect from and after the date of its passage and adoption. PC Reso. No. 2025-____ Page 2 of 2 3 8 8 8 8 Passed and Adopted on this 3rd day of June 2025. __________________________________ John Gray, Chair Attest: ___________________________________ Damaris Abraham, Community Development Director STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Damaris Abraham, Community Development Director of the City of Lake Elsinore, California, hereby certify that Resolution No. 2025-__ was adopted by the Planning Commission of the City of Lake Elsinore, California, at a regular meeting held on June 3, 2025, and that the same was adopted by the following vote: AYES: NOES: ABSTAIN: ABSENT: Damaris Abraham, Community Development Director PROJECT TOTAL PROJECT COST ACTUALS PAID TO DATE FUTURE YEARS 2025-26 CIP BUDGET REQUESTED 2025-26 CIP PROJECTS FUNDED CIRCULATION PROJECTS: ANNUAL CITYWIDE ASPHALT MAINTENANCE PROGRAM 12,120,000$ -$ 10,100,000$ 2,020,000$ 1,505,374$ ANNUAL CITYWIDE DIRT ROAD PAVING PROGRAM 3,210,000 - 2,675,000 535,000 275,838 ANNUAL CITYWIDE TRAFFIC IMPROVEMENTS 1,206,000 - 1,005,000 201,000 201,000 ANNUAL CITYWIDE LANDSCAPE RENOVATION 18,120,000 - 15,100,000 3,020,000 - ANNUAL CITYWIDE SIDEWALK IMPROVEMENTS 1,165,000 - 820,000 345,000 - ANNUAL CITYWIDE SIGN INVENTORY 1,290,000 1,075,000 215,000 215,000 ANNUAL CITYWIDE SLURRY SEAL PROGRAM 3,215,300 - 2,713,300 502,000 502,000 ANNUAL CITYWIDE SURFACE & MINOR DRAINAGE IMPROVEMENTS 4,620,000 - 3,850,000 770,000 770,000 ANNUAL CITYWIDE SIDEWALK SURVEY & IMPROVEMENTS 8,910,000 - 7,425,000 1,485,000 1,221,610 ANNUAL CITYWIDE TRAFFIC STRIPING IMPROVEMENTS 1,560,000 - 1,300,000 260,000 260,000 AUTO CENTER DRIVE BRIDGE RETROFIT 5,661,206 934,206 4,227,000 500,000 500,000 BROADWAY TRACT PAVING 2,027,936 26,736 - 2,001,200 2,001,200 DOWNTOWN MAIN STREET PARKING & LANDSCAPE IMPROVEMENT 6,702,996 202,996 - 6,500,000 - EAST LAKE CIRCULATION 10,188,685 - 6,304,837 3,883,848 3,883,848 GUNNERSON ST RIVERSIDE DR INTERSECTION TRAFFIC SIGNAL IMPRVMT 1,107,821 97,821 - 1,010,000 1,010,000 HIGHWAY SAFETY IMPROVEMENTS CYCLE 11 1,164,028 54,028 400,000 710,000 710,000 HIGHWAY SAFETY IMPROVEMENTS CYCLE 12 - SIGNALIZED INTERSECTIONS 921,400 - 881,400 40,000 40,000 1-15 FRANKLIN STREET INTERCHANGE IMPROVEMENT 101,692,947 672,947 97,010,000 4,010,000 4,010,000 I-15/MAIN STREET INTERCHANGE LANDSCAPE IMPROVEMENT 1,755,262 255,262 - 1,500,000 1,500,000 I-15/NICHOLS ROAD INTERCHANGE 65,944,579 944,579 62,500,000 2,500,000 2,500,000 I-15/STATE ROUTE 74 INTERCHANGE PROJECT 62,225,529 2,925,529 45,400,000 13,900,000 13,900,000 LA STRADA EXTENSION 28,110,195 - 28,110,195 - - LAKE STREET WIDENING 36,468,909 - 36,318,909 150,000 150,000 LAKESHORE PAVING REHAB 1,969,671 - - 1,969,671 1,969,671 LAKESHORE SIDEWALK IMPROVEMENTS - SB821 1,439,628 111,958 - 1,327,670 1,327,670 LIMITED STREET SIDEWALK IMPROVEMENTS 715,046 - 664,046 51,000 51,000 MAIN STREET PEDESTRIAN SAFETY IMPROVEMENTS AND IT 7,213,686 7,053,686 - 160,000 160,000 MOUNTAIN & AVOCADO WAY TRACT PAVING REHAB 1,524,421 1,519,421 - 5,000 5,000 RAILROAD CANYON ROAD SAFETY IMPROVEMENTS - HSIP 12 5,145,000 - 3,970,000 1,175,000 1,175,000 RIVERWALK LIGHTING AND LANDSCAPE IMPROVEMENTS 5,000,000 - 4,000,000 1,000,000 - SB1 PAVEMENT PROJECT FY26-27 1,332,387 - 1,332,387 - - SB1 PAVEMENT PROJECT FY27-28 1,332,387 - 1,332,387 - - SPRING STREET SIDEWALK PROJECT 845,000 - 807,500 37,500 37,500 STATE ROUTE 74 WIDENING 11,554,745 4,745 11,550,000 - - STREET LIGHTING MASTER PLAN 2,047,146 - 1,705,955 341,191 - SUMMERHILL DRIVE EXTENSION 34,818,083 1,818,083 27,520,100 5,479,900 5,479,900 TEMESCAL CANYON ROAD - BRIDGE & ROAD WIDENING PHASE I 29,280,824 4,130,824 25,075,000 75,000 75,000 TERRA COTTA ROAD STREET IMPROVEMENT PROJECT 6,076,520 424,776 5,500,000 151,744 151,744 Total Circulation Projects 489,682,337 21,177,597 410,673,016 57,831,724 45,588,355 FACILITY PROJECTS: AMPHITHEATER 7,900,000 - - 7,900,000 7,900,000 AQUATICS CENTER 40,000,000 - 40,000,000 - - BUILDING FACILITIES RENOVATIONS 3,295,000 - 2,655,000 640,000 640,000 CITY HALL 31,473,264 14,625,578 - 16,847,686 16,847,686 CITY LIBRARY 13,093,973 2,115,122 - 10,978,851 10,978,851 CITYWIDE FACILITIES IT UPGRADES 1,920,000 - 1,600,000 320,000 - COMMUNITY CENTER 16,334,030 - 16,334,030 - - DENC COMPUTER ROOM AND EXPANSION 525,000 - - 525,000 465,958 FACILITY ADA IMPROVEMENTS 1,800,000 - 1,500,000 300,000 - FIRE STATION FACILITY IMPROVEMENTS 335,000 - 195,000 140,000 140,000 LAKE COMMUNITY CENTER KITCHEN 400,000 - - 400,000 400,000 NEW FIRE STATION 12,000,000 - 10,183,927 1,816,073 1,816,073 Total Facility Projects 129,076,267 16,740,700 72,467,957 39,867,610 39,188,568 CITY OF LAKE ELSINORE, CALIFORNIA CAPITAL IMPROVEMENT PLAN (CIP) FY2025‐26 THROUGH FY2029‐30 PROJECT TOTAL PROJECT COST ACTUALS PAID TO DATE FUTURE YEARS 2025-26 CIP BUDGET REQUESTED 2025-26 CIP PROJECTS FUNDED CITY OF LAKE ELSINORE, CALIFORNIA CAPITAL IMPROVEMENT PLAN (CIP) FY2025‐26 THROUGH FY2029‐30 INFRASTRUCTURE PROJECTS: BUSHMAN & LAKESHORE STORM DRAIN REPLACEMENT 323,608 23,608 - 300,000 300,000 CAMINO DEL NORTE SEWER EXTENSION 1,048,815 162,409 - 886,406 886,406 COLLIER AVENUE DRAINAGE IMPROVEMENTS 600,000 - - 600,000 600,000 ELECTRIC VEHICLE CHARGING STATIONS 140,000 - - 140,000 140,000 MURRIETA CREEK REGIONAL TRAIL CONNECTION 8,829,702 2,504,702 2,225,000 4,100,000 4,100,000 POPE CIRCLE IMPROVEMENTS 643,771 23,771 - 620,000 620,000 RICE CANYON REVETMENT 2,500,000 - 2,500,000 - - STORM DRAIN CATCH BASIN INLET FILTER INSTALLATION 1,201,871 301,871 750,000 150,000 150,000 THIRD STREET DRAINAGE IMPROVEMENT - PHASE III 1,634,048 - 1,634,048 - - Total Infrastructure Projects 16,921,815 3,016,361 7,109,048 6,796,406 6,796,406 PARK PROJECTS: ALBERHILL VILLAGE SPORTS PARK 45,000,000 - 45,000,000 - - CANYON HILLS PARK UPGRADES 8,199,596 5,168,596 3,011,000 20,000 20,000 CITY PARK IMPROVEMENTS 941,485 231,465 - 710,020 710,020 CITYWIDE PARK IMPROVEMENTS 5,397,000 - 4,625,000 772,000 772,000 CITYWIDE PARK IT IMPROVEMENTS 360,000 - 300,000 60,000 - DOCK EXTENSION 1,360,000 - - 1,360,000 - LAKE IMPROVEMENTS 450,000 - - 450,000 230,000 LAUNCH POINTE AMENITY IMPROVEMENTS 636,584 451,584 - 185,000 - SERENITY PARK IMPROVEMENTS 2,539,728 1,939,728 500,000 100,000 - SNACK BAR IMPROVEMENTS 400,000 - - 400,000 - SPECIAL NEEDS MULTI-SPORT PARK 8,558,462 88,462 2,500,000 5,970,000 46,000 SPLASH PADS 2,050,000 - 1,025,000 1,025,000 - SOCCER SPORTS COMPLEX 6,350,000 - 6,350,000 - - SPORTSPLEX 7,000,000 - 6,000,000 1,000,000 - SUMMERLY PARK IMPROVEMENTS 7,615,010 415,010 6,000,000 1,200,000 - THE RESERVE AT LAUNCH POINTE 3,006,400 - 2,000,000 1,006,400 - TUSCANY HILLS PARK RENOVATION 912,000 - 750,000 162,000 162,000 Total Park Projects 100,776,265 8,294,845 78,061,000 14,420,420 1,940,020 Total Capital Projects 736,456,684$ 49,229,503$ 568,311,021$ 118,916,160$ 93,513,349$ ANNUAL CITYWIDE ASPHALT MAINTENANCE PROGRAM Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project includes annual crack sealing and street resurfacing services throughout the city.  Details Type of Project Resurface Current Road Priority I - Urgent Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $2,020,000 $2,020,000 $2,020,000 $2,020,000 $2,020,000 $2,020,000 $12,120,0 Total $2,020,000 $2,020,000 $2,020,000 $2,020,000 $2,020,000 $2,020,000 $12,120,0 Capital Cost FY2026 Budget $2,020,000 Total Budget (all years) $10.1M Future $2.02M Project Total $12.12M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $2,020,000.00 $2,020,000.00 $2,020,000.00 $2,020,000.00 $2,020,000.00 $0 $500K $1M $1.5M $2M Capital Cost for Budgeted Years TOTAL $10,100,000.00 Construction/Maintenance (100%)$10,100,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Gas Tax $539,562 $0 $0 $0 $0 $0 $539,562 Measure A $965,812 $525,000 $535,000 $535,000 $535,000 $535,000 $3,630,812 Unfunded $514,626 $1,495,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $7,949,626 Total $2,020,000 $2,020,000 $2,020,000 $2,020,000 $2,020,000 $2,020,000 $12,120,000 Funding Sources FY2026 Budget $2,020,000 Total Budget (all years) $10.1M Future $2.02M Project Total $12.12M Funding Sources by Year Gas Tax Measure A Unfunded 2026 2027 2028 2029 2030 $2,020,000.00 $2,020,000.00 $2,020,000.00 $2,020,000.00 $2,020,000.00 $0 $500K $1M $1.5M $2M Funding Sources for Budgeted Years TOTAL $10,100,000.00 Gas Tax (5%)$539,562.00 Measure A (31%)$3,095,812.00 Unfunded (64%)$6,464,626.00 ANNUAL CITYWIDE DIRT ROAD PAVING PROGRAM Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description The purpose of the program is to identify and create a plan to pave dirt roads throughout the City. Some of these roads have become impossible to drive on during weather-related events and are in need of repair.  Details If funding source is other, please explain.Unspecied Type of Project New Road Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $535,000 $535,000 $535,000 $535,000 $535,000 $535,000 $3,210,000 Total $535,000 $535,000 $535,000 $535,000 $535,000 $535,000 $3,210,000 Capital Cost FY2026 Budget $535,000 Total Budget (all years) $2.675M Future $535K Project Total $3.21M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $535,000.00 $535,000.00 $535,000.00 $535,000.00 $535,000.00 $0 $150K $300K $450K Capital Cost for Budgeted Years TOTAL $2,675,000.00 Construction/Maintenance (100%)$2,675,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Mobile Source Air Pollution $275,838 $0 $0 $0 $0 $0 $275,838 Unfunded $259,162 $535,000 $535,000 $535,000 $535,000 $535,000 $2,934,162 Total $535,000 $535,000 $535,000 $535,000 $535,000 $535,000 $3,210,000 Funding Sources FY2026 Budget $535,000 Total Budget (all years) $2.675M Future $535K Project Total $3.21M Funding Sources by Year Mobile Source Air Pollution Unfunded 2026 2027 2028 2029 2030 $535,000.00 $535,000.00 $535,000.00 $535,000.00 $535,000.00 $0 $150K $300K $450K Funding Sources for Budgeted Years TOTAL $2,675,000.00 Mobile Source Air Pollution (10%)$275,838.00 Unfunded (90%)$2,399,162.00 ANNUAL CITYWIDE TRAFFIC IMPROVEMENTS Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2022 Est. Completion Date 06/30/2029 Department Circulation Form Type Capital Improvement Request Type Circulation Description Trafc safety improvements at various locations throughout the City.  These improvements can include video detection, controllers, trafc related studies and other safety improvements.  Details Type of Project Trafc Flow Improvements Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Design $1,000 $1,000 $1,000 $1,000 $1,000 $1,000 $6,000 Construction/Maintenance $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Total $201,000 $201,000 $201,000 $201,000 $201,000 $201,000 $1,206,000 Capital Cost FY2026 Budget $201,000 Total Budget (all years) $1.005M Future $201K Project Total $1.206M Capital Cost by Year Construction/Maintenance Design 2026 2027 2028 2029 2030 $201,000.00 $201,000.00 $201,000.00 $201,000.00 $201,000.00 $0 $50K $100K $150K $200K Capital Cost for Budgeted Years TOTAL $1,005,000.00 Construction/Maintenance (100%)$1,000,000 Design (0%)$5,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Trafc Impact Fee $201,000 $201,000 $201,000 $201,000 $201,000 $201,000 $1,206,000 Total $201,000 $201,000 $201,000 $201,000 $201,000 $201,000 $1,206,000 Funding Sources FY2026 Budget $201,000 Total Budget (all years) $1.005M Future $201K Project Total $1.206M Funding Sources by Year Trafc Impact Fee 2026 2027 2028 2029 2030 $201,000.00 $201,000.00 $201,000.00 $201,000.00 $201,000.00 $0 $50K $100K $150K $200K Funding Sources for Budgeted Years TOTAL $1,005,000.00 Trafc Impact Fee (100%)$1,005,000.00 ANNUAL CITYWIDE LANDSCAPE RENOVATION PROGRAM Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project provides for rehabilitating landscaping, median, and irrigation equipment within city-maintained right-of-way areas. Areas for improvement currently include Lakeshore Drive, Lincoln Street, Terra Cotta Road, and Railroad Canyon Road, Details Type of Project Other Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $18,120,0 Total $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $18,120,0 Capital Cost FY2026 Budget $3,020,000 Total Budget (all years) $15.1M Future $3.02M Project Total $18.12M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $3,020,000.00 $3,020,000.00 $3,020,000.00 $3,020,000.00 $3,020,000.00 $0 $800K $1.6M $2.4M Capital Cost for Budgeted Years TOTAL $15,100,000.00 Construction/Maintenance (100%)$15,100,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $18,120,000 Total $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $3,020,000 $18,120,000 Funding Sources FY2026 Budget $3,020,000 Total Budget (all years) $15.1M Future $3.02M Project Total $18.12M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $3,020,000.00 $3,020,000.00 $3,020,000.00 $3,020,000.00 $3,020,000.00 $0 $800K $1.6M $2.4M Funding Sources for Budgeted Years TOTAL $15,100,000.00 Unfunded (100%)$15,100,000.00 ANNUAL CITYWIDE SIDEWALK IMPROVEMENT PROGRAM Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2023 Est. Completion Date 06/30/2029 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project includes designing and constructing sidewalk improvements at various locations within the City. Details Type of Project Sidewalk Improvements Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total Administration $10,000 $10,000 $10,000 $10,000 $10,000 $50,000 Design $35,000 $35,000 $35,000 $35,000 $35,000 $175,000 Engineering $0 $10,000 $10,000 $10,000 $10,000 $40,000 Land/Right-of-way $150,000 $0 $0 $0 $0 $150,000 Construction/Maintenance $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 Total $345,000 $205,000 $205,000 $205,000 $205,000 $1,165,000 Capital Cost FY2026 Budget $345,000 Total Budget (all years) $1.165M Project Total $1.165M Capital Cost by Year Administration Construction/Maintenance Design Engineering Land/Right-of-way 2026 2027 2028 2029 2030 $345,000.00 $205,000.00 $205,000.00 $205,000.00 $205,000.00 $0 $100K $200K $300K Capital Cost for Budgeted Years TOTAL $1,165,000.00 Administration (4%)$50,000.00 Construction/Maintenance (64%)$750,000.00 Design (15%)$175,000.00 Engineering (3%)$40,000.00 Land/Right-of-way (13%)$150,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total Unfunded $345,000 $205,000 $205,000 $205,000 $205,000 $1,165,000 Total $345,000 $205,000 $205,000 $205,000 $205,000 $1,165,000 Funding Sources FY2026 Budget $345,000 Total Budget (all years) $1.165M Project Total $1.165M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $345,000.00 $205,000.00 $205,000.00 $205,000.00 $205,000.00 $0 $100K $200K $300K Funding Sources for Budgeted Years TOTAL $1,165,000.00 Unfunded (100%)$1,165,000.00 ANNUAL CITYWIDE SIGN INVENTORY Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description Check reectivity and inventory/GIS/ on all Citywide street signs. Street signs throughout the City have faded and many of the metal support poles have failed or are near failure and need replacement. Federal regulations require that signs be replaced when reectivity has faded.  Details Type of Project Trafc Flow Improvements Priority I - Urgent Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $215,000 $215,000 $215,000 $215,000 $215,000 $215,000 $1,290,000 Total $215,000 $215,000 $215,000 $215,000 $215,000 $215,000 $1,290,000 Capital Cost FY2026 Budget $215,000 Total Budget (all years) $1.075M Future $215K Project Total $1.29M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $215,000.00 $215,000.00 $215,000.00 $215,000.00 $215,000.00 $0 $60K $120K $180K Capital Cost for Budgeted Years TOTAL $1,075,000.00 Construction/Maintenance (100%)$1,075,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Trafc Impact Fee $215,000 $215,000 $215,000 $215,000 $215,000 $215,000 $1,290,000 Total $215,000 $215,000 $215,000 $215,000 $215,000 $215,000 $1,290,000 Funding Sources FY2026 Budget $215,000 Total Budget (all years) $1.075M Future $215K Project Total $1.29M Funding Sources by Year Trafc Impact Fee 2026 2027 2028 2029 2030 $215,000.00 $215,000.00 $215,000.00 $215,000.00 $215,000.00 $0 $60K $120K $180K Funding Sources for Budgeted Years TOTAL $1,075,000.00 Trafc Impact Fee (100%)$1,075,000.00 ANNUAL CITYWIDE SLURRY SEAL PROGRAM Overview Request Owner Carlos Norvani, Capital Projects Engineer Est. Start Date 07/01/2022 Est. Completion Date 06/30/2029 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project includes the design, inspection, striping, monument preservation, and slurry sealing of asphalt paved roadways maintained by the City. Selected roadways are programmed annually for slurry seal in accordance with the City's Pavement Management Plan. Details Type of Project Resurface Current Road Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Administration $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 Design $12,000 $12,000 $12,000 $12,000 $12,000 $12,000 $72,000 Engineering $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 Construction/Maintenance $480,000 $508,000 $508,000 $529,100 $529,100 $529,100 $3,083,300 Total $502,000 $530,000 $530,000 $551,100 $551,100 $551,100 $3,215,300 Capital Cost FY2026 Budget $502,000 Total Budget (all years) $2.664M Future $551.1K Project Total $3.215M Capital Cost by Year Administration Construction/Maintenance Design Engineering 2026 2027 2028 2029 2030 $502,000.00 $530,000.00 $530,000.00 $551,100.00 $551,100.00 $0 $150K $300K $450K Capital Cost for Budgeted Years TOTAL $2,664,200.00 Administration (1%)$25,000.00 Construction/Maintenance (96%)$2,554,200.0 Design (2%)$60,000.00 Engineering (1%)$25,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Measure A $502,000 $530,000 $530,000 $551,100 $551,100 $551,100 $3,215,300 Total $502,000 $530,000 $530,000 $551,100 $551,100 $551,100 $3,215,300 Funding Sources FY2026 Budget $502,000 Total Budget (all years) $2.664M Future $551.1K Project Total $3.215M Funding Sources by Year Measure A 2026 2027 2028 2029 2030 $502,000.00 $530,000.00 $530,000.00 $551,100.00 $551,100.00 $0 $150K $300K $450K Funding Sources for Budgeted Years TOTAL $2,664,200.00 Measure A (100%)$2,664,200.00 ANNUAL CITYWIDE SURFACE AND MINOR DRAINAGE IMPROVEMENTS Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2026 Est. Completion Date 06/28/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This ongoing project provides for the installation of new or replacement drainage facilities located within City right-of-way areas.  