HomeMy WebLinkAboutVILLAGE PRKWY 29381 (3)C l dry 0
LADE LSINO E BUILDING & SAFETY
DREAM EXTREME 7M
130 South Main Street
PERMIT
PERMIT NO : 08-00000404 DATE : 3/31/08
JOB ADDRESS . . . . . 29381 VILLAGE PARKWAY
DESCRIPTION OF WORK BLOCK WALL
OWNER------------------------- CONTRACTOR—^
LIBERTY FOUNDERS OWNER
A. P . # . . . 365-030-041 6 SQUARE FOOTAGE 0
OCCUPANCY . . . GARAGE SQ FT 0
CONSTRUCTION . . FIRE SPRNKLR
VALUATION . . . 6 , 930 ZONE . . . . . . NA
BUILDING PERMIT
QTY UNIT CHG ITEM CHARGE
5 . 00 X 12 . 5000 VALUATION 62 . 50
FEE SUMMARY CHARGES PAID DUE
PERMIT FEES
BUILDING PERMIT 62 - 50 00 62 . 50
OTHER FEES
BUILDING DEVELOPERFEEF 5 . 00 00 5 . 00
PLANNING REVIEW FEE 25 . 10 00 25 . 10
PLAN RETENTION FEE 50 00 50
SEISMIC GROUP R 50 00 50
PLAN CHECK FEES 46 . 88 00 46 . 88
TOTAL 140 . 48 00 140 . 48
SPECIAL NOTE_S_& CONDITIONS
3151f of up to 91high Screen wall for
maintenance facility.
I}aii -3f3 fthipt.ncr.. ME
C)OB q(Yl
W. '.a1I IM, PE}3{TT "I
Trail r:
JOt Qom_'. _ _.1 s
Tram date: 3/31/OB Tirp; 14:14:34
City of Lake Elsinore Please read and initial
Building Safety Division 1.1 am Licensed under the provisions of Business and professional Code Section 7000 et seq.and
my license is in full force.
Post in conspicuous place 2.[,as owner of the property,or my employees w/wages as their sole compensation will do the work
on the job and the structure is not intended or offered for sale.
3.l,as owner of the property,am exclusively contracting with licensed contractors to construct the
You must furnish PERMIT NUMBER and the project.
JOB ADDRESS for each respective inspection: 4.I have a certificate of consent to selfinsure or a certificate of Workers Compensation Insurance
Approved plans must be on job or a certified copy thereof.
at all times: 5.1 shall not employ any person in any manner so as to become subject to Workers Compensation
Laws in the performance of the work for which this permit is issued.
Note:If you should become subject to Workers Compensation after making this certification,
Code Approvals Date Inspector you must forthwith comply with such provisions or this permit shall be deemed revoked.
ELO I Temporary Electric Service
PLO1 Soil Pipe Underground
ELO2 Electric Conduit Underground
BPOI Footings 3E
BP02 Steel Reinforcement
BP03 Grout
BP04 Slab Grade 8 6
PLO Underground Water Pipe y t, ok
SSO1 Rough Septic System
SWO1 On Site Sewer
BI1'05 Floor Joists
BP06 Floor Sheathing
BP07 Roof Framing
BPO8 Roof Sheathing
BP09 Shear Wall&Pre-Lath
PLO3 Rough Plumbing
EL03 lRough Electric Conduit
EL.04 I Rough Electric Wiring
EL05 Rough Electric T-Bar
ME01 Rough Mechanical
ME02 Ducts,Ventilating
PL.04 Rough Gas Pipe/Test
PLO2 lRoof Drains
BPI O Framing&Flashing
BP 12 Insulation
BP13 Drywall Nailing
BPI I Lathing&Siding
PL99 Final Plumbing
EL99 Final Electrical
ME99 Final Mechanical
BP99 Final Building 1
Code Pool&Spa Approvals Date Inspector OTHER DIVISION RELEASES
Deputy Inspector Department Approval required prior to the
P001 Pool Steel Rein./Forms building being released by the City
POO I Pool Plumbing/Pressure Test
P003 Pre-Gunite Approval Date Inspector
EL06 Rough Pool Electric Planning
Sub List Approval Landsca e
P004 Pool Fencing/Gates/Alarms Finance
P005 Pre-Plaster Approval Engineering
P009 Final Pool/Spa
C.kTY 6F
LAKE ES I N.0P-,,,E
DREAM. E TREM.E TM 130 South Main Street
APPLICATION FOR APPLI 7 ON NO
y
BUILDING PERMIT APPLICATION RECEIVED
DATE 4- (0 8
VALUATION CALCULATIONS 3co S- o.A 1 ('p
BUILDING A DRESS
list FLOOR SF 2'-'>38
TRACT BLO PAGE TFPARCEL2ndFLOORSF
NAM
3rdFLOOR SF 0
W MAILING'— p pGARAGESFNADDRESS318
E C TY
STORAGESF R E— r=1. 125 3-Z,
hereby affirm that am jicensed under provisions of @iapter 9 Commenc ngDECK&BALCONIES SF with section 7000)of division 3 of the business and professions code,and
C my license is in full force and effect.OTHER: SF O LICENSE# CITY BUSINESS
N AND CLASS TAX#-
vD N
VALUATION: E' / R
A . MAILING
C ADDRESS
FEES T CITY STATE/ZIP PHONE
O
BUILDING PERMIT R COT TOR SI NA pq715
PLAN CHECK NAM= LICENSE
A
PLAN REVIEW R MAILI G
C ADDRESS
SEISMIC H U I T STATE/Zip PHONE
PLAN RETENTION NEW OCC GRP./ CONST.
