HomeMy WebLinkAboutHYDROLOGY REPORT TR 30496 PA 1, 2, 3 EXISTING CONDITIONS HYDROLOGY REPORT FOR TENTATIVE TRACT NO. 30496 PLANNING AREAS 1, 2 &3 (EXISTING CONDITION) CITY OF LAKE ELSINORE COUNTY OF RIVERSIDE Prepared for: PARDEE CONSTRUCTION COMPANY 108880 Wilshire Blvd., Suite 1900 Los Angeles, CA 90024 F J.N. 51.009 Date: 4-23-02 Engineer: Christine Duk 13re red Under Supervision of: Peter H. Duk, R. . E. 3 , XP. 6-30-04 M' BV ENGINEERING CIVIL ENOINEERINO LAND PLANNING u ! LAND SURVEYING ONE CORPORATE PARK • STE 101 • IRMNE CA FORMA 92606 (949)962-0617 FAX(949)962-9692 HYDROLOGY REPORT FOR TENTATIVE TRACT NO. 30496 PLANNING AREAS 1, 2 & 3 (EXISTING CONDITION) CITY OF LAKE ELSINORE COUNTY OF RIVERSIDE Prepared for: PARDEE CONSTRUCTION COMPANY 108880 Wilshire Blvd., Suite 1900 Los Angeles, CA 90024 J.N. 51.009 Date: 4-23-02 Engineer: Christine Duk 4Prred Under Supervision of; Peter H. Duk, R.V.jjfi95-5—,EXP. 6-30-04 BV ENGINEERING CIVIL ENGINEERING LAND PLANNING LAND SURVEYING ONE CORPORATE PARK • STE 101 • IRVINE CALIFORNA 92806 (9")862-0617 FAX(949)862-9682 3 Introduction This is a preliminary drainage study of Tentative Tract Map No. 30496 of the Canyon Hills project. It includes the computation of the flow runoff discharging into Cottonwood Creek, San Jacinto River, and to the open space outside of the project site. Tentative Tract Map No. 30496 is bounded by Railroad Canyon Road, Canyon Hills Road, and by open space. Under the existing condition, the project area consists of perennial grasses and bushes, chaparral, oak trees, mule fat, etc...(see the attached aerial photo). The site consists of soil types "A", `B", and "C". Soil type "C" dominates the entire project. The purpose of the hydrology computation for the existing condition is to estimate the flow's magnitude from the offsite entering into the project area at the tract boundary in order to provide a storm drain system to pick up that flow at the final engineering. In addition, the hydrology calculation for the existing condition is used to balance the flow leaving the project as required by UBC and the County. If the flow at the developed condition exceeds the flow at the existing condition, then the peak flow at the developed condition must be attenuated until it is equal to or less than the flow at the existing condition. In that case, a detention basin must be provided to detain the difference in flow between the existing and developed condition. HYDROLOGY REPORT FOR TENTATIVE TRACT NO. 30496 PLANNING AREAS 1, 2&3 (EXISTING CONDITION) CITY OF LAKE ELSINORE COUNTY OF RIVERSIDE Prepared for: PARDEE CONSTRUCTION COMPANY 108880 Wilshire Blvd., Suite 1900 Los Angeles, CA 90024 1 J.N. 51.009 Date: 4-23-02 Engineer: Christine Duk Prepared Under Supervision of: Peter H. Duk, R,5,E.j 3 , EXP. 6-30-04 BV ENGINEERING CIVIL ENGINEERING LAND PLANNING LAND SURVE V INO ONE CORPORATE PARK - STE 101 - IRMNE CALWORNA 9243043 (949)862-0617 FAX(949)062-9662 TABLE OF CONTENTS INTRODUCTION................................................................................................. 3 A. PROJECT LOCATION: VICINITY MAP,AREA MAP....................................... 5 B. HYDROLOGIC SOILS GROUP MAP: PLATE C-1.41......................................... 8 PROJECTDESCRIPTION............................................................................. 11 BASISOF DESIGN ............................................................................................ 13 COMPUTERSOFTWARE.............................................................................. 15 HYDROLOGY CALCULATIONS............................................................... 16 A. SUMMARIZED HYDROLOGY TABLE ............................................................ 17 B. DETAILED HYDROLOGY CALCULATIONS..................................................22 1. i0 YEAR STORM..............................................................................................23 2. 100 YEAR STORM............................................................................................ 57 HYDROLOGYMAP......................................................................................... 91 INTRODUCTION 3 Introduction This is a preliminary drainage study of Tentative Tract Map No. 30496 of the Canyon Hills project. It includes the computation of the flow runoff discharging into Cottonwood Creek, San Jacinto River, and to the open space outside of the project site. Tentative Tract Map No. 30496 is bounded by Railroad Canyon Road, Canyon Hills Road, and by open space. Under the existing condition, the project area consists of perennial grasses and bushes, chaparral, oak trees, mule fat, etc...(see the attached aerial photo). The site consists of soil types "A", `B", and "C". Soil type "C" dominates the entire project. The purpose of the hydrology computation for the existing condition is to estimate the flow's magnitude from the offsite entering into the project area at the tract boundary in order to provide a storm drain system to pick up that flow at the final engineering. In addition, the hydrology calculation for the existing condition is used to balance the flow leaving the project as required by UBC and the County. If the flow at the developed condition exceeds the flow at the existing condition,then the peak flow at the developed condition must be attenuated until it is equal to or less than the flow at the existing condition. In that case, a detention basin must be provided to detain the difference in flow between the existing and developed condition. E�. .�-, r, - lr +'+�,,'��;•Lt�j�i. ,,��t nif.=v, �;,' _ r �' >:'- 4 n•�,� -' ,R^., _ - l. 166 ISO. 30493 'o o!-jk_l '3 0 96 N N, PRMM(NARY L1$S'�lrtG 3C}iOQL VACANT LU PARDM CONSTRUCTION TRAILHR dv.-L . t IX +^ C •E S_ ID _ x TRA T N 4 j =y EXISTtN _GRADED 0 800 PROJECT LOCATION 4z-� j _• - FE R. 3 Q` O 1 A•r-y 0 U Al - - - P�4p JI �,��,;rtu=fit^"�,•`• <✓f:> � � PROJECT LOCATION VICINITY MAP NOT TO SCALE ICY p %4 cr W ti ar o NEWPORT RD r CAN PROJECT ILLS RD 215 °N LOCATION RAILROAD �N COTTON V 000 CYN. RD RD SCOTT RD BUNDY CYN. i5 CLIN TON KET TN, RD N i Ll AREA MAP NOT TO SCALE THOMAS BROS.MAP PG.28,GRID D4. 8 HYDROLOGIC SOILS GROUP MAP ISTEELE PEAK) D. D ' _ •.a ,wt ., .,,�, '. ' 8:��.• -� } •,• .y�,+.�`� `• �,{"y tom. _ _ A - f _•"f: .....•• •M.:..: ' D •tiT �,� :`•� .a J '(' K '2 r t 7T •-�. �Q� '-C•' B BCi. r c'� �, - i `T... �� .•• B - t - r _Y B C. D A �^ BBC • A -� e El Cto . - 'C= r.•- - ��.� - ''• _—•i' :'�.•r• � - � ;— -C,,r �:;�' - '-4. sue;' . `'%-�' � ,,,..— _�• � t'-. -.; � r fir' `- J •• t\;�: 'li.^. Jam• �; - �-,. / p� 1U�8 B � �`r _ ^p A ec <PROJECT SITE - - �� V'^ _ '� .C• Teti .�• �r - ��'^ .:- BC B C =`4> B fir -Bc L K i oc -g BC A - 1„ I Yew - BCsc MLOOMARt BC C C B C D A Wv LEGEND HYDROLOGIC SOILS GROUP MAP SOILS GROUP BOUNDARY FOR A SOILS GROUP DESIGNATION R C F C & W C D ELSINORE HYDROLOGY MANUAL 0 FEET 5000 PROJECT DESCRIPTION 11 Project Description The project site is bounded northeast by the existing Cottonwood Creek,Railroad Canyon Road and Canyon Hills Road,north and northwest by open space, southwest by open space. Its gross area is approximately 57.4 acres. Under the existing condition, the entire project is covered with perennial grasses and bushes. It also consists of chaparral, oak trees, mule fat, and etc... Soil type "C" is predominating in this project site. However, soil type"A"is along the creek. This project site is west of the proposed Tract No. 30493. It consists of Planning Areas 1,2, and 3. Planning Area 1 will be developed into 200 units of apartments which are approximately 17.8 acres. Planning Area 2 will be developed into 368 units of apartments which are about 31.9 acres. Planning Area 3's land use is unknown,but it has approximately 7.7 acres. BASIS OF DESIGN 13 Basis of Design A hydrology computation for this project is mainly based on the Hydrology Design Manual prepared by RCFC &WCD, dated April 1978, along with the County's requirements. The peak runoff for this project will be computed based on the 10 and 100-year storm event for the existing condition. Based on the RCFC &WCD, the land use shall be the "poor condition"in order to be conservative when determining the peak runoff of an undeveloped condition. The runoff generated from the project site will be subdivided into several small local watersheds. Each local watershed will consist of an initial area that is limited to 10 acres and a maximum flow path of 1000 feet as described in the above Hydrology Design Manual. The flow runoff from the initial area will flow downstream to the next area. That travel time for that area is calculated by using either the valley or mountain condition depending upon the natural slope. If the natural slope is less than or equal to 10%, then it is considered a valley condition. Otherwise,the mountain condition will be applied in the computation of the travel time. This travel time will be added to the time of concentration from the previous area. The total time of concentrations will be used in the runoff calculation for that subarea based on the equation Q= CIA.This procedure will be repeated until it reaches the end of the local watershed. FF COMPUTER SOFTWARE I 15 Computer Software The runoff computation for this project site is based on the CIVILCAD/CIVILDESIGN Hydrology-Hydraulics,Version 5.0,prepared by Joesph E. Bonadiman &Associates, Inc. The software is designed based on the Hydrology Dc°si un Manual prepared by the RCFC &WCD, dated April 1978, and approved by the Riverside County Flood Control. This engineering software is used to perform hydrology calculations and input data can be entered in as either Metric(SI) or English(in-lb) units. The output data may be prepared in either Metric and/or English units, too. HYDROLOGY CALCULATIONS SUMMARIZED HYDROLOGY TABLE SUMMARY TABLE FOR DETAILED HYDROLOGY CALCULATION EXISTING CONDITION TENTATIVE TRACT NO. 30496 10&100 YEAR Node Total Area Q10 Q100 Pipe Size Remarks # Subareo (Ac) (cfs) (cfs) (in) 20 Al 5.85 10.9 17.2 Initial Area 18 Pipe Flow 21 A2 9.50 17.6 27.7 Discharges to open space NC 22 A3 11.85 21.7 34.3 V Ditch Assume 23 A4 26.55 46.5 73.9 V Ditch Assume 24 A5 I 29.30 I51 .1 81.3 Discharges to a low point SUMMARY TABLE FOR DETAILED HYDROLOGY CALCULATION EXISTING CONDITION TENTATIVE TRACT NO. 30496 10&100 YEAR Node Total Area Q10 0100 Pipe Size Remarks # Subarea (Ac) (cfs) (cfs) (in) 4.0 81 5.90 10.8 17.0 Initial Area 4.0 B2 11.05 20.2 31.9 Addition V Ditch Assume 5.0 63+B4 26.20 46.4 73.6 Discharges to open space 36 Pipe Flow 5.1 B5+B7 29.10 51.8 82.0 Addition 36 Pipe Flow 5.2 136+138 29.95 53.4 84.4 Add'ition 36 Pipe Flow 5.3 29.95 53.4 84.4 Confluence wl Subarea E 11.0 E 2.75 5.0 7.9 Initial Area 18 Pi e Flow 5.3 32.70 58.1 91.9 Confluence w Subarea B 42 Pipe Flow 11.1 Discharges to Cottonwood Creek 2.0 B3 3.70 6.9 10.9 jEntering pr-;--1 site ro'ect boundar SUMMARY TABLE FOR DETAILED HYDROLOGY CALCULATION EXISTING CONDITION TENTATIVE TRACT NO.30496 10&100 YEAR Node Total Area Q10 Q100 Pipe size Remarks # Subarea (Ac) (cfs) (cfs) (in) 12.1 C 0.45 1.1 1.7 Initial Area 18 Pipe Flow 12.2 Dischoraes to Cottonwood Creek 7.0 D1 6.45 12.1 19.1 Entering roiect site O project boundar V Ditch Assume 8.0 D2 8.