HomeMy WebLinkAbout265 SAN JACINTO_ 251-89 (13)GRADING AND COMPACTION CONTROL
A PORTION OF LOTS 7, B. 9 AND 10
PARCELS 1 AND 2
CITY OF LAKE ELSINORE
RIVERSIDE COUNTY, CALIFORNIA
Project No, 6S4WO9 -64
January 17, 1991
LAKE
ELSlNORE
Prepared for:
LLH Construction
Post Office Box 205
Temecula, California 92390
Attn: Mr. Larry Hansen
Prepared by:
CALIFORNIA GEO TEK, INCORPORATED
42030 Avenida Alvarado, Suite A
Rancho California, California 92390
714) 676 -2782
CALIFORNIA GEO TEK, INC. _ ___/
121130 Avvmdn /U ,nod,,. Sole A - 1I tiwrul.i. (714) (,%0'2782
I
January 17, 1991
i
Project No. 6S4WO9 -64
INTRODUCTION
The compacted fill on the subject lot has been tested for compliance with
applicable City specifications. The work was authorized by Mr. Larry Hansen and
included:
1) inspecting the clearing and stripping,
2) inspecting the bottom of the overexcavation,
3) inspecting and testing the compacted fill,
4) testing the recompaction of the overexcavation materials,
5) performing a laboratory Maximum Density test on representative materials,
6) preparing this report presenting the findings, conclusions and
recommendations.
Plate 1 - Test Location Plan (30- scale)
Appendix A - Laboratory Test Data Sheets
Appendix B - References
6S4WO9 -64
Page 2
FINDINGS
Proposed Development
A two story commercial office building is proposed for construction. Ultimate
development includes the installation of sidewalks, curb and gutter, street
improvements, and on -site parking.
Document Review
The Grading Plan was submitted to California Geo Tek by Mr. Larry Hansen on
January 4, 1991, and was used as a basis for the grading operation.
The Preliminary Soils Report was prepared by Schaefer Dixon Associates under the
authorization of Mr. Danny Lee and was used as a basis for the gradingoperation.
Grading Plan
The Grading Plan was prepared by Diversified Engineering (Temecula) and surveyedbySunSurvey (Moreno Valley). The pad is located in the northwest quadrant of
the let, and is L- shaped with dimensions rP approximately 110 feet by 175 feet. The estimated earthwork quantities are 550 cubic yards of cut and 500 cubic
yards of fill with the difference being allowed for shrinkage.
Preliminary Soils Report
Foundation Recommendation Report
The report prepared by Schaefer Dixon Associates dated April 21, 1989 indicated
that in the area of the proposed structures, within a perimeter of 5 feet
outside the building limits, the existing grade should be overexcavated two
times the footing width below the bottom of the footings. The overexcavation
backfill or compacted fill shall be compacted to a minimum of 90 percent
relative compaction and all potentially expansive material placed a minimum of
36 inches below finish grade. The report mentioned based on a visual /manual
classification the on -site soil to have a very low expansion potential. The
structural section of the on -site parking is 2.5 inches of Asphaltic Concrete
AC) over 18 inches of compacted subgrade.
Site Conditions
The project site is located on Casino Drive on the west side of San Jacinto
Avenue in the City of Lake Elsinore and consists of approximately one acre.
i
4
i Q
Ph
5cA,
I•; yo O
1
b
LEGENDFo9APPROXIMATE. LOCATION OF I_OMPACTIDN 7i
i
I "Z 1?1&
N 17' 11' 53" E 216.86'
I *3 •.
APPROXIM
OVEI
lj` IIVITIC TANK
ABANDONED)
li
EXIST PIT
R N. WiT"ZT'E.
SAN ROAD
114
N °5 /
2
Q.SEEPAIGE PIT
ABANDONED)
o$
4 •6
8
b
DRAWING PRODUCED FROM A FINISX G;LADING AND PAYING PLMI
PREPARED BY DIVERSIFIED ENGINEERING MT MECULAI JANUARY 1991 L
PROJECT N0.