0 ADDITION DIVISION: TYPE:
ALTERATION NUMBER OF NUMBER OF
OTHER STORIES: BEDROOMS:
SINGLE FAMILY ZONE:
0 APARTMENTS
1 certify that I have read this application and state that the CONDOMINIUM HAZARD YES
above information is correct.I agree to comply with all city TOWN HOMES AREA?. NO
and county ordinances and state laws relating to building 0 COMMERCIAL SPRINKLERS YES
construction,and hereby authorize representatives of this INDUSTRIAL REQUIRED? NO
DEMOLISH PRESENT USE OF BLDG:='
JOS DESCRIPTION.
S' ttlre of Applicant or Agent Date
Agent for. contractor owner c
Agents Name b , zE.•
Agents Address
Street Clty State Zip
1
1
SUMMERLY MAINTENANCE FACILITY
TRACT 31920-1
WALL CALCULATIONS
1
March 26, 2008
1
PREPARED FOR:
RpFESS1pN
John Laing Homes 4
Lake Elsinore LLC
31900 Mission Trail, Suite 225
Lake Elsinore, CA 92530
M No. C49SS4
EXP.
Civic
OF
PREPARED BY:
M WILSON •MIKAMI•CORPORATION
W 3 P1;TERS CANYON'Su1TE 1 1 D'1RV1NE'CA'926C16
1
Table of Contents
1
RETAINING WALL CALCULATIONS
APPENDIX A — GEOTECHNICAL REPORT
1
1
1
1
1
I
I
Wilson Mikami Corporation, Title Summerly Maint.Fac 8'8" Wall Page:
3 Peters Canyon Road Job# 10001.14 Dsgnr: SMW Date: AUG 9,2007
Suite 110 Description....
Irvine,CA 92606
949)67"090
This Wall in File:S:110001.141doc1WallCalcs\WALLBB.RP5
Retain Pron#: P-1135075
ici19a9 zoaa
Cantilevered RetainingWall Design Code: 1997 UBCRegistration#:RP-1135075 g
Criteria Soil Data Footing Dimensions & Strengths
Retained Height 0.50 It Allow Soil Bearing 1,000.0 psf Toe Width 0.54 ft
Wall height above soil - 8.17 It
Equivalent Fluid Pressure Method Heel Width 1.21
Heel Active Pressure - 100.0 psf/ft Total Footing Width =1.75
Slope Behind Wall = 0.00: 1 Toe Active Pressure = 75.0 psf/ft Footing Thickness 48.00 in
Height of Soil over Toe = 6.00 in Passive Pressure 250.0 psf/ft
Water height over heel = 0.0 It Soil Density 110.00 pcf Key Width 0.00 in
Key Depth 0.00 in
FootingIlSoil Friction - 0.300
Key Distance from Toe =0.00 ft
tWind on Stem 18.0 psf Soil height to ignore
for passive pressure 0.00 in- f'c - 2,000 psi FY 60,000 psi
Footing Concrete Density 150.00 pcf
Min.As% 0.0018
Cover® Top = 2.00 in @ Btm.= 3.00 in
Surcharge Loads Lateral Load Applied to Stem Adjacent Footing Load
Surcharge Over Heel = 0.0 psf Lateral Load 0.0#/ft Adjacent Footing Load =0.0 lbs
Used To Resist Sliding&Overturning Height to Top 0.00 ft Footing Width 0.00 ft
Surcharge Over Toe 0.0 psi Height to Bottom 0.00 ft Eccentricity 0.00 in
Used for Sliding&Overturning Wall to Ftg CL Dist 0.00 It
Axial Load Applied to Stem Footing Type Line Load
Base Above/Below Soil
Axial Dead Load 0.0 Ibs at Back of Wall 0.0 It
Axial Live Load 0.0 Ibs
Axial Load Eccentricity = 0.0 in
Design Summary 1Siim76onstruction I Top Stem 2nd
t Wall StabilityRatios
Stem OK Stem OK
5 a6 a'T1'4-1E Design height It 8.67 0.00
verturnin Wall Material Above"Ht" = Masonry Masonry
Sliding 7.68 OK Thickness 8.00 8.00
Total Bearing Load 1,810 Ibs Rebar Size 4 # 4
resultant ecc. 10.0.775 ism Rebar Spacing 16.00 16.00
Soil Pressure @ Toe = 14ebar Placed at Center Center
Soil Pressure @ Heel Design Data
Allowable 1,000 psf
fb/FB+fa/Fa 0.000 0.811
Soil Pressure Less Than Allowable Total Force @ Section Ibs=0.0 150.2
ACI Factored @ Toe = 0 psf Moment....Actual ft-#=0.0 674.8
ACI Factored @ Heel - 0 psf Moment.....Allowable ft-#= 521.2 832.1
Footing Shear @ Toe = 0.8 psi OK Shear.....Actual psi=0.0 3.7
Footing Shear @ heel 0.9 psi OK Shear.....Allowable psi= 19.4 38.7
Allowable 76.0 psi Lap Splice if Above in= 24.00 20.00
Sliding Calcs (Vertical Component Used)Lap Splice if Below in= 24.00 6.26
