HomeMy WebLinkAboutStaff Report CITY OF
LAKE LSINO E
K �
DREAM EXTREME
VP I
REPORT TO CITY COUNCIL
To: Honorable Mayor and Members of the City Council
From: Jason Simpson, City Manager
Prepared by: Damaris Abraham, Assistant Community Development Director
Date: November 14, 2023
Subject: Planning Application No. 2022-03 (Mission Trail at Lemon) — A Request for
Approval of Tentative Tract Map No. 38378 to Subdivide an approximately
17.21-acre Site into One (1) Lot for Condominium Purposes and Residential
Design Review to Construct 191 Detached Condominium Residences within
the East Lake Specific Plan
Applicant: Brett Crowder, Coastal Commercial Properties
Recommendation
1. Find that the project is exempt from the California Environmental Quality Act(CEQA) pursuant
to CEQA Guidelines Section 15182(c) (Residential Projects Implementing Specific Plans);
2. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, ADOPTING FINDINGS THAT PLANNING APPLICATION NO. 2022-03
(TENTATIVE TRACT MAP NO. 38378 AND RESIDENTIAL DESIGN REVIEW NO. 2022-02)
IS CONSISTENT WITH THE WESTERN RIVERSIDE COUNTY MULTIPLE SPECIES
HABITAT CONSERVATION PLAN (MSHCP);
3. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING TENTATIVE TRACT MAP NO. 38378 TO SUBDIVIDE AN
APPROXIMATELY 17.21-ACRE SITE INTO ONE LOT AND 191 RESIDENTIAL UNITS FOR
CONDOMINIUM PURPOSES LOCATED IN APNS: 370-050-019, 370-050-020, AND 370-
050-032; and
4. Adopt A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELSINORE,
CALIFORNIA, APPROVING RESIDENTIAL DESIGN REVIEW NO. 2022-02 PROVIDING
BUILDING DESIGNS AND RELATED IMPROVEMENTS FOR 191 TWO-STORY
DETACHED CONDOMINIUM RESIDENTIAL UNITS IN LOCATED APNS: 370-050-019, 370-
050-020, AND 370-050-032.
Page 1 of 10
PA 2022-03 (Mission Trail at Lemon)
Planning Commission Action
On October 17, 2023, the Planning Commission conducted a duly noticed Public Hearing and
recommended approval of the project to the City Council with a 5-0 vote. Only the applicant
attended the hearing. No one spoke in opposition to the project.
Protect Location
The project site located adjacent to and west of Mission Trail, across from Lemon Street to the
south, and Lewis Street and Victorian Lane to the north within the East Lake Specific Plan. The
project site encompasses Assessor Parcel Numbers (APNs) 370-050-019, 370-050-020, and
370-050-030.
Environmental Setting
EXISTING USE GENERAL PLAN ZONING
Project ELSP -Action Sports, Tourism,
Site Vacant East Lake Specific Plan (ELSP) Commercial and Recreation with a
Mixed Use Overlay
ELSP-Action Sports, Tourism,
North Vacant East Lake Specific Plan (ELSP) Commercial and Recreation with a
Mixed Use Overlay
ELSP -Action Sports, Tourism,
South Vacant East Lake Specific Plan (ELSP) Commercial and Recreation with a
Mixed Use Overlay
Light industrial, City of Wildomar—Commercial City of Wildomar—C-1/C-P and
East commercial, Retail (CR)and Medium High Rural Residential (R-R)
and residential Density Residential MHDR
Lake Elsinore ELSP -Action Sports, Tourism,
West Motor Sport East Lake Specific Plan (ELSP) Commercial and Recreation with a
Park Light Industrial Overlay
Project Description
Planning Application No. 2022-03 (Mission Trail at Lemon) consists of applications for Tentative
Tract Map No. 38378 to subdivide an approximately 17.21-acre site into one approximately 16.93-
acre lot for condominium purposes (0.28-acre right-of-way dedication) and Residential Design
Review No. 2022-02 to construct 191 detached condominium residences and associated
improvements within the East Lake Specific Plan. The proposed buildings feature seven (7) two-
story floor plans ranging in size from 1,323 sq. ft. to 2,146 sq. ft. and three (3) architectural styles
(French Country, Santa Barbara and Modern Farmhouse).
