HomeMy WebLinkAboutRAILROAD CANYON RD 25341 (4)CITY OF ^*Nt*,ti
LADE LS I HOIJE
DREAM EXTREME,M
PERMIT NO: 10- 00001088
BUILDING &SAFETY
OF-
PERMIT
JOB ADDRESS . . . . . : 25341 RAILROAD CANYON RD
TENANT NBR, NAME . . . JOE'S HARDWARE
DESCRIPTION OF WORK . : MISCELLANIOUS
OWNER CONTRACTOR
CHMP 1 OWNER
130 South Main Street
DATE: 10/19/10
A.P.# . . . . . . 363- 210 -003 5 SQUARE FOOTAGE 0
OCCUPANCY . . . . GARAGE SQ FT 0
CONSTRUCTION . . . FIRE SPRNKLR .
VALUATION . . . . 15,000 ZONE . . . . . . R -1
BUILDING PERMIT
QTY UNIT CHG ITEM CHARGE
BASE FEE 63.00
13.00 X 12.5000 VALUATION 162.50
FEE SUMMARY CHARGES PAID DUE
PERMIT FEES
BUILDING PERMIT 225.50 00 225.50
OTHER FEES
PROF.DEV.FEE 1 TRADE 5.00 00 5.00
PLAN RETENTION FEE 5.20 5.20 00
SEISMIC OTHER 50 50 00
GREEN BUILDING FEE 1 1.00 00 1.00
PLAN CHECK FEES 169.13 169.13 00
TOTAL 406.33 174.83 231.50
SPECIAL NOTES & CONDITIONS
Install interior shelving up to 9' high
per supplied engineering - RKC
City of Lake Elsinore
Building Safety Division
Post in conspicuous place
on the job
You must furnish PERMIT NUMBER and the
JOB ADDRESS for each respective inspection:
Approved plans must be on job
at all times:
Please read and initial
1. I am Licensed under the provisions of Business and professional Code Section 7000 et seq. and
my license is in full force.
owner of the property,or my employees w /wages as their sole compensation will do the work
and the structure is not intended or offered for sale.
3. I,as owner of the property,am exclusively contracting with licensed contractors to construct the
project.
4.1 have a certificate of consent to selfinsme or a certificate of Workers Compensation Insurance
J 7 /
or a certified copy thereof.
knot employ any person in any manner so as to become subject to Workers Compensation
Laws in the performance of the work for which this permit is issued.
Note: If you should become subject to Workers Compensation after making this certification,
you must forthwith comply with such provisions or this permit shall be deemed revoked. Code Approvals Date Inspector
ELO1 Temporary Electric Service
PLOT Soil Pipe Underground
EL02 Electric Conduit Underground
BPOI Footings
BP02 Steel Reinforcement
BP03 lGrout
BP04 Slab Grade
PLOT Underground Water Pipe
SSOI Rough Septic System
SWOI On Site Sewer
BP05 Floor Joists
BP06 Floor Sheathing
BP07 lRoafFraming
BP08 Roof Sheathing
BP09 Shear Wall & Re -Lath
PL03 Rough Plumbing
EL03 Rough Electric Conduit
EL04 Rough Electric Wiring
EL05 Rough Electric/ T -Bar
ME01 Rough Mechanical
ME02 Ducts, ventilating
PLO4 Rough Gas Pipe / Test
PL02 Roof Drains
BPI O Framing & Flashing
BP12 insulation
BP13 Drywall Nailing
BPI 1 Lathing & Siding
PL99 Final Plumbing
EL99 Final Electrical
NM99 Final Mechanical
BP99 Final Building
I
Code Pool & Spa Approvals Date Inspector OTHER DIVISION RELEASES
Deputy Inspector Department Approval required prior to the
building being released by the CityP001PoolSteelRein. / Forms
P001 Pool Plumbing /Pressure Test
P003 Pre - Gunite Approval Date Inspector
EL06 Rough Pool Electric Planning
Sub List Approval I Landscape
P004 Pool Fencing / Gates / Alarms Finance
P005 Pre - Plaster Approval I fA Engineering
P009 Final Pool / Spa I I I
CITY OF i/
LAKE LSIrIOI E
DREAM EXTREMETM
APPLICATION FOR
BUILDING PERMIT
VALUATION CALCULATIONS
1st FLOOR SF
2nd FLOOR
3rd FLOOR
GARAGE
STORAGE
DECK & BALCONIES
SF
SF
SF
SF
SF
OTHER: SF
VALUATION:
FEES
BUILDING PERMIT
PLAN CHECK
PLAN REVIEW
SEISMIC
PLAN RETENTION
FIRE SERVICES
t
So
Irtify that I have read this application and state that the
above information is correct. I agree to comply with all city
and county ordinances and state laws relating to building
construction, and hereby authorize representatives of this
city to enter upon the above - mentioned property for insp-
tion purposes.
