Loading...
HomeMy WebLinkAboutWEKA UPLOAD BID DOCS 20240409 CITY OF LAKE ELSINORE CIP Project No. Z10032 BIDDER'S PROPOSAL THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO. Z10032 Company: W1 P,kk I nb Honorable Mayor, Members of the Council: In accordance with the Notice Inviting Bids pertaining to the receiving of bid proposals by the City of Lake Elsinore for the above titled improvement, the undersigned hereby proposes to furnish all Work to be performed in accordance with the Specifications, Standard Drawings, and the Contract Documents, for the unit price or lump sum set forth in the following schedule: Time of Completion: One Hundred Twenty (120) Working Days from Issuance of Notice to Proceed (NTP) by City to Contractor. 1. BID SCHEDULE A ITEM ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL COST NO. GENERAL ITEMS 1. Mobilization&Demobilization(Not to Exceed 5%of Bid). LS 1 I35,OD0.00 135, 000.0 0 2. Site Maintenance and Best Management Practice LS 1 I2,5 00 .00 )2i 500• 0 0 3. Traffic Control and Public Convenience. LS 1 11 Dt 000•0 0 10 I b 06 •0 d 4. Construction Survey and Re-Establishing Centerline Ties and LS 1 �11 DOD .Ot) 2It 0 0 D . 0 Monuments. SITE DEMOLITION 5. Sawcut,Remove and Dispose of Existing AC Pavement SF 28,460 D . 70 / 7iZ•oO 6. Remove And Dispose of Existing AC Berm LF 505 3.00 / S 1 S.Oa 7. Remove And Dispose of Existing Concrete Headwall w/ Precautionary Measures Taken to Protect the Two LS 1 Existing 36"Fiberglass Pipes In-Place for Reuse 0,90,0L) 1/1 00o. Old 8 &Gutter ut,Remove and Dispose of Existing Concrete Curb LF 355 j 0 0 1,775 0 0 9. Sawcut,Remove and Dispose of Existing Concrete Curb Only LF 75 S.0 0 �j 7,3 .®V 10. Sawcut, Remove and Dispose of Existing Concrete Sidewalk SF 440 1.y0 (p(y® .0(7 11. Sawcut, Remove and Dispose of Existing Concrete u Cross-Gutter&Curb at T-Intersection SF 1,085 Y.Q t7 Y�3/�• D 12. Remove Existing Gabion Wall for Reuse (59 LF). Dispose of ExistingFilter Fabric Material. LS 1 15 . Od Remove And Dispose of Existing T Wide Curb Opening Catch Basin w/ Precautionary Measures Taken to 13. Protect the Existing 15"And 24" Storm Drain Pipes In- EA 1 3iD10.00 3,010,00 Place for Reuse UNCLASSIFIED EXCAVATION,SOIL EXPORT AND GRADING 14. Earthwork Trenching&Stockpiling,Cut-Volume Cy 4850 1"5O 311 525. 00 15. Earthwork Backfill and Roadway Grading, Fill-Volume Cy 2,700 12, 00 321 1a).0 0 16. Off-site Hauling and Disposal of Surplus Soil Material 3(� 55D 0 0As-Needed Cy 2,150 )�,0 fl STREET IMPROVEMENTS 17. Construct 8" Hot Mix Asphalt Dike Per City of Lake Elsinore Std.No.207 LF 616 1q.0 D /it 00.0() 18. Construct 4" AC Paving Over 95% Compacted Native Soils Per Soil Engineer's Recommendations TON 387 210 ,00 '9),77 U•00 19' Construct 6"Thick PCC Residential Driveway Approach u Per Cityof Lake Elsinore Std.No.207,Width Per Plan SF 340 11, 00 Construct 8" Curb Only, Type 8A Per City of Lake 20' Elsinore Std. No.203 LF 56 00 t tf�D J C-7 CITY OF LAKE ELSINORE CIP Project No. Z10032 Construct 6' Wide Concrete Cross Gutter Only Per Section A-A Of City of Lake Elsinore Std. No.209A and 21. Detail 26 On Sheet 2.Construct Weakened Plane Joints SF 1,425 Z 2 .00 31,350.0 0 for Gutter Eve 10' Construct 4'Wide Concrete Ribbon Gutter Per Detail 27 zz. on Sheet 2 SF 2sso ) g,S 0 �f 7,73 D .0 0 Construct 8"Concrete Integral Curb&Gutter Type 8 Per 23. Cityof Lake Elsinore Std No.201 LF 80 '0 0 0 9)000,06 Cold Mill 2" Min. Of Existing AC Pavement, Crack Seal 24. 1/4" Or Larger, And Construct 2" Min. AC Overlay Per SF 1800 Detail on Sheet 2 �.�J 6,3D0.00 25. Construct 3'Long 0"Curb to Full Height Curb Transition LF 6 )DO,Od &190, 0 26 Construct Full Depth AC Paving. Paving To Match SF 415 Existing Pavement Section. 4"Min. 17.D 0 7 D5S.D 0 Construct 4"Thick Concrete Sidewalk Per City of Lake 27' Elsinore Std No.210 SF 575 12,00 900 00 Reinstall Gabion Wall Using Salvaged Materials with 28. New Mirafi 140N Filter Fabric (or Approved Equal) Per LS 1 Plan 59 LF 30. 00 30,p o Traffic Striping & Markers, and Pavement Legends (4" Double Yellow Striping per Caltrans STD. A20A, Detail 29. 22; 4" White Edge of Traveled Way Line per Caltrans LS 1 STD. 2713; Stop Pavement Marking and 12" Limit Line �'L�p 00,D 1� 12,00 0-0 0 Striping) Re-install Salvaged Traffic Signs with Mounting per City 30. STD.No.406A. EA 1 )7 y,p0 175.0 D Install MUTCD Warning Sign W3-1 (CA)With Mounting 31. Per City of Lake Elsinore Stop Sign Installation Detail EA 1 �OD.0 0 q019.00 Std.Dwg.406A Construct 2"AC (4"AC at Storm Drain Trench) Paving L 32. TON 565 Per Detail on Sheet 2 STORM DRAINAGE IMPROVEMENTS 33. Install 15" RCP (D-LOAD Per Profile).Trench And Pipe BeddingPer RCFC&WCD Std. Dwg.No.M815 LF $$ 34. Install 18" RCP (d-load per profile). Trench and pipe Bedding Per RCFC&WCD Std. Dwg. No.M815 LF 570 337.0 0 OV.d 35. Install 24" RCP (D-Load Per Profile). Trench And Pipe BeddingPer RCFC&WCD Std. Dwg. No.M815 LF 373(P •0D �/�� 3r?,Ol� 36. Install 36" RCP (D-Load Per Profile). Trench And Pipe BeddingPer RCFC&WCD Std.Dwg.No.M815 LF 896 L f 25, D i7 �i0 2 90D ,D D 37. Install 48" RCP (D-Load Per Profile). Trench And Pipe BeddingPer RCFC&WCD Std. Dwg.No.M815 LF 723 �2 D 0 379 f 176. 0 38. Construct Concrete Collar Per RCFC&WCD Std. Dwg. No.M803 EA 1 I M0.0 D )i 35(). 0 0 39. Construct Catch Basin No.1 Per RCFC&WCD Std.Dwg. No.CB100-10'C.B. EA 3 C11V()0,00 Jqj U0( 00 40. Construct Catch Basin No. 1 Per RCFC&WCD Std.Dwg. No.CB100-14'C.B. EA 3 15, W0,00 of toa00 41. Construct Catch Basin No.1 Per RCFC&WCD Std.Dwg. No.CB100-21'C.B. EA 4 1�1000.0 D D .00 42. Construct Catch Basin with Grate Inlets Per SPPWC Std. Plan No.301-4-14'C.B. EA 1 I'�[J��,p 0 )`2 500.a 0 43. Construct Catch Basin with Grate Inlets Per SPPWC Std. Plan No.301-4-21'C.B. EA 1 1717oD Ot7 DD �O 44. Construct Manhole No. 2 Per RCFC&WCD Std. Dwg. 15t S�Q,o EA 11 M.H.252 )01s00.00 45. Construct Junction Structure No.2 Per RCFC&WCD Std. (�/DOD �� Dw .JS227 EA 1 I�1000 .� 46. Construct Junction Structure-Pipe to Pipe Per SPPWC EA 4 L4�l4op DO I1t UVd 0() Std. Plan No.332-2 47. Install Precast Jensen 24"X36" Catch Basin Model No. D1243660 With Bolted Down Traffic-Rated Trax Plate Steel Cover,Slip Resistant and Painted Black Per Detail EA 1 �'000.00 q'000.V0 No. 15 On Sheet 13 48. Install Trash Rack(Inclined)Per SPPWC Std.Dwg.361- EA 1 %Oo 00 6t 000 0� 2 49. Install 18" CMP Pipe by Cutting Existing 18" CMP and Welding18"CMP Tee Per Detail 18 on Sheet 13 EA 1 C-8 CITY OF LAKE ELSINORE CIP Project No. Z10032 50. Install 24"CMP Riser Per Detail 13 On Sheet 15(CMP Shall Be Polymer Lined Per ASTM Std.A762,AASHTO EA 1 7i1D00 •D,9 wig-0 O Std.M245, Inside and Out 51. Construct Concrete Headwall and Wingwalls Per Caltrans Std. Plan D90 With Concrete Cutoff Wall-4.0' EA 1 oioDQ.00 'Jd Poo.0 v Deep, 12"Wide w/#4 @ 12"E.W. 7-11 52. Construct Grouted 1/4 Ton Rip-Rap, 2.7 Deep w/Mirafi 1100N Filter Fabric Per Detail No. 16 on Sheet 13(3,100 LS 1 SF) 551 SOD pO 6�'00L� 53. Construct Local Depression No.2 Per RCFC&WCD Std. Dw .No. LD201 and Per Detail on Sheet 3 EA 11 lP,3DD.0 p 10%500•oD 54. Connect RCP Pipe to Catch Basin or Manhole Structure Per Plan.Apply Non-Shrink Grout to Form a Water Tight EA 56 7©D.DDT Seal 55. Install 36"x72" Precast Reinforced Concrete Box Per CALTRANS Std.No.D83A D83B LF 554 )i)0O.D'0 56. Construct Transition Structure for RCB to Pipe per SPPWC Std.Plan No.342-2 EA 1 �71 500.0 0 J?,506• 0 57. Construct Junction Structure to Connect Pipe to RCB per 7�o D® SPPWC Std.Plan No.333-2 EA 4 S'10 D.0 1) ZO 58. Construct manhole Structure per SPPWC Std. Plan No. 323-4 EA 2 A 000,0 o 22,0DD •O L9 59. Install (Modified) Cast-in-Place Reinforced Concrete Junction Structure per CALTRANS Std.Plan No.D91A EA 1 301000.0o w.do 60. Install 24"Flap Gate(Hydrogate or Approved Equal) EA 1 61, Remove interfering Portion of Exist. 30"Water Line and Cap Ends.Install48"Steel Casing per EVMWD Std.Plan LF 20 /)/DD ,DO •7,21000 .DO W-6(Casing Only for Future Use).Cap Ends. 62. Install Bio-Clean Full Capture Filter with 21' Trough System Curb Opening Catch Basin Model No. CIF-Full- EA 4 6,&DD,00 -Ui,c/O0, 019 24. 63. Install Bio-Clean Full Capture Filter with 14' Trough System Curb Opening Catch Basin Model No. CIF-Full- EA 2 y 3D D a 0 �)&O D• 00 24. 64. Install Bio-Clean Full Capture Filter with 10' Trough System Curb Opening Catch Basin Model No. CIF-Full- EA 3 3,7 jq p,0 0 11)y tg o,0 o 24. 65. Install Bio-Clean's Connector Pipe Screen (CPS)Model EA 2 4000.00 No.U4.7x24. TOTAL BID PRICE: TOTAL BID PRICE BASED ON BID SCHEDULE TOTAL OF UNIT PRICES FOR THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT $ 3 ( lac', C79T 00 Total Bid Price in Numbers $ `fAftf_ mi)11,0A on e hW did - � fik lx_h r, l ec *4's Total Bid Price in Written Form o&1t&rs cLPd 2zofidv In case of discrepancy between the written price and the numerical price, the written price shall prevail. Note: Estimated quantities are for the purpose of Bid comparison only; payments will be made on the basis of actual measurement of Work completed, except for lump sum (LS) and final pay (F) quantities. (S) denotes a specialty item. The Bid Price shall include, but not be limited to, sales tax and all other applicable taxes and fees. All work described on the plans and in the specifications and other incidentals necessary to complete the project shall be paid under items above.No additional payments will be allowed. *BID MAY BE REJECTED IF TOTAL IS NOT SHOWN FOR BOTH FIGURES AND WORDS. C-9 CITY OF LAKE ELSINORE CIP Project No. Z10032 The undersigned agrees to enter into and execute a contract, with necessary bonds, at the unit prices set forth herein and in case of default in executing such contract, with necessary bonds, the check or bond accompanying this bid and the money payable thereon shall be forfeited thereby to and remain the property of the City of Lake Elsinore. The above unit prices include all work appurtenant to the various items as outlined in the Specifications and all work or expense required for the satisfactory completion of said items. In case of discrepancies between unit prices and totals, the unit prices shall govern. The undersigned declares that it has carefully examined the Plans, Specifications, and Contract Documents, and has investigated the site of the work and is familiar with the conditions thereon. inC- Contractor Date: 1+1,g [2D?A By: Contractor's State License No.: Class: A Department of Industrial Relations Registration No: 100000 jM- Registration Date: Expiration Date: Q� y 2n2 y Address: JOC (A ) Or-cme P, 5hnA 4 �► V)aV1gr 1vlo CA 9M CA Phone: C��(� �I�� 4�70() FAX: C-10 CITY OF LAKE ELSINORE CIP Project No. Z10032 ACKNOWLEDGMENT OF ADDENDA RECEIVED THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 The Bidder shall acknowledge the receipt of addenda by placing an "X" by each addendum received. Addendum No. 1 Addendum No. 2 Addendum No. 3 Addendum No. 4 If an addendum or addenda have been issued by the City and not noted above as being received by the Bidder, the Bid Proposal may be rejected. �2 . 4yl�1,1-02-q idder's Signature Date a� e a Prin Name Title C-11 CITY OF �� LADE LSI110R-E ,L DREAM EXTREME �M ADDENDUM NUMBER 1 CIP Project No. Z10032 PROJECT: The Avenues Master Plan Storm Drain Improvement Project DATE: March 19, 2024 The attached ADDENDUM is added to the contract documents for the above referenced project. 1. Avenues Storm Drain Delta Revisions: Line A-Alignment and corresponding laterals were revised to accommodate future utility improvements. Please see the detailed descriptions below: • Within Mill Street, Line A moved 4' southerly. • Laterals A-11,A-10,A-9 length increased by 4' • Within Avenue 1 -Line A moved 8' easterly. • Laterals A-8,A-7,A-6 length increased by 8' Laterals A-5, A-4 length decreased by 23' • Lateral A-4.1 length decreased by 8' • Within Park Way Alley, Line A moved 2.5' northerly. • Lateral A-3 length increased by 2'. Lateral A-2 length decreased by 3' • Contractor is responsible to verify all changes from original plan set and specifications. 2. Bidder's Proposal Bid Schedule—Quantity changes due to the above details. 