HomeMy WebLinkAboutItem No. 14 - Third and Final Extension of Time Request for Tentative Tract Map No. 37381 and14)Third and Final Extension of Time Request for Tentative Tract Map No. 37381 and
Tentative Tract Map No. 37382 (Wasson Canyon Homes)
1.Find that pursuant to the California Environmental Quality Act (CEQA) Guidelines
Section 15162, the extension of time request would not have a significant effect on the
environment, and no new environmental documentation is necessary because all
potentially significant effects have been adequately analyzed in a previously adopted
Mitigated Negative Declaration (MND No. 2007-01) (SCH No. 2007041063);
2.Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO MAY 14, 2027,
FOR TENTATIVE TRACT MAP NO. 37381; and
3.Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO MAY 14, 2027,
FOR TENTATIVE TRACT MAP NO. 37382.
Page 1 of 3
REPORT TO CITY COUNCIL
To:Honorable Mayor and Members of the City Council
From:Jason Simpson, City Manager
Prepared by:Damaris Abraham, Community Development Director
Date:September 10, 2024
Subject:Third and Final Extension of Time Request for Tentative Tract Map No.
37381 and Tentative Tract Map No. 37382 (Wasson Canyon Homes)
Applicant: Ryan Mordahl
Recommendation
1. Find that pursuant to the California Environmental Quality Act (CEQA) Guidelines Section
15162, the extension of time request would not have a significant effect on the environment,
and no new environmental documentation is necessary because all potentially significant
effects have been adequately analyzed in a previously adopted Mitigated Negative
Declaration (MND No. 2007-01) (SCH No. 2007041063);
2. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO MAY 14, 2027, FOR
TENTATIVE TRACT MAP NO. 37381; and
3. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO MAY 14, 2027, FOR
TENTATIVE TRACT MAP NO. 37382.
Background
On August 14, 2007, the City Council approved Tentative Tract Map (TTM) No. 32537 and TTM
No. 35422 in conjunction with MND No. 2007-01, Annexation No. 79, Ramsgate Specific Plan
Amendment No. 6, General Plan Amendment No. 2007-01, and Pre-Annexation Zone Change
No. 2007-01.
TTM 32537 and TTM 35422 were contiguous projects proposing the subdivision of 19.54 acres
into 73 single-family residential lots and 55.06 acres into 199 single-family residential lots,
respectively. Both TTM 32537 and TTM 35422 expired on August 14, 2016.
TTM 37381 & TTM 37382 3rd EOT (Wasson Canyon Homes)
Page 2 of 3
1
3
0
6
On June 14, 2017, the applicant filed two new tentative maps (TTM 37381 and TTM 37382) to
replace the expired ones. The City Council approved both maps on November 14, 2017.
On January 28, 2020, the City Council approved the first extension of time for TTM 37381 and
TTM 37382 extending the expiration date for the maps by two (2) years to November 14, 2021.
Assembly Bill 1561, which became effective on September 28, 2020, automatically extended the
life of TTM 37381 and TTM 37382 by 18 months to May 14, 2023.
On June 13, 2023, the City Council approved the second extension of time request for TTM 37381
and TTM 37382, extending the expiration date for the maps by one (1) year to May 14, 2024.
The applicant submitted this third and final extension of time request for TTM 37381 and TTM
37382 on April 23, 2024, which stayed the expiration date until action by the City Council.
Project Description
Tentative Tract Map No. 37381 is a subdivision of 19.54 acres into 73 single-family residential
lots (ranging in size from 6,354 sq. ft. to 35,284 sq. ft.) and five (5) lettered lots for open space
and a water quality/detention basin. The subject site is located southeasterly of Highway 74,
westerly of Rosetta Canyon Drive, on the northern side of Third Street within the Ramsgate
Specific Plan and includes Assessor Parcel Numbers (APNs) 347-330-001, 002, 065, 347-330-
067 through 073.
Tentative Tract Map No. 37382 is a subdivision of 55.06 acres into 199 single-family residential
lots (ranging in size from 4,600 sq. ft. to 17,445 sq. ft.) and 23 lettered lots for a 5.6-acre public
park, open space, utility easements, and water quality/detention basins. The subject site is located
southeasterly of Highway 74, westerly of Rosetta Canyon Drive, northeasterly of Cambern
Avenue, on the southern side of Third Street within the Ramsgate Specific Plan and includes
APNs: 347-330-022, 023, 066, 347-360-001, 002, 377-100-006, 009, and 010.
Discussion
Section 16.24.160 of the Lake Elsinore Municipal Code (LEMC) provides one or more extensions
of time totaling a maximum of 36 months. Pursuant to the Subdivision Map Act, Government Code
Section 66452.6(e), the time at which the map expires may be extended by the legislative body
for a period not exceeding a total of six (6) years. This third extension of time request for additional
three (3) years represents the final extension of time allowed by the Subdivision Map Act and the
LEMC.
The applicant is requesting this extension of time in order to have additional time to comply with
Mitigation Measure Biological Resources 5 as required in MND No. 2007-01 as well as Conditions
of Approval No. 153 and 156. Under this mitigation measure and conditions of approval, the
applicant is required to acquire and revegetate riparian or marsh habitat at a 1:1 ratio within the
City of Lake Elsinore or within an approved off-site mitigation site and must be done prior to the
issuance of a grading permit. However, there is currently a regional shortage of mitigation land
TTM 37381 & TTM 37382 3rd EOT (Wasson Canyon Homes)
Page 3 of 3
1
3
0
6
banks within Riverside County that has significantly delayed the applicant’s ability to continue the
grading permit plan check process and comply with said mitigation requirements. This third
extension of time will allow the applicant additional time to secure the required replacement
habitat.
The Planning, Fire, and Engineering Departments have reviewed the extension of time and
recommended no revisions to previous Conditions of Approval from the prior extension of time.
Environmental Determination
Pursuant to CEQA Guidelines Section 15162, staff has determined that this extension of time
request would not have a significant effect on the environment and no new environmental
documentation is necessary because all potentially significant effects have been adequately
analyzed in an earlier Mitigated Negative Declaration (MND). All potentially significant impacts
have been avoided or mitigated pursuant to the earlier mitigated negative declaration and none
of the conditions described in Section 15162 exist. MND No. 2007-01 (SCH No. 2007041063)
was adopted by the City Council on August 14, 2007. No substantial changes that require major
revisions to the MND exist, and no new information of substantial importance that require
revisions to the earlier MND exists. Therefore, no further environmental documentation is
necessary.
Public Notice
Notice of the hearing for the extension of time application has been published in the Press-
Enterprise newspaper and mailed to property owners within 300 feet of the subject property for
each application. As of the writing of this report, no written comments concerning this application
have been received by staff.
Fiscal Impact
The time and costs related to processing this application have been covered by application fees
paid for by the applicant. No General Fund budgets have been allocated or used in the processing
of this application.
Attachments
Attachment 1 – TTM 37381 EOT Resolution
Attachment 2 – TTM 37382 EOT Resolution
Attachment 3 – TTM 37381 Conditions of Approval
Attachment 4 – TTM 37382 Conditions of Approval
Attachment 5 – GIS Exhibits
Attachment 6 – TTM 37381
Attachment 7 – TTM 37382
Attachment 8 – Public Notice Materials
RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO MAY 14,
2027, FOR TENTATIVE TRACT MAP NO. 37381
Whereas, on November 14, 2017, at a duly noticed Public Hearing, the Council approved
Tentative Tract Map (TTM) No. 37381, a subdivision of 19.54 acres into 73 single-family
residential lots (ranging in size from 6,354 sq. ft. to 35,284 sq. ft.) and five (5) lettered lots for
open space and a water quality/detention basin;
Whereas, on April 23, 2024, Ryan Mordahl submitted applied for an Extension of Time
(EOT 2024-02) to extend the expiration date for TPM No. 37381 by three years from May 14,
2024 to May 14, 2027; and
Whereas, on September 10, 2024, at a duly noticed Public Hearing, the Council has
considered the recommendation of City staff as well as evidence presented by the Community
Development Department and other interested parties with respect to this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES
HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has reviewed and analyzed the proposed Project pursuant to the
appropriate Planning and Zoning Laws and Chapter 16 (Subdivisions) of the LEMC.
Section 2: The Council finds and determines that no new environmental documentation
is necessary because all potentially significant effects have been adequately analyzed in an
earlier Mitigated Negative Declaration (MND). All potentially significant impacts have been
avoided or mitigated pursuant to the earlier MND and none of the conditions described in Section
15162 exist. MND No. 2007-01 (SCH No. 2007041063) was adopted in 2007 for the Ramsgate
Specific Plan Amendment No. 6 that evaluated environmental impacts that would result from full
build-out of the Specific Plan. No substantial changes that require major revisions to the MND
exist and no new information of substantial importance that require revisions to the earlier MND
exist.
Section 3: That in accordance with the California Subdivision Map Act (Cal. Gov. Code
Section 66000 et. seq.) and the LEMC Section 16.24.160, the Council makes the following
findings for the approval of an extension of time for TTM No. 37381:
1. The proposed subdivision, together with the provisions for its design and improvement, is
consistent with the General Plan. The proposed subdivision is compatible with the
objectives, policies, general land uses, and programs specified in the General Plan
(Government Code Section 66473.5).
a. TTM No. 37381 is located within Planning Area 11 of the Ramsgate Specific Plan (No.
89-1, Amendment No. 6 [RSP No. 6]). The land use regulations, including development
standards for Planning Area 11, where the project site is located, are derived from
Chapter 9.1 of RSP No. 6. Allowable uses in Planning Area 11 include medium-low-
density residential developments and open space acreage. The development standards
for newly created parcels within Planning Area 11 require a minimum lot area of 5,000
sq. ft. and a minimum street frontage of 50 feet. The proposed parcels created by TTM
No. 37381 range from 6,354 to 35,284 sq. ft., and the street frontages average over 50
CC Reso. No. 2024-____
Page 2 of 4
3
7
8
3
2
feet, exceeding the minimum requirements. Therefore, the proposed project complies
with the RSP No. 6 development standards for Planning Area 11. The tentative tract
map is consistent with the designated land use, development and design standards, and
all other applicable requirements in the General Plan and the Subdivision Map Act. The
project is also consistent with the General Plan because RSP No. 6 was found to be
consistent with the General Plan at adoption.
b. All offsite mitigation measures have been identified in a manner consistent with the
General Plan.
c. All recreational amenities have been provided in a manner consistent with the General
Plan.
2. The site of the proposed subdivision of land is physically suitable for the proposed density
of development in accordance with the General Plan.
a. The site of TTM No. 37381 is 19.54 acres and proposes 73 single-family residential lots
and five (5) lettered lots for open space and a water quality/detention basin. Per Chapter
2, Table 1 (Land Use Plan) of the RSP No. 6, the density allowed for Planning Area 11
(Medium Low Density Residential) is 3 to 6 dwelling units (du) per acre. TTM No. 37381
proposes a density of 3.5 du’s per acre. With appropriate mitigation measures, the site
is physically suitable for the proposed density of the proposed development.
3. The effects that this project is likely to have upon the housing needs of the region, the public
service requirements of its residents and the available fiscal and environmental resources
have been considered and balanced.
a. The Project will facilitate the construction of 73 single-family homes, which will contribute
to the City’s Regional Housing Needs Assessment (RHNA) and include open space and
water quality/retention basins as required by the approved Water Quality Management
Plan (WQMP). Public service requirements and environmental resources were
considered and balanced in the previously adopted MND No. 2007-01 (SCH No.
2007041063).
4. The proposed division of land or type of improvements is not likely to result in any significant
environmental impacts.
a.The previously adopted MND No. 2007-01 (SCH No. 2007041063) considered and
balanced impacts on environmental resources. Appropriate conditions of approval and
mitigation measures have been included to mitigate any potential environmental impacts
to below a level of significance.
5. The design of the proposed division of land or type of improvements is not likely to cause
serious public health problems.
a. The previously adopted MND No. 2007-01 (SCH No. 2007041063) considered impacts
on existing communities surrounding the Project site, including noise and air quality.
Appropriate conditions of approval and mitigation measures have been included to
ensure the proposed project would not cause adverse public health impacts.
CC Reso. No. 2024-____
Page 3 of 4
3
7
8
3
2
6. The design of the proposed division of land or type of improvements will not conflict with
easements, acquired by the public at large, for access through or use of property within the
proposed division of land.
a. All known easements or requests for access have been incorporated into the design of
TTM No. 37381.
b. The map has been circulated to City departments and outside agencies, and appropriate
Conditions of Approval have been applied to the Project.
Section 4: Based upon the evidence presented, both written and testimonial, and the
above findings, and the Conditions of Approval imposed upon the project, the Council hereby
approves a three-year extension of time for TTM No. 37381 to May 14, 2027.
Section 5: This Resolution shall take effect immediately upon its adoption.
Section 6: The City Clerk shall certify to the adoption of this Resolution and enter it into
the book of original Resolutions.
Passed and Adopted on this 10th day of September 2024.
Steve Manos, Mayor
Attest:
___________________________________
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2024-____ was adopted by the City Council of the City of Lake Elsinore, California,
at the regular meeting of September 10, 2024, and that the same was adopted by the following
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, MMC
City Clerk
CC Reso. No. 2024-____
Page 4 of 4
3
7
8
3
2
RESOLUTION NO. 2024 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING A THREE-YEAR EXTENSION OF TIME TO MAY 14,
2027, FOR TENTATIVE TRACT MAP NO. 37382
Whereas, on November 14, 2017, at a duly noticed Public Hearing, the Council approved
Tentative Tract Map (TTM) No. 37382, a subdivision of 55.06 acres into 199 single-family
residential lots (ranging in size from 4,600 sq. ft. to 17,445 sq. ft.) and 23 lettered lots for a 5.6-
acre park, open space, utility easements, and water quality/detention basins;
Whereas, on April 23, 2024, Ryan Mordahl submitted applied for an Extension of Time
(EOT 2024-03) to extend the expiration date for TPM No. 37382 by three years from May 14,
2024 to May 14, 2027; and
Whereas, on September 10, 2024, at a duly noticed Public Hearing the Council has
considered the recommendation of City staff as well as evidence presented by the Community
Development Department and other interested parties with respect to this item.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE DOES
HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1: The Council has reviewed and analyzed the proposed Project pursuant to the
appropriate Planning and Zoning Laws and Chapter 16 (Subdivisions) of the LEMC.
Section 2: The Council finds and determines that no new environmental documentation
is necessary because all potentially significant effects have been adequately analyzed in an
earlier Mitigated Negative Declaration (MND). All potentially significant impacts have been
avoided or mitigated pursuant to the earlier MND and none of the conditions described in Section
15162 exist. MND No. 2007-01 (SCH No. 2007041063) was adopted in 2007 for the Ramsgate
Specific Plan Amendment No. 6 that evaluated environmental impacts that would result from full
build-out of the Specific Plan. No substantial changes that require major revisions to the MND
exist and no new information of substantial importance that require revisions to the earlier MND
exist.
Section 3: That in accordance with State Planning and Zoning Law and the LEMC, the
Council makes the following findings for approval of an extension of time for TTM 37382:
1. The proposed subdivision, together with the provisions for its design and improvement, is
consistent with the General Plan. The proposed subdivision is compatible with the
objectives, policies, general land uses and programs specified in the General Plan
(Government Code Section 66473.5).
a. TTM No. 37382 is located within Planning Area 11 of the Ramsgate Specific Plan (No.
89-1, Amendment No. 6 [RSP No. 6]). The land use regulations, including development
standards for Planning Area 11, where the project site is located, are derived from
Chapter 9.1 of RPS No. 6. Allowable uses in Planning Area 11 include modified-medium-
low-density residential developments and open space acreage. The development
standards for newly created parcels within the modified-medium-low-density area of
Planning Area 11 require a minimum lot area of 4,600 sq. ft. and a minimum street
frontage of 40 feet. The proposed parcels created by TTM No. 37382 range from 4,600
to 17,445 sq. ft., and the street frontages average over 40 feet, exceeding the minimum
CC Reso. No. 2024-____
Page 2 of 3
3
7
8
3
3
requirements. Therefore, the proposed project complies with the RSP No. 6
development Standards for Planning Area 11. The tentative tract map is consistent with
the designated land use, development and design standards, and all other applicable
requirements in the General Plan and the Subdivision Map Act. The project is also
consistent with the General Plan because RSP No. 6 was found to be consistent with
the General Plan at adoption.
b. All offsite mitigation measures have been identified in a manner consistent with the
General Plan.
c. All recreational amenities have been provided in a manner consistent with the General
Plan.