9--4, ll2f IU
Si atu a of Applicant or Agent Date
Agent for [] contractor Vowner
Agents Name
Agents Address
130 South Main Street
APPLICATIONN
C) fs
APPLICATI R2 VED
DATE
AP If
3--21D- do3
5TY
8LOUKIPAGE Ev T PAR EL
O
NAME
D //
J
i -e. r 0
N
C
O
N
I hereby affirm that 1 am licensed under provisions of chapter 9 (commencing
with section 7000) of division 3 of the business and professions code,and
my license is in full force and effect.
LICENSE # CITY BUSINESS
AND CLASS TAX #
T
R
NAME
A
C
MAILING
ADDRESS
T CITY STATE /ZIP PHONE
R NTRA T OR'S SIGNATURE 6A i
A
AME LICENSE #
MAILING
ADDRESS
H CITY STATE/ZIP PHONE
NEW OCC GRP. / CONST.
DIVISION: TYPE: ADDITION
ALTERATION NUMBER OF NUMBER OF
STORIES: BEDROOMS: OTHER
p SINGLE FAMILY
APARTMENTS
ZONE:
0 CONDOMINIUME HAZARD YES
AREA? NOTOWNHOMES
COMMERCIAL SPRINKLERS YES
REQUIRED? NOINDUSTRIAL
REPAIR PROPOSED USE OF BLDG:
PRESENT USE OF BLDG: DEMOLISH
JOB DESCRIPTION 14J- 57i/41— .STO A e
h e I U *f i x -r'tti r-e s, 96 " #10 /
Al ' K ce r N S-f, .e
F i 1 LA 5.
Joe's Hardware
Madix Hvpermaxi Gondolas
Location:
25341 Rail Road Canyon Road
Lake Elsinore, CA SG'uy /} •• a' r
L ?. -
Prepared For:'
r plans have been r:.
for ,
n'
s
Joe's Hardware cable codr sc
Ice.
andinc
Fallbrook CA - ing ,
ri.: ebY gram—
Prepared By pproval l y 12 --
ncies.
Peter S. Higgins And Associates of a p ermit based on
Consulting Structural "IEngiif&"nce or gral t nn not b c onstrued 10
30765 Pacific Coast Hf h'W of these PIEu: ypl u ie
Malibu, CA USA 19M4 r approve any vl
i:cn
310) 589 -17 &1 or ca ne I the Pfc-.u.
a 70 V
Peter S. Higgins,cS s shall be valid.
Job Number 9400
September 28, 2010
This Document and the design it contains is copyright by Peter S. Higgins and A4iates. It
is provided as an instrument of service, and shall not be reproduced in any fa n without
the written nermission of Peter S. Hi¢oins and Acmciates- n
S 2842 °'
Notice to Building Departments pJtp 0"1,1Ifthiscalculationissubmittedforbuildingpermitapproval, it shall coma a sh is o
calculations as listed in the table of contents on the next page(s), and shall e a m d+
by all drawings listed in Section 1. All documents shall bear appropriate seal an sig res NEI`'
in ink of a contrasting color with the same Job Number Reference. The cal la 11 be '4Tc _ _e1P/
CITY OF ^*Nt*,ti
LADE LS I HOIJE
DREAM EXTREME,M
PERMIT NO: 10- 00001088
BUILDING &SAFETY
OF-
PERMIT
JOB ADDRESS . . . . . : 25341 RAILROAD CANYON RD
TENANT NBR, NAME . . . JOE'S HARDWARE
DESCRIPTION OF WORK . : MISCELLANIOUS
OWNER CONTRACTOR
CHMP 1 OWNER
130 South Main Street
DATE: 10/19/10
A.P.# . . . . . . 363- 210 -003 5 SQUARE FOOTAGE 0
OCCUPANCY . . . . GARAGE SQ FT 0
CONSTRUCTION . . . FIRE SPRNKLR .