Below is a description of the project design aspects and features, including site design,floor plans,
architectural design and conceptual wall and fence plans.
Page 2 of 10
PA 2022-03 (Mission Trail at Lemon)
Site Design
The buildings will be arranged in a clustered manner with regular spacing along a 26'-0" wide,
two-lane private loop street. Each building will be served by a 24'-0" wide shared drive aisle
serving up to six(6) units or eight(8)units per cluster. The attached design review package shows
the typical clustering layout as well as the parking and circulation plan for the project. The site will
feature two (2) common open space areas with amenities. Private open space areas will be
provided adjacent to the residences between buildings and in required yards along rear and side
property lines.
Floor Plans
Each building will be either rectangular or roughly"L"-shaped in plan. Each unit will contain a two-
car garage, interior laundry facilities, common living areas, and a private patio. Seven floor plans
are proposed as specified below:
6-Plex Cluster
Plan 1: Two-story, 1,631 square-foot unit with 3 bedrooms, 2.5 bathrooms, 2-car garage
Plan 2: Two-story, 1,779 square-foot unit with 3 bedrooms, 2 bathrooms, 2-car garage
Plan 3: Two-story, 2,146 square-foot unit with 5 bedrooms, 4 bathrooms, 2-car garage
8-Plex Cluster
Plan 1: Two-story, 1,323 square-foot unit with 3 bedrooms, 2 bathrooms, 2-car garage
Plan 2: Two-story, 1,599 square-foot unit with 3 bedrooms, 2.5 bathrooms, 2-car garage
Plan 3: Two-story, 1,756 square-foot unit with 3 bedrooms, 2.5 bathrooms, 2-car garage
Plan 4: Two-story, 1,918 square-foot unit with 4 bedrooms, 4 bathrooms, 2-car garage
A sufficient mix and variation of plans will be provided throughout the development as depicted in
the site plan.
Architectural Design
Three distinct architectural styles are proposed and are generally characterized as follows:
• French Country elevations feature a dark composite tile gabled roof, tan or white stucco
siding, accent wood siding, metallic railing, window shutters, and stone wainscoting.
• Santa Barbara elevations feature a red composite tile varied gable and hipped roof, tan or
white stucco siding, metallic railing, window shutters, accent tiles, and stone wainscoting.
• Modern Farmhouse elevations feature a dark composite tile gabled roof, tan or white
stucco siding, accent siding, metallic railing, window shutters and stone wainscoting.
The architectural styles will be evenly distributed throughout the development as depicted in the
site plan. In addition, enhanced architectural treatments will be provided on all elevations including
those that are visible from common areas and the public right-of-way.
Page 3 of 10
PA 2022-03 (Mission Trail at Lemon)
Recreation and Open Space
The project includes the development of two (2) recreation and open space areas totaling 49,044
sq. ft. on site that would include playground equipment, pool/spa, barbeque area, overhead trellis,
turf areas, seating, sidewalks, restrooms, drinking fountains, showers, bocce ball court, fitness
equipment, shade structures, table, and chairs.
Landscaping
Landscaping proposed as part of the project would consist of ornamental trees, vines, shrubs,
and groundcovers throughout the common areas of the development, such as along roadways,
common walls, site boundary, and the open space/recreation areas. Trees would be installed
along the proposed sidewalks throughout the project site and along Mission Trail. The entrance
to the project site would have a landscaped median and decorative landscaping. The proposed
landscaping plan has been designed to complement the different architectural styles and to
conform to the water efficiency standards under Chapter 19.08 of the Lake Elsinore Municipal
Code (LEMC).
Conceptual Wall and Fence Plan
The project proposes 6-foot-high concrete masonry unit walls along the north, south, and east
sides of the site. An 8-foot-high concrete masonry unit wall will be constructed along the western
boundary of the site that is adjacent to the Motorsports Park. Pedestrian and vehicular entry gates
would be 6-foot-high metal rolling security gates at the project driveway at Mission Trail.
Residences and private exterior spaces would be separated by rear and side yard 6-foot-high
vinyl fences.