2. The site of the proposed subdivision of land is physically suitable for the proposed density
of development in accordance with the General Plan.
a. The site of TTM No. 37382 is 55.06 acres and proposes 199 single-family residential
lots and 23 lettered lots for open space and a water quality/detention basin. Per Chapter
2, Table 1 (Land Use Plan) of the RSP No. 6, the density allowed for Planning Area 11
(Modified-Medium-Low-Density) is 3 to 6 dwelling units (du) per acre. TTM No. 37382
proposes a density of 3.6 du’s per acre. With appropriate mitigation measures, the site
is physically suitable for the proposed density of the proposed development.
3. The effects that this project is likely to have upon the housing needs of the region, the public
service requirements of its residents, and the available fiscal and environmental resources
have been considered and balanced.
a. The Project will facilitate the construction of 199 single-family homes, which will
contribute to the City’s Regional Housing Needs Assessment (RHNA) and include open
space and water quality/retention basins as required by the approved Water Quality
Management Plan (WQMP). Public service requirements and environmental resources
were considered and balanced in the previously adopted MND No. 2007-01 (SCH No.
2007041063).
4. The proposed division of land or type of improvements is not likely to result in any significant
environmental impacts.
a.The previously adopted MND No. 2007-01 (SCH No. 2007041063) considered and
balanced impacts on environmental resources. Appropriate conditions of approval and
mitigation measures have been included to mitigate any potential environmental impacts
to below a level of significance.
5. The design of the proposed division of land or type of improvements is not likely to cause
serious public health problems.
a. The previously adopted MND No. 2007-01 (SCH No. 2007041063) considered impacts
on existing communities surrounding the Project site, including noise and air quality.
Appropriate conditions of approval and mitigation measures have been included to
ensure the proposed project would not cause adverse public health impacts.
CC Reso. No. 2024-____
Page 3 of 3
3
7
8
3
3
6. The design of the proposed division of land or type of improvements will not conflict with
easements, acquired by the public at large, for access through or use of property within the
proposed division of land.
a. All known easements or requests for access have been incorporated into the design of
TTM 37382.
b. The map has been circulated to City departments and outside agencies, and appropriate
Conditions of Approval have been applied to the Project.
Section 4: Based upon the evidence presented, both written and testimonial, and the
above findings, and the Conditions of Approval imposed upon the project, the Council hereby
approves a three-year extension of time for TTM 37382 to May 14, 2027.
Section 5: This Resolution shall take effect immediately upon its adoption.
Section 6: The City Clerk shall certify to the adoption of this Resolution and enter it into
the book of original Resolutions.
Passed and Adopted on this 10th day of September 2024.
Steve Manos, Mayor
Attest:
___________________________________
Candice Alvarez, MMC
City Clerk
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF LAKE ELSINORE )
I, Candice Alvarez, MMC, City Clerk of the City of Lake Elsinore, California, do hereby certify that
Resolution No. 2024-____ was adopted by the City Council of the City of Lake Elsinore, California,
at the regular meeting of September 10, 2024, and that the same was adopted by the following
vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Candice Alvarez, MMC
City Clerk
Applicant’s Initials: _____ Page 1 of 19
CONDITIONS OF APPROVAL
(New text underlined and deletions in strikethrough)
PROJECT: TTM 37381
PROJECT NAME:Wasson Canyon
PROJECT LOCATION:APNs: 347-330-022, 023, 066, 347-360-001, 002,
377-100-006, 009, and 010
APPROVAL DATE:November 14, 2017
EOT1 APPROVAL DATE:January 28, 2020
EOT2 APPROVAL DATE:June 13, 2023
EOT3 APPROVAL DATE:
EXPIRATION DATE:
September 10, 2024
May 14, 2027
GENERAL
1.Tentative Tract Map No. 37381 is a subdivision of 19.54 acres into 73 single-family
residential lots (ranging in size from 6,354 sq. ft. to 35,284 sq. ft.) and five (5) lettered lots
for open space and a water quality/detention basin. The subject site is located southeasterly
of Highway 74, westerly of Rosetta Canyon Drive, on the northern side of Third Street within
the Ramsgate Specific Plan. (APNs: 347-330-001, 002, 065, 347-330-067 through 073).
2.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and its Consultants
(Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning approval, implementation and construction of Tentative Tract
Map No. 37381, which action is bought within the time period provided for in California
Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section
21167, including the approval, extension or modification of Tentative Tract Map No. 37381
or any of the proceedings, acts or determinations taken, done, or made prior to the decision,
or to determine the reasonableness, legality or validity of any condition attached thereto.
The Applicant's indemnification is intended to include, but not be limited to, damages, fees
and/or costs awarded against or incurred by Indemnitees and costs of suit, claim or litigation,
including without limitation attorneys' fees, penalties and other costs, liabilities and
expenses incurred by Indemnitees in connection with such proceeding. The City will
promptly notify the applicant of any such claim, action, or proceeding against the City. If the
project is challenged in court, the City and the applicant shall enter into formal defense and
indemnity agreement, consistent with this condition.
3.Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the Community
Development Department for inclusion in the case records.
PLANNING DIVISION
4.Tentative Tract Map No. 37381 will expire January 28, 2022 May 14, 2024 May 14, 2027
unless within that period of time a Final Map has been filed with the County Recorder., or
an extension of time is granted by the City of Lake Elsinore City Council in accordance with
the State of California Subdivision Map Act and applicable requirements of the Lake Elsinore
Municipal Code.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 2 of 19
3
7
8
3
4
5.Tentative Tract Map No. 37381 shall comply with the State of California Subdivision Map
Act, the Ramsgate Specific Plan No. 89-1, Revision No. 6 (RSP #6), and applicable
requirements set forth in the Lake Elsinore Municipal Code (LEMC), unless modified by
approved Conditions of Approval.
6.The applicant shall provide all project-related on-site and off-site improvements as required
by these Conditions of Approval.
7.All future development proposals shall be reviewed by the City on a project by project basis.
If determined necessary by the Community Development Director or designee, additional
environmental analysis will be required.
8.The applicant shall pay all applicable City fees, including but not limited to Development
Impact Fees (DIF) per Section 16.74 of the LEMC, Transportation Uniform Mitigation Fees
(TUMF) per LEMC Section 16.83, (ii) Area Drainage Fees per LEMC Section 16.72, (iii)
MSHCP Fees per LEMC Section 16.85, (iv) Stephens Kangaroo Habitat Fee (K-Rat) per
Chapter 19.04 of LEMC, (vii) Capital Improvement Impact/Mitigation Fees, and (viii) Plan
Check and Permit fees, at the rate in effect at the time of payment (modified per 1/28/2020
CC).
Prior to Recordation of Final Tract Map
9.All lots shall comply with minimum standards set forth in the Ramsgate Specific Plan No.
89-1, Revision No. 6 (RSP #6).
10.A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
11.Street names within the subdivision shall be reviewed and approved by the Community
Development Director or designee.
12.All of the project improvements shall be designed by the applicant's Civil Engineer to the
specifications of the City of Lake Elsinore.
13.The applicant shall meet all the requirements of the Elsinore Valley Municipal Water District
(EVMWD).
14.Prior to recordation of a Final Map, the applicant shall initiate and complete the formation of
a Homeowner’s Association (HOA) which shall be approved by the City. All Association
documents shall be submitted for review and approval by City Planning, Engineering and
the City Attorney and upon City approval shall be recorded. Such documents shall include
the Articles of Incorporation for the Association and Covenants, Conditions and Restrictions
(CC&Rs).
a. At a minimum, all recreation and park areas (except public parks), all natural slopes and
open space, all graded slopes abutting public street rights-of-way which are not part of
residential lots, up slopes from public rights-of-way within private lots and all private
streets, and all drainage basins shall be maintained by the Homeowner’s Association
(HOA).
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 3 of 19
3
7
8
3
4
Prior to Design Review Approval
15.All future structural development associated with this map requires separate Design Review
approval pursuant to the provisions of LEMC Chapter 17.184.
16.The following architectural details shall be provided:
•All front fence returns shall be decorative masonry walls. Wood fences will not be
allowed along the front elevation. Wood, vinyl or steel (wrought iron or aluminum)
gates are allowed in order to allow access to rear yards.
•The applicant shall provide four-sided articulation. Architectural enhancements and
treatments shall be provided on all residential elevations (front, rear and side) visible
from streets and other public views.
•All fireplaces shall be natural gas fireplaces only. No wood burning fireplaces shall be
allowed.
Prior to Issuance of Grading Permits/Building Permits
17.Prior to the issuance of a grading permit, the project applicant shall obtain all necessary
State and Federal permits, approvals, or other entitlements, including obtaining the
necessary authorizations from the regulatory agencies for proposed impacts to jurisdictional
waters. Authorizations may include a Section 404 Permit from the U.S. Army Corps of
Engineers, a Section 1602 Streambed Alteration Agreement from the California Department
of Fish and Wildlife, and a Section 401 Water Quality Certification/Waste Discharge
Requirement from the Regional Water Quality Control Board.
18.Prior to issuance of building permit, the applicant shall prepare a Final Wall and Fence Plan
addressing the following:
•Show that a masonry or decorative block wall will be constructed along the entire tract
boundary.
•Show materials, colors, and heights of rear, side and front walls/fences for proposed
lots.
•Show the location of all wood, vinyl or steel (wrought iron or aluminum) gates placed
within the front return walls.
•Show that side walls for corner lots shall be decorative masonry block walls.
•Show that those materials provided along the front elevations (i.e. brick, stone, etc.)
will wrap around the side elevation and be flush with the front return walls.
19.Signs are not part of this project approval. All signage shall be subject to Planning Division
or Planning Commission review and approval prior to installation.
20.Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during
all site preparation and construction activity. The applicant shall place a weatherproof 3’ X
3’ sign at the entrance to the project site identifying the approved days and hours of
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 4 of 19
3
7
8
3
4
construction activity. Site preparation activity and construction shall not commence before
7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work
and similar interior construction may be conducted on Saturdays and may commence no
earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not
take place on Sunday, or any Legal Holidays. The sign shall identify the name and phone
number of the development manager to address any complaints.
21.Prior to issuance of a building permit, building plans for the Model Home Complex shall
comply with all American Disabilities Act (ADA) requirements, including provision of a
handicapped-accessible bathroom.
22.Construction phasing shall be implemented in accordance with the approved Phasing Plan
which avoids construction traffic from entering occupied neighborhoods within the tract.
23.A cash bond shall be required for the Model Home Complex. This bond is to guarantee
removal of the temporary fencing material, parking lot, etc. that have been placed onsite for
the Model Home Complex. The bond will be released after removal of the materials and the
site is adequately restored, subject to the approval of the Community Development Director
or designee.
24.A cash bond shall be required for any garage conversion of the model(s). Bonds will be
released after removal of all temporary materials and the site is adequately restored, subject
to the approval of the Community Development Director or designee.
25.A cash bond shall be required for any construction trailers used during construction. Bonds
will be released after removal of trailers, subject to the approval of the Community
Development Director or designee.
26.The applicant shall pay school fees to the Lake Elsinore Unified School District prior to
issuance of each building permit.
27.Prior to the issuance of a building permit, the applicant shall pay the City’s Multiple Species
Habitat Conservation Plan (MSHCP) Local Development Mitigation Fee, at the rate in effect
at the time of payment.
28.Prior to the issuance of a building permit, the applicant shall pay the Stephens' Kangaroo
Rat mitigation fee in accordance with the Stephens' Kangaroo Rat Habitat Conservation
Plan.
29.The project shall connect to water and sewer and meet all requirements of the Elsinore
Valley Municipal Water District (EVMWD). The applicant shall submit water and sewer plans
to the EVMWD and shall incorporate all district conditions and standards.
30.All mechanical and electrical equipment associated with the residences shall be ground
mounted. All outdoor ground or wall mounted utility equipment shall be consolidated in a
central location and architecturally screened behind fence returns, subject to the approval
of the Community Development Director, prior to issuance of building permit.
31.All front yards and side yards on corner lots shall be properly landscaped with automatic
(manual or electric) irrigation systems to provide 100 percent planting coverage using a
combination of drip and conventional irrigation methods. Construction Landscape &
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 5 of 19
3
7
8
3
4
Irrigation drawings shall be prepared, reviewed by the City's Landscape Architect Consultant
and approved by the Community Development Director or designee. A Cost Estimate for
materials and labor shall also be submitted for review and approval. A Landscape Plan
Check fee will be charged prior to final landscape approval based on the Consultant's fee,
inspection, permits and administration fees.
•The applicant shall replace any street trees harmed during construction, in
conformance with the City's Street Tree List, at a maximum of 30 feet apart and at
least 24-inch box in size.
•Perimeter walls shall be protected by shrubs and other plantings that discourage
graffiti.
•The applicant shall ensure a clear line of sight at ingress/egress points by providing
plantings within 15 feet of ingress/egress points whose height does not exceed two (2)
feet and whose canopy does not fall below six feet.
•The landscape plan shall provide for California native drought-tolerant ground cover,
shrubs, and trees. Special attention shall be given to use of Xeriscape or drought
resistant plantings with combination drip irrigation system to prevent excessive
watering.
•No front-yard grass turf landscaping will be installed.
•All landscape improvements shall be bonded with a ten percent (10%) Faithful
Performance Bond of the approved estimated labor and materials cost for all planting.
The bond shall remain in effect for one year from Certificate of Occupancy.
•All landscaping and irrigation shall be installed within an affected portion of any phase
at the time a certificate of occupancy is requested for any building.
•All Model Homes shall be Xeriscaped and signage provided identifying Xeriscape
landscaping. Xeriscape is a method of landscape design that minimizes water use by:
1) Implementing hydrozones;
2) Eliminating high and medium water-use plant material as identified by Water Use
Classifications of Landscape Species (WUCOLS) (such as turf) and incorporates
low to very low water-efficient (“drought-tolerant” / climate-appropriate) plants;
3) Requires an efficient irrigation system that includes:
a. ET-Based (“Smart irrigation”) controller(s) with weather-sensing, automatic
shut-off and seasonal adjustment capabilities;
b. Efficient irrigation water application through use of:
i. Low-volume point-source irrigation (such as drip irrigation and bubblers) for
all shrub planter areas (maximum of 3:1 slope) with a minimum irrigation
efficiency of 0.90 ; and/or
ii. Rotor-type nozzles for areas greater than ten (10) feet wide, for slopes 3:1
and greater, AND with a minimum irrigation efficiency of 0.71.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 6 of 19
3
7
8
3
4
4) Improvement of soil structure for better water retention; and
5) Application of mulch to hinder evaporation.
•The Final landscape plan shall be consistent with any approved site and/or plot plan.
•The Final landscape plan shall include planting and irrigation details.
•All exposed slopes in excess of three feet in height within the subject tract and within
private lots shall have a permanent irrigation system and erosion control vegetation
installed, as approved by the Planning Division, prior to issuance of certificate of
occupancy.
•All landscaping and irrigation shall comply with the water-efficient landscaping
requirements set forth in LEMC Chapter 19.08 (Water Efficient Landscape
Requirements), as adopted and any amendments thereto.
ENGINEERING DIVISION
General
32.All slopes and landscaping within public right-of-way shall be maintained by the property
owner or property owner’s association or another maintenance entity approved by the City
Council.
33.All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right-of-way shall be owned and maintained by property owner
or property owner’s association.
34.All storm drain system pipes with diameter greater than 36” shall be plan checked and
maintained by Riverside County Flood Control District.
