HomeMy WebLinkAbout11-044 SIGNING AND STRIPING GENERAL NOTES
1. ALL LINES AND MARKINGS SHALL CONFORM TO THE CALIFORNIA
MANUAL ON TRAFFIC CONTROL DEVICES (CA MUTCD) AND 9. THE CONTRACTOR SHALL FURNISH AND INSTALL RAISED
CALTRANS STANDAR PLANS AND SPECIFICATIONS(LATEST PAVEMENT MARKERS (RPMS) WITHIN SEVEN WORKING DAYS OF
EDITION). ROADWAY STRIPING. ALL EXISTING RPMS WITHIN THE PROJECT
AREA SHALL BE REPLACED IN KIND OR REMOVED IN