Noise
To reduce the noise from the adjacent Motocross Track, the project will construct an 8-foot-high
concrete masonry wall. The project will also be required to implement the following noise
abatement design features to ensure that interior noise levels meet or exceed the 45 dBA CNEL
interior noise level requirements:
• Windows & Glass Doors: Windows and glass doors would be well-fitted, well-weather-
stripped assemblies and shall have minimum sound transmission class (STC) ratings of
35 for residences located along the western property line, and STC ratings of 29 for
residences along the northern, eastern, and southern property lines.
• Exterior Doors: All exterior doors facing the project site property lines (facing offsite land
uses) would be well-fitted, well-weather stripped, and have minimum STC ratings of 29.
• Walls:At any penetrations of exterior walls by pipes, ducts, or conduits, the space between
the wall and pipes, ducts, or conduits would be caulked or filled with mortar to form an
airtight seal.All exterior wall assemblies facing the Motorsports Park shall have a minimum
Page 4 of 10
PA 2022-03 (Mission Trail at Lemon)
STC rating of 35 and all exterior wall assemblies along the northern, eastern, and southern
property lines facing offsite land uses shall have a minimum STC rating of 29.
• Roof: Roof sheathing of wood construction shall be per manufacturer's specification or
caulked plywood of at least one-half inch thick. Insulation with at least a rating of R-19
shall be used in the attic space.
• Ceilings: Ceilings shall be per manufacturer's specification or constructed of well-sealed
gypsum board of at least one-half inch thick.
Additionally, the applicant is required to provide all prospective home buyers and home owners a
written disclosure statement identifying that the project is located within an active recreation area.
Said written disclosure statements would indicate that such recreation activities will include, but
are not limited to, noise impacts, excessive lighting, and dust (COA No. 14).
Parking
The proposed project would provide garage, driveway, and open guest parking. Each residence
would have a two-car garage resulting in 383 total garage parking spaces.The project would also
provide 196 driveway spaces and 135 open common parking spaces. In total the project would
provide 713 spaces. Driveways in the proposed community are 19 ft. in length.
To ensure that parking occurs on approved and developed parking spaces, the developer is
required to include restrictions in the Covenants, Conditions and Restrictions (CC&Rs). Such
restriction would include requiring homeowners to park their vehicles in their garages or driveways
(where applicable)and requiring an on-street parking permit for additional vehicles (COA No. 20).
Furthermore, a condition of approval has been added to require the developer to install signage
restricting vehicular parking along Mission Trail (COA No. 88).
Street Improvements
Mission Trail is classified as an Urban Arterial Highway in the General Plan, where full-width is
120 feet and curb-to-curb width is 96 feet. The applicant is required to dedicate right-of-way for
Mission Trail adjacent to the property for a total right-of-way of 60 feet from centerline to the
project property line. Street improvements on Mission Trail include widened section of new AC
pavement and base material, curb and gutter, sidewalks, parkway landscaping, utility relocations,
signage relocations, modifying traffic signals as required on Mission Trail and Lemon Street, and
streetlights.
Analysis
The project site is located within Planning Area 2 of the East Lake Specific Plan (ELSP) and has
an Action Sports, Tourism, Commercial and Recreation Land Use Designation with a Mixed-Use
Overlay. The Mixed-Use overlay offers an option to develop residential and commercial uses in
addition to those uses described in the Action Sports, Tourism, Commercial, and Recreation land
use designation. Per Table 2-12 (Mixed Use Overlay — Allowable Land Uses) of the ELSP,
Page 5 of 10
PA 2022-03 (Mission Trail at Lemon)
Condominiums are listed as permitted uses. Table 2-13 (Mixed Use Overlay Development
Standards)allows Detached Multiple-Family Cluster Residential Only Development with a density
up to 18 Dwelling Units per Net Acre (du/ac). The application proposes to construct 191 two-story
detached condominium residential units on an approximately 16.93 net acre parcel at an
approximate density of 11.3 du/ac. The proposed multi-family residential development is
consistent with the land use goals and policies of the ELSP. The project is also consistent with
the General Plan because the ELSP was found to be consistent with the General Plan at adoption.
Staff has reviewed the submitted development plans for compliance with the Mixed-Use Overlay
development standards and regulations of Table 2-13 for Detached Multiple-Family Cluster
Residential Only Development of the ELSP. The proposed development conforms to applicable
standards as shown in the below table.