35.The developer shall provide a copy of an encroachment permit or any approval documents
from the Riverside County Flood Control District and/or Caltrans for encroaching, grading,
or discharging into County flood control facilities or Caltrans right of way.
36.This project shall comply with the recommendations of the traffic study prepared by Urban
Crossroads dated January 23, 2007.
37.In accordance with the City’s Franchise Agreement for waste disposal & recycling, the
developer shall be required to contract with CR&R Inc. for removal and disposal of all waste
material, debris, vegetation and other rubbish generated during cleaning, demolition, clear
and grubbing or all other phases of construction.
38.Developer shall mitigate to prevent any flooding and/or erosion downstream caused by
development of the site and or diversion of drainage.
39.Any grading that affects “waters of the United States”, wetlands or jurisdictional streambeds,
shall require approval and necessary permits from respective Federal and/or State
agencies.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 7 of 19
3
7
8
3
4
40.All required soils, geology, hydrology and hydraulic, and seismic reports shall be prepared
by a Registered Civil Engineer.
FEES
41.The developer shall pay all Engineering Division assessed, Development Impact Fees, Plan
Check and Permit fees (LEMC 16.34) prior to the issuance of a building permit consistent
with Condition No. 8. Applicable Engineering Division assessed Development Impact Fees
include: Railroad Canyon Road Benefit District, Stephens Kangaroo Habitat Fee (K-Rat),
Traffic Infrastructure Fee (TIF), Transportation Uniform Mitigation Fee (TUMF), and Area
Drainage Fee (modified per 1/28/2020 CC).
42.Mitigation Fees will be assessed at the prevalent rate at time of payment in full.
STORMWATER MANAGEMENT / POLLUTANT PREVENTION / NPDES
Design
43.The project is responsible for complying with the Santa Ana Region NPDES Permits as
warranted based on the nature of development and/or activity. These Permits include but
are not limited to:
•General Permit – Construction
•Deminimus Discharges
•MS4
44.A Water Quality Management Plan (WQMP) (preliminary and final) shall be prepared using
the Santa Ana Region 8 approved template and guidance and submitted for review and
approval to the City. The Preliminary WQMP shall be approved by the City prior to Planning
Commission; the Final WQMP shall be approved by the City prior to rough or precise grading
plan approval and issuance of ANY permit for construction.
45.Any portion of the DCV that is not infiltrated, harvested and used, evapotranspired, and/or
biotreated shall be treated and discharged in accordance with the requirements set forth in
Section XII.G.
46.The Final WQMP shall document the following:
•Detailed site and project description.
•Potential stormwater pollutants.
•Post-development drainage characteristics.
•Low Impact Development (LID) BMP selection and analysis.
•Structural and Non-Structural source control BMPs.
•Treatment Control BMPs
•Site design and drainage plan (BMP Exhibit).
•Documentation of how vector issues are addressed in the BMP design, operation and
maintenance.
•GIS Decimal Minute Longitude and Latitude coordinates for all LID and Treatment
Control BMP locations.
•HCOC – demonstrate that discharge flow rates, velocities, duration and volume for the
post construction condition from a 2 year and 10 year, 24 hour rainfall event will not
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 8 of 19
3
7
8
3
4
cause adverse impacts on downstream erosion and receiving waters, or measures are
implemented to mitigate significant adverse impacts downstream public facilities and
water bodies. Evaluation documentation shall include pre-and post-development
hydrograph volumes, time of concentration and peak discharge velocities, construction
of sediment budgets, and a sediment transport analysis.
•Operations and Maintenance Plan and Agreement as well as documentation of
formation of funding district for long term maintenance cost.
47.The 2010 SAR MS4 Permit requires implementation of LID Principles and LID Site Design,
where feasible, to treat the pollutants of concern identified for the project, in the following
manner (from highest to lowest priority): (Section XII.E.2, XII.E3, and XII.E.7).
•Preventatives measures (these are mostly non-structural measures, e.g., minimizing
impervious areas, conserving natural areas, minimizing directly connected impervious
areas, etc.)
•The Project shall in the order presented, infiltrate, harvest and use, evapotranspire
and/or bio-treat the Design Capture Volume (DCV).
•The Project shall consider a properly engineered and maintained bio-treatment system
only if infiltration, harvesting and use and evapotranspiration cannot be feasibly
implemented at the project site.
•Any portion of the DCV that is not infiltrated, harvested and used, evapo-transpired,
and/or bio-treated shall be treated and discharged in accordance with the
requirements set forth in Section XII.G.
48.Parking lot landscaping areas shall be designed to provide for treatment, retention or
infiltration of runoff.
49.Project hardscape areas shall be designed and constructed to provide for drainage into
adjacent landscape.
50.If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant
shall obtain certification through the Santa Ana Regional Water Quality Control Board and
provide a copy to the Engineering Division.
51.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain”
using the City authorized marker.
52.The project shall use either volume-based and/or flow-based criteria for sizing BMPs in
accordance with NPDES Permit Provision XII.D.4.
53.Multi-family and/or high density residential developments shall implement full trash capture
methods/devises approved by the Regional Water Quality Control Boards.
Construction
54.A Storm Water Pollution Prevention Plan (SWPPP) (as required by the NPDES General
Construction Permit) and compliance with the Green Building Code for sediment and
erosion control are required for this project.
55.Prior to grading or building permit for construction or demolition and/or weed abatement
activity projects subject to coverage under the NPDES General Construction Permit shall
demonstrate that compliance with the permit has been obtained by providing a copy of the
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 9 of 19
3
7
8
3
4
Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of
the notification of the issuance of a Waste Discharge Identification (WDID) Number or other
proof of filing to the satisfaction of the City Engineer. A copy of the SWPPP shall be kept at
the project site, updated, and be available for review upon request.
56.Erosion & Sediment Control – ALL PROJECTS - Prior to the issuance of any grading or
building permit for construction or demolition, the applicant shall submit for review and
approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet
of the grading plan submittal to demonstrate compliance with the City’s NPDES Program
and state water quality regulations for grading and construction activities. The Erosion and
Sediment Control Plan shall identify how all construction materials, wastes, grading or
demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be property
covered, stored and secured to prevent transport into local drainages or waters by wind,
rain, tracking, or dispersion. The plan shall also describe how the project will ensure that all
BMPs will be maintained during construction of any future right of ways. A copy of the plan
shall be incorporated into the SWPPP as applicable, kept updated as needed to address
changing circumstances of the project site, be kept at the project site and available for
review upon request.
57.Minimum BMP’s as identified by the City shall be implemented by all projects.
Post-Construction
58.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall
demonstrate compliance with applicable NPDES permits for construction, MS4, etc. to
include:
•Demonstrate that the project has complied with all non-structural BMPs described in
the project’s WQMP.
•Provide signed, notarized certification from the engineer of work that the structural
BMP’s identified in the project’s WQMP are installed in conformance with approved
plans and specifications and operational.
•The Operation and Maintenance (O&M) Plan and Agreement and/or CC&R’s shall (1)
describe the long-term operation and maintenance requirements for BMPs identified in
the BMP Exhibit; (2) identify the entity that will be responsible for long-term operation
and maintenance of the referenced BMPs; (3) describe the mechanism for funding the
long-term operation and maintenance of the referenced BMPS; and (4) provide for
annual certification of water quality facilities by a registered civil engineer. The City
format shall be used.
•Submit a copy of the fully executed, recorded City approved Operations and
Maintenance (O&M) Plan and Agreement for all structural BMPs or a copy of the
recorded City approved CC&R.
•Provide documentation of annexation into a CFD for funding of facilities to be
maintained by the City.
•Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan or
CC&R’s attached) are available for the HOA.
•Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve
(12) months after the issuance of a Certificate of Use and/or Occupancy for the project
to verify compliance with the approved WQMP and O&M Plan. A signed/sealed
certification from the engineer of work dated 12 months after CofO will be considered
in lieu of a Special Investigation by the City.
•Provide the City with a digital .pdf copy of the Final WQMP.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 10 of 19
3
7
8
3
4
FINAL TRACT OR PARCEL MAP
59.The developer shall submit for plan check review and approval a final map.
60.Phasing plan, if any, shall be approved by the City Engineer prior to issuance of any permits.
61.Prior to City Council approval of the final Tract Map the developer shall, in accordance with
Government Code, have constructed all improvements or have improvement plans
submitted and approved, agreements executed and securities posted.
62.The Final Tract Map or Parcel Map shall include the phasing boundaries consistent with the
parcels of the Tentative Tract or Parcel Map. The phasing boundaries or parcels shall be
processed as separate tract maps.
UTILITIES
63.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway shall be the responsibility of the property owner or his agent.
64.All overhead utilities shall be undergrounded in accordance with Chapter 12.16 of the Lake
Elsinore Municipal Code (LEMC)
65.Underground water rights shall be dedicated to the City pursuant to the provisions of Section
16.52.030 (LEMC), and consistent with the City’s agreement with the Elsinore Valley
Municipal Water District.
66.The developer shall apply for, obtain and submit to the City Engineering Division a letter
from Southern California Edison (SCE) indicating that the construction activity will not
interfere with existing SCE facilities (aka SCE NIL).
67.The developer shall submit a copy of the "Will Serve" letter to the City Engineering Division
from the applicable water agency stating that water and sewer arrangements have been
made for this project and specify the technical data for the water service at the location,
such as water pressure and volume etc.
IMPROVEMENTS
Design
68.The development of each Planning Area or Phase shall be subject for specific review and
conditions of approval.
69.Sight distance into and out of the project location shall comply with CALTRANS Standards.
70.The developer shall install permanent bench marks per City of Lake Elsinore Standards and
at locations to be determined by City Engineer.
71.The developer shall install blue dot markers in the roadway at a right angle to Fire Hydrant
locations per Lake Elsinore Standards.
72.The developer shall coordinate with Riverside Transit Authority for location and installation
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 11 of 19
3
7
8
3
4
of bus transit facilities.
73.10-year storm runoff shall be contained within the curb and the 100 year storm runoff shall
be contained within the street right-of-way. When either of these criteria are exceeded,
drainage facilities shall be provided.
74.All drainage facilities in this project shall be constructed to Riverside County Flood Control
District Standards.
75.A drainage study shall be provided. The study shall identify the following: identify storm
water runoff from and upstream of the site; show existing and proposed off-site and onsite
drainage facilities; and include a capacity analysis verifying the adequacy of the facilities.
The drainage system shall be designed to ensure that runoff from a 10-yr storm of 6 hours
or 24 hours duration under developed condition is equal or less than the runoff under
existing conditions of the same storm frequency. Both 6 hour and 24hour storm duration
shall be analyzed to determine the detention basin capacities necessary to accomplish the
desired results.
76.All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off-site drainage, if
different from historic flow, shall be conveyed to a public facility, accepted by adjacent
property owners by a letter of drainage acceptance, or conveyed to a drainage easement.
77.Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs
should drain to a landscaped area.
78.The site shall be planned and developed to keep surface water from entering buildings
(California Green Building Standards Code 4.106.3).
79.All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Public Works
Standard Plans.
80.Construct streets A and B per City Standard 108 (60’/40’).
81.Construct Sassy Lane per Riverside County Standard 106A Modified (50’/36’).
82.Construct ac pavement to City Standard Local Street Section 108, 1/2 width +12’, on Third
Street, from Conard Avenue to Cambern Avenue.
83.Provide street lighting and show lighting improvements as part of street improvement plans.
Coordinate with engineering Department for selection of the LS-2 or LS-3 and design
standards and requirements.
84.The developer shall implement mitigation measures identified in the Traffic Analysis dated
January 23, 2007, as specified in this Study to the satisfaction of the City Engineer.
85.Street improvement plans shall be prepared by a Registered Civil Engineer and the plans
shall include curb and gutter, sidewalk, ac pavement, street lighting, median, trail, and
drainage improvements.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 12 of 19
3
7
8
3
4
86.The developer shall provide signing and striping plans for the required improvements of this
project. The plans shall also incorporate traffic calming measures on local streets.
87.This project shall provide trail and roadway connections to adjacent developments unless
otherwise deemed unfeasible as concurred by the city. The trail cross section shall be per
County standards unless otherwise approved by the City Engineer.
88.If existing improvements are to be modified, the existing improvement plans on file shall be
modified accordingly and approved by the City Engineer prior to issuance of building
permit.
Permitting/Construction
89.An Encroachment Permit shall be obtained prior to any work on City and/or State right-of-
way. The developer shall submit the permit application, required fees and executed
agreements, security and other required documentation prior to issuance.
90.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 ½" x 11" Mylar) shall be submitted to the Engineering Division before final
inspection of public works improvements will be scheduled and approved.
91.The developer shall be responsible for acquiring right-of-ways in which the developer or the
City has no legal title or interest. If the developer is unsuccessful in acquiring such right-of-
ways, the City could assist the developer in the Eminent Domain process at developer’s
cost.
92.All streets shall be constructed per Lake Elsinore City Standards and/or applicable specific
plan. Any deviation from City standards shall be approved by the City Engineer.
Acceptance of Improvements
93.Pay all fair-share contribution for the cost of offsite improvements as identified in this
project’s Traffic Study, dated January 23, 2007. The fair-share cost shall be based on a cost
estimate of the offsite improvements provided by the developer and approved by the City
Engineer.
94.A portion of the required improvements for this development may be covered under the
Traffic Impact Fee (TIF) or Area Drainage Fee program. Request for reimbursement or
credits shall be approved by the City Engineer and based on allowable costs in the fee
program and availability of funds.
95.The developer shall submit a written request for acceptance to the City Engineer.
96.As-built plans shall be completed and signed by the City Engineer.
GRADING
Design
97.Provide written approval of construction activity from the U.S. Department of Fish and Game
and U.S. Army Corp of Engineers.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 13 of 19
3
7
8
3
4
98.A grading plan signed and stamped by a California Registered Civil Engineer shall be
submitted for City review and approval for all addition and/or movement of soil (grading) on
the site. The plan shall include separate sheets for erosion control, haul route and traffic
control. The grading submittal shall include all supporting documentation and be prepared
using City standard title block, standard drawings and design manual (available at
www.lake-elsinore.org).
99.All grading plan contours shall extend to minimum of 50 feet beyond property lines to
indicate existing drainage pattern.
100.The grading plan shall show that no structures, landscaping, or equipment are located near
the project entrances that could reduce sight distance.
101.If the grading plan identifies alterations in the existing drainage patterns as they exit the site,
a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required
prior to issuance of grading permits. All grading that modifies the existing flow patterns
and/or topography shall be approved by the City Engineer.
102.A seismic study shall be performed on the site to identify any hidden earthquake faults,
liquefaction and/or subsidence zones present on-site. A certified letter from a registered
geologist or geotechnical engineer shall be submitted confirming the absence of this hazard.
103.Applicant shall obtain all necessary off-site easements for off-site grading from the adjacent
property owners prior to final map approval.
104.The applicant shall accept drainage from the adjacent property owners.
Permit/Construction:
105.Developer shall execute and submit grading and erosion control agreement, post grading
security and pay permit fees as a condition of grading permit issuance.
106.A preconstruction meeting with the City Public Works Inspector (Engineering Division) is
required prior to commencement of ANY grading activity.
107.Developer shall provide the city with a copy of the Notice of Intent (NOI) and Waste
Discharge Identification (WDID) letter issued by the Regional Water Quality Control Board
for the National Pollutant Discharge Elimination System (NPDES) program
108.Prior to commencement of grading operations, developer is to provide to the City with a map
of all proposed haul routes to be used for movement of export material. All such routes shall
be subject to the review and approval of the City Engineer. Haul route shall be submitted
prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall be approved by
City Council. (LEMC 15.72.065)
109.Export sites located within the Lake Elsinore City limits must have an active grading permit.
110.Applicant to provide to the City a video record of the condition of all proposed public City
haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring
public roads to the baseline condition. A bond may be required to ensure payment of
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 14 of 19
3
7
8
3
4
damages to the public right-of-way, subject to the approval of the City Engineer.
111.All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper
than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the
City.
112.A copy of the current SWPPP shall be kept at the project site and be available for review
upon request.