The location will be determined by the updated Master Drainage Plan that depicts 12 different locations that will need to be upgraded.  Details Type of Project Resurface Current Road Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Administration $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 Design $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $210,000 Engineering $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $60,000 Construction/Maintenance $720,000 $720,000 $720,000 $720,000 $720,000 $720,000 $4,320,000 Total $770,000 $770,000 $770,000 $770,000 $770,000 $770,000 $4,620,000 Capital Cost FY2026 Budget $770,000 Total Budget (all years) $3.85M Future $770K Project Total $4.62M Capital Cost by Year Administration Construction/Maintenance Design Engineering 2026 2027 2028 2029 2030 $770,000.00 $770,000.00 $770,000.00 $770,000.00 $770,000.00 $0 $200K $400K $600K Capital Cost for Budgeted Years TOTAL $3,850,000.00 Administration (1%)$25,000.00 Construction/Maintenance (94%)$3,600,000. Design (5%)$175,000.00 Engineering (1%)$50,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Storm Drain $770,000 $770,000 $770,000 $770,000 $770,000 $770,000 $4,620,000 Total $770,000 $770,000 $770,000 $770,000 $770,000 $770,000 $4,620,000 Funding Sources FY2026 Budget $770,000 Total Budget (all years) $3.85M Future $770K Project Total $4.62M Funding Sources by Year Storm Drain 2026 2027 2028 2029 2030 $770,000.00 $770,000.00 $770,000.00 $770,000.00 $770,000.00 $0 $200K $400K $600K Funding Sources for Budgeted Years TOTAL $3,850,000.00 Storm Drain (100%)$3,850,000.00 ANNUAL CITYWIDE SIDEWALK SURVEY AND IMPROVEMENTS PROGRAM Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This is an ongoing annual project for the repair and/or replacement of hazardous curbs, gutters, and sidewalks throughout the city. Funding for the Sidewalk Survey Program. As part of the City's Sidewalk Inspection Program. ALL sidewalks are to be inspected on a yearly basis. Having a contractor perform repair recommendations and a cost analysis for said repairs would identify the potential hazards citywide. The survey will better serve staff when identifying areas for the concrete contractor. Images Details Type of Project Sidewalk Improvements Priority I - Urgent Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $1,485,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $8,910,000 Total $1,485,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $8,910,000 Capital Cost FY2026 Budget $1,485,000 Total Budget (all years) $7.425M Future $1.485M Project Total $8.91M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $1,485,000.00 $1,485,000.00 $1,485,000.00 $1,485,000.00 $1,485,000.00 $0 $400K $800K $1.2M Capital Cost for Budgeted Years TOTAL $7,425,000.00 Construction/Maintenance (100%)$7,425,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Measure Z $701,610 $0 $0 $0 $0 $0 $701,610 Measure A $520,000 $540,000 $550,000 $550,000 $550,000 $550,000 $3,260,000 Unfunded $263,390 $945,000 $935,000 $935,000 $935,000 $935,000 $4,948,390 Total $1,485,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $1,485,000 $8,910,000 Funding Sources FY2026 Budget $1,485,000 Total Budget (all years) $7.425M Future $1.485M Project Total $8.91M Funding Sources by Year Measure A Measure Z Unfunded 2026 2027 2028 2029 2030 $1,485,000.00 $1,485,000.00 $1,485,000.00 $1,485,000.00 $1,485,000.00 $0 $400K $800K $1.2M Funding Sources for Budgeted Years TOTAL $7,425,000.00 Measure A (36%)$2,710,000.00 Measure Z (9%)$701,610.00 Unfunded (54%)$4,013,390.00 ANNUAL CITYWIDE TRAFFIC STRIPING PROGRAM Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project provides for repairing and/or replacing pavement markings, street striping and legends throughout the City. Our goal is to restripe Stop Bar & Legends in a thermal plastic coating which will extend the life of the striping for up to 5 years instead of 1 to 2 years with regular striping paint. Details Type of Project Resurface Current Road Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $260,000 $260,000 $260,000 $260,000 $260,000 $260,000 $1,560,000 Total $260,000 $260,000 $260,000 $260,000 $260,000 $260,000 $1,560,000 Capital Cost FY2026 Budget $260,000 Total Budget (all years) $1.3M Future $260K Project Total $1.56M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $260,000.00 $260,000.00 $260,000.00 $260,000.00 $260,000.00 $0 $80K $160K $240K Capital Cost for Budgeted Years TOTAL $1,300,000.00 Construction/Maintenance (100%)$1,300,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Measure A $0 $129,000 $135,000 $131,000 $156,950 $260,000 $811,950 Trafc Impact Fee $260,000 $0 $0 $0 $0 $0 $260,000 Unfunded $0 $131,000 $125,000 $129,000 $103,050 $0 $488,050 Total $260,000 $260,000 $260,000 $260,000 $260,000 $260,000 $1,560,000 Funding Sources FY2026 Budget $260,000 Total Budget (all years) $1.3M Future $260K Project Total $1.56M Funding Sources by Year Measure A Trafc Impact Fee Unfunded 2026 2027 2028 2029 2030 $260,000.00 $260,000.00 $260,000.00 $260,000.00 $260,000.00 $0 $80K $160K $240K Funding Sources for Budgeted Years TOTAL $1,300,000.00 Measure A (42%)$551,950.00 Trafc Impact Fee (20%)$260,000.00 Unfunded (38%)$488,050.00 AUTO CENTER DRIVE BRIDGE SEISMIC RETROFIT Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 01/01/2019 Est. Completion Date 12/31/2029 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project includes the seismic retrot of the bridge over the San Jacinto River at Auto Center Drive, widening of the bridge to the north to provide sidewalk, barrier upgrades, streetlights, and restriping. Details If funding source is other, please explain.Unspecied *Measure Z construction possible otherwise Unspecied Type of Project Resurface Current Road Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 Total Administration $32,954 $0 $0 $0 $32,954 Design $48,285 $0 $0 $0 $48,285 Engineering $852,967 $500,000 $200,000 $0 $1,552,967 Construction/Maintenance $0 $0 $0 $4,027,000 $4,027,000 Total $934,206 $500,000 $200,000 $4,027,000 $5,661,206 Capital Cost Total Historical $934,206 FY2026 Budget $500,000 Total Budget (all years) $4 .727M Project Total $5.661M Capital Cost by Year Construction/Maintenance Engineering 2026 2027 2028 $500,000.00 $200,000.00 $4,027,000.00 $0 $1M $2M $3M $4M Capital Cost for Budgeted Years TOTAL $4,727,000.00 Construction/Maintenance (85%)$4,027,000. Engineering (15%)$700,000.00 Funding Sources Breakdown Funding Sources Historical FY2026 FY2027 FY2028 Total Measure Z $722,617 $500,000 $200,000 $2,027,000 $3,449,617 Grant $0 $0 $0 $2,000,000 $2,000,000 Total $722,617 $500,000 $200,000 $4,027,000 $5,449,617 Funding Sources Total Historical $722,617 FY2026 Budget $500,000 Total Budget (all years) $4.727M Project Total $5.45M Funding Sources by Year Grant Measure Z 2026 2027 2028 $500,000.00 $200,000.00 $4,027,000.00 $0 $1M $2M $3M $4M Funding Sources for Budgeted Years TOTAL $4,727,000.00 Grant (42%)$2,000,000.00 Measure Z (58%)$2,727,000.00 BROADWAY TRACT PAVING Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 08/18/2025 Est. Completion Date 10/31/2025 Department Circulation Form Type Capital Improvement Request Type Circulation Description Paving rehabilitation for the Broadway Tract neighborhood.  The limits are Grand Avenue, Lakeshore Drive, Laurelwood Lane and St. Clair Ave Images Broadway Tracts Paving Details Type of Project Resurface Current Road Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $26,736 $0 $26,736 Construction/Maintenance $0 $2,001,200 $2,001,200 Total $26,736 $2,001,200 $2,027,936 Capital Cost Total Historical $26,736 FY2026 Budget $2,001,200 Total Budget (all years) $2.001M Project Total $2.028M Capital Cost by Year Construction/Maintenance 2026 $2,001,200.00 $0 $500K $1M $1.5M $2M Capital Cost for Budgeted Years TOTAL $2,001,200.00 Construction/Maintenance (100%)$2,001,200 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $197,090 $197,090 SB 1 $1,804,110 $1,804,110 Total $2,001,200 $2,001,200 Funding Sources FY2026 Budget $2,001,200 Total Budget (all years) $2.001M Project Total $2.001M Funding Sources by Year Measure Z SB 1 2026 $2,001,200.00 $0 $500K $1M $1.5M $2M Funding Sources for Budgeted Years TOTAL $2,001,200.00 Measure Z (10%)$197,090.00 SB 1 (90%)$1,804,110.00 DOWNTOWN MAIN STREET PARKING & LANDSCAPE IMPROVEMENT Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project will make improvements to the Main Street Corridor including, but not limited to parking, landscaping, and irrigation equipment within the City's Right-of-Way areas from Interstate 15 to Lakeshore Drive. Project scope to remove and replace all plant material and trees in the parkways and raised planters: repair or replace seating, sidewalks, site furnishings and street lighting; add two entry gateway arches over Main Street.  Images Details Type of Project Resurface Current Road Priority II - Important Supplemental Attachments Main Street Streetscape Master Plan(/resource/cg-prod-v2/projects/documents/39084fbfa6b641fe0ac8.pdf) Landscape Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $315 $0 $315 Design $202,681 $0 $202,681 Construction/Maintenance $0 $6,500,000 $6,500,000 Total $202,996 $6,500,000 $6,702,996 Capital Cost Total Historical $202,996 FY2026 Budget $6,500,000 Total Budget (all years) $6.5M Project Total $6.703M Capital Cost by Year Construction/Maintenance 2026 $6,500,000.00 $0 $2M $4M $6M Capital Cost for Budgeted Years TOTAL $6,500,000.00 Construction/Maintenance (100%)$6,500,000 Funding Sources Breakdown Funding Sources FY2026 Total Unfunded $6,500,000 $6,500,000 Total $6,500,000 $6,500,000 Funding Sources FY2026 Budget $6,500,000 Total Budget (all years) $6.5M Project Total $6.5M Funding Sources by Year Unfunded 2026 $6,500,000.00 $0 $2M $4M $6M Funding Sources for Budgeted Years TOTAL $6,500,000.00 Unfunded (100%)$6,500,000.00 EAST LAKE CIRCULATION Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2024 Est. Completion Date 06/30/2032 Department Circulation Form Type Capital Improvement Request Type Circulation Description Construct a four (4) lane road to provide access and circulation for the East Lake Specic Plan and Diamond Specic Plan. Details If funding source is other, please explain.Unspecied Type of Project New Road Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2026 FY2027 Total Administration $100,000 $10,000 $110,000 Design $388,667 $0 $388,667 Construction/Maintenance $3,395,181 $6,294,837 $9,690,018 Total $3,883,848 $6,304,837 $10,188,685 Capital Cost FY2026 Budget $3,883,848 Total Budget (all years) $10.189M Project Total $10.189M Capital Cost by Year Administration Construction/Maintenance Design 2026 2027 $3,883,848.00 $6,304,837.00 $0 $2M $4M $6M Capital Cost for Budgeted Years TOTAL $10,188,685.00 Administration (1%)$110,000.00 Construction/Maintenance (95%)$9,690,018.0 Design (4%)$388,667.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Summerly Trafc Impact Fee $3,883,848 $0 $3,883,848 Unfunded $0 $6,304,837 $6,304,837 Total $3,883,848 $6,304,837 $10,188,685 Funding Sources FY2026 Budget $3,883,848 Total Budget (all years) $10.189M Project Total $10.189M Funding Sources by Year Summerly Trafc Impact Fee Unfunded 2026 2027 $3,883,848.00 $6,304,837.00 $0 $2M $4M $6M Funding Sources for Budgeted Years TOTAL $10,188,685.00 Summerly Trafc Impact Fee (38%)$3,883,84 Unfunded (62%)$6,304,837.00 GUNNERSON ST RIVERSIDE DR INTERSECTION TRAFFIC SIGNAL IMPROVEMENT Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2023 Est. Completion Date 07/31/2025 Department Circulation Form Type Capital Improvement Request Type Circulation Description The project will install trafc signals and curb ramps, modify striping and signage, and relocate utilities at the intersection of Gunnerson Street and Riverside Drive. Images Details Type of Project Trafc Flow Improvements Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $0 $10,000 $10,000 Design $97,821 $0 $97,821 Construction/Maintenance $0 $1,000,000 $1,000,000 Total $97,821 $1,010,000 $1,107,821 Capital Cost Total Historical $97,821 FY2026 Budget $1,010,000 Total Budget (all years) $1.01M Project Total $1.108M Capital Cost by Year Administration Construction/Maintenance 2026 $1,010,000.00 $0 $250K $500K $750K $1M Capital Cost for Budgeted Years TOTAL $1,010,000.00 Administration (1%)$10,000.00 Construction/Maintenance (99%)$1,000,000.0 Funding Sources Breakdown Funding Sources FY2026 Total TUMF $1,010,000 $1,010,000 Total $1,010,000 $1,010,000 Funding Sources FY2026 Budget $1,010,000 Total Budget (all years) $1.01M Project Total $1.01M Funding Sources by Year TUMF 2026 $1,010,000.00 $0 $250K $500K $750K $1M Funding Sources for Budgeted Years TOTAL $1,010,000.00 TUMF (100%)$1,010,000.00 HIGHWAY SAFETY IMPROVEMENTS CYCLE 11 - CITYWIDE PEDESTRIAN CROSSWALK ENHANCEMENTS Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 09/29/2023 Est. Completion Date 07/31/2026 Department Circulation Form Type Capital Improvement Request Type Circulation Description Install Solar-Powered Rectangular Rapid Flashing Beacon (RRFB) systems at existing pedestrian crossings and install advanced yield ine pavement markings and signs at various locations throughout the City. Images Project Exhibit Project Exhibit Rectangular Rapid Flashing Beacon (RRFB) Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 Total Administration $0 $10,000 $0 $10,000 Engineering $0 $100,000 $0 $100,000 Construction/Maintenance $54,028 $600,000 $400,000 $1,054,028 Total $54,028 $710,000 $400,000 $1,164,028 Capital Cost Total Historical $54,028 FY2026 Budget $710,000 Total Budget (all years) $1.11M Project Total $1.164M Capital Cost by Year Administration Construction/Maintenance Engineering 2026 2027 $710,000.00 $400,000.00 $0 $200K $400K $600K Capital Cost for Budgeted Years TOTAL $1,110,000.00 Administration (1%)$10,000.00 Construction/Maintenance (90%)$1,000,000. Engineering (9%)$100,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Trafc Impact Fee $485,000 $400,000 $885,000 Grant $225,000 $0 $225,000 Total $710,000 $400,000 $1,110,000 Funding Sources FY2026 Budget $710,000 Total Budget (all years) $1.11M Project Total $1.11M Funding Sources by Year Grant Trafc Impact Fee 2026 2027 $710,000.00 $400,000.00 $0 $200K $400K $600K Funding Sources for Budgeted Years TOTAL $1,110,000.00 Grant (20%)$225,000.00 Trafc Impact Fee (80%)$885,000.00 HIGHWAY SAFETY IMPROVEMENTS CYCLE 12 - SIGNALIZED INTERSECTIONS Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 09/01/2025 Est. Completion Date 03/01/2029 Department Circulation Form Type Capital Improvement Request Type Infrastructure Description The project will improve intersections at thirty (30) various locations throughout the City. Improvements will include installing retroreective signal backplates, pedestrian countdown heads, and leading pedestrian interval (LPI). Details New Facility or Replacement New Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 Total Design $40,000 $35,000 $0 $75,000 Construction $0 $400,000 $446,400 $846,400 Total $40,000 $435,000 $446,400 $921,400 Capital Cost FY2026 Budget $40,000 Total Budget (all years) $921.4K Project Total $921.4K Capital Cost by Year Construction Design 2026 2027 2028 $40,000.00 $435,000.00 $446,400.00 $0 $120K $240K $360K Capital Cost for Budgeted Years TOTAL $921,400.00 Construction (92%)$846,400.00 Design (8%)$75,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 Total Grant $40,000 $435,000 $286,760 $761,760 Unfunded $0 $0 $159,640 $159,640 Total $40,000 $435,000 $446,400 $921,400 Funding Sources FY2026 Budget $40,000 Total Budget (all years) $921.4K Project Total $921.4K Funding Sources by Year Grant Unfunded 2026 2027 2028 $40,000.00 $435,000.00 $446,400.00 $0 $120K $240K $360K Funding Sources for Budgeted Years TOTAL $921,400.00 Grant (83%)$761,760.00 Unfunded (17%)$159,640.00 I-15 FRANKLIN STREET INTERCHANGE IMPROVEMENT Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 04/15/2024 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description The Plan Approval/Environmental Document (PA&ED) phase was completed concurrently with the Railroad Canyon Road Interchange Project in August 2017. The project has initiated Final Plans, Specications, and Estimates (PS&E) for the development of plans, specications, and construction cost estimates and obtaining any resource agency permits and right-of-way acquisition.  