3. Online Q&A Open until: March 26, 2024, at 3:00 P.M. 3. New Bid Opening Date: April 9, 2024, at 2:00 P.M. Prospective bidders are required to acknowledge receipt of this addendum to the contract on the bid proposal form. Failure to acknowledge the addendum and/or include the revised Bidders Proposal will consider your bid as non-responsive. Sincerely, Remon Habib City Engineer 951-674-3124 130 S.MAIN STREET LAKE ELSINORE,CA 92530 WWW.LAKE-ELSINORE.ORG CITY OF LAKE ELSINORE CIP Project No. Z10032 NON-COLLUSION AFFIDAVIT THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 STATE OF CALIFORNIA ) ) SS COUNTY OF 5o,o �Jer�grr)iv�o ) (NAME) q((?,A �I affiant ein first duly sworn, deposes and says: That he or she is "5 CCo of �(' (sole owner, partner or other proper title) �A �r--KA iYl L the party making the foregoing Bid, that the Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the Bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham Bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed Contract; that all statements contained in the Bid are true; and,further,that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company associations, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham Bid. (Public Contract Code Section 7106) Address: 2�J� C�r�svq� GJhnt� Q� , z)vife i 1`t, c)w Bafp7pr'd iVln Telephone No.: (qoq� Print Name: 153J, 1YYII P� Signature: Title:I r C p C�'1� C C� Date: SIGNING INSTRUCTIONS TO THE CONTRACTOR Non-Collusion Affidavit must be accompanied by notary certificates for signature. Note the description of the document on the notary certificate. Attach notary certificate immediately following this naae. If the Bidder fails to properly sign or omits the required signature,the bid will be considered non-responsive and will be rejected. C-12 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document. State of California ) County of San Bernardino ) On April 8,2024 before me, Karl Saputo,Notary Public Date Here Insert Name and Title of the Officer personally appeared Jared Himle Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/#erAlveir authorized capacity(+e&), and that by his/herft-reir signature(*on the instrument the persons, or the entity upon behalf of which the person*acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. KAKI SAPUTO WITNESS my hand and official seal. Notary Public•California g S San Bernardino County _ ` Commission M 2457160 My Comm.E)piresAuS 1,2027 Signature I& Sign ture of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Non-collusion Affidavit Document Date: 4i8i2024 Number of Pages: one Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Jared Himie Signer's Name: *Corporate Officer — Title(s): President ❑Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑General ❑ Partner — ❑ Limited ❑General ❑ Individual ❑Attorney in Fact ❑ Individual ❑Attorney in Fact ❑Trustee ❑Guardian or Conservator ❑Trustee ❑Guardian or Conservator ❑Other: ❑ Other: Signer Is Representing: Weka,Inc. Signer Is Representing: 02016 National Notary Association •www.NationalNotary.org - 1-800-US NOTARY(1-800-876-6827) Item#5907 CITY OF LAKE ELSINORE CIP Project No. Z10032 LIST OF SUBCONTRACTORS THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 The bidder is required to fill in the following blanks in accordance with the provisions of the Subletting and Subcontracting Fair Practices Act (Chapter 2 of Division 5, Title 1 of the Government Code of the State of California) and should familiarize itself with Sections 2-3 of the Standard Specifications. Name Under Which Subcontractor is Licensed: yn 416 i•n f tan of J`ur�/e�Jn y License Number: L5 S/33 / Address of Office, Mill or Shop: I90( 6fAngc t" -42110 R dlurtA a gZ377` Specific Description of Sub-Contract: and Bid Items of Work: 5iwr ve Name Under Which Subcontractor is Licensed: `PGLV"IN ,' ZLa4gr, Inc License Number: Z/$952 _ Address of Office, Mill or Shop: 32 /�C{/►G/?D YG� �'71ySf OA 9ZG 3D Specific Description of Sub-Contract: and Bid Items of Work Ind( Name Under Which Subcontractor is Licensed: ` All2 h411'r 1 D�Gl� • h76. License Number: 513/g'12 Address of Office, Mill or Shop: /17/z I)e Pa-lat a S-t /-C PM3 23� Com,�c 91q 9ZH3 Specific Description of Sub-Contract: and Bid Items of Work: A-,-y'9 'VW a-i4 NHS Name Under Which Subcontractor is Licensed: License Number: Address of Office, Mill or Shop: Specific Description of Sub-Contract: and Bid Items of Work: Subcontractors listed in accordance with the provisions of Section 2-3 must be properly licensed under the laws of the State of California for the type of work that they are to perform. Do not list alternate subcontractors for the same work. C-15 CITY OF LAKE ELSINORE CIP Project No. Z10032 REFERENCES THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 Failure to demonstrate adequate experience may result in rejection of the bid. For all public agency projects with a similar scope of work which you have worked on (or are currently working on) in the past two (2)years, provide the following requir d information: '_ _ 1. Name (Firm/Agency) L CIS f P.G Address Project Title Project Location Type of Work Project Manager Contact Phone Dated Completed Contract Amount 2. Name (Firm/Agency) Address Project Title Project Location Type of Work Project Manager Contact Phone Dated Completed Contract Amount 3. Name (Firm/Agency) Address Project Title Project Location Type of Work Project Manager Contact Phone Dated Completed Contract Amount C-16 CITY OF LAKE ELSINORE CIP Project No. Z10032 List any other projects (private, older than three(3) years, etc.) that may represent qualifying or similar experience: 4. Name Firm/A enc ( g Y) Address Project Title Project Location Type of Work Project Manager Contact Phone Dated Completed Contract Amount 5. Name (Firm/Agency) Address Project Title Project Location Type of Work Project Manager Contact Phone Dated Completed Contract Amount 6. Name (Firm/Agency) Address Project Title Project Location Type of Work Project Manager Contact Phone Dated Completed Contract Amount C-17 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANOTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS curtent Pro eels Chino Preserve Development L.D.King Inc Block 3 Wet Utilities c/o Albert A Webb Associates Corporation Install approx.26471f of 8"-10"VCP Sewer,2,4141f of 24"- 316 Chino,CA 3788 MCCray Street 48"RCP,881f of 24"-30"CSP 14 gauge,3,8491f of 8"-12" 100 working days 5556 N.Mountain Avenue $2,910,149.00 PVC C900-16 CI-200,(3)36"CSP Risers and 2/6/24 Weka Foreman: Upland,CA 91786 Weka Project Manageer:r:TBD Riverside,CA 92506 909-985-0971 Bradley A Sackett appurtenances (951)686-1070 CIP 2017-028 Westside Fire Station Beaumont,CA Land Development Design Sub to Kemcorp Construction Inc City of Beaumont Company,LLC Install approx. S50 E.6th Street 2313 E.Philadelphia St,Ste f f1" 1001f of 4"C ate DIP,120]ices,of 8"CL350 317 Jason Kem(909)947-0639 $531,671.00 DIP,301f of 1"non-potable water services,201f 2"water 5 workingdays jason@kemcorp.net Beaumont,CA 92223 Ontario,CA 91761 services y p.ne Weka Foreman:TBD (951)769-8522 Kevin 1 Richer sand appurtenances Weka Project Manager:Steve Miller (909)930-1466 City of Fontana Court Place Housing Development 8353 Sierra Ave Kes Technologies,Inc Infrastructure Improvements Fontan,CA 92335 Civil Engineering Chris Sorenson Install approx.1,0251f of 64"RCP,6501f of 108" 80 Working days 316 Fontana,CA Construction Manager 1 Venture,Ste 130 $4,863,524.00 RCP,stall f of approx. V 0251f f 6"VCP and appurtenances 1/23/24- Weka Project Manager:Neil Kaufman csorensen@fontanaca.gov 949-339-5331 (909)350-7696 Downtown Sewer Replacement W.O. Elsinore Valle Municipal Water Albert Webb Associates P YReplace approx 3,700Lf of VCP and PVC sewer pipeline G2103 District 3788 McCray Street TE Riverside,CA 92506 $3,079,875.00 ranging msoze from 6"-B"with PVC sewer pipeline, 240 Calendar days 315 Lake Elsinore, 31375 Chaney Street replacement or new construction of(20)5'diameter Weka Foreman: D Lake Elsinore,CA 92530 Keith Barnett 1/18/24- Weka Project Manager:Mark Sisemore (951)614-3146 (951)320. sewer manholes and installatio of a temporary sewer Keith.Barnett@webbassociates.com bypass system. Avallno-Tract 318960ffsite Sewer DR Horton Improvements 2280 Wardlow Circle,Ste 100 MD5 Consulting-Morse Schultz Install temporary Sewer Force Main 1,295Lf with 5 Peters Canyon Rd,Ste 305 protective barrier,Dispose of existing VCP Sewer 1,182Lf, 313 Riverside,CA Corona,CA 92880 Irvine,CA 92606 $2,451,446.00 install approx 1,00SLf of 18"C905 PVC DR25,146Lf of 16" 60 Working days Weka Foreman:TBD Tim Markel Edward J Lenth C905 DR25,47Lf of 8"C900 PVC DR25 Sewer main,8" Weka Project Manager.Steve Miller tmarkel@m 949-251-8821 Plug point of connection to on-site sewer line and 949-988-7158.com-7158appurtenances JBJ Ranch Tract 31818-1-16"DIP Domestic Water Improvements in KB Home KWC Engineers mountain Road in the Elsinore Valley 363101n1and Valley Drive 1880 Compton Ave,Suite 100 312 Municipal Water District Wildomar,CA 92595 Corona,CA 92881 Install approx.16751f of 16"DIP,1781fof C900"'PVC CA Stephanie Maciel Victor Eli. $532,185.00 and appurtenances 35 Working days, Weka Foreman:TBD smaciel@moote.com (949)753-8111 Weka Project Manager:Mark Si semore 949428-1400 victor.elia@kwcengineers.com CIP W W-09 Beaumnnt Mesa Lift Station City of Beaumont Albert A Webb Associates Force Main 550 E.6th Street 3788 WebbMcCra Street Beaumont,CA 92223 Install approx.7,S551f of 16"PVC C-900 Pipe,DRIB and 210 calendar days 311 Beaumont,on Kenyon Potter,Principal Engineer Riverside,CA 92506 $3,269,552.00 appurtenances 1/27/24 Weka Foreman:Jason Martin (760)641-8830 Bradley ASackett Weka Project Manager.Steve Miller kpotter@beaumontca.gov (951)686-1070 City of Riverside City of Riverside Lincoln Aveue Tehite Pipe Replacement, 3750 University Avenue 3750 University Avenue Phase 1 Third Floor Third Floor Constrution of a potable waterline and appurtenances 480 calendar days 309 Riverside,CA Riverside,CA 92501 Riverside,CA 92501 $7,063,762.00 consisting of approximately 3,3001f of 54"mortar lined& Weka Foreman:TBD Breeana M.Best Breeana M.Best coated steel pipe,and 6001f of 12"&8"DIP 8/4/2023 Weka Project Manager:TBD 951-826-5367 951-826-5367 bbest@riversideca.gov bbest@riversidea.gov 1 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNT AND TYPE OF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Temescal Valle Water District Dudek Y Conversion of landscape irrigation meters to non-potable 2023 Non-Potable Conversion Project 22646 Temescal Canyon Rd. ni Third St 1 Yo water including installation of appro.15051f of 4"PVC Temescal Valley,CA Corona,CA 92883 Encinitas,CA 92024 306 y waterline,(6)new water services,connection to the 120 Calendar days Weka Foreman:TBD Jeff Pa Justin T.Scheidel Senior Project $783,063.00 Weka Project Manager:Steve Miller -1 Manager existing non-potable water system,6201f water services, 7/26/23- 1 (951)27J-1414 Barrett Simplex Booster Pump, jeffp@temescalvwd.com (760) 02 p p,including all 'scheidel@dudeudek.com appurtenances. Campus Avenue Sewer Improvements Grove Land Ventures,LLC West Land Group,Inc Ontario,CA 4450 MacArthur Blvd,Suite 100 4150 Coucours Install approx.26221f of 16"Ductile Iron Sewer Pipe with 65 working days 305 New Port Beach,CA 92650 Ontario,CA 90638 $2,633,891.00 CL250 with Protecto 401 Epoxy Lining,1601f of 60"Sewer 6/22/23- Weka Foreman:Aurelio ell Kaufman GregBrooks 949 278-2108 Siara Mackinne Weka Project Manager.Neil Kaufman ( ) Y Manhole,125adety Shaft Ledge gbrooks@redallccom (909)989-9789 x5647 install approx.2435 of 18"Ductile Iron Sewer Pipe Bon View Avenue Sewer Improvements Grove Land Ventures,LLC West Land Group,Inc Pressure CL250 with Protect 401 Ceramic Epoxy Lining, Ontario,CA 4450 MacArthur Blvd,Suite 100 4150 Coucours Class B-3 Bedding,with Polyethylene Encasement,6" 65 working days 303 New Port Beach,CA 92660 Ontario,CA 90638 $5,790,421.00 Suaile Iron Sewer Lateral Pressure CL350 with Protean Weka Project Manager: Neil GregBrooks 949 278-2108 Siara Mackinne 6/22/23- Weka Project Manager:Neil Kaufman ( j y 401 Ceramic Epoxy Lining,Class 3 Bedding with gbrooks@redallccom (909)989-9789 x5647 Polyethylene Encasement,Construct(13)60"Sewer Manholes Elsinore Valley Municipal Water Infrastructure Engineering Corp. Single Check Backfiow Device District 41593 Winchester Rd,Suite 110 Replacement Ph se cement 2 se 4(FY2023) 31315 Chaney Street Temecula,CA 92590 Replacement of existing vaulted below ground 301 Elsinore,CA Lake Elsinore,CA 92530 Anthony Dazzo-Construction $1,036,776.00 cemen devices,in multiple locations 240 calendar days Weka Foreman:Dave Tosta Andrea Kraft Manager Weka Project Manager:Mark Sizemore akraft@evmwd.net adazzo@iecorporation.com (951)674-3146 x8312 (951)396-4980 Desert Water Agency Desert Water Agency Avenida Caballeros Pipeline 1200 South Gene Autry Trail 1200 South Gene Autry Trail Replacement Palm Springs,CA 92264 Palm Springs,CA 92264 300 Palm Springs,CA David Tate-Operation&Engineer David Tate-Operation&Engineer $2,014,407.00 Install approx.1,84711'of 30"Avenida Caballeros Pipeline Weka Foreman:TBD Manager Manager Replacement 150 calendar days Weka Project Manager:TBD dtate@dwa.org dtate@dwa.org 760 323-4971 760 323-4971 Install approx.5,2001f of 36"CL 250 zinc coated DIP water Coachella Valley Water District Michael Baker International main with vbio polyethylene encasement,1,5901f of 36" PO Box 1058 9755 Clairemont Mesa Blvd.,Suite CL250 zinc coated DIP water main with restrained joints FY 2020-2021 NPW Off-Site Pipeline Coachella,CA 92236 100 &volt,polyethylene encasement,4,5601f 18"of CL250 Coachella Valley,CA Jignesh Ladhawala-Senior Engineer, San Diego,CA 92124 zinc coated DIP water main with vbio polyethylene 292 Weka Foreman:Vince Davidson SAN and NPW Daniel Smith-Project Manager $21,057,581.00 encasement,1,38011`18"CL250 zinc coated DIPwater 720 days Weka Project Manager:Mark Sizemore dan.smith@mbakerintl.com main with restrained joints&vbio polyethylene J g jiadhawala@�d.org x2.org (858)614-5000 encasement,20,8501f of 12"CL350 zinc coated DIP water main 760-398-2661 x2789 with vbio polyethylene encasement,12,3101f of CL350 zinc coated DIP water main with restrained joints &vbio polyethylene encasement,and all appurtenances. ACS Consulting,INC PO Box 2252 Canterwood-Tract 27439 Backbone, Temecula,CA 92593 Off-site Sewer,Force offsite and Holland Channel Storm Drain Frank A.Ardga main,and Water.Domestic Water& Install Winchester,CA Facilities BRPLD LLC frank@acsconsultinginc.com(951)757-5178 approx 1,5761f of 18"-60"RCP Storm Drain 281A 3200 Park Center Drive,Suite 1000 $6,001,882.00 Reclaimed Water Pipe,1561f of bollards,bon culverts,baffle wall,basin 110 Working days Weka Sub to Brookfield COCaI Land Costa Mesa,CA 92626 1LC Engineering&Consulting Relocations,Briggs& outlet structure 5/6/2022- Constructors 41660 Ivy St Suite A Holland&Leon Rd Weka Foreeman:man:Les Bredwick Murrieta,CA 92562 $12,449,411 Weka Project Manager:Jared Himle Joe Castanets (951)265-0531 joe@jlcengineering.com 2 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOU NT&RESULTS Tri Pointe Homes IE_SO,Inc(FKA MDS Consulting-Morse Schultz Lakeview(Echo Highlands)Tract 32585 Pardee Homes) 17320 Redhill Ave,Suite 350 Install approx.4,9101f of 8"PVC SDR-35 Sewer Main, Elsinore Valley,CA 1250 Carona Point Court,Suite 600, Irvine,CA 92614 2,5851f 8"PVC Class 150 C-900(DR-25)Sewer Main, 279 Corona,CA 92879 $3,261,050.00 175 Working days Weka Foreman:Vince Davidson Nick Lacher 4,3581f 4"PVC SOR-35 Sewer lateral,5,5541f 8"PVC C-900 Weka Project Manager:Mark Sisemore Shelly Jordan nick.lasher@tripointhomes.com Water Main CL 235 and all a shellyjordan@tripointhomes.com ( ) ppurtenances. (9S3)339-6725 949-251-9821 Pulte Home Company,LLC Albert A Webb Associates Install approx.5,4361f 8"PVC SDR35 8'-12'deep,7281f Tract 33410 Sewer Improvements 27401 Los Altos,Suite 400 j PVC SDR35 12'-20'deep,2091f 8"PVC SDR35 20'plus Riverside,CA Mission Viejo,CA 92691 3788 McCray Street 270 Riverside,CA 92506 $1,371,152.00 deep,39651f 4"PVC SDR35 lateral,80 backwater valve,6 90 working days Weka Foreman:Trent Himle Robert Paradise Jennifer Gillen construct precast concrete terminus manhole 8'-12'deep, Weka Project Manager:Mark Sisemore bob.pamdise@pultegroup.com 21 precast concrete manhole 8'-12'deep,412'-20'deep 951-258-6001 951-686-1070 and 120'plus deep and all appurtenances. Tract 37153 Domestic Water,Recycled Taylor Morrison of California,LLC Proactive Engineering Consultants Water and Sewer Improvements 4695 MacArthur Court,8th Floor 200 South Main St.,Suite 300 Install approx.6651f 6"SDR 35 PVC,3761f 6"C-900 PVC, 260 (Serrano) Newport Beach,CA 92660 Corona,CA 92802 $1,939,978.00 14551f 8"SDR 35 PVC,9971f 8"C-900 PVC,14701f 12"DIP 45 Working days Corona,CA Sean Doyle Scott Gilbert Class 350,4101f^"DIP and appurtenances. Weka Foreman:Les Bredwick sdoyle@taylormorrison.com cottgilbert@proaaiveengineering.c Weka Project Manager:Tomas Ramirez 949-341-1289 om City of Riverside Public Utilities Dept. City of Riverside Public Utilities Canyon Crest Booster Station Water Engineering Division Dept.Water Engineering Division Construction of a booster pump station,waterline and Replacement Phase 2 3750 University Ave 3750 University Ave appurtenances consisting of approx.(5)60 HP pumps, 270 calender days 239 Riverside,CA 92501 Riverside,CA 92501 $3,449,308.00 6101f of 20"mortar lined and coated steel pipe,6301f of 11/270 calendar days City of Riverside Cheyne Wells Senior Engineer Che Weka Foreman:Vince Davidson gi yne Wells 16"mortar lined and coated steel pipe and demolition o Weka Project Manager:Mark Sisemore mells@riversideca.gov cwells@riversideca.gov an existing booster station (951)826-5257 (951)826-5257 Sub for Balfour Beatty for East Valley Water District Regional Recycled Water Pipe for East Valle Water District 31111 Greenspot Road cyc P Y Install approx12,0001fof30"CML&Cand ys(added days due Sterling Natural Resource Center 31111 Greenspot Road Highland,CA 92346 ter changes $1e changes 980 365 da appurtenances. 214 Jeff Noelte After changes Multiple changes due to changes) Highland,CA Highland,CA92346 909 Manager: -888-8986 $31,182,562 to new alignment Adjusted contract to 32,000If,added weaver baisin piping 12/30/2019- Weka Foreman:Les Bred wick 909-889-9-9501 &structure. Weka Project Neil Kaufman engineeringdepartmant@eastvalley. org Completed Projects Jurupa Community Services District 1CSD Task Order 24WO01 11201 Harrel St Jurupa Community Services District 314 Jurupa,CA Jurupa Valley,CA 91752 11201 Harrel St $30,000.00 $ 30,000.00 Move 4"CMLC Waterline 3'(Air Vac),4"CMLC water line 1/23/2024 S Working days N/A Weka Foreman:lash Koelle Juan Hernandez Jurupa Valley,CA 91752 move back 11'(blow off) 1/23/24-1/23/24 Weka Project Manager:Steve Miller jhernandez@jad.us .aa Jurupa Community Services District Jurupa Community Services District 1CSD Task Order 2023 PS-06 11201 Harrel Street 11201 Harrel Street $240,235 Eartvale,CA Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 Water Service Leaks Weka Foreman:Augie Mendez 308 Keith Backus-Engineering Services Keith Backus-Engineering Services $683,100.00 Task Order 2023PS-07 $ 689,155.00 Replacement of 172 water services 9/25/2023 47 calendar days N/A Weka Project Manager:Mark Sisemore Supervisor Supervisor Additional Services 7/10/23-8/25/23 kbackus@jcsd.us kbackus@jad.us Bonds (951)685-7434 x135 (951)685-7434 x135 3 of 20 WEKA, INC. PROJECT LIST ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Jurupa Community Services District Jurupa Community Services District JCSD Task Order No.23w011 11201 Harrel Street 11201 Harrel Street $3,654.00 Eastvale,CA J urupa Valley,CA 91752 Jurupa Valley,CA 91752 Relocating existing Blow 307 Weka Foreman:Au Mendez Keith BackuSu erneering Services Keith BackuSuperneering Services $9,500.00 $ 13,154.00 Water appurtenances relocation 7/11/2023 1calendar day N/A gie Off in lieu of Weka Project Manager:Mark Sisemore Supervisor Supervisor g kbackus@jcsd.us kbackus@jcsd.us abandonment (951)685-7434 x135 (951)685-7434 x135 lurupa Community Services District Jurupa Community Services District JCSD Task Order 2023PS-03 11201 Harrel Street 11201 Harrel Street Jurupa Valley,CA Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 $1824.00 90 Calendar Days 302 Keith Backus-Engineering Services Keith Backus-Engineering Servi , ces $562,439.00 $ 564,263.00 Replacement of 266 water services in the city of Eastvale 8/4/2023 N/A Weka Foreman:Angle Mendez Re Weka Project Manager:Steve Miller Supervisor Supervisor pair 5/24/23-8/4/23 kbackus@jcsd.us kbackus@jtsd.us (951)685-7434 x135 (951)685-7434 x135 Jurupa Community Services District Jurupa Community Services District JCSD Task Order 23SO03 11201 Harrel Street 11201 Harrel Street Installation of 40'LF on new 12"CML&C waterline, JurupaValley,CA Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 Y Materials not provided Installation of 2 ea 12"fittings(60 deg.elbow&90 deg. 298 Keith Backus-Engineering Services Keith Backus-Engineering Services $27,815.00 $ 28,757.13 5/24/2023 5/23/23-5/24/23 N/A Weka Foreman:David Tosta $942.13 elbow),connection to existing waterline&suface Weka Project Manager:Steve Miller Supervisor Supervisor restroration. kbackus@jcsd.us kbackus@jcsd.us (951)685-7434 x135 (951)685-7434 x135 Jurupa Community Services District Jurupa Community Services District JCSD Task Order 235003 11201 Harrel Street 11201 Harrel Street Jurupa Valley,CA Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 Second Vac&Drain 18" 297 Keith Backus-Engineering Servi lva ces Keith Backus-Engineering Services $70,911.00 Sewer,Bonds $ 80,386.00 Install a u 150 days Weka Foreman:TBD p g lve on an existing 18"force main 11/20/2023 6/1/23-SD/1/23 N/A Weka Project Manager:Steve Miller Supervisor Supervisor $9,475 kbackus@jcsd.us kbackus@jad.us (951)685-7434 x13S (951)685-7434 x135 Jurupa Community Services District Jurupa Community Services District JCSD Task Order 23SO01 11201 Harrel Street 11201 Harrel Street Jurupa Valley,,CA Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 Weka Foreman:David Tosta 296 Keith Backus-Engineering Services Keith Backus-Engineering Services $27,594.00 $27,594,00 Install approx.240'pf8"pipe,core drill manhole,install 6/26/2023 2/17/23-6/26/23 N/A MT-20 vent ordor filter. Weka Project Manager:Mark Sisemore Supervisor Supervisor kbackus@jcsd.us kbackus@jad.us (951)685-7434 x135 (951)685-7434 x135 Liberty Utilities Service Corp. Liberty Utilities Service Corp. Kiowa Easement Main Replacement 21760 Ottawa Rd.,Apple Valley,CA 21760 Ottawa Rd.,Apple Valley,CA $20,689 Install approx.1655'of 12"PC350 DIP,10'of 6"PC350 41223003 92307 92307 Extra work due to DIP,412"butterfly valve,6"gate valve,6"fire hydrant 40 working days 295 Apple Valley,CA Greg Miles-Manager,Engineering Greg Miles-Manager,Engineering $548,210.00 fiberoptic line&power $ 568,899.00 bury,6"PC 350 DIP-Fire hydrant run,271"copper 7/6/2023 4/20/23-J/6/23 N/A Weka Foreman:Joshua Koelle Projects Projects Mark Sisemore greg.miles@libertyutilities.com greg.miles@libertyutilities.com pole services,2"Air vac assembly (760)240-8314 (760)240-8314 Emergency Repair to 30"NW Indian Wells Valley Water District 500 Krieger&Stewart 3602 University Transmission west Ridgecrest Blvd.,Ridgecrest,CA Ave 294 Ridgecrest,CA 93555 Riverside,CA 92501 Credit for down time 20working days Jason Uilion-Operation Manager Sinisan Saric $674,126.00 ($-137.00) $ 673,959.00 Replace 1809'of 30"CM LC with 30"HDPE 3/10/2023 6week lead time for HDPE N/A Weka Foreman:David Tosta Weka Project Manager:Steve Miller jlillion@iwvwd.com ssaric@kriegerandstewart.com (760)382-5540 (951)684-6900 Nichols Ranch Offsite Water K&A Engineering Nichols Road Partners,LLC Improvements re,CA 103 357 N.Sheridan St.,Ste 117 Install approx.1631f of 8"PVC C900 CL 235,971f of 12" 30 working days 289 Lake Elsinore,TB PO Sox A 928 Corona,CA 92880 $1,333,160.00 $58,598 $ 1,391,758.00 DIP CL 350 main,33291f of 20"DIP CL 350 main including 6/26/2023 N/A Weka Foreman:TBD Corona,CA 92877 Keith G.Osborn all appurtenances. 