113.Approval of the project Water Quality Management Plan (WQMP) for post construction shall
be received prior to issuance of a grading permit.
114.Submit an approved environmental clearance document to the Engineering Division. This
approval shall identify and clear all proposed grading activity anticipated for this project.
115.Developer shall pay all grading permit applicable processing, permit, security and
development fees including those fees identified in an applicable development agreement,
Stephens Kangaroo Rat Habitat.
PRIOR TO ISSUANCE OF BUILDING PERMIT
116.Provide final soils, geology and seismic report, including recommendations for parameters
for seismic design of buildings, and walls prior to building permit.
117.The Parcel or Final Tract Map shall be recorded.
118.All street improvement plans and signing and striping plans shall be completed and
approved by the City Engineer per the Traffic Impact Analysis dated January 23, 2007.
119.The developer shall pay all Capital Improvement TIF and Master Drainage Fees and Plan
Check fees (LEMC 16.34).
PRIOR TO OCCUPANCY
120.All signing and striping and traffic control devices for the required improvements of this
development shall be installed.
121.All public improvements shall be completed in accordance with the approved plans or as
condition of this development to the satisfaction of the City Engineer.
122.Pay all fair-share contribution for the cost of offsite improvements as identified in this
project’s Traffic Study, dated January 23, 2007. The fair-share cost shall be based on a cost
estimate of the offsite improvements provided by the developer and approved by the City
Engineer.
123.All water and sewer improvements shall be completed in accordance with Water District
requirements.
124.As-built plans for all approved plan sets shall be submitted for review and approval by the
City. The developer/developer/owner is responsible for revising the original mylar plans.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 15 of 19
3
7
8
3
4
125.In the event of damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
126.All final studies and reports, grade certifications, monument certifications (with tie notes
delineated on 8 ½ x 11” mylar) shall be submitted in .tif format on a CD/DVD. Studies and
reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc.
127.All plan sets and recorded maps shall be digitized and provided on CD/DVD as follows:
•Final Map(s) - GIS Shape files*, AutoCad file and .tif of recorded map.
•Improvement Plans – GIS Shape files*, and .tif of approved as built mylar.
•Grading Plans - .tif of approved as built mylar.
o *GIS Shape files must be in projected Coordinate System: NAD 83 State Plane
California Zone VI U.S. Fleet.
128.Final soil report showing compliance with recommendations, compaction reports, grade
certifications, monument certifications (with tie notes delineated on 8 ½ x 11” mylar) shall
be submitted in .tif format on CD to the Engineering Division before final inspection will be
scheduled.
129.Documentation of responsibility for slope maintenance along right-of-ways and open spaces
to be maintained by the HOA or other entity shall be provided in a recordable format and
recorded prior to occupancy/final.
130.Prior to grading or building permit close-out and/or the issuance of a certificate of use or a
certificate of occupancy, developer shall:
•Demonstrate that all structural BMPs have been constructed, installed and are
functioning in conformance with approved plans and specifications and the WQMP;
•Demonstrate that they are prepared to implement all non-structural BMPs included in
the conditions of approval or building/grading permit conditions;
•Demonstrate that an adequate number of copies of the approved project specific
WQMP are available for the future owners/occupants.
131.All required public right-of-way dedications, easements, vacations and easement
agreement(s) shall be recorded with a recorded copy provided to the City prior to first
occupancy.
132.The property owner (aka Legally Responsible Party) shall execute and cause to be recorded
a “Covenant and Agreement” in the form provided by the City to inform future property
owners of the requirement to implement the approved final project-specific WQMP.
133.Developer shall pay all applicable citywide development impact fees in effect at the time of
issuance of building permits, including fees due pursuant to LEMC Section 16.72
(Drainage), Section 16.74 (TIF, DIF, Fire), Section 16.83 (TUMF), and Section 16.85
(MSHCP), and Stephens Kangaroo Rat Habitat (modified per 10/17/2017 PC).
COMMUNITY SERVICES DEPARTMENT
134.The developer shall pay Quimby and park Development Impact Fees (DIF), at the rate in
effect at the time of payment.
135.The developer is required to participate in the Public Facility fee program.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 16 of 19
3
7
8
3
4
136.All interior landscape, recreation areas, facilities and/or open space shall be maintained by
the HOA. No park credits shall be given.
137.The HOA shall maintain all park and common landscape areas.
CITY OF LAKE ELSINORE FIRE MARSHAL
General Conditions
138.Lake Elsinore Fire Protection Planning Office Responsibility - It is the responsibility of
the recipient of Fire Department conditions to forward them to all interested parties. The
permit number is required on all correspondence. Questions should be directed to the
Riverside County Fire Department, Lake Elsinore Fire Protection Planning Division at 130
S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225. The following fire
department conditions shall be implemented in accordance with the Lake Elsinore Municipal
Code and the adopted codes at the time of project building plan submittal, these conditions
are in addition to the adopted code requirements.
139.Blue Dot Reflectors - Blue retro-reflective pavement markers shall be mounted on private
streets, public streets and driveways to indicate location of fire hydrants. Prior to installation,
placement of markers must be approved by the Riverside County Fire Dept.
140.Minimum Hydrant Fire Flow - Minimum required fire flow shall be 1,500 GPM for 2 hours
duration at 20-PSI residual operating pressure, which must be available before any
combustible material is placed on the job site. Average spacing between hydrants 500’ and
250’ maximum distance from any point on the street or road frontage to hydrant. Standard
Fire hydrants shall be installed (6”x4”x2-1/2”).
141.Standard Fire Hydrants - Standard fire hydrants (6” x 4” x 2-2 1/2”), shall be located not
less than 25 feet or more than 250 feet from any portion of the building as measures along
approved vehicular travel ways. The required fire flow shall be available from any adjacent
hydrant(s) in the system.
142.Fuel Modification Plan - Fuel modification plans shall be provided to the Lake Elsinore Fire
Protection Planning office. Plans shall include fuels modeling and comprehensive details
with regard to the vegetation management plan. The fuels modification zone shall be not
less than 100’ from all structures and may be required to be increased.
143.Minimum Access Standards - The following access requirements are required to be
implemented to ensure fire department and emergency vehicular access. All roadways shall
conform to the City of Lake Elsinore approved roadway standards but in no case shall the
minimum fire department vehicular access be less the following provisions:
1. Twenty-four feet (24’) clear width. Where parking is to be provided, each parking
side shall be provided with eight (8’) additional feet on each side of the fire
department access.
2. Median openings or crossovers between opposing lanes of a divided highway or
street shall be located only at approved intersections at intervals of not less than 500
feet. [Ord. 529 § 3.2(F), 1973].
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 17 of 19
3
7
8
3
4
3. The required all weather vehicular access shall be able to support no less than
65,000 lbs. over 2 axles.
4. Roadway gradient shall not exceed 15% on any access road, driveways, and
perimeter roads.
5. Turning Radius shall be 24’ inside and 45’ outside for all access roads.
144.Secondary Access - In the interest of Public Safety, this project shall provide an Alternate
or Secondary Access. Said access shall be constructed in accordance to the City of Lake
Elsinore Engineering Department standards to accommodate full fire response and
community evacuation.
145.Automatic / Manual Gates - Gate entrances shall be at least two feet wider than the width
of the traffic lane(s) serving that gate and no less than 20 feet wide. Any gate providing
access from a road to a driveway shall be located at least 35 feet from the roadway and
shall open to allow vehicle to stop without obstructing traffic on the road. Where a one-way
road with a single traffic lane provides access to a gate entrance, a 40 foot turning radius
shall be used. Gate access shall be equipped with a rapid entry system. Plans shall be
submitted to the Fire Department for approval prior to installation. Automatic/manual gate
pins shall be rated with shear pin force, not to exceed 30 foot pounds. Automatic gates shall
be equipped with emergency backup power. Gates activated by the rapid entry system shall
remain open until closed by the rapid entry system. Contact the Fire Planning Office for
current plan check fees.
Prior to Building Permit Issuance
146.Plan Check Fee - Building plan check fees shall be made payable to the “City of Lake
Elsinore”, and shall be submitted to the Fire Department at the time of plan submittal.
147.Water System Plans - Applicant and/or developer shall separately submit 2 sets of water
system plans to the Fire Department for review. Plans must be signed by a registered Civil
Engineer and/or water purveyor prior to Fire Department review and approval. Mylars will
be signed by the Fire Department after review and approval. Two (2) copies of the signed
and approved water plans shall be returned to the Fire Department before release of a
building permit.
148.Prior to Building Construction Verification - This project shall be inspected and approved
by the Fire Marshal or designee prior to bringing combustible materials on site. During such
inspection all permanent road signs shall be in place, all hydrants shall on operating and
approved for use by the water purveyor, and all permanent road surfaces shall be completed
including primary and secondary access circulation.
Prior to Building Final Inspection
149.Residential Fire Sprinkler Systems for Single family and two-family 13D - Install a
complete fire sprinkler system designed in accordance with California Residential Code,
California Fire Code and adopted standards. A C-16 licensed contractor must submit plans,
along with the current fee, to the Fire Department for review and approval prior to installation.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 18 of 19
3
7
8
3
4
DEPARTMENT OF ADMINISTRATIVE SERVICES
Annex into CFD 2015-1 (Safety) Law Enforcement, Fire and Paramedic Services CFD
150.Prior to approval of the Final Map, Parcel Map, Residential Design Review, or Conditional
Use Permit (as applicable), the applicant shall annex into Community Facilities District No.
2015-1 (Safety) the Law Enforcement, Fire and Paramedic Services Mello-Roos Community
Facilities District to offset the annual negative fiscal impacts of the project on public safety
operations and maintenance issues in the City. Alternatively, the applicant may propose
alternative financing mechanisms to fund the annual negative fiscal impacts of the project
with respect to Public Safety services. Applicant shall make a non-refundable deposit of
$15,000, or at the current rate in place at the time of annexation toward the cost of
annexation, formation or other mitigation process, as applicable (modified per 1/28/2020
CC).
Annex into the City of Lake Elsinore Community Facilities District No. 2015-2 (Maintenance
Services)
151.Prior to approval of the Final Map, Parcel Map, Residential Design Review, Conditional Use
Permit or building permit (as applicable), the applicant shall annex into the Community
Facilities District No. 2015-2 (Maintenance Services) to fund the on-going operation and
maintenance of the public right-of-way landscaped areas and neighborhood parks to be
maintained by the City and for street lights in the public right-of-way for which the City will
pay for electricity and a maintenance fee to Southern California Edison, including parkways,
open space and public storm drains constructed within the development and federal NPDES
requirements to offset the annual negative fiscal impacts of the project. Alternatively, the
applicant may propose alternative financing mechanisms to fund the annual negative fiscal
impacts of the project with respect to Maintenance Services. Applicant shall make a non-
refundable deposit of $15,000, or at the current rate in place at the time of annexation toward
the cost of annexation, formation or other mitigation process, as applicable (modified per
1/28/2020 CC).
MITIGATION MONITORING AND REPORTING PROGRAM
152.The applicant shall comply with the Mitigation Monitoring & Reporting Program (MMRP) for
Mitigated Negative Declaration No. 2007-01 for Ramsgate Specific Plan No. 89-1, Revision
No. 6, which was adopted for this project.
TTM 37381
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 19 of 19
3
7
8
3
4
I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above
named project and do hereby agree to accept and abide by all Conditions of Approval as approved
by the City Council of the City of Lake Elsinore on_______________. I also acknowledge that all
Conditions shall be met as indicated.
Date:
Applicant’s Signature:
Print Name:
Address:
Phone Number:
Applicant’s Initials: _____ Page 1 of 20
CONDITIONS OF APPROVAL
(New text underlined and deletions in strikethrough)
PROJECT: TTM 37382
PROJECT NAME:Wasson Canyon
PROJECT LOCATION:APNs: 347-330-022, 023, 066, 347-360-001, 002,
377-100-006, 009, and 010
APPROVAL DATE:November 14, 2017
EOT1 APPROVAL DATE:January 28, 2020
EOT2 APPROVAL DATE:June 13, 2023
EOT3 APPROVAL DATE:
EXPIRATION DATE:
September 10, 2024
May 14, 2027
GENERAL
1.Tentative Tract Map No. 37382 is a subdivision of 55.06 acres into 199 single-family
residential lots (ranging in size from 4,600 sq. ft. to 17,445 sq. ft.) and 23 lettered lots for a
5.6-acre park, open space, utility easements, and water quality/detention basins. The
project site is located southeasterly of Highway 74, westerly of Rosetta Canyon Drive,
northeasterly of Cambern Avenue, on the southern side of Third Street within the Ramsgate
Specific Plan. (APNs: 347-330-022, 023, 066, 347-360-001, 002, 377-100-006, 009, and
010).
2.The applicant shall defend (with counsel acceptable to the City), indemnify, and hold
harmless the City, its Officials, Officers, Employees, Agents, and its Consultants
(Indemnitees) from any claim, action, or proceeding against the Indemnitees to attack, set
aside, void, or annul an approval of the City, its advisory agencies, appeal boards, or
legislative body concerning approval, implementation and construction of Tentative Tract
Map No. 37382, which action is bought within the time period provided for in California
Government Code Sections 65009 and/or 66499.37, and Public Resources Code Section
21167, including the approval, extension or modification of Tentative Tract Map No. 37382
or any of the proceedings, acts or determinations taken, done, or made prior to the decision,
or to determine the reasonableness, legality or validity of any condition attached thereto.
The Applicant's indemnification is intended to include, but not be limited to, damages, fees
and/or costs awarded against or incurred by Indemnitees and costs of suit, claim or litigation,
including without limitation attorneys' fees, penalties and other costs, liabilities and
expenses incurred by Indemnitees in connection with such proceeding. The City will
promptly notify the applicant of any such claim, action, or proceeding against the City. If the
project is challenged in court, the City and the applicant shall enter into formal defense and
indemnity agreement, consistent with this condition.
3.Within 30 days of project approval, the applicant shall sign and complete an
"Acknowledgment of Conditions" and shall return the executed original to the Community
Development Department for inclusion in the case records.
PLANNING DIVISION
4.Tentative Tract Map No. 37382 will expire January 28, 2022 May 14, 2024 May 14, 2027
unless within that period of time a Final Map has been filed with the County Recorder., or
an extension of time is granted by the City of Lake Elsinore City Council in accordance with
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 2 of 20
3
7
8
3
5
the State of California Subdivision Map Act and applicable requirements of the Lake Elsinore
Municipal Code.
5.Tentative Tract Map No. 37382 shall comply with the State of California Subdivision Map
Act, the Ramsgate Specific Plan No. 89-1, Revision No. 6 (RSP #6), and applicable
requirements set forth in the Lake Elsinore Municipal Code (LEMC), unless modified by
approved Conditions of Approval.
6.The applicant shall provide all project-related on-site and off-site improvements as required
by these Conditions of Approval.
7.All future development proposals shall be reviewed by the City on a project by project basis.
If determined necessary by the Community Development Director or designee, additional
environmental analysis will be required.
8.The applicant shall pay all applicable City fees, including but not limited to Development
Impact Fees (DIF) per Section 16.74 of the LEMC, Transportation Uniform Mitigation Fees
(TUMF) per LEMC Section 16.83, (ii) Area Drainage Fees per LEMC Section 16.72, (iii)
MSHCP Fees per LEMC Section 16.85, (iv) Stephens Kangaroo Habitat Fee (K-Rat) per
Chapter 19.04 of LEMC, (vii) Capital Improvement Impact/Mitigation Fees, and (viii) Plan
Check and Permit fees, at the rate in effect at the time of payment (modified per 1/28/2020
CC).
Prior to Recordation of Final Tract Map
9.All lots shall comply with minimum standards set forth in the Ramsgate Specific Plan No.
89-1, Revision No. 6 (RSP #6).
10.A precise survey with closures for boundaries and all lots shall be provided per the LEMC.
11.Street names within the subdivision shall be reviewed and approved by the Community
Development Director or designee.
12.All of the project improvements shall be designed by the applicant's Civil Engineer to the
specifications of the City of Lake Elsinore.
