Loading...
HomeMy WebLinkAboutBaker Industrial_Environmental Information ResponsesBaker Street Industrial—Environmental Information Responses 1. Describe the project site and any existing structures as they exist before the project, including information on topography, soil stability, plants and animals, and any cultural or scenic aspects. The site is vacant and undeveloped with unplanned, naturally occurring vegetation. Much of the vegetation occurring on the site appears to be low lying grasses and shrubs. A residence used to be located on the site, however, it was since demolished to just the building pad between the years of 2019 and 2023.There are unpaved dirt trails located throughout the site, continuing through adjacent parcels.There is also has gentle sloping throughout the entirety of the site.The site will be further analyzed within the forthcoming Biological Study and EIR. 2. Describe the surrounding properties, including information on plants and animals and any cultural, historical or scenic aspects. The surrounding properties are largely vacant and undeveloped and contain similar flora characteristics to the proposed site.To the north, below Collier avenue, are wetlands. There is a nonconforming single family residence adjacent to the southeast of the site and two additional residences adject to the northwest corner of the site. 3. Describe the type of surrounding land use, intensity of land use, and scale of development. The site is zoned as M-1 (Limited Manufacturing) and M-2 (General Manufacturing) and has a General Plan Land Use of Limited Industrial.The project proposes a zone change to M-2 for site consistency and proposes two high cube warehouses.The surrounding land uses are listed below: Zone General Plan Northeast General Manufacturing M-2 Limited Industrial Southeast Limited Manufacturing M-1, Limited Industrial, Public Public/Institutional (PI) Institutional Southwest Single Family Residential (R- Low-Medium Residential, 1), Hillside Single Family Hillside Residential Residential (RH) Northwest Residential Mixed Use Residential Mixed Use RMU) 4. Identify any other related permits and other public approvals required for this project including those required by the City, regional, State, Federal agencies, no including approvals form the City, fire department, sheriff's department, and Elsinore Valley Municipal Water District. The Project will be further analyzed within forthcoming technical studies and EIR.