Loading...
HomeMy WebLinkAboutCorydon Parcels 5 & 6 Grading Permit-issued LA ) 110KELSIPERMIT NUMBER: ENG-2022-00128 K PERMIT STATUS: ISSUED j�`%=? DREAM EXTREME Effective Date: 10/27/22 Expiration Date:4/25/23 130 S MAIN LAKE ELSINORE,CA 92530 TEL:(951)674-3124 WWW.LAKE-ELSINORE.ORG PERMITTEE: ON-POINT COMMERCIAL, LLC CONTACT: STEVE VETTEL ADDRESS: 1451 BALDY VIEW CIRCLE PHONE: (714)-240-0410 CORONA, CA 92882 EMAIL: svettel@on-pointllc.com WORK DESCRIPTION: Precise Grading Plan TR37977 Parcels 5 and 6 PROJECT PERMIT SPECIFIC CONDITIONS-RESTRICTIONS: THIS IS YOUR RECEIPT WHEN MACHINE VALIDATED LOCATION: 33575 CORYDON ROAD LAKE ELSINORE, CA 92530 OTHER ID: PERMIT FEES: FEES CHARGE[ FEES: FEES PAID: FEES: GRADING PLAN CHECK $4,536.35 GRADING PLAN CHECK $4,536.35 ADMINISTRATIVE CHARGE (5200) $200.00 ADMINISTRATIVE CHARGE ($ $200.00 ADMINISTRATIVE CHARGE (5200) $200.00 ADMINISTRATIVE CHARGE ($ $200.00 IMPROVEMENT INSPECTION FEE $20,374.95 IMPROVEMENT INSPECTION $20,374.95 REFUNDABLE SECURITY DEPOSIT $1,813.20 REFUNDABLE SECURITY DEPC $1,813.20 GRADING PERMIT(TOTAL CUBIC YAF $871.65 GRADING PERMIT(TOTAL CU $871.65 REPRODUCTIONS-COPYING $4.25 REPRODUCTIONS-COPYING $4.25 PUBLIC WORKS IMPROVEMENT PLAI $13,128.32 PUBLIC WORKS IMPROVEMEI $13,128.32 TOTAL FEES: $0.00 ISSUED BY: (_' ISSUED DATE: 10/27/2022 Owner / Applicant / Contractor / Agent NOTES & CONDITIONS Call either of the Engineering Inspectors: Scott Rippstein at 951-538-9116,or Mike Payment at 951-805-9835 WITHIN 24 HOURS of RECEIVING THIS PERMIT to schedule a preconstruction meeting. A copy of this PERMIT, approved plans and SWPPP &applicable REAP must remain onsite at all times or a STOP WORK NOTICE will be issued. Thursday,October27,2022 City of Lake Elsinore,Engineering Division Please read and initial: X1. I am Licensed under the provisions of Business and Professional Post in conspicuous place on the job Code Section 7000 et seq. and my license is in full force. Permit Card/Approved Plans must be available for each inspection or inspection will not be made 2. I, as owner of the property, or my employees w/wages as their You must furnish PERMIT NUMBER and the JOB ADDRESS for sole compensation will do the work and the structure is not intended or offered for sale. each respective inspection: CONTACT Engineering Inspector listed on front to schedule inspection X3. 1,as owner of the property, am exclusively contracting with licensed contractors to construct the project. _4. 1 have a certificate of consent to self-insure or a Certificate of Worker's Compensation Insurance or a certified copy thereof. DEPARTMENT USE ONLY 5. 1 shall not employ any person in any manner so as to become subject to Worker's Compensation laws in the performance of the work for Inspection Item Inspector Date which this permit is issued. Soil Stripping/Clearing Dry Weather Earthwork Note: If you should become subject to Worker's Compensation after making this certification,you must forthwith comply with such provisions or Wet Weather Earthwork this permit shall be deemed revoked. Fill/Landscape Stockpiles Cut Sloped 2H:1 V or Flatter Rough Footing Excavation Inspection Item Inspector Date -Conventional, TYP Retaining Wall—separate permit required - Piers& Caisson Driveway /Private Road Trenching Sub-Grade Preparation Trench Plates Approach Grades/Width Other: Vertical Clearance Fills Turning Radius/Turnouts Setbacks Structural Section Preparation of Ground _ Portland Concrete(Rigid) Approved Fill Material Asphalt Concrete (Flexible) Fill Slopes 2H:1V or Flatter Crushed rock or Gravel Toe Bench/Keys Other Unpaved Compaction of Ground Road Drainage Other Code Violations Drainage/Terracing Non-Stormwater Discharge—note on separate form Positive Drainage from Bldg Illegal Storm Drain Connection—note on separate form Culverts/Catch Basins Hazardous Conditions Drainage for Cut/Fill Slopes Grading w/o Permit -Terraces/Swales Intermediate Reports - Subsurface Drainage Compaction Test Summary - Interceptor Drains Elevation Certificate (SFHA)for Pad Erosion Control BMP's Progress Grading Report SWPPP ONSITE Final Grading & Reports Short Term: Soils Grading Report Silt Fence/Plastic Covering As-Graded Plan (redline) Straw bale/Gravel bag Barrier Geologic Grading Report Sediment Basin/Traps Elevation Certificate (SFHA)w/photo Check Dam/Gravel Bag Berm Notice of Completion—recorded Fiber Rolls/Jute Netting Notice of Termination Rock/gravel Constr. Entrance Wind/Dust Control Long Term Hydro-mulching RELEASE Straw/Wood Mulch Division Date Staff Geotextiles& Mats FIELD INSPECTION Energy Dissipation Devices IN HOUSE TECHNICIAN i Stream Bank Stabililzation DISTRIBUTION: APPLICANT,FILE, INSPECTOR,NPDES COORDINATOR https:Hlakeelsinore.sharepoint.com/eng/Shared Documents/Engr/Forms/Engineering Forms/Grading permit form Energov 20171205.doc