$0 16.3 25.8 V Ditch Assume 9.0 D3+D4 23.05 41.3 65.6 36 Pipe Flow 9.1 D5+D6 23.95 43.0 68.2 Addition 36 Pie Flow 9.2 D7+DS 24.85 44.7 70.8 Addition 36_Pipe Flow 9.3 Discharges to Cottonwood Creek 6.1 D3 5,00 9.5 15.0 Enteringproject site @ project boundary 26.0 F1 3.55 6.9 Initial Area V Ditch Assume 27.0 F2 3.70 7 11 Discharges to a low point a SUMMARY TABLE FOR DETAILED HYDROLOGY CALCULATION EXISTING CONDITION TENTATIVE TRACT NO. 30496 10 do 100 YEAR Node Total Area Q10 Q100 Pipe Size Remarks # Subarea (Ac) (cfs) (cfs) (in) 31.0 G1 6.15 11.0 17.4 11nitial Area NC 32.0 G2 14.45 25.0 39.7 NC 33.0 G3 21.10 36.2 57.5 NC 34.0 G4+G5 36.15 60.6 96.6 Addition NC 35.0 G6 47.90 78.7 125.8 10ischarges to San Jacinto River 37.0 1-11 4.45 8.2 12.9 Initial Area NC 38.0 H2 12.80 23.1 36.5 NC 39.0 H 3 20.05 35.8 56.7 NC 40.0 H4+H5 35.10 60.0 95.6 Addition NC 41 H6 39.25 66.6 106.3 Dischar es to San Jacinto River 4 11 4.50 8.8 13.9 Enteringoro'ect site project boundar NC 42.3 12 11.25 21.3 33.7 NC 42.4 13 1 15.75 28.8 45.9 Oischaraes to San Jacinto River 43.2 J 3.65 6.7 10.5 Discharges to San Jacinto River 44.2 K1 3.65 6.8 10.8 Entering project site ® project boundary NC 44.3 K2 7.80 14.1 22.4 Discharges to San Jacinto River 45.0 L1 5.70 10.4 16.4 Entering project site @ project boundar NC 45.1 L2 8.30 14.9 23.6 Discharges to San Jacinto River FF DETAILED HYDROLOGY CALCULATIONS 10 YEAR STORM 24 Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989 - 1997 Version 5.0 Rational Hydrology Study Date: 05/22/02 File:x496.out -- ------------------------- ---------------------------------—---------- HYDROLOGY CALCULATIONS - EXISTING CONDITION - 10 YEAR STORM TENTATIVE TRACT NO. 30496 - CITY OF LAKE ELSINORE ENGINEER: CHRISTINE ----------------------- --------------------------------- ----- - ------------ BV ENGINEERING, One Corporate Park, Irvine, CA - SIN 705 ------------------------------------------------- ------------------------- Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 10 . 00 Antecedent Moisture Condition = 2 Standard intensity-duration curves data (Plate D-4.1) For the [ Elsinore-Wildomar ] area used. 10 year storm 10 minute intensity 2 .320 (In/Hr) 10 year storm 60 minute intensity = 0 .980 (In/Hr) 100 year storm 10 minute intensity = 3 .540 (In/Hr) 100 year storm 60 minute intensity = 1.500 (In/Hr) Storm event year = 10.0 Calculated rainfall intensity data: 1 hour intensity = 0.980 (In/Hr) Slope of intensity duration curve = 0.4800 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 20.000 **** INITIAL AREA EVALUATION **** Al Initial area flow distance = 920.000 (Ft. ) Top (of initial area) elevation = 1741.000 (Ft. ) Bottom (of initial area) elevation = 1486.500 (Ft.) Difference in elevation = 254.500 (Ft.) Slope = 0 .27663 s (percent)= 27.66 TC = k(0 .530) * [ (length'3) / (elevation change) ] '0.2 Initial area time of concentration = 10.505 min. Rainfall intensity = 2.262 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.821 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0. 000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 10.866 (CFS) Total initial stream area = 5 .850 (Ac.) Pervious area fraction = 1.000 I 25 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20 .000 to Point/Station 21.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1486.500 (Ft. ) Downstream point/station elevation = 1482.000 (Ft. ) Pipe length = 170.00 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 10.866 (CFS) Nearest computed pipe diameter = 18.00 (In. ) Calculated individual pipe flow = 10.866 (CFS) Normal flow depth in pipe = 10.42 (In. ) Flow top width inside pipe = 17.78 (In. ) Critical Depth = 15.16 (In. ) Pipe flow velocity = 10.24 (Ft/s) Travel time through pipe = 0.28 min. Time of concentration (TC) = 10.78 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21. 000 to Point/Station 21.000 **** SUBAREA FLOW ADDITION **** A2 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 I Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 10.78 min. Rainfall intensity = 2 .234 (In/Hr) for a 10.0 year storm Subarea runoff = 6.688 (CFS) for 3.650 (Ac. ) Total runoff = 17.554 (CFS) Total area = 9.500 (Ac.) 26 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21.000 to Point/Station 22 .000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** A3 Top of natural channel elevation = 1482 .000 (Ft. ) End of natural channel elevation = 1466.200 (Ft. ) Length of natural channel = 360.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 19.725 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) ~.352) (slope^0.5) Velocity using mean channel flow = 6.25 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0439 Corrected/adjusted channel slope = 0.0439 Travel time = 0.96 min. TC = 11.74 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.817 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .144 (In/Hr) for a 10 .0 year storm Subarea runoff = 4 .118 (CFS) for 2 .350 (Ac. ) Total runoff = 21.672 (CFS) Total area = 11.850 (Ac. ) ) 27 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 22 .000 to Point/Station 23 .000 **** IMPROVED CHANNEL TRAVEL TIME **** A4 Upstream point elevation = 1466.200 (Ft. ) Downstream point elevation = 1451.000 (Ft. ) Channel length thru subarea = 585 .000 (Ft. ) Channel base width = 0 .000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1. 000 Estimated mean flow rate at midpoint of channel = 35.114 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 3.000 (Ft. ) Flow(q) thru subarea = 35 . 114 (CFS) Depth of flow = 1.743 (Ft. ) , Average velocity = 11.563 (Ft/s) Channel flow top width = 3 .485 (Ft.) Flow Velocity = 11.56 (Ft/s) Travel time = 0.84 min. Time of concentration = 12 .58 min. Sub-Channel No. 1 Critical depth = 2 .375 (Ft. ) ' Critical flow top width = 4.750 (Ft.) ' Critical flow velocity= 6.225 (Ft/s) ' I ' Critical flow area = 5.641 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.815 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .074 (In/Hr) for a 10.0 year storm Subarea runoff = 24.840 (CFS) for 14.700 (Ac. ) Total runoff = 46.512 (CFS) Total area = 26.550 (Ac. ) I 28 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 23 .000 to Point/Station 24 . 000 **** IMPROVED CHANNEL TRAVEL TIME **** A5 Upstream point elevation = 1451.000 (Ft. ) Downstream point elevation = 1432.300 (Ft. ) Channel length thru subarea = 265.000 (Ft.) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1. 000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 48.921 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 2.000 (Ft. ) Flow(q) thru subarea = 48.921(CFS) Depth of flow = 1.636 (Ft. ) , Average velocity = 18.271(Ft/s) Channel flow top width = 3.273 (Ft. ) Flow Velocity = 18.27 (Ft/s) Travel time = 0.24 min. Time of concentration = 12 .83 min. Sub-Channel No. 1 Critical depth = 2 .672 (Ft. ) ' Critical flow top width = 4.000 (Ft. ) ' ' I Critical flow velocity= 7.315 (Ft/s) ' ' Critical flow area = 6.688 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.814 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .055 (In/Hr) for a 10.0 year storm Subarea runoff = 4.601(CFS) for 2 .750 (Ac. ) Total runoff = 51.113 (CFS) Total area = 29.300 (Ac. ) Qlo = 51. 1 cfs Discharges to a low point I 29 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 3.000 to Point/Station 4 .000 **** INITIAL AREA EVALUATION **** B1 Initial area flow distance = 990.000 (Ft. ) Top (of initial area) elevation = 1761.000 (Ft. ) Bottom (of initial area) elevation = 1488 .700 (Ft. ) Difference in elevation = 272 .300 (Ft. ) Slope = 0.27505 s (percent) = 27.51 TC = M0.530) * [ (length'3) / (elevation change) ] '0.2 Initial area time of concentration = 10 .830 min. Rainfall intensity = 2.229(In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 10.786(CFS) Total initial stream area = 5.900 (Ac. ) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 4.000 **** SUBAREA FLOW ADDITION **** B2 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0. 820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 10.83 min. Rainfall intensity = 2.229 (In/Hr) for a 10.0 year storm Subarea runoff = 9.415 (CFS) for 5.150 (Ac. ) Total runoff = 20i200 (CFS) Total area = 11.050 (Ac. ) I 30 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4 . 000 to Point/Station 5.000 **** IMPROVED CHANNEL TRAVEL TIME **** B3 + B4 Upstream point elevation = 1488.700 (Ft. ) Downstream point elevation = 1470.400 (Ft.) Channel length thru subarea = 790. 000 (Ft. ) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 34.048 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 3.000 (Ft.) Flow(q) thru subarea = 34.048 (CFS) Depth of flow = 1.760 (Ft. ) , Average velocity = 10.990 (Ft/s) Channel flow top width = 3.520 (Ft: ) Flow Velocity = 10.99 (Ft/s) Travel time = 1.20 min. Time of concentration = 12 .03 min. Sub-Channel No. 1 Critical depth = 2 .344 (Ft. ) ' ' Critical flow top width = 4.688 (Ft. ) ' ' Critical flow velocity= 6.198 (Ft/s) ' ' ' Critical flow area = 5 .493 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.816 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (PMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0. 000 Rainfall intensity = 2 .120 (In/Hr) for a 10.0 year storm Subarea runoff = 26.215 (CFS) for 15.150 (Ac. ) Total runoff = 46.415 (CFS) Total area = 26.200 (Ac.) Qlo = 46 .4 cfs Discharges to a low point ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5 . 000 to Point/Station 5.100 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1470.400 (Ft. ) Downstream point/station elevation = 1449.000 (Ft. ) Pipe length = 85. 00 (Ft. ) Manning' s N = 0.013 No. of pipes = 1 Required pipe flow = 46.415 (CFS) Nearest computed pipe diameter = 18.00 (In. ) Calculated individual pipe flow = 46.415 (CFS) Normal flow depth in pipe = 13 .10 (In. ) Flow top width inside pipe = 16.02 (In. ) Critical depth could not be calculated. Pipe flow velocity = 33 .65 (Ft/s) Travel time through pipe = 0.04 min. Time of concentration (TC) = 12.07 min. 31 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.100 to Point/Station 5.100 **** SUBAREA FLOW ADDITION **** B5 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 12.07 min. Rainfall intensity = 2.116 (In/Hr) for a 10.0 year storm Subarea runoff = 3 .445 (CFS) for 1.850 (Ac.) Total runoff = 49.861(CFS) Total area = 28.050 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.100 to Point/Station 5.100 **** SUBAREA FLOW ADDITION**** B7 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69. 00 Pervious area fraction = 0.100; Impervious fraction = 0 :900 Time of concentration = 12 .07 min. Rainfall intensity = 2.116 (In/Hr) for a 10.0 year storm Subarea runoff = 1.955 (CFS) for 1.050 (Ac. ) Total runoff = 51. 816 (CFS) Total area = 29.100 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.100 to Point/Station 5.200 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1449.000 (Ft.) Downstream point/station elevation = 1447.000 (Ft. ) Pipe length = 100.00 (Ft. ) Manning' s N = 0.013 No. of pipes = 1 Required pipe flow = 51.816 (CFS) Nearest computed pipe diameter = 30 .00 (In. ) Calculated individual pipe flow = 51.816(CFS) Normal flow depth in pipe = 22 .13 (In. ) Flow top width inside pipe = 26.40 (In. ) Critical Depth = 27.87 (In. ) Pipe flow velocity = 13.36 (Ft/s) Travel time through pipe = 0.12 min. Time of concentration (TC) = 12.20 min. 32 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.200 to Point/Station 5.200 **** SUBAREA FLOW ADDITION **** B6 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0 .900 Time of concentration = 12.20 min. Rainfall intensity = 2.106 (In/Hr) for a 10.0 year storm Subarea runoff = 0.927 (CFS) for 0.500 (Ac.) Total runoff = 52.743 (CFS) Total area = 29.600 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.200 to Point/Station 5.200 **** SUBAREA FLOW ADDITION **** B8 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0 :900 Time of concentration = 12 .20 min. Rainfall intensity = 2 .106 (In/Hr) for a 10.0 year storm Subarea runoff = 0.649 (CFS) for 0.350 (Ac.) Total runoff = 53 .391 (CFS) Total area = 29.950 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.200 to Point/Station 5.300 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1447 .000 (Ft. ) Downstream point/station elevation = 1440.000 (Ft.) Pipe length = 245.00 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 53.391 (CFS) Nearest computed pipe diameter = 27. 