13.The applicant shall meet all the requirements of the Elsinore Valley Municipal Water District
(EVMWD).
14.Prior to recordation of a Final Map, the applicant shall initiate and complete the formation of
a Homeowner’s Association (HOA) which shall be approved by the City. All Association
documents shall be submitted for review and approval by City Planning, Engineering and
the City Attorney and upon City approval shall be recorded. Such documents shall include
the Articles of Incorporation for the Association and Covenants, Conditions and Restrictions
(CC&Rs).
a. At a minimum, all recreation and park areas (except public parks), all natural slopes and
open space, all graded slopes abutting public street rights-of-way which are not part of
residential lots, up slopes from public rights-of-way within private lots and all private
streets, and all drainage basins shall be maintained by the Homeowner’s Association
(HOA).
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 3 of 20
3
7
8
3
5
Prior to Design Review Approval
15.All future structural development associated with this map requires separate Design Review
approval pursuant to the provisions of LEMC Chapter 17.184.
16.The following architectural details shall be provided:
•All front fence returns shall be decorative masonry walls. Wood fences will not be
allowed along the front elevation. Wood, vinyl or steel (wrought iron or aluminum)
gates are allowed in order to allow access to rear yards.
•The applicant shall provide four-sided articulation. Architectural enhancements and
treatments shall be provided on all residential elevations (front, rear and side) visible
from streets and other public views.
•All fireplaces shall be natural gas fireplaces only. No wood burning fireplaces shall be
allowed.
Prior to Issuance of Grading Permits/Building Permits
17.Prior to the issuance of a grading permit, the project applicant shall obtain all necessary
State and Federal permits, approvals, or other entitlements, including obtaining the
necessary authorizations from the regulatory agencies for proposed impacts to jurisdictional
waters. Authorizations may include a Section 404 Permit from the U.S. Army Corps of
Engineers, a Section 1602 Streambed Alteration Agreement from the California Department
of Fish and Wildlife, and a Section 401 Water Quality Certification/Waste Discharge
Requirement from the Regional Water Quality Control Board.
18.Prior to issuance of building permit, the applicant shall prepare a Final Wall and Fence Plan
addressing the following:
•Show that a masonry or decorative block wall will be constructed along the entire tract
boundary.
•Show materials, colors, and heights of rear, side and front walls/fences for proposed
lots.
•Show the location of all wood, vinyl or steel (wrought iron or aluminum) gates placed
within the front return walls.
•Show that side walls for corner lots shall be decorative masonry block walls.
•Show that those materials provided along the front elevations (i.e. brick, stone, etc.)
will wrap around the side elevation and be flush with the front return walls.
19.Signs are not part of this project approval. All signage shall be subject to Planning Division
or Planning Commission review and approval prior to installation.
20.Provisions of the City's Noise Ordinance (LEMC Chapter 17.176) shall be satisfied during
all site preparation and construction activity. The applicant shall place a weatherproof 3’ X
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 4 of 20
3
7
8
3
5
3’ sign at the entrance to the project site identifying the approved days and hours of
construction activity. Site preparation activity and construction shall not commence before
7:00 AM and shall cease no later than 5:00 PM, Monday through Friday. Only finish work
and similar interior construction may be conducted on Saturdays and may commence no
earlier than 8:00 am and shall cease no later than 4:00 p.m. Construction activity shall not
take place on Sunday, or any Legal Holidays. The sign shall identify the name and phone
number of the development manager to address any complaints.
21.Prior to issuance of a building permit, building plans for the Model Home Complex shall
comply with all American Disabilities Act (ADA) requirements, including provision of a
handicapped-accessible bathroom.
22.Construction phasing shall be implemented in accordance with the approved Phasing Plan
which avoids construction traffic from entering occupied neighborhoods within the tract.
23.A cash bond shall be required for the Model Home Complex. This bond is to guarantee
removal of the temporary fencing material, parking lot, etc. that have been placed onsite for
the Model Home Complex. The bond will be released after removal of the materials and the
site is adequately restored, subject to the approval of the Community Development Director
or designee.
24.A cash bond shall be required for any garage conversion of the model(s). Bonds will be
released after removal of all temporary materials and the site is adequately restored, subject
to the approval of the Community Development Director or designee.
25.A cash bond shall be required for any construction trailers used during construction. Bonds
will be released after removal of trailers, subject to the approval of the Community
Development Director or designee.
26.The applicant shall meet all requirements of the providing electric utility company The
applicant shall satisfy easement concerns as noted in the Southern California Edison
correspondence dated March 22, 2007.
27.The applicant shall pay school fees to the Lake Elsinore Unified School District prior to
issuance of each building permit.
28.Prior to the issuance of a building permit, the applicant shall pay the City’s Multiple Species
Habitat Conservation Plan (MSHCP) Local Development Mitigation Fee, at the rate in effect
at the time of payment.
29.Prior to the issuance of a building permit, the applicant shall pay the Stephens' Kangaroo
Rat mitigation fee in accordance with the Stephens' Kangaroo Rat Habitat Conservation
Plan.
30.The project shall connect to water and sewer and meet all requirements of the Elsinore
Valley Municipal Water District (EVMWD). The applicant shall submit water and sewer plans
to the EVMWD and shall incorporate all district conditions and standards.
31.All mechanical and electrical equipment associated with the residences shall be ground
mounted. All outdoor ground or wall mounted utility equipment shall be consolidated in a
central location and architecturally screened behind fence returns, subject to the approval
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 5 of 20
3
7
8
3
5
of the Community Development Director, prior to issuance of building permit.
32.All front yards and side yards on corner lots shall be properly landscaped with automatic
(manual or electric) irrigation systems to provide 100 percent planting coverage using a
combination of drip and conventional irrigation methods. Construction Landscape &
Irrigation drawings shall be prepared, reviewed by the City's Landscape Architect Consultant
and approved by the Community Development Director or designee. A Cost Estimate for
materials and labor shall also be submitted for review and approval. A Landscape Plan
Check fee will be charged prior to final landscape approval based on the Consultant's fee,
inspection, permits and administration fees.
•The applicant shall replace any street trees harmed during construction, in
conformance with the City's Street Tree List, at a maximum of 30 feet apart and at
least 24-inch box in size.
•Perimeter walls shall be protected by shrubs and other plantings that discourage
graffiti.
•The applicant shall ensure a clear line of sight at ingress/egress points by providing
plantings within 15 feet of ingress/egress points whose height does not exceed two (2)
feet and whose canopy does not fall below six feet.
•The landscape plan shall provide for California native drought-tolerant ground cover,
shrubs, and trees. Special attention shall be given to use of Xeriscape or drought
resistant plantings with combination drip irrigation system to prevent excessive
watering.
•No front-yard grass turf landscaping will be installed.
•All landscape improvements shall be bonded with a ten percent (10%) Faithful
Performance Bond of the approved estimated labor and materials cost for all planting.
The bond shall remain in effect for one year from Certificate of Occupancy.
•All landscaping and irrigation shall be installed within an affected portion of any phase
at the time a certificate of occupancy is requested for any building.
•All Model Homes shall be Xeriscaped and signage provided identifying Xeriscape
landscaping. Xeriscape is a method of landscape design that minimizes water use by:
1) Implementing hydrozones;
2) Eliminating high and medium water-use plant material as identified by Water Use
Classifications of Landscape Species (WUCOLS) (such as turf) and incorporates
low to very low water-efficient (“drought-tolerant” / climate-appropriate) plants;
3) Requires an efficient irrigation system that includes:
a. ET-Based (“Smart irrigation”) controller(s) with weather-sensing, automatic
shut-off and seasonal adjustment capabilities;
b. Efficient irrigation water application through use of:
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 6 of 20
3
7
8
3
5
i. Low-volume point-source irrigation (such as drip irrigation and bubblers) for
all shrub planter areas (maximum of 3:1 slope) with a minimum irrigation
efficiency of 0.90 ; and/or
ii. Rotor-type nozzles for areas greater than ten (10) feet wide, for slopes 3:1
and greater, AND with a minimum irrigation efficiency of 0.71.
4) Improvement of soil structure for better water retention; and
5) Application of mulch to hinder evaporation.
•The Final landscape plan shall be consistent with any approved site and/or plot plan.
•The Final landscape plan shall include planting and irrigation details.
•All exposed slopes in excess of three feet in height within the subject tract and within
private lots shall have a permanent irrigation system and erosion control vegetation
installed, as approved by the Planning Division, prior to issuance of certificate of
occupancy.
•All landscaping and irrigation shall comply with the water-efficient landscaping
requirements set forth in LEMC Chapter 19.08 (Water Efficient Landscape
Requirements), as adopted and any amendments thereto.
ENGINEERING DIVISION
General
33.All slopes and landscaping within public right-of-way shall be maintained by the property
owner or property owner’s association or another maintenance entity approved by the City
Council.
34.All open space and slopes except for public parks and schools and flood control district
facilities, outside the public right-of-way shall be owned and maintained by property owner
or property owner’s association.
35.All storm drain system pipes with diameter greater than 36” shall be plan checked and
maintained by Riverside County Flood Control District.
36.The developer shall provide a copy of an encroachment permit or any approval documents
from the Riverside County Flood Control District and/or Caltrans for encroaching, grading,
or discharging into County flood control facilities or Caltrans right of way.
37.This project shall comply with the recommendations of the traffic study prepared by Urban
Crossroads dated January 23, 2007.
38.In accordance with the City’s Franchise Agreement for waste disposal & recycling, the
developer shall be required to contract with CR&R Inc. for removal and disposal of all waste
material, debris, vegetation and other rubbish generated during cleaning, demolition, clear
and grubbing or all other phases of construction.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 7 of 20
3
7
8
3
5
39.Developer shall mitigate to prevent any flooding and/or erosion downstream caused by
development of the site and or diversion of drainage.
40.Any grading that affects “waters of the United States”, wetlands or jurisdictional streambeds,
shall require approval and necessary permits from respective Federal and/or State
agencies.
41.All required soils, geology, hydrology and hydraulic, and seismic reports shall be prepared
by a Registered Civil Engineer.
FEES
42.The developer shall pay all Engineering Division assessed, Development Impact Fees, Plan
Check and Permit fees (LEMC 16.34) prior to the issuance of a building permit consistent
with Condition No. 8. Applicable Engineering Division assessed Development Impact Fees
include: Railroad Canyon Road Benefit District, Stephens Kangaroo Habitat Fee (K-Rat),
Traffic Infrastructure Fee (TIF), Transportation Uniform Mitigation Fee (TUMF), and Area
Drainage Fee (modified per 1/28/2020 CC).
43.Mitigation Fees will be assessed at the prevalent rate at time of payment in full.
STORMWATER MANAGEMENT / POLLUTANT PREVENTION / NPDES
Design
44.The project is responsible for complying with the Santa Ana Region NPDES Permits as
warranted based on the nature of development and/or activity. These Permits include but
are not limited to:
•General Permit – Construction
•Deminimus Discharges
•MS4
45.A Water Quality Management Plan (WQMP) (preliminary and final) shall be prepared using
the Santa Ana Region 8 approved template and guidance and submitted for review and
approval to the City. The Preliminary WQMP shall be approved by the City prior to Planning
Commission; the Final WQMP shall be approved by the City prior to rough or precise grading
plan approval and issuance of ANY permit for construction.
46.Any portion of the DCV that is not infiltrated, harvested and used, evapotranspired, and/or
biotreated shall be treated and discharged in accordance with the requirements set forth in
Section XII.G.
47.The Final WQMP shall document the following:
•Detailed site and project description.
•Potential stormwater pollutants.
•Post-development drainage characteristics.
•Low Impact Development (LID) BMP selection and analysis.
•Structural and Non-Structural source control BMPs.
•Treatment Control BMPs
•Site design and drainage plan (BMP Exhibit).
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 8 of 20
3
7
8
3
5
•Documentation of how vector issues are addressed in the BMP design, operation and
maintenance.
•GIS Decimal Minute Longitude and Latitude coordinates for all LID and Treatment
Control BMP locations.
•HCOC – demonstrate that discharge flow rates, velocities, duration and volume for the
post construction condition from a 2 year and 10 year, 24 hour rainfall event will not
cause adverse impacts on downstream erosion and receiving waters, or measures are
implemented to mitigate significant adverse impacts downstream public facilities and
water bodies. Evaluation documentation shall include pre-and post-development
hydrograph volumes, time of concentration and peak discharge velocities, construction
of sediment budgets, and a sediment transport analysis.
•Operations and Maintenance Plan and Agreement as well as documentation of
formation of funding district for long term maintenance cost.
48.The 2010 SAR MS4 Permit requires implementation of LID Principles and LID Site Design,
where feasible, to treat the pollutants of concern identified for the project, in the following
manner (from highest to lowest priority): (Section XII.E.2, XII.E3, and XII.E.7).
•Preventatives measures (these are mostly non-structural measures, e.g., minimizing
impervious areas, conserving natural areas, minimizing directly connected impervious
areas, etc.)
•The Project shall in the order presented, infiltrate, harvest and use, evapotranspire
and/or bio-treat the Design Capture Volume (DCV).
•The Project shall consider a properly engineered and maintained bio-treatment system
only if infiltration, harvesting and use and evapotranspiration cannot be feasibly
implemented at the project site.
•Any portion of the DCV that is not infiltrated, harvested and used, evapo-transpired,
and/or bio-treated shall be treated and discharged in accordance with the
requirements set forth in Section XII.G.
49.Parking lot landscaping areas shall be designed to provide for treatment, retention or
infiltration of runoff.
50.Project hardscape areas shall be designed and constructed to provide for drainage into
adjacent landscape.
51.If CEQA identifies resources requiring Clean Water Act Section 401 Permitting, the applicant
shall obtain certification through the Santa Ana Regional Water Quality Control Board and
provide a copy to the Engineering Division.
52.All storm drain inlet facilities shall be appropriately marked “Only Rain in the Storm Drain”
using the City authorized marker.
53.The project shall use either volume-based and/or flow-based criteria for sizing BMPs in
accordance with NPDES Permit Provision XII.D.4.
54.Multi-family and/or high density residential developments shall implement full trash capture
methods/devises approved by the Regional Water Quality Control Boards.
Construction
55.A Storm Water Pollution Prevention Plan (SWPPP) (as required by the NPDES General
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 9 of 20
3
7
8
3
5
Construction Permit) and compliance with the Green Building Code for sediment and
erosion control are required for this project.
56.Prior to grading or building permit for construction or demolition and/or weed abatement
activity projects subject to coverage under the NPDES General Construction Permit shall
demonstrate that compliance with the permit has been obtained by providing a copy of the
Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of
the notification of the issuance of a Waste Discharge Identification (WDID) Number or other
proof of filing to the satisfaction of the City Engineer. A copy of the SWPPP shall be kept at
the project site, updated, and be available for review upon request.
57.Erosion & Sediment Control – ALL PROJECTS - Prior to the issuance of any grading or
building permit for construction or demolition, the applicant shall submit for review and
approval by the City Engineer, an Erosion and Sediment Control Plan as a separate sheet
of the grading plan submittal to demonstrate compliance with the City’s NPDES Program
and state water quality regulations for grading and construction activities. The Erosion and
Sediment Control Plan shall identify how all construction materials, wastes, grading or
demolition debris, and stockpiles of soil, aggregates, soil amendments, etc. shall be property
covered, stored and secured to prevent transport into local drainages or waters by wind,
rain, tracking, or dispersion. The plan shall also describe how the project will ensure that all
BMPs will be maintained during construction of any future right of ways. A copy of the plan
shall be incorporated into the SWPPP as applicable, kept updated as needed to address
changing circumstances of the project site, be kept at the project site and available for
review upon request.
58.Minimum BMP’s as identified by the City shall be implemented by all projects.
Post-Construction
59.Prior to the issuance of a certificate of use and/or occupancy, the applicant shall
demonstrate compliance with applicable NPDES permits for construction, MS4, etc. to
include:
•Demonstrate that the project has complied with all non-structural BMPs described in
the project’s WQMP.