VALUATION . . . . 15,000 ZONE . . . . . . R -1
BUILDING PERMIT
QTY UNIT CHG ITEM CHARGE
BASE FEE 63.00
13.00 X 12.5000 VALUATION 162.50
FEE SUMMARY CHARGES PAID DUE
PERMIT FEES
BUILDING PERMIT 225.50 00 225.50
OTHER FEES
PROF.DEV.FEE 1 TRADE 5.00 00 5.00
PLAN RETENTION FEE 5.20 5.20 00
SEISMIC OTHER 50 50 00
GREEN BUILDING FEE 1 1.00 00 1.00
PLAN CHECK FEES 169.13 169.13 00
TOTAL 406.33 174.83 231.50
SPECIAL NOTES & CONDITIONS
Install interior shelving up to 9' high
per supplied engineering - RKC
City of Lake Elsinore
Building Safety Division
Post in conspicuous place
on the job
You must furnish PERMIT NUMBER and the
JOB ADDRESS for each respective inspection:
Approved plans must be on job
at all times:
Please read and initial
1. I am Licensed under the provisions of Business and professional Code Section 7000 et seq. and
my license is in full force.
owner of the property,or my employees w /wages as their sole compensation will do the work
and the structure is not intended or offered for sale.
3. I,as owner of the property,am exclusively contracting with licensed contractors to construct the
project.
4.1 have a certificate of consent to selfinsme or a certificate of Workers Compensation Insurance
J 7 /
or a certified copy thereof.
knot employ any person in any manner so as to become subject to Workers Compensation
Laws in the performance of the work for which this permit is issued.
Note: If you should become subject to Workers Compensation after making this certification,
you must forthwith comply with such provisions or this permit shall be deemed revoked. Code Approvals Date Inspector
ELO1 Temporary Electric Service
PLOT Soil Pipe Underground
EL02 Electric Conduit Underground
BPOI Footings
BP02 Steel Reinforcement
BP03 lGrout
BP04 Slab Grade
PLOT Underground Water Pipe
SSOI Rough Septic System
SWOI On Site Sewer
BP05 Floor Joists
BP06 Floor Sheathing
BP07 lRoafFraming
BP08 Roof Sheathing
BP09 Shear Wall & Re -Lath
PL03 Rough Plumbing
EL03 Rough Electric Conduit
EL04 Rough Electric Wiring
EL05 Rough Electric/ T -Bar
ME01 Rough Mechanical
ME02 Ducts, ventilating
PLO4 Rough Gas Pipe / Test
PL02 Roof Drains
BPI O Framing & Flashing
BP12 insulation
BP13 Drywall Nailing
BPI 1 Lathing & Siding
PL99 Final Plumbing
EL99 Final Electrical
NM99 Final Mechanical
BP99 Final Building
I
Code Pool & Spa Approvals Date Inspector OTHER DIVISION RELEASES
Deputy Inspector Department Approval required prior to the
building being released by the CityP001PoolSteelRein. / Forms
P001 Pool Plumbing /Pressure Test
P003 Pre - Gunite Approval Date Inspector
EL06 Rough Pool Electric Planning
Sub List Approval I Landscape
P004 Pool Fencing / Gates / Alarms Finance
P005 Pre - Plaster Approval I fA Engineering
P009 Final Pool / Spa I I I
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
Project: Joe's Hardware
September 28, 2010
Table of Contents
Job No. 9400
Sheet ii
ReferenceData ............................................................... ...............................