00 (In. ) Calculated individual pipe flow = 53 .391 (CFS) Normal flow depth in pipe = 22 .64 (In. ) Flow top width inside pipe = 19.87 (In. ) Critical depth could not be calculated. Pipe flow velocity = 14.99 (Ft/s) Travel time through pipe = 0.27 min. Time of concentration (TC) = 12.47 min. 33 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.300 to Point/Station 5.300 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 29.950 (Ac.) Runoff from this stream = 53 .391(CFS) Time of concentration = 12 .47 min. Rainfall intensity = 2 .083 (In/Hr) Confluence with Subarea "E" ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 11.000 **** INITIAL AREA EVALUATION **** $ Initial area flow distance = 640.000 (Ft.) Top (of initial area) elevation = 1515.000 (Ft. ) Bottom (of initial area) elevation = 1446.500 (Ft.) Difference in elevation = 68.500(Ft.) Slope = 0.10703 s (percent) = 10.70 TC = k(0.530) * [ (length^3) / (elevation change) ] '0.2 Initial area time of concentration = 10.986 min. Rainfall intensity = 2 .214 (In/Hr) for a 10 .0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 4.990 (CFS) Total initial stream area = 2.750 (Ac. ) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 11.000 to Point/Station 5.300 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1446.500 (Ft. ) Downstream point/station elevation = 1440.000 (Ft. ) Pipe length = 80.00 (Ft. ) Manning' s N = 0 .013 No. of pipes = 1 Required pipe flow = 4.990 (CFS) Nearest computed pipe diameter = 12 .00 (In. ) Calculated individual pipe flow = 4 .990 (CFS) Normal flow depth in pipe = 5.94 (In. ) Flow top width inside pipe = 12.00 (In. ) Critical Depth = 11.00 (In. ) Pipe flow velocity = 12 . 88 (Ft/s) Travel time through pipe = 0.10 min. Time of concentration (TC) = 11.09 min. 34 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.300 to Point/Station 5.300 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 2 .750 (Ac. ) Runoff from this stream = 4.990 (CFS) Time of concentration = 11.09 min. Rainfall intensity = 2 .204 (In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 53 .391 12.47 2.083 2 4.990 11.09 2.204 Largest stream flow has longer time of concentration Qp = 53.391 + sum of Qb Ia/Ib 4.990 * 0.945 = 4.717 Qp = 58.108 Total of 2 streams to confluence: Flow rates before confluence point: 53.391 4.990 Area of streams before confluence: 29.950 2.750 Results of confluence: Total flow rate = 58 .108 (CFS) Time of concentration = 12 .468 min. Effective stream area after confluence = 32.700 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.300 to Point/Station 11.100 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1440.000 (Ft. ) Downstream point/station elevation = 1420.000 (Ft. ) Pipe length = 80.00 (Ft. ) Manning's N = 0 .013 No. of pipes = 1 Required pipe flow = 58 .108 (CFS) Nearest computed pipe diameter = 21.00 (In. ) Calculated individual pipe flow = 58.108 (CFS) Normal flow depth in pipe = 13 .36 (In.) Flow top width inside pipe = 20.21(In. ) Critical depth could not be calculated. Pipe flow velocity = 35 .98 (Ft/s) Travel time through pipe = 0.04 min. Time of concentration (TC) = 12 .50 min. Q10 = 58.1 cfs Discharges to Cottonwood Creek 35 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12.000 to Point/Station 12 .100 **** INITIAL AREA EVALUATION **** C Initial area flow distance = 170.000 (Ft. ) Top (of initial area) elevation = 1500.000 (Ft. ) Bottom (of initial area) elevation = 1482 .900 (Ft. ) Difference in elevation = 17.100 (Ft. ) Slope = 0.10059 s (percent)= 10 .06 TC = k(0.530) * [ (length'3) / (elevation change) ] '0.2 Initial area time of concentration = 6.546 min. Rainfall intensity = 2 .838 (In/Hr) for a 10. 0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.836 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 1.068 (CFS) Total initial stream area = 0.450 (Ac.) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12 .100 to Point/Station 12 .200 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1482.900 (Ft. ) Downstream point/station elevation = 1460.000 (Ft.) Pipe length = 190.00 (Ft. ) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.068 (CFS) Nearest computed pipe diameter = 6.00 (In.) Calculated individual pipe flow = 1.068 (CFS) Normal flow depth in pipe = 3 .17 (In. ) Flow top width inside pipe = 5 .99 (In.) Critical depth could not be calculated. Pipe flow velocity = 10.15 (Ft/s) Travel time through pipe = 0.31 min. Time of concentration (TC) = 6.86 min. Q10 = 1.1 cfs Discharges to Cottonwood Creek 36 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 7.000 **** INITIAL AREA EVALUATION **** DI Initial area flow distance = 900.000 (Ft. ) Top (of initial area) elevation = 1741.000 (Ft. ) Bottom (of initial area) elevation = 1478.200 (Ft. ) Difference in elevation = 262 .800 (Ft. ) Slope = 0.29200 s (percent)= 29.20 TC = k(0.530) * ( (length'3) / (elevation change) ] "0.2 Initial area time of concentration = 10.301 min. Rainfall intensity = 2.283 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 .822 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction 0.000 Initial subarea runoff = 12.103 (CFS) Total initial stream area = 6.450 (Ac. ) Pervious area fraction = 1.000 Q10 = 12 . 1 cfs Enters project site @ project boundary i 37 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 8.000 **** IMPROVED CHANNEL TRAVEL TIME **** D2 Upstream point elevation = 1478.200 (Ft. ) Downstream point elevation = 1448.500 (Ft.) Channel length thru subarea = 660.000 (Ft. ) Channel base width = 0.000 (Ft.) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 14.308 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 2 .000 (Ft. ) Flow(q) thru subarea = 14.308 (CFS) Depth of flow = 1. 123 (Ft.) , Average velocity = 11.351 (Ft/s) Channel flow top width = 2.245 (Ft.) Flow Velocity = 11.35 (Ft/s) Travel time = 0.97 min. Time of concentration = 11.27 min. Sub-Channel No. 1 Critical depth = 1.664 (Ft.) ' Critical flow top width = 3 .328 (Ft. ) ' ' Critical flow velocity= 5 .167 (Ft/s) ' Critical flow area = 2 .769 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.819 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Rainfall intensity = 2 .187 (In/Hr) for a 10.0 year storm Subarea runoff = 4.207 (CFS) for 2 .350 (Ac. ) Total runoff = 16.311 (CFS) Total area = 8.800 (Ac.) 38 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 8 .000 to Point/Station 9.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 1448 .500 (Ft.) Downstream point elevation = 1440 .800 (Ft.) Channel length thru subarea = 300. 000 (Ft.) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 29.517 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 2.000 (Ft.) Flow(q) thru subarea = 29.517 (CFS) Depth of flow = 1.637 (Ft.) , Average velocity = 11.021(Ft/s) Channel flow top width = 3.273 (Ft. ) Flow Velocity = 11.02 (Ft/s) Travel time = 0 .45 min. Time of concentration = 11.72 min. Sub-Channel No. 1 Critical depth = 2.188 (Ft. ) ' Critical flow top width = 4.000 (Ft. ) ' Critical flow velocity= 6.214 (Ft/s) ' ' Critical flow area = 4.750 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.817 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0. 000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .146 (In/Hr) for a 10.0 year storm Subarea runoff = 24.991 (CFS) for 14.250 (Ac.) Total runoff = 41.302 (CFS) Total area = 23.050 (Ac. ) 410 = 41 .3 cfs Discharges to a low point ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.000 to Point/Station 9.100 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1440 .800 (Ft. ) Downstream point/station elevation = 1433 .700 (Ft. ) Pipe length = 40.00 (Ft.) Manning's N = 0. 013 No. of pipes = 1 Required pipe flow = 41.302 (CFS) Nearest computed pipe diameter = 18 .00 (In. ) Calculated individual pipe flow = 41.302 (CFS) Normal flow depth in pipe = 13 .78 (In. ) Flow top width inside pipe = 15 .25 (In. ) Critical depth could not be calculated. Pipe flow velocity = 28.46 (Ft/s) Travel time through pipe = 0.02 min. Time of concentration (TC) = 11.75 min. 39 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.100 to Point/Station 9.100 **** SUBAREA FLOW ADDITION **** D5 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.75 min. Rainfall intensity = 2.144 (In/Hr) for a 10.0 year storm Subarea runoff = 1.132 (CFS) for 0.600 (Ac.) Total runoff = 42 .434 (CFS) Total area = 23 .650 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.100 to Point/Station 9.100 **** SUBAREA FLOW ADDITION **** D6 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.75 min. Rainfall intensity = 2 .144 (In/Hr) for a 10.0 year storm Subarea runoff = 0.566 (CFS) for 0 .300 (Ac.) Total runoff = 43 .001(CFS) Total area = 23 .950 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.100 to Point/Station 9.200 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1433 .700 (Ft.) Downstream point/station elevation = 1422 .900 (Ft. ) Pipe length = 95 .00 (Ft. ) Manning' s N = 0.013 No. of pipes = 1 Required pipe flow = 43 .001(CFS) Nearest computed pipe diameter = 21.00 (In. ) Calculated individual pipe flow = 43 .001 (CFS) Normal flow depth in pipe = 14.27 (In. ) Flow top width inside pipe = 19.60 (In. ) Critical depth could not be calculated. Pipe flow velocity = 24.70 (Ft/s) Travel time through pipe = 0.06 min. Time of concentration (TC) = 11.81 min. 40 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.200 to Point/Station 9.200 **** SUBAREA FLOW ADDITION **** D7 COMMERCIAL subarea type Runoff Coefficient = 0 .880 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0. 000 Decimal fraction soil group C = 1. 000 Decimal fraction soil group D = 0. 000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.81 min. Rainfall intensity = 2.138 (In/Hr) for a 10.0 year storm Subarea runoff = 1.129(CFS) for 0. 600 (Ac.) Total runoff = 44.130 (CFS) Total area = 24.550 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.200 to Point/Station 9.200 **** SUBAREA FLOW ADDITION **** D8 COMMERCIAL subarea type Runoff Coefficient = 0.880 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0 .900 Time of concentration = 11.81 min. Rainfall intensity = 2 .138 (In/Hr) for a 10.0 year storm Subarea runoff = 0.565 (CFS) for 0.300 (Ac.) Total runoff = 44.695 (CFS) Total area = 24.850 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.200 to Point/Station 9.300 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1422 .900 (Ft.) Downstream point/station elevation = 1422 .000 (Ft. ) Pipe length = 65.00 (Ft.) Manning's N = 0. 013 No. of pipes = 1 Required pipe flow = 44.695 (CFS) Nearest computed pipe diameter = 30.00 (In. ) Calculated individual pipe flow = 44.695 (CFS) Normal flow depth in pipe = 22 .80 (In.) Flow top width inside pipe = 25.62 (In.) Critical Depth = 26.65 (In.) Pipe flow velocity = 11.16 (Ft/s) Travel time through pipe = 0.10 min. Time of concentration (TC) = 11.91 min. Q10 = 44 .7 cfs Discharges to Cottonwood Creek 41 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 25 .000 to Point/Station 26.000 **** INITIAL AREA EVALUATION **** F1 Initial area flow distance = 795 .000 (Ft. ) Top (of initial area) elevation = 1701.000 (Ft. ) Bottom (of initial area) elevation = 1446.000 (Ft. ) Difference in elevation = 255.000 (Ft.) Slope = 0.32075 s (percent) = 32 .08 TC = k(0.530) * [ (length'3) / (elevation change) ] ^0.2 Initial area time of concentration = 9.620 min. Rainfall intensity = 2.359 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.824 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0. 000 Decimal fraction soil group C = 1. 000 Decimal fraction soil group D = 0 . 000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0. 000 Initial subarea runoff = 6. 903 (CFS) Total initial stream area = 3 .550 (Ac.) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 26.000 to Point/Station 27.000 **** IMPROVED CHANNEL TRAVEL TIME **** F2 Upstream point elevation = 1446.000 (Ft. ) Downstream point elevation = 1438 .000 (Ft.) Channel length thru subarea = 20. 000 (Ft. ) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Manning' s 'N' = 0 .015 Maximum depth of channel = 2.000 (Ft.) Flow(q) thru subarea = 6.903 (CFS) Depth of flow = 0 .567 (Ft.) , Average velocity = 21.464 (Ft/s) Channel flow top width = 1.134 (Ft. ) Flow Velocity = 21.46 (Ft/s) Travel time = 0 .02 min. Time of concentration = 9.64 min. Sub-Channel No. 1 Critical depth = 1.242 (Ft. ) Critical flow top width = 2 .464 (Ft. ) Critical flow velocity= 4 .474 (Ft/s) Critical flow area = 1.543 (Sq.Ft) 1 42 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 27 .000 to Point/Station 27.000 **** SUBAREA FLOW ADDITION **** F2 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 .824 Decimal fraction soil group A = 0 . 