Good afternoon everyone,
I’ve been working through some of the key issues that were covered in the meeting with Mr. Cooper
and his folks yesterday. One of the most critical issues was the status of his entitlements. Specifically,
he mentioned the following:
1. That a CUP had been adopted for his subject tracts
2. That a long-term lease had been negotiated allowing him to park inventory on top of the
closed landfill:
a. He mentioned that his intended use of the landfill would include the following:
i. Construction of a temporary employee parking lot on the land he
currently owns and running a shuttle to the landfill
ii. Construction of solar panels that would also double as parking covers
iii. Construction of electronic billboard(s) at the southern end of the landfill
iv. Construction of an off-road track for customers to test vehicles
b. I raised the concern that the Post Closure Plan for the landfill might not allow for his
intended use and that there might be a need to amend the permit
i. Mr. Cooper refutes this assertion
ii. Post Closure Plan Volumes 1 and 2 have been downloaded and emailed to
Peter Templeton, Mr. Cooper’s land planner
iii. Facility Permit No. 33-AA-005 for the landfill has been downloaded and
emailed to Peter Templeton as well
3. That a map had been approved for the subject tracts
After researching these issues today, I am still of the opinion that there are no entitlements
established for this project and am reaching out to see if I am missing or overlooking any pertinent
information.