HomeMy WebLinkAboutPAR - West Nichols - Project DescriptionNichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 1 of 13
Nichols Industrial Center Project Description
Nichols Industrial Center (Project) consists of a ±85.6 acre industrial development located along
southeast corner of the Nichols Road and Terra Cotta intersection. The property consists of the
following existing and proposed planning characteristics:
Existing Lake Elsinore General Plan Designation: Mixed-Use Neighborhood Commercial/
Multi-Family
Low-Medium Residential
Residential Mixed Use
Existing Lake Elsinore Zoning Designation: Murdock Alberhill Ranch SP (C-1/R-3)
R1 – Single Family Residential
RMU – Residential Mixed Use
Proposed Lake Elsinore General Plan Designation: Limited Industrial
Proposed Lake Elsinore Zoning Designation: M1 – Limited Manufacturing
The Project property is undeveloped, vacant property south of Nichols Road and west of Pierce
Street/Baker Street within the City of Lake Elsinore. The Project is also bordered by Kings Highway
(SCE substation and transmission easement) to the south, and Terra Cotta Road to the west.
Tentative Tract Map 38597 (Conveyance Purposes) has been prepared and submitted to the City
of Lake Elsinore to consolidate existing parcels and vacation of unused right-of-way.
The Project proposes a single 1,225,000 square foot industrial building that includes a 19,700
square foot office. The proposed site plan includes 190 dock doors, 533 standard vehicle parking
stalls, 385 trailer parking stalls, 51 van parking stalls, and approximately 49 box truck parking
stalls. The Project site plan proposes primary access off of the realigned Pierce Street and Baker
Street intersection along the east side of the property. The development application will include
a General Plan Amendment (GPA) to modify the general plan land use designations to Limited
Industrial. Concurrently, the development application will include a proposed Specific Plan
Amendment (SPA) to remove the westerly ±14-acre property within the Murdock Alberhill Ranch
Specific Plan (MARSP). In addition to the SPA, the same area will be included in the upcoming
zone change application will also propose the rezoning of the R1, and RMU properties (included
on APN List), to M1.
Infrastructure
The Project terrain is generally oriented from west to east and existing storm flows sheet flow
toward the Temescal Wash further to the east\northeast. The Project intends to maintain
conveyance of storm flows through the extension of storm drain facilities within Nichols Road
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 2 of 13
and the construction of a regional detention basin that serves the Project as well as the upstream
residential properties further to the west. The regional basin is proposed along the northerly
right-of-way of Nichols Road located in the Hoist Property. The Project intends to construct the
roadway frontages of the property as well as the necessary improvements identified within the
Project traffic analysis. The Project will coordinate with the Elsinore Valley Municipal Water
District (District) regarding sewer and water service as well as master planned facilities within the
Project area.
Good Neighbor Policy
Being in excess of 250,000 square feet as proposed, Lake Elsinore’s Good Neighbor policy will
be applicable to the project. It is the Applicant’s intent for the project’s design and operations
to be consistent with the guidance outlined in the GNP, and for the project as proposed to
minimize potential impacts to sensitive receptors while delivering a quality development to the
city of Lake Elsinore with significant economic benefits and job creation.
While the proposed building maintains a minimum 300 foot setback from the property line of
all existing sensitive receptors to the project’s truck bays, loading docks, active truck operations
areas , outdoor storage areas, or any building, as required by the GNP, the features listed above
would be located within 1000 feet of existing sensitive receptors.
As part of this PAR application, Applicant is requesting review by the City Council Development
Subcommittee and the Development Review Committee, for confirmation that the proposed
project design in addition to site specific conditions would support the proposed use being
acceptable within the 1,000 feet separation based on the guidelines of the GNP.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 3 of 13
1) To the Project Building West shown through Section A-A, there is a residential
community under construction where the proposed industrial building would be
approximately 427 feet to the closest residential property line. Here is a section line
exhibit to illustrate:
At this location, the various potential negative impacts are mitigated as follows:
Screening Requirements
This section will be fully screened with perimeter landscaping and 6 feet tall masonry
walls. The landscaping screening shall measure a minimum of 15 feet in width with a
continuous vegetative screen of overstory trees that measure 25 feet in height within
ten (10) years of planting.