Images Location Details If funding source is other, please explain.UNSPECIFIED Type of Project Trafc Flow Improvements Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 FY2029 Total Administration $3,822 $10,000 $10,000 $0 $0 $23,822 Design $669,125 $4,000,000 $4,000,000 $1,000,000 $0 $9,669,125 Land/Right-of-way $0 $0 $0 $12,000,000 $0 $12,000,000 Construction/Maintenance $0 $0 $0 $0 $80,000,000 $80,000,000 Total $672,947 $4,010,000 $4,010,000 $13,000,000 $80,000,000 $101,692,947 Capital Cost Total Historical $672,947 FY2026 Budget $4 ,010,000 Total Budget (all years) $101.02M Project Total $101.693M Capital Cost by Year Administration Construction/Maintenance Design Land/Right-of-way 2026 2027 2028 2029 $4,010,000.00 $4,010,000.00 $13,000,000.00 $80,000,000.00 $0 $20M $40M $60M $80M Capital Cost for Budgeted Years TOTAL $101,020,000.00 Administration (0%)$20,000.00 Construction/Maintenance (79%)$80,000,00 Design (9%)$9,000,000.00 Land/Right-of-way (12%)$12,000,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 Total Measure Z $1,010,000 $1,010,000 $0 $0 $2,020,000 TUMF $3,000,000 $3,000,000 $6,500,000 $0 $12,500,000 Unfunded $0 $0 $6,500,000 $80,000,000 $86,500,000 Total $4,010,000 $4,010,000 $13,000,000 $80,000,000 $101,020,000 Funding Sources FY2026 Budget $4,010,000 Total Budget (all years) $101.02M Project Total $101.02M Funding Sources by Year Measure Z TUMF Unfunded 2026 2027 2028 2029 $4,010,000.00 $4,010,000.00 $13,000,000.00 $80,000,000.00 $0 $20M $40M $60M $80M Funding Sources for Budgeted Years TOTAL $101,020,000.00 Measure Z (2%)$2,020,000.00 TUMF (12%)$12,500,000.00 Unfunded (86%)$86,500,000.00 I-15 MAIN STREET INTERCHANGE LANDSCAPE IMPROVEMENT PROJECT Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 01/01/2024 Est. Completion Date 10/31/2025 Department Circulation Form Type Capital Improvement Request Type Circulation Description Landscape Improvements throughout the Main Street Interchange. Images Details Type of Project Other Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $6,378 $0 $6,378 Design $164,237 $0 $164,237 Construction/Maintenance $84,647 $1,500,000 $1,584,647 Total $255,262 $1,500,000 $1,755,262 Capital Cost Total Historical $255,262 FY2026 Budget $1,500,000 Total Budget (all years) $1.5M Project Total $1.755M Capital Cost by Year Construction/Maintenance 2026 $1,500,000.00 $0 $400K $800K $1.2M Capital Cost for Budgeted Years TOTAL $1,500,000.00 Construction/Maintenance (100%)$1,500,000 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $1,500,000 $1,500,000 Total $1,500,000 $1,500,000 Funding Sources FY2026 Budget $1,500,000 Total Budget (all years) $1.5M Project Total $1.5M Funding Sources by Year Measure Z 2026 $1,500,000.00 $0 $400K $800K $1.2M Funding Sources for Budgeted Years TOTAL $1,500,000.00 Measure Z (100%)$1,500,000.00 I-15 NICHOLS ROAD INTERCHANGE Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 01/10/2023 Est. Completion Date 12/31/2033 Department Circulation Form Type Capital Improvement Request Type Circulation Description With completion of the Project Study Report (PSR), the project will initiate Plan Approval/Environmental Document (PA&ED) phase of work for future modications to the existing I-15/Nichols Road Interchange.  Proposed interchange improvements would include adding segments of auxiliary lanes on Interstate 15; widening Nichols Road overcrossing and ramps; adding complete street elements; and adding or upgrading intersection trafc control devices. Images Details Type of Project Trafc Flow Improvements Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2030 Total Administration $2,856 $0 $0 $0 $2,856 Design $941,723 $2,500,000 $2,500,000 $0 $5,941,723 Construction/Maintenance $0 $0 $0 $60,000,000 $60,000,000 Total $944,579 $2,500,000 $2,500,000 $60,000,000 $65,944,579 Capital Cost Total Historical $944 ,579 FY2026 Budget $2,500,000 Total Budget (all years) $65M Project Total $65.945M Capital Cost by Year Construction/Maintenance Design 2026 2027 2030 $2,500,000.00 $2,500,000.00 $60,000,000.00 $0 $15M $30M $45M $60M Capital Cost for Budgeted Years TOTAL $65,000,000.00 Construction/Maintenance (92%)$60,000,000 Design (8%)$5,000,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2030 Total TUMF $2,500,000 $2,500,000 $0 $5,000,000 Unfunded $0 $0 $60,000,000 $60,000,000 Total $2,500,000 $2,500,000 $60,000,000 $65,000,000 Funding Sources FY2026 Budget $2,500,000 Total Budget (all years) $65M Project Total $65M Funding Sources by Year TUMF Unfunded 2026 2027 2030 $2,500,000.00 $2,500,000.00 $60,000,000.00 $0 $15M $30M $45M $60M Funding Sources for Budgeted Years TOTAL $65,000,000.00 TUMF (8%)$5,000,000.00 Unfunded (92%)$60,000,000.00 I-15 STATE ROUTE 74 INTERCHANGE Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 01/01/2019 Est. Completion Date 12/31/2027 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project initiated nal Plans, Specications, and Engineer's Estimate (PS&E) phase of work for future modications to the existing I- 15/SR 74 Interchange at Central Avenue. Proposed improvements include removal/replacement of northbound on-ramp with northbound hook on- and off-ramps at Dexter Avenue north of Central Avenue; widening of northbound off-ramp; construction of northbound loop off-ramp at Central Avenue; construction of auxiliary lane segments at on- and off-ramps; and widening of southbound on- and off-ramps and segments of Central Avenue and Dexter Avenue. Details If funding source is other, please explain.Unspecied Type of Project Trafc Flow Improvements Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 Total Administration $157,838 $0 $0 $157,838 Design $51,302 $6,000,000 $0 $6,051,302 Engineering $2,716,389 $0 $0 $2,716,389 Land/Right-of-way $0 $3,300,000 $0 $3,300,000 Construction/Maintenance $0 $4,600,000 $45,400,000 $50,000,000 Total $2,925,529 $13,900,000 $45,400,000 $62,225,529 Capital Cost Total Historical $2,925,529 FY2026 Budget $13,900,000 Total Budget (all years) $59.3M Project Total $62.226M Capital Cost by Year Construction/Maintenance Design Land/Right-of-way 2026 2027 $13,900,000.00 $45,400,000.00 $0 $12M $24M $36M Capital Cost for Budgeted Years TOTAL $59,300,000.00 Construction/Maintenance (84%)$50,000,00 Design (10%)$6,000,000.00 Land/Right-of-way (6%)$3,300,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total TUMF $3,000,000 $18,500,000 $21,500,000 Unfunded $0 $26,900,000 $26,900,000 Total Road Improvement Program $10,900,000 $0 $10,900,000 Total $13,900,000 $45,400,000 $59,300,000 Funding Sources FY2026 Budget $13,900,000 Total Budget (all years) $59.3M Project Total $59.3M Funding Sources by Year Total Road Improvement Pro…TUMF Unfunded 2026 2027 $13,900,000.00 $45,400,000.00 $0 $12M $24M $36M Funding Sources for Budgeted Years TOTAL $59,300,000.00 Total Road Improvement Program (18%)$10,9 TUMF (36%)$21,500,000.00 Unfunded (45%)$26,900,000.00 LA STRADA EXTENSION Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 04/26/2022 Est. Completion Date 06/30/2035 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project will extend La Strada west to Camino Del Norte with two (2) lanes in each direction along its entire length with a painted median. Details If funding source is other, please explain.LA STRADA RBBD/ FY22.23 PRELIM DESIGN WORK UNSPECIFIED Type of Project New Road Priority II - Important Capital Cost Breakdown Capital Cost FY2030 Total Administration $285,921 $285,921 Engineering $1,908,425 $1,908,425 Land/Right-of-way $1,897,000 $1,897,000 Construction/Maintenance $24,018,849 $24,018,849 Total $28,110,195 $28,110,195 Capital Cost Total Budget (all years) $28.11M Project Total $28.11M Capital Cost by Year Administration Construction/Maintenance Engineering Land/Right-of-way 2030 $28,110,195.00 $0 $8M $16M $24M Capital Cost for Budgeted Years TOTAL $28,110,195.00 Administration (1%)$285,921.00 Construction/Maintenance (85%)$24,018,849 Engineering (7%)$1,908,425.00 Land/Right-of-way (7%)$1,897,000.00 Funding Sources Breakdown Funding Sources FY2027 FY2030 Total Unfunded $28,110,195 $28,110,195 $56,220,390 Total $28,110,195 $28,110,195 $56,220,390 Funding Sources Total Budget (all years) $56.22M Project Total $56.22M Funding Sources by Year Unfunded 2027 2030 $28,110,195.00 $28,110,195.00 $0 $8M $16M $24M Funding Sources for Budgeted Years TOTAL $56,220,390.00 Unfunded (100%)$56,220,390.00 LAKE STREET WIDENING Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2027 Est. Completion Date 12/31/2032 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project will realign and widen Lake Street. This multi-functional corridor will provide wildlife linkage, meandering pedestrian and bicycle paths, utility easements, a perennial owing creek, ponds, and a native re-vegetated landscape. With the landscape corridors and edges on both sides of Lake Street and the landscaped roadway median, this Lake Street entry will form a broad canopy of the native landscape. Lake Street’s cross-section will vary from six (6) to eight (8) lanes, the eight (8) lanes occurring near the Temescal Canyon Road intersection and transitioning to six (6) lanes as it approaches Nichols Road. Bike lanes will be provided on both sides of the street. In addition, a newly widened bridge will extend over Temescal Creek along Lake Street. Details If funding source is other, please explain.UNSPECIFIED Type of Project Trafc Flow Improvements Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2026 FY2028 FY2029 Total Administration $0 $250,000 $250,000 $500,000 Design $150,000 $2,000,000 $2,000,000 $4,150,000 Engineering $0 $500,000 $1,000,000 $1,500,000 Land/Right-of-way $0 $1,305,000 $0 $1,305,000 Construction/Maintenance $0 $0 $29,013,909 $29,013,909 Total $150,000 $4,055,000 $32,263,909 $36,468,909 Capital Cost FY2026 Budget $150,000 Total Budget (all years) $36.469M Project Total $36.469M Capital Cost by Year Administration Construction/Maintenance Design Engineering Land/Right-of-way 2026 2028 2029 $150,000.00 $4,055,000.00 $32,263,909.00 $0 $8M $16M $24M $32M Capital Cost for Budgeted Years TOTAL $36,468,909.00 Administration (1%)$500,000.00 Construction/Maintenance (80%)$29,013,909 Design (11%)$4,150,000.00 Engineering (4%)$1,500,000.00 Land/Right-of-way (4%)$1,305,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2028 FY2029 Total Trafc Impact Fee $150,000 $0 $0 $150,000 Unfunded $0 $4,055,000 $32,263,909 $36,318,909 Total $150,000 $4,055,000 $32,263,909 $36,468,909 Funding Sources FY2026 Budget $150,000 Total Budget (all years) $36.469M Project Total $36.469M Funding Sources by Year Trafc Impact Fee Unfunded 2026 2028 2029 $150,000.00 $4,055,000.00 $32,263,909.00 $0 $8M $16M $24M $32M Funding Sources for Budgeted Years TOTAL $36,468,909.00 Trafc Impact Fee (0%)$150,000.00 Unfunded (100%)$36,318,909.00 LAKESHORE PAVING REHABILITATION Overview Request Owner Carlos Norvani, Capital Projects Engineer Est. Start Date 07/01/2025 Est. Completion Date 06/30/2027 Department Circulation Form Type Capital Improvement Request Type Circulation Description Pavement rehabilitation Lakeshore Dr /Main to Mission Trail/ Malaga Details Type of Project Resurface Current Road Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2026 Total Administration $15,000 $15,000 Design $20,000 $20,000 Construction/Maintenance $1,934,671 $1,934,671 Total $1,969,671 $1,969,671 Capital Cost FY2026 Budget $1,969,671 Total Budget (all years) $1.97M Project Total $1.97M Capital Cost by Year Administration Construction/Maintenance Design 2026 $1,969,671.00 $0 $500K $1M $1.5M Capital Cost for Budgeted Years TOTAL $1,969,671.00 Administration (1%)$15,000.00 Construction/Maintenance (98%)$1,934,671.0 Design (1%)$20,000.00 Funding Sources Breakdown Funding Sources FY2026 Total SB 1 $1,969,671 $1,969,671 Total $1,969,671 $1,969,671 Funding Sources FY2026 Budget $1,969,671 Total Budget (all years) $1.97M Project Total $1.97M Funding Sources by Year SB 1 2026 $1,969,671.00 $0 $500K $1M $1.5M Funding Sources for Budgeted Years TOTAL $1,969,671.00 SB 1 (100%)$1,969,671.00 LAKESHORE DRIVE SIDEWALK IMPROVEMENTS SB-821 Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 04/21/2025 Est. Completion Date 07/31/2025 Department Circulation Form Type Capital Improvement Request Type Circulation Description Construct an ADA-compliant sidewalk, curb, gutter and curb ramps on Lakeshore Drive to Herbert. The work will include minor grading behind the pavement, and installation of curb, gutter, sidewalk and ramps.  Images Lakeshore Sidewalk SB 821 Details Type of Project Sidewalk Improvements Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $4,595 $8,000 $12,595 Design $23,313 $0 $23,313 Construction/Maintenance $84,050 $1,319,670 $1,403,720 Total $111,958 $1,327,670 $1,439,628 Capital Cost Total Historical $111,958 FY2026 Budget $1,327,670 Total Budget (all years) $1.328M Project Total $1.44M Capital Cost by Year Administration Construction/Maintenance 2026 $1,327,670.00 $0 $400K $800K $1.2M Capital Cost for Budgeted Years TOTAL $1,327,670.00 Administration (1%)$8,000.00 Construction/Maintenance (99%)$1,319,670.0 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $745,320 $745,320 SB 821 $163,480 $163,480 Community Development Block Grant $418,870 $418,870 Total $1,327,670 $1,327,670 Funding Sources FY2026 Budget $1,327,670 Total Budget (all years) $1.328M Project Total $1.328M Funding Sources by Year Community Development Bl…Measure Z SB 821 2026 $1,327,670.00 $0 $400K $800K $1.2M Funding Sources for Budgeted Years TOTAL $1,327,670.00 Community Development Block Grant (32%) Measure Z (56%)$745,320.00 SB 821 (12%)$163,480.00 LIMITED STREET SIDEWALK IMPROVEMENTS Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2025 Est. Completion Date 06/30/2027 Department Circulation Form Type Capital Improvement Request Type Infrastructure Description The project will install concrete sidewalk, curb & gutter, and ADA ramps on the south side of Limited Street between Kellogg Street and Main Street. The pedestrian crossing at Langstaff Street and Main Street will be enhanced with a rectangular rapid ashing beacon and advanced yield line pavement markings and signs.  Details New Facility or Replacement Replacement Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 Total Administration $0 $10,000 $10,000 Design $51,000 $0 $51,000 Construction $0 $654,046 $654,046 Total $51,000 $664,046 $715,046 Capital Cost FY2026 Budget $51,000 Total Budget (all years) $715.046K Project Total $715.046K Capital Cost by Year Administration Construction Design 2026 2027 $51,000.00 $664,046.00 $0 $200K $400K $600K Capital Cost for Budgeted Years TOTAL $715,046.00 Administration (1%)$10,000.00 Construction (91%)$654,046.00 Design (7%)$51,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Measure Z $0 $291,706 $291,706 Community Development Block Grant $51,000 $372,340 $423,340 Total $51,000 $664,046 $715,046 Funding Sources FY2026 Budget $51,000 Total Budget (all years) $715.046K Project Total $715.046K Funding Sources by Year Community Development Bl…Measure Z 2026 2027 $51,000.00 $664,046.00 $0 $200K $400K $600K Funding Sources for Budgeted Years TOTAL $715,046.00 Community Development Block Grant (59%) Measure Z (41%)$291,706.00 MAIN STREET PAVEMENT REHABILITATION, PED SAFETY AND IT INFRASTRUCTURE Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 05/13/2024 Est. Completion Date 09/29/2025 Department Circulation Form Type Capital Improvement Request Type Circulation Description Project scope consists of pavement rehabilitation from Main St to the I-15 Freeway. The scope also includes pedestrian safety crosswalk improvements at Library Street and at City Hall crossing. The project includes Information Technology infrastructure throughout Main Street and other side roads for the purpose of future installation of data and power wiring. The project also includes aesthetic improvements to cross walks and intersections along Main Streets in addition to installation of ADA Ramps. Images Main Street Pavement Rehab, Ped Safety & IT Infrastructure Details Type of Project Resurface Current Road Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $130,443 $10,000 $140,443 Design $284,010 $0 $284,010 Construction/Maintenance $6,639,233 $150,000 $6,789,233 Total $7,053,686 $160,000 $7,213,686 Capital Cost Total Historical $7,053,686 FY2026 Budget $160,000 Total Budget (all years) $160K Project Total $7.214M Capital Cost by Year Administration Construction/Maintenance 2026 $160,000.00 $0 $40K $80K $120K $160K Capital Cost for Budgeted Years TOTAL $160,000.00 Administration (6%)$10,000.00 Construction/Maintenance (94%)$150,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $160,000 $160,000 Total $160,000 $160,000 Funding Sources FY2026 Budget $160,000 Total Budget (all years) $160K Project Total $160K Funding Sources by Year Measure Z 2026 $160,000.00 $0 $40K $80K $120K $160K Funding Sources for Budgeted Years TOTAL $160,000.00 Measure Z (100%)$160,000.00 MOUNTAIN & AVOCADO WAY TRACT PAVING REHABILITATION (ADJACENT TO RUNNING DEER AND ONTARIO WAY) Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 03/10/2025 Est. Completion Date 06/30/2025 Department Circulation Form Type Capital Improvement Request Type Circulation Description Project Improvements include grind and overlay of existing residential neighborhood around Mountain Street and Ontario Way. Restriping and minor road and surface drainage where needed. Images Mountain Avocado Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $17,722 $5,000 $22,722 Construction/Maintenance $1,501,699 $0 $1,501,699 Total $1,519,421 $5,000 $1,524,421 Capital Cost Total Historical $1,519,421 FY2026 Budget $5,000 Total Budget (all years) $5K Project Total $1.524M Capital Cost by Year Administration 2026 $5,000.00 $0 $1.2K $2.4K $3.6K $4.8K Capital Cost for Budgeted Years TOTAL $5,000.00 Administration (100%)$5,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $5,000 $5,000 Total $5,000 $5,000 Funding Sources FY2026 Budget $5,000 Total Budget (all years) $5K Project Total $5K Funding Sources by Year Measure Z 2026 $5,000.00 $0 $1.2K $2.4K $3.6K $4.8K Funding Sources for Budgeted Years TOTAL $5,000.00 Measure Z (100%)$5,000.00 RAILROAD CANYON ROAD SAFETY IMPROVEMENTS - HSIP 12 Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 09/30/2025 Est. Completion Date 09/30/2029 Department Circulation Form Type Capital Improvement Request Type Circulation Description Project will install safety improvements on Railroad Canyon Road from Summerhill Drive to eastern City limits. Improvements include relocating utility poles; adding guardrails near Church Road; installing high friction surface treatment, LED/ashing beacon chevron and "Curve Ahead" signs, and additional reectors along curved segments; and improving signal hardware and signal timing. Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 Total Design $350,000 $0 $0 $350,000 Construction/Maintenance $825,000 $1,970,000 $2,000,000 $4,795,000 Total $1,175,000 $1,970,000 $2,000,000 $5,145,000 Capital Cost FY2026 Budget $1,175,000 Total Budget (all years) $5.145M Project Total $5.145M Capital Cost by Year Construction/Maintenance Design 2026 2027 2028 $1,175,000.00 $1,970,000.00 $2,000,000.00 $0 $500K $1M $1.5M $2M Capital Cost for Budgeted Years TOTAL $5,145,000.00 Construction/Maintenance (93%)$4,795,000. Design (7%)$350,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 Total Measure Z $1,000,000 $0 $0 $1,000,000 Grant $175,000 $1,970,000 $1,810,500 $3,955,500 Unfunded $0 $0 $189,500 $189,500 Total $1,175,000 $1,970,000 $2,000,000 $5,145,000 Funding Sources FY2026 Budget $1,175,000 Total Budget (all years) $5.145M Project Total $5.145M Funding Sources by Year Grant Measure Z Unfunded 2026 2027 2028 $1,175,000.00 $1,970,000.00 $2,000,000.00 $0 $500K $1M $1.5M $2M Funding Sources for Budgeted Years TOTAL $5,145,000.00 Grant (77%)$3,955,500.00 Measure Z (19%)$1,000,000.00 Unfunded (4%)$189,500.00 RIVERWALK LIGHTING AND LANDSCAPE IMPROVEMENTS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Parks Description This project will make improvements to the City's Riverwalk extending Riverside Drive to the Lake at Seaport including, but not limited to: fresh landscape along existing irrigated slopes; renovate and repair damaged irrigation; replacement of drinking fountains, new benches, new trash cans; Repair or replace damaged cement areas i.e. lifted sidewalks, broken panels; repair or replace damaged or missing bollards; install approximately 87 new solar lights to increase evening usability Images Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Total Admin $10,000 $10,000 $10,000 $10,000 $10,000 $50,000 Design $40,000 $40,000 $40,000 $40,000 $40,000 $200,000 Construction $550,000 $550,000 $550,000 $550,000 $550,000 $2,750,000 Furnishings, Fixtures and Equipment $400,000 $400,000 $400,000 $400,000 $400,000 $2,000,000 Total $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Capital Cost FY2026 Budget $1,000,000 Total Budget (all years) $5M Project Total $5M Capital Cost by Year Admin Construction Design Furnishings, Fixtures and Eq… 2026 2027 2028 2029 2030 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0 $250K $500K $750K $1M Capital Cost for Budgeted Years TOTAL $5,000,000.00 Admin (1%)$50,000.00 Construction (55%)$2,750,000.00 Design (4%)$200,000.00 Furnishings, Fixtures and Equipment (40%)$ Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Total Unfunded $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Total $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000 Funding Sources FY2026 Budget $1,000,000 Total Budget (all years) $5M Project Total $5M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $1,000,000.00 $0 $250K $500K $750K $1M Funding Sources for Budgeted Years TOTAL $5,000,000.00 Unfunded (100%)$5,000,000.00 SB 1 PAVEMENT REHABILITATION PROGRAM FY26.27 Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2026 Est. Completion Date 06/30/2027 Department Circulation Form Type Capital Improvement Request Type Circulation Description The City receives Road Maintenance and Rehabilitation funds annually as part of the Road Repair and Accountability Act of 2017. Each year, the City must declare a specic project in May. The selected project is based on Pavement Conditions Indices (PCI) and Average Daily Trafc (ADT) demand. Details Type of Project Resurface Current Road Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2027 Total Administration $15,000 $15,000 Design $20,000 $20,000 Construction/Maintenance $1,297,387 $1,297,387 Total $1,332,387 $1,332,387 Capital Cost Total Budget (all years) $1.332M Project Total $1.332M Capital Cost by Year Administration Construction/Maintenance Design 2027 $1,332,387.00 $0 $400K $800K $1.2M Capital Cost for Budgeted Years TOTAL $1,332,387.00 Administration (1%)$15,000.00 Construction/Maintenance (97%)$1,297,387.0 Design (2%)$20,000.00 Funding Sources Breakdown Funding Sources FY2027 Total SB 1 $1,332,387 $1,332,387 Total $1,332,387 $1,332,387 Funding Sources Total Budget (all years) $1.332M Project Total $1.332M Funding Sources by Year SB 1 2027 $1,332,387.00 $0 $400K $800K $1.2M Funding Sources for Budgeted Years TOTAL $1,332,387.00 SB 1 (100%)$1,332,387.00 SB 1 PAVEMENT REHABILITATION PROGRAM FY27.28 Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2026 Est. Completion Date 07/01/2028 Department Circulation Form Type Capital Improvement Request Type Circulation Description The City receives Road Maintenance and Rehabilitation funds annually as part of the Road Repair and Accountability Act of 2017. Each year, the City must declare a specic project in May. The selected project is based on Pavement Conditions Indices (PCI) and Average Daily Trafc (ADT) demand. Details Type of Project Resurface Current Road Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2028 Total Administration $15,000 $15,000 Design $20,000 $20,000 Construction/Maintenance $1,297,387 $1,297,387 Total $1,332,387 $1,332,387 Capital Cost Total Budget (all years) $1.332M Project Total $1.332M Capital Cost by Year Administration Construction/Maintenance Design 2028 $1,332,387.00 $0 $400K $800K $1.2M Capital Cost for Budgeted Years TOTAL $1,332,387.00 Administration (1%)$15,000.00 Construction/Maintenance (97%)$1,297,387.0 Design (2%)$20,000.00 Funding Sources Breakdown Funding Sources FY2028 Total SB 1 $1,332,387 $1,332,387 Total $1,332,387 $1,332,387 Funding Sources Total Budget (all years) $1.332M Project Total $1.332M Funding Sources by Year SB 1 2028 $1,332,387.00 $0 $400K $800K $1.2M Funding Sources for Budgeted Years TOTAL $1,332,387.00 SB 1 (100%)$1,332,387.00 SPRING STREET SIDEWALK PROJECT Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 11/27/2025 Est. Completion Date 12/31/2026 Department Circulation Form Type Capital Improvement Request Type Circulation Description Installation of curb, sidewalk and ADA ramps on Spring Street between Limited Street to Lakeshore Drive.  Images Spring Street Sidewalk Details If funding source is other, please explain.UNSPECIFIED - APPLICATION SUBMITTED FOR SB 821 FUNDING Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 Total Administration $0 $0 $10,000 $10,000 Design $37,500 $37,500 $0 $75,000 Construction/Maintenance $0 $0 $760,000 $760,000 Total $37,500 $37,500 $770,000 $845,000 Capital Cost FY2026 Budget $37,500 Total Budget (all years) $845K Project Total $845K Capital Cost by Year Administration Construction/Maintenance Design 2026 2027 2028 $37,500.00 $37,500.00 $770,000.00 $0 $200K $400K $600K Capital Cost for Budgeted Years TOTAL $845,000.00 Administration (1%)$10,000.00 Construction/Maintenance (90%)$760,000.00 Design (9%)$75,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 Total Measure Z $18,750 $18,750 $385,000 $422,500 SB 821 $18,750 $18,750 $385,000 $422,500 Total $37,500 $37,500 $770,000 $845,000 Funding Sources FY2026 Budget $37,500 Total Budget (all years) $845K Project Total $845K Funding Sources by Year Measure Z SB 821 2026 2027 2028 $37,500.00 $37,500.00 $770,000.00 $0 $200K $400K $600K Funding Sources for Budgeted Years TOTAL $845,000.00 Measure Z (50%)$422,500.00 SB 821 (50%)$422,500.00 STATE ROUTE 74 WIDENING Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 06/01/2026 Est. Completion Date 12/29/2028 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project will widen State Route 74, west of I-15 to the Ortega mountains. The widening will increase the number of lanes from two (2) up to six (6) (A study is necessary to determine the feasibility of more than four (4) lanes) and include turn pockets and one trafc signal at the intersection of SR74 (Riverside Drive) and Grand Avenue. Details Priority IV - Future Need Capital Cost Breakdown Capital Cost Historical FY2030 Total Administration $4,745 $50,000 $54,745 Engineering $0 $1,500,000 $1,500,000 Land/Right-of-way $0 $5,600,000 $5,600,000 Construction/Maintenance $0 $4,400,000 $4,400,000 Total $4,745 $11,550,000 $11,554,745 Capital Cost Total Historical $4,745 Total Budget (all years) $11.55M Project Total $11.555M Capital Cost by Year Administration Construction/Maintenance Engineering Land/Right-of-way 2030 $11,550,000.00 $0 $3M $6M $9M Capital Cost for Budgeted Years TOTAL $11,550,000.00 Administration (0%)$50,000.00 Construction/Maintenance (38%)$4,400,000 Engineering (13%)$1,500,000.00 Land/Right-of-way (48%)$5,600,000.00 Funding Sources Breakdown Funding Sources FY2027 Total Unfunded $11,550,000 $11,550,000 Total $11,550,000 $11,550,000 Funding Sources Total Budget (all years) $11.55M Project Total $11.55M Funding Sources by Year Unfunded 2027 $11,550,000.00 $0 $3M $6M $9M Funding Sources for Budgeted Years TOTAL $11,550,000.00 Unfunded (100%)$11,550,000.00 STREET LIGHTING MASTER PLAN Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Circulation Form Type Capital Improvement Request Type Circulation Description This Street Lighting Master Plan aims to improve the overall lighting infrastructure in our community by providing a comprehensive and strategic approach to street lighting. The plan will involve a detailed assessment of our current lighting system, identication of areas with inadequate lighting, and the development of a roadmap to upgrade and modernize the street lighting network. The goal is to enhance safety, security, and visibility on our streets, creating a more inviting and well-lit environment for residents and visitors. Images Details Type of Project Other Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $341,191 $341,191 $341,191 $341,191 $341,191 $341,191 $2,047,146 Total $341,191 $341,191 $341,191 $341,191 $341,191 $341,191 $2,047,146 Capital Cost FY2026 Budget $341,191 Total Budget (all years) $1.706M Future $341.191K Project Total $2.047M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $341,191.00 $341,191.00 $341,191.00 $341,191.00 $341,191.00 $0 $100K $200K $300K Capital Cost for Budgeted Years TOTAL $1,705,955.00 Construction/Maintenance (100%)$1,705,955. Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $341,191 $341,191 $341,191 $341,191 $341,191 $341,191 $2,047,146 Total $341,191 $341,191 $341,191 $341,191 $341,191 $341,191 $2,047,146 Funding Sources FY2026 Budget $341,191 Total Budget (all years) $1.706M Future $341.191K Project Total $2.047M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $341,191.00 $341,191.00 $341,191.00 $341,191.00 $341,191.00 $0 $100K $200K $300K Funding Sources for Budgeted Years TOTAL $1,705,955.00 Unfunded (100%)$1,705,955.00 SUMMERHILL DRIVE EXTENSION Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2019 Est. Completion Date 12/31/2027 Department Circulation Form Type Capital Improvement Request Type Circulation Description Summerhill Drive will be extended north to Greenwald Avenue per the General Plan with two (2) lanes in each direction along its entire length and a painted median. Details If funding source is other, please explain.Unspecied fund Type of Project New Road Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 Total Administration $4,228 $30,000 $0 $34,228 Design $67,964 $449,900 $0 $517,864 Engineering $1,674,371 $1,000,000 $0 $2,674,371 Land/Right-of-way $0 $1,000,000 $0 $1,000,000 Construction/Maintenance $71,521 $3,000,000 $27,520,100 $30,591,621 Total $1,818,084 $5,479,900 $27,520,100 $34,818,084 Capital Cost Total Historical $1,818,084 FY2026 Budget $5,479,900 Total Budget (all years) $33M Project Total $34 .818M Capital Cost by Year Administration Construction/Maintenance Design Engineering Land/Right-of-way 2026 2027 $5,479,900.00 $27,520,100.00 $0 $8M $16M $24M Capital Cost for Budgeted Years TOTAL $33,000,000.00 Administration (0%)$30,000.00 Construction/Maintenance (92%)$30,520,100 Design (1%)$449,900.00 Engineering (3%)$1,000,000.00 Land/Right-of-way (3%)$1,000,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Capital Improvement Fund $5,479,900 $0 $5,479,900 Unfunded $0 $27,520,100 $27,520,100 Total $5,479,900 $27,520,100 $33,000,000 Funding Sources FY2026 Budget $5,479,900 Total Budget (all years) $33M Project Total $33M Funding Sources by Year Capital Improvement Fund Unfunded 2026 2027 $5,479,900.00 $27,520,100.00 $0 $8M $16M $24M Funding Sources for Budgeted Years TOTAL $33,000,000.00 Capital Improvement Fund (17%)$5,479,900.0 Unfunded (83%)$27,520,100.00 TEMESCAL CANYON BRIDGE REPLACEMENT & ROAD WIDENING PHASE I Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 01/01/2016 Est. Completion Date 12/31/2027 Department Circulation Form Type Capital Improvement Request Type Circulation Description This project includes the design, right-of-way acquisition, and construction of a four-lane bridge across Temescal Canyon wash. Details Type of Project New Road Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 Total Administration $304,776 $0 $0 $304,776 Design $1,787,323 $75,000 $75,000 $1,937,323 Engineering $910,734 $0 $0 $910,734 Construction/Maintenance $1,127,991 $0 $25,000,000 $26,127,991 Total $4,130,824 $75,000 $25,075,000 $29,280,824 Capital Cost Total Historical $4,130,824 FY2026 Budget $75,000 Total Budget (all years) $25.15M Project Total $29.281M Capital Cost by Year Construction/Maintenance Design 2026 2027 $75,000.00 $25,075,000.00 $0 $8M $16M $24M Capital Cost for Budgeted Years TOTAL $25,150,000.00 Construction/Maintenance (99%)$25,000,000 Design (1%)$150,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Grant $75,000 $25,075,000 $25,150,000 Total $75,000 $25,075,000 $25,150,000 Funding Sources FY2026 Budget $75,000 Total Budget (all years) $25.15M Project Total $25.15M Funding Sources by Year Grant 2026 2027 $75,000.00 $25,075,000.00 $0 $8M $16M $24M Funding Sources for Budgeted Years TOTAL $25,150,000.00 Grant (100%)$25,150,000.00 TERRA COTTA ROAD STREET IMPROVEMENT Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 07/28/2025 Est. Completion Date 06/30/2027 Department Circulation Form Type Capital Improvement Request Type Circulation Description Widen Terra Cotta Road to the ultimate road section per the City's General Plan Circulation Element.  Improvements also include ultimate intersection improvements at Nichols Road and Terra Cotta Road.   Images Terra Cotta Details Type of Project Resurface Current Road Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 Total Administration $5,715 $2,000 $0 $0 $7,715 Design $419,061 $149,744 $0 $0 $568,805 Land/Right-of-way $0 $0 $500,000 $0 $500,000 Construction/Maintenance $0 $0 $0 $5,000,000 $5,000,000 Total $424,776 $151,744 $500,000 $5,000,000 $6,076,520 Capital Cost Total Historical $424,776 FY2026 Budget $151,744 Total Budget (all years) $5.652M Project Total $6.077M Capital Cost by Year Administration Construction/Maintenance Design Land/Right-of-way 2026 2027 2028 $151,744.00 $500,000.00 $5,000,000.00 $0 $1.2M $2.4M $3.6M $4.8M Capital Cost for Budgeted Years TOTAL $5,651,744.00 Administration (0%)$2,000.00 Construction/Maintenance (88%)$5,000,000 Design (3%)$149,744.00 Land/Right-of-way (9%)$500,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 Total Measure Z $151,744 $500,000 $0 $651,744 Unfunded $0 $0 $5,000,000 $5,000,000 Total $151,744 $500,000 $5,000,000 $5,651,744 Funding Sources FY2026 Budget $151,744 Total Budget (all years) $5.652M Project Total $5.652M Funding Sources by Year Measure Z Unfunded 2026 2027 2028 $151,744.00 $500,000.00 $5,000,000.00 $0 $1.2M $2.4M $3.6M $4.8M Funding Sources for Budgeted Years TOTAL $5,651,744.00 Measure Z (12%)$651,744.00 Unfunded (88%)$5,000,000.00 AMPHITHEATER Overview Request Owner Jason Simpson, City Manager Est. Start Date 07/01/2023 Est. Completion Date 06/30/2026 Department Facilities Form Type Capital Improvement Request Type Facilities Description An outdoor amphitheater with tiered lawn seating, stage, picnic area, and a children's play area. Details Type of Project New Construction Priority III - Enhance Quality of Life Capital Cost Breakdown Capital Cost FY2026 Total Administration $30,000 $30,000 Design $250,000 $250,000 Construction/Maintenance $6,335,000 $6,335,000 Land Acquisition $1,285,000 $1,285,000 Total $7,900,000 $7,900,000 Capital Cost FY2026 Budget $7,900,000 Total Budget (all years) $7.9M Project Total $7.9M Capital Cost by Year Administration Construction/Maintenance Design Land Acquisition 2026 $7,900,000.00 $0 $2M $4M $6M Capital Cost for Budgeted Years TOTAL $7,900,000.00 Administration (0%)$30,000.00 Construction/Maintenance (80%)$6,335,000. Design (3%)$250,000.00 Land Acquisition (16%)$1,285,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $7,900,000 $7,900,000 Total $7,900,000 $7,900,000 Funding Sources FY2026 Budget $7,900,000 Total Budget (all years) $7.9M Project Total $7.9M Funding Sources by Year Measure Z 2026 $7,900,000.00 $0 $2M $4M $6M Funding Sources for Budgeted Years TOTAL $7,900,000.00 Measure Z (100%)$7,900,000.00 AQUATICS CENTER Overview Request Owner Beau Davis, Assistant Director of