1.1 Scope of Work and Codes .......................................... ...............................
1.2 Drawings ............................................................... ...............................
1.2.1 By Peter S. Higgins and Associates ....................... ...............................
1.2.2 By Others ....................................................... ...............................
1.3 Loads ................................................................... ...............................
1.3.1 Vertical (Dead plus Live) ................................... ...............................
1.3.1.1 Arms ..................................................... ...............................
1.3.1.2 Hyper Maxi Shelves .................................. ...............................
1.3.2 Seismic .......................................................... ...............................
2 Components and Geometry ................................................ ............................... 2
3 Check Arms ................................................................... ............................... 2
4 Check Hyper Maxi Beams ................................................. ............................... 2
4.1 Design Forces ......................................................... ............................... 3
4.2 Beam Properties ...................................................... ............................... 3
5 Check Posts (Dead plus Live Loads) .................................... ............................... 3
5.1 Gondola Upright ..................................................... ............................... 3
5.1.1 Demands ........................................................ ............................... 3
5.1.2 Capacities ....................................................... ............................... 3
5.1.2.1 Gondola Post ........................................... ............................... 4
5.1.2.1.1 Basic Section, Moment Capacity ............ ............................... 4
5.1.2.1.2 Axial Capacities ................................ ............................... 4
5.1.2.1.2.1 Minor Axis ............................... ............................... 4
5.1.2.1.2.2 Major Axis ............................... ............................... 4I? +' .2.1.3 Combined Stress Check ....................... ............................... 4
Base...................................................... ............................... 5
St•i669Per Malec Post ..................................................... ............................... 5
a5.2.1 j'ands ........................................................ ............................... 5
Properties and Capacities ............................. ............................... 5
31 siiilc :: >.. ..................................................................... ............................... 5
BaseShear ............................................................. ............................... 5
6.1.1 Compute Period ............................................... ............................... 5
6.1.2 One Side Loaded .............................................. ............................... 6
6.1.3 Both Sides Loaded ............................................ ............................... 6
6.2 Transverse Seismic .................................................. ............................... 6
6.2.1 Demands ........................................................ ............................... 6
6.2.2 Capacity Checks .............................................. ............................... 6
6.3 Stability ............ ............................. ..................................................... 7
6.4 Longitudinal Seisnuc ................................................ ............................... 7
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
Project: Joe's Hardware
September 28, 2010
Table of Contents
Job No. 9400
Sheet ii
ReferenceData ............................................................... ...............................
1.1 Scope of Work and Codes .......................................... ...............................
1.2 Drawings ............................................................... ...............................
1.2.1 By Peter S. Higgins and Associates ....................... ...............................
1.2.2 By Others ....................................................... ...............................
1.3 Loads ................................................................... ...............................
1.3.1 Vertical (Dead plus Live) ................................... ...............................
1.3.1.1 Arms ..................................................... ...............................
1.3.1.2 Hyper Maxi Shelves .................................. ...............................
1.3.2 Seismic .......................................................... ...............................
2 Components and Geometry ................................................ ............................... 2
3 Check Arms ................................................................... ............................... 2
4 Check Hyper Maxi Beams ................................................. ............................... 2
4.1 Design Forces ......................................................... ............................... 3
4.2 Beam Properties ...................................................... ............................... 3
5 Check Posts (Dead plus Live Loads) .................................... ............................... 3
5.1 Gondola Upright ..................................................... ............................... 3
5.1.1 Demands ........................................................ ............................... 3
5.1.2 Capacities ....................................................... ............................... 3
5.1.2.1 Gondola Post ........................................... ............................... 4
5.1.2.1.1 Basic Section, Moment Capacity ............ ............................... 4
5.1.2.1.2 Axial Capacities ................................ ............................... 4
5.1.2.1.2.1 Minor Axis ............................... ............................... 4
5.1.2.1.2.2 Major Axis ............................... ............................... 4I? +' .2.1.3 Combined Stress Check ....................... ............................... 4
Base...................................................... ............................... 5
St•i669Per Malec Post ..................................................... ............................... 5
a5.2.1 j'ands ........................................................ ............................... 5
Properties and Capacities ............................. ............................... 5
31 siiilc :: >.. ..................................................................... ............................... 5
BaseShear ............................................................. ............................... 5
6.1.1 Compute Period ............................................... ............................... 5
6.1.2 One Side Loaded .............................................. ............................... 6
6.1.3 Both Sides Loaded ............................................ ............................... 6
6.2 Transverse Seismic .................................................. ............................... 6
6.2.1 Demands ........................................................ ............................... 6
6.2.2 Capacity Checks .............................................. ............................... 6
6.3 Stability ............ ............................. ..................................................... 7
6.4 Longitudinal Seisnuc ................................................ ............................... 7
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
Project: Joe's Hardware Job No. 9400
September 28, 2010 Sheet 1
1 Reference Data
1.1 Scone of Work and Codes
This calculation reviews the installation of storage racks and displays for structural adequacy. The
sealing of drawings is for the structural review of these items only. Other information is not
reviewed, nor approved.
