Loading...
HomeMy WebLinkAboutResolution 2021-51 Sign Application Design Review 2021-16 RESOLUTION NO. 2021-51 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE, CALIFORNIA, FINDING THAT SIGN APPLICATION (DESIGN REVIEW) NO. 2021-16 IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES HABITAT CONSERVATION PLAN (MSHCP) Whereas, Mark Cooper, Catalyst Commercial Group has filed an application with the City of Lake Elsinore (City) requesting approval of Sign Application (Design Review) No. 2021 -16 proposing to establish a sign program for the Corydon Gateway Project that provides standards and specifications that assure consistency of signage in terms of design, composition, size and placement throughout the project. The uniform sign program includes the following signs: Center identification signs: 20’-0” high multi-tenant sign located at the corner of Lemon Street and Mission Trail, 15’-0” high multi-tenant sign located along Corydon Street, 8’-3” high multi-tenant sign located at the corner of Mission Trail and Corydon Street, and 5’-0” high multi-tenant directional sign located along the project’s northerly drive isle; two 7’-0” high each freestanding single-tenant signs fronting on Mission Trail and Corydon Street; two 7’-0” high each fuel pricing signs fronting on Mission Trail and Corydon Street; and two 12’-0” high each directory signs for the flex-tech condominiums. The sign program also provides guidelines for maximum sign areas for wall mounted signs, required letter styles, illumination, and sign materials. The project site is located within the East Lake Specific Plan, at the northwestern corner of the intersection of Mission Trail and Corydon Street. The project site encompasses Assessor Parc el Number (APN) 370-050-026 and a portion of 370-050-030; Whereas, Section 6.0 of the Multiple Species Habitat Conservation Plan (MSHCP) requires that all discretionary projects within a MSHCP Criteria Cell undergo the Lake Elsinore Acquisition Process (LEAP) and the Joint Project Review (JPR) to analyze the scope of th e proposed development and establish a building envelope that is consisten t with the MSHCP criteria; Whereas, Section 6.0 of the MSHCP further requires that the City adopt consistency findings demonstrating that the proposed discretionary entitlement complies with the MSHCP Criteria Cell, and the MSHCP goals and objectives; Whereas, pursuant to Section 17.196.180.C (Signs in commercial districts) and Section 17.415.050 (Major Design Review) of the Lake Elsinore Municipal Code (LEMC) the Planning Commission (Commission) has been delegated with the responsibility of reviewing and approv ing, conditionally approving, or denying design review applications for uniform sign programs; and Whereas, on December 7, 2021 at a duly noticed Public Hearing the Commission has considered evidence presented by the Community Development Department and other interested parties with respect to this item. NOW THEREFORE, THE PLANNING COMMISSION OF THE CITY OF LAKE ELSINORE DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1: The Commission has considered the project and its consistency with the MSHCP prior to adopting Findings of Consistency with the MSHCP. Docusign Envelope ID: 801220F4-5DEB-4CE9-A102-7843AEBF6EAE PC Reso. No. 2021-51 Page 2 of 4 Section 2: That in accordance with the MSHCP, the Commission makes the following findings for MSHCP consistency: 1. The Project is a project under the City’s MSHCP Resolution, and the City must make an MSHCP Consistency finding before approval. Pursuant to the City’s MSHCP resolution, the project must be reviewed for MSHCP consistency, consistent with the Protection of Species Associated with Riparian/Riverine Areas and Vernal Pool Guidelines (MSHCP, Section 6.1.2), Protection of Narrow Endemic Plant Species Guidelines (MSHCP, Section 6.1.3), Additional Survey Needs and Procedures (MSHCP, Section 6.3.2), Urban/Wildlands Interface Guidelines (MSHCP, Section 6.1.4), Vegetation Mapping (MSHCP, Section 6.3.1) requirements, Fuels Management Guidelines (MSHCP, Section 6.4), and payment of the MSHCP Local Development Mitigation Fee (MSHCP Ordinance, Section 4). The Project has been reviewed in light of these sections and is consistent therewith. 