3/27/23-6/26/2023 Weka Project Manager.TBD (951)277-3900 (951)279-1900 4 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Jurupa Community5ervices District Jurupa Community Services District JCSD Repair Service Leaks 11201 Harrel Street 11201 Harrel Street Jurupa Valley,CA Jurupa Valley,CA 917SZ Jurupa Valley,CA 91752 288 Weka Foreman:David Tosta Keith Backus-Englneering5emices Keith Backus-Engineering Services $70,000.00 $ 70,000.00 19 Water Service Repairs 9/16/2022 8/16/22-9/16/22 N/A Weka Project Manager.Mark Sisemore Supervisor Supervisor kbackus@jad.us kbackus@jad.us (951)685-7434 x135 (951)685-7434 x135 Merrill Commerce Center LAND INE024lg Prologis Westland Group,Inc Install approx.69971f of 6"8"18"20"30"36"Ductile Iron Start by 9/5/2022 and 1.010 Merrill Ave and Grove Ave- 3546 Concours SC,Suite 100 4150 Contours Sewer Pipe Pressure Class"18"20"3 cto 401 Ceramic Finish by 2/7/2023 Sanitary Sewer Improvements Ontario,CA 91764 Ontario,CA 91764 285 $7,441,206.00 $ 1,505,187.00 $ 8,946,393.00 Epoxy Lining,w/Polythylene Encasement perAW WA C- 8/24/2023 (1/28/22working/24/23 N/A Ontario,CA Sam Cho ney westMacK)n dg 105,Jack and Bore 1301f of 54"Steel Casing w 1/2"wall 11/28/22-B/24/23 Weka Foreman:Aurelio Viramontes scho@prologis.com smackinney@westlandgroup.net additional days due to Weka Project Manager:Neil Kaufman (470)349-0153 (909)989-9789 24"DIP Class 250 and all appurtenances. change orders Jurupa Community Services District Jurupa Community Services District 1CSD Water Services Re 11201 Harrel Street 11201 Harrel Street 284 Jurupa Valley, Repairs Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 Weka Foreman:David Tosta Keith Backus-Engineering Services Keith Backus-Engineering Services $154,654.00 $ 154,654.00 24 Water Services Repairs 6/27/2022 6/3/22-6/27/22 N/A d Weka Project Manager:Mark Sisemore Supervisor Supervisor kbackus@jad.us kbackus@jcsd.us (951)685-7434 x135 (951)685-7434 x135 Move traffic control& Install approx.2,0971f 12"PVC C900 DR38 Water Main, Winchester Rd&Clinton Keith Rd. Murrieta Markerplace Holdings,LP. DRC equipment due to 3081f 12"CML&C Steel Water Main,9 12"RSGV,1101f 6" Murrieta,CA PO Box 1958,Corona,CA 92878 160 South Old Aprings Rd.,Ste Z10, county project,base PVC C900 DR18 Water Line,293$"PVC C900 DR18 Water 280 Weka Foreman:David Tosta Karine Kofdarali Anaheim,ins Rd., $2,740,000.00 backfill R&R, $ 4,202,004.00 line,2321f 18"Steel Casingl&B,1,1321f 8"PVC c900 DR18 12/29/2023 9/28/23-10/17/23 N/A Weka Project Manager:Tomas Ramirez karine@jntmgmt.com Anaheim 9 8 dewatering,design Recycled Water Main,2121f 8"CML&C Steel Water Main, (951)280-3833 change 360 2"PVC C-900 Dr 18 Water Line,and all $1,462,004.00 appurtenances. Clearing&Grubbing Excess Growth of City of Lake Elsinore City of Lake Elsinore Weeds and Trees Ontario Way 1305.Main Street 1305.Main Street 278 Lake Elsinore,CA Lake Elsinore,CA 92530 Lake Elsinore,CA 92530 Clearing and Grubbing excess growth weeds and trees Weka Foreman:David Tosta Daniel Saavedra-Public Work Daniel Saavedra-Public Work $310,610.00 $ 130,610.00 Ontario Way in Lake Elsinore. 3/29/2022 3/4/22-3/21/22 N/A Weka Project Manager:Tomas Ramirez Supervisor(951)674-5170 x255 Supervisor(951)674-5170 x255 dsaavedra@lake-elsinore.org dsaavedra@lake-elsinore.org y"v ea Emergency Tee Replacement on Live Oak 11201 Harrel Street 11201 Harrel Street Drive-Task Order No.22WO03 Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 1/31/22 277 Jurupa Valley,CA Keith Backus-Engineering Services Keith Backus-Engineering Services $14,500.00 $ 14,500.00 Replace Existing Tee Water 1/31/2022 1 day N/A Weka Formn—David Tosta Supervisor Supervisor Weka Project Manager:Tomas Ramirez kbackus@jad.us kbackus@jad.us Merrill Avenue Sewer Improvments Euclid Land Ventures,LLC West Land Group,Inc $414,230 Ontario,CA 4100 MacArthur Blvd.,Suite 120 4150 Contours change orders for add'I Install approx.6278lf36"DIP 30'plus deep expoxy lining, 100 working days 276 Weka Foreman:Aurelio Viramontes Newport Beach,CA 92660 Ontario,CA 90639 $6,320,256.00 6"sewer lateral&60" $ 6,734,486.00 (23)72"sewer manholes,401f 16"DIP,128711`36"DIP 30' 8/7/2023 Done in 2 Phases N/A Weka Project Manager:Neil Kaufman Jeff Johnson 949-216-7300 Glenn M.Chung 909-898-9789 ext manhole,manhole plus deep and all appurtenences 3/7/22-8/7/2023 309 base,152 safety ledges 5 of 20 WEKA, INC. PROJECT LIST ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIM5,MEDIATION,ARVITRATION JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Ontario Land Ventures,LLC 4450 Macanhur Blvd.,Ste 100 781-8 Merrill Ave.Bridge Widening Newport,CA 92660 West Land Group,Inc $112,474 Installation of two-tam Ontario,CA Powell Constructors,Inc 4150 Concours Remove 2 Flextends, p end of line air vact at the 274 Sub to Powell Constructors Inc 8555 Banana Ave. Ontario,CA 90638 $328,955.00 Install 2 spools, $ 441,429.00 Encluded dewater line&coordinate with city regarding Merrill Ave Bridge widening,12"PVC&12"CML&C, 1/11/2023 12/23/21-5/11/23 N/A Weka Foreman:Aurelio Viramontes Fontana,CA 92335 Glenn M.Chung Recycled&Potable shut down of existin Weka Project Manager:Neil Kaufman Michael Powell 909-898-9789 ext 308 Water Connection gwater main. mike@poweliconstruaors.com (909)356-8880 Jurupa Community Services District Jurupa Community Services District JCSD T.O.22W002 Blow off 11201 Harrel Street 11201 Harrel Street Replacements Jurupa Valley,CA 91752 Jurupa Valley,CA 91752 Remove existing Blow-off and Install New 4"Blow-off, 273 Jurupa Valley,CA Keith Backus-Engineering5ervices Keith Backus-Engineering Services $44,440.00 $ 44,440.00 concrete repair including sidewalk,curb&gutter,base 6/22/2022 12/6/21-6/22/22 N/A Weka Foreman:Les Bredwick Supervisor Supervisor pave,grind and overlay Weka Project Manager:Tomas Ramirez khackuz@jcsd.us kbackus@jcsd.us (951)685-7434 x135 (951)685-7434 x135 Santa Ana Watershed Project WO 2022-26 Reach V Line Failure Authority Santa Ana Watershed Project Pasadena Street 11615 Sterling Ave authority 272 Lake Elsinore,CA Riverside,CA 92503 51615 Sterling Ave $135,915.00 $ 135,915.00 Repair 30"PVC BrineUne 12/20/2021 Emergency work N/A Weka Foreman:Aurelio Viramontes David Ruh[Engineer Manager Riverside,CA 92503 Weka Project Manager:Neil Kaufman druhl@sawpa.org (951)354-4223 Coachella Valley Water District Coachella Valley Water District PO Box 1058 PO Box 1058 Madison Club-Avenue 54 Meter Coachella,CA 92236 Coachella,CA 92236 Connection Carrie Oliphant-Director of 380[f of C909 PVCO pipe,install(1)meter vault(1) Elizabeth Carr—-Supervising (-68262) 260 calendar days 265 Coachella Valley,CA Engineering $712,959.00 $ 644,697.00 control valve vault,lake dizchard piping and 9/8/2022 N/A Weka Foreman:Vince Davidson Management Analyst coliphant@cvwd.org Adjustment on bid item appurtenances. 5/24/22-9/8/22 Weka Project Manager:Mark Sisemore ecarr760-3 8-2661 x2350 760-398-2661 760.398-2661 x2350 Cahuilla Casino Hotel Cahuilla Casino Hotel-Storm Drain 52702 Highway 371 Repair at entrance 263 Anza,CA Anza,CA 92359 N/A $14,742.00 $ 14,742.00 Repair Storm Drain and Entrance. 11/10/2021 1 day N/A Weka Foreman:Les Bredwick Tim Thornsberry-Facilities Director Weka Project Manager:Trent Himle tthornsberry@cahuillacasino.com (951)763-1200 x168 Pettit Regulated Pressure Zone Eastern Municipal Water District Eastern Municipal Water District Specifation No.1342W 2270 Trumble Road 2270 Trumble Road $6344900 (4)Pressure regulating stations 12"PVC connection , . Moreno Valley,CA piping,12"potale waterlines,apputenances,8"PVC& 450 calendar days 262 Weka Foreman:Les Bredwick Perris,CA 92570 Perris,CA 92570 $2,534,783.00 Bond CML&C,Mainline $ 2,598,232.00 12"PVC potable connection piping&appurtenances for 6/29/2023 6/7/22 6/29/23 N/A Weka Project Manager:Tomas Ramirez Anthony Valenzuela Melissa Abell. Realignment (951)928-3777 x4451 (951)928-3777 x4432 (13)jumper connections. Golden State Water Company Install approx.401f of 4"AW WA C-900 CL 305 Dr 14,351f Brown Ave.Area Main Replacement Golden State Water Company 160 E.Via Berde,Suite100 4"PVC AW WA C-900 CL 235 DR 19,7951f 8"AW WA C-900 160 E.Via Verde,Suite 100 CL 235 Dr 18,resilient 4"&8"wedge gate valve,fire Contract 20605 WO tt35231148 San Dimas,ez 91773 Final Quantity hydrants,2"water service with niw meter box,1"service 30 calendar days San Dimas,CA 91773 258 ore a n: CA Ben Jimenez,P.E. $336,893.00 Final Quantity $ 278,796.00 1/25/2022 N/A Elizabeth Severson-Project line to the new water service meter box,cut&plug 9/23/21-1/25/22 Weka Foreman:David as Ramirez Coordinator ben.limenez@gswater.com x312 om adjustment existing system water mains,abandon and remove Weka Project Manager:Tomas Ramirez 909-305-5427 909-305-5427 x312 existing fire hydrant,dispose 2"&4"asbesrtos cement pipe. 6 of 20 WEKA, INC. PROJECT LIST ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Tract 16420 Une F Storm Drain c 3788 McCray St Improvements and Tract 16420-3 Main China Preserve Development Riverside,CA 92506 $742,743 Storm drain improvements including reinforced box Street Wer Utilities Corporation Malissa Martinez-Project Multiple change orders culverts,RCP,manholes and structures;PVC C-900ovem Waents ter, 257 1156 N.Mountain Avenue $6,179,283.00 $ 6,922,026.00 3/31/2023 100 Workinig days N/A Chino,CA 0 Weka Foreman:David Tosta Up Coordinator for additional work at PVC C-90 Recycled Water,and VCP Sewer impr land,CA 91786 malissa.martinez@webbassociates. owners request with associated a 909-985-0971 Q ppurtenences. Wkea Project Manager:Mark Sizemore tom Monserate Hill Road,Maintenance Fallbrook Culvert Replacement LLC Kam Engineering Culvert pipe,inlet basin rework,exit slope restoration. Manserate Hill Road 3622Fa MonseraA 20ill Road 129k,Fig St Which encludes remove 1501fofexising CMP,install 1721f 30 WORKING DAYS 256 Fallbrorema FaSeveCCrricky Fall Scot CA 92028 $336,092.00 $ 295,564.00 30"RCP with rubber gasket,3,045sf repair and replace 12/7/2021 9/3/2021- N/A Weka Foreman: Steve Chemicky Scott Harry Weka Project Manager. (918)640-9735 (760)728-1134 AC,recompact slope. stcbhere@gmail.com Overcrest Drive Irrigation Repair Crescent Height Water Co. Crescent Height Water Co. Redland,CA 11730 Overcrest Dr. 11730 Overcrest Dr. 255 Weka Foreman:Les Bredwick Redlands,CA Redlands,CA $13,000.00 $ 13,000.00 Install approx.3001fof8"HOPE 9/21/2021 2days N/A Weka Project Manager:Jared Himle Joseph Asbury Joseph Asbury josephlasbury@gmaii.com josephlasbury@gmaii.com Mill Creek Ave.from Bellegrave Ave.to Shea Homes Fusme Engineering Riverside Dr.Domestic Water and 1250 Corona Point Court,Suite 500 2850 Inland Empire Blvd, Install approx.1,325If of 12"PVC Cl 200,AW WA C-900 Recycled Water Improvements in the Corona,CA 92879 Suite B $4,20Additional 1 including restrained joints,1211f of B"purple PVC Cl 200, 254 Ontario,CA 91764 $527,671.00 Additional l2"gate $ 531,871.00 4/24/2023 40 working days N/A Wake F Ontario,CA Gina Gordan AW WA C-900,129712"Purple PVC Cl 200,AW WA C-900, Weka foreman:TBD Steve Ellis valve gina.gordon@she8homes.com(949) sellis@fusme.com and all appurtenances. Weka Project Manager:Tomas Ramirez 526-8840 (909)581-0676 Design-Build Contract for the Phase 2 Coachella Valley Water District Adkan Engineers Coachella Campus Fire Protection and 6879 Airport Drive Irrigation System Improvements ProJ ect PO Box 1058 Riverside,CA 92504 Install a 252 Coachella,CA 92236 $1,461,748.00 $ 1,461,748.00 approx.32901f 8"DIP,6651f 6"DIP,11 fire 6/29/2022 180 calendar days N/A Coachella,CA Mitch 9-0241 hydrants,and all appurtenances. 8/11/21-6/29/22 Weka Foreman:Vince Davidson Jim Barrett-General Manager (951)688-0241 Weka Project Manager.Mark Sizemore madkison@adkan.mm $46,643 Eucalyptus Ave Domestic Water&Int.St Euclid Land Ventures,LLC West Land Group,Inc Change Orders for Install approx.60401f of 16"DIP Class 350 AW WA C- Ontario,CA 4100 MacArthur Blvd.,Suite 120 4150 Contours Slurry backfill 16" 150/151 with push joints&Polyethylene Encaement, 50 working days 245 Newport Beach,CA 92660 Ontario,CA 90638 $2,872,474.00 CML.