Loading...
HomeMy WebLinkAbout2871Endresen Development Inc 15301 Alvarado Street Lake Elsinore, CA 92530 +19517575695 end resendevelopment@gmail.com BILL TO City of Lake Elsinore 130 S. Main Street Lake Elsinore, CA 92530 PROJECT LP Police sub station Plumbing Reimbursement- 3,012.75 - Backed up main line due to soft clog in sewer line. Pulled toilet in restroom ran snake roughly 90ft to clear stoppage sewer main did not clear sewer main pulled back some plastic wrapping's and baby wipes. - Upon arrival technician cut into dry wall on backside of restroom sink cut into 2" abs pipe to run snake roughly 40' to clear soft stoppage snake did not clear drain. Ran hydra jetted 60' to clear sewer main of soft clog and debris in sewer line. Ran camera discovered belly in sewer main at 40' belly in line is roughly 8' long. Installed new 2" clean out at backside of restroom sink located in break room next to fridge. Sewer line is clear of soft clog and debris. Recommend replacing belly in main sewer line to avoid future back up in sewer main. Dry wall is not included in work performed. Technician covered cut out section of dry wall with plastic. Patch and paint drywall. 500.00