2. The Project is subject to the City’s LEAP and the County’s Joint Project Review processes. Approximately 1.12 acres of the project site is located in the northeastern corner of Criteria Cell 5131, which is in MSHCP Elsinore Area Plan, Subunit 3 (Elsinore). The area that will be developed by the Proposed Project is approximately 0.89 acres of tha t area. Therefore, a formal and complete LEAP application, LEAP 2020 -01 was submitted to the City on April 3, 2020. The JPR application, JPR 20 -06-09-01 was submitted to the Regional Conservation Authority (RCA). The RCA completed the review on September 2 4, 2020 and found the Project consistent with both the Criteria and Other Plan Requirements. 3. The Project is consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. The previously approved PA 2019 -69 (Corydon Gateway Project) was determined to be consistent with the Riparian/Riverine and Vernal Pool Guidelines as set forth in Section 6.1.2 of the MSHCP. The scope and nature of the project have not been modified from t hat which was previously approved and is therefore consistent with the Riparian/Riverine Areas and Vernal Pools Guidelines. 4. The Project is consistent with the Protection of Narrow Endemic Plant Species Guidelines. The property is not in a Narrow Endemic Plant Species Survey Area (NEPSSA) for any narrow endemic species, and no NEPSSA surveys are required. The proposed project is therefore consistent with the Protection of Narrow Endemic Plant Species Guidelines. 5. The Project is consistent with the Additional Survey Needs and Procedures. The previously approved PA 2019 -69 (Corydon Gateway Project) was consistent with the Additional Survey Needs and Procedures as set forth in Section 6.3.2 of the MSHCP. The Project has not been modified from that which was previously approved under PA 2019 -69 (Corydon Gateway Project). The Project is consistent with the Additional Survey Needs and Procedures of the MSHCP. 6. The Project is consistent with the Urban/Wildlands Interface Guidelines. Docusign Envelope ID: 801220F4-5DEB-4CE9-A102-7843AEBF6EAE PC Reso. No. 2021-51 Page 3 of 4 The previously approved PA 2019 -69 (Corydon Gateway Project) was consistent with the Urban/Wildlands Interface Guidelines as set forth in Section 6.1.4 of the MSHCP. Because the project has not been modified from that which was previously approved under PA 2019- 69 (Corydon Gateway Project), no further MSHCP review is necessary and the Project is consistent with the Urban/Wildlands Interface Guidelines. 7. The Project is consistent with the Vegetation Mapping requirements. The previously approved PA 2019 -69 (Corydon Gateway Project) was consistent with the Vegetation Mapping requirements as set forth in Section 6.3.1 of the MSHCP. Mapping was conducted as part of the biological surveys for the original project. The project has not been modified from that which was previously approved and therefore is consistent with the Vegetation Mapping requirements. 8. The Project is consistent with the Fuels Management Guidelines. The previously approved PA 2019 -69 (Corydon Gateway Project) was consistent with the Fuels Management Guidelines as set forth in Section 6.4 of the MSHCP. The project site is not within or adjacent to conservation areas where the Fuels Management Guideline s would be required. The project has not been modified from that which was previously approved and therefore is consistent with the Fuel Management Guidelines. 9. The Project overall is consistent with the MSHCP. Section 3: Based upon the evidence presented, both written and testimonial, and the above findings, the Commission hereby finds that the project is consistent with the MSHCP. Section 4: This Resolution shall take effect immediately upon its adoption. Passed and Adopted on this 7th day of December, 2021. John Gray Chair Attest: __________________________FOR: Justin Kirk Assistant Community Development Director Docusign Envelope ID: 801220F4-5DEB-4CE9-A102-7843AEBF6EAE PC Reso. No. 2021-51 Page 4 of 4 STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF LAKE ELSINORE ) I, Justin Kirk, Assistant Community Development Director of the City of Lake Elsinore, California, hereby certify that Resolution No. 2021-51 was adopted by the Planning Commission of the City of Lake Elsinore, California, at a regular meeting held on December 7, 2021 and that the same was adopted by the following vote: AYES: Commissioners Peters, Carroll and Klaarenbeek; Vice Chair Dobler; and Chair Gray NOES: ABSTAIN: ABSENT: FOR: Justin Kirk Assistant Community Development Director Docusign Envelope ID: 801220F4-5DEB-4CE9-A102-7843AEBF6EAE