Noise
This section of the project has the largest elevation difference from the proposed
building pad to the nearest sensitive receptor’s building pad. Our proposed project sits
120 feet below the nearest sensitive receptor, which will significantly reduce the noise
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 4 of 13
impacts. Additionally, Terra Cotta Road which is proposed to be a 4-lane secondary road
will absorb a significant amount of sound and light from the proposed project and the
residential community to the West. Our proposed project sits approximately 24 feet
below Terra Cotta Road.
2) To the Project Building Southwest shown through Section B-B there is a residential
community under construction where the proposed industrial building would be
approximately 780 feet to the closest residential property line across the property
owned by SCE. Here is a section line exhibit to illustrate:
At this location the various potential negative impacts are mitigated as follows:
Screening Requirements
This section will be fully screened with perimeter landscaping and 6 feet tall masonry
walls. The landscaping screening shall measure a minimum of 15 feet in width with a
continuous vegetative screen of overstory trees that measure 25 feet in height within
ten (10) years of planting. This section includes an existing SCE transmission line that
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 5 of 13
runs East to West along the South side of the project that acts as an additional screening
measure.
Noise
The adjacent property to this section of the project is the SCE transmission easement. At
this section, our proposed project sits approximately 22 feet below the nearest sensitive
receptor. This section includes multiple screening measures with significant horizonal
distance from sensitivity receptors.
3) To the Project Building Southeast shown through Section C-C there is an existing
residential community where the proposed industrial building would be approximately
884 feet to the closest residential property line across the property owned by SCE.
Here is a section line exhibit to illustrate:
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 6 of 13
At this location the various potential negative impacts are mitigated as follows:
Screening Requirements
This section will be fully screened with perimeter landscaping and 6 feet tall masonry
walls. The landscaping screening shall measure a minimum of 15 feet in width with a
continuous vegetative screen of overstory trees that measure 25 feet in height within
ten (10) years of planting. This section includes an existing SCE transmission line that
runs East to West along the South side of the project that acts as an additional screening
measure.
Noise
The adjacent property to this section of the project is also the SCE transmission
easement. At this section, our proposed project sits approximately 12 feet below the
nearest sensitive receptor. This section includes multiple screening measures with
significant horizonal distance from sensitivity receptors. The Applicant will analyze this
section pending review of Noise Study to evaluate if further noise mitigation options are
needed.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 7 of 13
4) To the Project’s Building North shown below, there is vacancy with conservation land on
the Western half, and potential future industrial use to on the Eastern half. Under both
West/East locations, there would be no mitigation impacts considered under the GNP as
these Northern uses are not included as a sensitive receptor under the GNP.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 8 of 13
Additionally, the project as proposed meets the STANDARDS of the Good Neighbor
policy as follows:
1) Siting and Design section has been addressed in the above comments and
illustrations regarding the setback requirements
2) On-Site Parking – The proposed project includes approximately 533 car parking
stalls, 385 truck parking stalls, 51 van parking stalls, and 49 box truck parking stalls
totaling approximately 1,018 parking stalls. Based on the City’s parking requirements
for office and warehousing the project would need a total of 1,245 parking stalls.
Applicant is requesting confirmation from the City’s Development Review
Committee approval for the proposed parking counts described above. Applicant to
perform and evaluate parking stall counts with a completed Parking Study.
3) Entry Gates - The proposed project includes entry gates. Per the GNP, the entry
gates into loading dock(s)/truck court area(s) shall be positioned at a minimum of
140 feet inside the property line. Based on the proposed project (Figure 1), the
distance from entry gate to property line is 834 feet. Per the GNP, the stacking
distance shall be increased by 70 feet for every 20 loading docks beyond 40 docks.
The proposed project includes 190 dock positions which would increase the required
stacking distance to 665 feet. However, the project includes double truck stacking
lanes which will increase our true distance of truck queuing length to approximately
1,668 feet. Our proposed project entry gate distance is still greater than the
increased stacking distance calculation used within the GNP.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 9 of 13
Figure 1 – Entry Gate Dimension
4) Screening - As described above in our project section illustrations, the proposed
project will be fully screened with perimeter landscaping and masonry screening
walls along all boarding streets and adjacent to the property lines of sensitive
receptors. The property Owner will establish a long-term maintenance plan to
ensure landscaping remains in place and functional in accordance with the approved
landscaping plans.