Lateral Sliding Force 400.2 Ibs Wall Weight psf= 78.0 78.0
less 100%Passive Force= - 2.531.3 Ibs Rebar Depth 'd' in= 3.75 3.75
less 100%Friction Force - 543.0 Masonry Data
Added Force'
for 1.5: 1 Stability 0.0 Ibs OK
Req'd = 0.0 Ibs OK
f'm psi= 1,500 1,500_
Fs psi= 24,000 20,000
Solid Grouting Yes Yes
Special Inspection No Yes
Modular Ratio'n' 25,78 25.78
Short Term Factor 1.000 1.000
Equiv. Solid Thick.in= 7.60 7.60
Masonry Block Type= Medium Weight
Concrete Data
f'c psi=
Fy psi=
Footing Design Results
Toe Heel
Factored Pressure = 0 0 psf
Mu':Upward 0 0 ft-#
Mu':Downward 197 218 ft-#
Mu: Design 197 218 ft-9
Actual 1-Way Shear = 0.82 0.85 psi
Allow 1-Way Shear = 76.03 76.03 psi Other Acceptable Sizes& Spacings
Toe Reinforcing = None Spec'd Toe: Not req'd,Mu<S'Fr
Heel Reinforcing = None Spec'd Heel:Not req'd,Mu<S`Fr
Key Reinforcing = None Spec'd Key: No key defined
1
Wilson Mikami Corporations Title ; Summerly Maint.Fac B'B" Wall Page:
3 Peters Canyon Road Job# : 10001.14 Dsgnr: SMW Date: AUG 9,2007
Suite 110 Description....
Irvine,CA 92606
949)679-0090
This Wall In File: S:110001.14\doc\WallCalcs\WALL88.RP5
Retain Pro 6.1e,8-July-2004,(c)1989-2004
Registration#:RP-1135075 Cantilevered Retaining Wall Design Code: 1997 UBC
1 Summary of Overturnin & Resisting Forces & Moments
OVERTURNING.....RESISTING.....
Force Distance Moment Force Distance Moment
Item Ibs ft It-#Ibs ft ft-#
Heel Active Pressure 1,012.5 1.50 1,518.8 Soil Over Heel 29.8 1.48 44.1
Toe Active Pressure 759.4 1.50 1,139.1 Sloped Soil Over Heel
Surcharge Over Toe = Surcharge Over Heel
Adjacent Footing Load = Adjacent Footing Load =
Added Lateral Load Axial Dead Load on Stem=. 0.00
Load @ Stem Above Soil= 147.1 8.59 1,262.5 Soil Over Toe
29.8 0.27 8.1
Surcharge Over Toe
Stem Weight(s) 676.3 0.88 591.7
Earth @ Stem Transitions`
Total 400.2 O.T.M. = 1,642.2 Footing Weighs
1,050.0 0.88 918.8
Resisting/Overturning Ratio 0.98 Key Weight
Vertical Loads used for Soil Pressure= 1,810.0 lbs
Vert.Component 24.1 1.75 42.2
Vertical component of active pressure used for soil pressure
Total= 1,810.0 Ibs R.M.= 1,604.8
1
1
1
1
1
1
t
Project Report
Date: p Sheet / of /
Project: Job No.: 1p4v1,
RE. By: a
Contact: Phone:
1
i
A) /4
j _ ,
4. .
400
lS D rl i off, •--t7 7-7 -9 s-
laso
7Z 7-)e/
W/L50N • M/KAM/ • =RPORAT/ON
C12N51JLT/NG ENG/NE£R/NG SERV/G'£5
3 PETERS CANYON, SUITE 110• IRVINE, CA 92606
949) 679-0090 FAX (949) 679-0091
gyp M PiA A--r .e C
1
P -- Ce C% is
1
t1 FkE 1 TL, = L
C. - 1, 06 (Z ABLE 16-G)
Cl% = 1 .3 CrA(3t.E t6- H)
psf
Q 1a.6 PSF
t 17.4 PSF
1
1
1
1
t
1
APPENDIX A
GEOTECHNICAL REPORT
1
1
1
1
1
1
t
Do
1
Neblett&Associates
Laing—CP, Lake Elsinore, LLC. July 24, 2007
31881 Corydon, Suite 130 Project No. 420-003-08
Lake Elsinore, California 92530
Attention: Mr. Michael A. Filler, Vice President
Subject: Geotechnical Review of Precise Grading Plan
Maintenance Facility
Summerly—Phase I
Tract 31920-1
City of Lake Elsionore, California
Reference: Wilson Mikami Corporation, Precise Grading Plan for Tract 31920-1, Summerly -
1 Phase 1, Maintenance Facility, City of Lake Elsinore, Sheets 1 through 5, stamp
dated July 18, 2007
Dear Mr. Filler:
Introduction
In accordance with your request, Neblett & Associates, Inc. (NA) reviewed the referenced'
Precise Grading Plan for the Maintenance Facility, located within Phase 1 of the Summerly
Development, in the City of Lake Elsinore, California, and our comments are summarized
below. Our review is limited to the geotechnical engineering aspects of the project only. The
civil and structural engineering design and details, including lines and grades are within the
purview of others.
