Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Capacity Fee Comp Study
Capacity Fee Comp Study Connection/Capacity Fees, excludes installation EVMWD 7/1/24 3/4" Meter Potable Water 17,356.00$ 3/4" Meter Recycled Water 872.00$ Backup Facility Capacity Fee -$ EMS - Landscape Water Financial Participation Charge -$ Per EDU Wasterwater 10,220.00$ Per EDU Sewer Treatment Plant Capacity Fee -$ Total:28,448.00$ Difference to EVMWD (Updated)$11,055.00$ Difference to EVMWD (Updated)%39% Per Equivalent Meter Size (EMS) EVMWD (updated)EMWD WMWD City Riverside P RCWD - Rancho Division; EM 24,173.00$ 7,416.00$ 12,620.76$ 3,277.00$ 2,911.00$ 334.00$ 2,250.00$ 6,732.00$ 14,996.00$ 3,476.00$ 12,310.60$ 12,310.60$ 12,310.60$ $6,589.00$ 39,503.00$ 10,892.00$ 24,931.36$ 17,837.60$ 15,221.60$ -$ 28,611.00$ 14,571.64$ 21,665.40$ 24,281.40$ 0%263%58%121%160%