HomeMy WebLinkAbout2871Endresen Development Inc
15301 Alvarado Street
Lake Elsinore, CA 92530
+19517575695
end resendevelopment@gmail.com
BILL TO
City of Lake Elsinore
130 S. Main Street
Lake Elsinore, CA 92530
PROJECT
LP Police sub station
Plumbing Reimbursement- 3,012.75
- Backed up main line due to soft clog in sewer line. Pulled toilet in restroom ran snake roughly 90ft
to clear stoppage sewer main did not clear sewer main pulled back some plastic wrapping's and
baby wipes.
- Upon arrival technician cut into dry wall on backside of restroom sink cut into 2" abs pipe to run
snake roughly 40' to clear soft stoppage snake did not clear drain. Ran hydra jetted 60' to clear
sewer main of soft clog and debris in sewer line. Ran camera discovered belly in sewer main at 40'
belly in line is roughly 8' long. Installed new 2" clean out at backside of restroom sink located in
break room next to fridge. Sewer line is clear of soft clog and debris. Recommend replacing belly
in main sewer line to avoid future back up in sewer main. Dry wall is not included in work
performed. Technician covered cut out section of dry wall with plastic.
Patch and paint drywall. 500.00