ELSP Development Standards Required Proposed
Density Up to 18 du/ac 11.3 du/ac
Lot Area Minimums . ft.) No Minimum 737,906 sq. ft.
Minimum Lot Width No Minimum n/a
Setbacks ft):
Front— Living Area to Public
Street 10 10,
Front— Living Area to
Private Drive 10 10' min — 19' max
Front— Porch 10 10' min — 13' max
Front— Garage, Straight-in
Drive 18 19' min —24 max
Front— Garage, Side Entry 10 10' min — 19' max
Front— Rear Alley/Street
Loaded Garage 5 n/a
Side— Main Dwelling 5 8' min -20' max
Side — Garage 5 8' min -20' max
Rear 10 20' min -20' max
Rear—Alley/Street Loaded
Garage 18 n/a
Corner Side— Public
Street 10 10' min — 10' max
Corner Side— Private
Street 10 10' min — 10' max
Separation Between Buildings ft.
Garage Face to Garage
Face 28 30' min —35' max
Bldg. Front to Bldg. Front 10 30' min —35' max
Bldg. Front to Bldg. Side 8 43' min —74' max
15 for one-story building,
Bldg. Front to Bldg. Rear plus 5 additional feet for
each additional story 88' min —89.5' max
Page 6 of 10
PA 2022-03 (Mission Trail at Lemon)
Bldg. Side to Side 8 8' min —20' max
Bldg. Side to Rear 8 8' min —23' max
Bldg. Rear to Rear 15 for one-story building,
plus 5 additional feet for
each additional story 20' in —23' max
Lot Coverage % 70 42%
Building Height 40' max. 27'-0" max.
Parking Total: 713
Covered Spaces (Garage):
382
382 Covered, & 382 Private Total Open Spaces: 331
Driveway and/or 191 On- (196 Private Drive Way&
Street 135 On-Street
Shared driveway access into dwelling unit cluster
Building heights up to 25
feet 26 feet minimum width n/a
Building heights greater 30 feet with no on-
than 25 feet street/alley parking allowed n/a
Driveway in front of garage door 18 feet minimum length 19' min -24' max
Private Street Width 40 feet minimum 40' min —46' max
Garage Access Alley/Street Width
Building heights up to 25 24 ft. with no on-street/alley
feet parking allowed 24'
Building Heights greater 30 feet with no on-
than 25 feet street/alley parking allowed n/a
Dwelling Unit Size Minimum sq. ft.
Studio Dwelling Units 900 n/a
One-Bedroom Dwelling n/a
Units 900
Two-Bedroom Dwelling 1,000 plus 100 sq. ft. for
Units or Larger each additional bedroom 1,323 sq. ft. —2,146 sq. ft.
Open Space (s . ft.
Common Open Space 250 per unit, or 35,000 36,666 sq. ft.
Private Open Space 80 per unit 138 sq. ft. min.
Tentative Tract Map Analysis
Tentative Tract Map No. 38378 includes a subdivision of an approximately 17.21-acre site into
one (1) approximately 16.93-acre lot for condominium purposes (0.28-acre right-of-way
dedication). The proposed subdivision meets the minimum lot area requirement and street
frontage width of the East Lake Specific Plan. The tentative map also complies with Chapter 16.24
(Tentative Map) of the LEMC and the Subdivision Map Act. The project will be required to form a
Homeowner's Association (HOA) for reciprocal access easements, for parking spaces as well as
for the maintenance of common areas.
Page 7 of 10
PA 2022-03 (Mission Trail at Lemon)
Design Review
The architectural design of the proposed buildings conforms to the design guidelines outlined in
Chapter 8 of the ELSP and the Residential Development Standards (Chapter 17.44)of the LEMC.
The three elevation styles will create a distinctive street scene within the project site and serve to
avoid repetition.
The Design Review Committee, which includes staff from Planning, Building and Safety, Fire, and
Engineering, has reviewed the proposed project, and have conditioned the project to ensure
compliance with the general plan, the LEMC, and the related environmental document.