TEST LOCATION PLAN
CALIFORNIA OEO TEK, INC. N E CORNER OF CASINO DR &SAN JAfINTO RD
42030 AvENIDA ALVARADU SURE A6S4W09 (n4 CI-'f OF LAKE ELMORE CALIFOR "';A TEN'ECULA, CALIFORNIA 9 390
RMW611—No
1 r
105
SNAViTl
V
all
SG =2.50 ZERO AIR
SG =260
S.G =2.70 VOIDS CURVE
on
95
NN
NO.-
RMW611—No
LOCATION NATIVE
BORING /TRENCH NO
BORING /TRENCH DEPTH
SOIL CLASS SN
ASTM D 698 METHOD
ASTM D 1557 METHOD A
MAXIMUM DENSITY 130.5 IbsM3
OPTIMUM MOISTURE_ B•5
1 r
105
V
100
SG =2.50 ZERO AIR
SG =260
S.G =2.70 VOIDS CURVE
125
95
Lt90
0 5 10 15 20 25 30 35
i
MOISTURE CONTENT (% OF DRY WEIGHT)
DATE
MAXIMUM DENSITY CURVE APPEAD;X
JANUARY 1991
PROJECT NO.
120
CALIFORNIA GEO TEK INC. 0.
TEANCAAL;FORN
n654ia9 -64 LLH CONSTRUCTION TEME(ULA A 9 }390
Z
w
cc
t
110
LOCATION NATIVE
BORING /TRENCH NO
BORING /TRENCH DEPTH
SOIL CLASS SN
ASTM D 698 METHOD
ASTM D 1557 METHOD A
MAXIMUM DENSITY 130.5 IbsM3
OPTIMUM MOISTURE_ B•5
APPENDIX B
REFERENCES
Schaefer Dixon Associates. "Geotechnical Investigation, Proposed Commercial
Building, San Jacinto and Casino Drive, Lake Elsinore, California ", dated
April 21, 1989.
Schaefer Dixon Associates. "Observation and Test Results, Excavation Backfill,
Former ARCO Northwest Corner Casino Drive and San Jacinto River Road, Lake
Elsinore, California ", dated December 18, 1990.
GEOTECHNIAL INVESTIGATION
Proposed Co-nmericiai Building
San .Jacinto and Casino Drive
Lake Elsinore, California
9R4513A
April 21, 1989
for
Devenplus Corportion
2441 Lazy 131ook
Hacienda Heights, California 91745
Prepared by
Schaefer Dixon Associates, Inc.
251 Tennessee Street
Redlands, California 92373
Te 1
1 r
105
100
SG =2.50 ZERO AIR
SG =260
S.G =2.70 VOIDS CURVE
95
Lt90
0 5 10 15 20 25 30 35
i
MOISTURE CONTENT (% OF DRY WEIGHT)
DATE
MAXIMUM DENSITY CURVE APPEAD;X
JANUARY 1991
PROJECT NO. CALIFORNIA GEO TEK INC. 0.
TEANCAAL;FORN
n654ia9 -64 LLH CONSTRUCTION TEME(ULA A 9 }390
APPENDIX B
REFERENCES
Schaefer Dixon Associates. "Geotechnical Investigation, Proposed Commercial
Building, San Jacinto and Casino Drive, Lake Elsinore, California ", dated
April 21, 1989.
Schaefer Dixon Associates. "Observation and Test Results, Excavation Backfill,
Former ARCO Northwest Corner Casino Drive and San Jacinto River Road, Lake
Elsinore, California ", dated December 18, 1990.
GEOTECHNIAL INVESTIGATION
Proposed Co-nmericiai Building
San .Jacinto and Casino Drive
Lake Elsinore, California
9R4513A
April 21, 1989
for
Devenplus Corportion
2441 Lazy 131ook
Hacienda Heights, California 91745
Prepared by
Schaefer Dixon Associates, Inc.
251 Tennessee Street
Redlands, California 92373
Te 1
6S4WO9 -64
Page 3
Earthwork Contractor
The earthwork was performed by LLH Construction (Temecula) from January 4
through January 6, 1991 with the benefit of surveyed construction stakingprovidedbyLLHConstruction. The equipment used was a Caterpillar 950 loader
and Dynapacker 6648 vibratory roller with moisture provided by a water hose.
Pre - grading
The project site, which is now abandoned, previously consisted of a gasoline
station, and a real estate office which were demolished with the debris exported
offsite. The work was directed by Schaefer Dixon Associates (Appendix 8).
Grading and Earthwork Operation
The fill materials were obtained from the parking areas. During the earthwork,
the contractor encountered a concrete septic tank in the southeast corner of the
lot, in the parking area. The contractor said this tank will remain in place
until it can be pumped out and removed. A section within the parking area wasdiscoveredtobebackfilledwithcrushedrock (Plate 1). This may have been an
underground storage tank area (Appendix 8).
No debris was used in the fill material. The soils are Silty Sand and were
placed in lifts of 6 to 8 inches in uncompacted thickness, moistened, and
compacted.
Overexcavation
The overexcavation beneath the building was done in 3 equal sections, by "flipflop" of the material. During the overexcavation, an abandoned seepage pit was
found in the northern end of the building limits. The seepage pit had been
backfilled with slurry during demolition of the gas station building.
