HomeMy WebLinkAboutPA 2023-08 Project NarrativePROJECT NARRATIVE
Planning Application
Alberhill Villages Specific Plan Amendment
February 27, 2024
The amendment to the Alberhill Villages Specific Plan (AVSP) proposes updates to the land use
plan, planning area boundaries, phasing plan, and amended open space and roadway
configuration. The focus of land use changes generally affects the area west of existing Lake
Street, and east of future Lincoln Street and north of future Nichols Road. There is also area and
roadway adjustments proposed to Planning Area 6A and 6B. The amendment includes:
1. Change in land use to include Business Park uses and remove Institutional/University
and Lake land uses.
2. Reduction of commercial/mixed use acreage and square feet.
3. Reduction in lower density residential uses, and an increase in higher density residential
uses.
4. Incorporation of development standards and guidelines for business park development.
5. Revision to circulation to service amended land use.
Land Use: The amendment introduces 262.2 acres of business park uses and 55.6 acres of open
space in the University Town Center, University Village and Lakeside Village. Business Park uses
will replace the Mixed-Use (MXU REG COM, COM/MXU), University, Multi-Family Residential
(MF-35), Single Family Residential (SF-5 and SF-10), Worship, Lake, and Park uses. Importantly,
the amendment does not result in a net reduction in the housing allowed, as 2,178 dwelling units
programmed in the subject land use areas have been accommodated through increased density
to Residential High (RH) density within the Specific Plan. The reorganization of the Business Park
use provides opportunities for other regional needs, such as a medical use, to be programmed if
supported.
Land Use Regulations: Business Park land use regulations will be added to AVSP and related
planning area, land use and circulation amendments. Substantive changes related to the
Business Park land use regulations included, but were not limited to, the following chapters.
• Development Plan (Chapter 3)
• Development Regulations (Chapter 4)
• Permitted Uses and Uses Subject to a CUP (Chapter 4)
• Zoning Requirements as outlined in Table 4-1 of the AVSP
• Implementation (Chapter 5)
• General Plan Consistency, Updated (Chapter 6)
• Climate Action Plan Compliance, Updated (Chapter 7)
• Landscape Design Regulations (Chapter 8 of the AVSP),
• Lighting Design Guidelines (Chapter 9 of the AVSP)
• Sign Regulations (Chapter 10 of the AVSP)
PROJECT NARRATIVE
Alberhill Villages Specific Plan Amendment
February 27, 2024
Page 2 of 3
• Definitions (Chapter 11)
The increased multi-family housing opportunities and the introduction of Business Park land use
are consistent with the AVSP’s primary goal of providing balanced transition from extractive
mining activities to a network of residential communities within a mix of commercial, business
park, business professional and open space. The proposed increase in multi-family housing
furthers the city’s housing goals to provide a range of housing opportunities for attainable housing
within the City of Lake Elsinore. The proposed amendment accommodates over 3,500 units of
residential high density (35 du/ac), which represents roughly 52% of the City’s regional housing
needs allocation (RHNA) (Source: Lake Elsinore Housing Element, 2021 to 2029).
The introduction of the Business Park use in the AVSP area is consistent with the AVSP and Lake
Elsinore General Plan primary goal and policies in that it establishes a compatible land use
between mining activities to the southeast and surrounding uses. Business Park use creates
economic development opportunities, transitioning existing mining uses to a productive economic
base for the area. The proposed Business Park use would increase the city’s business
professional and limited industrial revenue base by an estimated 25% (Source: City of Lake
Elsinore General Plan, Section 2.0 Community Form).
Circulation: To optimize the changes to the land use patterns in the Specific Plan, changes to the
road network are included. Changes to the road network are as follows: Reconfiguration of
Collector streets: Street A, Street B, and Street D, and Major Enhanced: Nichols Road.
There are no proposed changes to the major roads (Lincoln Street, Lake Street, and Temescal
Canyon Road). The amendment remains consistent with the adopted AVSP and Lake Elsinore
general plan goals and policies by continuing to anchor the vehicular circulation system by the I -
15 Freeway. Lake Street’s configuration and designation as an Urban Arterial highway is
unchanged. Nichols Street will also be improved as a Major Enhanced roadway. The
reconfiguration of Streets A, B, and D better accommodate the mix of the vehicle uses generated
by the proposed land use plan. Deliberate connection points have been proposed to separate
passenger vehicles from commercial and industrial vehicles. Traffic generated by Business Park
uses are purposefully sent to Lincoln Street, Temescal Canyon Road, and the northern end of
Lake Street nearest I-15 to manage traffic flow. As proposed, truck traffic will not travel south on
Lake Street and east on Nichols Road when leaving the industrial use areas.
Multi-modal transportation connections remain an emphasis of the circulation plan, with
pedestrian and bicycle connections increasing with the proposed park and open space
configurations. Connection of bicycle routes and pedestrian walkways to Lincoln Street, Lake
Street, and Nichols Road are enhanced by the interconnectedness of the proposed park and open
space system.
Parks and Open Space: Extensive and varied recreation opportunities are proposed in the
amended Specific Plan. A network of 346.4 acres of parks and open space creates a near-
PROJECT NARRATIVE
Alberhill Villages Specific Plan Amendment
February 27, 2024
Page 3 of 3
continuous park throughout the area for residents and visitors to enjoy. Notably, a 14.3 acres park
use is proposed adjacent to the Lake Elsinore Unified School District elementary school site. The
proximity of the recreation area to the school creates greater opportunity for expanded usage
while also creating a buffer between the school and Lincoln Street. There is no proposed change
to the natural riparian corridor on Lake Street.