Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
St Imp-05
i ITEM DESCRIPTION NO. .. ® REMOVE EXISTING COPPER PIPE,ELL AND CONCRETE SLAB. SALVAGE AND RELOCATE REMAINING ITEMS. Q1 RELOCATE PVC SCH 80 CLOSE NIPPLE AND 2-SCH 80 STREET _ ELLS AND INSECT SCREEN. - - (2)RELOCATE VALVE ENCLOSURE, POWDER COATED, Q RELOCATE BRONZE MIPT X COMPRESSION ADAPTER. \ / ®RELOCATE AUTOMATIC COMBINATION AIR RELEASE AND VACUUM - RELIEF VALVE.(SEE SECTION 15100 OF SPECIFICATIONS) \ ©RELOCATE BRONZE BALL VALVE WITH APT. ©NEW 1/2".X 3'STAINLESS STEEL DROP-IN ANCHORS(3 E4.O 120'APART) ®NEW 2'-6"X 2'-6'X 6'THICK CONCRETE SLAB 9Q NEW 1/2'THICK BLACK FOAM SLEEVE 1� NEW COPPER PIPE TYPE'r(REQUIRED LENGTH)(SOFT) - \ 2x \ \ 11 NEW 90 DEGREE BRONZE COMPRESSION ELL(2'ONLY) - 1© RELOCATE STAINLESS STEEL SCREEN TO VENT OUTLET. < \ - 1 EX \\ ®INSTALL COUPLING \\ PROIEECT IN PLACES RELOCATE 2 NEW AIR VAC EX.AIR VAC 17 LOCATION II II 5 \ \ \ \ \ \ \ 8� II II 3 \\ \ \\\ \ I I II \ \ \ \ \ \\ �! II II s \ \ \ \ \ II II 9 6 \ \\\ \\ 27 \ ���.� //f/R\� ��i 20 ICI \ \,. 9p \� \\ 26\ 27 I.. /,-fi ----- 21 11 \\ 25 III EXISTING COPPER PIPE I�I DIMENSION PER PLAN PROPOSED\\ All 6'AC BERM \ \\ < \\\ \ \ \ I EXISTING WATER MAIN EXISTING AIR VAC EVMWD STANDARD W-16, 1'AND 2"AUTOMATIC COMBINA7ON.AIR RELEASE AND VACUUM RELIEF VALVE INSTALLATIONS - \ \\ \\� \\ \\� S. AIR VAC RELOCATION DETAIL "A" \\ \`\ `� RELOCATED AIR VAC N.T.S. \ \ \\ \ \ \ 28 ITEM EACH DESCRIPTION SPEC. REMARKS 1 EXIST.FIRE HYDRANT ASSEMBLY REMOVE&DISPOSE OF EXIST.CONCRETE PAD,FIRE HYDRANT,AND FIRE HYDRANT BURY.SALVAGE REMAINING ITEMS. \ \\ \\ \\ \ - 1 1 NEW 6•FIRE HYDRANT �T�NOTES 2 AS REQ'D NEW BREAK-OFF BOLTS WITH NUTS 5/8'0'HEX HEAD ZINC PLATED NUTS ON TOP OF FLANGE FILL BREAK- 11 \ \�\ \ \ 25 REMOVE EXISTING BOLLARDS ON TOP OF FLANGE - OFF BOLT HOLES W/SILICON OR EPDXY - \ \ \ I \ 1 1 \ 26 RELOCATE EXISTING FIRE HYDRANT PER DETAIL'B'THIS SHEET 3 1 RELOCATE GROOVED BREAK-OFF SPOOL 1 ` 1 \ ` \ AND EVMWD STD. W-7 4 1 NEW FIRE HYDRANT BURY 6 HOLE FLxMJ/P.O./FL VARIABLE HEIGHT IF 8"D.I. J wit 1� \\ 1\ \ \ 27 INSTALL 2 EACH GUARD POST PER EVMWD STD. W-26 5 i NEW 6"HYDRANT RUN PIPE PVC C-900, OR DUCTILE IRON P&PE CANNOT CROSS STREET c --III \ BOLLARDS SHALL BE INSTALLED AS PER EXISTING FIELD CONDITIONS 1 1 NEW 4'x4'x8'THK CONCRETE SPLASH PAD \ \ / 1 \ \ n :. \\\ \ 28 RELOCATE EXISTING AIR VAC PER DETAIL'A'THIS SHEET \\ AND EVMWD STD. W-20 DIMENSION PER PLAN - e�.< 0 EVMWD NOTES IX.FIRE HYDRANT I NEW FIRE HYDRANT 1 \ _ \\ \ "\ \ ALL CONSTRUCTION SHALL BE COMPLETED IN \c I LOCATION T / \ ACCORDANCE WITH EVMWD LATEST STANDARDS. IX.CONC.CURB �r�r 10 3 AND GUTTER I MISSION TRAIL \\ -� __ +G�--- __--- . r`?u -------------- -- -� ------- --------------.�i �2�-94 � . --- EXISTING RESTRAINED FLANGE _: JOINT 6'PVC C-900 PIPE RESTRAINED JOINTS EVMWD STANDARD W-7,FIRE HYDRANT ASSEMBLY Y " FIRE HYDRANT RELOCATION DETAIL "B" 20 0 10'GR0' SC' 80' N.T.S. - ( IN FEET ) N 1 inch = 20' ft. WATER//SEWER APPROVED BY REVISIONS: PREPARE UNDER SUPERVISION OF: PREPARED eY: CITY OF LAKE ELSINORE a ELSIN6RE VALLEY MUNICIPAL WATER DISTRICT ESS/ #.WILSON MIKAMI 3 PETERS CANYON, SUITE'110 o OLD(' - IRVINE, CA 92606 SUMMERLY-TRACT NO.31920-1 SHEET CORPORATION OFF—SITE STREET IMPROVEMENT PLANS o SCOTT. 9884N DATE T: 949-679-0090 4 RICE N0.49884 EXP. 9-30-12 GENERAL MANAGER DATE: No.asesa: UTILITY PLAN OF HAVE BEEN REVIEWED FOR COMPLIANCE SCALE: AS NOTED BENCHMARK: o - _ APPROPRIATE OF DEVELOPMENT ITY AND RIVERSIDE BENCHMARK NO.BM E-3-70.ELEV.1279.829. BRASS B DEPARTMENT APPROVALS ✓} crvn \� THE STATE LAWS,AND P LIED. DISC IN CONCRETE POST 72'NORTH OF"Y.INTERSEC110N OF SHEETS K DESCRIPTION APPR. 9ff 1\ CORYDON STREET AND MISSION TRAIL 27'EAST OF THE CENTERLINE o m2wwarop�„�� DESIGNED BY: KAM DRAWN BY: KAM (>F CAL DATE: OF MISSION TRAIL H ENGINEERING WATER SUPERINTENDENT WASTE WATER SUPT. CHECKED eY., cc PROJECT MANAGER: SCOTT M.W9LSON K ALO R.C.E 56915 CI W.O. FOR: F.B. FILE NO.Bed Idn