Approximately 5 feet of the seepage pit was removed in achieving the properdepthofoverexcavation. The overall depth of the overexcavation is 4 feet, and
extended 5 feet outside the proposed building limits.
Laboratory - Testing
Maximum Density
A representative sample of the compacted material was tested to determine the
maximum density in accordance with ASTM D1557 -78 Method A. The results are as
follows:
Location/ Material
Source Classification
Native Silty Sand (SM)
71 x --
Maximum Optimum
Density, pcf Moisture, 9
130.5 8.5
6S4WO9 -64
Page 4
Erosion Control
In the event of adverse weather conditions prior to construction, measures
should be taken to minimize erosion damage. Should damage occur (i.e. gullies,
washed out slope, erosion scars, etc.) please contact this firm, or a Registered
Geotechnical Engineer, to inspect and recommend corrective measures towards
mitigating any problems. Following construction, the fill slopes should be
planted as quickly as possible with appropriate vegetation as indicated on the
Grading Plan or as recommended by a landscape architect. The irrigation system
should be adequately constructed and placed to prevent possible washouts due to
line breakage.
Compaction Testing
The tests were performed in accordance with ASTM D1556 -82 (Sand Cone Test
Method). The test locations are shown on Plate 1 and the results are summarized
below:
Test Dry Density, pcf !•igisture, Relative
No. Elevationl/ Field Max field Opt Compaction, Y
121 80.0 126.0 130.5 7.2 8.5 97
22/ 79.5 123.6 130.5 8.1 8.5 95
32/ 82.7 127.2 130.5 7.8 8.5 97
42/ 80.0 126.2 130.5 7.6 8.5 97
52/ 82.5 123.5 130.5 7.8 8.5 95
62/ 82.8 120.4 130.5 8.4 8.5 92
7 84.0 127.7 130.5 8.8 8.5 96
8 84.0 122.2 130.5 9.5 8.5 94
9 83.8 128.6 130.5 9.2 8.5 96
I/ Elevation, in feet, of test is in reference to the finish grade as shown on
the Grading Plan
21 Overexcavation backfill test
Test Location Plan
The basis of the test location plan (Plate 1) is the Grading Plan prepared by
Diversified Engineering. The test elevations shown assume the finish grade
elevation is 84.5 feet as shown on the Grading Plan and are in reference to that
elevation.
6S4WO9 -64
Page 5
CONCLUSIONS AND RECOMMENDATIONS
Conclusions
1. The site was properly stripped prior to the overexcavation of the
materials.
2. The vegetation was removed from the overexcavated area and was not used in
the fill or backfill of overexcavated materials.
3. The fill and backfill of the overexcavated materials have been compacted to
a minimum relative compaction of 90 percent based on ASTM D1557 -78
unweighted average = 95.2 percent).
4. The pad was overexcavated to 5 feet outside the building limits identified
by construction staking to a maximum depth of approximately 4 feet below
pad grade in vertical dimension.
5. The bottom of the overexcavation was properly premoistened and precompacted
to a depth of 6 inches prior to replacement of the overexcavated materials.
6. A total of 9 quality assurance tests were performed by the Sand Cone Method
ASTM D1556 -82).
7. The parking and drive areas were left below finish grade to accommodate
material generated from trench and footing excavations.
8. A concrete tank was found on the southeast corner of the parking area. The
tank was not removed and was not within the building structure limits.
9. A seepage pit was found during overexcavation of building pad. (See
grading plan for location). The pit had been backfilled with slurry duringdemolitionofthebuildingasstatedbyMr. Dave Davis. Approximately 5feetofthepitwasremovedtoachievetherequireddepthof
overexcavation.
Schaefer DixonAssociates
I
J.N.9R4513A
April 21, 1989
Devenplus Corporation
2441 Lary Brook
Hacienda Heights, Catifornia 91745
Attention: Mr. Danny Lee
I Subject: Geotechnical Investigation
Proposed Commericial Building
San Jacinto and Casino Drive
Lake Elsinore, California
Gentlemen:
We are pleased to submit this report in accordance with the contract dated November 17,
1988. The objective of the invesugadon was to evaluate the site subsurface conditions with
respect to the proposed development.
I Presently existing sewage disposal systems should be found and removed. Su e x a v i n v il.
be required in the proposed building area and at the removed -qk location.
Thank you for the opportunity to be of service. Should you have any questions, please contact
this office.
Respectfully submitted,
SCHAEFER DIXON ASSO__ TES, INC.
