HomeMy WebLinkAboutItem No. 17 - Extension of Time Request for Tentative Tract Map No. 37922, Conditional Use Per17)Extension of Time Request for Tentative Tract Map No. 37922, Conditional Use Permit
No. 2019-19, and Commercial Design Review No. 2019-27 (Lake and Mountain
Commercial Center)
1.Find that pursuant to the California Environmental Quality Act (CEQA) Guidelines
Section 15162, the extension of time request would not have a significant effect on the
environment and no new environmental documentation is necessary because all
potentially significant effects have been adequately analyzed in a previously certified
Environmental Impact Report (ER 2020-03) (SCH No. 2020080538);
2.Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR TENTATIVE
TRACT MAP NO. 37922 TO JANUARY 25, 2026;
3.Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR CONDITIONAL
USE PERMIT NO. 2019-19 TO JANUARY 25, 2026; and
4.Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR COMMERCIAL
DESIGN REVIEW NO. 2019-27 TO JANUARY 25, 2026.
Page 1 of 4
REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Jason Simpson, City Manager
Prepared by:Damaris Abraham, Assistant Community Development Director
Date:March 12, 2024
Subject:Extension of Time Request for Tentative Tract Map No. 37922, Conditional
Use Permit No. 2019-19, and Commercial Design Review No. 2019-27
Lake and Mountain Commercial Center)
Applicant:Valeria Salampessy, Empire Design Group
Recommendation
1. Find that pursuant to the California Environmental Quality Act (CEQA) Guidelines Section
15162, the extension of time request would not have a significant effect on the environment
and no new environmental documentation is necessary because all potentially significant
effects have been adequately analyzed in a previously certified Environmental Impact Report
ER 2020-03) (SCH No. 2020080538);
2. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR TENTATIVE TRACT
MAP NO. 37922 TO JANUARY 25, 2026;
3. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR CONDITIONAL USE
PERMIT NO. 2019-19 TO JANUARY 25, 2026; and
4.Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR COMMERCIAL
DESIGN REVIEW NO. 2019-27 TO JANUARY 25, 2026.
Background
On January 25, 2022, the City Council certified Environmental Impact Report (ER 2020-03) (SCH
No. 20200080538) and approved Tentative Tract Map No. 37922 (TTM 37922), Conditional Use
Permit No. 2019-19 (CUP 2019-19), and Commercial Design Review No. 2019-27 (CDR 2019-
27).
TTM 37922, CUP 2019-19, and CDR 2019-27 EOT)
Page 2 of 4
1
0
6
0
TTM 37922 proposes to subdivide the 6.07-acre site into six (6) lots ranging in size from 0.66
acres to 1.10 acres. The remaining 0.44-acre portion of the site will be dedicated for road right-
of-way purposes.
CUP 2019-19 and CDR 2019-27 propose to establish approximately 32,695 sq. ft. of commercial
and retail uses as outlined below:
Parcel 1: will include a 3,320 sq. ft. drive-through restaurant (Drive-Thru A) with an
attached 1,600 sq. ft. retail building (Retail C).
Parcel 2: will include a 2,520 sq. ft. drive-through restaurant (Drive-Thru B) with an
attached 2,400 sq. ft. retail building (Retail D).
Parcel 3: will include a 3,150 sq. ft. express car wash.
Parcel 4: will include a 3,400 sq. ft. convenience store (C-Store) with an attached 1,525
sq. ft. quick service restaurant (QSR), a 4,089 sq. ft. fueling canopy with six (6) Multi-
Product Dispensers (MPD), and three (3) stormwater bio-retention basins (WQMP).
Parcel 5: will include a 4,850 sq. ft. retail building (Retail B) and four (4) stormwater bio-
retention basin (WQMP) areas.
Parcel 6: will include a 4,850 sq. ft. retail building (Retail B).
The Project site consists of an approximately 6.07-acre undeveloped area and is located at the
northwest corner of Mountain Street and Lake Street (APNs: 389-030-012, 013, 014, 015, 016,
017, and 018).
The original expiration date of TTM 37922, CUP 2019-19, and CDR 2019-27 was January 25,
2024. On November 3, 2023, the applicant submitted this two-year extension of time request,
which stayed the expiration until action by the City Council. The applicant has submitted a grading
plan, hydrology study, and Water Quality Management Plan (EGPC No. 2023-0013) and is
currently in plan check. The applicant has stated that the time extension is necessary to allow
additional time to complete the plan check process and obtain grading and building permits.
Discussion
Section 16.24.160 of the Lake Elsinore Municipal Code (LEMC) provides one or more extensions
of time for tentative maps totaling a maximum of 36 months. Pursuant to the Subdivision Map Act,
Government Code Section 66452.6(e), the time at which the map expires may be extended by
the legislative body for a period not exceeding a total of six (6) years. The applicant will have four
4) more years of extensions available for TPM 37922 after the approval of this extension of time
request.
In accordance with Sections 17.415.050.I (Lapse of Design Review Approval and Time
Extensions) and 17.415.070.D (Lapse of Conditional Use Permit) of the LEMC, the expiration
TTM 37922, CUP 2019-19, and CDR 2019-27 EOT)
Page 3 of 4
1
0
6
0
date of an approved Conditional Use Permit and Commercial Design Review may be extended
for no more than two (2) years. The two-year extension of time for CUP 2019-19 and CDR 2019-
27 represents the final extension of time allowed by the LEMC.
The Community Development (Building & Safety and Planning), Engineering, and the
Administrative Services Departments have recommended revised Conditions of Approval
consistent with section 66452.6 (e) of the Subdivision Map Act and sections 65961 (a) (1-2) and
65961 (f) of the Planning and Zoning Laws. These updated Conditions of Approval reflect the
most current City requirements for development and ensure that the project complies with current
laws, standards, and policies.
Environmental Determination
Pursuant to CEQA Guidelines Section 15162, staff has determined that this extension of time
request would not have a significant effect on the environment and no new environmental
documentation is necessary because all potentially significant effects have been adequately
analyzed in an earlier Environmental Impact Report (EIR). All potentially significant impacts have
been avoided or mitigated pursuant to the earlier mitigated negative declaration and none of the
conditions described in Section 15162 exist. EIR (ER 2020-03) (SCH No. 20200080538) was
adopted by the City Council on January 25, 2022. As part of the extension of time request,
conditions of approval were updated to reflect the most current City requirements for
development. These are standard conditions of approval and will not result in any modifications
to the previously approved Project. No substantial changes which require major revisions to the
mitigated negative declaration exist and no new information of substantial importance which
require revisions to the earlier mitigated negative declaration exist. Therefore, no further
environmental documentation is necessary.
Public Notice
Notice of the hearing for the extension of time application has been published in the Press-
Enterprise newspaper and mailed to property owners within 300 feet of the subject property for
each application. As of the writing of this report, no written comments concerning this application
have been received by staff.
Fiscal Impact
The time and costs related to processing this application have been covered by application fees
paid for by the applicant. No General Fund budgets have been allocated or used in the processing
of this application.
Attachments
Attachment 1 – TTM 37922 EOT Resolution
Attachment 2 – CUP 2019-19 EOT Resolution
Attachment 3 – CDR 2019-27 EOT Resolution
Attachment 4 – Conditions of Approval
Attachment 5 – GIS Exhibits
TTM 37922, CUP 2019-19, and CDR 2019-27 EOT)
Page 4 of 4
1
0
6
0
Attachment 6 – TTM 37922
Attachment 7 – Design Review Package
Attachment 8 – Public Notice Materials
RESOLUTION NO. 2024-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR TENTATIVE
TRACT MAP NO. 37922 TO JANUARY 25, 2026
Whereas, on January 25, 2022, the City Council (Council) approved Tentative Tract Map
TTM) No. 37922 to subdivide the 6.07-acre site into six (6) lots ranging in size from 0.66 acres
to 1.10 acres. The remaining 0.44-acre portion of the site will be dedicated for road right-of-way
purposes. The project site is located at the northwest corner of Mountain Street and Lake Street
APNs: 389-030-012, 013, 014, 015, 016, 017, and 018);
Whereas, the Lake Elsinore Municipal Code (LEMC) Section 16.24.160 requires that a
land divider wishing to extend the life of a tentative map make a written application to the City
Council (Council) not less than 30 days prior to the expiration of the tentative map requesting an
extension of time on the map;
Whereas, on November 3, 2023, Valeria Salampessy, Empire Design Group submitted a
request for an extension of time for TTM No. 37922 to extend the expiration date by two (2) years
from January 25, 2024 to January 25, 2026; and
Whereas, on March 12, 2024, at a duly noticed Public Hearing the Council has considered
the recommendation of City staff as well as evidence presented by the Community Development
Department and other interested parties with respect to this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES
HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has reviewed and analyzed the proposed extension of time for
TTM No. 37922 pursuant to the appropriate Planning and Zoning Laws and Chapter 16
Subdivisions) of the LEMC prior to making its decision to extend the life of the map for a period
of two years.
Section 2: The Council finds and determines that and no new environmental
documentation is necessary because all potentially significant effects have been adequately
analyzed in an earlier Environmental Impact Report (EIR). All potentially significant impacts have
been avoided or mitigated pursuant to the earlier mitigated negative declaration and none of the
conditions described in Section 15162 exist. EIR (ER 2020-03) (SCH No. 20200080538) was
adopted by the City Council on January 25, 2022. As part of the extension of time request,
conditions of approval were updated to reflect the most current City requirements for
development. These are standard conditions of approval and will not result in any modifications
to the previously approved Project. No substantial changes which require major revisions to the
mitigated negative declaration exist and no new information of substantial importance which
require revisions to the earlier mitigated negative declaration exist. Therefore, no further
environmental documentation is necessary.
Section 3: That in accordance with State Planning and Zoning Law and the LEMC, the
Council makes the following findings for approval of an extension of time for TTM No. 37922:
1. The proposed subdivision, together with the provisions for its design and improvement, is
consistent with the General Plan. The proposed subdivision is compatible with the
CC Reso. No. 2024-____
Page 2 of 4
3
7
1
4
1
objectives, policies, general land uses, and programs specified in the General Plan
Government Code Section 66473.5).
a. The project has a General Plan Land Use designation of General Commercial (GC) and
is located within the Alberhill District. The GC Land Use designation provides for retail,
services, restaurants, professional and administrative offices, hotels and motels, mixed-
use projects, public and quasi-public uses, and similar and compatible uses with a
maximum 0.40 Floor Area Ratio (FAR). The project is proposing to develop
approximately 32,695 sq. ft. of commercial retail development, which includes a
convenience store, gas station, express car wash, drive-through and quick-serve
restaurants, and retail buildings with 0.13 FAR. The proposed subdivision is compatible
with the objectives, policies, general land uses and programs specified in the General
Plan.
b. All offsite mitigation measures have been identified in a manner consistent with the
General Plan.
2. The site of the proposed subdivision of land is physically suitable for the proposed density
of development in accordance with the General Plan.
a. The proposed project does not include residential development. The proposed
subdivision is consistent and compatible with the adjacent communities.
3. The effects that this project are likely to have upon the housing needs of the region, the
public service requirements of its residents and the available fiscal and environmental
resources have been considered and balanced.
a. The project is consistent with the City’s General Plan. The project has a General
Commercial (GC) Land Use Designation and will not have a direct impact on housing
needs. During the approval of the General Plan, housing needs, public services and
fiscal resources were scrutinized to achieve a balance within the City
4. The proposed division of land or type of improvements is not likely to result in any significant
environmental impacts.
a. An Environmental Impact Report (EIR) (ER 2020-03) (SCH No. 2020080538) was
prepared for TTM No. 37922. The EIR identified potentially significant environmental
effects, but these impacts will be mitigated to below a level of significance through
compliance with the mitigation measures set forth in the EIR. TTM No. 37922 has been
conditioned to comply with these mitigation measures.
5. The design of the proposed division of land or type of improvements is not likely to cause
serious public health problems.
a.TTM No. 37922 has been designed in a manner consistent with the General Plan and
does not divide previously established communities.
6. The design of the proposed division of land or type of improvements will not conflict with
easements acquired by the public at large for access through or use of property within the
proposed division of land.
CC Reso. No. 2024-____
Page 3 of 4
3
7
1
4
1
a. All known easements or requests for access have been incorporated into the design of
TTM No. 37922.
b. The map has been circulated to City departments and outside agencies, and appropriate
Conditions of Approval have been applied to the project.
Section 4: Based upon all of the evidence presented, the above findings, and the
conditions of approval imposed upon the project, the Council hereby approves a two-year
extension of time for Tentative Tract Map No. 37922 to January 25, 2026.
Section 5: This Resolution shall take effect immediately upon its adoption.
Section 6: The City Clerk shall certify to the adoption of this Resolution and enter it into
the book of original Resolutions.
Passed and Adopted on this 12th day of March, 2024.