The Precise Grading Plan (copy attached), prepared by Wilson Mikami Corporation, includes the
following:
Plan Sheet No. Contents
1 Title Sheet and Index
2 Detail Sheet/Quantities
3 Precise Grading
4 Utility Sheet
5 Horizontal Control Plan—Erosion Control Plan
P.O. Box 1159 •Huntington Beach, CA 92647
4911 Warner Avenue, Suite 218• Huntington Beach • CA • 92649• tel (714) 840-8286•fax (714) 840-9796
Laing—CR Lake Elsinore,LLC. July 24, 2007
Geotechnical Review of Precise Grading Plan Project No.420-003-08
Maintenance Facility Page 2 of 6
Summerly—Phasse I
Tract No. 31120-1
City of Lake Elsinore,California
Proiect_Description
The planned Maintenance Facility will he located at the southwest corner of Diamond Drive and
Malaga Road, and include a modular office trailer, concrete slabs for cart storage area and
enclosed by masonry block walls, fuel area, and asphalt concrete pavement. Limited grading was
previously performed in this area as part of the golf course grading, and was limited to grade
cuts.
Review Comments
Plan Sheet 1, GradinQ Notes, Item 8
This note should be corrected to the following: "Fills should be compacted throughout to at least
90 percent relative compaction as determined by the modified five (5) layer ASTM: D1557-91
test method."
Plan Sheet 1, Grading Notes, Item 1S
Reference should be made to this letter.
Plan Sheet 1, Soils Engineering Certificate
Neblett & Associates, Inc. should be identified in lieu of Leighton and Associates.
Plan Sheet 2, Detail A
The subgrade soils underlying the aggregate base course section should he compacted to at least
90 percent relative compaction.
Plan Sheet 3, Construction Note I
This note specifies 4" AC over 6" AB per Geotechnical Engineer's recommendations. This
aggregate base should consist of crushed aggregate base (CAB) or crushed miscellaneous base
CMB) satisfying the specifications outlined in the "Standard Specifications for Public Works
Construction", ("Green Book"). The base material should be compacted to minimum 95 percent
of the maximum laboratory density, determined in accordance with ASTM: D1557. The
underlying soil subgrade should be compacted to at least 90 percent relative compaction (ASTM:
Nehlert&Associates, Inc.
1
Lain;--CP, Lake Elsinore, 1.1_C. July 24, 2007
Geotechnical Review of Precise Gradine Plan Projcct No.420-003-08
Maintenance Facility Page 3 of 6
Summerty—Phasse 1
Tract No. 31920-l
City of Lake Elsinore,California
D1557) in accordance with the recommendations provided hereinafter. Upon request, NA can
provide pavement sections based on traffic index provided by the Client and results of laboratory
R"-value test.
Plan Sheet 3, Precise Grading, Construction Note 21
This note specifies gravel surface. As a minimum, the underlying and surrounding soil subgrade
should be graded to promote drainage away from the gravel surface areas.
Sheet 4 Precise Grading Plan for Maintenance Area, Construction_Note 13
A 5" concrete slab is recommended for the planned cart storage area. The underlying subgrade
material should be compacted to at least 90 percent relative compaction in accordance with the
recommendations provided hereinafter.
The structural details, such as slab thickness, concrete strength, reinforcing criteria,joint spacing,
etc. should be established by the Project Structural Engineer.
Recommendations
Remedial Grading
The exposed soil surface at the subject site is anticipated to be weathered and disturbed. Prior to
the placement of new fills, if required, and construction, the exposed subgrade should be
scarified approximately one foot depth, moisture conditioned to about I to 3 percentage points
wet of optimum moistr.tre conditions, and compacted to at least 90 percent relative compaction
ASTM: D1557). Should unsuitable, disturbed soils extend to greater depths, it is recommended
that such soils be removed full depth and replaced as engineered compacted fill compacted to at
least 90 percent relative compaction (ASTM: D 1557).
The upper one foot of subgrade soils underlying planned concrete slab and pavement
construction should be over-excavated, as necessary, and recompacted to at least at 90 percent
relative compaction at 1 to 2 percentage points wet of optimum moisture content.
Subgrade soils underlying proposed masonry screen wall footings should be over-excavated to
provide at least 2 feet of compacted fill beneath footings and replaced with engineered
Neblett & Associates, Inc.
Laing—CP„Lake Elsinore, LLC. July 24,2007
Geotechnical Review of Precise Grading Plan Project No.420-003-08
Maintenance Facility Paae 4 of 6
Sti nmerly—Phasse I
Tract No. 31920-1
City of Lake Elsinore,California
1 compacted fill. Lateral extent of over-excavation should be to a distance of at least five (5) feet
beyond footing edges.
Fill Placement
Approved fill materials should be placed in thin lifts not exceeding 8-inches in loose thickness,
moisture conditioned to approximately 1-3 percentage points above optimum moisture content
and compacted to minimum 90 percent relative compaction based on the laboratory maximum
dry density (ASTM: D 1557).
Observation and Testing
All grading, compaction, and backfill operations should be performed under the observation and
testing by a representative of the Geotechnical Engineer. if it is determined during grading that
site soils require remedial grading to greater depths for obtaining proper support for the proposed
construction, this additional work should be performed in accordance with the recommendations
of the Project Geotechnical Engineer.