Community Services Est. Start Date 07/01/2025 Est. Completion Date 06/30/2027 Department Facilities Form Type Capital Improvement Request Type Facilities Description The proposed Aquatics Center is a state-of-the-art facility that will serve as a premier destination for various water sports and activities. The center will feature a 25x50 meter deep water pool that can accommodate water polo, competitive swimming, scuba diving, paddle sports, high diving, and other activities. The center will also include smaller pools for recreational use, as well as amenities and features such as locker rooms, showers, restrooms, seating areas, and concession stands. The Aquatics Center will serve as a regional aquatic hub, hosting events and programs for the community. The Aquatics Center project represents an exciting opportunity for the community to create a state-of-the-art aquatic destination that can serve as a hub for water sports and activities. The project would work closely with the community and relevant stakeholders to ensure that the facility is designed, constructed, and operated in a manner that meets the community's needs and expectations. The proposed Aquatics Center will be a source of pride for the community and a destination for visitors from across the region. Details Type of Project New Construction Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2030 Total Administration $200,000 $200,000 Design $325,000 $325,000 Engineering $325,000 $325,000 Construction/Maintenance $38,500,000 $38,500,000 Furniture, Fixtures and Equipment $650,000 $650,000 Total $40,000,000 $40,000,000 Capital Cost Total Budget (all years) $40M Project Total $40M Capital Cost by Year Administration Construction/Maintenance Design Engineering Furniture, Fixtures and Equip… 2030 $40,000,000.00 $0 $10M $20M $30M $40M Capital Cost for Budgeted Years TOTAL $40,000,000.00 Administration (1%)$200,000.00 Construction/Maintenance (96%)$38,500,000 Design (1%)$325,000.00 Engineering (1%)$325,000.00 Furniture, Fixtures and Equipment (2%)$650 Funding Sources Breakdown Funding Sources FY2030 Total Unfunded $40,000,000 $40,000,000 Total $40,000,000 $40,000,000 Funding Sources Total Budget (all years) $40M Project Total $40M Funding Sources by Year Unfunded 2030 $40,000,000.00 $0 $10M $20M $30M $40M Funding Sources for Budgeted Years TOTAL $40,000,000.00 Unfunded (100%)$40,000,000.00 Operational Costs Breakdown Operational Costs Future Total General Maintenance $300,000 $300,000 Total $300,000 $300,000 Operational Costs Total Budget (all years) N/A Future $300K Project Total $300K Please add in budgeted amounts for any of the scal years to see chart information. BUILDING FACILITIES RENOVATIONS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Facilities Form Type Capital Improvement Request Type Facilities Description This will improve City facilities, including HVAC replacements, windows, roong, plumbing, electrical, lighting, exterior/interior wall, ooring, doors, LED parking lot light installation, shade structures, landscaping, concrete, drains, rain gutters, fencing, etc. Details Type of Project Refurbishment Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $640,000 $855,000 $450,000 $450,000 $450,000 $450,000 $3,295,000 Total $640,000 $855,000 $450,000 $450,000 $450,000 $450,000 $3,295,000 Capital Cost FY2026 Budget $640,000 Total Budget (all years) $2.845M Future $450K Project Total $3.295M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $640,000.00 $855,000.00 $450,000.00 $450,000.00 $450,000.00 $0 $250K $500K $750K Capital Cost for Budgeted Years TOTAL $2,845,000.00 Construction/Maintenance (100%)$2,845,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Capital Improvement Fund $640,000 $0 $0 $0 $0 $0 $640,000 Unfunded $0 $855,000 $450,000 $450,000 $450,000 $450,000 $2,655,000 Total $640,000 $855,000 $450,000 $450,000 $450,000 $450,000 $3,295,000 Funding Sources FY2026 Budget $640,000 Total Budget (all years) $2.845M Future $450K Project Total $3.295M Funding Sources by Year Capital Improvement Fund Unfunded 2026 2027 2028 2029 2030 $640,000.00 $855,000.00 $450,000.00 $450,000.00 $450,000.00 $0 $250K $500K $750K Funding Sources for Budgeted Years TOTAL $2,845,000.00 Capital Improvement Fund (22%)$640,000.0 Unfunded (78%)$2,205,000.00 CITY HALL Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 09/01/2022 Est. Completion Date 01/31/2024 Department Facilities Form Type Capital Improvement Request Type Facilities Description The existing City Hall Facility requires major repairs and upgrades for Americans with Disabilities Act (ADA) compliance, mechanical, electrical, and security systems. There are four separate buildings with adjoining modications comprising City administrative ofces. Previous efforts have exhausted expansion possibilities as current ofce spaces are insufcient. The new facility will be approximately 35,000 square feet and connect to the existing City Hall. It will include the following amenities: . Open two-story glass entrance steel moment frame with wood stud walls/roof. . Fire engine in lobby. . Sliding glass entrance doors with metal detectors. . Interior elevator. . Public counters. . Council Chambers on 3rd oor with view of Lake.  . Use red thin brick on exterior walls. . Restrooms. . Conference Room Details Type of Project Replacement Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $106,554 $50,000 $156,554 Design $1,773,789 $0 $1,773,789 Engineering $18,682 $0 $18,682 Construction/Maintenance $10,868,438 $14,797,686 $25,666,124 Furniture, Fixtures and Equipment $305,663 $2,000,000 $2,305,663 Land Acquisition $1,552,452 $0 $1,552,452 Total $14,625,578 $16,847,686 $31,473,264 Capital Cost Total Historical $14 ,625,578 FY2026 Budget $16,847,686 Total Budget (all years) $16.848M Project Total $31.473M Capital Cost by Year Administration Construction/Maintenance Furniture, Fixtures and Equip… 2026 $16,847,686.00 $0 $5M $10M $15M Capital Cost for Budgeted Years TOTAL $16,847,686.00 Administration (0%)$50,000.00 Construction/Maintenance (88%)$14,797,686 Furniture, Fixtures and Equipment (12%)$2,0 Funding Sources Breakdown Funding Sources FY2026 Total DAG $518,599 $518,599 City Hall/Public Works DIF $261,000 $261,000 Capital Improvement Fund $16,068,087 $16,068,087 Total $16,847,686 $16,847,686 Funding Sources FY2026 Budget $16,847,686 Total Budget (all years) $16.848M Project Total $16.848M Funding Sources by Year Capital Improvement Fund City Hall/Public Works DIF DAG 2026 $16,847,686.00 $0 $5M $10M $15M Funding Sources for Budgeted Years TOTAL $16,847,686.00 Capital Improvement Fund (95%)$16,068,087 City Hall/Public Works DIF (2%)$261,000.00 DAG (3%)$518,599.00 CITY LIBRARY Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 07/01/2022 Est. Completion Date 06/30/2025 Department Facilities Form Type Capital Improvement Request Type Facilities Description This project includes the design and construction of a new City Library for the residents of Lake Elsinore. Details Type of Project New Construction Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $63,264 $50,000 $113,264 Design $707,982 $0 $707,982 Engineering $18,000 $100,000 $118,000 Construction/Maintenance $333,972 $9,828,851 $10,162,823 Furniture, Fixtures and Equipment $0 $1,000,000 $1,000,000 Land Acquisition $991,904 $0 $991,904 Total $2,115,122 $10,978,851 $13,093,973 Capital Cost Total Historical $2,115,122 FY2026 Budget $10,978,851 Total Budget (all years) $10.979M Project Total $13.094M Capital Cost by Year Administration Construction/Maintenance Engineering Furniture, Fixtures and Equip… 2026 $10,978,851.00 $0 $3M $6M $9M Capital Cost for Budgeted Years TOTAL $10,978,851.00 Administration (0%)$50,000.00 Construction/Maintenance (90%)$9,828,851.0 Engineering (1%)$100,000.00 Furniture, Fixtures and Equipment (9%)$1,00 Funding Sources Breakdown Funding Sources FY2026 Total Library DIF $1,167,961 $1,167,961 Grant $9,798,290 $9,798,290 PEG $12,600 $12,600 Total $10,978,851 $10,978,851 Funding Sources FY2026 Budget $10,978,851 Total Budget (all years) $10.979M Project Total $10.979M Funding Sources by Year Grant Library DIF PEG 2026 $10,978,851.00 $0 $3M $6M $9M Funding Sources for Budgeted Years TOTAL $10,978,851.00 Grant (89%)$9,798,290.00 Library DIF (11%)$1,167,961.00 PEG (0%)$12,600.00 CITYWIDE FACILITIES INFORMATION TECHONOLOGY UPGRADES Overview Request Owner Jim Jensen, IT Manager Est. Start Date 07/01/2024 Est. Completion Date 06/30/2029 Department Facilities Form Type Capital Improvement Request Type Facilities Description Upgrades to the City's surveillance infrastructure to enhance security, deter criminal activities, and improve incident response capabilities. This will encompass the following facilities: City Hall, Cultural Center, Dream Extreme Neighborhood Center, Senior Center, Lake Community Center, Public Works Admin, Emergency Operation Center, Community Development Building, and Launch Pointe. Details Type of Project Replacement Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Administration $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $120,000 Furniture, Fixtures and Equipment $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $600,000 Land Acquisition $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Total $320,000 $320,000 $320,000 $320,000 $320,000 $320,000 $1,920,000 Capital Cost FY2026 Budget $320,000 Total Budget (all years) $1.6M Future $320K Project Total $1.92M Capital Cost by Year Administration Furniture, Fixtures and Equip… Land Acquisition 2026 2027 2028 2029 2030 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $0 $80K $160K $240K $320K Capital Cost for Budgeted Years TOTAL $1,600,000.00 Administration (6%)$100,000.00 Furniture, Fixtures and Equipment (31%)$500 Land Acquisition (63%)$1,000,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $320,000 $320,000 $320,000 $320,000 $320,000 $320,000 $1,920,000 Total $320,000 $320,000 $320,000 $320,000 $320,000 $320,000 $1,920,000 Funding Sources FY2026 Budget $320,000 Total Budget (all years) $1.6M Future $320K Project Total $1.92M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $320,000.00 $0 $80K $160K $240K $320K Funding Sources for Budgeted Years TOTAL $1,600,000.00 Unfunded (100%)$1,600,000.00 COMMUNITY CENTER Overview Request Owner Beau Davis, Assistant Director of Community Services Est. Start Date 06/01/2027 Est. Completion Date 06/30/2029 Department Facilities Form Type Capital Improvement Request Type Facilities Description The proposed community center, spanning between 15,000 to 20,000 square feet, would offer a wide array of amenities and activities to cater to the diverse interests and needs of the entire community. The primary goal of the community center is to foster a sense of belonging, promote health and wellness, and facilitate social interactions among residents of all ages. With its expansive space, the center will house various facilities, such as state-of-the-art tness areas, multi-purpose rooms for classes and workshops, indoor courts for basketball and volleyball, and dedicated spaces for children's activities. In addition, the community center will feature versatile event spaces capable of accommodating large gatherings, community meetings, and cultural events. These spaces will provide a platform for local organizations and groups to connect, collaborate, and showcase their talents and initiatives, strengthening community bonds and promoting civic engagement. One alternative option to a single large community center would be the construction of three strategically located neighborhood centers. Each center, spanning between 5,000 to 10,000 square feet, would be strategically placed in different areas of the city to ensure accessibility and convenience for residents across all neighborhoods. These neighborhood centers would feature similar amenities and programming as the larger community center, catering specically to the needs of the local community. They would act as smaller-scale recreation hubs, fostering a sense of community within each neighborhood while still being part of the larger city-wide network of facilities. Details Type of Project New Construction Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2028 FY2029 Total Administration $100,000 $100,000 $200,000 Design $600,000 $0 $600,000 Engineering $600,000 $0 $600,000 Construction/Maintenance $0 $12,000,000 $12,000,000 Furniture, Fixtures and Equipment $900,000 $750,000 $1,650,000 Land Acquisition $984,030 $300,000 $1,284,030 Total $3,184,030 $13,150,000 $16,334,030 Capital Cost Total Budget (all years) $16.334M Project Total $16.334M Capital Cost by Year Administration Construction/Maintenance Design Engineering Furniture, Fixtures and Equip…Land Acquisition 2028 2029 $3,184,030.00 $13,150,000.00 $0 $4M $8M $12M Capital Cost for Budgeted Years TOTAL $16,334,030.00 Administration (1%)$200,000.00 Construction/Maintenance (73%)$12,000,000 Design (4%)$600,000.00 Engineering (4%)$600,000.00 Furniture, Fixtures and Equipment (10%)$1,65 Land Acquisition (8%)$1,284,030.00 Funding Sources Breakdown Funding Sources FY2028 FY2029 Total Unfunded $3,184,030 $13,150,000 $16,334,030 Total $3,184,030 $13,150,000 $16,334,030 Funding Sources Total Budget (all years) $16.334M Project Total $16.334M Funding Sources by Year Unfunded 2028 2029 $3,184,030.00 $13,150,000.00 $0 $4M $8M $12M Funding Sources for Budgeted Years TOTAL $16,334,030.00 Unfunded (100%)$16,334,030.00 Operational Costs Breakdown Operational Costs FY2030 Future Total General Maintenance $50,000 $50,000 $100,000 Utilities $500,000 $500,000 $1,000,000 Total $550,000 $550,000 $1,100,000 Operational Costs Total Budget (all years) $550K Future $550K Project Total $1.1M Operational Costs by Year General Maintenance Utilities 2030 $550,000.00 $0 $150K $300K $450K Operational Costs for Budgeted Years TOTAL $550,000.00 General Maintenance (9%)$50,000.00 Utilities (91%)$500,000.00 DENC COMPUTER ROOM AND EXPANSION Overview Request Owner Ben Foster, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2026 Department Facilities Form Type Capital Improvement Request Type Facilities Description This expansion project will transform the 5,700 square-foot facility at 117 S. Langstaff St., turning the existing and obsolete generator room into a computer room for teens, STEM and other programs by adding approximately 580 square feet of programmable and storage space.  It will also expand DENC Multi-Purpose Room storage and add Preschool Room storage.  Additional improvements include installation of a ceiling-mounted wireless projector and screen and blinds for windows in the Multi-Purpose Room to make the space more attractive for a variety of programming such as movie nights and private rentals for business meetings, birthday parties, and other engagements.  Window blinds will allow for privacy during classes and rentals and enhance the room for rental opportunities of the facility. It will also enhance the appeal of the room as a usable program/event space as well as a rentable space. This new computer room will be utilized as a dedicated and quiet workspace with 8-12 workstations for use by teens during Youth Room hours, STEM program instruction, and other program uses such as day camp.  Additional storage will increase program capability and facility functionality.  Added storage to preschool room will increase organization of the space and enhance the ability to expand the scope of the class and will include two points of access for outside patio play equipment storage for class. Details Type of Project New Construction Priority II - Important Supplemental Attachments Original Floor Plan(/resource/cg-prod-v2/projects/documents/1343ccf 14d6f24426b3c.png) Updated Floor Plan(/resource/cg-prod-v2/projects/documents/51a4d175c2175359c039.png) DENC(/resource/cg-prod-v2/projects/documents/45ec882097d49117eaa1.png) Capital Cost Breakdown Capital Cost FY2026 Total Construction/Maintenance $500,000 $500,000 Furniture, Fixtures and Equipment $25,000 $25,000 Total $525,000 $525,000 Capital Cost FY2026 Budget $525,000 Total Budget (all years) $525K Project Total $525K Capital Cost by Year Construction/Maintenance Furniture, Fixtures and Equip… 2026 $525,000.00 $0 $150K $300K $450K Capital Cost for Budgeted Years TOTAL $525,000.00 Construction/Maintenance (95%)$500,000.00 Furniture, Fixtures and Equipment (5%)$25,0 Funding Sources Breakdown Funding Sources FY2026 Total Community Center DIF $465,958 $465,958 Unfunded $59,042 $59,042 Total $525,000 $525,000 Funding Sources FY2026 Budget $525,000 Total Budget (all years) $525K Project Total $525K Funding Sources by Year Community Center DIF Unfunded 2026 $525,000.00 $0 $150K $300K $450K Funding Sources for Budgeted Years TOTAL $525,000.00 Community Center DIF (89%)$465,958.00 Unfunded (11%)$59,042.00 FACILITY ADA (DAC-TRAK) Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Facilities Form Type Capital Improvement Request Type Facilities Description This project aims to improve accessibility in our facilities by implementing a digital tracking system for ADA compliance. The DAC-TRACK system will help monitor and manage compliance with the Americans with Disabilities Act (ADA) regulations in our buildings and facilities. It will enable us to track and document the accessibility features and modications made to our facilities, ensuring that we meet the required standards and provide equal access to all individuals. Chamber of Commerce, City Hall, Community Center, Cultural Center, Diamond Stadium, El Unico Restaurant, Fire Station 85, Fire Station 94, Fire Station 97, Launch Pointe, Library Street Parking Lot, Neighborhood Center, Planet Youth, Public Works Administrative Building, Senior Center & Senior Center Annex, Vacant Lot - Cultural Center, Vacant Lot - Limited Avenue & Poe Street, Vacant Lot - Peck Street, Vacant Lot - Sulfur & Graham Street, and Vacant Lot - Whiskers Beach.  