Steve Manos
Mayor
Attest:
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2024-____ was adopted by the City Council of the City of Lake Elsinore, California,
at the regular meeting of March 12, 2024, and that the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, MMC
City Clerk
CC Reso. No. 2024-____
Page 4 of 4
3
7
1
4
1
RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR
CONDITIONAL USE PERMIT NO. 2019-19 TO JANUARY 25, 2026
Whereas, on January 25, 2022, the City Council (Council) approved Conditional Use
Permit (CUP) No. 2019-19 and Commercial Design Review (CDR) No. 2019-27 for the
development of an approximately 32,695 sq. ft. commercial retail center that includes a 3,400 sq.
ft. convenience store with an attached 1,525 sq. ft. Quick-Serve Restaurant, a 4,089 sq. ft. gas
fueling canopy, a 3,150 sq. ft. express car wash, two (2) 4,850 sq. ft. retail buildings, a 3,320 sq.
ft. drive-thru restaurant with an attached 1,600 sq. ft. retail building, and a 2,520 sq. ft. drive-thru
restaurant with an attached 2,400 sq. ft. retail building, 170 parking spaces, landscaping, and
related site improvements. The project is located at the northwest corner of Mountain Street and
Lake Street (APNs: 389-030-012, 013, 014, 015, 016, 017, and 018);
Whereas, Valeria Salampessy, Empire Design Group submitted a request for an
extension of time in accordance with Lake Elsinore Municipal Code (LEMC) Section 17.415.070.D
for CUP No. 2019-19 by two years from January 25, 2024 to January 25, 2026; and,
Whereas, on March 12, 2024, at a duly noticed Public Hearing the Council has considered
the recommendation of City staff as well as evidence presented by the Community Development
Department and other interested parties with respect to this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has reviewed and analyzed the proposed extension of time for
CUP No. 2019-19 prior to making its decision to extend the life of the conditional use permit for a
period of two years..
Section 2: The Council finds and determines that and no new environmental
documentation is necessary because all potentially significant effects have been adequately
analyzed in an earlier Environmental Impact Report (EIR). All potentially significant impacts have
been avoided or mitigated pursuant to the earlier mitigated negative declaration and none of the
conditions described in Section 15162 exist. EIR (ER 2020-03) (SCH No. 20200080538) was
adopted by the City Council on January 25, 2022. As part of the extension of time request,
conditions of approval were updated to reflect the most current City requirements for
development. These are standard conditions of approval and will not result in any modifications
to the previously approved Project. No substantial changes which require major revisions to the
mitigated negative declaration exist and no new information of substantial importance which
require revisions to the earlier mitigated negative declaration exist. Therefore, no further
environmental documentation is necessary.
Section 3. That in accordance with LEMC Section 17.415.070.C. Findings, the Council
makes the following findings for approval of an extension of time CUP No. 2019-19:
1. The Project, as approved, will comply with the goals and objectives of the General Plan
and the Zoning District in which the Project is located.
CC Reso. No. 2024-____
Page 2 of 3
3
7
1
3
8
The Project has a General Plan Land Use designation of General Commercial (GC) and
is located within the Alberhill District. The GC Land Use designation provides for retail,
services, restaurants, professional and administrative offices, hotels and motels, mixed-
use projects, public and quasi-public uses, and similar and compatible uses with a
maximum 0.40 Floor Area Ratio (FAR). The project is proposing to develop approximately
32,695 sq. ft. of commercial retail development, which includes a convenience store, gas
station, express car wash, drive-through and quick-serve restaurants, and retail buildings
with 0.13 FAR. Therefore, the Project is consistent with the General Plan. The current
zoning for the subject site is General Commercial (C-2). Section 17.124.020 of the C-2
zone states that permitted uses listed in the Neighborhood Commercial (C-1) zone are
also permitted in the C-2 zone. Section 170.120.020 of the C-1 zone lists retail stores and
restaurants and eating establishments (excluding drive-through) as permitted uses.
Section 17.124.030 of the C-2 zone states that uses subject to a conditional use permit
listed in the C-1 zone are also permitted in the C-2 zone subject to a Conditional Use
Permit. Section 170.120.030 of the C-1 zone permits drive-through establishments,
gasoline dispensing establishments, and car wash subject to a Conditional Use Permit.
Further, the proposed commercial Project will assist in achieving the development of a
well-balanced and functional mix of residential, commercial, industrial, open space,
recreational and institutional land uses.
2. The proposed use will not be detrimental to the general health, safety, comfort or general
welfare of persons residing or working within the neighborhood of the proposed use or the
City, or injurious to property or improvements in the neighborhood or the City.
The proposed use does not propose either directly or indirectly any detrimental effects to
the existing surrounding community. The Project has been conditioned as such to avoid
any possible negative impacts associated with the proposed use.
3. The Project complies with current laws, standards, and policies in accordance with Section
17.415.070.D of the LEMC.
The extension of time request has been reviewed by all applicable City divisions,
departments and agencies to ensure that the project complies with all applicable current
laws, standards and policies.
Section 4: Based upon the evidence presented, the above findings, and the Conditions
of Approval imposed upon the project, the Council hereby approves a two-year extension of time
for Conditional Use Permit No. 2019-19 to January 25, 2026.
Section 5: This Resolution shall take effect immediately upon its adoption.
Section 6: The City Clerk shall certify to the adoption of this Resolution and enter it into
the book of original Resolutions.
Passed and Adopted on this 12th day of March, 2024.
Steve Manos
CC Reso. No. 2024-____
Page 3 of 3
3
7
1
3
8
Mayor
Attest:
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2024-____ was adopted by the City Council of the City of Lake Elsinore, California,
at the regular meeting of March 12, 2024, and that the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, MMC
City Clerk
RESOLUTION NO. 2024-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A TWO-YEAR EXTENSION OF TIME FOR
COMMERCIAL DESIGN REVIEW NO. 2019-27 TO JANUARY 25, 2026
Whereas, on January 25, 2022, the City Council (Council) approved Conditional Use
Permit (CUP) No. 2019-19 and Commercial Design Review (CDR) No. 2019-27 for the
development of an approximately 32,695 sq. ft. commercial retail center that includes a 3,400 sq.
ft. convenience store with an attached 1,525 sq. ft. Quick-Serve Restaurant, a 4,089 sq. ft. gas
fueling canopy, a 3,150 sq. ft. express car wash, two (2) 4,850 sq. ft. retail buildings, a 3,320 sq.
ft. drive-thru restaurant with an attached 1,600 sq. ft. retail building, and a 2,520 sq. ft. drive-thru
restaurant with an attached 2,400 sq. ft. retail building, 170 parking spaces, landscaping, and
related site improvements. The project is located at the northwest corner of Mountain Street and
Lake Street (APNs: 389-030-012, 013, 014, 015, 016, 017, and 018);
Whereas, Valeria Salampessy, Empire Design Group submitted a request for an
extension of time in accordance with Lake Elsinore Municipal Code (LEMC) Section 17.415.050.I
for CDR No. 2019-27 by two years from January 25, 2024 to January 25, 2026; and
Whereas, on March 12, 2024, at a duly noticed Public Hearing the Council has considered
the recommendation of City staff as well as evidence presented by the Community Development
Department and other interested parties with respect to this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES
HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has reviewed and analyzed the proposed extension of time for
CDR No. 2019-27 prior to making its decision to extend the life of the design review for a period
of two years.
Section 2: The Council finds and determines that and no new environmental
documentation is necessary because all potentially significant effects have been adequately
analyzed in an earlier Environmental Impact Report (EIR). All potentially significant impacts have
been avoided or mitigated pursuant to the earlier mitigated negative declaration and none of the
conditions described in Section 15162 exist. EIR (ER 2020-03) (SCH No. 20200080538) was
adopted by the City Council on January 25, 2022. As part of the extension of time request,
conditions of approval were updated to reflect the most current City requirements for
development. These are standard conditions of approval and will not result in any modifications
to the previously approved Project. No substantial changes which require major revisions to the
mitigated negative declaration exist and no new information of substantial importance which
require revisions to the earlier mitigated negative declaration exist. Therefore, no further
environmental documentation is necessary.
Section 3: That in accordance with Section 17.415.050.G of the LEMC, the Council
makes the following findings for approval of an extension of time for CDR No. 2019-27:
1. The Project, as approved, will comply with the goals and objectives of the General Plan and
the Zoning District in which the Project is located.
CC Reso. No. 2024-____
Page 2 of 3
3
7
1
4
0
The Project has a General Plan Land Use designation of General Commercial (GC) and is
located within the Alberhill District. The GC Land Use designation provides for retail,
services, restaurants, professional and administrative offices, hotels and motels, mixed-use
projects, public and quasi-public uses, and similar and compatible uses with a maximum
0.40 Floor Area Ratio (FAR). The project is proposing to develop approximately 32,695 sq.
ft. of commercial retail development, which includes a convenience store, gas station,
express car wash, drive-through and quick-serve restaurants, and retail buildings with 0.13
FAR. Therefore, the project is consistent with the General Plan. The project complies with
the goals and objectives of the General Plan because it will assist in achieving the
development of a well-balanced and functional mix of residential, commercial, industrial,
open space, recreational, and institutional land uses. The project will serve to diversify and
expand Lake Elsinore’s economic base.
The current zoning for the subject site is General Commercial (C-2). Section 17.124.020 of
the C-2 zone states that permitted uses listed in the Neighborhood Commercial (C-1) zone
are also permitted in the C-2 zone. Section 170.120.020 of the C-1 zone lists retail stores
and restaurants and eating establishments (excluding drive-through) as permitted uses.
Section 17.124.030 of the C-2 zone states that uses subject to a conditional use permit
listed in the C-1 zone are also permitted in the C-2 zone subject to a Conditional Use Permit.
Section 170.120.030 of the C-1 zone permits drive-through establishments, gasoline
dispensing establishments, and car wash subject to a Conditional Use Permit. The project
meets requirements identified for the proposed use including development standards for
setbacks, landscaping, screening and all other additional requirements for development of
this type.
2. The Project complies with the design directives contained in the General Plan and all other
applicable provisions of the LEMC.
The project is appropriate to the site and surrounding developments. The architectural
design of the proposed building complies with the Nonresidential Development Standards
Chapter 17.112) of the LEMC. The architecture has been designed to achieve harmony
and compatibility with the surrounding area. The colors and materials proposed will assist
in blending the architecture into the existing landscape and are compatible with other colors
and materials used on other properties near the Project site. In addition, safe and efficient
circulation has been achieved onsite.
3. The Project complies with current laws, standards, and policies in accordance with Section
17.415.050.I of the LEMC.
The extension of time request has been reviewed by all applicable City divisions,
departments and agencies to ensure that the project complies with all applicable current
laws, standards and policies.
Section 4: Based upon all of the evidence presented, the above findings, and the
conditions of approval imposed upon the project, the Council hereby approves a two-year
extension of time for Commercial Design Review No. 2019-27 to January 25, 2026.
Section 5: This Resolution shall take effect immediately upon its adoption.
Section 6: The City Clerk shall certify to the adoption of this Resolution and enter it into
the book of original Resolutions.
CC Reso. No. 2024-____
Page 3 of 3
3
7
1
4
0
Passed and Adopted on this 12th day of March, 2024.
Steve Manos
Mayor
Attest:
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2024-____ was adopted by the City Council of the City of Lake Elsinore, California,
at the regular meeting of March 12, 2024, and that the same was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, MMC
City Clerk
Applicant’s Initials: _____ Page 1 of 19
CONDITIONS OF APPROVAL
New text underlined and deletions in strikethrough)
PROJECT: PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27
PROJECT NAME:Lake and Mountain Commercial Center
PROJECT LOCATION:APNs: 389-030-012, 013, 014, 015, 016, 017, and 018
APPROVAL DATE:January 25, 2022
EOT APPROVAL DATE:March 12, 2024
EXPIRATION DATE:January 25, 2026
GENERAL
1.Tentative Tract Map No. 37922 is a subdivision of 6.07 acres into six (6) lots ranging in size
from 0.66 acres to 1.10 acres. The remaining 0.44-acre portion of the site will be dedicated
for road right-of-way purposes. Conditional Use Permit No. 2019-19 and Commercial Design
Review No. 2019-27 include a 3,400 SF convenience store with an attached 1,525 SF
Quick-Serve Restaurant, 4,089 SF gas fueling canopy, a 3,150 SF express car wash, two
2) 4,850 SF retail buildings, a 3,320 SF drive-thru restaurant with an attached 1,600 SF
retail building, and a 2,520 SF drive-thru restaurant with an attached 2,400 SF retail building
with 170 parking spaces, landscaping, and related site improvements. The Project is located
at the northwest corner of Mountain Street and Lake Street (APNs: 389-030-012, 013, 014,
015, 016, 017, and 018).