&C,16"Restrained $ 2,963,112.00 5851f of 16"CML/CMC Full Weld(Double Pass),18 Fire 5/6/2022 8/11/2021-5/6/22 N/A Weka Foreman:Aurelio Nei,Kaufman Patricia Urbino Glenn M.Chung 909-898-9789 ext Coupling.Conversion Hydrants,6 Cathadic Test Stations,50018"RCP Storm Material Delays Weka Project Manager:Neil Kaufman Purbina@murowdccom 308 from DI to CML&C and Drain,all appurtenances,street improvements. additional welding Elsinore Valley Municipal Water Elsinore Valley Municipal Water Sewer Lateral at APN 374-072-039 Lake District District Elsinore 31315 Cheney5treet 31315 Cheney Street 244 Lake Elsinore,CA Lake Elsinore,CA.92530 Lake Elsinore,CA.92530 $39,894.00 $ 39,894.00 Install new sewer lateral 7/9/2021 30 days N/A Weka Foreman:Les Bredwick Kelie Jones Engineering Project Kelie Jones Engineering Project 7/6/21-7/9/21 oordinator Ccordinator Weka Project Manager:Tomas Ramirez C kjones@evmwd.net kjones@evmwd.net 951-674-3146 951-674-3146 Repair of Existing Fire Hydrant on Jurupa Community Services District Jurupa Community Services District Country Village Road Task Order No.W21005 11201 Harrel Street 11201 Harrel Street 243 Jurupa,CA Jurupa,CA 91752 Jurupa,CA 91752 $35,000.00 $ 35,000.00 Remove and replace exsisting fire hydrant 7/7/2021 30'days N/A Weka Foreman:Les Bredwick Lakenn Rey Administrative Assistant Lakenn Rey Administrative Assistant 6/23/21-9/1/21 Weka Project Manager:Tomas Ramirez Trey@jad.us Irey@jcsd.us 951-685-7434 x217 951-685-7434 x217 7 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTVPEOF TOTALCONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACT TIME OR LAWSUITS,AMOUNT&RESULTS Lennar Communities,Inc Monte Land Development Solutions 980 Montecito Drive#300 El Rancho Verde 92879 Corona, 60 Corporate Park,Suite 100 Install approx.66961f of 30"class 150 CML&C Steel, 242 Rialto,CC Irvine,CA 92606 7,9041f of 12"DIP,3,1141f of 18"DIP,4,7231f of 14" 100 working days Chris Conklin,Construction Manager $5,361,878. $352,829 00 Well line extention and $ 5,714,707.00 5/26/2023 N/A Weka Foreman:Les eredwick chris.mnklin@lennar.com Colin Zawsnick connection CML&C Steel,1,0141f of 24"CML&C Steel-Added 7/27/21fi/30/23 Weka Project Manager:Neil Kaufman 942-428-1400 Additional Pipe Footages 951-712-6684 czavmnick@moote.com Century Communities of California, Elsinore Valley Municipal Water District LLC Elsinore Valley Municipal Water Tessera Tract 33370 Offsite Public 4695 Mamrthur tt,Suite 3000 District Sewer,Storm Drain&Water 31315 Cheney Street $58,473 Furnish and install approx.235411'of 12"DIP(class 350), 60 Working days Newport Beach,CA 92660 241 Improvements Lake Elsinore,CA.92530 $1,178,114.00 Additional potholes and $ 1,236,587.00 15411f of 8"PVC Sewer,4001f of24"-30"Storm drain,11 2/14/2022 N/A Lake Elsinore,CA Kyle Maccarato VP of Operations Ma ra Cabrera Sr.Civil Engineer work,spray lining 12"RWGV,and all a 1/6/2021-2/14/22 (801)674-9551 y g p y g ppurtenances. Weka Foreman:na Aurelio Viramontel kyle.nacarat.@centurycommunities. (951)674-3146 Weka Project Manager:Lorrie Steely mcabrem@evmwd.net Jurupa Community Services District Jurupa Community Services District 1CSD-Sewer Repairs 11201 Harrel Street 11201 Harrel Street City of Rubidouz,Mira Loma,&Corona Min Loma,CA 91752 Mira Loma,CA 91752 Replace approz 1061ft Of 8"VCP repaird,broken or 20 calendar days 240 Keith Backus Engineering Services Keith Backus Engineering Services $161,825.00 $ 161,825.00 sagging pipes,requiring bypass and/or rechannel 2/3/2021 N/A Weka Foreman:Dave Lopez Weka Project Manager:Mark Sisemore Supervisor Supervisor manhole. 1/6/2021-2/3/2021 kbacus@jmd.us kbacus@jod.us (951)685-7434 (951)685-7434 Liberty Utilities(Apple Valley Ranchos liberty Utilities(Apple Valley Water)Corp. Ranchos Water)Corp. Tract4394 Choco and Tiger Road Main P.O.Box 7005 P.O.Box 7005 Replacement-Phase 2 21760 Ottawa Rd 21760 Ottawa Rd Apple Valley,CA 92308-7005 $21,052.00 Install approx.3,8061f of 8"C900 PC305 DR14 PVC,5501f 40 working days 236 Apple Valley,G Apple Valley,CA Engineer Pr Greg Miles Manager Engineer $505,280.00 Additional boring $ 526,332.00 of 6"C900 PC305 DR 14 PVC,and appurtenances. 2/8/2021 11/19/20-2/8/21 N/A Weka Foreman:Vince Davidson Greg Miles Manager Engineer Project Weka Project Manager.Mark Sizemore (760)240-8314 Project greg.miles@libertyutilities.com (760)240-8314 greg.miles @ libertyutilities—ran Liberty Utilities(Apple Valley Ranchos Liberty Utilities(Apple Valley Water)Corp. Ranchos Water)Corp. Tract 4394 Choco and Tiger Road Main P.O.Box 7005 P.O.Box 7005 Replacement-Phase 1 21760 Ottawa Rd 21760 Ottawa Rd Install approx.101f of 12"PC350 DIP,4,5321f of 8"C900 q0 Working days 235 Apple Valley,CA Apple Valley,CA 92308-7005 Apple Valley,CA 9Z308-7005 $505,319.00 $ 505,319.00 PC305 DR14 PVC,388If of 6"C900 PC305 DR14 PVC and 1/5/2021 N/A Weka Foreman:Vince Davidson GregMiles Greg Miles 10/2/20-1/5/21 g appurtenances. Weka Project Manager:Mark Sisemore (760)240-8314 (760)24G 8314 greg.miles@libertyutilities.com greg.miles@libertyutilities.com KB Home Adkan Engineers Tract37593 Offsite Storm Drain 36310 Inland Valley Drive 6879 Airport Drive Remove approx.1,2971f of 36"Storm Drain Pipe,install 234 City of Riverside Wildomar,CA 92595 Riverside,CA 92504 $381,694 9/23/2020-2/1/22 $1,677,410.00 $ 2,059,104.00 approx 27371f of 42"RCP,657[f of 24"RCP,128]f of 18" 2/1/2022 N/A Weka ProjeForect ManagerAurel: Vrk Sise o Stephanie Maciel Mitch 688Adk-0241nson Pipe Realignment RCP,catch basins,manholes and appurtenances. Material Delay Weka Project Manager.Mark Sisemore smaciel@moote.com (951)668-0241 m 949-428-1400 madkison@adkan.wm 8 of 20 WEKA, INC. PROJECT LIST ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTALCONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Approximately 2,600 LF.of 24-inch diameter sewer Regional Wastewater Forcemain- Jurupa Community Services District Albert A.Webb Associates forcemain,920 LF.of24-inch diameter gravity main, Segment#3 11201 Harrel Street 3788 McCray St 1270 LF.of 20"diameter dual siphons,control structure, 232 1CSD P.N.C765036 Mira Loma,CA 91752 Riverside,CA 92506 $355,187 drains,maintenance structure,flow meter,and 300 calendar days Weka Foreman:David Tosta Keith Backus Siming Zhang $4,246,006.00 Additional work $4,601,193 associated appurtenances;the Crest Steel lateral and 30/5/2022 9/1/202D-7/1/22 N/A Weka Project Manager:Mark Sisemore kbackus@jcsd.us ming.zhang@webbassociates.com associated appurtenances;Linares lift station force main (951)685-7434 951-686-1070 insertion per the plans and specifications.Plant Modifications. Cvwd-Coachella Fire Line And Irrigation Cvwd The Purp ose Of The Project Is fto Design And Construct A System Improvements Phase 1 Design- Coachella Valley Water District Adkan Engineers 6879 Airport Drive New Fire Line For Cvwd's Coachella Campus,Separate Build Project 75-515 Holvey Lane East Palm Riverside,CA 92504 The Irrigation System Form Existing Non-Potable Water 150 calendar days 231 Coachella Valley,CA Dessert,Ca 92211 Richard Reaves $685,384.00 $ 685,384.00 Supply,Properly Abandon Portions Of Existing Non- 7/27/2021 1 50 calendar days N/A Weka Foreman:Vince Davidson Dan Ruiz,Engineering Manager 760- ph:(951)-688-0241 Potable Well And Ancillary Facilities,And Disconnect The Weka Project Manager:Lorrie Steely 399-2651 druiz@cvwd.org fax:(951)-688-0599 Non-Potable Water Supply Pipes To The Elevated Storage rreaves@adkan.com Tank. Installation of new 18 and 12 CML&C pipeline within new City Of Colton Public Works Washington Bridge limits as well as public Row; Colton-Washington Bridge Pipeline Department Michael Baker International $309,214 installation of two precast concrete vaults and flextend Relocation 3536 Concours,Suite 100 230 Colton,CA 160s lath Street,Colton,Ca 92324 Ontario,CA 91764 Traffic control onnections;removal of the existing steel pipe and 1030 calendar days Jess Sotto,PE $1,390,070.00 additional sliplining, $ 1,699,284.00 sting from existing Washington 4/29/2023 N/A Weka Foreman:Aurelio Viremontes Safa Kamangar,PE g• g g gton Bridge;removal and 8/27/2024 Weka Project Manager:Mark Sisemore jsotto@coltonca.gov 951-676-8042 additional vaults disposal of existing absestos pipe in conflict with Caltrans 909-370-5551 wall;installation of pipeline appurtenances and connections to existing systems;and installation of CIPP. Inland Empire Brine Line Lower Reach Santa Ana Watershed Project Santa Ana Watershed Project Includes removal and disposal of approx.440'of 36" IVB and CRC Lateral Utility Protection Authority Authority RCP/Hobas lined pipe and construction ofapprox430'of Project 11615 Sterling Avenue 11615 Sterling Avenue new 36"IPS HOPE pipe,removal and disposal ofapprox. ($25,170.10) 120 calendar days 228 Riverside,[A.92503 Riverside,CA.92503 $7,349,805.00 $ 1,324,635.00 135'of 15/16"VCP/DIP and construction of approx.135' 12/22/2020 N/A Corona,es David Ruh]Engineer Management Fencing was deleted 9/17/2020.12/22/20 Weka Foreman:Les eredwick 8 Bement David Ruhl Engineer Management of new 18"IP5 HOPE pipe,construction of3 maintenance Weka Project Manager:Mark Sisemore druhl@sawpa.org druhl@sawpa.org access structures and associated fittings and 951-354-4223 951-354-4223 appurtenances,Also b pp y-passing and dewatering City of Riverside Public Utilities Dept. City of Riverside Public Utilities Install a manhole inline with the existing 72"storm drain Phoenix Storm Drain Division Water Engineering Division Dept.Water Engineering Division pipe to intercept Theme withhe ter flow existing 72"stormert flow Riverside,CA 3750 University Ave 3750 University Ave $7,897 into a trash screening manhole,then through a system of 60 Working days 227 Weka Foreman:Vince Davidson Riverside,CA 92501 Riverside,CA 92501 $567,729.00 Added Electrical $ 575,626.00 valves and controllers,through a weir manhole,and 7/21/2021 60 Working d/21 N/A Weka Project Manager:Mark Sisemore John Farley John Farley Antenna finally into an existing jfarley@riversideca.gov jfarley@riversideca.gov y g sewer manhole.Furnish and install 951826-5705 951826-5705 3:SCH40 conduits and a meter pedestal. Larson Road Storm Drain,Water and City of Lake Elsinore City of Lake Elsinore Construction of,Curb&Gutter,Cross Gutter,Driveways, Street Improvement 130 S.Main 5t 130 S.Main St Lake Elsinore,CA 92530 Lake Elsinore,CA 92530 $73,291.00 asphalt berms,Slurry seal and Grinding,Resurfacing, 60 Working days 226 Lake Elsinore,CA $623,725.00 additional bern& $ 697,015.00 Water mains and appurtenances,storm drain culvert, 1/11/2021 N/A Yu Tagai Sr.Civil Engineer Yu Tagai Sr.Civil Engineer 8/31/2020-1/11/2027 Weka Foreman: ntes Weka Project Manager:Neil'Kaa uufman ytagai@lake-elsinore.org(951)674 y[agai@lake-elsinore.org(951)674 asphalt/base headwalls,and Rip-Rap,adjusting manhole to grade, 3124 3124 minor grading of the hack of driveways. UPRR Crossing and Glen Avon Trunk Jurupa Community Sew Dist 11201 Albert A.Webb Associates Unmarked utilities,cut Sewer Phase 1 Harrel Street Mira Loma,CA 3788 McCray St and remove casing, additional potholing, Install approx.3,6001f 8"through 12"sewer main,jack& 223 JCSD P.N.C195064 91752 Riverside,CA 92506 Riverside,CA Enayat Khugyani Senior Engineer Sitting $2,765,903.00 fence repair,install $ 2,777,019.00 bore 24"steel casing underneath caltrans 60 freeway 12/18/2020 days N/A Zhan g 250 calendar concrete weirs,change6/30/202D-12/18/2020 Weka Foreman:Dave Tosta ekhugyani@jcsd.us ming.zhang@webbassociates.com ver-pass,street pavement restoration,and by-passing Weka Project Manager:Mark Sisemore (951)685-7434 x530 951-686-1070 of material,dig outbore&receiving pits, 9 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTALCONTRACi DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACT TIME OR LAWSUITS,AMOUNT&RESULTS Project No.2014-03 Hargrave at Ramsey Department x DDepartment Intersection Improvements 99 East Ramsey5t 99 East Ramsey St Install approx.2,3498"DIP,1,47712"DIP,8 Street light 120 working days 222 Banning,CA Banning,CA 92220 Banning,CA 92220 $27038 g, g, $3,745,435.00 Less conduit $ 3,735,435.00 hanhole,Transformer 70 Ifsfor PVC Risers In Poles,2-Single Phase 12/4/2020 4/20/20-2/23/21 N/A Weka Foreman:Les Bredwick Patrick Safar Associate Engineer Patrick Safari Associate EngineerTransformer pad,I-Intercepting vaults Weka Project Manager:Neil Kaufman psafari@banningca.gov psafari@banningca.gov Mark Kirk Mark Kirk Kirk Extension 349 Alvarado St 349 Alvarado St 221 Fallbrook,CA Fallbrook,CA 92028 Fallbrook,CA 92028 $379,223.00 $ (30,217.00) $ 349,006.00 Install approx 2,293 If of 8"SDR35 Sewer,11-48" 2/24/2020 1/9/2020-2/24/2020 N/A Weka Foreman:David Tosta Mark Kirk Mark Kirk Manholes with coating,16 laterals,60yd ofjRipRap Weka Project Manager:Mark Sisemore 760-805-4619 760-805-4619 mark@markkirk.com mark@markkirk.com 2018/2019 CDBG Street and Storm Drain City of Riverside City of Riverside Improvements Phase 2 3750 University Ave 3750 University Ave 220 Riverside,CA Riverside,CA 92501 Riverside,CA 92501 617.00 Street Maintenance,concrete sidewalk,stormdrain 75 working days Weka Foreman:Aurelio Virmontes Steven Howard Steven Howard $1,298,617.00 $ - $ 1,298, improvements 8/11/2020 5/6/2D 8/11/2020 N/A Wweka Project Manager:Mark showard@riversideca.gov showard@riversideca.gov Sisemore (951)826-5341 (951)826-5341 Mission Springs Water District Well 27 Mission Springs Water District $2,2521.00 and 31 Drywellz 66575 Second Street Wallace&Associates Construct drywells,storm drains,and associated well and Desert Hot Springs,CA 92248 David Valenzuela Project Engineer Install goosneck fitting P gs. J B site improvements:approx 403 If 12"HOPE dual wall 90 consecutive days 219 Desert Hot Springs,CA Theresa Murphy Eng.Tech davidv@wallace-cm.com $239,891.00 at discharge,install two $ 262,412.00 pipe,7 48"dia dry wall,replace 195 sf of ungrouted Rip 9/1/2020 5/1/2020-9/1/2020 N/A Weka Foreman:Vince Davidson production meters p tmurphy@mswd.org (951)473-4659 Ra Weka Project Manager.Mark Sisemore 760-329-6448 39th Street Storm Drain Replacement County of San Bernardino Public County of5an Bernardino Public San Bernardino,CA Works Works $19,200.00 Remove exsiting drainage system.Constructing 5'w x Vht SO working days 218 Weka Foreman:Trent Himle Carlos Seanez Carlos Seanez $419,998.00 $ 438,198.00 ftCH,concrete Parkway Culvert,catch Basin 7/9/2020 N/A Weka Project Manager:Mark Sisemore 909-387-7945 909-387-7945 additional curb&gutter Change order:Additional curb&gutter 4/29/2020-7/9/2020 seam@dpw.sb<ounry.gov seam@dpw.sbcounry.gov Liberty Utililties(Apple Valley Liberty Utililties(Apple Valley Track 3333 Ph 2 Symeron/Yanan Main Ranchos Water)Corp Ranchos Water)Corp Replacement 21760 Ottawa Rd. 21760 Ottawa Rd. $158,26.000 217 Apple Apple Valley,CA 92308 Apple Valley,CA 92308 Additional 6"pipe and Install approx 6,000 If of 6"&8"PVC pipe and N/A 1/8/2020 Weka Foremans::Vince D Davidson Emily Fontno Engineering Technician Emily Fontno Engineering $492,228.00 fire hydrant runs $ 650,488.00 appurtenances. 