Details Type of Project Replacement Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction/Maintenance $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Total $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Capital Cost FY2026 Budget $300,000 Total Budget (all years) $1.5M Future $300K Project Total $1.8M Capital Cost by Year Construction/Maintenance 2026 2027 2028 2029 2030 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $0 $80K $160K $240K Capital Cost for Budgeted Years TOTAL $1,500,000.00 Construction/Maintenance (100%)$1,500,000 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Total $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Funding Sources FY2026 Budget $300,000 Total Budget (all years) $1.5M Future $300K Project Total $1.8M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $0 $80K $160K $240K Funding Sources for Budgeted Years TOTAL $1,500,000.00 Unfunded (100%)$1,500,000.00 FIRE STATION FACILITY IMPROVEMENTS Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Facilities Form Type Capital Improvement Request Type Infrastructure Description The re station facility improvements are designed to modernize and enhance operational efciency, safety, and response capabilities for re service personnel. These improvements address aging infrastructure, incorporate current safety standards, and support the growing needs of the community. Details New Facility or Replacement Replacement Capital Cost Breakdown Capital Cost FY2026 FY2027 Total Construction $140,000 $195,000 $335,000 Total $140,000 $195,000 $335,000 Capital Cost FY2026 Budget $140,000 Total Budget (all years) $335K Project Total $335K Capital Cost by Year Construction 2026 2027 $140,000.00 $195,000.00 $0 $50K $100K $150K Capital Cost for Budgeted Years TOTAL $335,000.00 Construction (100%)$335,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Capital Improvement Fund $140,000 $0 $140,000 Unfunded $0 $195,000 $195,000 Total $140,000 $195,000 $335,000 Funding Sources FY2026 Budget $140,000 Total Budget (all years) $335K Project Total $335K Funding Sources by Year Capital Improvement Fund Unfunded 2026 2027 $140,000.00 $195,000.00 $0 $50K $100K $150K Funding Sources for Budgeted Years TOTAL $335,000.00 Capital Improvement Fund (42%)$140,000.00 Unfunded (58%)$195,000.00 Operational Costs Breakdown Operational Costs FY2027 FY2028 FY2029 Total General Maintenance $30,000 $30,000 $30,000 $90,000 Total $30,000 $30,000 $30,000 $90,000 Operational Costs Total Budget (all years) $90K Project Total $90K Operational Costs by Year General Maintenance 2027 2028 2029 $30,000.00 $30,000.00 $30,000.00 $0 $8K $16K $24K Operational Costs for Budgeted Years TOTAL $90,000.00 General Maintenance (100%)$90,000.00 LAKE COMMUNITY CENTER KITCHEN - 2025 Overview Request Owner Beau Davis, Assistant Director of Community Services Est. Start Date 07/01/2024 Est. Completion Date 06/30/2026 Department Facilities Form Type Capital Improvement Request Type Facilities Description This project will include the remodeling of over 500 square feet of the existing kitchen and pantry area. The primary remodel elements will include updating the existing area to ADA standards. All the kitchen appliances will be replaced. The countertop, ooring, and wall covering are not in compliance with current health and safety codes and will be reconstructed to satisfy these requirements. Exterior windows will be replaced with conforming Title 24 windows.  Details Type of Project Refurbishment Priority I - Urgent Capital Cost Breakdown Capital Cost FY2026 Total Administration $15,000 $15,000 Construction/Maintenance $50,000 $50,000 Furniture, Fixtures and Equipment $335,000 $335,000 Total $400,000 $400,000 Capital Cost FY2026 Budget $400,000 Total Budget (all years) $400K Project Total $400K Capital Cost by Year Administration Construction/Maintenance Furniture, Fixtures and Equip… 2026 $400,000.00 $0 $100K $200K $300K $400K Capital Cost for Budgeted Years TOTAL $400,000.00 Administration (4%)$15,000.00 Construction/Maintenance (13%)$50,000.00 Furniture, Fixtures and Equipment (84%)$33 Funding Sources Breakdown Funding Sources FY2026 Total Community Center DIF $400,000 $400,000 Total $400,000 $400,000 Funding Sources FY2026 Budget $400,000 Total Budget (all years) $400K Project Total $400K Funding Sources by Year Community Center DIF 2026 $400,000.00 $0 $100K $200K $300K $400K Funding Sources for Budgeted Years TOTAL $400,000.00 Community Center DIF (100%)$400,000.00 NEW FIRE STATION Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 07/01/2025 Est. Completion Date 06/30/2027 Department Facilities Form Type Capital Improvement Request Type Facilities Description The new re station will be a modern facility strategically located to optimize emergency response times across the service area. Capital Cost Breakdown Capital Cost FY2026 FY2027 Total Administration $10,000 $10,000 $20,000 Design $250,000 $0 $250,000 Construction/Maintenance $1,056,073 $9,173,927 $10,230,000 Furniture, Fixtures and Equipment $0 $1,000,000 $1,000,000 Land Acquisition $500,000 $0 $500,000 Total $1,816,073 $10,183,927 $12,000,000 Capital Cost FY2026 Budget $1,816,073 Total Budget (all years) $12M Project Total $12M Capital Cost by Year Administration Construction/Maintenance Design Furniture, Fixtures and Equip… Land Acquisition 2026 2027 $1,816,073.00 $10,183,927.00 $0 $2.5M $5M $7.5M $10M Capital Cost for Budgeted Years TOTAL $12,000,000.00 Administration (0%)$20,000.00 Construction/Maintenance (85%)$10,230,000 Design (2%)$250,000.00 Furniture, Fixtures and Equipment (8%)$1,00 Land Acquisition (4%)$500,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Fire Protection DIF $1,816,073 $0 $1,816,073 Unfunded $0 $10,183,927 $10,183,927 Total $1,816,073 $10,183,927 $12,000,000 Funding Sources FY2026 Budget $1,816,073 Total Budget (all years) $12M Project Total $12M Funding Sources by Year Fire Protection DIF Unfunded 2026 2027 $1,816,073.00 $10,183,927.00 $0 $2.5M $5M $7.5M $10M Funding Sources for Budgeted Years TOTAL $12,000,000.00 Fire Protection DIF (15%)$1,816,073.00 Unfunded (85%)$10,183,927.00 BUSHMAN & LAKESHORE STORM DRAIN REPLACEMENT Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 07/21/2025 Est. Completion Date 09/30/2025 Department Infrastructure Form Type Capital Improvement Request Type Circulation Description   Repair an existing collapsed 36" storm drain located at Bushman and Lakeshore Drive Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Design $23,608 $60,000 $83,608 Construction/Maintenance $0 $240,000 $240,000 Total $23,608 $300,000 $323,608 Capital Cost Total Historical $23,608 FY2026 Budget $300,000 Total Budget (all years) $300K Project Total $323.608K Capital Cost by Year Construction/Maintenance Design 2026 $300,000.00 $0 $80K $160K $240K Capital Cost for Budgeted Years TOTAL $300,000.00 Construction/Maintenance (80%)$240,000.0 Design (20%)$60,000.00 Funding Sources Breakdown Funding Sources FY2026 Total National Pollutant Discharge Elimination System $300,000 $300,000 Total $300,000 $300,000 Funding Sources FY2026 Budget $300,000 Total Budget (all years) $300K Project Total $300K Funding Sources by Year National Pollutant Discharge… 2026 $300,000.00 $0 $80K $160K $240K Funding Sources for Budgeted Years TOTAL $300,000.00 National Pollutant Discharge Elimination Sys CAMINO DEL NORTE SEWER Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 05/01/2025 Est. Completion Date 08/29/2025 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description Installation of an 8" sewer from Main Street to future Elsinore Hills Road. Details New Facility or Replacement New Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $7,680 $0 $7,680 Design $124,730 $0 $124,730 Construction $29,999 $886,406 $916,405 Total $162,409 $886,406 $1,048,815 Capital Cost Total Historical $162,409 FY2026 Budget $886,406 Total Budget (all years) $886.406K Project Total $1.049M Capital Cost by Year Construction 2026 $886,406.00 $0 $250K $500K $750K Capital Cost for Budgeted Years TOTAL $886,406.00 Construction (100%)$886,406.00 Funding Sources Breakdown Funding Sources FY2026 Total American Rescue Plan Act $886,406 $886,406 Total $886,406 $886,406 Funding Sources FY2026 Budget $886,406 Total Budget (all years) $886.406K Project Total $886.406K Funding Sources by Year American Rescue Plan Act 2026 $886,406.00 $0 $250K $500K $750K Funding Sources for Budgeted Years TOTAL $886,406.00 American Rescue Plan Act (100%)$886,406.0 COLLIER AVENUE CULVERT DRAINAGE IMPROVEMENTS Overview Request Owner Nicole McCalmont, CIP Specialist Est. Start Date 07/01/2022 Est. Completion Date 07/31/2025 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description Reconstruct the existing undersized 3' x 5' box culvert and headwalls with a 4' x 8' box culvert which crosses under Collier Avenue. Upsized culvert to alleviate recurring ooding in the area. Details New Facility or Replacement Replacement Priority II - Important Capital Cost Breakdown Capital Cost FY2026 Total Construction $600,000 $600,000 Total $600,000 $600,000 Capital Cost FY2026 Budget $600,000 Total Budget (all years) $600K Project Total $600K Capital Cost by Year Construction 2026 $600,000.00 $0 $150K $300K $450K $600K Capital Cost for Budgeted Years TOTAL $600,000.00 Construction (100%)$600,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Storm Drain $600,000 $600,000 Total $600,000 $600,000 Funding Sources FY2026 Budget $600,000 Total Budget (all years) $600K Project Total $600K Funding Sources by Year Storm Drain 2026 $600,000.00 $0 $150K $300K $450K $600K Funding Sources for Budgeted Years TOTAL $600,000.00 Storm Drain (100%)$600,000.00 ELECTRIC VEHICLE CHARGING STATIONS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2026 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description Installation of electric vehicle charging stations at Gediman square parking lot, Community Center, Diamond Stadium, and City Hall parking lot.  Images Details New Facility or Replacement New Priority II - Important Supplemental Attachments Gediman Square Parking Lot(/resource/cg-prod-v2/projects/documents/f08089a964eb06c12d03.pdf) Diamond Stadium(/resource/cg-prod-v2/projects/documents/0911ff1d48864b77579d.pdf) City Hall(/resource/cg-prod-v2/projects/documents/945966ea190a48a1e1bd.pdf) Capital Cost Breakdown Capital Cost FY2026 Total Construction $140,000 $140,000 Total $140,000 $140,000 Capital Cost FY2026 Budget $140,000 Total Budget (all years) $140K Project Total $140K Capital Cost by Year Construction 2026 $140,000.00 $0 $40K $80K $120K Capital Cost for Budgeted Years TOTAL $140,000.00 Construction (100%)$140,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Measure Z $14,970 $14,970 Grant $125,030 $125,030 Total $140,000 $140,000 Funding Sources FY2026 Budget $140,000 Total Budget (all years) $140K Project Total $140K Funding Sources by Year Grant Measure Z 2026 $140,000.00 $0 $40K $80K $120K Funding Sources for Budgeted Years TOTAL $140,000.00 Grant (89%)$125,030.00 Measure Z (11%)$14,970.00 MURRIETA CREEK REGIONAL TRAIL CONNECTION Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 01/01/2019 Est. Completion Date 06/30/2026 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description Construction of a regional multi-use trail that would include safety improvements for non-motorists, and safety fences along the trail. The proposed trail would be ten feet wide AC paved with two-foot-wide decomposed granite surface shoulders.  Images Details New Facility or Replacement New Priority III - Enhance Quality of Life Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Administration $529,047 $0 $0 $0 $0 $0 $0 $529,047 Design $641,384 $0 $0 $0 $0 $0 $0 $641,384 Engineering $0 $100,000 $100,000 $0 $0 $0 $0 $200,000 Construction $960,500 $4,000,000 $2,000,000 $25,000 $25,000 $25,000 $50,000 $7,085,500 Land/Right-of-Way $373,771 $0 $0 $0 $0 $0 $0 $373,771 Total $2,504,702 $4,100,000 $2,100,000 $25,000 $25,000 $25,000 $50,000 $8,829,702 Capital Cost Total Historical $2,504,702 FY2026 Budget $4 ,100,000 Total Budget (all years) $6.275M Future $50K Project Total $8.83M Capital Cost by Year Construction Engineering 2026 2027 2028 2029 2030 $4,100,000.00 $2,100,000.00 $25,000.00 $25,000.00 $25,000.00 $0 $1M $2M $3M $4M Capital Cost for Budgeted Years TOTAL $6,275,000.00 Construction (97%)$6,075,000.00 Engineering (3%)$200,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Measure Z $111,434 $0 $0 $0 $0 $0 $111,434 DAG $500,000 $0 $0 $0 $0 $0 $500,000 Storm Drain $688,566 $0 $0 $0 $0 $0 $688,566 Grant $2,800,000 $1,124,000 $0 $0 $0 $0 $3,924,000 Unfunded $0 $976,000 $25,000 $25,000 $25,000 $50,000 $1,101,000 Total $4,100,000 $2,100,000 $25,000 $25,000 $25,000 $50,000 $6,325,000 Funding Sources FY2026 Budget $4,100,000 Total Budget (all years) $6.275M Future $50K Project Total $6.325M Funding Sources by Year DAG Grant Measure Z Storm Drain Unfunded 2026 2027 2028 2029 2030 $4,100,000.00 $2,100,000.00 $25,000.00 $25,000.00 $25,000.00 $0 $1M $2M $3M $4M Funding Sources for Budgeted Years TOTAL $6,275,000.00 DAG (8%)$500,000.00 Grant (63%)$3,924,000.00 Measure Z (2%)$111,434.00 Storm Drain (11%)$688,566.00 Unfunded (17%)$1,051,000.00 POPE CIRCLE DRAINAGE Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 09/26/2025 Est. Completion Date 12/23/2026 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description Project will construct a storage basin, submersible pump and a storm drain force main to alleviate ooding in the area Images Details New Facility or Replacement New Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 Total Administration $1,262 $0 $1,262 Construction $0 $620,000 $620,000 Land/Right-of-Way $22,509 $0 $22,509 Total $23,771 $620,000 $643,771 Capital Cost Total Historical $23,771 FY2026 Budget $620,000 Total Budget (all years) $620K Project Total $643.771K Capital Cost by Year Construction 2026 $620,000.00 $0 $600K$150K $300K $450K Capital Cost for Budgeted Years TOTAL $620,000.00 Construction (100%)$620,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Storm Drain $620,000 $620,000 Total $620,000 $620,000 Funding Sources FY2026 Budget $620,000 Total Budget (all years) $620K Project Total $620K Funding Sources by Year Storm Drain 2026 $620,000.00 $0 $600K$150K $300K $450K Funding Sources for Budgeted Years TOTAL $620,000.00 Storm Drain (100%)$620,000.00 RICE CANYON REVETMENT Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2021 Est. Completion Date 06/29/2029 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description The project will provide rock slope protection that would tie into the high ground southwest of Dale Court and continue along the right bank of Rice Canyon watercourse as it travels northeast behind homes serviced by Dale Court. The slope protection would tie into the revetment project along Lincoln Street extension adjacent to the future Running Deer community. Details New Facility or Replacement New Priority II - Important Capital Cost Breakdown Capital Cost FY2028 Future Total Administration $50,000 $110,000 $160,000 Design $0 $940,000 $940,000 Engineering $1,195,000 $205,000 $1,400,000 Total $1,245,000 $1,255,000 $2,500,000 Capital Cost Total Budget (all years) $1.245M Future $1.255M Project Total $2.5M Capital Cost by Year Administration Engineering 2028 $1,245,000.00 $0 $1.2M$300K $600K $900K Capital Cost for Budgeted Years TOTAL $1,245,000.00 Administration (4%)$50,000.00 Engineering (96%)$1,195,000.00 Funding Sources Breakdown Funding Sources FY2028 Future Total Grant $675,000 $700,000 $1,375,000 Unfunded $570,000 $555,000 $1,125,000 Total $1,245,000 $1,255,000 $2,500,000 Funding Sources Total Budget (all years) $1.245M Future $1.255M Project Total $2.5M Funding Sources by Year Grant Unfunded 2028 $1,245,000.00 $0 $1.2M$300K $600K $900K Funding Sources for Budgeted Years TOTAL $1,245,000.00 Grant (54%)$675,000.00 Unfunded (46%)$570,000.00 STORM DRAIN CATCH BASIN INLET FILTER INSTALLATION Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2022 Est. Completion Date 06/30/2027 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description Install MS4 inlet lters to comply with the mandate of the MS4 permit system. Details If funding source is other, please explain.NPDES FUNDS New Facility or Replacement New Priority I - Urgent Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Administration $10,038 $0 $0 $0 $0 $0 $0 $10,038 Engineering $291,833 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $1,191,833 Total $301,871 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $1,201,871 Capital Cost Total Historical $301,871 FY2026 Budget $150,000 Total Budget (all years) $750K Future $150K Project Total $1.202M Capital Cost by Year Engineering 2026 2027 2028 2029 2030 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $0 $40K $80K $120K Capital Cost for Budgeted Years TOTAL $750,000.00 Engineering (100%)$750,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total National Pollutant Discharge Elimination System $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Funding Sources FY2026 Budget $150,000 Total Budget (all years) $750K Future $150K Project Total $900K Funding Sources by Year National Pollutant Discharge… 2026 2027 2028 2029 2030 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $0 $40K $80K $120K Funding Sources for Budgeted Years TOTAL $750,000.00 National Pollutant Discharge Elimination Sys THIRD STREET