HomeMy WebLinkAboutItem No. 05 - Change Order No. 1 to the Public Works Construction Agreement with SAS Construct5)Change Order No. 1 to the Public Works Construction Agreement with SAS Construction, Inc. for Concrete Footings and Foundation, Bid Set ‘A,’ on the New City Hall Project (CIP Project #Z20006) Approve and authorize the City Manager to execute Change Order No.1 for the not to exceed amount of $1,024,850.00 to SAS Construction, Inc. Concrete Footings and Foundation, Bid Set ‘A,’ on the New City Hall Project (CIP Project #Z20006) in such final form as approved by the City Attorney. Page 1 of 2 REPORT TO CITY COUNCIL To:Honorable Mayor and Members of the City Council From:Jason Simpson, City Manager Prepared by:Shannon Buckley, Assistant City Manager Date:October 22, 2024 Subject:Change Order No. 1 to the Public Works Construction Agreement with SAS Construction, Inc. for Concrete Footings and Foundation, Bid Set ‘A,’ on the New City Hall Project (CIP Project #Z20006) Recommendation Approve and authorize the City Manager to execute Change Order No.1 for the not to exceed amount of $1,024,850.00 to SAS Construction, Inc. Concrete Footings and Foundation, Bid Set ‘A,’ on the New City Hall Project (CIP Project #Z20006) in such final form as approved by the City Attorney. Background On March 26, 2024, a Public Works Construction Contract was awarded to SAS Construction, Inc. in the amount of $2,690,000.00 for the City Hall Concrete Footings and Foundation. On August 22, 2024, the City posted on PlanetBids the notice inviting bids for the City Hall Bid Set “D” Metal Stud Framing with Additive Alternate Interior two-hour and one-hour glass walls. During the open bid time frame, fourteen (14) prime contractors reviewed the bid document; however, on the bid date deadline of September 25, 2024, no bids were submitted. On October 30, 2024, the City re-opened the City Hall Bid Set “D” Metal Stud Framing with Additive Alternate Interior two-hour and one-hourglass walls. During the second open bid timeframe, Nine (9) prime contractors reviewed the bid document; however, on the bid date deadline of October 9, 2024, no bids were submitted. It was determined through discussions with some of the known PlanetBids registered prime vendors the reasons why the contractors did not submit a qualifying bid. Multiple reasons existed, and the most common reasons were the physical location of the project, timing, and additional contractor commitments. Change Order No. 1 – SAS Construction, Inc. Page 2 of 2 Discussion Following these efforts to receive competitive bidding, the City engaged and negotiated a Change Order to perform the Bid Set “D” Metal Stud Framing scope of work with SAS Construction Inc., the City Hall contractor performing the Bid Set “A” Concrete Footings and Foundation. If no bids are received, the California Contract Code, Chapter 22038, provides exceptions to notices inviting bids. Stated, “If no bids are received through the formal or informal procedure, the project may be performed by the employees of the public agency by force account or negotiated contract without further complying with this contract code article.” Therefore, the City has negotiated a Change Order for the entire scope of work within the anticipated amount. Fiscal Impact In this change order, all the scope of work elements in the notice inviting bid, Bid Set “D,” Metal Stud Framing, are affirmed. Attachment “B,” 2024-0821 Lake Elsinore City Hall- Bid Set “D,” Metal Stud Framing complete set, details the construction scope of work as defined in the architectural drawing. It is further understood that the Contractor, SAS Construction Inc., will provide a fully bonded (Labor, Material, and Performance bonds) change order from a California-admitted surety for the additional scope of work. Attachments Attachment 1 – Change Order No. 1 Exhibit A – Proposal City Manager’s Office 1 DATE: QUANTITY UNIT Lump Sum 1.00 Lump Sum 1.00 $70,000.00 Lump Sum 1.00 $150,000.00 Lump Sum 1.00 $250,000.00 Lump Sum 1.00 $250,000.00 Lump Sum 1.00 $250,000.00 Lump Sum 1.00 $29,850.00 TOTAL SUM OF 1 Review by:Initials Date Date Metal Stud Interior Metal Stud Framing Material Metal Stud Interior Framing Labor Metal Stud Exterior Metal Stud Framing Material Overhead $150,000.00 $250,000.00 $250,000.00 $29,850.00 PRIOR TO THIS CHANGE ORDER CONTRACTOR IS AUTHORIZED TO MAKE THE FOLLOWING CHANGES: City Manager $250,000.00 UNIT PRICE EXTENSIONITEM Mobilization & Demobilization Including Construction Schedules (Not To Exceed 3% of Total Bid) ITEM QUANTITIES DECREASED $70,000.00 $25,000.00$25,000.00 Labor, Material and Performance Bonds Metal Stud Exterior Framing Labor UNIT PRICE CITY PROJECT # March 26, 2024DATE AWARDED: PROJECT TITLE:City Hall Footings and Foundation, Bid Set ‘A’SAS Construction Inc. #Z20021 Authorized by:Jason Simpson TOTAL AMOUNT OF CONTRACT $2,690,000.00 QUANTITIES INCREASED CITY OF LAKE ELSINORE 130 S. MAIN STREET LAKE ELSINORE, CA 92530 (951) 674-3124 October 22, 2024 PROJECT CHANGE ORDER CHANGE ORDER # THIS CHANGE ORDER IS APPLICABLE TO: CONTRACT AWARDED TO: City Manager: $1,024,850.00 Approved by: Contractor Change Order No. Assistant City Manager EXTENSION THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) BY THE $1,024,850.00 None QUANTITY 301 West Dyer Road Unit D Santa Ana CA 92707 (949) 800-9247 | INFO@SASConstructionS.com DATE: 10/11/2024 PROJECT NAME TO: MR. GUS PAPAGOLOS D Metal Walls -City Hall CONTRACT # NA CONTRACT DATE: C.O. / P.C.O. # RFI Reference: According to Plans ISSUED 12/01/2023, Sheets A2.1,A2.2,A2.3,A2.16, ONLY METAL STUDS Mobilization & Demobilization Including Construction Schedules (Not To Exceed 3% of Total Bid)$25,000.00 Labor, Material and Performance Bonds $70,000.00 Metal Stud Interior Metal Stud Framing Material $150,000.00 Metal Stud Interior Framing Labor $250,000.00 Metal Stud Exterior etal Stud Framing Material $250,000.00 Metal Stud Exterior Framing Labor $250,000.00 SUBTOTAL $995,000.00 3% Overhead & Insurance $29,850.00 TOTAL $1,024,850 Contractor's Signature: __________________________________Date: 10/11/2024 Owner/Client's Signature: ________________________________Date:_______________ Proposal # 1771 Accepted - The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terns and conditions as specified in orgininal contract unless otherwise stipulated. SAS Constructions