000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 9.64 min. Rainfall intensity = 2.358 (In/Hr) for a 10.0 year storm Subarea runoff = 0.291(CFS) for 0.150 (Ac.) Total runoff = 7.195 (CFS) Total area = 3 .700 (Ac.) 410 = 7 .2 cfs Discharges to a low point ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 30 .000 to Point/Station 31.000 **** INITIAL AREA EVALUATION **** G1 Initial area flow distance = 975.000 (Ft. ) Top (of initial area) elevation = 1633 .600 (Ft. ) Bottom (of initial area) elevation = 1425.000 (Ft.) Difference in elevation = 208.600 (Ft.) Slope = 0.21395 s (percent) = 21.39 TC = k(0.530) * [ (length"3) / (elevation change) ] '0 .2 Initial area time of concentration = 11.319 min. Rainfall intensity = 2.182 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.819 Decimal fraction soil group A = 0 . 000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 . 000 RI index for soil (AMC 2) = 86. 00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Initial subarea runoff = 10.986 (CFS) Total initial stream area = 6.150 (Ac.) Pervious area fraction = 1.000 I 43 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 31.000 to Point/Station 32.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G2 Top of natural channel elevation = 1425.000 (Ft. ) End of natural channel elevation = 1392.000 (Ft. ) Length of natural channel = 545.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 18.400 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) ".352) (slope^0.5) Velocity using mean channel flow = 7.21 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0606 Corrected/adjusted channel slope = 0.0606 Travel time = 1.26 min. TC = 12 .58 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.815 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1. 000 Decimal fraction soil group D = 0 . 000 RI index for soil (AMC 2) = 86.00 1 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Rainfall intensity = 2.074 (In/Hr) for a 10.0 year storm Subarea runoff = 14.028 (CFS) for 8.300 (Ac. ) Total runoff = 25.015 (CFS) Total area = 14.450 (Ac. ) 1 44 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 32.000 to Point/Station 33 .000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G3 Top of natural channel elevation = 1392 .000 (Ft. ) End of natural channel elevation = 1390.000 (Ft. ) Length of natural channel = 50.000 (Ft.) Estimated mean flow rate at midpoint of channel = 30.771(CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) ~.352) (slope"0.5) Velocity using mean channel flow = 6.74 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0400 Corrected/adjusted channel slope = 0.0400 Travel time = 0.12 min. TC = 12.70 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.814 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .065 (In/Hr) for a 10 .0 year storm Subarea runoff = 11.182 (CFS) for 6.650 (Ac. ) Total runoff = 36.197 (CFS) Total area = 21.100 (Ac.) 45 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 33 .000 to Point/Station 34.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G4 Top of natural channel elevation = 1390.000 (Ft. ) End of natural channel elevation = 1365.000 (Ft. ) Length of natural channel = 455. 000 (Ft.) Estimated mean flow rate at midpoint of channel = 40 .014 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) '.352) (slope^0.5) Velocity using mean channel flow = 8.51(Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0549 Corrected/adjusted channel slope = 0.0549 Travel time = 0.89 min. TC = 13 .59 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.812 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 1.999 (In/Hr) for a 10.0 year storm Subarea runoff = 7.221 (CFS) for 4.450 (Ac. ) Total runoff = 43 .417 (CFS) Total area = 25.550 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 34.000 to Point/Station 34.000 **** SUBAREA FLOW ADDITION **** G5 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.812 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 13 .59 min. Rainfall intensity = 1.999 (In/Hr) for a 10.0 year storm Subarea runoff = 17.199 (CFS) for 10.600 (Ac. ) Total runoff = 60 .617 (CFS) Total area = 36.150 (Ac.) 46 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 34.000 to Point/Station 35.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G6 Top of natural channel elevation = 1365 . 000 (Ft.) End of natural channel elevation = 1304 . 000 (Ft.) Length of natural channel = 925.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 70 .468 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) ".352) (slope'0 .5) Velocity using mean channel flow = 10.98 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0659 Corrected/adjusted channel slope = 0.0659 Travel time = 1.40 min. TC = 15. 00 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.808 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 1.907 (In/Hr) for a 10.0 year storm Subarea runoff = 18.101 (CFS) for 11.750 (Ac.) Total runoff = 78.718 (CFS) Total area = 47.900 (Ac• ) 4io = 78 .7 cfs Discharges to San Jacinto River ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 36.000 to Point/Station 37.000 **** INITIAL AREA EVALUATION **** H1 Initial area flow distance = 835.000 (Ft. ) Top (of initial area) elevation = 1615 .000 (Ft. ) Bottom (of initial area) elevation = 1447 .700 (Ft.) Difference in elevation = 167.300 (Ft. ) Slope = 0.20036 s (percent) = 20 .04 TC = k(0.530) * [ (length"3) / (elevation change) ] A0.2 Initial area time of concentration = 10.779 min. Rainfall intensity = 2 .234 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Initial subarea runoff = 8.155 (CFS) Total initial stream area = 4.450 (Ac. ) Pervious area fraction = 1.000 47 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 37.000 to Point/Station 38.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H2 Top of natural channel elevation = 1447.700 (Ft.) End of natural channel elevation = 1428 .700 (Ft. ) Length of natural channel = 240.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 15.806 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) '.352) (slope^0.5) Velocity using mean channel flow = 7 .92 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0792 Corrected/adjusted channel slope = 0.0792 Travel time = 0.51 min. TC = 11.28 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.819 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0. 000 RI index for soil (AMC 2) = 86.00 } Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .185 (In/Hr) for a 10. 0 year storm Subarea runoff = 14 .940 (CFS) for 8.350 (Ac. ) Total runoff = 23.095 (CFS) Total area = 12.800 (Ac.) 48 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 38.000 to Point/Station 39.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H3 Top of natural channel elevation = 1428 .700 (Ft. ) End of natural channel elevation = 1405.000 (Ft. ) Length of natural channel = 290.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 29.636 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) '.352) (slope'0.5) Velocity using mean channel flow = 9.54 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0817 Corrected/adjusted channel slope = 0.0817 Travel time = 0.51 min. TC = 11.79 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 . 817 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Rainfall intensity = 2.140 (In/Hr) for a 10.0 year storm Subarea runoff = 12 .677 (CFS) for 7.250 (Ac.) Total runoff = 35.772 (CFS) Total area = 20.050 (Ac.) 49 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 39.000 to Point/Station 40.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H4 Top of natural channel elevation = 1405.000 (Ft. ) End of natural channel elevation = 1325.000 (Ft. ) Length of natural channel = 760.000 (Ft.) Estimated mean flow rate at midpoint of channel = 43 .444 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (q'.33) (slopeA.492) Velocity using mean channel flow = 6.24 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0 .1053 Corrected/adjusted channel slope = 0.1037 Travel time = 2.03 min. TC = 13 .82 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 .811 Decimal fraction soil group A = 0 . 000 Decimal fraction soil group B = 0. 000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0. 000 Rainfall intensity = 1.983 (In/Hr) for a 10.0 year storm Subarea runoff = 13 .832 (CFS) for 8.600 (Ac.) Total runoff = 49.604 (CFS) Total area = 28.650 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 40.000 to Point/Station 40.000 **** SUBAREA FLOW ADDITION **** H5 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0. 811 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0 . 000 Decimal fraction soil group C = 1. 000 Decimal fraction soil group D = 0 . 000 RI index for soil (AMC 2) = 86. 00 Pervious area fraction = 1.000; Impervious fraction = 0. 000 Time of concentration = 13.82 min. Rainfall intensity = 1.983 (In/Hr) for a 10.0 year storm Subarea runoff = 10.374 (CFS) for 6.450 (Ac. ) Total runoff = 59.979 (CFS) Total area = 35 .100 (Ac.) 1 50 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 40.000 to Point/Station 41.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H6 Top of natural channel elevation = 1325.000 (Ft. ) End of natural channel elevation = 1310.000 (Ft. ) Length of natural channel = 205.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 63 .524 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) ^.352) (slope'0.5) Velocity using mean channel flow = 11.22 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0 .0732 Corrected/adjusted channel slope = 0.0732 Travel time = 0.30 min. TC = 14.13 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.810 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 1.962 (In/Hr) for a 10.0 year storm Subarea runoff = 6.599(CFS) for 4.150 (Ac.) Total runoff = 66.577 (CFS) Total area = 39.250 (Ac.) Qlo = 66 . 6 cfs Discharges to San Jacinto River 51 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION **** B3 Initial area flow distance = 700.000 (Ft. ) Top (of initial area) elevation = 1607 .100 (Ft. ) Bottom (of initial area) elevation = 1494.600 (Ft. ) Difference in elevation = 112.500 (Ft. ) Slope = 0.16071 s (percent)= 16.07 TC = k(0.530) * [ (length"3) / (elevation change) ] ^0.2 Initial area time of concentration = 10.498 min. Rainfall intensity = 2 .263 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.821 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Initial subarea runoff = 6.875 (CFS) Total initial stream area = 3 .700 (Ac.) Pervious area fraction = 1.000 Q10 = 6 . 9 c f s Enters project site @ project boundary ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 6.100 **** INITIAL AREA EVALUATION **** D3 Initial area flow distance = 865.000 (Ft. ) Top (of initial area) elevation = 1741.000 (Ft. ) Bottom (of initial area) elevation = 1480.000 (Ft. ) Difference in elevation = 261.000 (Ft.) Slope = 0 .30173 s (percent) = 30.17 TC = k(0.530) * [ (length^3) / (elevation change) ] '0.2 Initial area time of concentration = 10.073 min. Rainfall intensity = 2 .308 (In/Hr) for a 10 .0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.823 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 9.493 (CFS) Total initial stream area = 5.000 (Ac.) Pervious area fraction = 1.000 Q3.0 = 9 .5 cfs Enters project site @ project boundary } 52 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 42 .100 to Point/Station 42.200 **** INITIAL AREA EVALUATION **** Il Initial area flow distance = 615.000 (Ft.) Top (of initial area) elevation = 1655.000 (Ft. ) Bottom (of initial area) elevation = 1524.000 (Ft. ) Difference in elevation = 131. 000 (Ft. ) Slope = 0 .21301 s (percent) = 21.30 TC = k(0 .530) * L (length'3) / (elevation change) ] '0.2 Initial area time of concentration = 9.422 min. Rainfall intensity = 2 .383 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.825 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 8. 846 (CFS) Total initial stream area = 4.500 (Ac.) Pervious area fraction = 1.000 Q10 = 8 . 8 cfs Enters project site @ project boundary ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 42 .200 to Point/Station 42.300 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** I2 Top of natural channel elevation = 1524.000 (Ft. ) End of natural channel elevation = 1494.000 (Ft. ) Length of natural channel = 515.000 (Ft.) Estimated mean flow rate at midpoint of channel = 15.481 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) A.352) (slope"0.5) Velocity using mean channel flow = 6.75 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0. 