2.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and its Consultants
Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning approval, implementation and construction of TTM 37922, CUP
2019-19, and CDR 2019-27, which action is bought within the time period provided for in
California Government Code Sections 65009 and/or 66499.37, and Public Resources Code
Section 21167, including the approval, extension or modification of TTM 37922, CUP 2019-
19, and CDR 2019-27 or any of the proceedings, acts or determinations taken, done, or
made prior to the decision, or to determine the reasonableness, legality or validity of any
condition attached thereto. The Applicant's indemnification is intended to include, but not be
limited to, damages, fees and/or costs awarded against or incurred by Indemnitees and
costs of suit, claim or litigation, including without limitation attorneys' fees, penalties and
other costs, liabilities and expenses incurred by Indemnitees in connection with such
proceeding. The City will promptly notify the applicant of any such claim, action, or
proceeding against the City. If the project is challenged in court, the City and the applicant
shall enter into formal defense and indemnity agreement, consistent with this condition.
3.Within 30 days of project approval, the applicant shall sign and complete an
Acknowledgment of Conditions" and shall return the executed original to the Community
Development Department for inclusion in the case records.
4.The applicant shall submit a check for $3,589.25 made payable to the County of Riverside
for the filing of a Notice of Determination. The check shall be submitted to the Planning
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 2 of 19
3
7
1
3
9
Division for processing within 48 hours of the project’s approval.
PLANNING DIVISION
5.Tentative Tract Map No. 37922 will expire two years from the date of approval on January
25, 2026 unless within that period of time a Final Map has been filed with the County
Recorder, or an extension of time is granted by the City Council in accordance with the State
of California Subdivision Map Act and applicable requirements of the Lake Elsinore
Municipal Code (LEMC).
6.Tentative Tract Map No. 37922 shall comply with the State of California Subdivision Map
Act and applicable requirements contained in the LEMC, unless modified by these
Conditions of Approval.
7.Conditional Use Permit No. 2019-19 shall lapse and become void two years following the
date on which the conditional use permit became effective on January 25, 2026, unless one
of the following: (1) prior to the expiration of two years, a building permit related to the
conditional use permit is issued and construction commenced and diligently pursued toward
completion; or (2) prior to the expiration of two years, the applicant has applied for and has
been granted an extension of the conditional use permit approval pursuant to subsections
a), (b), and (c) of Lake Elsinore Municipal Code (LEMC) Section 17.415.070.D.2. Subject
to the provisions of LEMC Section 17.415.070.I, a conditional use permit granted pursuant
to the provisions of this section shall run with the land and shall continue to be valid upon a
change of ownership of the site or structure, which was the subject of the Conditional Use
Permit application.
8.Commercial Design Review No. 2019-27 shall lapse and become void two years following
the date on which the design review became effective on January 25, 2026, unless one of
the following: (1) prior to the expiration of two years, a building permit related to the design
review is issued and construction commenced and diligently pursued toward completion; or
2) prior to the expiration of two years, the applicant has applied for and has been granted
an extension of the design review approval pursuant to subsections (1) and (2) of Lake
Elsinore Municipal Code (LEMC) Section 17.415.050.I.1. Notwithstanding conditions to the
contrary, a design review granted pursuant to LEMC Section 17.415.050.I.2 shall run with
the land for this two-year period, subject to any approved extensions, and shall continue to
be valid upon a change of ownership of the site, which was the subject of the design review
application.
9.An application for modification, expansion or other change in a Conditional Use Permit shall
be reviewed according to the provisions of the Section 17.415.070 of the LEMC, in a similar
manner as a new application.
10.If operation of this use triggers concerns related to parking, noise, traffic, or other impacts,
at the discretion of the Community Development Director, this Conditional Use Permit may
be referred back to the Planning Commission for subsequent review at a Public Hearing. If
necessary, the Commission may modify or add conditions of approval to mitigate such
impacts, or may revoke said Conditional Use Permit.
11.The applicant shall provide all project-related on-site and off-site improvements as required by
these Conditions of Approval.
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 3 of 19
3
7
1
3
9
12.All Conditions of Approval shall be reproduced on page one of building plans prior to their
acceptance by the Building and Safety Division, Community Development Department. All
Conditions of Approval shall be met prior to the issuance of a Certificate of Occupancy.
13.All future development proposals shall be reviewed by the City on a project-by-project basis. If
determined necessary by the Community Development Director or designee, additional
environmental analysis will be required.
14.Any proposed minor revisions to approved plans shall be reviewed and approved by the
Community Development Director or designee. Any proposed substantial revisions to the
approved plans shall be reviewed according to the provisions of the Municipal Code in a
similar manner as a new application.
15.Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during
all site preparation and construction activity. Site preparation activity and construction shall
not commence before 7:00 AM and shall cease no later than 5:00 PM, Monday through
Friday. Only finish work and similar interior construction may be conducted on Saturdays
and may commence no earlier than 8:00 am and shall cease no later than 4:00 p.m.
Construction activity shall not take place on Sunday, or any Legal Holidays.
16.No individual signs are approved as part of this approval. The applicant or designee shall
submit an application for a sign permit, pay appropriate fees and receive approval from the
Community Development Department for any sign(s) installed at the project site. OR The
applicant shall submit a sign program for review and approval of the Planning Commission
prior to installation. Sign plans submitted to the City for review shall incorporate City
identification signs.
17.In accordance with Section 17.112.090.O. of the LEMC, establishments engaged in the
concurrent sale of motor vehicle fuel with alcoholic beverages shall abide by the following
requirements:
a. No beer or wine shall be displayed within five feet of the cash register or the front door.
b. No advertisement of alcoholic beverages shall be displayed at motor fuel islands.
c. No sale of alcoholic beverages shall be made from a drive-in window.
d. No display or sale of beer or wine shall be made from an ice tub.
e. No beer or wine advertising shall be located on motor fuel islands and no self-illuminated
advertising for beer or wine shall be located on buildings or windows.
f. Employees on duty between the hours of 10:00 p.m. and 2:00 a.m. shall be at least 21
years of age to sell beer and wine.
18.Graffiti shall be removed within 24 hours.
19.The entire site shall be kept free from trash and debris at all times and in no event shall
trash and debris remain for more than 24 hours.
20.No outside overnight storage of inoperable vehicles shall occur at the site.
21.There shall be no loitering in or around the business.
22.All roof mounted or ground support air conditioning units or other mechanical equipment
incidental to development shall be architecturally screened or shielded by landscaping so
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 4 of 19
3
7
1
3
9
that they are not visible from neighboring property or public streets. Any roof mounted
central swamp coolers shall also be screened, and the Community Development Director,
prior to issuance of building permit shall approve screening plan.
23.The property address (in numerals at least six inches high) shall be displayed near the
entrance and be easily visible from the front of the subject property and public right-of-way.
24.The applicant shall construct trash enclosure(s) with a decorative roof to match the colors,
materials and design of the project architecture.
25.If any of the conditions of approval set forth herein fail to occur, or if they are, by their terms,
to be implemented and maintained over time, if any of such conditions fail to be so
implemented and maintained according to their terms, the City shall have the right to revoke
or modify all approvals herein granted, deny or further condition issuance of all future
building permits, deny revoke, or further condition all certificates of occupancy issued under
the authority of approvals herein granted; record a notice of violation on the property title;
institute and prosecute litigation to compel their compliance with said conditions or seek
damages for their violation.
Prior to Recordation of Final Map(s)
26.All lots shall comply with minimum standards set forth in the General Commercial (C-2)
zoning designation of the LEMC.
27.A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
28.All of the project improvements shall be designed by the applicant's Civil Engineer to the
specifications of the City of Lake Elsinore.
29.Prior to recordation of a Final Map, the applicant shall initiate and complete the formation of
a Property Owner’s Association (POA) which shall be approved by the City. All Association
documents that address including, but not limited to, reciprocal easements, shall be
submitted for review and approval by City Planning, Engineering and the City Attorney and
upon City approval shall be recorded. Such documents shall include the Articles of
Incorporation for the Association and Covenants, Conditions and Restrictions (CC&Rs).
a. All slopes, landscaping within public right-of-way, all drainage basins, and common
areas including but not limited to parking areas and drive aisles, shall be maintained by
the (POA).
b. Provisions to restrict parking upon other than approved and developed parking spaces
shall be written into the CC&Rs for the project.
Prior to Issuance of Grading Permits/Building Permits
30.The applicant shall pay all applicable City fees, including but not limited to Development
Impact Fees (DIF) and MSHCP Fees per LEMC Section 16.85, at the rate in effect at the
time of payment.
31.All roof mounted or ground support air conditioning units or other mechanical equipment
incidental to development shall be architecturally screened or shielded by landscaping so
that they are not visible from neighboring property or public streets. Any roof mounted
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 5 of 19
3
7
1
3
9
central swamp coolers shall also be screened, and the Community Development Director,
prior to issuance of building permit shall approve screening plan.
32.A uniform hardscape and street furniture design including seating benches, trash
receptacles, free-standing potted plants, bike racks, light bollards, etc., shall be utilized and
be compatible with the architectural style. Detailed designs shall be submitted for Planning
Division review and approval prior to the issuance of building permits.
33.Prior to issuance of Building Permit, the Applicant shall submit a photometric study to the
Community Development Department for review and approval. The plan shall ensure that
all exterior on-site lighting are shielded and directed on-site so as not to create glare onto
neighboring properties and streets or allow illumination above the horizontal plane of the
fixture.
34.Prior to the issuance of a Building Permit, all exterior wall mounted and freestanding light
fixtures shall be submitted for review and approval by the Director of Community
Development, or their designee. Light fixtures shall compliment the architectural style of the
buildings onsite.
35.Prior to the issuance of a Building Permit, the color, finish and pattern of all decorative paving
onsite shall be submitted for review and approval by the Director of Community
Development, or their designee.
36.Prior to issuance of building permit, the applicant shall prepare a Final Wall and Fence Plan
shall be submitted for review and approval by the Director of Community Development, or
their designee.
37.Prior to issuance of a building permit, Final Landscaping / Irrigation Detail Plans shall be
submitted along with appropriate fees for review and approval by the Community
Development Director or designee.
a. All planting areas shall have permanent and automatic sprinkler system with 50% plant
coverage using a drip irrigation method.
b. Mature specimen trees shall be planted on locations visible from public views.
c. All planting areas shall be separated from paved areas with a six inch (6”) high and six
inch (6”) wide concrete curb. Runoff shall be allowed from paved areas into landscape
areas.
d. Planting within fifteen feet (15’) of ingress/egress points shall be no higher than twenty-
four inches (24”).
e. Landscape planters shall be planted with an appropriate parking lot shade tree pursuant
to the LEMC and Landscape Design Guidelines.
f. No required tree planting bed shall be less than 5 feet wide.
g. Root barriers shall be installed for all trees planted within 10 feet of hardscape areas to
include sidewalks.
h. Any transformers and mechanical or electrical equipment shall be indicated on
landscape plan and screened as part of the landscaping plan.
i. The landscape plan shall provide for ground cover, shrubs, and trees and meet all
requirements of the City’s adopted Landscape Guidelines.
j. All landscape improvements shall be bonded 100% for material and labor for two years
from installation sign-off by the City. Release of the landscaping bond shall be requested
by the applicant at the end of the required two years with approval/acceptance reviewed
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 6 of 19
3
7
1
3
9
by the Landscape Consultant and approved by the Community Development Director or
Designee.
k. All landscaping and irrigation shall be installed within affected portion of any phase at
the time a Certificate of Occupancy is requested for any building.
l. Final landscape plan must be consistent with approved site plan.
m. Final landscape plans to include planting and irrigation details.
n. Final landscape plans shall include drought tolerant planting consistent with Elsinore
Valley Municipal Water District standards subject to plan check and approval by the City.
o. No turf shall be permitted.
38.Landscaping installed for the project shall be continuously maintained to the reasonable
satisfaction of the Community Development Director. If it is determined that the landscaping
is not being maintained, the Director of Community Development shall have the authority to
require the property owner to bring the landscaping into conformance with the approved
landscape plan. The continued maintenance of all landscaped areas shall be the
responsibility of the developer or any successors in interest.
39.The proposed location of on-site construction trailers shall be approved by the Community
Development Director or designee. A cash bond of $1,000 shall be required for any
construction trailers placed on the site and used during construction. Bonds will be released
after removal of trailers and restoration of the site to an acceptable state, subject to approval
of the Community Development Director or designee. Such trailer(s) shall be fully on private
property and outside the public right of way.
BUILDING DIVISION
General Conditions
40.Final Building and Safety Conditions. Final Building and Safety Conditions will be addressed
when building construction plans are submitted to Building and Safety for review. These
conditions will be based on occupancy, use, the California Building Code (CBC), and related
codes which are enforced at the time of building plan submittal.
41.Compliance with Code. All design components shall comply with applicable provisions of
the 2019 2022 edition of the California Building, Plumbing and Mechanical Codes: 2019
2022 California Electrical Code; California Administrative Code, 2019 California Energy
Codes, 2019 2022 California Green Building Standards, California Title 24 Disabled Access
Regulations, and Lake Elsinore Municipal Code.
42.Green Measures. The application shall provide 10% voluntary green measures on the
project, as stipulated by the 2019 2022 California Green Building Standards.