•Provide signed, notarized certification from the engineer of work that the structural
BMP’s identified in the project’s WQMP are installed in conformance with approved
plans and specifications and operational.
•The Operation and Maintenance (O&M) Plan and Agreement and/or CC&R’s shall (1)
describe the long-term operation and maintenance requirements for BMPs identified in
the BMP Exhibit; (2) identify the entity that will be responsible for long-term operation
and maintenance of the referenced BMPs; (3) describe the mechanism for funding the
long-term operation and maintenance of the referenced BMPS; and (4) provide for
annual certification of water quality facilities by a registered civil engineer. The City
format shall be used.
•Submit a copy of the fully executed, recorded City approved Operations and
Maintenance (O&M) Plan and Agreement for all structural BMPs or a copy of the
recorded City approved CC&R.
•Provide documentation of annexation into a CFD for funding of facilities to be
maintained by the City.
•Demonstrate that copies of the project’s approved WQMP (with recorded O&M Plan or
CC&R’s attached) are available for the HOA.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 10 of 20
3
7
8
3
5
•Agree to pay for a Special Investigation from the City of Lake Elsinore for a date twelve
(12) months after the issuance of a Certificate of Use and/or Occupancy for the project
to verify compliance with the approved WQMP and O&M Plan. A signed/sealed
certification from the engineer of work dated 12 months after CofO will be considered
in lieu of a Special Investigation by the City.
•Provide the City with a digital .pdf copy of the Final WQMP.
FINAL TRACT OR PARCEL MAP
60.The developer shall submit for plan check review and approval a final map.
61.Phasing plan, if any, shall be approved by the City Engineer prior to issuance of any permits.
62.Applicant shall dedicate right-of-way for Cambern Avenue adjacent to the property for a
total right-of-way of 45 feet from centerline to the project property line. Cambern Avenue is
classified as an Secondary Highway in the City's General Plan. where full-width 90
feet and curb-to-curb width is 70 feet.
63.Prior to City Council approval of the final Tract Map the developer shall, in accordance with
Government Code, have constructed all improvements or have improvement plans
submitted and approved, agreements executed and securities posted.
64.The Final Tract Map or Parcel Map shall include the phasing boundaries consistent with the
parcels of the Tentative Tract or Parcel Map. The phasing boundaries or parcels shall be
processed as separate tract maps.
UTILITIES
65.All arrangements for relocation of utility company facilities (power poles, vaults, etc.) out of
the roadway shall be the responsibility of the property owner or his agent.
66.All overhead utilities shall be undergrounded in accordance with Chapter 12.16 of the Lake
Elsinore Municipal Code (LEMC)
67.Underground water rights shall be dedicated to the City pursuant to the provisions of Section
16.52.030 (LEMC), and consistent with the City’s agreement with the Elsinore Valley
Municipal Water District.
68.The developer shall apply for, obtain and submit to the City Engineering Division a letter
from Southern California Edison (SCE) indicating that the construction activity will not
interfere with existing SCE facilities (aka SCE NIL).
69.The developer shall submit a copy of the "Will Serve" letter to the City Engineering Division
from the applicable water agency stating that water and sewer arrangements have been
made for this project and specify the technical data for the water service at the location,
such as water pressure and volume etc.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 11 of 20
3
7
8
3
5
IMPROVEMENTS
Design
70.The development of each Planning Area or Phase shall be subject for specific review and
conditions of approval.
71.Sight distance into and out of the project location shall comply with CALTRANS Standards.
72.The developer shall install permanent bench marks per City of Lake Elsinore Standards and
at locations to be determined by City Engineer.
73.The developer shall install blue dot markers in the roadway at a right angle to Fire Hydrant
locations per Lake Elsinore Standards.
74.The developer shall coordinate with Riverside Transit Authority for location and installation
of bus transit facilities.
75.10-year storm runoff shall be contained within the curb and the 100 year storm runoff shall
be contained within the street right-of-way. When either of these criteria are exceeded,
drainage facilities shall be provided.
76.All drainage facilities in this project shall be constructed to Riverside County Flood Control
District Standards.
77.A drainage study shall be provided. The study shall identify the following: identify storm
water runoff from and upstream of the site; show existing and proposed off-site and onsite
drainage facilities; and include a capacity analysis verifying the adequacy of the facilities.
The drainage system shall be designed to ensure that runoff from a 10-yr storm of 6 hours
or 24 hours duration under developed condition is equal or less than the runoff under
existing conditions of the same storm frequency. Both 6 hour and 24hour storm duration
shall be analyzed to determine the detention basin capacities necessary to accomplish the
desired results.
78.All natural drainage traversing the site shall be conveyed through the site, or shall be
collected and conveyed by a method approved by the City Engineer. All off-site drainage, if
different from historic flow, shall be conveyed to a public facility, accepted by adjacent
property owners by a letter of drainage acceptance, or conveyed to a drainage easement.
79.Roof drains shall not be allowed to outlet directly through coring in the street curb. Roofs
should drain to a landscaped area.
80.The site shall be planned and developed to keep surface water from entering buildings
(California Green Building Standards Code 4.106.3).
81.All Public Works requirements shall be complied with as a condition of development as
specified in the Lake Elsinore Municipal Code (LEMC) and Lake Elsinore Public Works
Standard Plans.
82.Construct streets D, E, F, G, H, I, and K per City Standard 108 (60’/40’).
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 12 of 20
3
7
8
3
5
83.Construct streets J and N per Riverside County Standard 106A Modified (50’/36’).
84.Construct ac pavement to City Standard Local Street Section 108, 1/2 width +12’, on Third
Street, from Conard Avenue to Cambern Avenue.
85.Construct half-width + 19’ improvements on the east side of Cambern Avenue, from Third
Street, along the project frontage, to the project boundary per City Secondary Highway
Standard 104 (90’/70’).
86.Provide street lighting and show lighting improvements as part of street improvement plans.
Coordinate with Engineering Department for selection of the LS-2 or LS-3 and design
standards and requirements.
87.The developer shall implement mitigation measures identified in the Traffic Analysis dated
January 23, 2007, as specified in this Study to the satisfaction of the City Engineer.
88.Street improvement plans shall be prepared by a Registered Civil Engineer and the plans
shall include curb and gutter, sidewalk, ac pavement, street lighting, median, trail, and
drainage improvements.
89.The developer shall provide signing and striping plans for the required improvements of this
project. The plans shall also incorporate traffic calming measures on local streets.
90.This project shall provide trail and roadway connections to adjacent developments unless
otherwise deemed unfeasible as concurred by the city. The trail cross section shall be per
County standards unless otherwise approved by the City Engineer.
91.If existing improvements are to be modified, the existing improvement plans on file shall be
modified accordingly and approved by the City Engineer prior to issuance of building
permit.
Permitting/Construction
92.An Encroachment Permit shall be obtained prior to any work on City and/or State right-of-
way. The developer shall submit the permit application, required fees and executed
agreements, security and other required documentation prior to issuance.
93.All compaction reports, grade certifications, monument certifications (with tie notes
delineated on 8 ½" x 11" Mylar) shall be submitted to the Engineering Division before final
inspection of public works improvements will be scheduled and approved.
94.The developer shall be responsible for acquiring right-of-ways in which the developer or the
City has no legal title or interest. If the developer is unsuccessful in acquiring such right-of-
ways, the City could assist the developer in the Eminent Domain process at developer’s
cost.
95.All streets shall be constructed per Lake Elsinore City Standards and/or applicable specific
plan. Any deviation from City standards shall be approved by the City Engineer.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 13 of 20
3
7
8
3
5
Acceptance of Improvements
96.Pay all fair-share contribution for the cost of offsite improvements as identified in this
project’s Traffic Study, dated January 23, 2007. The fair-share cost shall be based on a cost
estimate of the offsite improvements provided by the developer and approved by the City
Engineer.
97.A portion of the required improvements for this development may be covered under the
Traffic Impact Fee (TIF) or Area Drainage Fee program. Request for reimbursement or
credits shall be approved by the City Engineer and based on allowable costs in the fee
program and availability of funds.
98.The developer shall submit a written request for acceptance to the City Engineer.
99.As-built plans shall be completed and signed by the City Engineer.
GRADING
Design
100.Provide written approval of construction activity from the U.S. Department of Fish and Game
and U.S. Army Corp of Engineers.
101.A grading plan signed and stamped by a California Registered Civil Engineer shall be
submitted for City review and approval for all addition and/or movement of soil (grading) on
the site. The plan shall include separate sheets for erosion control, haul route and traffic
control. The grading submittal shall include all supporting documentation and be prepared
using City standard title block, standard drawings and design manual (available at
www.lake-elsinore.org).
102.All grading plan contours shall extend to minimum of 50 feet beyond property lines to
indicate existing drainage pattern.
103.The grading plan shall show that no structures, landscaping, or equipment are located near
the project entrances that could reduce sight distance.
104.If the grading plan identifies alterations in the existing drainage patterns as they exit the site,
a Hydrology and Hydraulic Report for review and approval by City Engineer shall be required
prior to issuance of grading permits. All grading that modifies the existing flow patterns
and/or topography shall be approved by the City Engineer.
105.A seismic study shall be performed on the site to identify any hidden earthquake faults,
liquefaction and/or subsidence zones present on-site. A certified letter from a registered
geologist or geotechnical engineer shall be submitted confirming the absence of this hazard.
106.Applicant shall obtain all necessary off-site easements for off-site grading from the adjacent
property owners prior to final map approval.
107.The applicant shall accept drainage from the adjacent property owners.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 14 of 20
3
7
8
3
5
Permit/Construction:
108.Developer shall execute and submit grading and erosion control agreement, post grading
security and pay permit fees as a condition of grading permit issuance.
109.A preconstruction meeting with the City Public Works Inspector (Engineering Division) is
required prior to commencement of ANY grading activity.
110.Developer shall provide the city with a copy of the Notice of Intent (NOI) and Waste
Discharge Identification (WDID) letter issued by the Regional Water Quality Control Board
for the National Pollutant Discharge Elimination System (NPDES) program
111.Prior to commencement of grading operations, developer is to provide to the City with a map
of all proposed haul routes to be used for movement of export material. All such routes shall
be subject to the review and approval of the City Engineer. Haul route shall be submitted
prior to issuance of a grading permit. Hauling in excess of 5,000 cy shall be approved by
City Council. (LEMC 15.72.065)
112.Export sites located within the Lake Elsinore City limits must have an active grading permit.
113.Applicant to provide to the City a video record of the condition of all proposed public City
haul roads. In the event of damage to such roads, applicant shall pay full cost of restoring
public roads to the baseline condition. A bond may be required to ensure payment of
damages to the public right-of-way, subject to the approval of the City Engineer.
114.All grading shall be done under the supervision of a geotechnical engineer. Slopes steeper
than 2 to 1 shall be evaluated for stability and proper erosion control and approved by the
City.
115.A copy of the current SWPPP shall be kept at the project site and be available for review
upon request.
116.Approval of the project Water Quality Management Plan (WQMP) for post construction shall
be received prior to issuance of a grading permit.
117.Submit an approved environmental clearance document to the Engineering Division. This
approval shall identify and clear all proposed grading activity anticipated for this project.
118.Developer shall pay all grading permit applicable processing, permit, security and
development fees including those fees identified in an applicable development agreement,
Stephens Kangaroo Rat Habitat.
PRIOR TO ISSUANCE OF BUILDING PERMIT
119.Provide final soils, geology and seismic report, including recommendations for parameters
for seismic design of buildings, and walls prior to building permit.
120.The Parcel or Final Tract Map shall be recorded.
121.All street improvement plans and signing and striping plans shall be completed and
approved by the City Engineer per the Traffic Impact Analysis dated January 23, 2007.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 15 of 20
3
7
8
3
5
122.The developer shall pay all Capital Improvement TIF and Master Drainage Fees and Plan
Check fees (LEMC 16.34).
PRIOR TO OCCUPANCY
123.All signing and striping and traffic control devices for the required improvements of this
development shall be installed.
124.All public improvements shall be completed in accordance with the approved plans or as
condition of this development to the satisfaction of the City Engineer.
125.Pay all fair-share contribution for the cost of offsite improvements as identified in this
project’s Traffic Study, dated January 23, 2007. The fair-share cost shall be based on a cost
estimate of the offsite improvements provided by the developer and approved by the City
Engineer.
126.All water and sewer improvements shall be completed in accordance with Water District
requirements.
127.As-built plans for all approved plan sets shall be submitted for review and approval by the
City. The developer/developer/owner is responsible for revising the original mylar plans.
128.In the event of damage to City roads from hauling or other construction related activity,
applicant shall pay full cost of restoring public roads to the baseline condition.
129.All final studies and reports, grade certifications, monument certifications (with tie notes
delineated on 8 ½ x 11” mylar) shall be submitted in .tif format on a CD/DVD. Studies and
reports include, Soils, Seismic, Hydrology, Hydraulics, Grading, SWPPP, WQMP, etc.
130.All plan sets and recorded maps shall be digitized and provided on CD/DVD as follows:
•Final Map(s) - GIS Shape files*, AutoCad file and .tif of recorded map.
•Improvement Plans – GIS Shape files*, and .tif of approved as built mylar.
•Grading Plans - .tif of approved as built mylar.
o *GIS Shape files must be in projected Coordinate System: NAD 83 State Plane
California Zone VI U.S. Fleet.
131.Final soil report showing compliance with recommendations, compaction reports, grade
certifications, monument certifications (with tie notes delineated on 8 ½ x 11” mylar) shall
be submitted in .tif format on CD to the Engineering Division before final inspection will be
scheduled.
132.Documentation of responsibility for slope maintenance along right-of-ways and open spaces
to be maintained by the HOA or other entity shall be provided in a recordable format and
recorded prior to occupancy/final.
133.Prior to grading or building permit close-out and/or the issuance of a certificate of use or a
certificate of occupancy, developer shall:
•Demonstrate that all structural BMPs have been constructed, installed and are
functioning in conformance with approved plans and specifications and the WQMP;
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 16 of 20
3
7
8
3
5
•Demonstrate that they are prepared to implement all non-structural BMPs included in
the conditions of approval or building/grading permit conditions;
•Demonstrate that an adequate number of copies of the approved project specific
WQMP are available for the future owners/occupants.
134.All required public right-of-way dedications, easements, vacations and easement
agreement(s) shall be recorded with a recorded copy provided to the City prior to first
occupancy.
135.The property owner (aka Legally Responsible Party) shall execute and cause to be recorded
a “Covenant and Agreement” in the form provided by the City to inform future property
owners of the requirement to implement the approved final project-specific WQMP.
136.Developer shall pay all applicable citywide development impact fees in effect at the time of
issuance of building permits, including fees due pursuant to LEMC Section 16.72
(Drainage), Section 16.74 (TIF, DIF, Fire), Section 16.83 (TUMF), and Section 16.85
(MSHCP), and Stephens Kangaroo Rat Habitat (modified per 10/17/2017 PC).
COMMUNITY SERVICES DEPARTMENT
137.The developer shall pay Quimby and park Development Impact Fees (DIF), at the rate in
effect at the time of payment.
138.The developer is required to participate in the Public Facility fee program.
139.All interior landscape, recreation areas, facilities and/or open space shall be maintained by
the HOA. No park credits shall be given.
140.The HOA shall maintain all park and common landscape areas.
CITY OF LAKE ELSINORE FIRE MARSHAL
General Conditions
141.Lake Elsinore Fire Protection Planning Office Responsibility - It is the responsibility of
the recipient of Fire Department conditions to forward them to all interested parties. The
permit number is required on all correspondence. Questions should be directed to the
Riverside County Fire Department, Lake Elsinore Fire Protection Planning Division at 130
S. Main St., Lake Elsinore, CA 92530. Phone: (951) 671-3124 Ext. 225. The following fire
department conditions shall be implemented in accordance with the Lake Elsinore Municipal
Code and the adopted codes at the time of project building plan submittal, these conditions
are in addition to the adopted code requirements.