Footing Design
tFootings supporting masonry screen walls may be designed using the following criteria:
Allowable soil bearing pressure (l) 1,000 psf
Minimum footing embedment (2)1.5 feet
Minimum footing reinforcement (3) Two No. 4 bars, one at top and one at
bottom
Passive earth pressure(4) 200 psf
Coefficient of friction 0.35 (ultimate)
1) Allowable soil bearing pressure applies to footings minimum 12 inches
wide, may be increased by one-third to resist transient loads such as wind or
seismic forces. All foundation excavations should be inspected and
approved by the Project Geotechnical Engineer prior to the placement of
reinforcement or concrete. Forming of footing excavations may be required.
Excavations should be free of slough and debris and thoroughly moisture
conditioned prior to placing concrete.
2) Footing embedment is below lowest adjacent finish soil grade.
Neblett &Associates. Inc.
Laing—CP,Lake Elsinore, LLC. July 24, 2007
Geotechnieal Review of Precise Grading Plan Project No.470-003-08
Maintenance Facility Pagre 5 of b
Summerly—Phasse I
Tract No.31920-1
City of Lake Elsinore,California
3) The reinforcements shown above should be considered as minimum
requirements. More restrictive criteria based on structural design and/or
regulatory or Code requirements shall govern.
4) Passive soil pressure value is for level soil conditions adjacent to footings
with a maximum value not to exceed 2,500 psf.
Total static settlements for continuous footings supporting screen walls and designed in
accordance with the above recommendations are not anticipated to exceed I-inch. In general,
differential settlement along continuous footings over a distance of 30 feet is not expected to
exceed 3/4 inch.
Concrete Design
It is anticipated that the site soils will exhibit negligible sulfate concentration. Concrete mix
design, including water-cement ratio should be in accordance with the 1997 UBC Table 19-A-4
and the requirements of the City of Lake Elsinore. Soil soluble sulfates should be confirmed by
laboratory testing during the precise grading phase.
Soil Expansion
Site surface soils are expected to exhibit low expansion potential as defined in UBC Table 18-1-
B). The actual soil expansion potential should be confirmed by laboratory testing during the
precise grading phase.
Conclusions
Based on our review of the geotechnical data pertaining to the subject development site and the
referenced Precise Grading Plans, it is our opinion that the plans are suitable for their intended
use, subject to incorporation of the comments and recommendations presented herein.
Closure
Our review, comments, and recommendations presented herein are in accordance with general
engineering principles and local practice in the field of geotechnical engineering and reflect our
best professional judgment. We make no other warranty, either express or implied.
Neblett &Associates, h7.c.
Laing—CP,Lake Elsinore, LLC. July 24,2007
Geotechnical Review of Precise Grading Plan Project No.420-003-09
Maintenance Facility Pale 6 of 6
Summerly— Phasse 1
Tract No. 31920-1
City of Lake Elsinore,California
We thank you for the opportunity of providing our services for this project. We look forward to
working with you and other project team during the precise grading, design, and construction
phases of the project.
1
Respectfully submitted,
NEBLETT & ASSOCIATES, INC.
1 114EEfi/NG P;RatOFESS/pOGUF'q 0 c 1.J.Mpv
By: By: y
ris A. Gues eta P. g p.p * Daniel . M rikaw , E.£ 2726
CEG 2361, Re ires 9/30/0 RGI 2726, eg. E i
t Project Geologis ql Q Manager of Engineeg 0 eHM p PFOFCA1-CFO FOF CAL1F
1
Distribution: Addressee (3 copies)
Wilson Mikami Corporation; Attn: Mr. Scott Wilson (I copy)
File: 420-003-08 072407 JLH PGP Review Maintenance Facility.doc
1
1
Neblett &Associates, fne.
t
r`"+
PAGE - OF !
IIILr ,l lt MEMO NO.
FIELD MEMORANDUM
2 r
Nenlettr9Assoejates
PROJECT NO. PROJECT NAME l t)a't -r'' DATE
AJ
R NO
tj tj rf'i 1zP1 0 A) rV
Aft
All F ci A/z,-s' lVd-5— &,E A16P%- Czc-Ate
By:
For: Neblett&Associates, Inn.
The conclusions and recommendations contained herein have been based upon observations,as noted,and were derived using
Oe neraY acce ted enaineerina approaches and principles available at this time and the degree of care and skills ordinarily
exercised under similar circumstances by reputable geotechnical engineers practicing in this area.No representations are made
as to the quantity or extent of material not observed and tested.No other warranty or representation,either expressed or implied,
is included or intended.
i
Y
1
V
i
n 149216
TWINING
tAB Q;PITQ ISLES 3310 Airport Way,Long Beach,CA 90806 1562.426.3355 phone!562.426.6424 fax I www.twininglabs.com
OF SOUTHERN CALIFORNIA
CONCRETE / MASONRY
Testing & Inspection Report
INSPECTOR CODE JOB NUMBER DATE
Q
M T W T F- S S
b—7G
JOB NAME r J r BUILDING/OSHPD PERMIT 61 DSA-APP DSA-FILER'
U 6i 1 7OM4 a pp 6
ADDRESS
t GENERAL CONTRACTOR JURISDICTION
r v. CWyiLSa Lo-: - o, S
ARCHITECT ENGINEER SUBCONTRACTOR flf Any)
V1, lLSaN f { kill/..f
REQUIREMENTS:Limit of one job number,one permit number per sheet. Identify all work by type and SPECIFIC location.Non-compliant work must be
specifically identified.Communication(RFI, Sketch,etc.)voiding previous non-compliant items must be listed,record conversations and communications
with project designers,building and permit granting authority officials.