43.Disabled Access. Applicant shall provide details of all applicable disabled access provisions
and building setbacks on plans to include:
a. All ground floor units to be adaptable.
b. Disabled access from the public way to the entrance of the building.
c. Van accessible parking located as close as possible to the main entry.
d. Path of accessibility from parking to furthest point of improvement.
e. Path of travel from public right-of-way to all public areas on site, such as clubhouse,
trach enclosure tot lots and picnic areas.
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 7 of 19
3
7
1
3
9
44.Street Addressing. Applicant must obtain street addressing for all proposed buildings by
requesting street addressing and submitting a site plan for commercial or multi-family
residential projects or a recorded final map for single- family residential projects. It takes 10
days to issue address and notify other agencies. Please contact Sonia Salazar at
ssalazar@lake-elsinore.org or 951-674-3124 X 277.
45.Clearance from LEUSD. A receipt or clearance letter from the Lake Elsinore School District
shall be submitted to the Building and Safety Department evidencing the payment or
exemption from School Mitigation Fees.
46.Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit
approvals prior to commencement of any construction work.
47.Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards,
and any block walls will require separate approvals and permits.
48.Sewer and Water Plan Approvals. On-site sewer and water plans will require separate
approvals and permits. Septic systems will need to be approved from Riverside County
Environmental Health Department before permit issuance.
49.House Electrical Meter. Applicant shall provide a house electrical meter to provide power
for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each
building on the site. Developments with single user buildings shall clearly show on the plans
how the operation of exterior lighting and fire alarm systems when a house meter is not
specifically proposed.
At Plan Review Submittal
50.Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4)
complete sets of plans and two (2) sets of supporting calculations for review and approval
including:
a. An electrical plan including load calculations and panel schedule, plumbing schematic,
and mechanical plan applicable to scope of work.
b. A Sound Transmission Control Study in accordance with the provisions of the Section
1207, of the 2019 2022 edition of the California Building Code.
c. A precise grading plan to verify accessibility for the persons with disabilities.
d. Truss calculations that have been stamped by the engineer of record of the building and
the truss manufacturer engineer.
Prior to Issuance of Grading Permit(s)
51.Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from
the building plans, shall be submitted to Building and Safety for review and approval.
52.Demolition Permits. A demolition permit shall be obtained if there is an existing structure to
be removed as part of the project.
Prior to Issuance of Building Permit(s)
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 8 of 19
3
7
1
3
9
53.Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp
of a registered professional with original signature on the plans. Provide C.D. of approved
plans to the Building Division.
Prior to Beginning of Construction
54.Pre-Construction Meeting. A pre-construction meeting is required with the building inspector
prior to the start of the building construction.
ENGINEERING DEPARTMENT
General
55.All new submittals for plan check or permit shall be made using the City’s online Citizen
Self-Service Portal (CSSP).
56.All plans (Street, Storm Drain, Improvement, Grading) shall be prepared by a Registered
Civil Engineer using the City’s standard title block.
57.All required soils, geology, hydrology and hydraulic and seismic reports shall be prepared
by a Registered Civil Engineer.
58.All slopes and landscaping within the public right-of-way shall be maintained by the property
owner, owner’s association, firms contracted by the property owner’s association, or another
maintenance entity approved by the City Council.
59.All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right-of-way shall be owned and maintained by the property
owner or property owner’s association.
60.In accordance with the City’s Franchise Agreement for waste disposal & recycling, the
applicant shall be required to contract with CR&R Inc. for removal and disposal of all waste
material, debris, vegetation and other rubbish generated both during cleaning, demolition,
clear and grubbing or all other phases of construction and during occupancy.
61.Applicant shall submit a detailed hydrology and hydraulic study for review for the sufficient
containment and conveyance of the storm water to a safe and adequate point as approved
by the City Engineer.
62.The site will accommodate all construction activity, building activity, vehicles, etc. No staging
on public streets, or private property belonging to others shall be conducted without the
written permission of the property owner.
FEES
63.Applicant shall pay all applicable permit application and Engineering assessed fees,
including without limitation plan check and construction inspection fees, at the prevalent rate
at time of payment in full.
64.Applicant shall pay all applicable Mitigation and Development Impact Fees at the prevalent
rate at time of payment in full. Mitigation and Development Impact Fees include without
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 9 of 19
3
7
1
3
9
limitation:
Master Plan of Drainage Fee – Due prior to Grading Permit issuance
Traffic Infrastructure Fee (TIF) – Due prior to Building Permit issuance
Transportation Uniform Mitigation Fee (TUMF) – Due prior to Occupancy
LAND DIVISION-DEDICATION
65.All required public right-of-way dedications and easements shall be prepared by the
developer or his agent and shall be submitted to the Engineering Department for review and
approval.
66.Owner shall dedicate on the Final Map to the City right-of-way along Lake Street adjacent
to the property frontage for a total right-of-way of 60 feet from centerline to the project
property line.
67.Owner shall dedicate on the Final Map to the City right-of-way along Mountain Street
adjacent to the property frontage for a total right-of-way of 30 feet minimum from centerline
to the project property line.
68.The project shall vacate/abandon City approved excess right-of-way by separate
instrument. All City costs for processing a vacation/abandonment (ex. Publication, noticing)
shall be invoiced and paid by the developer.
69.Monumentation shall be in accordance with Lake Elsinore Municipal Code 16.32 and the
Subdivision Map Act. Security and Inspection fee for monumentation shall be paid and two
contiguous monuments shall be inspected prior to scheduling Final Map for City Council.
70.Covenants, Conditions and Restrictions (CC&Rs) shall be submitted to the Engineering
Department for review and approval.
71.Legal agreements and financial commitments (LLMD, CFD, etc.) for operation and
maintenance be recorded prior to Certificate of Occupancy.
STORM WATER MANAGEMENT / POLLUTION PREVENTION / NPDES
Design
72.The project is responsible for complying with the Santa Ana Region NPDES Permits as
warranted based on the nature of development and/or activity. These Permits include:
General Permit – Construction
De Minimus Discharges
MS4
73.A Water Quality Management Plan (WQMP) – Preliminary and Final – shall be prepared
using the Santa Ana Region 8 approved template and guidance and submitted for review
and approval to the City.
The Final WQMP shall be approved by the City prior to rough or precise grading plan
approval and issuance of any permit for construction.
74.The Final WQMP shall document the following:
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 10 of 19
3
7
1
3
9
Detailed site and project description.
Potential stormwater pollutants.
Post-development drainage characteristics.
Low Impact Development (LID) BMP selection and analysis.
Structural and non-structural source control BMPs.
Treatment Control BMPs.
Site design and drainage plan (BMP Exhibit).
Documentation of how vector issues are addressed in the BMP design, operation and
maintenance.
GIS Decimal Minute Longitude and Latitude coordinates for all LID and Treatment
Control BMP locations.
HCOC – demonstrate that discharge flow rates, velocities, duration and volume for the
post construction condition from a 2-year and 10-year, 24-hour rainfall event will not
cause adverse impacts on downstream erosion and receiving waters, or measures are
implemented to mitigate significant adverse impacts downstream public facilities and
water bodies. Evaluation documentation shall include pre- and post-development
hydrograph volumes, time of concentration and peak discharge velocities, construction
of sediment budgets, and a sediment transport analysis. (Note the facilities may need
to be larger due to flood mitigation for the 10-year, 6- and 24-hour rain events).
Operations and Maintenance (O&M) Plan and Agreement (using City approved form
and/or CC&Rs) as well as documentation of formation of funding district for long term
maintenance costs.
75.The 2010 SAR MS4 Permit requires evaluation of the site for implementation of LID
Principles and LID Site Design, where feasible, to treat the pollutants of concern identified
for the project, the following manner (from highest to lowest priority):
Evaluate site for highest and best use applicability (Exemption for projects that
discharge to Lake Elsinore).
Preventative measures (these are mostly non-structural measures, e.g. minimizing
impervious areas, conserving natural areas, minimizing directly connected impervious
areas, etc.)
The Project shall in the order presented: infiltrate, harvest and use, evapotranspire
and/or bio-treat the Design Capture Volume (DCV).
The Project shall consider a properly engineered and maintained bio-treatment system
only if infiltration, harvesting and use and evapotranspiration cannot be feasibly
implemented at the project site.
Any portion of the DCV that is not infiltrated, harvested and used, evapotranspired,
and/or bio-treated shall be treated and discharged in accordance with the
requirements set forth in Section XII.G.
76.Parking lot landscaping areas shall be designed to provide for treatment, retention or
infiltration of runoff.
77.Project hardscape areas shall be designed and constructed to provide for drainage into
adjacent landscape.
78.Project trash enclosure shall be covered, bermed, and designed to divert drainage from
adjoining paved areas and regularly maintained.
79.Hydromodification / Hydraulic Conditions of Concern – The project shall identify potential
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 11 of 19
3
7
1
3
9
Hydraulic Conditions of Concern (HCOC) and implement measures to limit disturbance of
natural water bodies and drainage systems; conserve natural areas; protect slopes and
channels; and minimize significant impacts from urban runoff.
80.If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant
shall obtain certification through the Santa Ana Regional Water Quality Control Board and
provide a copy to the Engineering Department.
81.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain”
using the City authorized marker.
82.The project shall use either volume-based and/or flow-based criteria for sizing BMPs in
accordance with NPDES Permit Provision XII.D.4.
83.The project site shall implement full trash capture methods/devices approved by the Region
Water Quality Control Board.
84.To meet NPDES requirements, all vehicle/equipment washing/steam cleaning areas must
be self-contained and/or covered, equipped with a clarifier or other pretreatment facility, and
properly connected to a sanitary sewer or other appropriately permitted disposal facility.
PLAN REQUIREMENTS: The Owner/Applicant shall incorporate these vehicle/equipment
wash requirements into project design and depict on plans, including detail plans as needed.
Construction
85.A Storm Water Pollution Prevention Plan (SWPPP) (as required by the NPDES General
Construction Permit) and compliance with the Green Building Code for sediment and
erosion control are required for this project.
86.Prior to grading or building permit for construction or demolition and/or weed abatement
activity, projects subject to coverage under the NPDES General Construction Permit shall
demonstrate that compliance with the permit has been obtained by providing a copy of the
Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of
the notification of the issuance of a Waste Discharge Identification (WDID) Number or other
proof of filing to the satisfaction of the City Engineer. A copy of the SWPPP shall be kept at
the project site, updated, and be available for review upon request.
87.Erosion & Sediment Control – All Projects – Prior to the issuance of any grading or building
permit for construction or demolition, the applicant shall submit for review and approval by
the City Engineer, an Erosion and Sediment Control Plan as a separate sheet of the grading
plan submittal to demonstrate compliance with the City’s NPDES Program and state water
quality regulations for grading and construction activities. A copy of the plan shall be
incorporated into the SWPPP, kept updated as needed to address changing circumstances
of the project site, be kept at the project site, and available for review upon request.
88.The project shall implement LID practices that treat the 85th percentile storm in the priority
order as follows:
Highest and best use – treat all pollutants of concern to a medium to high level and
discharge (applicable to projects discharging to Lake Elsinore)
Infiltrate
Harvest and use
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 12 of 19
3
7
1
3
9
Evapotranspire and/or bio-treat
89.Chemical Management – Prior to issuance of building permits for any tank or pipeline, the
uses of said tank or pipeline shall be identified and the developer shall submit a Chemical
Management Plan in addition to a WQMP with all appropriate measures for chemical
management (including, but not limited to, storage, emergency response, employee
training, spill contingencies and disposal) in a manner meeting the satisfaction of the
Manager, Permit Intake, in consultation with the Riverside County Fire Department and
wastewater agencies, as appropriate, to ensure implementation of each agency’s respective
requirements. A copy of the approved “Chemical Management Plans” shall be furnished to
the Fire Marshall, prior to the issuance of any Certificates of Use and Occupancy.
Post-Construction
90.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall
demonstrate compliance with applicable NPDES permits for construction,
industrial/commercial, MS4, etc. to include:
Demonstrate that the project has compiled with all non-structural BMPs described in
the project’s WQMP.
Provide signed, notarized certification from the Engineer of Work that the structural
BMPs identified in the project’s WQMP are installed in conformance with approved
plans and specifications and operational.
Submit a copy of the fully executed, recorded City approved Operations and
Maintenance (O&M) Plan and Agreement for all structural BMPs or a copy of the
recorded City approved CC&R.
The Operation and Maintenance (O&M) Plan and Agreement and/or CC&R’s shall: (1)
describe the long-term operation and maintenance requirements for BMPs identified
in the BMP Exhibit; (2) identify the entity that will be responsible for long-term operation
and maintenance of the referenced BMPs; (3) describe the mechanism for funding the
long-term operation and maintenance of the referenced BMPs; and (4) provide for
annual certification for water quality facilities by a Registered Civil Engineer. The City
format shall be used.
Provide documentation of annexation into a CFD for funding facilities to be maintained
by the City.
Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan
or CC&R’s attached) are available for each of the initial occupants.
Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve
12) months after the issuance of a Certificate of Use and/or Occupancy for the project
to verify compliance with the approved WQMP and O&M Plan. A signed/sealed
certification from the Engineer of Work dated 12 months after the Certificate of
Occupancy will be considered in lieu of a Special Investigation by the City.
Provide the City with a digital .pdf copy of the Final WQMP.
UTILITIES
91.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway shall be the responsibility of the property owner or his agent. Overhead utilities
34.5 kV or lower) shall be undergrounded. All power lines (temporary or permanent) shall
comply with Caltrans standards for vehicle clearance.
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 13 of 19
3
7
1
3
9
92.Underground water rights shall be dedicated to the City pursuant to the provisions of Section
16.52.030 (LEMC), and consistent with the City’s agreement with the Elsinore Valley
Municipal Water District.
93.Developer shall apply for, obtain and submit to the City Engineering Department a letter
from Southern California Edison (SCE) indicating that the construction activity will not
interfere with existing SCE facilities.
94.Developer shall submit a “Will Serve” letter to the City Engineering Department from the
applicable water agency stating that water and sewer arrangements have been made for
this project and specify the technical data for the water service at the location, such as water
pressure, volume, etc.
IMPROVEMENTS
Design
95.Sight distance into and out and throughout the project location shall comply with City or
Caltrans standards.
96.10-year storm runoff shall be contained within the curb and the 100-year storm runoff shall
be contained within the street right-of-way. When either of these criteria are exceeded,
drainage facilities shall be provided.
97.All drainage facilities in this project shall be constructed to Riverside County Flood Control
District Standards.
98.A drainage study shall be provided. The study shall identify the following: identify storm
water runoff from and upstream of the site; show existing and proposed off-site and on-site
drainage facilities; and include a capacity analysis verifying the adequacy of the facilities.
The drainage system shall be designed to ensure that runoff from a 10-year storm of 6 hours
and 24 hours duration under developed condition is equal or less than the runoff under
existing conditions of the same storm frequency. Both 6-hour and 24-hour storm duration
shall be analyzed to determine the detention
99.All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off-site drainage, if
different from historic flow, shall be conveyed to a public facility.
100.Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs
should drain to a landscaped area.
101.The site shall be planned and developed to keep surface water from entering buildings
California Green Building Standards Code 4.106.3).
102.All existing storm drain inlet facilities adjacent to the subject properties shall be retrofitted
with a storm drain filter; all new storm drain inlet facilities constructed by this project shall
include a storm drain filter. Off-site facilities shall be maintained by the City with maintenance
funded through a CFD or other City authorized assessment.
103.Developer shall be responsible at a minimum for the installation of half-width improvements
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 14 of 19
3
7
1
3
9
including, but not limited to curb, gutter, sidewalk, roadway pavement, and drainage
improvements on Lake Street to the ultimate 60-foot half-width cross section along the
property frontage. The project will construct the raised median on Lake Street to restrict
access to right-in/right-out access at the two driveways on Lake Street.
104.Developer shall be responsible at a minimum for installation of half-width improvements
including, but not limited to curb, gutter sidewalk, roadway pavement, and drainage
improvements on Mountain Street to the ultimate 30-foot half-width cross section along the
property frontage. The project will construct a pork chop island to restrict access to right-
in/right-out for Driveway 2 as shown on Exhibit 1-1 of the Traffic Impact Analysis dated
January 17, 2020.
105.Developer shall provide transition or offset from westerly driveway on Mountain Street to
existing curb at westerly property line.
106.Developer shall implement improvements identified in Section 1.6 of the Traffic Impact
Analysis dated January 17, 2020.
107.Developer shall submit signing and striping plans for City review and approval. All signing
and traffic control devices shall be installed prior to occupancy.
108.Developer shall install permanent benchmarks per City Standards and at location to be
determined by the City Engineer.
109.A California Registered Civil Engineer shall prepare the improvement plans required for this
project. Improvements shall be designed and constructed to City Standards and Codes
LEMC 12.04 and 16.34).
110.If existing improvements are to be modified, the existing improvement plans on file shall be
revised accordingly and approved by the City Engineer prior to issuance of a building permit.
Permitting/Construction
111.An Encroachment Permit shall be obtained prior to any work on City right-of-way. The
developer shall submit the permit application, required fees and executed agreements,
security and other required documentation prior to issuance.
112.All compaction reports, grade certification, monument certification (with tie notes delineated
on 8 ½ X 11” Mylar) shall be submitted to the Engineering Department before final inspection
of public works improvements will be scheduled and approved.
PRIOR TO GRADING PERMIT
Design
113.A grading plan signed and stamped by a California Registered Civil Engineer shall be
submitted for City review and approval for all addition and/or movement of soil (grading) on
site. The plan shall include separate sheets for erosion control, haul route and traffic control.
The grading submittal shall include all supporting documentation and be prepared using City
standard title block, standard drawings and design manual.
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 15 of 19
3
7
1
3
9
114.All grading plan contours shall extend to minimum of 50 feet beyond property lines to
indicate existing drainage pattern.
115.The grading plan shall show that no structures, landscaping, or equipment are located near
the project entrances that could reduce sight distance.
116.If the grading plan identifies alterations in the existing drainage patterns as they exit the site,
a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required
prior to issuance of grading permits. All grading that modifies the existing flow patterns
and/or topography shall be in compliance with Federal, State and Local law and be approved
by the City Engineer.
117.A seismic study shall be performed on the site to identify any hidden earthquake faults,
liquefaction and/or subsidence zones present on-site. A certified letter from a registered
geologist or geotechnical engineer shall be submitted confirming the absence of this hazard
prior to grading permit. The location of faults, active or inactive shall be shown on the plan
sets.
118.Developer shall obtain all necessary off-site easements and/or permits for off-site grading
and the applicant shall accept drainage from the adjacent property owners.
119.Developer shall mitigate to prevent any flooding and/or erosion downstream caused by
development of the site and/or diversion of drainage.
120.All natural drainage traversing the site (historic flow) shall be conveyed through the site in a
manner consistent with the historic flow or to one or a combination of the following: to a
public facility; accepted by adjacent property owners by a letter of drainage acceptance; or
conveyed to a drainage easement as approved by the City Engineer.
Permitting/Construction
121.Developer shall execute and submit grading and erosion control agreement, post grading
security and pay permit fees as a condition of grading permit issuance.
122.A preconstruction meeting with the City Engineering Inspector (Engineering Department) is
required prior to commencement of any grading activity.
123.Prior to commencement of grading operations, developer is to provide to the City a map of
all proposed haul routes to be used for movement of export material. All such routes shall
be subject to the review and approval of the City Engineer. Haul route shall be submitted
prior to issuance of a grading permit. Hauling in excess of 5,000 cubic yards shall be
approved by the City Council (LEMC 15.72.065).
124.Export sites located within the Lake Elsinore City limits must have an active grading permit.
125.Applicant to provide to the City a video record of the condition of all proposed public City
haul roads. In the event of damage to such roads, the applicant shall pay full cost of restoring
public roads to the baseline condition. A bond may be required to ensure payment of
damages to the public right-of-way, subject to approval of the City Engineer.
126.All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 16 of 19
3
7
1
3
9
than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the
City.
127.Review and approval of the project sediment and erosion control plan shall be completed.
As warranted, a copy of the current SWPPP shall be kept at the project site and be available
for review upon request.
128.Approval of the project Final Water Quality Management Plan (WQMP) for post construction
shall be received prior to issuance of a grading or building permit.
129.Submit applicable environmental clearance document to the Engineering Department. This
approval shall identify and clear all proposed grading activity anticipated for this project.
PRIOR TO BUILDING PERMIT
130.Provide soils, geology and seismic report, including recommendations for parameters for
seismic design of buildings, and walls prior to building permit.
131.Prior to issuance of certificates of use and occupancy or building permits for individual tenant
improvements or construction permits for a tank or pipeline, facility uses shall be identified
and, for specified uses (where the proposed improvements will store, generate or handle
hazardous materials in quantities that will require permitting and inspection once
operational), the applicant shall propose plans and measures for chemical management
including, but not limited to storage, emergency response, employee training, spill
contingencies and disposal) to the satisfaction of the City Building Official(s).
132.All street improvement plans, traffic signal plans, signing and striping plans shall be
completed an approved by the City Engineer per Traffic Impact Analysis dated June 4, 2021,
as specified.
133.All required public right-of-way dedications and easements shall be prepared by the
developer or his agent and shall be submitted to the Engineering Department for review and
approval prior to issuance of the building permit.
PRIOR TO OCCUPANCY / FINAL APPROVAL
134.All public improvements shall be installed in accordance with the approved plans or as
condition of this development to the satisfaction of the City Engineer.
135.Proof of acceptance for maintenance responsibility of slopes, open spaces, landscape
areas, and drainage facilities shall be provided.
136.Covenants, Conditions and Restrictions (CC&Rs) shall be recorded prior to occupancy. A
digital copy shall be provided to the Engineering Department.
137.As-built plans for all approved plan sets shall be submitted for review and approval by the
City. Developer/Owner is responsible for revising the original mylar plans.
138.In the event of the damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 17 of 19
3
7
1
3
9
139.Final soil report showing compliance with recommendations, compaction reports, grade
certifications, monument certification (with tie notes delineated on 8 ½ X 11” Mylar) shall be
submitted in .tif format on a USB flash drive or electronically to the Engineering Department
before final inspection will be scheduled.
140.All required public right-of-way dedications, easements, vacations and easement
agreement(s) shall be recorded with a recorded copy provided to the City prior to occupancy.
141.Developer shall pay all outstanding applicable processing and development fees prior to
occupancy and/or final approval.
PROJECT CLOSEOUT / SECURITY RELEASE
142.Developer shall submit documentation pursuant to City’s Security Release handout.
143.Developer shall submit as-built all Engineering Department approved project plan sets. After
City approval of paper copy, the developer/owner is responsible for revising the original
mylar plans. Once the original mylars have been approved, the developer shall provide the
City with a digital copy of the “as-built” plans in .tif format.
144.Developer shall provide AutoCAD and GIS Shape files of all Final Maps, Street and Storm
Drain plans. All data must be in projected coordinate system: NAD 83 State Plane California
Zone VI U.S. Fleet.
CITY OF LAKE ELSINORE FIRE MARSHAL
145.The applicant/operator shall comply with all requirements of the Riverside County Fire
Department Lake Elsinore Office of the Fire Marshal. Questions should be directed to the
Riverside County Fire Department, Lake Elsinore Office of the Fire Marshal at 130 S. Main
St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225.
146.Hazardous Fire Area: this project is in a Very High Fire Hazard Severity Zone of Riverside
County as shown on a map on file with the Clerk of the Board of Supervisors. Any building
constructed within this project shall comply with the special construction provisions
contained in Lake Elsinore Municipal Code and the California Building Code.
147.Fire flow and hydrants: the applicant or developer shall provide fire hydrants in accordance
with the following:
a. Prior to placing any combustibles on site, provide an approved water source for
firefighting purposes.
b. Prior to building permit issuance, submit plans to the water district for a water system
capable of delivering fire flow as required by the California Fire Code and Fire
Department standards. Fire hydrants shall be spaced in accordance with the California
Fire Code. Based on current standards, the required fire flow is estimated to be 1,500
GPM at 20 PSI for a 2 hour duration. Estimated fire flow is based on 5,000 square
foot building area, Type V-B construction, and buildings having a fire sprinkler system
per 2019 California Fire Code.
148.Prior to building permit issuance, install the approved water system, approved access roads,
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 18 of 19
3
7
1
3
9
and contact the Fire Department for a verification inspection.
149.Emergency access roads must meet fire department standards at the time of building permit
application. Current standards require minimum 24-foot wide roads. Roads must be capable
of supporting at least 80,000 pounds.
DEPARTMENT OF ADMINISTRATIVE SERVICES
Annex into the City of Lake Elsinore Community Facilities District No. 2015-2 (Maintenance
Services)
150.Prior to approval of a the Final Map or issuance of a Grading Permit (whichever comes first),
the applicant shall submit an application to the Department of Administrative Services or
building permit (as applicable), the applicant shall to initiate the annexation process into the
Community Facilities District No. 2015-2 (Maintenance Services) or current Community
Facilities District in place at the time of annexation to fund the on-going operation and
maintenance of the public right-of-way landscaped areas and neighborhood parks to be
maintained by the City and for street lights in the public right-of-way for which the City will
pay for electricity and a maintenance fee to Southern California Edison, including parkways,
street maintenance, open space and public storm drains constructed within the development
and federal NPDES requirements to offset the annual negative fiscal impacts of the project.
The annexation process shall be completed prior to issuance of the first certificate of
occupancy for the project. Alternatively, the applicant may propose alternative financing
mechanisms to fund the annual negative fiscal impacts of the project with respect to
Maintenance Services. Applicant shall make a non-refundable deposit of $15,000 or at the
current rate in place at the time of annexation toward the cost of annexation, formation or
other mitigation process, as applicable.