142.Blue Dot Reflectors - Blue retro-reflective pavement markers shall be mounted on private
streets, public streets and driveways to indicate location of fire hydrants. Prior to installation,
placement of markers must be approved by the Riverside County Fire Dept.
143.Minimum Hydrant Fire Flow - Minimum required fire flow shall be 1,500 GPM for 2 hours
duration at 20-PSI residual operating pressure, which must be available before any
combustible material is placed on the job site. Average spacing between hydrants 500’ and
250’ maximum distance from any point on the street or road frontage to hydrant. Standard
Fire hydrants shall be installed (6”x4”x2-1/2”).
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 17 of 20
3
7
8
3
5
144.Standard Fire Hydrants - Standard fire hydrants (6” x 4” x 2-2 1/2”), shall be located not
less than 25 feet or more than 250 feet from any portion of the building as measures along
approved vehicular travel ways. The required fire flow shall be available from any adjacent
hydrant(s) in the system.
145.Fuel Modification Plan - Fuel modification plans shall be provided to the Lake Elsinore Fire
Protection Planning office. Plans shall include fuels modeling and comprehensive details
with regard to the vegetation management plan. The fuels modification zone shall be not
less than 100’ from all structures and may be required to be increased.
146.Minimum Access Standards - The following access requirements are required to be
implemented to ensure fire department and emergency vehicular access. All roadways shall
conform to the City of Lake Elsinore approved roadway standards but in no case shall the
minimum fire department vehicular access be less the following provisions:
1. Twenty-four feet (24’) clear width. Where parking is to be provided, each parking
side shall be provided with eight (8’) additional feet on each side of the fire
department access.
2. Median openings or crossovers between opposing lanes of a divided highway or
street shall be located only at approved intersections at intervals of not less than 500
feet. [Ord. 529 § 3.2(F), 1973].
3. The required all weather vehicular access shall be able to support no less than
65,000 lbs. over 2 axles.
4. Roadway gradient shall not exceed 15% on any access road, driveways, and
perimeter roads.
5. Turning Radius shall be 24’ inside and 45’ outside for all access roads.
147.Secondary Access - In the interest of Public Safety, this project shall provide an Alternate
or Secondary Access. Said access shall be constructed in accordance to the City of Lake
Elsinore Engineering Department standards to accommodate full fire response and
community evacuation.
148.Automatic / Manual Gates - Gate entrances shall be at least two feet wider than the width
of the traffic lane(s) serving that gate and no less than 20 feet wide. Any gate providing
access from a road to a driveway shall be located at least 35 feet from the roadway and
shall open to allow vehicle to stop without obstructing traffic on the road. Where a one-way
road with a single traffic lane provides access to a gate entrance, a 40 foot turning radius
shall be used. Gate access shall be equipped with a rapid entry system. Plans shall be
submitted to the Fire Department for approval prior to installation. Automatic/manual gate
pins shall be rated with shear pin force, not to exceed 30 foot pounds. Automatic gates shall
be equipped with emergency backup power. Gates activated by the rapid entry system shall
remain open until closed by the rapid entry system. Contact the Fire Planning Office for
current plan check fees.
Prior to Building Permit Issuance
149.Plan Check Fee - Building plan check fees shall be made payable to the “City of Lake
Elsinore”, and shall be submitted to the Fire Department at the time of plan submittal.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 18 of 20
3
7
8
3
5
150.Water System Plans - Applicant and/or developer shall separately submit 2 sets of water
system plans to the Fire Department for review. Plans must be signed by a registered Civil
Engineer and/or water purveyor prior to Fire Department review and approval. Mylars will
be signed by the Fire Department after review and approval. Two (2) copies of the signed
and approved water plans shall be returned to the Fire Department before release of a
building permit.
151.Prior to Building Construction Verification - This project shall be inspected and approved
by the Fire Marshal or designee prior to bringing combustible materials on site. During such
inspection all permanent road signs shall be in place, all hydrants shall on operating and
approved for use by the water purveyor, and all permanent road surfaces shall be completed
including primary and secondary access circulation.
Prior to Building Final Inspection
152.Residential Fire Sprinkler Systems for Single family and two-family 13D - Install a
complete fire sprinkler system designed in accordance with California Residential Code,
California Fire Code and adopted standards. A C-16 licensed contractor must submit plans,
along with the current fee, to the Fire Department for review and approval prior to installation.
DEPARTMENT OF ADMINISTRATIVE SERVICES
Annex into CFD 2015-1 (Safety) Law Enforcement, Fire and Paramedic Services CFD
153.Prior to approval of the Final Map, Parcel Map, Residential Design Review, or Conditional
Use Permit (as applicable), the applicant shall annex into Community Facilities District No.
2015-1 (Safety) the Law Enforcement, Fire and Paramedic Services Mello-Roos Community
Facilities District to offset the annual negative fiscal impacts of the project on public safety
operations and maintenance issues in the City. Alternatively, the applicant may propose
alternative financing mechanisms to fund the annual negative fiscal impacts of the project
with respect to Public Safety services. Applicant shall make a non-refundable deposit of
$15,000, or at the current rate in place at the time of annexation toward the cost of
annexation, formation or other mitigation process, as applicable (modified per 1/28/2020
CC).
Annex into the City of Lake Elsinore Community Facilities District No. 2015-2 (Maintenance
Services)
154.Prior to approval of the Final Map, Parcel Map, Residential Design Review, Conditional Use
Permit or building permit (as applicable), the applicant shall annex into the Community
Facilities District No. 2015-2 (Maintenance Services) to fund the on-going operation and
maintenance of the public right-of-way landscaped areas and neighborhood parks to be
maintained by the City and for street lights in the public right-of-way for which the City will
pay for electricity and a maintenance fee to Southern California Edison, including parkways,
open space and public storm drains constructed within the development and federal NPDES
requirements to offset the annual negative fiscal impacts of the project. Alternatively, the
applicant may propose alternative financing mechanisms to fund the annual negative fiscal
impacts of the project with respect to Maintenance Services. Applicant shall make a non-
refundable deposit of $15,000, or at the current rate in place at the time of annexation toward
the cost of annexation, formation or other mitigation process, as applicable (modified per
1/28/2020 CC).
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 19 of 20
3
7
8
3
5
MITIGATION MONITORING AND REPORTING PROGRAM
155.The applicant shall comply with the Mitigation Monitoring & Reporting Program (MMRP) for
Mitigated Negative Declaration No. 2007-01 for Ramsgate Specific Plan No. 89-1, Revision
No. 6, which was adopted for this project.
TTM 37382
Conditions of Approval CC: September 10, 2024
Applicant’s Initials: _____ Page 20 of 20
3
7
8
3
5
I hereby state that I acknowledge receipt of the approved Conditions of Approval for the above
named project and do hereby agree to accept and abide by all Conditions of Approval as approved
by the City Council of the City of Lake Elsinore on_______________. I also acknowledge that all
Conditions shall be met as indicated.
Date:
Applicant’s Signature:
Print Name:
Address:
Phone Number:
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the City Council of the City of Lake Elsinore, California, will hold
a Public Hearing on September 10, 2024, at the Lake Elsinore Cultural Center, 183 North Main
Street, Lake Elsinore, California, 92530, at 7:00 p.m., or as soon thereafter as the matter may be
heard, to consider the following related items:
Third and Final Extension of Time Request for Tentative Tract Map (TTM) No. 37381
(Wasson Canyon): The proposed extension of time is a request by Ryan Mordahl to extend the
life of the approved tentative tract map for an additional three (3) years to May 14, 2027. The
previously approved TTM 37381 is a subdivision of 19.54 acres into 70 single-family residential
lots and six (6) lettered lots for open space and a water quality/detention basin. The project site
is located southeasterly of Highway 74, westerly of Rosetta Canyon Drive, on the northern side
of Third Street within the Ramsgate Specific Plan. (APNs: 347-330-001, 002, 065, 347-330-067
through 073).
Pursuant to CEQA Guidelines Section 15162, no new environmental documentation is necessary
because all potentially significant effects have been adequately analyzed in an earlier Mitigated
Negative Declaration (MND) and none of the conditions described in Section 15162 exist.
Subsequently, MND No. 2007-01 (SCH# 2007041063) was adopted in 2007 for the Ramsgate
Specific Plan, Amendment No. 6 which evaluated environmental impacts that would result from
maximum build-out of the Specific Plan. No substantial changes that require major revisions to
the 2007 MND exist and no new information of substantial importance that require revisions to
the earlier MND exist.
ALL INTERESTED PERSONS are hereby invited to attend this Public Hearing to present written
information, express opinions or otherwise present evidence in the above matters. If you wish to
legally challenge any action taken by the City on the above matter, you may be limited to raising
only those issues you or someone else at the Public Hearing described in this notice, or in written
correspondence delivered to the City prior to or at the Public Hearing. If you require
accommodation to participate in a Public Hearing, please contact the City Clerk’s office at (951)
674-3124 ext. 269. All Agenda materials are available for review at City Hall the Friday before the
Public Hearing. FURTHER INFORMATION on this item may be obtained by contacting Associate Planner Joey Mendoza in the Planning Division at jmendoza@lake-elsinore.org or at (951) 674-3124, ext. 273.
Candice Alvarez, MMC,
City Clerk
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the City Council of the City of Lake Elsinore, California, will hold
a Public Hearing on September 10, 2024, at the Lake Elsinore Cultural Center, 183 North Main
Street, Lake Elsinore, California, 92530, at 7:00 p.m., or as soon thereafter as the matter may be
heard, to consider the following related items:
Third and Final Extension of Time Request for Tentative Tract Map (TTM) No. 37382
(Wasson Canyon): The proposed extension of time is a request by Ryan Mordahl to extend the
life of the approved tentative map for an additional three (3) years to May 14, 2027. The previously
approved TTM 37382 is a subdivision of 55.06 acres into 199 single-family residential lots and 23
lettered lots for a 5.6-acre park, open space, utility easements, and water quality/detention basins.
The subject site is located southeasterly of Highway 74, westerly of Rosetta Canyon Drive,
northeasterly of Cambern Avenue, on the southern side of Third Street within the Ramsgate
Specific Plan (APNs: 347-330-022, 023, 066, 347-360-001, 002, 377-100-006, 009, and 010).
Pursuant to CEQA Guidelines Section 15162, no new environmental documentation is necessary
because all potentially significant effects have been adequately analyzed in an earlier Mitigated
Negative Declaration (MND) and none of the conditions described in Section 15162 exist.
Subsequently, MND No. 2007-01 (SCH# 2007041063) was adopted in 2007 for the Ramsgate
Specific Plan Amendment No. 6 which evaluated environmental impacts that would result from
maximum build-out of the Specific Plan. No substantial changes that require major revisions to
the 2007 MND exist and no new information of substantial importance that require revisions to
the earlier MND exist.
ALL INTERESTED PERSONS are hereby invited to attend this Public Hearing to present written
information, express opinions or otherwise present evidence in the above matters. If you wish to
legally challenge any action taken by the City on the above matter, you may be limited to raising
only those issues you or someone else at the Public Hearing described in this notice, or in written
correspondence delivered to the City prior to or at the Public Hearing. If you require
accommodation to participate in a Public Hearing, please contact the City Clerk’s office at (951)
674-3124 ext. 269. All Agenda materials are available for review at City Hall the Friday before the
Public Hearing. FURTHER INFORMATION on this item may be obtained by contacting Associate Planner Joey Mendoza in the Planning Division at jmendoza@lake-elsinore.org or at (951) 674-3124, ext. 273.
Candice Alvarez, MMC,
City Clerk
PH-TTM 37381 Third & Final Ext. Wasson Canyon - Page 1 of 1
The Press-Enterprise
3512 14 Street
Riverside, California 92501
(951) 368-9229
City of Lake Elsinore
130 South Main Street
Lake Elsinore, California 92530
Publication: The Press-Enterprise
PROOF OF PUBLICATION OF
Ad Desc: 0011689486
FILE NO. 0011689486
PROOF OF PUBLICATION
I am a citizen of the United States. I
am over the age of eighteen years and
not party to or interested in the above-
entitled matter. I am an authorized
representative of THE PRESS-
ENTERPRISE, a newspaper of general
circulation, printed and published daily
in the County of Riverside, and which
newspaper has been adjudicated a
newspaper of general circulation by the
Superior Court of the County of
Riverside, State of California, under
date of April 25, 1952, Case Number
54446, under date of March 29, 1957,
Case Number 65673, under date of
August 25, 1995, Case Number
267864, and under date of September
16, 2013, Case Number RIC 1309013;
that the notice, of which the annexed is
a printed copy, has been published in
said newspaper in accordance with the
instructions of the person(s) requesting
publication, and not in any supplement
thereof on the following dates, to wit:
08/31/2024
I certify (or declare) under the penalty
of perjury that the foregoing is true and
correct.
Date: August 31, 2024.
At: Riverside, California
______________________________
Signature
PH-Third & Final Ext. TTM 37382 Wasson Canyon - Page 1 of 1
The Press-Enterprise
3512 14 Street
Riverside, California 92501
(951) 368-9229
City of Lake Elsinore
130 South Main Street
Lake Elsinore, California 92530
Publication: The Press-Enterprise
PROOF OF PUBLICATION OF
Ad Desc: 0011689494
FILE NO. 0011689494
PROOF OF PUBLICATION
I am a citizen of the United States. I
am over the age of eighteen years and
not party to or interested in the above-
entitled matter. I am an authorized
representative of THE PRESS-
ENTERPRISE, a newspaper of general
circulation, printed and published daily
in the County of Riverside, and which
newspaper has been adjudicated a
newspaper of general circulation by the
Superior Court of the County of
Riverside, State of California, under
date of April 25, 1952, Case Number
54446, under date of March 29, 1957,
Case Number 65673, under date of
August 25, 1995, Case Number
267864, and under date of September
16, 2013, Case Number RIC 1309013;
that the notice, of which the annexed is
a printed copy, has been published in
said newspaper in accordance with the
instructions of the person(s) requesting
publication, and not in any supplement
thereof on the following dates, to wit:
08/31/2024
I certify (or declare) under the penalty
of perjury that the foregoing is true and
correct.
Date: August 31, 2024.