Chris K. yes, RE
hlJ. L
Proj cf Engine
Dean M. White, P.E. '
Associate /Branch Manager
DMW /CKH:dcn
Addressee (3)
Schaefer Dixon
Associates I
9R45 13A
Devenplus Corporation
April 21, 1989
1.0 INTRODUCTION
This report presents the results of the investigationwhich was performed in general accordance
with our proposal dated November 17, 1988. The scope of services provided in order to
develop the recommendations contained in this report included:
1. Seven exploratory borings located across the site.
2. Laboratory analysis of soil samples obtained from the exploratory borings.
r 3. Geotechnical engineering analysis of the data obtained from the field exploration,
laboratory analysis and information provided by you.
4. Preparation of this report including reco. emendations for foundation design, general
site grading and tentative pavement design.
2.0 PROJECI' DESCRIPTION
The project site is located it the northern quadrant of San Jacinto Road and Casino Drive in
Like Elsinore, California, and consists of approximately ore acre. The project site is now
abandoned but previously was used as a gasoline station and a real estate office building.
The pro wsed new development includes an L- shaped two -story masonry building located in
the northern corner of the property. The exact locations and dimensions were not available
at the time of our investigation. We have estimated that maximum wall loads will be 3,000
pounds per linear foot, and maximum column loads will be 30 kilopounds.
i
I - remainder of the property will be developed with paved parking areas and landscaiping.
If the proposed development differs from that described above, the recommendations of this
report should be reevaluated.
3.0 SUBSURFACE INVESTIGATION
3.1 Site Condition
P •I'he site was previously developed as a gas station and real estate office building which is Pow
abandoned. The office building has been demolished. At the time of our investigation there
was an existing one -story building, concrete pump islands covered with a canape and the
remainder of the property was paved with asphaltic concrete. South of the existing building
p
il,,;re was an area nominally 30 feet by 30 feet where gasoline storage tanks previously existed.
6
Schaefer Dixon
Associates
9R4513A
Devenplus Corporation
April 21, 1989
The site is relatively flat with a minimal slope to the south for drainage. The surrounding
area was commercial development.
3.2 Exploratory Borings
Seven exploratory borings were performed across the site utilizing a truck - mounted rotary
flight auger drill rig. The borings ranged in depth from 5 to 20 feet below the existing ground
surface. Logs of the: materials encountered were developed by our field engineer as the borings
were advanced.
Drive sampples were obtained from the borings with a 2.5 -inch internal diameter ring sampler
and Standard Penetration Test (SPT) sampler. The samplers were advanced using a
140 -pound safety -type hammer free - falling 30 inches. The number of blows required to drive
the sampler the last 12 inches of an 18 -inch drive are shown on the boring logs included as
Exhibits 2 through 8. In addition, representative bulk samples were obtained of each rep-
resentative soil type encountered. The samples were delivered o our laboratory for testing
and analysis.
3.3 Laboratoi Testing
The following tests were performed for this projec: in our laboratory in accordance with the
American Society for Testing aad Materials, the State of California Standard Specifications
or contempo-ary practices of the soil engineering profession.
In -Situ Moisture and Density: This test consists of weighing and measuring the drive samples
obtained from the borings to evaluate their in -place moisture and density. These results are
used to analyze the consistency of the subsoils.
Maximum Density - Optimum Moisture Evaluation: This test is used to evaluate the density
that a soil can be compacted at various moisture contents. For each soil mixture, there is a
maximum dry density obtained and the associated optimum moisture content. The results
are used to evaluate the natural compaction, !lie control of the grading process and as an aid
in developing the soil bearing capacity. This test is based on the ASTM Standard D1557.
Sieve Analysis: This test determines the size of the soil grains which constitute a soil and is
used in generating an engineering classification of the soil.
R" Va'ue Determination: The "R" value test is used to evaluate treated and untreated material
for base, subbase and subgrade for pavement thickness design.
Dire et Shear: This test is used to assess the soil shear strength values wNci, among the
basic soil properties used to evaluate the soil bearing capacity, slope stability and lateral earth
pressures on structures.
2
6S4W09 -64
Page 6
Recommendations
1. Utility trench backfill and base and subgrade shall be tested and approved
at a later date.
2. The concrete septic tank shall be removed prior to subgrade preparation.
The excavation shall be properly backfilled with suitable materials
compacted to a minimum relative compaction of 90 percent.
SAW /dg
Distribution: Addressee (4)
Respectfully submitted,
Scott A. Wynia
Project Manager
L' /",
Bruce R. Lee, P. E.
GE 509
No. 00,909
lip. 17.3193
OF !-Al
i
I 1 1. -. _1 "