MITIGATION MONITORING AND REPORTING PROGRAM
151.The applicant shall comply with all mitigation measures identified in the Mitigation Monitoring
Reporting Program for the Environmental Impact Report (Environmental Review No.
2020-03; SCH # 2020080538) prepared for the Project.
Conditions of Approval
PA 2019-34/TTM 37922/CUP 2019-19/CDR 2019-27 CC: March 12, 2024 (EOT)
Applicant’s Initials: _____ Page 19 of 19
3
7
1
3
9
I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above
named project and do hereby agree to accept and abide by all Conditions of Approval as approved
by the City Council of the City of Lake Elsinore on January 25, 2022 March 12, 2024. I also
acknowledge that all Conditions shall be met as indicated.
Date:
Applicant’s Signature:
Print Name:
Address:
Phone Number:
UTILITIESWATER:
EASTERN MUNICIPAL
WATERDISTRICT951-928-3777
APPLICABLE
BUILDINGCODESALLCONSTRUCTIONTOCOMPLY
WITH:
PROJECT
DESCRIPTION (
SOW)APPLICANTDANNYSINGHTIGERPETROLEUM,
INC.3017 E. EDINGER AVE.
TUSTIN, CA92780CELLPHONE: (949) 630-5345E-MAIL:
dannysingh9@gmail.com
SITEDATA11TELEPHONE / CABLE:
SPECTRUM1-833-694-
9259
1.CONDITIONAL USE PERMIT ANDCOMMERCIALDESIGNREVIEW.ADDRESS:NWC MOUNTAIN ST. & LAKE ST.
LAKE ELSINORE, CA92530
BUILDING
CODE:
PLUMBING
CODE:
ELECTRICAL
CODE:
2016 CALIFORNIA
BUILDINGCODE2016CALIFORNIA
PLUMBINGCODE2016CALIFORNIA
ELECTRIC CODE
2.THE PROJECT INVOLVES (7) SEVEN PARCELS
TOTALING APPROXIMATELY 5.60NETACRES.PERMITNUMBER:
APN:
TBD3.
4.
THE PROJECT PROPOSES A 3,400 S.F. C-STOREWITHATTACHED1,525 S.F.
QSR, AND AN ASSOCIATED (6) SIX MPD 4,089S.F. FUELING CANOPY.
SEWER:FRONTIER1-800-921-8101
MECHANICAL CODE: 2016
CALIFORNIA MECHANICAL CODE 389-030-012, 013, 014, 015, 016, 017, 018EASTERNMUNICIPALWATERDISTRICT951-928-3777
ENERGY
CODE:
GREEN
BUILDING:
FIRE CODE:
2016 CALIFORNIA ENERGY
CODE2016CALIFORNIA GREEN
BUILDINGCODE2016CALIFORNIA FIRE
CODE (2015 IFC)
A PROPOSED 3,150 S.F. 90 FOOT LONGEXPRESSCONVEYORBELTCARWASHWITHASSOCIATED20VACUUMSTALLS.
LOT
SIZE:EXISTING: 6.07 ACRES (264,583 S.F.)
PROPOSED: 5.63 ACRES (
245,324 S.F.)
ARCHITECT /
EXHIBITPREPAREREMPIREDESIGNGROUP, INC.
PO BOX944MURRIETA, CA92564PHONE: (951) 696-1490
WASTE:
WASTE
MANAGEMENT1-866-909-4458
GAS:5.
6.
4.
A PROPOSED 4,850 S.F. RETAIL BUILDING ACONSISTINGOF5SUITES.
A PROPOSED 4,850 S.F. RETAIL BUILDING B
CONSISTING OF 5 SUITES.
PHYSICAL
ADDRESS:24861
WASHINGTONAVE.
MURRIETA, CA92562
BUILDING
AREAS:C-STORE: 3,400 S.F.
QSR: 1,525 S.F.
CANOPY: 4,089 S.F.
EXPRESS CARWASH: 3,150 S.F.
DRIVE-THRU A:
3,320 S.F.
DRIVE-THRU B: 2,520
S.F.
RETAIL A: 4,850 S.F.
RETAIL B: 4,850 S.F.
RETAIL C: 1,600 S.F.
SOUTHERNCALIFORNIA GAS CO.
1-800-427-2200
THE PROJECT SHALL COMPLY WITH THE
DEVELOPMENTSTANDARDSASOUTLINEDINTHEC-2 ZONE AND THE
LEMC
A PROPOSED 3,320 S.F. DRIVE-THRU BUILDINGAFASTFOODRESTAURANTWITHANATTACHED1,600 S.F. RETAILBUILDINGC.
ELECTRICAL:SOUTHERN
CALIFORNIAEDISON1-800-655-4555
FAX: (951)
696-14435.
6.
7.
A PROPOSED 2,520 S.F. DRIVE-THRU B FAST
FOOD RESTAURANT WITHANON-ATTACHED 2,400 S.F. RETAIL BUILDINGD.
CELL PHONE: (951) 809-
7601E-MAIL: ghann@empiregr.bizCONTACT: GREGORYHANN, ARCHITECT
ONSITE IMPROVEMENTS CONSIST OF ON-SITEPARKING, WQMP AREAS, SITECIRCULATION, LANDSCAPING AND SITELIGHTING.RETAIL D: 2,400 S.F.
TRASH ENCLOSURE A: 176
S.F. (TYP. OF 4)
TRASH ENCLOSURE B: 287S.F. (TYP. OF 1)
OFFSITE IMPROVEMENTS CONSIST OF NEWUTILITYCONNECTIONS, RIGHTOFWAYDEDICATIONS, DRIVEWAY APPROACHES, A PROPOSED MEDIAN, ANDUNDERGROUNDINGOFEXISTING
TELEPHONE/POWER POLESFRONTINGPROJECTSITE.
1 FLOOR AREA
RATIO:
BUILDINGHEIGHT:
COUNTY:
13
MAX HEIGHT:
45'-0"
RIVERSIDECONSTRUCTIONTYPE:
OCCUPANCYS:
V-B/SPRINKLERED
MSPECIFICPLAN:N/A
EXISTING LAND
USE:
PROPOSEDLANDUSE:
EXISTINGZONE:
VACANTRETAIL /
COMMERCIAL
C2 - GENERAL
COMMERCIAL
C2 - GENERALCOMMERCIAL
1
1 EXISTING
PROPERTY LINE PROPOSEDZONE:LANDSCAPE
PLANTER HAZARDOUS FIRE AREA: VERY HIGH FIRE
HAZARD SEVERITYZONECOMPLY WITH LEMC &
CBC
1
LANDSCAPEPLANTER SURROUNDINGLANDUSEAND
ZONING:
NORTH: C2 - GENERALCOMMERCIALRETAIL
B25'X40',
38'(
TYP.
OF 5)
4,850
S.F.
20S
RETAIL
A25'X40',
38'(
TYP.
OF 5)
4,850
S.F.
20S
SOUTH: R1 - SINGLE FAMILY
RESIDENTIALEAST: MURDOCK ALBERHILLRANCHSPECIFICPLANWEST: R1 - SINGLE FAMILY
RESIDENTIAL
WQMP
AREA
WQMP
AREA
WQMP
AREA
WQMP
AREA 1
PARKING REQUIREMENTS: RESTAURANT: 1/45 S.F.
CUSTOMER & 1/200 S.F. NONRETAIL: 1/250 S.F.LOADING SPACES REQUIREDFORCOMMERCIALBUILDINGOVER12,000 S.F. -
20,000 S.F (N/A)
C-STORE: 3,400 S.F. / 250QSR: 1,525 S.F. (500 S.F. / 45 + 1,025 S.F. / 200)= 16
LANDSCAPEPLANTERLANDSCAPE
PLANTER
CONCRETE
WALKWAY
14CONCRETE
WALKWAY
CONCRETE
WALKWAY CANOPY: 4,089 S.F. /
0EXPRESS CAR WASH:
3,150 S.F. / 0DRIVE-THRU A: 3,320
S.F.(
1,200 S.F. / 45 + 2,120S.F. / 200)
DRIVE-THRU B: 2,520S.F.
0= 0T.E.
T.E.A A = 37
1,000 S.F. / 45 +
1,520 S.F. / 200)RETAIL A: 4,850 S.F. /
250RETAIL B: 4,850 S.F. /
250RETAIL C: 1,600 S.F. /
250RETAIL D: 2,400 S.F. / 250
30=
19=
19= 6
WQMP
AREA PROPOSED ADA
PATHOFTRAVEL
THROUGHOUT SITE
ANDTOTHE PUBLIC RIGHT
OF WAY
PROPOSED TREE WELL
LOCATIONS,
SEE LANDSCAPE, TYP.
PROPOSED
UNDERGROUNDUTILITIES, SEE CIVIL T.E.
B
1 PROPOSED
COVEREDVACUUMSTALLS,
TYP. OF 20
PROPOSED
STORMWATERSYSTEM, SEE CIVIL
1 = 10DRIVE-THROUGH LANES
PROVIDEMINIMUM 8 VEHICLES IN
ACCORDANCEWITHLEMCSECTION
17.148.060 (TYP.)
TOTAL PARKINGREQUIRED = 151STALLSDRIVE-THROUGH
LANES
DRIVE-
THROUGH
LANES
LANDSCAPE
PLANTER
LANDSCAPE
PLANTER T.E.
A
TOTAL PARKING PROVIDED =
170 STALLS(
INCLUDING 11 ADA & 20VACUUMSTALLS)
PROVIDE MINIMUM
8VEHICLESINACCORDANCE
WITHLEMCSECTION17.148.060 (
TYP.)
PROVIDE MINIMUM
8VEHICLESINACCORDANCE
WITHLEMCSECTION17.148.060 (
TYP.)
LOT
COVERAGE:
BUILDING: 32,695 S.F. (
13%)
LANDSCAPING: 64,572 S.F. (27%)
IMPERVIOUS: 146,781S.F. (60%)
TOTAL: 245,324 S.F. (100%)
1LANDSCAPE
PLANTERCONCRETE
WALKWAY
LANDSCAPE
PLANTER T.E.
A
LANDSCAPE
PLANTERLANDSCAPEPLANTER1F12F4F5158T6I0ERG16AG56158T4I8ER
G17F19'ELOW)F7(BELOW)
G17A
GM2IN1.
CLRA.F.F.TG7
T36G605E G9EPR9EB-R9IN'xS3E0"FG0AUCET
F8 SHEETINDEXQSR40'X40'
1,525
S.F.
16S
C-
STORE
F3A 48"
C7
4CCC8"54"C121980
G34 BEWTG3TG3G7 85'X40'AS1.0 CONCEPTUALSITEPLANFRONCW2
T C2
FRONTC2BELCO5BECL1O5WC3G1TG14AC1C1 C1
G6A A6
BELOW
A7
TG10 3,400
S.F.
A14 ALTA/TOPOSHEET1 ALTA/NSPA
LAND TITLE SURVEY
G16
TG4A36"Lx24"D
36"Lx24"D 14SA51
A1C7FILTERA4BEAL5OW
RETAILC
A1037A(2
BEAL4O9W SHEET2 ALTA/NSPA LANDTITLESURVEYA123(A2(
2)
A1037A(2
BEAL5OW WHFIPAROC3NRTEAM2-AH1E6AAD)40'X40'
1,600
S.F.
6S
A187FILTER
CIVILC01C02C02AC03
CONCRETE
WALKWAY RETAILD40'X60'
2,400
S.F.
10S
GRADING
PLANWQMP SITE
PLANDETAILSEXPRESSCAR
WASH90'X35'
UTILITY
PLAN1LANDSCAPEL1LANDSCAPE
CONCEPTPLAN500S.F. OF
CUSTOMER
PROPOSED
AIRANDWATER
LOCATION
SERVING
AREA
3,150
S.F.ARCHITECTURALC-STORE AND QSR
FLOORPLANA1.1A1.2A1.3A1.5A1.6A1.7A1.8A1.9A1.10A1.11A1.12A1.13A2.1A2.2A2.3A2.3.
1A2.4A2.5A2.6A2.7A3.0A3.1A3.2
DRIVE-
THRUA
PROPOSED
LOCATION OFHEALYTANK, VENT RISERS,
ANDUNDERGROUND
STORAGE TANKS
C-STORE AND QSRROOFPLANDRIVE-
THRUB
CANOPY FLOOR AND
ROOFPLANEXPRESSCAR WASH
FLOORPLANEXPRESSCAR WASHROOFPLANRETAILAANDBFLOORPLAN
40'X80'
3,320
S.F.
38S
40'X60'
2,520
S.F.
30S
6
MPDCANOPY87'X47'
RETAIL A AND B
ROOFPLANRETAILCAND DRIVE-THRUAFLOORPLANRETAILCANDDRIVE-THRUAROOFPLANRETAILDANDDRIVE-THRU
B FLOORPLANRETAILDAND DRIVE-THRU
B ROOFPLANTRASHENCLOSURE A ANDBFLOORPLANSC-STORE AND QSRELEVATIONS
4,089
S.F.