0583 Corrected/adjusted channel slope = 0 .0583 Travel time = 1.27 min. TC = 10.69 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.821 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .243 (In/Hr) for a 10. 0 year storm Subarea runoff = 12 .422 (CFS) for 6.750 (Ac. ) Total runoff = 21.268 (CFS) Total area = 11.250 (Ac.) 53 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 42 .300 to Point/Station 42 .400 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** I3 Top of natural channel elevation = 1494.000 (Ft.) End of natural channel elevation = 1330.000 (Ft.) Length of natural channel = 800.000 (Ft.) Estimated mean flow rate at midpoint of channel = 25.522 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (gA.33) (slopeA .492) Velocity using mean channel flow = 6.52 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0 .2050 Corrected/adjusted channel slope = 0.1620 Travel time = 2 .05 min. TC = 12 .74 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.814 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1. 000; Impervious fraction = 0.000 Rainfall intensity = 2.062 (In/Hr) for a 10.0 year storm Subarea runoff = 7.556 (CFS) for 4.500 (Ac. ) Total runoff = 28.824 (CFS) Total area = 15.750 (Ac.) Q10 = 28 . 8 cfs Discharges to San Jacinto River ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 43.100 to Point/Station 43.200 **** INITIAL AREA EVALUATION **** J Initial area flow distance = 930.000 (Ft. ) Top (of initial area) elevation = 1550.000 (Ft. ) Bottom (of initial area) elevation = 1330.000 (Ft.) Difference in elevation = 220 . 000 (Ft. ) Slope = 0.23656 s (percent) = 23 .66 TC = k(0.530) * [ (length'3) / (elevation change) ] A0.2 Initial area time of concentration = 10 . 886 min. Rainfall intensity = 2.223 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1. 000; Impervious fraction = 0 .000 Initial subarea runoff = 6.655 (CFS) Total initial stream area = 3.650 (Ac.) Pervious area fraction = 1.000 } Qlo = 6 .7 cfs Discharges to San Jacinto River 54 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 44.100 to Point/Station 44 .200 **** INITIAL AREA EVALUATION **** R1 Initial area flow distance = 870 .000 (Ft. ) Top (of initial area) elevation = 1655.000 (Ft.) Bottom (of initial area) elevation = 1420 . 000 (Ft. ) Difference in elevation = 235 .000 (Ft. ) Slope = 0.27011 s (percent) = 27.01 TC = k(0.530) * [ (length'3) / (elevation change) ] '0.2 Initial area time of concentration = 10 .322 min. Rainfall intensity = 2.281 (In/Hr) for a 10.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.822 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Initial subarea runoff = 6.842 (CFS) Total initial stream area = 3.650 (Ac. ) Pervious area fraction = 1.000 41.0 = 6 . 8 cfs Discharges to San Jacinto River ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 44.200 to Point/Station 44.300 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** K2 Top of natural channel elevation = 1420 .000 (Ft.) End of natural channel elevation = 1330 .000 (Ft.) Length of natural channel = 420.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 10.732 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (gA.33) (slopeA.492) Velocity using mean channel flow = 4.95 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.2143 Corrected/adjusted channel slope = 0.1657 Travel time = 1.41 min. TC = 11.74 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.817 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 2 .145 (In/Hr) for a 10.0 year storm Subarea runoff = 7.274 (CFS) for 4.150 (Ac.) Total runoff = 14.116 (CFS) Total area = 7. 800 (Ac.) 1 Q10 = 14. 1 cfs Discharges to San Jacinto River 55 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 44.100 to Point/Station 45.000 **** INITIAL AREA EVALUATION **** Ll Initial area flow distance = 980.000 (Ft. ) Top (of initial area) elevation = 1655 .000 (Ft.) Bottom (of initial area) elevation = 1400.000 (Ft. ) Difference in elevation = 255.000 (Ft. ) Slope = 0.26020 s (percent) = 26.02 TC = k(0.530) * [ (length^3) / (elevation change) ] '0.2 Initial area time of concentration = 10.907 min. Rainfall intensity = 2 .221 (In/Hr) for a 10 .0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.820 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 10.382 (CFS) Total initial stream area = 5.700 (Ac.) Pervious area fraction = 1.000 410 = 10 .4 cfs Enters project site @ project boundary i 56 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 45.000 to Point/Station 45.100 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** L2 Top of natural channel elevation = 1400.000 (Ft. ) End of natural channel elevation = 1330.000 (Ft. ) Length of natural channel = 285.000 (Ft.) Estimated mean flow rate at midpoint of channel = 12 .750 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (gA.33) (slopeA.492) Velocity using mean channel flow = 5.43 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.2456 Corrected/adjusted channel slope = 0.1782 Travel time = 0.87 min. TC = 11.76 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.817 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 86. 00 Pervious area fraction = 1.000; Impervious fraction = 0 . 000 Rainfall intensity = 2 .141 (In/Hr) for a 10.0 year storm Subarea runoff = 4.548 (CFS) for 2 .600 (Ac.) Total runoff = 14.930 (CFS) Total area = 8.300 (Ac. ) End of computations, total study area = 222.35 (Ac. ) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = 0.978 Area averaged RI index number = 85 .6 410 = 14 . 9 cfs Discharges to San Jacinto River 100 YEAR STORM 58 Riverside County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989 - 1997 Version 5.0 Rational Hydrology Study Date: 05/22/02 File:XX496.out ------------------------------------------------------------------------- HYDROLOGY CALCULATIONS - EXISTING CONDITION - 100 YEAR STORM TENTATIVE TRACT NO. 30496 - CITY OF LAKE ELSINORE ENGINEER: CHRISTINE -- ----------------------- --- ---------------------------------------------- BV ENGINEERING, One Corporate Park, Irvine, CA - SIN 705 ------------------------------------------------------------------------ Rational Method Hydrology Program based on Riverside County Flood Control & Water Conservation District 1978 hydrology manual Storm event (year) = 100.00 Antecedent Moisture Condition = 2 Standard intensity-duration curves data (Plate D-4.1) For the [ Elsinore-Wildomar ] area used. 10 year storm 10 minute intensity = 2 .320 (In/Hr) 10 year storm 60 minute intensity = 0 .980 (In/Hr) 100 year storm 10 minute intensity = 3 .540 (In/Hr) 100 year storm 60 minute intensity = 1.500 (In/Hr) Storm event year = 100.0 Calculated rainfall intensity data: 1 hour intensity = 1.500 (In/Hr) Slope of intensity duration curve = 0.4800 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 20.000 **** INITIAL AREA EVALUATION **** Al Initial area flow distance = 920.000 (Ft.) Top (of initial area) elevation = 1741.000 (Ft.) Bottom (of initial area) elevation = 1486.500 (Ft. ) Difference in elevation = 254.500 (Ft. ) Slope = 0.27663 s (percent)= 27 .66 TC = k(0 .530) * [ (length^3) / (elevation change) ] '0.2 Initial area time of concentration = 10.505 min. Rainfall intensity = 3 .462 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.847 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 17.152 (CFS) Total initial stream area = 5 .850 (Ac.) Pervious area fraction = 1.000 59 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 21.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1486.500 (Ft. ) Downstream point/station elevation = 1482.000 (Ft.) Pipe length = 170.00 (Ft. ) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 17.152 (CFS) Nearest computed pipe diameter = 18.00 (In.) Calculated individual pipe flow = 17.152 (CFS) Normal flow depth in pipe = 14.81(In. ) Flow top width inside pipe = 13 .74 (In.) Critical depth could not be calculated. Pipe flow velocity = 11.02 (Ft/s) Travel time through pipe = 0.26 min. Time of concentration (TC) = 10.76 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21.000 to Point/Station 21.000 **** SUBAREA FLOW ADDITION **** A2 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.846 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0. 000 Time of concentration = 10.76 min. Rainfall intensity = 3 .422 (In/Hr) for a 100. 0 year storm Subarea runoff = 10.571 (CFS) for 3.650 (Ac. ) Total runoff = 27.723 (CFS) Total area = 9.500 (Ac.) 60 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21.000 to Point/Station 22 .000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** A3 Top of natural channel elevation = 1482 .000 (Ft.) End of natural channel elevation = 1466.200 (Ft.) Length of natural channel = 360.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 31.152 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) '.352) (slope"0.5) Velocity using mean channel flow = 7.09 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0439 Corrected/adjusted channel slope = 0.0439 Travel time = 0.85 min. TC = 11.61 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.844 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .300 (In/Hr) for a 100.0 year storm Subarea runoff = 6.549 (CFS) for 2 .350 (Ac.) Total runoff = 34 .272 (CFS) Total area = 11.850 (Ac. ) 61 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 22.000 to Point/Station 23 .000 **** IMPROVED CHANNEL TRAVEL TIME **** A4 Upstream point elevation = 1466.200 (Ft. ) Downstream point elevation = 1451.000 (Ft.) Channel length thru subarea = 585.000 (Ft.) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 55.529 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 3.000 (Ft. ) Flow(q) thru subarea = 55.529(CFS) Depth of flow = 2.069 (Ft. ) , Average velocity = 12.966 (Ft/s) Channel flow top width = 4.139(Ft.) Flow Velocity = 12.97 (Ft/s) Travel time = 0.75 min. Time of concentration = 12 .36 min. Sub-Channel No. 1 Critical depth = 2 .859 (Ft. ) ' Critical flow top width = 5.719 (Ft.) ' Critical flow velocity= 6.792 (Ft/s) ' ' Critical flow area = 8 .176 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0. 843 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .202 (In/Hr) for a 100.0 year storm Subarea runoff = 39.673 (CFS) for 14 .700 (Ac.) Total runoff = 73 .945 (CFS) Total area = 26.550 (Ac. ) 62 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 23.000 to Point/Station 24 .000 **** IMPROVED CHANNEL TRAVEL TIME **** A5 Upstream point elevation = 1451.000 (Ft. ) Downstream point elevation = 1432.300 (Ft. ) Channel length thru subarea = 265.000 (Ft. ) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 77.775 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 2.000 (Ft. ) Flow(q) thru subarea = 77.775 (CFS) Depth of flow = 1.947 (Ft.) , Average velocity = 20.517 (Ft/s) Channel flow top width = 3.894 (Ft.) Flow Velocity = 20.52 (Ft/s) Travel time = 0 .22 min. Time of concentration = 12.58 min. Sub-Channel No. 1 Critical depth = 3 .281 (Ft. ) ' Critical flow top width = 4.000 (Ft.) ' ' ' Critical flow velocity= 8 .523 (Ft/s) ' Critical flow area = 9.125 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.842 i Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3.176 (In/Hr) for a 100.0 year storm Subarea runoff = 7.357 (CFS) for 2 .750 (Ac. ) Total runoff = 81.302 (CFS) Total area = 29.300.(Ac.) Q100 = 81.3 cfs Discharges to a low point 63 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 3.000 to Point/Station 4.000 **** INITIAL AREA EVALUATION **** B1 Initial area flow distance = 990.000 (Ft. ) Top (of initial area) elevation = 1761.000 (Ft. ) Bottom (of initial area) elevation = 1488 .700 (Ft. ) Difference in elevation = 272.300 (Ft. ) Slope = 0.27505 s (percent)= 27.51 TC = k(0.530) *[ (length'3) / (elevation change) ] '0 .2 Initial area time of concentration = 10 .830 min. Rainfall intensity = 3 .412 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.846 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 17.033 (CFS) Total initial stream area = 5.900 (Ac. ) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 4.000 **** SUBAREA FLOW ADDITION **** B2 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.846 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0. 