CBC, ASCE /ANSI 7, RMI /ANSI MH16.1, AISI/ANSI 5100, and FEMA 460 are used for design.
1.2 Drawings
1.2.1 By Peter S. Higgins and Associates
SK -1; MX -1, 2
1.2.2 By Others
Source unknown
Fixture Floor Plan Drawing (as received electronically 09 -13 -10
1.3 Loads
1.3.1 Vertical (Dead plus Livel
Design Gondolas for 25 % vertical load reserves (impact or temporary unbalanced condition)
1.3.1.1 Arms
Hand Stack Material
Density = 8 pcf
Design arms for 200 lbs
1.3.1.2 Hyper Maxi Shelves
Loads per level = 0.3 kips
1.3.2 Seismic
IBC 1617.4. VASCE 7 9.14 (Ref 9.14 -25)
V =CSW; CS R
D
V = IERoSW
E
Within the constraints
0.044SDSIf S Cs=
SDI < SDS
R/IF)T 7/1,
Yielding:
0.044SoS1EId <_V =(
RSDI
W: ( S W
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
Project: Joe's Hardware
September 28, 2010
Given:
SDS= (2 /3)SMS
SDI= (2 /3)Sm.
SMs= FaSs
Smi= FvSt
For default soils:
Fa= 1.0; Ss< 2.00
Fv= 1.5; St < 0.60
Results in:
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
R = 6 (Moment Frame)
R = 4 (Braced Frame)
T = Structure Period (sec)
W = Rack +(2 /3)Contents per 1622.3.4.2
IE= 1.5
0.075W < Vmom= 0.150W /T < 0.283W
0.075W < Vbrc= 0.225W /T < 0.425W
T may be determined by any rational method.
2 Components and Geometry
D-hh
D w
D =27in
Dh = 24 in
W = max 48 in
H = max 108 in
3 Check Arms
Design Forces
M:5
ZD
Front
yper Maxi
st Omitted
or Clarity
S
M
min F,e
0.07 in3
2.2 inch kips
Min. 2" x 11 ga arm (S = 0.16 iw) Ample
4 Check Hyper Maxi Beams
Minimum standard beams fitted
Job No. 9400
Sheet 2
Copyright ® by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
Project: Joe's Hardware
September 28, 2010
4.1 Design Forces
M<
L,W S !S M
2)(8) min Fye
6.7 inch kips = 0.15 in3
4.2 Beam Properties
1" 0.75"
Standard
i 0.69" D = 3.56 in O.K.
1$, 0.50" 0 S,t= 0.34 in3
t =16 go I,t= 0.66 in4
0.50"
Job No. 9400
Sheet 3
5 Check Posts (Dead plus Live Loads)
While the drawings show only single sided units, double face units are also reviewed as a future con-
tingency.
5.1 Gondola Upright
5.1.1 Demands
One Side Loaded Both Sides Loaded
P <_yWHD P <_2yHWD
0.6 kips 1.1 kips
0.8 kips factored 1.6 kips factored
M< PD M= 0 inch kips
2
Mtot < 9.6 in kips
13.4 in kips factored
Load from Hyper Maxi Load from Hyper Maxi
0.3 kips 0.6 kips
0.4 kips factored 0.84 kips factored
Ptot< 0.9 kips Pwt< 1.7 kips
1.2 kips factored 2.4 kips factored
5.1.2 Capacities
Second order effects negligible by inspection.
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
J
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
Project. Joe's Hardware Job No. 9400'
September 28, 2010
1 1
Sheet 4
5.1.2.1 Gondola Post
5.1.2.1.1 Basic Section, Moment Ca achy
1.35" As= 0.69 in2
Sx= 0.67 in3
rx= 1.11 in Mxn= 24.1 inch kips
Sy= 0.32 in3 Myn= 11.5 inch kips
b ry= 0.56 in
LON
n. 0.16°
5.1.2.1.2 Axial Capacities
5.1.2.1.2.1 Minor Axis
I /ry= 0 (shear panel)
n= 40 ksi
Pny= 27.6 kips (does not govern - see below)
5.1.2.1.2.2 Major Axis
Use Roark, 7th edition, table 15.1, case 3a.
rt2El Substitution yields:
pa)' =K tz pa' = 18.7 kips
For: This is the Euler load (or Pe).