CANOPYELEVATIONSLANDSCAPEPLANTER1LANDSCAPE
PLANTER EXPRESS CAR WASH
ELEVATIONSEXPRESSCAR WASH
ELEVATIONSRETAILAAND B
ELEVATIONSRETAILCAND DRIVE-THRUAELEVATIONSRETAILDANDDRIVE-THRUBELEVATIONSTRASHENCLOSUREAANDBELEVATIONSC-STORE AND QSR
SECTIONS
11,200 S.F. OF
CUSTOMERSERVINGAREA
1,200 S.F. OF
CUSTOMERSERVINGAREAPROPOSED5-BIKE
RACK(
INGROUND) BY:
BARCOPRODUCTS #05CL1692
OREQUALATEACHBUILDING,
TYP. OF 8
EXISTING UTILITY
METERSINPUBLIC
R.O.W. TOBERELOCATED,
SEE CIVIL
EXISTING
TELEPHONE/POWERPOLESTOBE
RELOCATEDUNDERGROUND,
TYP. OF 7
ALONG BOTH STREET
FRONTAGES RETAIL C/D AND DRIVE-THRU
A/BSECTIONSEXPRESSCAR WASH AND
RETAIL A/B SECTIONS
LANDSCAPE
PLANTER
CONCRETE
SIDEWALK
LANDSCAPE
PLANTER
LANDSCAPE
PLANTER
PROPOSED
PROPERTY LINE
CONCRETE
SIDEWALK
100.00'
VICINITY
MAP100.12'100.00'100.00'100.00'90.78'° 3 ' 8ABANDONEDPROPERTYLINEN1°25'44" E
591.02'=
1 9.
5
4 .'GH
GH
AHEXISTINGSIGNALIZEDINTERSECTION
TO BEUPDATED BASIS OF
BEARINGSS1°25'44" W
620.31'
L A K E S T
R E ETPUBLICROAD ROW =
VARIES
CL CONCEPTUALSITE
PLAN
CONCEPTUAL
SITE PLAN
MOUNTAINST
SITE AS
1.0SCALE:
1" =
30'-0"
NOT TO
SCALE
26' - 6"
22' - 0"
ELDORADO STONE
COASTAL LEDGESTONE
S1
KEYSTONE
FOAMARCH -
TYP.SIGNSIGN
C1
DIRECT APPLIED FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DESERT
TRAIL
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
C1
DIRECT APPLIED FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO (...)
OVERMETALLATHPROVIDECONTROL.
JOINTS ASSHOWNCOLORSPECIFY:
BIRCHSTONE
TIGERP
ETROLEUM,
INC
0' - 0"
C2FRONT
ELEVATION3/16" = 1'-
0"
S11 C2 C3C4S1
DIRECT APPLIED FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DARK
BEIGE STUCCO
C1
23' - 3"
C3
15' - 03/4"DIRECT APPLIED FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: MOCHAC4
ALUMINUM COMPOSITE
MATERIALWHITE0' - 0"
C3 C2 C4 M1
REAR
ELEVATI
ON3/16" = 1'-
0"
ACM Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
2
E-MAIL:
ghann@empiregr.bizDIRECTAPPLIEDFINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: 50YY
83/029
C1 S1 SEAL :
ICI# A0050 "
NATURAL WHITE "TRIM
DATE OCT3,
2019PAINTGRADEFINISHOVER
METAL SURFACES
PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTIONCOLORSPECIFY #
90BC 41/040ICI#A1963 " ASCOR
BLUE "
C3 M1
NOTE : ALL
SIGNAGE ARE ON
ASEPARATE PERMIT
C4
DESIGNED
BY:
CHECKED
BY:
GH
GHAGRIGHTSIDE
ELEVATION3/16" = 1'- 0"
LEFT SI DE
ELEVATION3/16" = 1'- 0"
DRAWN
BY:
3 4 C STORE
ANDQSRELEVATION
A2.
1
ELDORADO STONE
COASTAL LEDGESTONE
S1
22' -
0"
17' -
0"
ACM
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DESERT
TRAIL
All ideas, designs andlayoutsshownonthesedrawings, includingalldocumentsonelectronicmediaarethepropertyofempiredesigngroup, and areintendedtobeusedibconnectionwiththisspecificprojectonlyandshallnototherwisebeusedforanypurposewhatsoeverwithoutthewrittenconsent. andmaynotbereproduced orusedwithoutthewrittenpermissionofempiredesigngroup.All rights reserved
C2
S1
C1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO (...)
OVERMETALLATHPROVIDECONTROL.
JOINTS ASSHOWNCOLORSPECIFY:
BIRCHSTONE
TIGERPETROLEUM,
INC
0' -
0"
CANOPY FRONT
ELEVATION3/16" = 1'-0"
C21
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DARK
BEIGE STUCCO C3
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: MOCHA
ACM
C2
S1 C4
ALUMINUM COMPOSITE
MATERIAL WHITE
Architect of
Record:GREGORY S.
HANN, AIA24861
WASHINGTONAVE.
MURRIETA, CA
92562TEL: 951-696-
1490
ACMCANOPYREAR
ELEVATION3/16" = 1'-0"
CEL: 951-
809-7607FAX: 951-696-
1443E-MAIL:
ghann@empiregr.biz2DIRECTAPPLIDFINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: 50YY
83/029
SEAL :
ICI# A0050 "
NATURAL WHITE "TRIM
DATE OCT 3, 2019PAINTGRADEFINISHOVER
METAL SURFACES PROJECTNUMBER EDG#04589COLORSPECIFY #
90BC 41/040ICI#A1963 " ASCOR
BLUE "
NO DATE REVISIONDESCRIPTION
ACM M1
DESIGNEDBY:
CHECKEDBY:
GH
GH
AGDRAWNBY:
CANOPYELEVATIONCANOPYRIGHT
SIDEELEVATION3/16" = 1'-0"
CANOPY LEFT
SIDEELEVATION3/16" = 1'-0"
3 4 A2.
2
PAINT GRADE FINISH OVER
METAL SURFACES
ELDORADO STONE
COASTAL LEDGESTONE
S1
26' - 3"
24' - 8"
COLOR SPECIFY #
90BC 41/040ICI#A1963 " ASCOR
BLUE "M1
21' - 3"
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DESERT
TRAIL
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
C1
C1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO (...)
OVERMETALLATHPROVIDECONTROL.
JOINTS ASSHOWNCOLORSPECIFY:
BIRCHSTONE
TIGERP
ETROLEUM,
INC
KEYSTONE
FOAMARCH -
TYP.
M1 C4 C2
S1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DARK
BEIGE STUCCO
0' - 0"
C2
C3CARWASH
ENTRANCE ELEVATI
ON1/4" = 1'- 0"
1 DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: MOCHAC4
ALUMINUM COMPOSITE
MATERIAL WHITE
ACM Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490
S1
CEL: 951-809-
7607FAX: 951-696-1443E-MAIL:
ghann@empiregr.biz26' - 3"
25' - 0"
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: 50YY
83/029ICI# A0050 " NATURAL WHITE "
TRIM
SEAL :
21' - 3"
20' - 0"
EX PRESS
CAR WASH
DATE OCT3,
2019PROJECT
NUMBER EDG#04589C1
C4
NO DATE REVISION
DESCRIPTION
11' - 6"
KEYSTONE
FOAMARCH -
TYP.C2
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
0' - 0"EXPRESS
CARWASH
ELEVATION
CAR WASH EXIT
ELEVATION1/4" = 1'- 0"
A2.32
S1
C1 26' - 3"26' - 3"24' - 10"
21' - 3"
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rightsreservedTIGERP
ETROLEUM,INCC4
C2 C3
CAR WASH RI GHT SI
DE ELEVATION1/4" = 1'- 0"
1
26' - 3"26' - 3"Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490
24' - 10"
CEL: 951-809-7607FAX: 951-696-1443E-MAIL: ghann@empiregr.biz21' - 3"SEAL :
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
EXPRESS
CARWASHELEVATIONCARWASHLEFTSI
DE ELEVATION1/4" = 1'- 0"
2
A2.3.
1
30' - 0"
26' - 9"
21' - 3"21' -
3"
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
13' - 0"
10' - 0"
13' - 0"
TIGER5' - 0"
P
ETROLEUM,
INC
0' -
0"
RETAI L C AND DRI VE THRU
REAR ELEVATION3/16" = 1'- 0"
1
30' - 0"
26' - 8"
21' - 3"SI
GN
SI
GN
21' - 3"
13' - 0"
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490
CEL: 951-809-7607FAX: 951-696-1443E-MAIL: ghann@empiregr.bizRETAILCANDDRIVETHRU
FRONT ELEVATION3/16" = 1'- 0"
2 SEAL :
DATE OCT3, 201930' - 0"PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION26' - 8"
DESIGNED
BY:
CHECKED
BY:
GH13' - 0"GH
AGDRAWNBY:
RETAILC
ANDDRIVE
THRUELEVATION
5' - 0"
NOTE : ALL
SIGNAGE ARE ON
ASEPARATE PERMIT
A2.5RETAILCANDDRIVETHRU
SI DE ELEVATION3/16" = 1'- 0"
3
NOTE : ALL
SIGNAGE ARE ON
ASEPARATE PERMIT
ELDORADO STONE
COASTAL LEDGESTONE
S1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DESERT
TRAIL
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
C1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO (...)
OVERMETALLATHPROVIDECONTROL.
JOINTS ASSHOWNCOLORSPECIFY:
BIRCHSTONE
TIGERP
ETROLEUM,
INC
TRAS H ENCLOS URE FRONT
ELEVATI ON TYPEB1/4" = 1'- 0"
TRAS H ENCLOS URE FRONT
ELEVATI ON TY PEA1/4" = 1'- 0"
1 5 C2
GUTTERS BY
OTHER - TYP.C2
C1
GUTTERS BY
OTHER - TYP.DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DARK
BEIGE STUCCO
C3
S1
C3
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: MOCHA
C2
TRAS H ENCLOS URE REAR
ELEVATI ON TYPEB1/4" = 1'- 0"
TRAS H ENCLOSURE REAR
ELEVATI ON TY PEA1/4" = 1'- 0"
C426
ALUMINUM COMPOSITE
MATERIAL WHITE
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490
ACM
CEL: 951-809-7607FAX: 951-696-1443E-MAIL: ghann@empiregr.bizDIRECTAPPLIDFINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: 50YY
83/029
SEAL :
ICI# A0050 "
NATURAL WHITE "TRIM
TRAS H ENCLOS URE RIGHT
ELEVATI ON TYPEB1/4" = 1'- 0"
TRAS H ENCLOS URE RIGHT
ELEVATI ON TYPEA1/4" = 1'- 0"
DATE OCT3, 2019PAINTGRADEFINISHOVER
METALSURFACES37 PROJECT
NUMBER EDG#04589COLORSPECIFY #
90BC 41/040ICI#A1963 " ASCOR
BLUE "
NO DATE REVISION
DESCRIPTION
M1
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
TRAS
HENCLOS
UREELEVATIONTRASHENCLOSURELEFT
ELEVATI ON TY PEB1/4" = 1'- 0"
TRAS H ENCLOS URE LEFT
ELEVATI ON TYPEA1/4" = 1'- 0"
4 8 A2.
7
29' - 3"
26' - 3"
HIGHEST
PARAPET
LOWERPARAPETSI
GN
SIGNSIGNSIGN
SI
GN C4
C1
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
S1
TIGERC2P
ETROLEUM,
INC
0' - 0"
RETAI L A AND B
FRONT ELEVATION3/16" = 1'- 0"
1
HIGHESTPARAPET
29' - 3"
26' - 3"
LOWERPARAPET
C4
C1
C2C3
S1
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
E-MAIL:
ghann@empiregr.bizRETAILAANDREAR
ELEVATION3/16" = 1'- 0"
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: MOCHA
SEAL :
ELDORADO STONE
COASTAL LEDGESTONE 2
S1
C4
29' - 3"
26' - 3"
DATE OCT3,
2019PROJECT
NUMBER EDG#04589DIRECTAPPLIDFINISH
SYSTEMSMOOTHALUMINUMCOMPOSITE
MATERIAL WHITE TROWL 3 PART 7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DESERT
TRAIL
NO DATE REVISION
DESCRIPTION
C4 21' - 2"C1ACM
C1DIRECTAPPLID
FINISHSYSTEMSMOOTHTROWL 3
PART 7/8''
STUCCO OVER
METALLATHPROVIDE
CONTROL. JOINTS
ASSHOWN
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO (...)
OVERMETALLATHPROVIDECONTROL.