DRAINAGE IMPROVEMENTS PHASE III Overview Request Owner Yu Tagai, Associate Engineer Est. Start Date 07/01/2023 Est. Completion Date 06/30/2027 Department Infrastructure Form Type Capital Improvement Request Type Infrastructure Description This project includes the complete design, hydrology/hydraulic analysis and construction of missing storm drain improvements along Third Street, Conard Avenue and Welch Drive starting at Cambern Avenue. Improvements include the construction of new storm drains, catch basins, laterals, and modications to existing ood control channel downstream. Details If funding source is other, please explain.Unspecied New Facility or Replacement New Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2028 FY2029 Total Administration $200,000 $0 $200,000 Engineering $300,000 $0 $300,000 Construction $567,024 $567,024 $1,134,048 Total $1,067,024 $567,024 $1,634,048 Capital Cost Total Budget (all years) $1.634M Project Total $1.634M Capital Cost by Year Administration Construction Engineering 2028 2029 $1,067,024.00 $567,024.00 $0 $300K $600K $900K Capital Cost for Budgeted Years TOTAL $1,634,048.00 Administration (12%)$200,000.00 Construction (69%)$1,134,048.00 Engineering (18%)$300,000.00 Funding Sources Breakdown Funding Sources FY2028 FY2029 Total Unfunded $1,067,024 $567,024 $1,634,048 Total $1,067,024 $567,024 $1,634,048 Funding Sources Total Budget (all years) $1.634M Project Total $1.634M Funding Sources by Year Unfunded 2028 2029 $1,067,024.00 $567,024.00 $0 $300K $600K $900K Funding Sources for Budgeted Years TOTAL $1,634,048.00 Unfunded (100%)$1,634,048.00 ALBERHILL VILLAGE SPORTS PARK Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 07/01/2026 Est. Completion Date 06/30/2027 Department Parks Form Type Capital Improvement Request Type Parks Description This project is a new 46-acre park facility. The improvements will consist of constructing new soccer and baseball elds, volleyball and basketball courts, restrooms, picnic areas, concession stand, and play areas for children. Details Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2028 Future Total Design $0 $1,000,000 $1,000,000 Engineering $0 $1,000,000 $1,000,000 Construction $0 $42,000,000 $42,000,000 Furnishings, Fixtures and Equipment $0 $1,000,000 $1,000,000 Total $0 $45,000,000 $45,000,000 Capital Cost Total Budget (all years) N/A Future $45M Project Total $45M Please add in budgeted amounts for any of the scal years to see chart information. Funding Sources Breakdown Funding Sources FY2028 Future Total Unfunded $45,000,000 $45,000,000 $90,000,000 Total $45,000,000 $45,000,000 $90,000,000 Funding Sources Total Budget (all years) $45M Future $45M Project Total $90M Funding Sources by Year Unfunded 2028 $45,000,000.00 $0 $12M $24M $36M Funding Sources for Budgeted Years TOTAL $45,000,000.00 Unfunded (100%)$45,000,000.00 CANYON HILLS PARK UPGRADES Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description This project will make improvements to Canyon Hills Park, including, but not limited to, articial turf for at least one soccer/ football eld, fresh mulch in landscape planters, renovated landscaping, replacing drinking fountains, picnic tables, benches, trash cans, trash enclosures and BBQ grills; installation of desirable palm trees to enhance the esthetics of the park and provide additional shade, add additional lighting to the dog parks.  Images Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Admin $5,625 $0 $0 $0 $0 $0 $0 $5,625 Construction $5,098,631 $20,000 $582,200 $582,200 $582,200 $582,200 $582,200 $8,029,631 Furnishings, Fixtures and Equipment $64,340 $0 $100,000 $0 $0 $0 $0 $164,340 Total $5,168,596 $20,000 $682,200 $582,200 $582,200 $582,200 $582,200 $8,199,596 Capital Cost Total Historical $5,168,596 FY2026 Budget $20,000 Total Budget (all years) $2.449M Future $582.2K Project Total $8.2M Capital Cost by Year Construction Furnishings, Fixtures and Eq… 2026 2027 2028 2029 2030 $20,000.00 $682,200.00 $582,200.00 $582,200.00 $582,200.00 $0 $200K $400K $600K Capital Cost for Budgeted Years TOTAL $2,448,800.00 Construction (96%)$2,348,800.00 Furnishings, Fixtures and Equipment (4%)$10 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Capital Improvement Fund $20,000 $0 $0 $0 $0 $0 $20,000 Unfunded $0 $682,200 $582,200 $582,200 $582,200 $582,200 $3,011,000 Total $20,000 $682,200 $582,200 $582,200 $582,200 $582,200 $3,031,000 Funding Sources FY2026 Budget $20,000 Total Budget (all years) $2.449M Future $582.2K Project Total $3.031M Funding Sources by Year Capital Improvement Fund Unfunded 2026 2027 2028 2029 2030 $20,000.00 $682,200.00 $582,200.00 $582,200.00 $582,200.00 $0 $200K $400K $600K Funding Sources for Budgeted Years TOTAL $2,448,800.00 Capital Improvement Fund (1%)$20,000.00 Unfunded (99%)$2,428,800.00 CITY PARK IMPROVEMENTS Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 03/01/2024 Est. Completion Date 12/31/2024 Department Parks Form Type Capital Improvement Request Type Parks Description This project will include approx. 2,100 feet of ADA compliant sidewalk from the Library Street Parking Lot through City Park all the way to Main St and Graham St. Some of this sidewalk will need new curb, gutter and ramping at roadway intersection. Included in this project will be the design and construction of approx. 75 new parking spaces in a new parking lot area connected to City Park. The parking lot will incorporate underground electrical conduits for electric vehicle charging stations at many of the new parking spaces. Within the existing park, an outdoor live entertainment area will be developed to support special events that are commonly held at the park. This entertainment area will be designed to accommodate small venues of several hundred people and cater to local talent and interests for family enjoyment. Park amenities will be expanded to include restroom facilities, security systems, LED directional and focused lighting and data/communication elements connected to Main St. Water and electrical surface outlets will be installed in areas of the park designated for vendor setup. The project's remaining elements include removal of large dangerous eucalyptus trees and the installation of drought tolerant landscaping and hardscapes throughout. Security fencing will be installed to separate neighboring properties and to assist with directing pedestrian trafc to Main St. Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Admin $15,600 $10,000 $25,600 Construction $215,865 $700,020 $915,885 Total $231,465 $710,020 $941,485 Capital Cost Total Historical $231,465 FY2026 Budget $710,020 Total Budget (all years) $710.02K Project Total $941.485K Capital Cost by Year Admin Construction 2026 $710,020.00 $0 $200K $400K $600K Capital Cost for Budgeted Years TOTAL $710,020.00 Admin (1%)$10,000.00 Construction (99%)$700,020.00 Funding Sources Breakdown Funding Sources FY2026 Total Community Development Block Grant $710,020 $710,020 Total $710,020 $710,020 Funding Sources FY2026 Budget $710,020 Total Budget (all years) $710.02K Project Total $710.02K Funding Sources by Year Community Development Bl… 2026 $710,020.00 $0 $200K $400K $600K Funding Sources for Budgeted Years TOTAL $710,020.00 Community Development Block Grant (100% CITYWIDE PARK IMPROVEMENTS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description This project will make improvements to City parks including, but not limited to: fresh mulch in landscape planters and playgrounds; renovate landscaping; eld renovations; replacement of drinking fountains, picnic tables, benches; trash cans and BBQ grills; remove and replace rubberized playground surfacing; resurfacing of tennis and basketball courts; add shade structures for splash pads, picnic areas, bleachers and dugouts; add automatic locking mechanisms to park restroom buildings; repair or replace damaged cement areas i.e. lifted sidewalks; facility and structure repairs and upgrades; install new trash enclosures and inclose existing enclosures; parking lot slurry, striping and repairs; add backow enclosures, repair or replace damaged fencing, add pickleball courts.  Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction $772,000 $2,625,000 $500,000 $500,000 $500,000 $500,000 $5,397,000 Total $772,000 $2,625,000 $500,000 $500,000 $500,000 $500,000 $5,397,000 Capital Cost FY2026 Budget $772,000 Total Budget (all years) $4 .897M Future $500K Project Total $5.397M Capital Cost by Year Construction 2026 2027 2028 2029 2030 $772,000.00 $2,625,000.00 $500,000.00 $500,000.00 $500,000.00 $0 $800K $1.6M $2.4M Capital Cost for Budgeted Years TOTAL $4,897,000.00 Construction (100%)$4,897,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Capital Improvement Fund $772,000 $0 $0 $0 $0 $0 $772,000 Unfunded $0 $2,625,000 $500,000 $500,000 $500,000 $500,000 $4,625,000 Total $772,000 $2,625,000 $500,000 $500,000 $500,000 $500,000 $5,397,000 Funding Sources FY2026 Budget $772,000 Total Budget (all years) $4 .897M Future $500K Project Total $5.397M Funding Sources by Year Capital Improvement Fund Unfunded 2026 2027 2028 2029 2030 $772,000.00 $2,625,000.00 $500,000.00 $500,000.00 $500,000.00 $0 $800K $1.6M $2.4M Funding Sources for Budgeted Years TOTAL $4,897,000.00 Capital Improvement Fund (16%)$772,000.00 Unfunded (84%)$4,125,000.00 CITYWIDE PARKS INFORMATION TECHONOLOGY UPGRADES Overview Request Owner Jim Jensen, IT Manager Est. Start Date 07/01/2024 Est. Completion Date 06/30/2029 Department Parks Form Type Capital Improvement Request Type Parks Description Installation of modern surveillance systems to deter criminal activities, protect park assets, and enhance the overall park experience for residents and visitors. The following parks encompass this project: Alberhill Ranch Community, Canyon Hills Community, Christensen Community, City, Lakepoint, Lincoln Street, Machado, McVicker Canyon, Oak Tree, Riverwalk, Rosetta Canyon Community, Serenity, Summerhill, Summerly Community, Swick & Matich, Tuscany Hills, and Yarborough Park. Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $60,000 Furnishings, Fixtures and Equipment $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 Total $60,000 $60,000 $60,000 $60,000 $60,000 $60,000 $360,000 Capital Cost FY2026 Budget $60,000 Total Budget (all years) $300K Future $60K Project Total $360K Capital Cost by Year Construction Furnishings, Fixtures and Eq… 2026 2027 2028 2029 2030 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $0 $15K $30K $45K $60K Capital Cost for Budgeted Years TOTAL $300,000.00 Construction (17%)$50,000.00 Furnishings, Fixtures and Equipment (83%)$ Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $60,000 $60,000 $60,000 $60,000 $60,000 $60,000 $360,000 Total $60,000 $60,000 $60,000 $60,000 $60,000 $60,000 $360,000 Funding Sources FY2026 Budget $60,000 Total Budget (all years) $300K Future $60K Project Total $360K Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $60,000.00 $0 $15K $30K $45K $60K Funding Sources for Budgeted Years TOTAL $300,000.00 Unfunded (100%)$300,000.00 DOCK EXTENSION Overview Request Owner Francisco Diaz, Public Works Superintendent Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description Extend existing boat docks at Launch Pointe Resort by adding approximately 440' of additional dock sections to the existing infrastructure at Launch Pointe Resort.  Images Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 Total Construction $1,360,000 $1,360,000 Total $1,360,000 $1,360,000 Capital Cost FY2026 Budget $1,360,000 Total Budget (all years) $1.36M Project Total $1.36M Capital Cost by Year Construction 2026 $1,360,000.00 $0 $400K $800K $1.2M Capital Cost for Budgeted Years TOTAL $1,360,000.00 Construction (100%)$1,360,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Unfunded $1,360,000 $1,360,000 Total $1,360,000 $1,360,000 Funding Sources FY2026 Budget $1,360,000 Total Budget (all years) $1.36M Project Total $1.36M Funding Sources by Year Unfunded 2026 $1,360,000.00 $0 $400K $800K $1.2M Funding Sources for Budgeted Years TOTAL $1,360,000.00 Unfunded (100%)$1,360,000.00 LAKE IMPROVEMENTS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2026 Department Parks Form Type Capital Improvement Request Type Parks Description Purchase and install 3 new oating restrooms, new buoys and hardware for placement around the lake. The new restrooms would provide functional restrooms for Lake users throughout the year and would replace aging and failing restrooms currently in place. The oating restroom is designed for ease of use, long-term durability and low maintenance and would help to ensure the City is meeting current unisex and ADA Accessibility Guidelines. Disposal of the old restrooms would take place as well.  Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 Total Construction $450,000 $450,000 Total $450,000 $450,000 Capital Cost FY2026 Budget $450,000 Total Budget (all years) $450K Project Total $450K Capital Cost by Year Construction 2026 $450,000.00 $0 $120K $240K $360K Capital Cost for Budgeted Years TOTAL $450,000.00 Construction (100%)$450,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Unfunded $220,000 $220,000 Lakeside Facilities DIF $230,000 $230,000 Total $450,000 $450,000 Funding Sources FY2026 Budget $450,000 Total Budget (all years) $450K Project Total $450K Funding Sources by Year Lakeside Facilities DIF Unfunded 2026 $450,000.00 $0 $120K $240K $360K Funding Sources for Budgeted Years TOTAL $450,000.00 Lakeside Facilities DIF (51%)$230,000.00 Unfunded (49%)$220,000.00 LAUNCH POINTE AMENITY IMPROVEMENTS Overview Request Owner Beau Davis, Assistant Director of Community Services Est. Start Date 07/01/2023 Est. Completion Date 10/31/2025 Department Parks Form Type Capital Improvement Request Type Parks Description Launch Pointe's proposed Capital Improvement Project aims to enhance the guest experience. To do this, the proposed project will create a new open-air concept group area, make improvements to Vintage Village, improve slopes at the splash pad and playground, add facility enhancing sidewalks and mow curbs, update the aging General Store, Adjust the circulation for RV's checking-in, Improve on the Bobber Restaurant, and add activities to the beach at Launch Pointe. The new group space will accommodate multiple setups for weddings, family reunions, corporate retreats, and other gatherings with glass garage doors for privacy and stunning lake views. The small kitchen will offer basic amenities, allowing guests to prepare and cook their meals while enjoying the company of friends and family. Launch Pointe's Vintage Village is a unique area that offers guests a one-of-a-kind experience. To ensure the area remains a premier destination, the proposed project includes adding a perimeter fence with gabion walls, improved restrooms, market lights, and designated entrances exclusive to Vintage Village guests and events. The perimeter fence with gabion walls will provide a clear boundary for the Vintage Village and add a visual appeal to the area. The improved restrooms will enhance guest comfort and satisfaction, while market lights will create a warm and inviting ambiance in the evenings. The designated entrances exclusive to Vintage Village guests and events will create a sense of exclusivity and enhance the overall guest experience. Improvements to the slopes at the splash pad and playground will create reservable spaces like cabanas at the Splash Pad and group picnic areas at the Playground, allowing guests to enjoy the areas with added comfort and convenience. The reservable spaces will include amenities like seating, tables, and shade structures to enhance the guest experience. Images Deck and Drain Example The Public Works Yard has a deck which could be utilized in some of the areas around the splash pad. Concealment This same type of green concealment will be utilized for the deck around the splash pad. Splash Pad Improvements A rough rendering of what the splash pad improvements could be. Playground Slope Improvements Pavilion Idea Cabana Idea Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 Total Admin $0 $55,000 $55,000 Engineering $12,750 $0 $12,750 Construction $438,834 $0 $438,834 Furnishings, Fixtures and Equipment $0 $130,000 $130,000 Total $451,584 $185,000 $636,584 Capital Cost Total Historical $451,584 FY2026 Budget $185,000 Total Budget (all years) $185K Project Total $636.584K Capital Cost by Year Admin Furnishings, Fixtures and Eq… 2026 $185,000.00 $0 $50K $100K $150K Capital Cost for Budgeted Years TOTAL $185,000.00 Admin (30%)$55,000.00 Furnishings, Fixtures and Equipment (70%)$ Funding Sources Breakdown Funding Sources FY2026 Total Unfunded $185,000 $185,000 Total $185,000 $185,000 Funding Sources FY2026 Budget $185,000 Total Budget (all years) $185K Project Total $185K Funding Sources by Year Unfunded 2026 $185,000.00 $0 $50K $100K $150K Funding Sources for Budgeted Years TOTAL $185,000.00 Unfunded (100%)$185,000.00 Operational Costs Breakdown Operational Costs FY2026 FY2027 FY2028 FY2029 FY2030 Future Total General Maintenance $22,000 $24,000 $26,000 $26,000 $26,000 $26,000 $150,000 Total $22,000 $24,000 $26,000 $26,000 $26,000 $26,000 $150,000 Operational Costs FY2026 Budget $22,000 Total Budget (all years) $124K Future $26K Project Total $150K Operational Costs by Year General Maintenance 2026 2027 2028 2029 2030 $22,000.00 $24,000.00 $26,000.00 $26,000.00 $26,000.00 $0 $8K $16K $24K Operational Costs for Budgeted Years TOTAL $124,000.00 General Maintenance (100%)$124,000.00 SERENITY PARK IMPROVEMENTS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description This project will make improvements to Serenity Park including, but not limited to: renovating landscaping, adding desirable palm trees, replacement of drinking fountains, picnic tables, trash enclosures, benches, trash cans and BBQ grills, resurfacing of tennis and basketball courts; add shade structures for picnic areas, skatepark and doc park, add automatic locking mechanisms to park restroom buildings, repair or replace damaged cement areas i.e. lifted sidewalks; facility and structure repairs and upgrades, parking lot and pump track slurry, striping and repairs, add backow enclosures, repair or replace damaged fencing Images Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Admin $40,355 $0 $0 $0 $0 $0 $0 $40,355 Design $74,610 $0 $0 $0 $0 $0 $0 $74,610 Land/Right-of-way $220,850 $0 $0 $0 $0 $0 $0 $220,850 Construction $1,512,299 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $2,112,299 Furnishings, Fixtures and Equipment $91,614 $0 $0 $0 $0 $0 $0 $91,614 Total $1,939,728 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $2,539,728 Capital Cost Total Historical $1,939,728 FY2026 Budget $100,000 Total Budget (all years) $500K Future $100K Project Total $2.54M Capital Cost by Year Construction 2026 2027 2028 2029 2030 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $0 $25K $50K $75K $100K Capital Cost for Budgeted Years TOTAL $500,000.00 Construction (100%)$500,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $600,000 Total $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $600,000 Funding Sources FY2026 Budget $100,000 Total Budget (all years) $500K Future $100K Project Total $600K Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $0 $25K $50K $75K $100K Funding Sources for Budgeted Years TOTAL $500,000.00 Unfunded (100%)$500,000.00 SNACK BAR IMPROVEMENTS Overview Request Owner Beau Davis, Assistant Director of Community Services Est. Start Date 07/01/2024 Est. Completion Date 06/30/2025 Department Parks Form Type Capital Improvement Request Type Parks Description Currently, not all parks are up to Riverside county Health (food and beverage) standards to be able to serve anything but pre-packaged food. With an upgrade, youth leagues and facility rentals can expand to allow serving of hot food through a secured location within the parks. Serving windows, air conditioning, commercial refrigerators, commercial freezers, shelving, 3 bay stainless sinks, expanding Lakepoint and Mcvicker. Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 Total Construction $400,000 $400,000 Total $400,000 $400,000 Capital Cost FY2026 Budget $400,000 Total Budget (all years) $400K Project Total $400K Capital Cost by Year Construction 2026 $400,000.00 $0 $100K $200K $300K $400K Capital Cost for Budgeted Years TOTAL $400,000.00 Construction (100%)$400,000.00 Funding Sources Breakdown Funding Sources FY2026 Total Unfunded $400,000 $400,000 Total $400,000 $400,000 Funding Sources FY2026 Budget $400,000 Total Budget (all years) $400K Project Total $400K Funding Sources by Year Unfunded 2026 $400,000.00 $0 $100K $200K $300K $400K Funding Sources for Budgeted Years TOTAL $400,000.00 Unfunded (100%)$400,000.00 SPECIAL NEEDS MULTI-SPORT PARK Overview Request Owner Ben Foster, Management Analyst Est. Start Date 06/01/2024 Est. Completion Date 06/30/2026 Department Parks Form Type Capital Improvement Request Type Parks Description The proposed project is a capital improvement initiative that seeks to renovate Christensen park into a special needs multi-sport park. The park will be transformed into an inclusive and universally accessible environment that caters to local champion league participants as well as visitors from neighboring regions and will be based on the standards set forth by Miracle League, and international non-prot that promotes special needs baseball. The primary objective of the project is to create a space where individuals with special needs can engage in various sports activities, including baseball, soccer, and other multi-sport activities. The park will feature  articial turf elds with a baseball layout that is designed to meet the needs of individuals with different abilities. In addition to the sports eld, the park will also include an accessible playground structure that is equipped with sensory play elements, slides, swings, and other interactive features that cater to children with physical and cognitive disabilities. The playground will be designed to provide a safe and engaging space for children to play and interact with their peers, fostering socialization and inclusion. The project will involve signicant renovations to the existing park infrastructure, including the installation of new sports equipment, safety features, and accessibility enhancements. The renovated park will also include restrooms, picnic areas, and other amenities that are essential for an enjoyable park experience. The proposed special needs multi-sport park will not only provide a much-needed recreational space for the local champion league participants but also attract visitors from neighboring regions. The park will serve as a regional attraction, contributing to the economic growth of the community. Overall, this capital improvement project is aimed at creating an inclusive and accessible environment that provides individuals with special needs the opportunity to participate in sports activities and socialize with their peers. *Note: other possible parks for this location include, Summerly Community Park and Summerhill Park *Playground could be a second phase depending on the location Images special needs photo 1 Special Needs photo 2 aerial shot Christensen UA Design Concept Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 Total Admin $0 $40,000 $0 $40,000 Design $88,462 $300,000 $0 $388,462 Construction $0 $5,630,000 $2,500,000 $8,130,000 Total $88,462 $5,970,000 $2,500,000 $8,558,462 Capital Cost Total Historical $88,462 FY2026 Budget $5,970,000 Total Budget (all years) $8.47M Project Total $8.558M Capital Cost by Year Admin Construction Design 2026 2027 $5,970,000.00 $2,500,000.00 $0 $1.5M $3M $4.5M Capital Cost for Budgeted Years TOTAL $8,470,000.00 Admin (0%)$40,000.00 Construction (96%)$8,130,000.00 Design (4%)$300,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Quimby $46,000 $0 $46,000 Unfunded $5,924,000 $2,500,000 $8,424,000 Total $5,970,000 $2,500,000 $8,470,000 Funding Sources FY2026 Budget $5,970,000 Total Budget (all years) $8.47M Project Total $8.47M Funding Sources by Year Quimby Unfunded 2026 2027 $5,970,000.00 $2,500,000.00 $0 $1.5M $3M $4.5M Funding Sources for Budgeted Years TOTAL $8,470,000.00 Quimby (1%)$46,000.00 Unfunded (99%)$8,424,000.00 SPLASH PAD INSTALLATIONS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description Installation of new splash pads at Machado Park and Rosetta Park. Details Priority III - Enhance Quality of Life Capital Cost Breakdown Capital Cost FY2026 FY2027 Total Construction $1,025,000 $1,025,000 $2,050,000 Total $1,025,000 $1,025,000 $2,050,000 Capital Cost FY2026 Budget $1,025,000 Total Budget (all years) $2.05M Project Total $2.05M Capital Cost by Year Construction 2026 2027 $1,025,000.00 $1,025,000.00 $0 $250K $500K $750K $1M Capital Cost for Budgeted Years TOTAL $2,050,000.00 Construction (100%)$2,050,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Unfunded $1,025,000 $1,025,000 $2,050,000 Total $1,025,000 $1,025,000 $2,050,000 Funding Sources FY2026 Budget $1,025,000 Total Budget (all years) $2.05M Project Total $2.05M Funding Sources by Year Unfunded 2026 2027 $1,025,000.00 $1,025,000.00 $0 $250K $500K $750K $1M Funding Sources for Budgeted Years TOTAL $2,050,000.00 Unfunded (100%)$2,050,000.00 SOCCER SPORTS COMPLEX Overview Request Owner Brendan Rafferty, Assistant Director Of Administrative Services Est. Start Date 07/01/2027 Est. Completion Date 06/30/2029 Department Parks Form Type Capital Improvement Request Type Parks Description An articial turf state-of-the-art sports complex located in Lake Elsinore. The Sports Complex will be able to accommodate 25 soccer/recreational elds. Parking will be on site of up to 10 acres. Images Capital Cost Breakdown Capital Cost FY2028 FY2029 Total Design $100,000 $0 $100,000 Engineering $250,000 $0 $250,000 Land/Right-of-way $1,000,000 $0 $1,000,000 Construction $0 $5,000,000 $5,000,000 Total $1,350,000 $5,000,000 $6,350,000 Capital Cost Total Budget (all years) $6.35M Project Total $6.35M Capital Cost by Year Construction Design Engineering Land/Right-of-way 2028 2029 $1,350,000.00 $5,000,000.00 $0 $1.2M $2.4M $3.6M $4.8M Capital Cost for Budgeted Years TOTAL $6,350,000.00 Construction (79%)$5,000,000.00 Design (2%)$100,000.00 Engineering (4%)$250,000.00 Land/Right-of-way (16%)$1,000,000.00 Funding Sources Breakdown Funding Sources FY2028 FY2029 Total Unfunded $1,350,000 $5,000,000 $6,350,000 Total $1,350,000 $5,000,000 $6,350,000 Funding Sources Total Budget (all years) $6.35M Project Total $6.35M Funding Sources by Year Unfunded 2028 2029 $1,350,000.00 $5,000,000.00 $0 $1.2M $2.4M $3.6M $4.8M Funding Sources for Budgeted Years TOTAL $6,350,000.00 Unfunded (100%)$6,350,000.00 SPORTSPLEX Overview Request Owner Ben Foster, Management Analyst Est. Start Date 06/30/2024 Est. Completion Date 06/30/2027 Department Parks Form Type Capital Improvement Request Type Parks Description Four eld baseball/softball sportsplex and outdoor amphitheater with concession stand, restrooms, and parking. Potential locations are the parcel south of Lakepointe Park, parcel at Spring/Limited with a pedestrian bridge connection to Swick and Matich, or other location. Images Alternate Site (Spring/Limited) This location could accommodate 1-2 ballelds Decatur Amphitheater Potential example of size and design Decatur Amphitheater Decatur Amphitheater Rough rendering of Decatur, IL amphitheater Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 Total Admin $20,000 $30,000 $30,000 $80,000 Design $300,000 $0 $0 $300,000 Land/Right-of-way $680,000 $1,320,000 $0 $2,000,000 Construction $0 $3,650,000 $970,000 $4,620,000 Total $1,000,000 $5,000,000 $1,000,000 $7,000,000 Capital Cost FY2026 Budget $1,000,000 Total Budget (all years) $7M Project Total $7M Capital Cost by Year Admin Construction Design Land/Right-of-way 2026 2027 2028 $1,000,000.00 $5,000,000.00 $1,000,000.00 $0 $1.2M $2.4M $3.6M $4.8M Capital Cost for Budgeted Years TOTAL $7,000,000.00 Admin (1%)$80,000.00 Construction (66%)$4,620,000.00 Design (4%)$300,000.00 Land/Right-of-way (29%)$2,000,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 Total Unfunded $1,000,000 $5,000,000 $1,000,000 $7,000,000 Total $1,000,000 $5,000,000 $1,000,000 $7,000,000 Funding Sources FY2026 Budget $1,000,000 Total Budget (all years) $7M Project Total $7M Funding Sources by Year Unfunded 2026 2027 2028 $1,000,000.00 $5,000,000.00 $1,000,000.00 $0 $1.2M $2.4M $3.6M $4.8M Funding Sources for Budgeted Years TOTAL $7,000,000.00 Unfunded (100%)$7,000,000.00 SUMMERLY PARK IMPROVEMENTS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description This project will make improvements to Summerly Park including, but not limited to: fresh mulch in landscape planters, renovating landscaping, eld renovations, add shade structures for picnic areas, bleachers and dugouts: add automatic locking mechanisms to park restroom buildings; repair or replace damaged cement areas i.e. lifted sidewalks; facility and structure repairs and upgrades; enclose existing trash enclosure; parking lot slurry, striping and repairs, add backow enclosures, repair or replace damaged fencing: add facilities/ofce for staff, add home run fencing: LED lighting upgrades or additions. Images Details Priority II - Important Capital Cost Breakdown Capital Cost Historical FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction $415,010 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $7,615,010 Total $415,010 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $7,615,010 Capital Cost Total Historical $415,010 FY2026 Budget $1,200,000 Total Budget (all years) $6M Future $1.2M Project Total $7.615M Capital Cost by Year Construction 2026 2027 2028 2029 2030 $1,200,000.00 $1,200,000.00 $1,200,000.00 $1,200,000.00 $1,200,000.00 $0 $300K $600K $900K $1.2M Capital Cost for Budgeted Years TOTAL $6,000,000.00 Construction (100%)$6,000,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Unfunded $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $7,200,000 Total $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $1,200,000 $7,200,000 Funding Sources FY2026 Budget $1,200,000 Total Budget (all years) $6M Future $1.2M Project Total $7.2M Funding Sources by Year Unfunded 2026 2027 2028 2029 2030 $1,200,000.00 $1,200,000.00 $1,200,000.00 $1,200,000.00 $1,200,000.00 $0 $300K $600K $900K $1.2M Funding Sources for Budgeted Years TOTAL $6,000,000.00 Unfunded (100%)$6,000,000.00 THE RESERVE AT LAUNCH POINTE Overview Request Owner Beau Davis, Assistant Director of Community Services Est. Start Date 11/01/2024 Est. Completion Date 03/31/2026 Department Parks Form Type Capital Improvement Request Type Parks Description The proposed capital improvement project to expand The Reserve at Launch Pointe has the potential to signicantly increase revenues for Launch Pointe. The addition of up to 10 park models will allow for additional lodging options, which can increase occupancy rates and generate more revenue from overnight stays. Additionally, the new rustic venue will provide a unique space for events such as weddings, corporate retreats, and family reunions, which can generate additional revenue from event bookings. The exclusive pool and premium spaces for class A motorhomes will also attract guests seeking a more luxurious experience, allowing for higher rates and potentially longer stays. These enhancements will help Launch Pointe appeal to a wider range of guests, attracting more visitors to the resort and increasing overall revenue. With the expansion of The Reserve at Launch Pointe, Launch Pointe can continue to grow and thrive as a premier RV resort destination in Southern California. Images Reserve Vision Board Barn Idea Park Model Row Park Model Interior Pool Idea Details Priority IV - Future Need Capital Cost Breakdown Capital Cost FY2026 FY2027 Total Admin $15,000 $15,000 $30,000 Design $100,000 $0 $100,000 Construction $891,400 $1,625,000 $2,516,400 Furnishings, Fixtures and Equipment $0 $360,000 $360,000 Total $1,006,400 $2,000,000 $3,006,400 Capital Cost FY2026 Budget $1,006,400 Total Budget (all years) $3.006M Project Total $3.006M Capital Cost by Year Admin Construction Design Furnishings, Fixtures and Eq… 2026 2027 $1,006,400.00 $2,000,000.00 $0 $500K $1M $1.5M $2M Capital Cost for Budgeted Years TOTAL $3,006,400.00 Admin (1%)$30,000.00 Construction (84%)$2,516,400.00 Design (3%)$100,000.00 Furnishings, Fixtures and Equipment (12%)$3 Funding Sources Breakdown Funding Sources FY2026 FY2027 Total Unfunded $1,006,400 $2,000,000 $3,006,400 Total $1,006,400 $2,000,000 $3,006,400 Funding Sources FY2026 Budget $1,006,400 Total Budget (all years) $3.006M Project Total $3.006M Funding Sources by Year Unfunded 2026 2027 $1,006,400.00 $2,000,000.00 $0 $500K $1M $1.5M $2M Funding Sources for Budgeted Years TOTAL $3,006,400.00 Unfunded (100%)$3,006,400.00 Operational Costs Breakdown Operational Costs FY2027 FY2028 FY2029 FY2030 Future Total Utilities $8,000 $8,000 $8,000 $8,000 $8,000 $40,000 General Maintenance $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 Total $33,000 $33,000 $33,000 $33,000 $33,000 $165,000 Operational Costs Total Budget (all years) $132K Future $33K Project Total $165K Operational Costs by Year General Maintenance Utilities 2027 2028 2029 2030 $33,000.00 $33,000.00 $33,000.00 $33,000.00 $0 $8K $16K $24K $32K Operational Costs for Budgeted Years TOTAL $132,000.00 General Maintenance (76%)$100,000.00 Utilities (24%)$32,000.00 TUSCANY HILLS PARK IMPROVEMENTS Overview Request Owner Carla Khalil, Management Analyst Est. Start Date 07/01/2025 Est. Completion Date 06/30/2030 Department Parks Form Type Capital Improvement Request Type Parks Description This project includes, but not limited to, upgrading the snack bar/restroom facilities, roong repairs, automatic locking doors for the restrooms; enlarging and enclosing the trash enclosure; eld renovations and fencing repair; adding additional picnic tables, benches, BBQ grills and trash cans within Tuscany Hills Park.  Images Details Priority II - Important Capital Cost Breakdown Capital Cost FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Construction $162,000 $150,000 $150,000 $150,000 $150,000 $150,000 $912,000 Total $162,000 $150,000 $150,000 $150,000 $150,000 $150,000 $912,000 Capital Cost FY2026 Budget $162,000 Total Budget (all years) $762K Future $150K Project Total $912K Capital Cost by Year Construction 2026 2027 2028 2029 2030 $162,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $0 $40K $80K $120K $160K Capital Cost for Budgeted Years TOTAL $762,000.00 Construction (100%)$762,000.00 Funding Sources Breakdown Funding Sources FY2026 FY2027 FY2028 FY2029 FY2030 Future Total Capital Improvement Fund $162,000 $0 $0 $0 $0 $0 $162,000 Unfunded $0 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 Total $162,000 $150,000 $150,000 $150,000 $150,000 $150,000 $912,000 Funding Sources FY2026 Budget $162,000 Total Budget (all years) $762K Future $150K Project Total $912K Funding Sources by Year Capital Improvement Fund Unfunded 2026 2027 2028 2029 2030 $162,000.00 $150,000.00 $150,000.00 $150,000.00 $150,000.00 $0 $40K $80K $120K $160K Funding Sources for Budgeted Years TOTAL $762,000.00 Capital Improvement Fund (21%)$162,000.00 Unfunded (79%)$600,000.00