HOURS
REGULAR 1.5X 2X TIME IN TIME OUT MEAL PERIOD*(Time)
bo 3 00
If no meal,complete
X Mileage-_? 3 Expenses appropriate section below.
Reinforcement Concrete Placement Masonry Prestress Post Ten Batch Plant
Fireproofing Quality Control Administration Other
DESCRIPTION OFF 0Rk'INSPECTED
t
r
Reason for
No Meal':
Approved/
Authorized by:Project Supervisor)
MIX USED DESIGN SLUMP ADMIXTURE DESIGN PSI CUBIC YARDS SPECIMENS
i
Certification of Compliance
Additional Page(Page A)CM
I declare under penalty of perjury that all of the above statements are true, and
that of my own personal knowledge the work during the period covered by this i
report has been performed and installed in compliance with the
All inspections based on minimum of 4 hours and over 4 hours-8 hours minimum.approved plans,specifications
In addition, any inspection extending past noon will be an 8 hour minimum.
approving authority,e.g.DSA,OSHPD.city of LA,etc.)
If inspector is called to a project and no work is performed,-a 2 hour minimumandallapplicablecodes,except as noted below:charge will be applied.
Exception(s)noted in report: Yes No
p! `Initial at Yes/No as applic"aJbllee)Approved/Authorized by /C J, J` /J
Inspector's Name u d 6/ 6-d5V Project Superintendent)
Inspector's Signature F ! Submitted by
Inspector's ID/Lic. # G —7/./:n3 `X Twining Laboratories of Southern California, Inc.
f i
CUSTOMER COPY
N,e J
149212
TW°IN NG
r lTO I ES 3310 Airport Way,Long Beach,CA 90R06/562.426.3355 phone!562.426.6424 fax/www.twiilitiglabs.com
l OI:SOUTHERN CAbY0PNIA -,.
Y
Z
CONCRETE / MASONRY
Testing & Inspection Report
INSPECTOR CODE JOB NUMBER
r`
pATEt/ /'M T W `
I
F S S
JOB NAME gUILDII/NG/ SHP/D PERMIT#/DSA• PP# DdSA-A-FILE#
m p. , . , i aY C. C1 G7 6 Qomoo {oy
ADDRESS I GENERALCONTF3ACT R JURISDICTION
ARCHITECT f' ENGINEER r SUBCONTRACTOR(ItAny)
f;WC fy N/ !finR/
REQUIREMENTS:Limit of one job number,one permit number per sheet.Identify all work by type and SPECIFIC location. Non-compliant work must be
specifically identified.Communication(RFI,Sketch,etc.)voiding previous non-compliant items must be listed,record conversations and communications
with project designers,building and permit granting authority officials.
HOURS
REGULAR 1.5X 2X TIME IN TIME OUT MEAL PERIOD` (Time)
3 0
If no meal,complete
Mileage ti Expenses appropriate section bebw,
Reinforcement Concrete Placement Masonry Dfe-Prestress Post Ten Batch Plant
Fireproofing Quality Control Administration Other
ES P10 OWQRK INSPECTED_
tA (. o ILL
V NJ
r _
c/
t y Q f` / l y,
ye" I.n/' 1 O / n A
1 / !r
1 C I R ri 1 rr. 1 t"k P.1r Ir2.ir yt 7 q /rC aNLt J
Reason for
No Meal":
Approved/
Authorized try:Project Supervisor)
MIX USED DESIGN SLUMP ADMIXTURE DESIGN PSI CUBIC YARDS SPECIMENS;
Certification of Compliance
Additional Page(Page#)CMtdeclareunderpenaltyofperjurythatalloftheabovestatementsaretrue, and
that of my own personal knowledge the work during the period covered by this
report has been performed and installed in compliance with the
All inspections based on minimum of 4 hours and over 4 hours•8 hours minimum.approved plans,specifications In addition, any,inspection extendingpast noon will be an 8 hour minimum.appwinq autnonry,e.g.DSA,oSHPD,city of LA,etc.)
If inspector is called to a project and o work is performed,a 2 hour minimumandallapplicablecodes,
charge will be applied. ..
G
Exception(s)noted in report: Yes No
initial at Yes!No as applicable) Approved/Authorized by
Inspector's Name c/y o s Project Superintendent)
Inspector's Signature Llnd,3 y Submitted by
Inspector's ID/Lic. # . % 61 X t1_1 Twining Laboratories of Southern California, Inc.
CUSTOMER COPY
TWL147537N,ING
r
UB O;RAI 01U ES 4 3310 Airport Way,long Beach,CA 90806!562.426.3355 phone/562.426.6424 fax I www.twininglabs.com
OF SOUTH ERN CALI FO RN IA
1
CONCRETE / MASONRY
Testing & Inspection Report
INSPECTOR CODE JOB NUMBER DATE M T W Tj F S S
tM (- h l bIo
JOB NAME BUILDING11 OSHPD PERMIT#I DSA-APP# DSA-FILE#
ADDRESS GENERAL CONTRACTOR JURISDICTION
VZ F IutJtJfT .
