Loading...
HomeMy WebLinkAboutCapacity Fee Comp StudyCapacity Fee Comp Study Connection/Capacity Fees, excludes installation EVMWD 7/1/24 3/4" Meter Potable Water 17,356.00$ 3/4" Meter Recycled Water 872.00$ Backup Facility Capacity Fee -$ EMS - Landscape Water Financial Participation Charge -$ Per EDU Wasterwater 10,220.00$ Per EDU Sewer Treatment Plant Capacity Fee -$ Total:28,448.00$ Difference to EVMWD (Updated)$11,055.00$ Difference to EVMWD (Updated)%39% Per Equivalent Meter Size (EMS) EVMWD (updated)EMWD WMWD City Riverside P RCWD - Rancho Division; EM 24,173.00$ 7,416.00$ 12,620.76$ 3,277.00$ 2,911.00$ 334.00$ 2,250.00$ 6,732.00$ 14,996.00$ 3,476.00$ 12,310.60$ 12,310.60$ 12,310.60$ $6,589.00$ 39,503.00$ 10,892.00$ 24,931.36$ 17,837.60$ 15,221.60$ -$ 28,611.00$ 14,571.64$ 21,665.40$ 24,281.40$ 0%263%58%121%160%