1/8/2020-4/21/2020 Weka Project Manager:Mark Sisemore 3 Technician 3 requested by district 760-240-8326 760-240-8326 emily.fontno@Iibertyutilities.com emily.fontno@libertyutilities.com City of Riverside Public Utilities Dept City of Riverside Public Utilities Scheure Well Supply Main Replacement Water Engineering Division Dept Water Engineering Division Project 3750 University Ave 3750 University Ave $7902.00 100 calendar days 215 San Bernardino,CA Riverside,CA 92501 Riverside,CA 92501 $524,938.00 City instructed $ 534,158.00 Install approx.1,314 if of 24"mortar lined&coated steel 2/27/2020 N/A Weka Foreman:David Tosta John Farley John Farley additional removals pipe and appurtenances. 2/27/2020-9/24/2020 Weka Project Manager.Mark Sisemore jfarley@riversideca.gov jfarley@riversideca.gov (951)826-5705 (951)826-5705 Elsinore Valley Municipal Water Elsinore Valley Municipal Water Meadow Reservoir No.1 and Lower District District Meadowbrook Pump Station Demolition 31315 Cheney5treet 31315 Cheney5treet Demolition of SCADATower and equipment r. 213 Lake Elsinore,CA Lake Elsinore,CA.92530 Engineering Lake Elsinore,CA.92530 Replacement of eleNical conduet at Meadowbrook 2 180 calendar days Tech Engineering Tech $460,778.00 $ - $ 460,778.00 Pump Station and miscellaneous site plant modifications 3/3/2020 2/21/2020-6/5/2020 Weka Foreman:Lance Kendall N/A Weka Project Manager:Neil Kaufman Ron Brees Ron Brees and piping (951)674-3146 x8348 (951)674-3146 x8348 rbrees@evmwd.net rbrees@evmwd.net 10 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNT AND TYPE OF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Elsinore Valley Municipal Water Single Check Backflow Device District Dudek Replacement Phase 1B 31315 Cheney Street 212 Lake Elsinore,Wildomar,&Murrieta,CA Lake Elsinore,CA.92530 Andrea Kraft 605 Third Street Replacement of 9 existingvaulted belowground backflow 120 calendar days Encinitas,CA.92024 $326,007.00 $ - $ 326,007.00 devices with above 2/26/2020 N/A Weka Foreman:Aurelio Viramontes Engineer Project Coordinator ground double check backflow device 1/20/2020-3/30/2020 Weka Project Manager:Mark Sizemore akraft@evmwd.net 760-942-5147 (951)674-3146 x8312 Lennar Homes Moote Land Development Solutions Summit at Rosena Tract 20214-5(PA) 980 Montecito,Suite 302 60 Corporate Park,Suite 100 Approx 195 If 24"RCP,826 If 18"RCP,690 8"VCP,1662 If 210 Fontana,CA Corona,CA 92979 Irvine,CA 92606 Weka Foreman:Aurelio Viramontes Theron Gunter Colin Zavrsnick $395,073.00 $ 7,541.00 $ 402,614.00 6"VCP sewer laterals,541f 4"VCP sewer laterals,5-48" 1/17/2020 11/18/2019-7/13/2021 N/A Weka Project Mara er:Mark Sisemore sewer manholes,l0-24 x 24 precast basins. 1 g (951)712-9218 942-428-1400 theron.gunter@lennar.com aavrsnick@moote.mm Rubidoux Community Service District TKE Engineering Jurupa Hills Lift Station 3590 Rubidoux Blvd. 2305 Chicago Ave. $15582.00 205 Jurupa Valley,CA Jurupa Valley,CA 92509 Riverside,CA 92507 $535,033.00 Additional pipe, $ 550,615.00 Abandon existing lift station and piping.Construct new q/17/2020 180 alendardays N/A Weka Foreman:David Tosta Jeff Sims Asst.General Manager 951- Terry Renner electrical,and changes lift station. 2/3/2020-4/17/2020 Weka Project Manager:Marke Sizemore 684-7580 951-680-0440 made to pump station jsimz@rad.org trenner@tkeengineering.com Sewer Improvements for Tract 28987- Friends of Riverside Airport LLC Adkan Engineers Phase 1,&Phase 2 8175 Limonite Ave,Suite E 6879 Airport Drive Jurupa Valley,CA 92509 Riverside,CA 92504 $ng manhole Install approx.CO,161f of 8"PVC l e,Sewer lift 63 4"PVC 204 or Riverside,Dave Robert Beers Project Manager(951) Mitch Adkinson $294,438.00 Adjusting manhole and $ 349,756A0 laterals with O,16 48"manholes,Sewer lik station, 9/6/2020 7/8/2020-9/6/2020 N/A Weka Foreman:Dave TomMark 360-2170 repairs to exiting line 1,1334"C900 PVC forcemain and all appurtenances. Weka Project Manager:Mark Sisemore (951)@Adkan. rmbeers777@hatmail.com madkison@adkan.mm GWS#4 Development,LLC Warren Well 411-Well Equipping&Early 901 Via Piemonte,Suite 175 Michael Baker International Procurement Ontario,CA 91764 3536 Contours,Suite 100 $42,068.00 Equipping of one groundwater extraction well,iwht 202 San Bernardino,CA cc Hillwood Ontario,CA 91764 569226 building interior and exterior piping.Warren 4R,and the Weka Foreman:Vince Davidson 2855 Michell Dr.,Suite 180 Irvine,CA Aaron Singer Field Engineer $1, , .00 Potholing $ 1,700,629.00 installation of discharge pipeline,24"CML&C 5/20/2020 7/16/2020-5/20/202D N/A replacement Weka Project Manager:Mark Sizemore 92606 Christine Buckle (909)974-4969 improvements. 909-256-5902 aaran.singer@mbakerinti.mm christine.buckle0hillwood.com Potable and Recycled Water&Private Friends of Riverside Airport LLC Adkan Engineers Improvements for Tnct 28987-Phase 1, 8175 Umonite Ave,Suite E 6879 Airport Drive&Phase 2 Jurupa Valley,CA.92509 Riverside,CA 92504 $8,700.00 Installing onsite a pprox 27001f of 8"and 16"DIP potable 2C0 Riverside,CA Robert Beers Project Manager(951) Mitch Adkinson $557,093.00 Changes to sewer $ 665,793.00 and 170011'of 16"recycled water main with 2/25/2020 9/11/2019 to 2/25/2020 N/A Weka Foreman:Dave Tosta 360-2070 (951)688-0241 crossing on the water appurtenances through tract to connect to exsisting. Weka Project Manager:Mark Sisemore rmbeers777@hotmail.mm madkison@adkan.com Water)Corp. Ranchos Water)Corp. $89,608.00 Tract 3626 Symeron and Atnah Water P.O.Box 7005 P.O.Box 7005 Additional potholing, Install approx.7301f of 16"PC3500IP,351f of 12"PC350 Main ReplacementJob No.41183003 217600ttawa Rd 217600ttawa Rd relocate 8"sewer, 40 working days 199 Apple Valley,CA Apple Valley,CA 92308-7005 Apple Valley,CA DIP,2,602If of 8"C900 PC305 DR34 PVC,861f of 6"C900 Start date 6/24/19 92308-7005 $466,124.00 install l"services, $555,732 6/24/2019-9/6/2019 N/A Weka Foreman:Vince Davidson Mike Lent Mike Lent removal of4"&8" PC305 DR14 PVC,4"air&vac station and all 11/14/19 I1/14/2019-11/15/2019 Weka Project Manager:Mark Sisemore (760)240-8317 (760)240-8317 waterline,utility appurtenances. michael.lent@libertyutilities.mm michael.lent@libertyutilities.com conflick 11 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS #2622 Valley&Cactus Valley Blvd. Fullmer Construction between Spruce&Cactus 1725 S.Grove Ave Thieves Engineerign,Inc $29539.00 198 Fontana,CA Ontario,CA 91761 14349 Firestone Blvd. Additional pavement, 149 calendar days $323,989.00 yper city& $353,528 Install approx.13211f of 12"DIP and all appurtenances. 12/10/2019 g/12/2019-32/10/2019 N/A Weka Foreman:Trent Himle Kevin Gill La Mirada,CA 90638 mill&overla Weka Project Manager.Mark Sizemore kgill@fullmerm.mm (714)521-4811 county (909)947-9467 Allard Engineering 16966 Seville Ave Fontana,CA 92335 Fontana Summit at Rosena Sanitary Lennar Homes Ray Allard 40 working days Sewer Improvements 980 Montecfto,Suite 302 (909)356-1815 Install appros 3,0731f of 8"extra strength VCP Sewer 2/4/2019-5/31/2019 196 Fontana,CA Corona,CA 92879 rallard@allardeng.com $412 Mainline,1048"precast concrete sewer manhole,248" 9/21/2020 9/6/2019-9/25/20 N/A Weka Foreman:Trent Himle Craig Moraes & ,235.00 $ 626,880.00 $ 1,039,115.00 Precastprecast comete break-in sewer manhole,160" t 4/10/2 0 2 6 4/15/2 0 2 0 Weka Project Manager.Mark Sisemore (951)712-9218 K&A Engineering,Inc concrete break-in sewer manhole and all appurtenances. 6/15/202D-6/19/2020 craig.momes@lennar.com 357 N.Sheridan St 7/21/202D-8/21/2020 Conrona,CA 92880 Amir Fallahi 290 W.Rialto Ave El Rivino Road and Agua Mansa Road, Rialto,CA 92376 City of Rialto Storm Drain Inprovements Project 951-332-6464 290 W.Rialto Ave $477,479.00 195 Rialto,CA Developer Rialto,CA 92376 $2,276,461.00 Additional AC due to $ 2,753,940.00 Install approx 2001f 24"R.C.P.,701f of 30"R.C.P.,1809 If 1/ZS/2020 180 working days N/A Weka Foreman:Aurelio Viramontes Panattoni Development Co.,Inc Steve R.Loriso R.C.E. County wanting it 48"R.C.P.,2,5001f 54"P C.P.and appurtenances. 5/13/2019 to 1/25/2020 Weka Project Manager:Neil Kaufman 20411 SW Birch St.,/ste 200 sloriso@jurupavalley.org thicker and wider Newport Beach,CA 92660 951-332-6464 x233 Mark Lewis Elsinore Valley Municipal Water Elsinore Valley Municipal Water Regional Agricultural Pipeline District District 193 Lake Elsinore,CA 31315 Cheney Street 31315 Cheney Street Weka Foreman:Lauro Hernandez Install approx 6301f of 36"C905 PVC waterline,new 120 calendar days Lake Elsinore,CA. m 92530 Andrea Kraft Lake Elsinore,CA.92530 Russell J. $1,038,549.00 $ (9,168.00) $ 1,029,381.00 9/4/2019 N/A Weka Project Manager:Mark Sisemore Engineer Project Coordinator Bergholz anholes,&new diversion structure. 3/11/2019-9/4/2019 akmft@evmwd.net 951-674-3146 (951)674-3146 x8312 Elsinore Valley Municipal Water "` $25,452.00 Single Check Be t Phase Device District District 31315 Cheney Street Potholes,4"Tee,Repair Replacement Phase I 31315 CheneyStreet Lake Elsinore,CA.92530 LarryRein A&S grease drain pipe, Remove existing single check backflow devices within 192 Lake Elsinore,Wildomar,&Murrieta,CA Lake Elsinore,CA-92530 Andrea Kraft 160 calendardays PE 1D $427,772.00 modified backflow $ 453,224.00 vaults and replacing them with above ground double 6/28/2019 N/A Weka Foreman:Jeff Wyatt Engineer Project Coordinator device,reconnect 4" check backflow devices at 12 locations. 1/28/2019-6/28/2019 Irein@evnwd.net Weka Project Manager:Mark Sisemore 951167akmft@emwd.net comestic waterline, 951 6743146 x8312 951-6743146 x8320 weld flange,install tee Tortes Martinez Desert Cahuilla Indian Health services Ave 64 Sewer Lateral Indians 1320 W.Valley Parkway,#309 $23,389.00 191 Thermal,CA PO Box 1160 Escondido,CA 92029 $546,335.00 Increase manhole to $ 569,723.00 Install approx 26801f of 8"SDR 26 PVC,9904"SDR 35 6/5/2019 190 calendar days N/A Weka Foreman:Vince Davidson Thermal,CA 92274 Julia Majkrzak 60",additional sewer PVC,8 Manholes and appurtenances. 2/19/2019-6/5/2019 Weka Project Manager.Mark Sisemore Laura Espinoza julia.majkrzak@ihs.gov connection&sewer line 760-397-0300 760-735-6887 12 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTALCONTRACT DATEOF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Elsinore Valley Municipal Water Elsinore Valley Municipal Water Installation of5ewer Lateral in the City District District of Canyon Lakes,APN 355-171-013 31315 Cheney5treet 31315 Cheney Street 190 Canyon Lakes,CA Lake Elsinore,CA.92530Andrea Kraft Lake Elsinore,CA.92530Andrea $27,648.00 $ - $ 27,648.00 Install 60 if of4"Sewer lateral off l0" 10/25/2018 10 alendardays N/A Weka Foreman:Trent Himle Engineer Project Coordinator Kraft Engineer Project Coordinator 10/15/2018-10/25/2018 Weka Project Manager:Neil Kaufman rbrees@evmwd.net rbrees@evmwd.net (951)674-3146 x8348 (951)674-3146 x8348 Rancho La Quinta Golf course Coachella Valley Water District P.O. Krieger&Stewart 3602 University Box 1058 Coachella,CA Connection Project Ave Riverside,CA 92501 Install approx 475 If of 8"PVC C900(DR18)and 90 calendar days 92236 189 la Quinta,CA Sinisan S. $426,898.00 $ (7,227.00) $ 419,671.00 3/15/2019 N/A Weka Foreman:Vince Davidson Brian Fogg Project Manager szaric@kriegerandstewart.com appurtemames. 