At: Riverside, California
______________________________
Signature
347-330-001,002,022-075/360-001,002/531-
001/540-002/377-100,006,009,010
KARAS AVA
4030 BIRCH ST #100
NEWPORT BEACH CA 92660
347-531-001,002
KARAS AVA
1232 VILLAGE WAY
SANTA ANA CA 92702
347-120-034
RIDGESTONE PARTNERS / PLAZA
APARTMENTS INV
9191 TOWNE CENTRE DR #180
SAN DIEGO CA 92122
347-120-050
CITY OF LAKE ELSINORE
130 S MAIN ST
LAKE ELSINORE CA 92530
347-120-051,052
ROSETTA CANYON COMMUNITY ASSN
1451 RIMPAU AVE #107
CORONA CA 92879
347-250-009,012
BRUCE ALLEN EICHORN / EICHORN
NANCY DIANE
455 W NAOMI AVE
ARCADIA CA 91006
347-330-003
HENRY L HARRIS / HARRIS CARRIE M
339 E 62ND ST
LOS ANGELES CA 90003
347-330-026
NAHAY REVOCABLE INTER-VIVOS
TRUST DTD 6/16/2005 / NAHAY
JENNIFER
29944 WAKE CT
CANYON LAKE CA 92587
347-330-029
GERARDO VARGAS / VARGAS DANIEL
29185 3RD ST
LAKE ELSINORE CA 92532
347-330-030
SCOTT G OSBOURNE / OSBOURNE
TAMMY MARIE
29135 MELBY DR
LAKE ELSINORE CA 92532
347-330-031
BILLY J MILLER / MILLER MARY A
29155 MELBY DR
LAKE ELSINORE CA 92532
347-330-032
DAVID J VENEGAS / CILURZO ANDREA L
29200 MELBY DR
LAKE ELSINORE CA 92532
347-330-034
GERALD E GIBSON
29150 MELBY DR
LAKE ELSINORE CA 92532
347-330-035
RANDY L WARRINER / WARRINER
BONNIE R
29178 MELBY DR
LAKE ELSINORE CA 92532
347-330-036
ANNAMARIEA CROSSLEY / CROSSLEY
TERRY K
29110 3RD ST
LAKE ELSINORE CA 92532
347-330-037
HERBER PADILLA
29120 MELBY DR
LAKE ELSINORE CA 92532
347-360-010
ROSETTA HILLS COMMUNITY ASSN
16845 VON KARMAN #200
IRVINE CA 92606
347-510-008
ROSETTA HILLS COMMUNITY ASSN
25 ENTERPRISE #300
ALISO VIEJO CA 92656
347-530-001
PETER SEM / CHAV BRENDA VANNTHY
40992 DIANA LN
LAKE ELSINORE CA 92532
347-530-002
CAN T TO / ZHANG LIN S
40990 DIANA LN
LAKE ELSINORE CA 92532
347-530-003
TANADOL PROMTANAKON
41002 SUNSPRITE ST
LAKE ELSINORE CA 92532
347-530-004
ROSETTA HILLS COMMUNITY ASSN
16845 VON KARMAN #200
IRVINE CA 92606
347-530-005,006
WASSON CANYON HOLDINGS
391 N MAIN ST #300
CORONA CA 92880
347-531-002
THONG NGUYEN
40986 DIANA LN
LAKE ELSINORE CA 92532
347-531-003
PABLO OROZCO / OROZCO ELENA
40984 DIANA LN
LAKE ELSINORE CA 92532
347-531-004
CLARA PENNY
40982 DIANA LN
LAKE ELSINORE CA 92532
347-531-005
MARK R CAMESA / VILLANUEVA ANNA
LISA
40980 DIANA LN
LAKE ELSINORE CA 92532
347-531-006
PRASAD D K GORTHY / GORTHY
VARASITHA P K
40978 DIANA LN
LAKE ELSINORE CA 92532
347-531-007
NATALIA DEL VALLE COLL / EYNARD
JUAN FACUNDO
40976 DIANA LN
LAKE ELSINORE CA 92532
347-531-008
RAUL ARTURO VELASQUEZ
28975 THIRD ST
LAKE ELSINORE CA 92532
347-531-009,010
ROSETTA HILLS COMMUNITY ASSN
16845 VON KARMAN #200
IRVINE CA 92606
347-532-001
KENNII PRAVONGVIENGKHAM
40971 WATERFORD ST
LAKE ELSINORE CA 92530
347-532-002
HPA BORROWER 2017 1
180 N STETSON AVE #3650
CHICAGO IL 60601
347-532-003
KIMVUOCH TE
40967 WATERFORD ST
LAKE ELSINORE CA 92530
347-532-004
JOSE L DE LA TORRE / ZAMORA MARIA
A
40965 WATERFORD ST
LAKE ELSINORE CA 92530
347-532-005
JOSE ARANDA / ARANDA MARISELA
40963 WATERFORD ST
LAKE ELSINORE CA 92532
347-532-006
RUBEN RUIZ / RUIZ CLAUDIA
40961 WATERFORD ST
LAKE ELSINORE CA 92530
347-532-007
ABRAHAM MARTINEZ / MARTINEZ
EDUARDO
40959 WATERFORD ST
LAKE ELSINORE CA 92530
347-532-008
CRUZ THOMAS DELA / DELA CRUZ
MELANIE
40970 DIANA LN
LAKE ELSINORE CA 92532
347-532-009
JOSE A BANUELOS / BANUELOS IRMA
40968 DIANA LN
LAKE ELSINORE CA 92532
347-532-010
OSCAR A ROSALES / ROSALES YIZZEL
TRUJILLO
40966 DIANA LN
LAKE ELSINORE CA 92532
347-532-011
JORGE CAMPOS
40964 DIANA LN
LAKE ELSINORE CA 92530
347-532-012
ROY R RENOUF / RENOUF SUNG JIN
40962 DIANA LN
LAKE ELSINORE CA 92532
347-532-013
JAIME PABON / PABON ERIKA
28290 TRELLIS LN
LAKE ELSINORE CA 92532
347-532-014
HEMBERGER FAMILY LIVING TRUST /
HEMBERGER NANNETTE L MCNIEL
40956 DIANA LN
LAKE ELSINORE CA 92532
347-532-015
RICO GARIBAY REVOCABLE LIVING
TRUST DTD 08/12/23 / RICO ALBERTO
40954 DIANA LN
LAKE ELSINORE CA 92532
347-532-016
ROSETTA HILLS COMMUNITY ASSN
16845 VON KARMAN #200
IRVINE CA 92606
347-532-017
ROSETTA HILLS COMMUNITY ASSN
2280 WARDLOW CIR #100
CORONA CA 92880
347-533-004
FRANCES M MIRABELLA
41003 WATERFORD ST
LAKE ELSINORE CA 92532
347-533-010
XIAOWEI WANG
40983 DIANA LN
LAKE ELSINORE CA 92532
347-533-011
OLIVAR JORGE & KARI M LIVING TRUST
DTD 4/23/20 / OLIVAR JORGE
40985 DIANA LN
LAKE ELSINORE CA 92532
347-533-012
ALEXANDER SANDOVAL / CARRILLO
SANDOVAL MARITZA
40987 DIANA LN
LAKE ELSINORE CA 92532
347-533-013
RUVALCABA FAMILY LIVING TRUST DTD
06/12/23 / GUERRERO GREGORIO
RUVALCABA
40989 DIANA LN
LAKE ELSINORE CA 92532
347-533-014
KENNETH T TRAN
40991 DIANA LN
LAKE ELSINORE CA 92532
347-533-015
NGO BRENDA LIVING TRUST DTD
01/14/24 / NGO BRENDA
40993 DIANA LN
LAKE ELSINORE CA 92532
347-533-016
JOSEPH PLAZA / PLAZA SYLVIA
40995 DIANA LN
LAKE ELSINORE CA 92532
347-533-028
ROSETTA HILLS COMMUNITY ASSN
16845 VON KARMAN #200
IRVINE CA 92606
347-540-001
KARAS AVA
1232 VILLAGE WAY
SANTA ANA CA 92702
347-540-003
DUCKWORTH FAMILY TRUST /
DUCKWORTH MORRIS KEITH
40950 DIANA LN
LAKE ELSINORE CA 92532
347-540-004
IN DUK LEE
40948 DIANA LN
LAKE ELSINORE CA 92532
347-540-005
MATTHEW ROSALES
40946 DIANA LN
LAKE ELSINORE CA 92532
347-540-006
GERARDO T GONZALES / GONZALES
LEONOR
40944 DIANA LN
LAKE ELSINORE CA 92532
347-540-007
BOBBY L GUZMAN / GUZMAN LILIANA G
40942 DIANA LN
LAKE ELSINORE CA 92532
347-540-008
PETE DMETRIO BARRERAS
40940 DIANA LN
LAKE ELSINORE CA 92532
347-540-009
JORGE VARGAS / NIVELO CECILIA
40938 DIANA LN
LAKE ELSINORE CA 92532
347-540-010
ROMAN COVARRUBIAS / TOSCANO
MARIA CARMEN
40936 DIANA LN
LAKE ELSINORE CA 92532
347-540-011
MATIN KOURASH KIRK & MARLA JANE
LIVING TRUST DTD 6/3 / MATIN
KOURASH KIRK
2420 SIERRA MORENA AVE
CARLSBAD CA 92010
347-540-012
ANDREW A DOGONYARO / DOGONYARO
TIFFANY J
40932 DIANA LN
LAKE ELSINORE CA 92532
347-540-013
CRUZ PRINCE JOY DELA / DELA CRUZ
MA CRIZETTE SIO DELA
40930 DIANA LN
LAKE ELSINORE CA 92532
347-540-014
VELVA HALL
40928 DIANA LN
LAKE ELSINORE CA 92532
347-540-015
IDABELLE MOLINA COLVIN
40926 DIANA LN
LAKE ELSINORE CA 92532
347-540-016
HASSAN OSMAN ITANI / GARCIA
CRISTINA LIZZET
40924 DIANA LN
LAKE ELSINORE CA 92532
347-540-017
ANAVELI GARCIA RAMOS
40922 DIANA LN
LAKE ELSINORE CA 92532
347-540-018
CHILDRESS WILLIAM A FAMILY TRUST
DATED 10/10/2018 / CHILDRESS WILLIAM
A
40920 DIANA LN
LAKE ELSINORE CA 92532
347-540-019
HPA JV BORROWER 2019-1 ATH
120 S RIVERSIDE PLAZA #2000
CHICAGO IL 60606
347-540-020
JEFFREY S LEWIS
40916 DIANA LN
LAKE ELSINORE CA 92532
347-540-021
CATHERINE JO DIBELLA
41095 HIGHTOWER ST
LAKE ELSINORE CA 92532
347-540-022
TAHREER FRANCO / BALL BRANDON
41097 HIGHTOWER ST
LAKE ELSINORE CA 92532
347-540-023
JENNIFER L SERRATO / SERRATO
ALVARO CORTEZ
41099 HIGHTOWER ST
LAKE ELSINORE CA 92532
347-540-024
GONZALEZ EVAN & MARICELA LIVING
TRUST DTD 3/28/18 / GONZALEZ EVAN A
41101 HIGHTOWER ST
LAKE ELSINORE CA 92532
347-540-037
KARAS AVA
1232 VILLAGE WAY
SANTA ANA CA 92702
347-540-038
ROSETTA HILLS COMMUNITY ASSN
16845 VON KARMAN #200
IRVINE CA 92606
347-541-011
GMJ FAMILY REVOCABLE LIVING TRUST
DTD 2/9/11 / GELLADUGA LILY D
40922 WHITEHALL ST
LAKE ELSINORE CA 92532
347-541-012
GREGORIO RUELAS LOPEZ / RUELAS
OLIVIA
40920 WHITEHALL ST
LAKE ELSINORE CA 92532
347-541-013
DOMI THANG PHAM
40919 DIANA LN
LAKE ELSINORE CA 92532
347-541-014
CHIN RATH / RATH CHARLENE ARIYA
40921 DIANA LN
LAKE ELSINORE CA 92532
347-541-015
JOSEPH MENDEZ / MENDEZ JILLIAN
TANDESKI
40923 DIANA LN
LAKE ELSINORE CA 92532
347-541-016
JUAN I SAUCEDO / SAUCEDO
EMERJORIE C
40925 DIANA LN
LAKE ELSINORE CA 92532
347-541-017
DOROTHY A WALLACE / WALLACE JOHN
R
40927 DIANA LN
LAKE ELSINORE CA 92532
347-541-018
GILLES G MARTEL / MARTEL JANETTE E
40929 DIANA LN
LAKE ELSINORE CA 92532
347-541-019
GAIL GHETTALAE
40931 DIANA LN
LAKE ELSINORE CA 92532
347-541-020
PEREZ FAMILY LIVING TRUST DATED
7/24/2020 / PEREZ DANIEL C
40933 CARNEGIE CIR
LAKE ELSINORE CA 92532
347-542-002
JOHN A TORRES
40938 CARNEGIE CIR
LAKE ELSINORE CA 92532
347-542-003
LARRY SEUGA / SEUGA SHARON
40936 CARNEGIE CIR
LAKE ELSINORE CA 92532
347-542-004
RENE ESQUIVEL / ESQUIVEL MARIA
LINDA
40934 CARNEGIE CIR
LAKE ELSINORE CA 92532
347-542-005
ERBACHER KARL F TRUST DATED
10/22/2021 / ERBACHER KARL F
40939 DIANA LN
LAKE ELSINORE CA 92532
347-542-006
MICHAEL LANDRY
40941 DIANA LN
LAKE ELSINORE CA 92532
347-542-007
HUGO C SANCHEZ
40943 DIANA LN
LAKE ELSINORE CA 92532
347-542-008
MICHELLE L GONZALEZ / GONZALEZ
LUIS F
40945 DIANA LN
LAKE ELSINORE CA 92532
347-542-009
JOSEPH F FERNANDEZ
40947 DIANA LN
LAKE ELSINORE CA 92532
347-542-010
ROLANDO JUAREZ / JUAREZ SAIDA
41004 WATERFORD ST
LAKE ELSINORE CA 92532
347-542-011
JESUS ARELLANO / ARELLANO MARTHA
E
41002 WATERFORD ST
LAKE ELSINORE CA 92532
377-090-001
WENDELL E VENERABLE / VENERABLE
MARY E
23535 HIGHWAY 74
PERRIS CA 92570
377-090-002-006,012
KARAS AVA
4030 BIRCH ST #100
NEWPORT BEACH CA 92660
377-100-001
MIRAMONTES PABLO & IRMA FAMILY TR
DTD 10/26/2021 / MIRAMONTES PABLO A
29300 3RD ST
LAKE ELSINORE CA 92532
377-100-003
AVENUE DEVEOPMENT HOLDING CL
CAMBERN
3111 CAMINO DEL RIO N #800
SAN DIEGO CA 92108
377-100-004
WENDY SIEGEL
18890 APPLEWOOD WAY
LAKE ELSINORE CA 92530
377-100-007
PHYLISS THOMAS
29491 THOMAS ST
LAKE ELSINORE CA 92532
377-100-008
GINA LYNN
29490 THOMAS WAY
LAKE ELSINORE CA 92532
377-100-011
CINDY S DUONG / SAI SOM
29350 THIRD ST
LAKE ELSINORE CA 92532
377-100-012
ROLANDO CARRILLO GUTIERREZ /
ARELLANO EFRAIN ANTONIO
29358 THIRD ST
LAKE ELSINORE CA 92532
377-380-008
MERLINDA MERCED
29265 THIRD ST
LAKE ELSINORE CA 92532
377-380-022
PONCE FAMILY TRUST DATED 9/21/2018
/ PONCE LORENZO A
18939 CONARD AVE
LAKE ELSINORE CA 92532
377-391-004
DANIEL A MUNOZ / MUNOZ DORA A
28978 ALLAN ST
LAKE ELSINORE CA 92532
377-391-005
PEDRO GONZALEZ
28994 ALLAN ST
LAKE ELSINORE CA 92532
377-391-006
GERARDO MOTA
29010 ALLAN ST
LAKE ELSINORE CA 92532
377-391-007
MICHAEL P MATTHEWS / MATTHEWS
LISA
29026 ALLAN ST
LAKE ELSINORE CA 92532
377-391-008
JULIO C BUSTOS
29042 ALLAN ST
LAKE ELSINORE CA 92532
377-391-009
VIVIAN D BALTHROPE
29058 ALLAN ST
LAKE ELSINORE CA 92532
377-391-014
THOMAS CINDRIC / CINDRIC MARY
ELIZABETH
18840 WELCH DR
LAKE ELSINORE CA 92532
377-391-015
BYRON QUIROZ
18856 WELCH DR
LAKE ELSINORE CA 92530
377-391-016
ELSA MARTINEZ / RIOS JOAQUIN
18872 WELCH DR
LAKE ELSINORE CA 92532
377-391-017
ROBERT FININIS / FININIS RENEE
18890 WELCH DR
LAKE ELSINORE CA 92532
377-391-018
ROBERT W DELAPP / DELAPP DEBORAH
29426 BATTERS BOX
LAKE ELSINORE CA 92530
377-391-019
MARTIN JAUREQUI / JAUREQUI
VERONICA R
18867 WELCH DR
LAKE ELSINORE CA 92532
377-392-006
GREGORIO MUNIZ
29059 ALLAN ST
LAKE ELSINORE CA 92532
377-392-007
JERRY WESSELING
28971 ALLAN ST
LAKE ELSINORE CA 92532
377-402-001
STEPHEN H LONG
18906 CONARD ST
LAKE ELSINORE CA 92532
377-402-002
PETER KONETZNY
18922 CONARD ST
LAKE ELSINORE CA 92532
377-402-003
IMELDA ESTRADA VARGAS
18946 CONARD AVE
LAKE ELSINORE CA 92532
377-402-004
JAVIER VEGA JACINTO / DEVEGA EMILIA
GARCIA
18974 CONARD AVE
LAKE ELSINORE CA 92532