P /pa = 0
a/1 < 1.0 Fe= 18.7/0.69 = 27.1 ksi
E = 29000 ksi F /Fe = 1.48
k=, I > 0.85 in4 (core section) 18.3 ksi
1 = 102 in (above base shoe) Pn= 12.6 kips
K = 0.795
5.1.2.1.3 Combined Stress Check
P M
Po Ma
0.63 < 1.00 O.K.
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only..
Project: Joe's Hardware
September 28, 2010
5.1.2.2 Base
N
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL; ENGINEERS
5.2 Hyper Maxi Post
5.2.1 Demands
Base Shoe
t = 14ga
Sx= 0.68 in3
p<(
tt of levels)(L)
2
0.3 kips
0.4 kips factored
W,. = 24.5 2
5.2.2 Post Properties and Capacities
Derives lateral stability from gondola. Second order effects negligible.
1.70"
R/ry= 150
A5= 0.30 in2
1 0.50" Sx= 0.19 in3 Fn= 9.48 ksi
rx= 0.71 in
Sy= 0.15 in3 Pa = 2.8k
ry= 0.68 in Ma= 7.2 "k
ksLMya= 5.8
6 Seismic
6.1 Base Shear
Job No. 9400
Sheet 5
6.1.1 Compute Period
Compute period. Conservatively use only gondola loads and ignore rotational degrees of free-
dom. Ref. Roark 7th ed, Table 16.7, cases 3a, 3b.
2n WL3
T' °P 1 .73 ELg
2n WL3
T ° °nd > 3.52 ELg
The periods are "uncoupled ", accordingly the Rayleigh method yields:
z
Tstr°aJ TfoP Tz9ond
Copyright ® by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS -
Project: Joe's Hardware Job No. 9400
September 28, 2010, Sheet 6
6.1.2 One Side Loaded
21t WL3
T 21t (0.3)(102)3 >
0.67 sec7' f., 1.73 T1 1.73 (29000)(0.85)(386)
27t WL3 2n (0.8)(102)'
Tyond >3.52 ELg =T 3.52 (29000)(0.85)(386) >
0.54 Sec
T,,,.,f> 0.542 +0.682 =0.86 sec
V < 0.18W
6.1.3 Both Sides Loaded
Masses doubled, material the same, period is 21/2 the single sided loads, or 1.2 sec
V < 0.13W
6.2 Transverse Seismic
6.2.1 Demands
Gondola With Hyper Maxi
One Side Loaded Both Sides Loaded
P < 0.6 kips P < 1.2 Idps
V gond< 0.11 kips V gond< 0.19 kips
0.06 kipsVtop < 0.04 kips V top <
Vmt< 0.15 kips Vtot< 0.25 kips
M < Md +l M < V oadH /2
dV H/2 mpH
Hto 11.0 +7.4
9.6+5.57i.7 M < 18.4 inch kips
M < 18.8 inch kips
6.2.2 Capacity Checks
One Side Loaded Both Sides Loaded
P M P M
op, omn o1'n omn
0.83 < 1.00 O.K. . 0.88 < 1.00 O.K.
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only.
PETER S. HIGGINS AND ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
Project: Joe's Hardware Job No. 9400
September 28, 2010 Sheet 7
6.3 Stabil ity
One Side Loaded Governs By Inspection
OTM < (VH /2) = 15.1 inch kips (from above)
RM > (PD /2) = (1.0)(12) = 12.0 inch kips
Net OTM < 3.1 inch kips
Uplift < 3.1/11 = 0.3 kips
Use min. 1/4" diam. approved anchors.
Minimum embedment 1.5" into slab. O.K.