1/7/2019-3/IS/2019 Weka Project Manager:Mark Sisemore bfogg@cvwd.org (760)398- (951)684-6900 2651 Jurupa Community Sew Dist 11201 Jurupa Community Sew Dist 11201 Chino 2 Desalter Harrel Street Mira Loma,CA Harrel Street Mira Loma, 188 Chino, 91752 Keith Backus CA 91752 $56,998.00 $ - $ 56,998.00 Appox 1561f of 12"C905 PVC 12/31/2018 30 calendar days N/A Weka Foreman:Trent Himle kbackus@faith Eddie Rhee Weka Project Manager.Mark Sisemore (g51)685-7434xus Erhee@jcsd.us (951)685-7434 Michael Baker International GWS-Rice-Thorne Blaw-off Pipeline GSW#4 Development,LLC 3536 Concours,Suite 100,Ontario, $19,201.00 Replacement 901 Via Piemonte,Suite 175 CA 91764 187 San Bernardino,CA Ontario,CA 91764 (951)676-SD42 $480,059.00 Tie-in adjustment, $ 499 260.00 Install approx pproz 1755 If of24"CML&C and appurtenances. 1/18/2019 125 calendar days N/A Weka Foreman:Trent Himle John M.Magness Pat Hanify abondonment Weka Project Manager:Mark Sisemore (909)392-0033 phanify@mbakerral.com (909)974-4971 City of Beaumont Brine Disposal Pipeline Project Reach 1 550 E.6th Street Albert A.Webb Associates 3788 $755,317 (2007-006)Project No.17-006 Beaumont,CA 92223 McCoy Street Riverside,CA 92506 Additional 6,0001f of Install approx 60,000 If 12"HOPE and appurtenances, 480 calendar days 186 Beaumont,CA Aftab Hussain Public Works and Brad Sackett5enior Engineer $10,869,324.00 $ 11,634,640.00 4/23/2020 N/A Weka Foreman:Les Bredwick Utility Manager bmd.sackett@webbassociates.com pipe and additional jack&bore,pavement repairs 11/9/2018-4/Z3/2020 Weka Project Manager.Neil Kaufman ahussain@ci.beaumonta.us overlay J g (951)6861070 (951)769-8520 $22,545.00 Elsinore Valley Municipal Water Vail Cooper&Associates,Inc Modified bore pits due County Water Company of Riverside- District 1935 Chicago Ave,Unit A to differing field Installation ofappm 1401fcf10"HDPE via Horizontal Final Water System Improvements 31315 Cheney Street Riverside,CA 92507 condition,disconnect Direction Drilling method,abandonment of 3,600 If of 185 Riverside,CA Lake Elsinore,CA.92530 Andrea Kraft Jennifer Saldivar Construction $265,093.00 highline,added blind $ 2g7,638.00 existing 8"CML&C,connection to existing S"CML&C,air 12/20/2018 60 calendar days N/A Weka Foreman:Jeff Wyatt Engineer Project Coordinator Manager flange,repair& release/vacuum valve assemblies,removal of existing 12" Weka Project Manager:Neil Kaufman akaft@evmwd.net realigned pipe HOPE highline on Bundy Canyon Rd and its 1 g jennifer.saldivar@valicooper.wm (951)674-3146 x8312 (951)788-6028 x307 upstream from our appurtenances project City of Riverside Public Utilities DeptTec Install approx.5,7001f of 42"CMl&C Steel Pipe,2,900 If Dept Water Engineering Division Magnolia Ave.ion Rep Pipe and Pressure Water Engineering Division of 12'.DIP,a buried pressure reducing station consisting 3750 University Ave ($25653.0o) Reducing Station Replacement Project 3750 University Ave of two 12"PRV's and an 10"PRV,a buried metering vault, Riverside,CA 92501 Utility conflicts,deleted 184 Riverside,CA Riverside,CA 92S01 Simon Lee $5,939,308.00 bid items,internal $ 5,913,454.00 permanent trench resurfacing and related striping and 6/25/2019 250 calendar days N/A Weka Foreman:Aurelio Viamontes John Farley painting,all in a major shopping Weka Project Manager:Neil Kaufman jfarley@rivemidea.gov zle(951)826-5757 roumnding correction corridor,and appurtenances.Project required Wake to 951 826-5705 (951)826-5757 pass out notice to inform residents of construction and Third Street Storm Drain Stage 2 CIP City of Lake Elsinore City of Lake Elsinore Install approx 3,0001f of 18"-96"RCP,RCB with various Project No.4296 130 S.Main St 130 S.Main St sizes and transitions,Pre-cast and cast-in-place 193 Lake Elsinore,CA Lake Elsinore,CA 92530 Lake Elsinore,CA 92530 installations,manholes,laterals,catch basins,stub outs Farid Dost Sr.Civil Engineer Farid Dost Sr.Civil Engineer $4,066,515.00 $ 16,819.00 $ 4,083,334.00 for future connections,Tunneling under 1-15 Freewayfor 3/15/2019 300 working days N/A Weka Foreman:Les Bredwick fdost@lake-elsinore.org(951)674- fdost@lake-elsinore.org(951)674- 4301f,1/4 ton RIP RAP,19 If of 12"steel sleeve and all Weka Project Manager:Neil Kaufman 3124x246 3124 x246 appurtenants. 13 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTALCONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS City of Redlands Municipal Utilities 2017 CIP Water Pipeline Replacement 35 Cajon St,Suite 4 City of Redlands Municipal Utilities Install approx.1101f of 6"DIP,24,845 If of 8"DIP,175 If Project No.71280 Redlands,CA 92373 35 Cajon St,Suite $159,132.97 of 12"DIP,118 6"-12"gate valves,55 fire hydrants,it 181 Redlands,CA Jason Montgomery Senior Civil Redlands,CA 9 Senior $3,778,786.00 Conflict with,c clay g ry $ 4,034,765.9J fire hydrants with check valve,452 1"services,12 2" 11/2/2018 184 calendar days N/A Weka Foreman:lauro Hernandez Engineer Jason Montgomery Senior Civil line,tie-in,leak,conflict s g� g ry with sewer lateral services.Project required to notify residents when Weka Project Manager:Mark Sisemore jmontgomery@cityofredlands.org Engineer(909)798-7584 x5 construction was going to take place. (909)798-7584 xS Yucaipa Blvd Sewer-Hampton Road to $73,170.00 SBth St Krieger&Stewart,Inc Yucaipa Valley Water District Extend sewer pipeline, 18o Yucaipa,CA 312770 Second Street Yucaipa,CA 3602 University Ave Approx 2,550 If of 8"VCP Sewer Pipe,including Riverside,CA 92501 $526,193.00 add four sewer laterals, $ 599,363.00 manholes,laterals,and appurtenances. 3/27/2019 60 calendar days N/A Weka ProjForeect an:ManaLauger: Mark Sisemore 92399 (909j 797-5118 additional work due to Weka Project Mana er.Mark Sisemore (951i 6846900 1 g other city projects Elsinore Valley Municipal Water Elsinore Valley Municipal Water ET-011601 Zone Dryden St.Water Main District District Elsinore Valley,CA 31315 Cheney Street 31315 Cheney Street Install approx 746 If 8"C-900 class 235 water main, 179 Weka Foreman Jeff Wyatt Lake Elsinore,CA.92530 Andrea Kraft Lake Elsinore,CA.92530 Andrea $216,935.00 $ (6,634.00) $ 210,301.00 resilient wedge gate valves,fire hydmnt/biow off 6/1/2018 60 calendardays N/A Weka Project Manager Neil Kaufman Engineer Project Coordinator Kraft Engineer Project Coordinator assemblies,air/vac assembly,AC grind and overlay akraft@evmwd.net akraft@evmwd.net (951)6743146 x8312 (951)674-3146 x8312 178 Cancelled CWC-EVMWD Linden Booster Station 12"Valve Replacement Puoject(Emergency Work) City of Riverside c/o Riverside Ciy of Riverside Public Utilities Spec No.957 Public Utilities 3750 University Department Water Division Replace the existing 12"butterfly valve at the Linden 177 Riverside,CA Ave,3rd Floor,Riverside,CA 92501 3750 University Ave,3rd Floor, $53,695.00 $ (3,531.00) $ 50,164.00 Booster Pump Station suction pipeline(suction Valve#3) 2/2/2018 6 calendar days N/A Weka Foreman:Lou Melia John Farley(951)826-5705 Riverside,CA 92501 with a new 12"gate valve. Weka Project Manager:Neil Kaufman Simon Lee(951)826-5858 San Joaquin Drive West Sewer Elsinore ValleyMunicipal Water Install approx.2901f of 8"PVC sewer,pipejacking 1191f Relocation(Spec 75875) Krieger&Stewart 3602 University of steel casing,4 new sewer manholes,modification of an Canyon Lakes,CA District Ave Riverside,CA 92501 existing sewer manhole and connection ofthe existing 176 777.00 Weka Foreman:Aurelio Viramontes 31315 Chaney Street Sinisa Saric $550,269.00 $ 24,48B.00 $ 574, ewer Iateral to the new sewer,approx 239 If of 6"PVC 5/25/2018 120 calendar days N/A Lake Elsinore,CA 92530 temporary sewer bypass and Weka Project Manager:Neil Kaufman Larry Rein(951)674-3146 (951)6846900 sewer lateral,as well as abandoning of the existing sewer. 36th Street 8"Water Main Replacement Rubidoux Community Services TKE Engineering Project from Daly Avenue to Crestmore District Install approx.8661f 8"&241f of C900 Polyvinyl Chloride 175 Road P.O.Boxey,C 2305 Chicago Avenue $341,339.00 $ (7,070.00) $ 334,269.00 Waterline,DR 14 and III fittings,58"gate valve and valve 3/27/2018 90 calendar days N/A Weka Foreman:Trent Himle Jurupa Valley,CA 92519 Riverside,CA 92507 box and a Weka Project Manager:Mark Sisemore Paul Moreno(951)6847580 , Brad Enscoe(951)680-0440 ppurtenances Highway 39524-Inch Pipeline Fallbrook Public Utility District 990 Installs Fallbrook Public Utility District 990 East Mission Road,Fallbrook,CA pprox 4751f of24"C.M.L&C.pressurized potable Replacement Job No.3052 East Mission Road,Fallbrook,CA water pipe,one 6"gate valve for a blow off,one 24"gate 174 Weka Foreman:Lauro Hernandez 92089-2290 92088-2290 $460,727.00 $ - $ 460,727.00 valve for an isolation valve,and one 4"airvac,and 7/31/2018 240 calendar days N/A Weka Project Manager:Neil Kaufman Joye Johnson (760)728-1125 lack Sebee(760)728-1125 a ppurenances City of Riverside Department of City of Riverside Department of Remove an existing 3.5-ft manhole and replace it with a Mockingbird Canyon Pump Station (8'L.8'W x 11'D)square vault with hydraulically assisted Meter Vault Replacement RPU-7517 Public Utilities Public Utilities 173 p 3750 University Ave.3rd Floor, 3750 University Ave.3rd Floor, $98,712.00 $ 5,575.00 $ 104,287.00 vault lid and the relocation of the existing SCADA data 4/14/2018 80 calendar days N/A Weka Foreman:Jeff Wyatt transmitter and conduits to the new vault,relocate water Weka Project Manager:Neil Kaufman Riverside,CA 92501 Riverside,CA 92501 J Tamrat Seyoum(951)826-5672 Simon Lee(951)826-5757 sampling station,removal&replacement of 3 traffic bollards. 14 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Jurupa Community Services District Jurupa Community5ervices District Regional Uft StationTask Order No. 11201 Harrel Street 11201 Harrel Street Install 4 manholes,remove external drop and install 172 18SO03 Mira Loma,CA 91752 Mira Loma,CA 91752 $42,991.00 $ 4,400.00 $ 47,391.00 internal drop on the manhole,repair/relocate existing 1/22/2018 N/A N/A Superintendent Trent Himle'.. Keith Backus Keith Backus water service hose bib. (951)685-7434 (951)695-7434 City of Ontario Fascoe Archibald Ave.and Eucalyptus Ave. 1425 S.Bon View Ave., 2g501niand Empire Blvd,Suite B 171 Storm Drain Improvements Tract 18400 Ontario,CA 91761 Ontario,CA 91764 $605,697.00 $ 60,024.00 $ 665,721.00 Install approx.1,244 If of 48"RCP,1701f of 36"RCP,297 12/31/2018 30 work days N/A Steve Ellis Weka Foreman:Aurelio Viramontes Tom O'Neill 909-395- If of 18"RCP and appurtenances Weka Project Manager:Neil Kaufman 2678 (90 5 Ellis 6 o KB Homes French Valley RW Pipeline Ph.1 Eastern Municipal Water District Krieger&Stewart Riverside,County 2270 Tumble Road 3602 University Ave. Install approx.3,1511f of 12"&18"PVC(DR 14)recycled 170 Weka Foreman:Jeff Wyatt Perris,CA 92570 Riverside,CA 92501 $733,548.00 $ 24,000.00 $ 757,548.00 waterlines and appurtenances.Shut downs for 5/16/2018 150 Calendar Days NA Weka Project Manager:Mark Sisemore Anthony Valenzuela Sabrina Nies connections. (951)928-3777 x4451 (951)6846900 Eastvale Collection System Jurupa Community Sew Dist 11201 Albert A.Webb Associates 3788 Installing manhole modifications and sluice gate Improvements Harrel Street McCray Street Riverside,CA 92506 construction 9sluice 169 Eastvale,Riverside County,CA Mira Loma,CA 91752 $764,017.00 $ - $ 764,01700 ( gates at main facilities);piping 7/31/2018 300 Calenday Days N/A Weka Foreman:Les Bredwick Keith Backus Sinnaro Yos,P.E. modifications for lift station quick connect bypass. Weka ProjectManager:Neil Kaufman (951)685-7434 (951)686-1070 assembly. California St and Lugonta Ave Storm Drain Repair City of Redlands Municipal Utilities City of Redlands Municipal Utilities 168 Weka Foreman:DrainRepair Himle Risa Jones Goutam Dobey $83,867.00 $ - $ 83,967.00 Repair Storm Drain 4/6/2018 40 Calendar Days NA Weka Project Manager:Mark Sisemore (909)489-5789 (909)798-7584 ext.2 Jurupa Community Services District Jurupa Community Services District Pinch Valve Replacements 11201 Harrel Street 11201 Harrel Street - 166 Weka Foreman:Jeff