5) Building Planes – The proposed project acknowledges that building planes visible
from public view shall be articulated by changes in exterior building materials, color,
decorative accents, and/or articulated features. Pedestrian and ground-level
building entries accessible to visitors should be designed used recessed entries,
covered entries, projects, or roofs to provide share and visual relief at a pedestrian
scale.
6) South Coast Air Quality Management District (SCAQMD) Regulations – The proposed
project will comply with SCAQMD regulations for all construction and grading
activities at the time the work commences.
7) Environmental Practices During Construction – The proposed project shall use
reasonable best efforts to deploy the highest rated California Air Resources Board
(CARB) Tier technology that is available at the time of construction, which the
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 10 of 13
project will provide a list of equipment the project plans to use at the time of
construction prior to permit issuance. Additionally, the project will make reasonable
best efforts to support the use of electric-powered hand tools, forklifts, aerial lifts,
material lifts, hoists, pressure washers, plate compactors, and air compressors.
During final plan review prior to permit issuance, the project will identify site
locations for future electric charging stations and installation of conduits to that
location.
8) Property Maintenance Program (PMP) – The project will submit a PMP to the
Community Development Director or designee prior to issuance of building permits.
The PMP shall provide for the regular maintenance of building structures,
landscaping, and paved surfaces in good physical condition, and appearance.
9) CARB & SCAQMD – The project facility operators will coordinate with CARB and
SCAQMD to obtain the latest information about regional air quality concentrations,
health risk, and trucking regulations.
10) City’s Nosie Ordinance – The project will follow the City Noise Ordinance and shall
be satisfied during all site preparation and construction activity.
11) Facility Hours of Operations – The facility hours of business operation shall be 24
hours, 7 days a week. Applicant is requesting confirmation from the City Council
Development Subcommittee and the Development Review Committee, that 24-hour
operations are approved as this facility is an e-commerce distribution facility that
focuses on customer demand for local residents in Lake Elsinore and neighboring
communities. An e-commerce distribution facility is a response to the changing
needs and expectations of customers.
Based on the mitigation measures referenced above in the elevation sections and
through sections 1 through 10, the project plans to shield and reduce noise impacts
to the sensitive receptors. In addition, all on-site exterior lighting will be downward
facing and will have zero-foot candles at the project’s property line, which will
create zero light pollution beyond our property line. Figure 2 illustrates the exterior
on-site lighting mitigation measures eliminating light pollution past our property
line.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 11 of 13
Figure 2 – Exterior Lighting
12) Noise – At no time during normal business hours shall the operational noise
generated from industrial facility exceed 65 dba as measured from the closest
property line of a sensitive receptor.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 12 of 13
Site Access to Project
Project Circulation
The Project proposes to re-align Baker Street consistent with alignment exhibits presented to
City staff in 2020. The proposed alignment incorporates a radius, concave northerly along the
Project frontage of Baker Street with a 90-degree intersection at Nichols Road westerly of the
existing EVMWD lift station parcel. The Project proposes to construct the Nichols Road and
Terra Cotta frontage improvements with appropriate lane transitions to match existing
conditions. In addition, Pierce Street is proposed to maintain its current alignment with a slight
radius to connect at a 90-degree intersection with Baker Street. A portion of Pierce Street is
proposed to be vacated. In-bound and out-bound truck traffic is proposed at the primary
access point on Pierce Street. As shown in the Site Access Exhibit, trucks will travel from and to
the I-15 and Nichols Road interchange via Nichols Road. Truck traffic is not proposed further
west of the Baker and Nichols intersection nor southerly along Terra Cotta Road. The primary
standard vehicle entrance is also located along Pierce Street to access the employee parking
field. No access points are proposed along the Nichols Road and Terra Cotta Road frontage.
Project Access
The Project proposes to take primary access from Pierce Street. In-bound and out-bound truck
traffic will access the site immediately south of the Pierce and Baker Intersection. Standard
vehicle access is proposed further southerly along Pierce Street. An internal drive aisle adjacent
to the truck docks encircles the proposed building and provides direct access to the trailer
parking area located on the southeastern portions of property. A gated Emergency Vehicle
Access (EVA) point is located at the entrance to the southerly parking field and the stub-
out/unvacated right-of-way of Pierce Street. The proposed Project access provides emergency
vehicle access to within 150 feet of all portions of the proposed building.
Nichols Industrial Pre-Application
NorthPoint Development
May 30, 2023
Page 13 of 13