000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 10.83 min. Rainfall intensity = 3 .412 (In/Hr) for a 100.0 year storm Subarea runoff = 14. 867 (CFS) for 5.150 (Ac.) Total runoff = 31.900 (CFS) Total area = 11.050 (Ac. ) 64 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 5.000 **** IMPROVED CHANNEL TRAVEL TIME **** B3 + B4 Upstream point elevation = 1488.700 (Ft.) Downstream point elevation = 1470.400 (Ft. ) Channel length thru subarea = 790.000 (Ft. ) Channel base width = 0.000 (Ft.) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 53 .768 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 3 .000 (Ft.) Flow(q) thru subarea = 53 .768 (CFS) Depth of flow = 2 .089 (Ft.) , Average velocity = 12.320 (Ft/s) Channel flow top width = 4.178 (Ft.) Flow Velocity = 12 .32 (Ft/s) Travel time = 1.07 min. Time of concentration = 11.90 min. Sub-Channel No. 1 Critical depth = 2 .828 (Ft. ) ' Critical flow top width = 5.656 (Ft.) ' ' ' Critical flow velocity= 6.722 (Ft/s) ' ' Critical flow area = 7.998 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.844 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .261 (In/Hr) for a 100.0 year storm Subarea runoff = 41.689 (CFS) for 15 .150 (Ac. ) Total runoff = 73 .589 (CFS) Total area = 26.200.(Ac.) 4100 = 73 .6 cfs Discharges to a low point ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 5.100 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1470.400 (Ft. ) Downstream point/station elevation = 1449. 000 (Ft. ) Pipe length = 85 .00 (Ft.) Manning's N = 0. 013 No. of pipes = 1 Required pipe flow = 73 .589(CFS) Nearest computed pipe diameter = 21.00 (In. ) Calculated individual pipe flow = 73 .589 (CFS) Normal flow depth in pipe = 15.96 (In. ) Flow top width inside pipe = 17.94 (In.) Critical depth could not be calculated. Pipe flow velocity = 37.53 (Ft/s) Travel time through pipe = 0.04 min. Time of concentration (TC) = 11.94 min. 65 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.100 to Point/Station 5.100 **** SUBAREA FLOW ADDITION **** B5 COMMERCIAL subarea type Runoff Coefficient = 0.886 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0 . 000 Decimal fraction soil group C = 1. 000 Decimal fraction soil group D = 0 . 000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0 .900 Time of concentration = 11.94 min. Rainfall intensity = 3.256 (In/Hr) for a 100.0 year storm Subarea runoff = 5.337 (CFS) for 1.850 (Ac. ) Total runoff = 78.927 (CFS) Total area = 28.050 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.100 to Point/Station 5.100 **** SUBAREA FLOW ADDITION **** B7 COMMERCIAL subarea type Runoff Coefficient = 0.886 Decimal fraction soil group A = 0. 000 Decimal fraction soil group B = 0. 000 Decimal fraction soil group C = 1. 000 Decimal fraction soil group D = 0. 000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0 .900 Time of concentration = 11.94 min. Rainfall intensity = 3 .256 (In/Hr) for a 100.0 year storm Subarea runoff = 3 .029 (CFS) for 1.050 (Ac.) Total runoff = 81.956 (CFS) Total area = 29.100 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.100 to Point/Station 5.200 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1449.000 (Ft. ) Downstream point/station elevation = 1447 .000 (Ft. ) Pipe length = 100.00 (Ft.) Manning's N = 0. 013 No. of pipes = 1 Required pipe flow = 81.956(CFS) Nearest computed pipe diameter = 36.00 (In. ) Calculated individual pipe flow = 81.956 (CFS) Normal flow depth in pipe = 25 .92 (In.) Flow top width inside pipe = 32.33 (In.) Critical Depth = 33 .44 (In. ) Pipe flow velocity = 15.03 (Ft/s) Travel time through pipe = 0. 11 min. Time of concentration (TC) = 12 .05 min. 66 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.200 to Point/Station 5.200 **** SUBAREA FLOW ADDITION **** B6 COMMERCIAL subarea type Runoff Coefficient = 0.886 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 12.05 min. Rainfall intensity = 3 .242 (In/Hr) for a 100.0 year storm Subarea runoff = 1.436 (CFS) for 0.500 (Ac. ) Total runoff = 83 .392 (CFS) Total area = 29.600 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.200 to Point/Station 5.200 **** SUBAREA FLOW ADDITION **** B8 COMMERCIAL subarea type Runoff Coefficient = 0 .886 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 12.05 min. Rainfall intensity = 3 .242 (In/Hr) for a 100 .0 year storm Subarea runoff = 1.005 (CFS) for 0.350 (Ac. ) Total runoff = 84 .397 (CFS) Total area = 29.950 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.200 to Point/Station 5.300 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1447.000 (Ft. ) Downstream point/station elevation = 1440.000 (Ft.) Pipe length = 245.00 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 84.397 (CFS) Nearest computed pipe diameter = 33 .00 (In.) Calculated individual pipe flow = 84 .397 (CFS) Normal flow depth in pipe = 25.55 (In.) Flow top width inside pipe = 27.60 (In. ) Critical depth could not be calculated. Pipe flow velocity = 17.12 (Ft/s) Travel time through pipe = 0.24 min. Time of concentration (TC) = 12 .29 min. 67 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.300 to Point/Station 5.300 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 29.950 (Ac. ) Runoff from this stream = 84.397 (CFS) Time of concentration = 12.29 min. Rainfall intensity = 3 .211 (In/Hr) Confluence with Subarea "E" ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 11.000 **** INITIAL AREA EVALUATION **** E Initial area flow distance = 640.000 (Ft.) Top (of initial area) elevation = 1515 .000 (Ft.) Bottom (of initial area) elevation = 1446.500 (Ft.) Difference in elevation = 68.500 (Ft. ) Slope = 0.10703 s (percent) = 10.70 TC = k(0.530) * [ (length"3) / (elevation change) ] "0.2 Initial area time of concentration = 10.986 min. Rainfall intensity = 3 .388 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 .846 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 7.881 (CFS) Total initial stream area = 2 .750 (Ac.) Pervious area fraction = 1. 000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 11.000 to Point/Station 5.300 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1446.500 (Ft. ) Downstream point/station elevation = 1440.000 (Ft. ) Pipe length = 80 .00 (Ft. ) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 7.881 (CFS) Nearest computed pipe diameter = 12 .00 (In.) Calculated individual pipe flow = 7.881 (CFS) Normal flow depth in pipe = 7.95 (In.) Flow top width inside pipe = 11.35 (In. ) Critical depth could not be calculated. Pipe flow velocity = 14.29 (Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 11.08 min. 68 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.300 to Point/Station 5.300 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 2 .750 (Ac. ) Runoff from this stream = 7.881 (CFS) Time of concentration = 11.08 min. Rainfall intensity = 3.375 (In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 84.397 12 .29 3 .211 2 7. 881 11.08 3 .375 Largest stream flow has longer time of concentration Qp = 84 .397 + sum of Qb Ia/Ib 7. 881 * 0.952 = 7.500 Qp = 91.897 Total of 2 streams to confluence: Flow rates before confluence point: 84 .397 7. 881 Area of streams before confluence: 29.950 2 .750 Results of confluence: Total flow rate = 91.897 (CFS) Time of concentration = 12.286 min. Effective stream area after confluence = 32.700 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.300 to Point/Station 11.100 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1440 .000 (Ft. ) Downstream point/station elevation = 1420.000 (Ft.) Pipe length = 80.00 (Ft. ) Manning' s N = 0.013 No. of pipes = 1 Required pipe flow = 91.897 (CFS) Nearest computed pipe diameter = 24.00 (In. ) Calculated individual pipe flow = 91.897 (CFS) Normal flow depth in pipe = 16.43 (In. ) Flow top width inside pipe = 22 .30 (In.) Critical depth could not be calculated. Pipe flow velocity = 40.11(Ft/s) Travel time through pipe = 0.03 min. Time of concentration (TC) = 12 .32 min. QiOo = 91. 9 cfs Discharges to Cottonw000d Creek j 69 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12 .000 to Point/Station 12.100 **** INITIAL AREA EVALUATION **** C Initial area flow distance = 170.000 (Ft.) Top (of initial area) elevation = 1500.000 (Ft. ) Bottom (of initial area) elevation = 1482 .900 (Ft.) Difference in elevation = 17.100 (Ft.) Slope = 0.10059 s (percent)= 10.06 TC = k(0.530) * [ (length"3) / (elevation change) ] A0.2 Initial area time of concentration = 6.546 min. Rainfall intensity = 4.345 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.857 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 1.676 (CFS) Total initial stream area = 0.450 (Ac.) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12 .100 to Point/Station 12 .200 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1482 .900 (Ft. ) Downstream point/station elevation = 1460.000 (Ft.) Pipe length = 190.00 (Ft.) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.676 (CFS) Nearest computed pipe diameter = 6.00 (In. ) Calculated individual pipe flow = 1.676 (CFS) Normal flow depth in pipe = 4.29 (In. ) Flow top width inside pipe = 5.42 (In.) Critical depth could not be calculated. Pipe flow velocity = 11.16 (Ft/s) Travel time through pipe = 0.28 min. Time of concentration (TC) = 6.83 min. 4100 = 1.7 cfs Discharges to Cottonwood Creek 70 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 7.000 **** INITIAL AREA EVALUATION **** D1 Initial area flow distance = 900.000(Ft. ) Top (of initial area) elevation = 1741.000 (Ft.) Bottom (of initial area) elevation = 1478 .200 (Ft. ) Difference in elevation = 262 .800 (Ft. ) Slope = 0.29200 s (percent) = 29.20 TC = k(0 .530) * [ (length~3) / (elevation change) ] A0.2 Initial area time of concentration = 10.301 min. Rainfall intensity = 3 .495 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.847 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 19.101(CFS) Total initial stream area = 6.450 (Ac.) Pervious area fraction = 1.000 4100 = 19 .1 cfs Enters project site @ project boundary 71 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7. 000 to Point/Station 8.000 **** IMPROVED CHANNEL TRAVEL TIME **** D2 Upstream point elevation = 1478.200 (Ft. ) Downstream point elevation = 1448.500 (Ft. ) Channel length thru subarea = 660.000 (Ft.) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1. 000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 22.580 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 2.000 (Ft. ) Flow(q) thru subarea = 22 .580 (CFS) Depth of flow = 1.332 (Ft.) , Average velocity = 12 .722 (Ft/s) Channel flow top width = 2.664 (Ft. ) Flow Velocity = 12 .72 (Ft/s) Travel time = 0.86 min. Time of concentration = 11.17 min. Sub-Channel No. 1 Critical depth = 2 .000 (Ft. ) ' ' Critical flow top width = 4.000 (Ft.) ' Critical flow velocity= 5.645 (Ft/s) ' ' ' Critical flow area = 4. 000 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.845 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3.362 (In/Hr) for a 100.0 year storm Subarea runoff = 6.680 (CFS) for 2.350 (Ac. ) Total runoff = 25.780 (CFS) Total area = B.B00 (Ac. ) 72 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 8.000 to Point/Station 9.000 **** IMPROVED CHANNEL TRAVEL TIME **** D3 + D4 Upstream point elevation = 1448.500 (Ft.) Downstream point elevation = 1440.800 (Ft. ) Channel length thru subarea = 300.000 (Ft. ) Channel base width = 0.000 (Ft.) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Estimated mean flow rate at midpoint of channel = 46.653 (CFS) Manning's 'N' = 0.015 Maximum depth of channel = 2.000 (Ft.) Flow(q) thru subarea = 46.653 (CFS) Depth of flow = 1.943 (Ft. ) , Average velocity = 12.357 (Ft/s) Channel flow top width = 3 .886 (Ft. ) Flow Velocity = 12.36 (Ft/s) Travel time = 0.40 min. Time of concentration = 11.57 min. Sub-Channel No. 1 Critical depth = 2.625 (Ft. ) ' Critical flow top width = 4.000 (Ft. ) ' Critical flow velocity= 7.177 (Ft/s) ' ' ' Critical flow area = 6.500 (Sq.Ft) Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 . 