JOINTS ASSHOWNCOLORSPECIFY:
BIRCHSTONE
15' - 0"
DESIGNED
BY:
CHECKED
BY:
GHCOLORSPECIFY:
50YY 83/029ICI# A0050 "
NATURAL WHITE "
GHAGC3TRIMDRAWNBY:C2
RETAILA
ANDBELE
VATION
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DARK
BEIGE STUCCO
PAINT GRADE FINISH OVER
METAL SURFACESS1COLORSPECIFY #
90BC 41/040ICI#A1963 " ASCOR
BLUE "M1 C2C3 A2.4RETAILAANDBSI
DE ELEVATION3/16" = 1'- 0"
NOTE : ALL
SIGNAGE ARE ON
ASEPARATE PERMIT
3
125' -
0"All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
OVERALL
40' -
0"
85' -
0"
6' -
0"
68' -
2"
6' -
0"
36' -
7"
6' -
0"TIGERP
ETROLEUM,
INC
A2.1
2
SEC36"
PULLSECTION
SEC30"
PULLMETERMAIN
CPI 47"
PANELSECTION1
CPI 24"CPI 24"
SECTION 2SECTION3
18605TIER
G56 18485
TIERF11F12 1854 18544
TIER
18544
TIER
1854 18544
TIER
1854 18544
TIER
18544
TIER
F5 G16A 4TIER 4TIER
4TIERFIRERISERF4G17AG21G17MIN. 9' CLR
A.F.F.TG7
F1
F7 (BELOW)F7 (BELOW)
G9EPGR9EB-R9I0N'xS3E0F"AUCETTG5E
3660
F8
F13
OFFICE7' - 6"PREP C7
F3A WALK
INCOOLER
48"48"54"
C8C9C10C12
TG3 TG3
G34
TG1BELOWG7
FRONTFRONTC2C2 C2
BECL5OW C15BELOW C3
G1
TG14A C1 C1 C1
A6BELA7OWG6A SALESAREAA2.1 4
3 A2.1TG10COLD
SHELL
A14
G16
TG4A
CUSTOMER 36"Lx24"
D
36"Lx24"
DSERVICE
AREA
A51
482
SF
A1C7
FILTER
BELA5OWUNISEXUNISEXA4
A10A10AA13(2)
A17
A49BELOW
A12(2)
A13(2)
A13A(
2)WALKINBEAL5OWA3WHIPCREAM Architect of
Record:
A10FRONTA10AA13(2)
A17 FREEZER GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490
A16A
2-HEAD)18604TIER
A178FILTER
CEL: 951-809-7607FAX: 951-696-1443E-MAIL: ghann@empiregr.biz6' -
0"SEAL :
3' -
0"
4' -
9"
8' -
0"
2' -
0"
6' -
0"
2' -
0"
8' -
0"
33' - 4
1/2"
8' -
0"
5' -
4"
6' -
0"
1
5' -
4"
8' -
0"
27' - 2
1/2"
DATE OCT3,
2019PROJECT
NUMBER EDG#04589A2.1 NO DATE REVISION
DESCRIPTION
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
C STORE
ANDQSRFLOORPLANCSTOREANDQSR
ENLARGED FLOORPLAN3/16" = 1'- 0"
1 A1.
1
91' -
0"OVERALL
2' -
0"
87' -
0"
2' -
6"
2' -
0"All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
9' -
3"
2' -
6"
30' -
6"
30' -
6"
2' -
6"
9' -
3"
TIGERP
ETROLEUM,
INC
6
MPDCANOPY87'X47'
3 A2.24,089
S.F.
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
E-MAIL:
ghann@empiregr.bizSEAL :
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTIONCANOPYFLOOR/
ROOFPLAN3/16" = 1'- 0"
1
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
CANOPY
FLOORPLAN
A1.
3
A2.3
10' - 6"
0' -
6"4' -
6"14' -
0"
4' -
6"
8' - 0
1/2"
4' -
6"
35' -
0"
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
1' -
6"
FIRE RISER
ROOM
UNISEX
RESTROOM TIGERP
ETROLEUM,
INC
3' -
0"
3' -
0"
CAR
WASH BAY
1 A2.3.
1
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
E-MAIL:
ghann@empiregr.bizSEAL :
A2.3.
1
2
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION
24' -
8"
9' -
10"DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
EXPRESS
CARWASH1' - 6" 4' -
6"
0' -
6"
14' -
0"
4' -
6"
0' -
6"
11' -
0"
EX PRESS CAR WASH
FLOORPLAN3/16" = 1'- 0"
35' -
0"
OVERALL A1.51
4' - 5". 6' - 10"
4' - 10"
28' -
4"
6' - 0 1/2"
4' - 0"
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
FIRERISER
TIGERP
ETROLEUM,
INC
RETAILC40'X40'1,600
S.F.6SCOLD
SHELL
2 A2.5
4' - 5
1/2"3' -
0"13' -
0"
A2.5 3
DRIVE-
THRU
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
A
CUSTOMERSERVING
AREA
40'X80'
3,320
S.F.
38S
E-MAIL:
ghann@empiregr.biz1160
SF SEAL :
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
RETAILC
ANDDRIVE
THRURETAILCAND
DRI VETHRU1/8" = 1'- 0"
1 A1.
9
125' - 0"OVERALL
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
25' -
0"
25' -
0"
25' -
0"
25' -
0"
25' -
0"
A2.4
2
TIGERP
ETROLEUM,
INC
FIRERISER
COLD
SHELL
COLD
SHELL
COLD
SHELL
COLDSHELLCOLD
SHELLRETAIL
A & B25'X40'(
TYP.
OF 5)
5,000
S.F.
20S
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
E-MAIL:
ghann@empiregr.bizSEAL :
4' -
0"
20' -
9"
3' -
0"
22' -
3"
2' -
9"
22' -
0"
3' -
0"
22' -
0"
3' -
0"
20' - 8
1/2"
4' -
0"
1
DATE OCT3,
2019A2.4 PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION
RETAI L A
ANDB3/16" =
1'- 0"
DESIGNED
BY:
CHECKED
BY:GH1GHAGDRAWNBY:
RETAILA
ANDB
A1.
7
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
6' - 10" 4' -
10"
28' -
4"
6' - 0 1/2"
4' - 0"
FIRERISER
TIGERP
ETROLEUM,
INCRETAILD40'X60'
2,400
S.F.
10SCOLD
SHELL 1 A2.6
4' -
0"A2.6 2
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
E-MAIL:
ghann@empiregr.bizSEAL :
DRIVE-
THRUD40'X60'
2,520
S.F.
30S
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION
3' -
0"
15' -
0"
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
3
RETAILD
ANDDRIVE
THRUD
A2.6
RETAI L D AND
DRI VETHRU1/8" = 1'- 0"
A1.111
A2.7
3
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
5' -
8"
6' -
8"
A2.7
8TIGER5' - 8"
6' -
8"P
ETROLEUM,
INC
A2.7 1
2 A2.7
A2.7 5
6 A2.7
12' -
4"
7 12' -
4"A2.7 4
A2.7
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
TRAS H ENCLOS
URE TY PEA1/4" = 1'- 0"
TRASH ENCLOS
URE TYPEB1/4" = 1'- 0"
1 2 E-MAIL:
ghann@empiregr.bizSEAL :
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTION
DESIGNED
BY:
CHECKED
BY:
GH
GH
AGDRAWNBY:
TRASHENCLOS
UREFLOOR P
LANA1.
13
ELDORADO STONE
COASTAL LEDGESTONE
All ideas, designs and
layouts shownonthesedrawings, including alldocumentsonelectronicmediaarethe
propertyofempiredesigngroup, and are
intended to be usedibconnectionwiththisspecific
project onlyandshallnototherwise be used
for anypurposewhatsoeverwithout the written
consent. andmaynotbereproduced or
used withoutthewrittenpermission of empire
design group.
All rights reserved
S1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DESERT
TRAIL
TIGERP
ETROLEUM,
INC
C1
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO (...)
OVERMETALLATHPROVIDECONTROL.
JOINTS ASSHOWNCOLORSPECIFY:
BIRCHSTONE
C2
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: DARK
BEIGE STUCCO C3
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: MOCHA
C4
Architect of
Record:GREGORY S. HANN,
AIA24861
WASHINGTON AVE.
MURRIETA, CA
92562TEL: 951-696-1490CEL: 951-809-7607FAX: 951-696-1443
ALUMINUM COMPOSITE
MATERIAL WHITE E-MAIL:
ghann@empiregr.bizSEAL :
ACM
DIRECT APPLID FINISH
SYSTEMSMOOTHTROWL3PART7/8'' STUCCO
OVERMETALLATHPROVIDE CONTROL.
JOINTS ASSHOWNCOLORSPECIFY: 50YY
83/029
DATE OCT3,
2019PROJECT
NUMBER EDG#04589NODATEREVISION
DESCRIPTIONICI# A0050 "
NATURAL WHITE "TRIM
PAINT GRADE FINISH OVER
METALSURFACESCOLORSPECIFY #
90BC 41/040ICI#A1963 " ASCOR
BLUE "
DESIGNED
BY:
CHECKED
BY:
GHM1GH
AGDRAWNBY:
MATERIAL
BOARD
A4.
0
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the City Council of the City of Lake Elsinore, California, will hold
a Public Hearing on March 12, 2024, at the Lake Elsinore Cultural Center, 183 North Main Street,
Lake Elsinore, California, 92530, at 7:00 p.m., or as soon thereafter as the matter may be heard,
to consider the following related items:
First Extension of Time Request for Tentative Tract Map No. 37922, Conditional Use Permit
No. 2019-19, and Commercial Design Review No. 2019-27 (Lake and Mountain Commercial
Center): A request by Danny Singh to extend the life of the approved Tentative Tract Map No.
37922 (TTM 37922), Conditional Use Permit No. 2019-19 (CUP 2019-19) and Commercial Design
Review No. 2019-27 (CDR 2019-27) by two years (2) to January 25, 2026. TTM 37922 proposes
to subdivide the 6.07-acre site into six (6) lots ranging in size from 0.66 acres to 1.10 acres. The
remaining 0.44-acre portion of the site will be dedicated for road right-of-way purposes. CUP
2019-19 and CDR 2019-27 propose the development of an approximately 32,695 square foot
SF) commercial retail center that includes a 3,400 SF convenience store with an attached 1,525
SF Quick-Serve Restaurant, a 4,089 SF gas fueling canopy, a 3,150 SF express car wash, two
2) 4,850 SF retail buildings, a 3,320 SF drive-thru restaurant with an attached 1,600 SF retail
building, and a 2,520 SF drive-thru restaurant with an attached 2,400 SF retail building, 170
parking spaces, landscaping, and related site improvements. The project is located at the
northwest corner of Mountain Street and Lake Street (APNs: 389-030-012, 013, 014, 015, 016,
017, and 018).
Pursuant to CEQA Guidelines Section 15162, no new environmental documentation is necessary
because all potentially significant effects have been adequately analyzed in an earlier
Environmental Impact Report (EIR) (SCH# 2020080538) and none of the conditions described in
Section 15162 exist. EIR (SCH# 2020080538) was certified by the City Council on January 25,
2022. No substantial changes that require major revisions to the EIR exist and no new information
of substantial importance that require revisions to the earlier EIR exist.
ALL INTERESTED PERSONS are hereby invited to attend this Public Hearing to present written
information, express opinions, or otherwise present evidence in the above matters. If you wish to
legally challenge any action taken by the City on the above matter, you may be limited to raising
only those issues you or someone else at the Public Hearing described in this notice, or in written
correspondence delivered to the City prior to or at the Public Hearing. If you require
accommodation to participate in a Public Hearing, please contact the City Clerk’s office at (951)
674-3124 ext. 269. All Agenda materials are available for review at City Hall the Friday before the
Public Hearing.
FURTHER INFORMATION on this item may be obtained by contacting Joey Mendoza, Associate
Planner in the Planning Division, at jmendoza@lake-elsinore.org or at (951) 674-3124, ext. 273.
Candice Alvarez, MMC,
City Clerk
PH-EOT TTM 37922 - Page 1 of 1
The Press-Enterprise
3512 14 Street
Riverside, California 92501
951) 368-9229
City of Lake Elsinore
130 South Main Street
Lake Elsinore, California 92530
Publication: The Press-Enterprise
PROOF OF PUBLICATION OF
Ad Desc: 0011651034
FILE NO. 0011651034
PROOF OF PUBLICATION
I am a citizen of the United States. I
am over the age of eighteen years and
not party to or interested in the above-
entitled matter. I am an authorized
representative of THE PRESS-
ENTERPRISE, a newspaper of general
circulation, printed and published daily
in the County of Riverside, and which
newspaper has been adjudicated a
newspaper of general circulation by the
Superior Court of the County of
Riverside, State of California, under
date of April 25, 1952, Case Number
54446, under date of March 29, 1957,
Case Number 65673, under date of
August 25, 1995, Case Number
267864, and under date of September
16, 2013, Case Number RIC 1309013;
that the notice, of which the annexed is
a printed copy, has been published in
said newspaper in accordance with the
instructions of the person(s) requesting
publication, and not in any supplement
thereof on the following dates, to wit:
02/28/2024
I certify (or declare) under the penalty
of perjury that the foregoing is true and
correct.
Date: February 28, 2024.
At: Riverside, California
Signature