ARCHITECT ENGINEER SUBCONTRACTOR(If Any)
REQUIREMENTS:Limit of one job number,one permit number per sheet. Identify all work by type and SPECIFIC location.Non-compliant work must be
specifically identified.Communication(RFI`Sketch,etc.)voiding previous non-compliant items must be listed,record conversations and communications
with project designers,buildingand ermit rantin authorit officials.
HOURS
REGULAR 1.5X' 2X TIME IN TIME OUT MEAL PERIOD,(Time)
1f no meal,complete
Mileage Expenses appropriate section below.
Reinforcement Concrete Placement Masonry Prestress Post Ten Batch Plant
Fireproofing Quality Control Administration Other
ry DESCRIPTIQN QF WORKANSPEQTED
n0o4r 4- (@ MkSMM N c" ym dog rr\arq%otf of cv-w.5 57oiz,
S 1N%0 -Ttr:sT 1 VAc1z z,s 1 L Q R n R%t
n?)CC> O ia=L . 11-4b nr v+ S hr^Pt. - n \ a t -T14 F Z t
12 A 7''*
Reason for
Ft " No Meai":
Approved/
Authorized by:Project Supervisor)
MIX USED DESIGN SLUMP ADMIXTURE DESIGN PSI CUBIC YARDS SPECIMENS
o ov o -- 3
Certification of Compliance
Additional Page(Page#}CM
I declare under penalty of perjury that all of the above statements are truo, and
that of my own personal knowledge the work during the period covered by this
report has been performed and installed in compliance with they
All inspections based on minimum of 4 hours and over 4 hours-8 hours minimum.rz.1.SA',\e%V,c s•approved plans,specifications
In addition, any inspection extending past noon will be an B hour minimum.approving authority,e.g.DSA,OSHPD,City of lA,etc.)
If inspector is called to a project and no work is performed, a 2 hour minimumandallapplicablecodes,exceQt as noted below:charge will be applied.
Exception(s)noted in report: Yes No JInitialatYes1Noasapplicable)Approved/Authorized by
Inspector's Name PtN\ q F--7 Project Superintendent)
Inspector's Signature Submitted by
Inspector's ID/Lic. #1 /' f t `2 — St C Twining Laboratories of Southern California, Inc.
CUSTOMER COPY
I
9' HIGH ORCO WALL SYSTEM PLAN
FOR
TRACT 31920-1
SUMMERLY — PHASE 1
MAINTENANCE FACILITY s
HEM OCK STREET
CITY E ELSINOREOFLAKE
COUNTY OF RIVERSIDE
STATE OF CAUFORNIA
PROJECT OLIVE ST.
SITE
CITY OF LAKE ELSINORE
BOIL DING DIVISION LEMON STREET
PERMIT#
VICINITY MAP
9' HIGH ORCO WALL SYSTEM WALL AP P Rl: a1 E L
NOT TO SCALE
FOR 70 MPH WIND A EXPOSURE C
DESIGN CRITERIA-
OPTIONAL FLAT CAP 1.ALLOWABLE SOIL BEARING PRESSURE ISOO PSF
2.ALLOWABLE LATERAL PASSIVE PRESSURE=200PCF
3.CONCRETE/GROUT STREN6TH=200D PS1028 DAYS
4.RaWN ORONG STEEL-GRADE 40 FOR/4 BARS AND SMALLER h
GRADE 60 FOR 45 AND LARGER
5.SEISMIC ZONE 4,2 KM FROM TYPE B SOURCE
6.15W PSI MASONRY COMPRESSION SIRENG7H
ORCO 13816 CMU MED. 7.70 MPH WIND SPEED AT EXPOSUREC
C
I W£IGHTGRCUIED ONLY SPECIAL INSPECTION FOR MASONRY REQUIRED
VERT STEEL
JNOTE.• PROVIDE(2)14 DOWELS 1.CONCRETE BLOCK SMALL CONFIRM TO UBC SID.21-4,ORCO
i
4 DROP-IN BAR AT CH
SIE OF JOINTDWAl1HGMTHANGES D
PARTS SAND TO 3-1 PARTS GRAVEL WITH A MAXIMUM OF 1} it
ca
1245
STD.SLUMPED BLOCK MAY BE USED.
2.CONCRETE FOR FOOTING SHALL BE 1 PART CEMENT TO 2- 240------._
12' HIGH PREFAB METAL
GALLONS OF WATER SACK PORiLAND CEMENT SHALL CONFORM LW BUILDING
TO ASIM C-150 TYPEE 1111/Y.Fc=2000 PSI
cJ3.REINFORCING STEEL SHALL BE DEFORMED AND CONFORM TO ASTM II 8-g HIGH WALL ORCO II BLOCK SY51EM)14 VERT DROP-IN BAR O a 615 GRADE 4D Far 14 BARS AND SMALLER,GRADE 60 FOR
SPLIT FACE AT(
ORCO
SURFACEx¢
16"0/C®CENTER OF CMU AND LARGER.PROVIDE 40 BAR DIAMETER LAP FOR CRADE 40
REBAR AND 48 BAR DIAMETER LAP FOR GRADE 60. I PRECISION FACE AT INTERIOR(TYP)
FULL HEIGHT I, 2 1240— SEE DETAIL SHOWN HEREON
j 4.REBAR SHALL BE CENTERED IN 714E CONCRETE BLOCK CELL IN
b, WHICH IT IS LOCATED.