845 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .305 (In/Hr) for a 100.0 year storm Subarea runoff = 39.776 (CFS) for 14.250 (Ac.) Total runoff = 65.557 (CFS) Total area = 23.050 (Ac.) 43.00 = 65 . 6 cfs Discharges to a low point ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.000 to Point/Station 9.100 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1440.800 (Ft. ) Downstream point/station elevation = 1433 .700 (Ft. ) Pipe length = 40.00 (Ft. ) Manning's N = 0 .013 No. of pipes = 1 Required pipe flow = 65 .557 (CFS) Nearest computed pipe diameter = 21.00 (In. ) Calculated individual pipe flow = 65.557 (CFS) Normal flow depth in pipe = 16.88 (In. ) Flow top width inside pipe = 16.69 (In.) Critical depth could not be calculated. Pipe flow velocity = 31.64 (Ft/s) Travel time through pipe = 0.02 min. I Time of concentration (TC) = 11.59 min. 73 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.100 to Point/Station 9.100 **** SUBAREA FLOW ADDITION **** D5 COMMERCIAL subarea type Runoff Coefficient = 0. 886 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil(AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.59 min. Rainfall intensity = 3 .302 (In/Hr) for a 100.0 year storm Subarea runoff = 1.756 (CFS) for 0.600 (Ac. ) Total runoff = 67.312 (CFS) Total area = 23.650 (Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.100 to Point/Station 9.100 **** SUBAREA FLOW ADDITION **** D6 COMMERCIAL subarea type Runoff Coefficient = 0. 886 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.59 min. Rainfall intensity = 3 .302 (In/Hr) for a 100.0 year storm Subarea runoff = 0 .878 (CFS) for 0.300 (Ac. ) Total runoff = 68.190 (CFS) Total area = 23 .950 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.100 to Point/Station 9.200 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1433.700 (Ft. ) Downstream point/station elevation = 1422 .900 (Ft.) Pipe length = 95.00 (Ft. ) Manning's N = 0 .013 No. of pipes = 1 Required pipe flow = 68 .190 (CFS) Nearest computed pipe diameter = 24.00 (In. ) Calculated individual pipe flow = 68.190 (CFS) Normal flow depth in pipe = 17.70 (In. ) Flow top width inside pipe = 21.12 (In.) Critical depth could not be calculated. Pipe flow velocity = 27.45 (Ft/s) Travel time through pipe = 0.06 min. Time of concentration (TC) 11.65 min. 74 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.200 to Point/Station 9.200 **** SUBAREA FLOW ADDITION **** D7 COMMERCIAL subarea type Runoff Coefficient = 0.886 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.65 min. Rainfall intensity = 3 .294 (In/Hr) for a 100.0 year storm Subarea runoff = 1.752 (CFS) for 0.600 (Ac. ) Total runoff = 69.942 (CFS) Total area = 24.550 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.200 to Point/Station 9.200 **** SUBAREA FLOW ADDITION **** D8 COMMERCIAL subarea type Runoff Coefficient = 0.886 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 69.00 Pervious area fraction = 0.100; Impervious fraction = 0.900 Time of concentration = 11.65 min. Rainfall intensity = 3 .294 (In/Hr) for a 100 .0 year storm Subarea runoff = 0.876 (CFS) for 0.300 (Ac. ) Total runoff = 70.818 (CFS) Total area = 24.850 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.200 to Point/Station 9.300 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** Upstream point/station elevation = 1422.900 (Ft.) Downstream point/station elevation = 1422 .000 (Ft. ) Pipe length = 65.00 (Ft. ) Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 70.818 (CFS) Nearest computed pipe diameter = 36.00 (In. ) Calculated individual pipe flow = 70.818 (CFS) Normal flow depth in pipe = 26.77 (In. ) Flow top width inside pipe = 31.44 (In.) Critical Depth = 32.03 (In. ) Pipe flow velocity = 12 .57 (Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 11.74 min. Q100 = 70 .8 cfs Discharges to Cottonwood Creek 75 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 25 .000 to Point/Station 26.000 **** INITIAL AREA EVALUATION **** F1 Initial area flow distance = 795.000 (Ft. ) Top (of initial area) elevation = 1701.000 (Ft. ) Bottom (of initial area) elevation = 1446.000 (Ft. ) Difference in elevation = 255.000 (Ft. ) Slope = 0.32075 s (percent)= 32 .08 TC = k(0.530) * [ (length'3) / (elevation change) ] '0 .2 Initial area time of concentration = 9.620 min. Rainfall intensity = 3.611(In/Hr) for a 100 .0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.849 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 10.884 (CFS) Total initial stream area = 3 .550 (Ac.) Pervious area fraction = 1.000 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 26.000 to Point/Station 27.000 **** IMPROVED CHANNEL TRAVEL TIME **** F2 Upstream point elevation = 1446.000 (Ft. ) Downstream point elevation = 1438 . 000 (Ft.) Channel length thru subarea = 20 .000 (Ft.) Channel base width = 0.000 (Ft. ) Slope or 'Z' of left channel bank = 1.000 Slope or 'Z' of right channel bank = 1.000 Manning's 'N' = 0.015 Maximum depth of channel = 2.000 (Ft. ) Flow(q) thru subarea = 10.884 (CFS) Depth of flow = 0.673 (Ft.) , Average velocity = 24.052 (Ft/s) Channel flow top width = 1.345 (Ft. ) Flow Velocity = 24 . 05 (Ft/s) Travel time = 0. 01 min. Time of concentration = 9.63 min. Sub-Channel No. 1 Critical depth = 1.492 (Ft. ) ' Critical flow top width = 2.984 (Ft.) ' Critical flow velocity= 4 .888 (Ft/s) ' ' Critical flow area = 2 .227 (Sq.Ft) 76 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 27.000 to Point/Station 27.000 **** SUBAREA FLOW ADDITION **** F2 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.849 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 9.63 min. Rainfall intensity = 3 .609(In/Hr) for a 100.0 year storm Subarea runoff = 0.460 (CFS) for 0.150 (Ac. ) Total runoff = 11.344 (CFS) Total area = 3 .700 (Ac. ) 4100 = 11.3 cfs Discharges to a low point ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 30.000 to Point/Station 31.000 **** INITIAL AREA EVALUATION **** G1 Initial area flow distance = 975.000 (Ft.) Top (of initial area) elevation = 1633.600 (Ft. ) Bottom (of initial area) elevation = 1425.000 (Ft. ) Difference in elevation = 208.600 (Ft.) Slope = 0.21395 s (percent) = 21.39 TC = k(0.530) * [ (length^3) / (elevation change) ] '0.2 Initial area time of concentration = 11.319 min. Rainfall intensity = 3 .340 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.845 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Initial subarea runoff = 17.360 (CFS) Total initial stream area = 6.150 (Ac. ) Pervious area fraction = 1.000 77 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 31.000 to Point/Station 32 .000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G2 Top of natural channel elevation = 1425.000 (Ft. ) End of natural channel elevation = 1392 .000 (Ft. ) Length of natural channel = 545.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 29.074 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) ^.352) (slope'0.5) Velocity using mean channel flow = 8.17 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0606 Corrected/adjusted channel slope = 0.0606 Travel time = 1.11 min. TC = 12 .43 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.843 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Rainfall intensity = 3 .193 (In/Hr) for a 100 .0 year storm Subarea runoff = 22.336 (CFS) for 8.300 (Ac. ) Total runoff = 39.696 (CFS) Total area = 14.450 (Ac.) 7s ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 32 .000 to Point/Station 33 .000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G3 Top of natural channel elevation = 1392 .000 (Ft. ) End of natural channel elevation = 1390.000 (Ft.) Length of natural channel = 50 .000 (Ft. ) Estimated mean flow rate at midpoint of channel = 48.830 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) '.352) (slope'0.5) Velocity using mean channel flow = 7.69 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0 .0400 Corrected/adjusted channel slope = 0 .0400 Travel time = 0.11 min. TC = 12.54 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.842 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 I RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3.180 (In/Hr) for a 100.0 year storm Subarea runoff = 17 .816 (CFS) for 6.650 (Ac.) Total runoff = 57.512 (CFS) Total area = 21.100 (Ac.) 79 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 33 .000 to Point/Station 34.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G4 Top of natural channel elevation = 1390.000 (Ft.) End of natural channel elevation = 1365.000 (Ft. ) Length of natural channel = 455.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 63.576 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) ".352) (slope'0.5) Velocity using mean channel flow = 9.73 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0549 Corrected/adjusted channel slope = 0.0549 Travel time = 0 .78 min. TC = 13.32 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.841 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 ' Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .089 (In/Hr) for a 100.0 year storm Subarea runoff = 11.560 (CFS) for 4.450 (Ac.) Total runoff = 69.072 (CFS) Total area = 25.550 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 34.000 to Point/Station 34.000 **** SUBAREA FLOW ADDITION **** G5 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.841 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 13 .32 min. Rainfall intensity = 3 .089 (In/Hr) for a 100.0 year storm Subarea runoff = 27.537 (CFS) for 10 .600 (Ac.) Total runoff = 96.609 (CFS) Total area = 36.150 (Ac. ) 80 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 34.000 to Point/Station 35.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** G6 Top of natural channel elevation = 1365.000 (Ft. ) End of natural channel elevation = 1304.000 (Ft. ) Length of natural channel = 925.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 112 .310 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: velocity(ft/s) _ (7 + 8 (q(English Units) '.352) (slope^0 .5) Velocity using mean channel flow = 12.62 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0659 Corrected/adjusted channel slope = 0.0659 Travel time = 1.22 min. TC = 14.54 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.839 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86. 00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Rainfall intensity = 2 .962 (In/Hr) for a 100.0 year storm Subarea runoff = 29.183 (CFS) for 11.750 (Ac. ) Total runoff = 125.792 (CFS) Total area = 47.900 (Ac. ) 4100 = 125 .8 cfs Discharges to San Jacinto River ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 36.000 to Point/Station 37.000 **** INITIAL AREA EVALUATION **** Hi Initial area flow distance = 835.000 (Ft. ) Top (of initial area) elevation = 1615 .000 (Ft.) Bottom (of initial area) elevation = 1447.700 (Ft. ) Difference in elevation = 167.300 (Ft.) Slope = 0.20036 s (percent) = 20.04 TC = k(0.530) * [ (length"3) / (elevation change) ] '0.2 Initial area time of concentration = 10 .779 min. Rainfall intensity = 3 .419 (In/Hr) for a 100. 0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.846 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1. 000; Impervious fraction = 0.000 Initial subarea runoff = 12 . 878 (CFS) Total initial stream area = 4 .450 (Ac. ) Pervious area fraction = 1. 000 81 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 37.000 to Point/Station 38.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H2 Top of natural channel elevation = 1447 .700 (Ft.) End of natural channel elevation = 1428 .700 (Ft. ) Length of natural channel = 240.000 (Ft.) Estimated mean flow rate at midpoint of channel = 24.959(CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) _ (7 + 8 (q(English Units) '.352) (slope^0.5) Velocity using mean channel flow = 8.95 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0792 Corrected/adjusted channel slope = 0.0792 Travel time = 0.45 min. TC = 11.23 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.845 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .353 (In/Hr) for a 100.0 year storm Subarea runoff = 23 .669 (CFS) for 8.350 (Ac. ) Total runoff = 36.547 (CFS) Total area = 12 .800 (Ac. ) 82 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 38.000 to Point/Station 39.