6.4 Longitudinal Seismic
Forces resisted by shear panels
Design Forces
V < 0.43W = 0.34 kips per side
Shear per foot of panel < V /2W = 0.04 kips per foot
1/4" Fiberboard
Tested per ASTM E72 to 0.2 klf
OK
Copyright 0 by Peter S. Higgins and Associates. Provided as an instrument of service. Copying by written permission only. -
I L
ORIE
OVERHANG OVERHANG OVERHANG
SAGGED GOODS SAGGED GOODS
3 OF CP
y '--, %? -V%mv r,'; NED
4, SCC170.41 -
4iHtgg
HVAC
101111; PRICTUM EINIFF Af I ROVED
PLUMBING FITTINGS
PLUMBING
ih
BREAKROOM
pr="Rbom SEP 2(&5*om 9 100
DATE JOB UMBER
r
ec-h 0 ris S 8 e-c-- '6 .vs"
LAWN& GARD"--;,,--
LVVA
ELECTRICAL
I Y—^ nave been - ------- ll
Aicablo "ed for theibAWN- hy "Co-
0.
a unicling 0,
3'4"
6- m
V-T
ELECTRICAL
I Y—^ nave been - ------- ll
Aicablo "ed for theibAWN- hy "Co-
0.
a unicling 0,
3'4"
t)rovajl of-Th.M of a 1permit kp_Arf j
FASTENERS & LIGHTING
rffljl or app not ba C'Onstrued to
cu, 01 HOU" PkT c n "A . N"', Eipplicabla
aL;:i"odty to vic:,: r
C, ; --, , " ' o 0 r 6 th,
ml
crrip.q
i I
V, t.
I IN N I
Q v kt-t- BL
I I I I I I I
c. EvsAc-v- FeDm at'L326talk LOAALU ulwmAc
f? I HARDWARE
5* c>r— NT ACCS I CLEANINGuawut0Pee.
Q I I I I I i Al I I I I
TOOLS & HARDWARE
3=9" 9-7 ml LZ
TOOLS PAINT
6- m
V-T
GENERALNOTES
1. This drawing shows typical unit material and geometry. See
Joe's Hardware fixture plan for location within store. See Higgins
Drawings MX -1, 2 for details of the components. All drawings
shall bear appropriate seals and have the same Job Number.
2. DIMENSIONS AND MATERIAL
Dimensions are maxima. Units may be smaller.
Units are <96" high, and usually are exempt from permit.
Material is minimum size.
Heavier components may be substituted.
3.ARRANGEMENT
A unit may have any number of beam /shelf levels if the
above loads per bay and the maximum spacings shown
are not exceeded.
4. ATTACHMENT TO ADJACENT STRUCTURE
Units are designed as free standing. Attachment to existing
buildings or adjacent walls is not necessary unless specifically
shown on the installation drawings.
Maximum Loads:
Hand stack storage
200 Ibs per Shelf
600lbs per side
Hyper -Maxi Extensions
300 Ibs per shelf
Max. 96" Max. 54"
M'
FRONT SIDE
MADIX GONDOLAS -
Ref. MX -1, MX -2
SHOWN WITH OPTIONAL
HYPER -MAXI EXTENSIONS
r• q ° --
a
CEO, 1 L- caATct;; i, ;
r.<c plans have been rs -d for ;. the
Aicable coder anc .ance . is
eby 9MY)(b:O 1 building pe;'i_rz, pending
ov- al by all app-:.,,_.:...
issuance or gra:
r- provai of these pla
permit or approve an;
aaii:ority to vio -io or c
codes shall be valid..
f a permit based on
I not be r anstrued to
Aicn o; 2ti applicable
emit pra•aurr;;; ; Su i is
ei the provisiuiis of auoh
Issue Date:
GENERALNOTES
1. This drawing shows standard details of the gondola product line only. Main structural elements
only are shown. Numerous secondary and non structural components are omitted for clarity.
See engineer approved installation drawings (same Job Number) for components used, special
details, arrangement, dimensions, and site specific information.
2. The installafion drawings govern over this drawing. LINO, this drawing applies solely to fixtures
regulated by Building Code (normally >96" to the top loaded level).
3. MATERIAL
Steel - ASTM A1008 Class HSLA Grade 50 LINO
Bases and arms Class CS Grade 40
Welding Electrodes - AWS E70 -XX (all welds single pass fillet welds designed at 50% stress levels)
4. Concrete Anchors shall be ICC approved types. e.g.
Simpson Strong Tie Strong Bolt ( #1771), Titan ( #2713)
ITW Ramset/Red Head ( #2427)
Powers /Rawl Power Bolt ( #2502), Wedge Bolt ( #2526)
Power Stud ( #2818)
HIM Kwik Bolt TZ ( #1917)
Embedment shall be minimum 6X Bolt Diameter.