Environmental Determination
The proposed project has been determined to be categorically exempt from California
Environmental Quality Act (CEQA), pursuant to CEQA Guidelines Section 15182(c) (Residential
Projects Pursuant to a Specific Plan). Where a public agency has prepared an EIR on a Specific
Plan, a residential project undertaken pursuant to and in conformity with that specific plan is
exempt from CEQA if the project meets the following requirements:
1. Eligibility. To qualify for this exemption the public agency must have prepared an EIR on
a specific plan after January 1, 1980.
The City adopted the East Lake Specific Plan, Amendment No. 11 (SPA 2016-02) and
Environmental Impact Report (EIR) SCH No. 2016111029 on November 11, 2017. The
proposed project meets this requirement.
2. Scope. Residential projects covered by this section include but are not limited to land
subdivisions, zoning changes, and residential planned unit development.
The project consists of applications for Tentative Tract Map No. 38378 to subdivide an
approximately 17.21-acre site into one approximately 16.93-acre lot for condominium
purposes (0.28-acre right-of-way dedication) and Residential Design Review No. 2022-02
to construct 191 detached condominium residences with a density of 11.3 du/ac. The
proposed project is consistent with the East Lake Specific Plan, Mixed Use Overlay district
which allows Detached Multiple-Family Cluster Residential Only Development with a
Density up to 18 Dwelling Units per Net Acre (du/ac).
3. Limitation. This section is subject to the limitation that a specific plan undergoes an event,
such as, but not limited to: a substantial change to the proposed project is made that
requires major revisions of the previous EIR; new circumstances under which the project
is undertaken that will require major revisions to the previous EIR; or new information has
been found resulting in new significant effects or increasing the severity of a significant
effect that were not known at the time of the previous EIR. Should one or more of these
events occur, this exemption shall not apply until the city or county which adopted the
specific plan completes a subsequent EIR or supplement to a previous EIR.
Page 8 of 10
PA 2022-03 (Mission Trail at Lemon)
Pursuant to CEQA Guidelines Section 15162, the project would not have a significant
effect on the environment and no new environmental documentation is necessary because
all potentially significant effects have been adequately analyzed in a previously adopted
Environmental Impact Report (SCH No. 2016111029) prepared for the East Lake Specific
Plan. A CEQA Exemption Study has been prepared for the project and is included as
Attachment 5 to this report. All potentially significant effects have been avoided or
mitigated pursuant to the EIR and none of the conditions described in Section 15162 have
occurred. EIR (SCH No. 2016111029)was adopted by the City Council on November 28,
2017.
MSHCP Consistency
The project has also been reviewed for consistency with the Western Riverside County Multiple
Species Habitat Conservation Plan (MSHCP). A portion of the project site (0.30 acres) is located
within the MSHCP Elsinore Area Plan, Criteria Cell # 5131. On August 08, 2023, the Western
Riverside County Regional Conservation Authority (RCA) completed the Joint Project Review
(JPR# 23-04-11-01) process and concluded that the Project is consistent with both the Criteria
and other plan requirements of the MSHCP.
Public Outreach
In August 2023, the applicant mailed advance notice of the development proposal to neighboring
property owners within 500 feet of the project site. Additionally, the applicant reached out the
Summerly Community's Home Owner Association as a part of their public outreach efforts.
Public Notice
Notice of the hearing for this application has been published in the Press-Enterprise newspaper
and mailed to property owners within 500 feet of the subject property. As of the writing of this
report, staff has received one (1) email communication from Leonard Leichnitz dated November
7, 2023. The email correspondence along with staff response is included as Attachment 10.
Fiscal Impact
The time and costs related to processing this application have been covered by application fees
paid for by the applicant. No General Fund budgets have been allocated or used in the processing
of this application. Project approval does not fiscally impact the City's General Fund. Mitigation
Measures to protect the City fiscally have already been included in the Conditions of Approval.
Page 9 of 10
PA 2022-03 (Mission Trail at Lemon)
Attachments
Attachment 1 — MSHCP Resolution
Attachment 2 —TTM Resolution
Attachment 3 — RDR Resolution
Attachment 4 — Conditions of Approval
Attachment 5— Initial Study/Categorical Exemption
Attachment 6 — GIS Package
Attachment 7 —TTM 38378
Attachment 8 — Design Review Package
Attachment 9 — Public Notice Material
Attachment 10 — Public Comment
Page 10 of 10