5.CONCRETE BLOCK SHALL BE LAVED IN A RUNINING BONDI
PATTERN WITH VERTICAL CONTINUITY OF THE CELLS UNO.
2"CLR. TYPICAL FOR BOTH DOWEL LEGS
SxJIRFAE
TOP OF SLOPE
6.ALL BLOCK CELLS CONTAINING VERTICAL REBAR SMALL BE SOLID
GrOu7E0. 1235— lE)asPRO NG ESN PEELACE
7.USE OBP TYPE S MORTAR PRO'ORWHED USING UBC TABLE NO
14 HORZ. CONT 024"01C 21-A,i PART CEMENT TO}PART LIME TO 4-1 PARTS DAMP LOOSE l , CONCRETEMIN 5 CU1BJK) GRAVEL
SAND.
GRAVEL
8.GROUT FOR CONCRETE BLOCK TO BE 1 PART CEMENT 70 3
71` PARTS SAND(GROUT MAY CONTAIN 2 PART{"PEA GRAVEL IF
14 DOWEL®i6"0/C I WEATHER COND17IONS ARE FAVORABLE AND BLOCK UNOBSTRUCTED
CELL SIZE IS SUFFICIENT TO ALLOW GOOD GROUT FLOW WATER 1230
SHALL BE ADDED TO PRODUCE GOOD GROUT FLOW W17HOUT
MF 1 I
1
SECTION A-ASEGREGATIONO'THE CONSPITUENTS. L[
127MIN. 9.BLOCK SEEM MAY BE MET-SET 1-}"M70 THE FOOLING WHILE
I
C T 8-8"ORCO W 3
I HORZ: 1`=20'
THE CONCRETE IS PL1S77C BLOCK S7FM MAY BE PLACED TO EITHER L SHOWN H Iy7 Lm
CT 8-8` 'WALL VERT: 1"=4'
EDGE OF THE TRENCH TYPE FOOTING. 75'x50' 2'HIGH AB . J , I'j YL SHOWN 0'J
v 10.FOOTNC MUST BE POURED ON OR INTO UNDISTURBED NATURAL
N 3 OPEN Y$AT
100'x50C12 HNEM1 PREFAB METAL
IIJJ
I
SOIL OR ON COMPACTED FILL WI7H A MINIMUM COMPACTION OF 90.L
i• W/4 BAYS T FRONTI
2 11.FIRST INSPECTION TO BE AFTER FOOTNG TRENCHES ARE READY
FOR CONCRETE AND ALL REWIRED STEEL IS 71E0 IN PLACE. I
1 SECOND INSPECTIOV TO BE WHEN THE REWIRED VERTICAL IS IN ao.
PLACE AND THE BLOCK WALL IS READY 70 GROUT.
12 MAXWUM CONTROL_T SPAGNG 20'0/C
14 HORZ. CONT 0 78"0/C DfIS71NG..SLOPEA
L 4
L _
GRAPHIC
5'TO DAYLIGHT
j. __-- _-_
00 m w
GRAD SCALE
b
e
I,FUT,
1 imh- 20 tL
ENGNEEFM SOL ENGINEER owNm
REVISIONS: PREPARED UNDER SUPERVISION OF: SCNE: M W LSON MIKAMI CITY OF LAKE ELSINORE
NEBLEIT R ASSOC., INC. NETT R AM, INC. IAINO-CP, LW ELSINORE LLC Q?
1{
7 CORPORATION
Si1 T
4011 WARMER AVENUE, SUITE 218 4911 WARNER AVENUE, SUITE 218 31900 MISSION TUL o SCOTT M.WILSON DATE rEATE 3 PETERS CANYON T:949-679-OD90 ORCO WALL PLAN
HUNTINOTON BEACH, CA 9260 HUNTIWM BEACH, CA 92649 SUITE 225
Hc.asea4
RCE N0.49864 EXP. 9-30-OB
SUITE 110
THESE PLANS HAVE BEEN REVIEIYED FOR COMPLIANCE WITH THE IRVg1 CA 92606
F:949-679-0091
714)60-VA . 714) 840-SM LAKE ELSINORE, 92530 E.o 9 m * APPROPRATE MOM OF WaOPMDRT AHD/OR CITY uroPOST 7r NORTH OF
Y' PHASE
949) 567-1900 1MR( ILSCAPIgl1 IN )PPR. DATE s uv, THE STATE LAWS.MED PO Wf MAYBE ISSUED.
OF CORMONN
9EN(MW NO.Mo ELEV 1279M.IML Zr DST OFF THE OF MISSION PA
r ONCE FACILITY FlLE N0.
DESIGNED BY: K.MIKAMI DRAWN BY:K.MIKAMI CN.t
SM OF BEW&U,
CHECKED Bra.GKEOBooN PROJECT MANAGER:S.MIL SON KT?1 sEUMAiD RCE 56915 CITY ENGINEER GATE IW,wc 1Nszsx4ew,ffEMMalMfxls a Mo 4 BFwc,Tc CFMmE E TRACT NO. 31920