Special inspections are not required unless demanded
by the building authority. Contractor shall determine
any inspection requirements prior to anchor installation.
5. Bases shall be anchored in the manner shown in detail 4.
i) Shoe Type: Replace leveling screw with assembly shown. Fasten to slab using one of the
anchor types of note 4. Single sided units shall have an anchor at the base front and post
Double sided units shall have an anchor at the end of each base.
ii) Slip On Type: Slide plate over leveling screw and anchor using one 318" diam. expansion
anchor per note 4. Single sided units shall have an anchor at the base front and post.
Double sided units shall have an anchor at the end of each base.
IQ
5Q
6.5 "x0.5 "x12 ga (0.105 ") Bar 7/16" Diam. Hales
AAA TYPE
4.00" Column
Face Stock
0.38"
N
1.82"
0.63" 12 ga (0.105 ") Bar
7/16" Diam. Holes typ
SLIP ON TYPE 118
LevelingScrew
1L1' —
ELEVATION
0 , • SINGLE
SIDED
PLAN VIEW
DOUBLE
SIDED
BASE SHOE TYPE
BASE ANCHORAGE 4
See Note 4. Anchor diameter shall be
1/16" less than minimum hole dimension.
1
18 ga
N
Min.
0.16"
POST 1
Fy= 50ksi)
O
N
ARM 2
t= 0.121 ")
ANCHORAGE PATTERN
Anchors may be on
either side of unit.
Alternate direction of AAA
type from unit to unit
0
TYPICAL ELEVATIONS %1
IJ
101
Ice cYrlr .nr —
114 ". SPot 14
4.22"
oI
1.72" _ _ 1 "_ _ V 1/4" BOLTS of o
11 U 0
1.25"
i,o C
of-- o
ii to
to
BASE SHELF
POST
BASE PL & CONN. 3
12 ga. -
GENERALNOTES
1. This drawing shows standard details of the
Hyper Maxi" shelving components only. These
components attach to Madix Gondolas as
shown. See Higgins DrawinSeegMx -1fordetailsofthegondolas. Engineer
approved installation drawings (same Job No)
for components used, special details, dimensions
general arrangement and other site specific
2. The installation drawings govern over this
drawing. UNO, this drawing applies solely to
fixtures regulated by Building Code (normally
96" to the top loaded level).
3. MATERIALSteel - ASTM A570, Gr. 50
Bolts and Hardware - ASTM A307 (Grade 2)
Welding Electrodes - AWS E70-XX (all welds
single pass fillets designed at 50% of allowable
stress levels)
4. Unless noted otherwise on the installation drawings,
the allowable soil bearing value is 1.0 ksf
1.00"
Upper
BEAMS G16ga
1
in
0
i..\
SIDE
FRONT
TYPICAL ELEVATIONS
SEEINSTALLATION DRAWINGS FOR
LOCATION IN STORE
r
Tack Weld Upright Face T , hCE , - 7 — , - Upright Face_,,
0.09 @ Notches 0.121" PL SGU i I D
0.09 - — D, , —
Iiasa plans have been n. -: r, s6 for ,,.r:.; j:) the
Iicable codF,s e i :.r.;utce. r, l =t. ,n isIF -reby grain,..: a br.iiding r!, ei id ing
proval by ail epj.,.: -. ; ergr cies.
Load Arm
Similar to 2 /MX -1 1.63x12 ga Bent PL
Notched to Clear Arm
STRUT TO UPRIGHT CONN. 6
S2642
SM °331-12
09 V -
1 ' issuance or gra: ': fa per it sei on
pproval of these piz: 'I not b c ns ru d to
o.e mit or approve any c i u :r, plilaole
0.09V, V o. r :.;ice h, t r
at ulty 'io VI(i f or t :,icol the pru"islo I' of su"'i'
ccdas shall be valid Min. 0.50" net throat per hook
Hooks at 1.25" C -C
REAR BEAM CONN. 3 Hook shown for clarity
5 2 hook connector on Standard Beam
0.121" PL - FRONT BEAM CONN. 4
12 ga. PUNCHED AND BENT TO
ENGAGE HOLES IN COLUMN
Issue Date: September 26, 2010