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H3 Top of natural channel elevation = 1428 .700 (Ft. ) End of natural channel elevation = 1405 .000 (Ft. ) Length of natural channel = 290.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 46.897 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) ^.352) (slope"0.5) Velocity using mean channel flow = 10.86 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0817 Corrected/adjusted channel slope = 0.0817 Travel time = 0.44 min. TC = 11.67 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.844 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0. 000 Rainfall intensity = 3 .292 (In/Hr) for a 100.0 year storm Subarea runoff = 20.148 (CFS) for 7.250 (Ac. ) Total runoff = 56.696(CFS) Total area = 20.050 (Ac.) 83 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 39. 000 to Point/Station 40.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H4 Top of natural channel elevation = 1405.000 (Ft. ) End of natural channel elevation = 1325.000 (Ft. ) Length of natural channel = 760.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 68.855 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (gA.33) (slopeA.492) Velocity using mean channel flow = 7.26 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.1053 Corrected/adjusted channel slope = 0 .1037 Travel time = 1.74 min. TC = 13 .42 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0. 841 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .079(In/Hr) for a 100.0 year storm Subarea runoff = 22.259 (CFS) for 8.600 (Ac. ) Total runoff = 78.955 (CFS) Total area = 28.650 (Ac. ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 40. 000 to Point/Station 40.000 **** SUBAREA FLOW ADDITION **** H5 UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.841 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0: 000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Time of concentration = 13 .42 min. Rainfall intensity = 3 .079 (In/Hr) for a 100. 0 year storm Subarea runoff = 16.694 (CFS.) for 6.450 (Ac. ) Total runoff = 95.649(CFS) Total area = 35.100 (Ac.) ) 84 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 40.000 to Point/Station 41.000 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** H6 Top of natural channel elevation = 1325 .000 (Ft.) End of natural channel elevation = 1310. 000 (Ft.) Length of natural channel = 205.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 101.304 (CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + 8 (q(English Units) ' .352) (slope'0.5) Velocity using mean channel flow = 12.89 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.0732 Corrected/adjusted channel slope = 0.0732 Travel time = 0.27 min. TC = 13 .68 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.840 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1. 000; Impervious fraction = 0 .000 Rainfall intensity = 3 .050 (In/Hr) for a 100.0 year storm Subarea runoff = 10.634 (CFS) for 4.150 (Ac. ) Total runoff = 106.283 (CFS) Total area = 39.250 (Ac.) 4100 = 106 . 3 cfs Discharges to San Jacinto River 85 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2 .000 **** INITIAL AREA EVALUATION **** B3 Initial area flow distance = 700 .000 (Ft.) Top (of initial area) elevation = 1607.100 (Ft. ) Bottom (of initial area) elevation = 1494.600 (Ft. ) Difference in elevation = 112 .500 (Ft. ) Slope = 0.16071 s (percent) = 16.07 TC = k(0.530) * [ (length"3) / (elevation change) ] '0.2 Initial area time of concentration = 10.498 min. Rainfall intensity = 3.463 (In/Hr) for a 100 .0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.847 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0. 000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 10 .852 (CFS) Total initial stream area = 3 .700 (Ac.) Pervious area fraction = 1.000 Q100 = 10 . 9 cfs Enters project site @ project boundary ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 6.100 **** INITIAL AREA EVALUATION **** D3 Initial area flow distance = 865 .000 (Ft.) Top (of initial area) elevation = 1741.000 (Ft. ) Bottom (of initial area) elevation = 1480.000 (Ft. ) Difference in elevation = 261.000 (Ft.) Slope = 0.30173 s (percent) = 30.17 TC = k(0.530) * [ (length�3) / (elevation change) 1 ^0.2 Initial area time of concentration = 10.073 min. Rainfall intensity = 3.533 (In/Hr) for a 100 .0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.848 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1. 000; Impervious fraction = 0.000 Initial subarea runoff = 14 .976 (CFS) Total initial stream area = 5.000 (Ac.) Pervious area fraction = 1.000 Q100 = 15. 0 cfs Enters project site @ project boundary I 86 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 42.100 to Point/Station 42.200 **** INITIAL AREA EVALUATION **** I1 Initial area flow distance = 615.000 (Ft. ) Top (of initial area) elevation = 1655.000 (Ft. ) Bottom (of initial area) elevation = 1524.000 (Ft. ) Difference in elevation = 131. 000 (Ft.) Slope = 0.21301 s (percent) = 21.30 TC = k(0.530) * [ (length"3) / (elevation change) ] "0.2 Initial area time of concentration = 9.422 min. Rainfall intensity = 3 .648 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0. 849 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0 .000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 13.943 (CFS) Total initial stream area = 4.500 (Ac.) Pervious area fraction = 1. 000 43.00 = 13 . 9 cfs Enters project site @ project boundary ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 42.200 to Point/Station 42.300 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** I2 Top of natural channel elevation = 1524.000 (Ft. ) End of natural channel elevation = 1494.000 (Ft.) Length of natural channel = 515.000 (Ft.) Estimated mean flow rate at midpoint of channel = 24 .401(CFS) Natural valley channel type used L.A. County flood control district formula for channel velocity: Velocity(ft/s) = (7 + e (q(English Units) A.352) (slope"0.5) Velocity using mean channel flow = 7.63 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0. 0583 Corrected/adjusted channel slope = 0.0583 Travel time = 1.12 min. TC = 10.55 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.847 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 . 000 Rainfall intensity = 3 .456 (In/Hr) for a 100.0 year storm Subarea runoff = 19.752 (CFS) for 6.750 (Ac. ) Total runoff = 33 .695 (CFS) Total area = 11.250 (Ac.) 87 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 42.300 to Point/Station 42 .400 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** I3 Top of natural channel elevation = 1494.000 (Ft. ) End of natural channel elevation = 1330.000 (Ft. ) Length of natural channel = 800.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 40.434 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (q~.33) (slope'.492) Velocity using mean channel flow = 7.59 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.2050 Corrected/adjusted channel slope = 0.1620 Travel time = 1.76 min. TC = 12.30 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.843 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3.209 (In/Hr) for a 100.0 year ,storm Subarea runoff = 12 .174 (CFS) for 4.500 (Ac. ) Total runoff = 45 .868 (CFS) Total area = 15.750 (Ac. ) 4ioo = 45 .9 cfs Discharges to San Jacinto River ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 43.100 to Point/Station 43 .200 **** INITIAL AREA EVALUATION **** J Initial area flow distance = 930.000 (Ft. ) Top (of initial area) elevation = 1550.000 (Ft. ) Bottom (of initial area) elevation = 1330.000 (Ft. ) Difference in elevation = 220. 000 (Ft.) Slope = 0.23656 s (percent) = 23.66 TC = k(0 .530) * [ (length"3) / (elevation change) ] '0.2 Initial area time of concentration = 10.886 min. Rainfall intensity = 3 .403 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.846 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86. 00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Initial subarea runoff = 10.510 (CFS) Total initial stream area = 3.650 (Ac. ) Pervious area fraction = 1.000 4100 = 10 .5 cfs Discharges to San Jacinto River I 88 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 44.100 to Point/Station 44.200 **** INITIAL AREA EVALUATION **** K1 Initial area flow distance = 870.000 (Ft.) Top (of initial area) elevation = 1655.000 (Ft. ) Bottom (of initial area) elevation = 1420.000 (Ft. ) Difference in elevation = 235.000 (Ft.) Slope = 0.27011 s (percent) = 27.01 TC = k(0.530) * [ (length'3) / (elevation change) 1 '0.2 Initial area time of concentration = 10.322 min. Rainfall intensity = 3 .491 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.847 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Initial subarea runoff = 10.798 (CFS) Total initial stream area = 3 .650 (Ac. ) Pervious area fraction = 1.000 4ioo = 10 . 8 cfs Discharges to San Jacinto River ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 44.200 to Point/Station 44 .300 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** K2 i Top of natural channel elevation = 1420.000 (Ft. ) End of natural channel elevation = 1330.000 (Ft. ) Length of natural channel = 420.000 (Ft.) Estimated mean flow rate at midpoint of channel = 16.936 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (q'.33) (slope'.492) Velocity using mean channel flow = 5.76 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.2143 Corrected/adjusted channel slope = 0.1657 Travel time = 1.22 min. TC = 11.54 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0 .845 Decimal fraction soil group A = 0 .000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0 .000 Rainfall intensity = 3 .310 (In/Hr) for a 100.0 year storm Subarea runoff = 11.601 (CFS) for 4.150 (Ac. ) Total runoff = 22 .398 (CFS) Total area = 7. 800 (Ac. ) I Qioo = 14 .1 cfs Discharges to San Jacinto River 89 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 44.100 to Point/Station 45.000 **** INITIAL AREA EVALUATION **** Ll Initial area flow distance = 980.000 (Ft. ) Top (of initial area) elevation = 1655.000 (Ft. ) Bottom (of initial area) elevation = 1400.000 (Ft. ) Difference in elevation = 255.000 (Ft.) Slope = 0.26020 s (percent)= 26.02 TC = k(0.530) * [ (length"3) / (elevation change) ] ^0.2 Initial area time of concentration = 10.907 min. Rainfall intensity = 3.400 (In/Hr) for a 100.0 year storm UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.846 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 RI index for soil (AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction= 0.000 Initial subarea runoff = 16.396 (CFS) Total initial stream area = 5.700 (Ac. ) Pervious area fraction = 1.000 4100 = 16 .4 cfs Enters project site @ project boundary 90 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 45.000 to Point/Station 45.100 **** NATURAL CHANNEL TIME + SUBAREA FLOW ADDITION **** L2 Top of natural channel elevation = 1400. 000 (Ft. ) End of natural channel elevation = 1330.000 (Ft.) Length of natural channel = 285.000 (Ft. ) Estimated mean flow rate at midpoint of channel = 20.136 (CFS) Natural mountain channel type used L.A. County flood control district formula for channel velocity: Velocity = 5.48 (gA.33) (slopeA.492) Velocity using mean channel flow = 6.32 (Ft/s) Correction to map slope used on extremely rugged channels with drops and waterfalls (Plate D-6.2) Normal channel slope = 0.2456 Corrected/adjusted channel slope = 0.1782 Travel time = 0.75 min. TC = 11.66 min. Adding area flow to channel UNDEVELOPED (poor cover) subarea Runoff Coefficient = 0.844 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0 .000 RI index for soil(AMC 2) = 86.00 Pervious area fraction = 1.000; Impervious fraction = 0.000 Rainfall intensity = 3 .293 (In/Hr) for a 100.0 year storm Subarea runoff = 7.229 (CFS) for 2.600 (Ac.) Total runoff = 23 .626 (CFS) Total area = 8.300 (Ac. ) End of computations, total study area = 222 .35 (Ac. ) The following figures may be used for a unit hydrograph study of the same area. Area averaged pervious area fraction(Ap) = 0.978 Area averaged RI index number = 85.6 43.00 = 23 . 6 cfs Discharges to San Jacinto River HYDROLOGY MAP MINE El��' �� i► 111019111I1�1011111 : = :_ �I�I�I�I�I� - = - �. 111111111910111�IIlall� : : � - o IM