Wyatt Mira Loma,CA 91752 Mira Loma,CA 91752 $11,901.00 $ - $ 11,905.00 Replace 194"Pinch Valves 1/25/2018 N/A NA Weka Project Manager:Mark Sisemore Keith Backus Keith Backus (951)685-7434 (951)68S-7434 Waterline Replacement Project in 63rd Street Between Smith Avenue and Dana Santa Ana River Water Company Albert A.Webb Associates 3788 Constructing the replacement of a 12"watermain, 164 Avenue 1053054th Street Mira MCCray Street Riverside,CA 92506 $126,710.00 $ - $ 126,710.00 connections and associated pipes,fittings and 1/7/2018 30 Calendar Days NA Weka Foreman:Aurelio Viramontes Loma,CA 91752 Arnold Sinnaro Yos,P.E. Weka Project Manager:Mark Sisemore Rodriguez (951)685-6591 (951)686-1070 appurtenances,approx 7321f of 12" Camino Sierra Road Pressure Zone Rancho California Water District Michael Baker International (1)above-grade pressure reducing station,including Conversion(Project No.D3807) 42135 Winchester Rd 40810 Country Center Drive,Suite below-grade piping(4",6",8",12"),above-grade piping 163 Weka Foreman:Aurelio Viramontes Temecula CA 92587 200 $1,153,222.00 $ 24,550,00 $ 1,177,772.00 (4",6".8"),fittings and appurtenances.Approx 4,0891f if 7/31/2018 200 Calendar Days N/A Project Manager:Neil Kaufman Heath McMann (951)676-8042 12"PVC below-grade&approx 3,367 If of 8"PVC below- (951)296-6900 grade. Sky Country Trunk SewerJCSD P.N. Jurupa Community Sery Dist 11201 C133526 Albert A.Webb Associates 3788 Install approx.34891f 18"PVC,5751f 15"PVC,15501f 162 Jurupa,Aurelio Harrel Street Mira Loma,CA McCray Street Riverside,CA 92506 $5,269,661.00 $281,744 $5,551,405 12"PVC,120 If PVC SDR 26,Bypass&shut down for 12/13/2017 290 Calendar Days NA 91752 Keith Backus (951)686-1070 Connection. Weka ct Mann:r:Ma Sisem ores (951)685-7434 Project Manager:Mark Sisemore 15.f20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTALCONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Mission Hills Pressure Zone Coachella Valley Water District P.O. Transmission Main and Sky Mountain Box 1058 Coachella,CA Krieger&Stewart 3602 University Pressure Zone Transmission Main 92236 Ave Riverside,CA 92501 Install approx 35,000 If of 36"DIP Transmission main with 161 Coachella,CA Brian Fogg Project Manager Sin Is-Sark $14,658,538.00 $ (87,898.00) $ 14,570,640.00 appurtenances.Four 54"Bore&Jack crossing Rail Road 1/4/2018 330 Calendar Days NA Weka Foreman:Vince Davidson bfogg@cvwd.org (760)398- ssaric@kriegerandstewart.com Tracks and 1-10 Freeway.Shut downs for connections. Project Manager: 2651 (951)684-6900 Mark Sisemore Luke Stowe Enviromental 5uperviser Santa Ana atershetl Project Inland Empire Brine U,3 Reach V Phase Authority Dudek Install approx 5,000LF of 24"PVC,Installation approx 1 Tasks n,3,&4 11615 Sterling Avenue 605 Third Street 23,000LF of CIPP,19 Maintenance access structures, 156 Corona,CA Riverside,eer CA. ana Encinitas,CA.92024 $15,529,461.00 $ (1,654,461.00) $ 14,875,000.00 replacementoffittings&a 12/13/2017 400 Calendar days NA Weka Foreman:Vince Davidson David Ruhl Engineer Management ppurtenances,and temporary 760-942-5147 by passing of brine flows with 18"HOPE Bypass Weka Project Manager:Neil Kaufman druhl@sawpa.org 4th Street Storm Drain Se Vineyard Industrial I Sequence 38 Ontario,CA o Oltmans Construction Michael Baker Intl 14725 Alton Pkwy Install approx 216 LF of storm Drain Inlet,121 LFof 84" c/ 155 Weka Formean:Aurelio Viramontes 10005 Mission Mill Rd Whittier,CA Irvine,CA.92618 $4,149,249.00 $ 228,273.00 $ 4,377,522.00 RCP,1471 LF of 96"RCP,8031f of 102",1101f ofjack& 8/29/2017 120 working days NA Weka Project Manager:Mark Sisemore 90608 Dan Wozniak 949y72-3505 Bore,and appurtenances. 562-948-4242 Euclid Avenue Irrigation Pump Station City of Ontario 1425 S.Bon View Michael Baker Intl and Recycled Water Improvements Ave.,Ontario,CA 91761 Tom 14725 Alton Pkwy Installation of a new recycled water 154 Ontario,CA $522,950.00 $ 79,039.00 $ 601,989.00 pump station,PVC, 12/19/2017 150 Calendar Days NA Weka Foreman:Jeff Wyatt O'Neill 909-395- Irvine,CA.92618 Appurtenances Weka Project Manager:Mark Sisemore 2678 949-472-3505 City of Loma Linda City of Loma Linda Street Storm Drain Dept.of Public works Dept.of Public works 153 Loma Linda,CA 25541 Barton Road Loma 25541 Barton Road $535,143.00 $ 11,912.00 $ 535,143.00 Jack and Bore 54"Steel Casing 10/31/2016 30 Working Days NA Weka Foreman:Vince Davidson Linda,CA 92354 Eleazar Rubalcava Loma Linda,CA 92355(909)799- 814 Linear Feet of 48"RCP Weka Project Manager:Mark Sisemore RCI erubalav@lGmalinda-ca.gov g400 909 799-4400 Wells Spring Street Jurupa Community Sery Dist 11201 Furnishing&installing,testing&making operational the Juru CA Harrel Street Mira Loma,CA Albert A.Webb Associates 3788 150 pa' sewer main repair,sewer lateral replacement,water Weka Foreman:Lauro Hernandez 91752 Keith Backus McCray Street Riverside,CA 92506 $438,409.00 $0 $438,409 8/31/2016 45 CAL Days NA Weka Project Manager:Mark Sisemore (951)686-3070 service replacement epconeme ions, street improvements,all 1 (951)685-7434 connections,appurtenances Milliken/Hamner Storm Drain Tar pan Property 5tanTec Consulting,Inc pa p an c/o Goodman 3105 East Guasti Rd Improvements 18201 Von Korman Ave,Suite 1170, Ontario,CA 91761 Install approx.1579 If 54"RCP,703 If 48"RCP,126 if 36" 149 man:Ontario, Irvine[Amer Kevin Brandt Senior Project $784,628.00 $281,404 $1,066,032 RCP,711f 18"RCP and appurtenances 6/10/2016 120 calendar days NA Weka Foreman:Lauro Hernandez John Carter Weka Project Manager:Mark Sisemore (949)407-0146 Manager (949)923-6211 Fullmer Construction Ridge One-1-10 Development 1725 S.Grove Ave Huitt-Zollers 148 Fontana,CA ontario,CA 91761 3590 Concours N330 Weka Foreman:Vince Davidson Josh Root Ontario,CA 91761 $586,042.00 $0 $586,042 Install approx 15001f 8"Sewer and street improvements 30/30/2016 120 calendar days NA Weka Project Manager:Mark Sisemore iroot@fulimerco.com (909)941-7799 (909)947-9467 Elsinore Valley Municipal Water Illinois Street Pipeline Project REF Consulting 31315 District Lake Elsinore Cheney Street Install approx.4,500 lineal feet of 8-inch PVC potable 40810 County Center Dr,K100 146 Lake Elsinore,CA,92530 Dario $898,998.00 $ 74,739.00 $ 973,737.00 waterline,jack and bore pipeline,and related work, 3/16/2017 150 Calendar Days NA Weka Foreman:Aurelio Viramontes Temecula,CA.92591 Weka Project Manager:Mark Sisemore Yegorova Project Engineer (951)676-8042 potholes and appurtenances dyegorova@iecorporation.com (951)6743146 16 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANOTYPEOF TOTALCONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Inland Empire Brine Line Reach V Phase Santa Ana Watershed Project Dudek Authority 2 145 Corona,CA 11675Ste 605 Third Street Install approx 5,100 LF of 32"IPS HDPE,4 maintenance Riverside,,CA.CA Avenue.92503 Encinitas,CA.92024 $1,880,262.00 $ - $ 1,880,262.00 access structructures,&associated fittings& 9/16/2016 180 Calendar Days N/A Weka Foreman:Aurelio Viramontes (760)942-5147 David Ruhlappurtenances.Bypassing for connections. Weka Project Manager:Mark Sisemore 4- jscheidel@dudek.com Catawba Ave Storm Drain City of Fontana Thienes Engineering c/o Ridge Development Co.2211 Install approx 5,074 feet of Sanitary Sewer and Storm Fontana,CA. 14349 Firestone Blvd 140 Michelson)751-57 Dr,Irvine,CA.92612 $2,187,058.00 $ 129,686.00 $ 2,316,744.00 11/30/2016 60 Working Days N/A Weka Foreman:Vince Davidson La Miradda,CA.90638(774)521- Drain Improvements Weka Project Manager:Mark Sizemore (949)751-(909 Rick Aspril 4811 (909)350.6632 Meredith Offsite 2A Vineyard Industrial RBF Consulting Ontario,CA. 18802 Bardeen Ave Irvine,CA.92612 14728 Alton PKWY Construction of 3515 feet of storm drain on Inland 139 Wake Foreman:Aurelio Viramontes c/o Sares-Regis Group(949)756- Irvine,CA.90710 (800)479- $1,264,535.00 $0 $ 1,264,535.00 Empire Blvd.to include 84"and 72"storm drain 6/30/2016 45 CAL DAYS N/A Weka Project Manager:Mark Sisemore 5959 3808 asso ciated laterals and COS units and diversion manhole CC76-034 Del Rey Drive 8"Sewer Abondon 1,500 LF 8"VCP sewer manholes;install 490 LF Victorville,CA City of Victorville 14343 City of Victorville 14343 8"sch 40 sewer main and manhole;install 100 LF 6"sch 138 Weka Foreman:Aurelio Viramontes Civic Drive 95S-50lle,CA 92392 Civic Drive 60)955-e,CA $99,794.00 $76,253 $176,047 40 sewer lateral;reconnect existing lateral to 8"VCP 1/25/2016 Within 20 working days N/A Weka Project Manager:Mark Sisemore (760)955-5000 92392 (760)955-5158 main 15th Street Turnout Slide Gate Replacement City of Riverside c/o Riverside Leonardo Ferrando,PE Riverside 137 Riverside,CA Public Utilities 3750 University Public Utilities 3750 University 598 Remove old slide gate,furnish and install 56"x53"Slide Ave,3rd Floor Riverside,CA 92501 Ave,3rd Floor Riverside,CA 92501 $23, .00 $0 $23,598 gate 12/3/2015 3 DAYS N/A Weka Foreman:Aurelio Viramontes Weka Project Manager:Mark Sisemore (9511782-0330 (951)782-0330 NS-12.2 Interim Booster Station Yucaipa Valley Water District Krieger&Stewart 3602 University One 300 gallons per minute Pre-Packaged Booster Station Yucaipa,CA Ave Riverside,CA 92501 136 312770 Second Street Yucaipa,CA $317,772.00 $0 $317,772 including onsite piping and electrical work.Approx 200 LF 5/9/2016 120 cal days N/A Weka Foreman:Lauro Hernandez g2399 (909)797-5118 Josh P MacPeek (951) of 24",20",and 12"piping Weka Project Manager:Mark Sisemore 684-6900 Miscellaneous Recycled Pipeline Yucaipa Valley Water District Krieger&Stewart 3602 University Install approx 688 LF of 8",417LF Of 6",990LF of 134 Yucaipa,CA 3127705econd Street Yucaipa,CA Ave Riverside,CA 92501 $411,536.00 $22,826 $434,362 4"cement mortar lined DIP,various laterals,valves, 1/31/2016 75 cal days N/A Weka Foreman:Lauro Hernandez 92399 Brent Anton (909)797 Sinisa Saric 951 684-6900 appurtenances,and connections Weka Project Manager:Mark Sisemore 5118 ( ) potholes, City of Barstow Merrell Johnson Companies 22221 Laverne Ave Flood Control Improvement 220 E.Mountain View St, Highway 18 Apple Valley, Install 1,121 LF of 48"HOPE,517 LF of 60"HDPE,12LF of -Phase 1 Barstow,CA Suite A $1567919 CA 92307 (760)240�8000 James 18"HOPE,60LF of 36"HOPE,1645 RIP-RAP,39LF 24" 133 Weka Foreman/Proeja Manager:Dave Merrill Consulting Contracts , , .00 $0 $1,567,919 HDPEStorm pipe,5 Manholes,932LF of 12"SDR-25 3/16/2016 120 working days N/A Himle Barstow,CA 92311 Manager(760)256-1750 g sewerline,66LF 8"SDR-26 sewerline i,mes.merrell@merrelljohnson.com Sewer Improvements-Inland Empire City of Ontario Albert A Webb Associates Blvd.OM UC Contract No,UT 1516-03 1425 S.Bon View Ave„ 3798 McCray Street Install Approx 3681f 12"VCP sewer main with B-2 trench 132 Ontario,CA Ontario,CA 91761 Riverside,CA 92506 $842,995.00 $144,170 $987,155 bedding,12531f 15"VCP sewer main with B-2 trench 9/30/2016 100 cal days N/A Weka Foreman:Aurelio Viramontes Tom O'Neill Shane Bloomfield bedding,1261f 4"Ductile Iron force main and lift station Weka Project Manager:Mark Sisemore 909-395-2678 (951)686-1070 FPUD Recycled Water Extension-East Fallbrook Public Utility District 990 Fallbrook Public Utility District 990 Sub to Downing Construction East Mission Road,Fallbrook,CA East Mission Road,Fall brook,CA 130 Incorporated $200,000.00 $0 $200,000 Install 950 LF 12"Pipeline-Storm Drain 12/15/201S N/A Downing/Weka Project Manager:Mark 92088-2290 92088-2290Jack Richard Bebee Civil Sisemore Brian Brady (760)728-1125 Engineer(760)728-1125 17 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Lenwood Recharge Basin Bypass Mojave Water Agency Mojave Water Agency Pipeline,Project No.345 13846 Conference Center Dr.Apple 22450 Headquarters Drive Install Approx 4401f of 16"C905 PVC,128 24"CIVIL&C 60 Consecutive Calendar 129 Valley,CA 92307 Apple Valley,CA 92307 Mike $239,400.00 $0 $239,400 9/14/2015 N/A Weka foreman/Project Manager:Dave Pipeline da s Himle Darrell Reynolds Umhaugh (760)946- Y Cemex Victorville Plant Cemex 16888"E"Street,Victorville, Cemex 16888"E"Street,Victorville, 128 Weka Foreman:Aurelio Viramontes CA 92394 Ivan Rosillo(760) CA 92394 Ivan Rosillo(760) $105,686.00 $31,391 $137,077 Sewer Line Repair 994'of 12"Sewer PVC SDR26 5/27/2015 N/A Weka Project Manager:Mark Sisemore 381-7656 381-7656 Chino Potholing Stratham Investors C&V Consulting,Inc Civil 125&126 Weka Foreman:Trent Himle Weka 2201 Dupont Drive,Suite 300 Irvine, Engineering $29,250.00 $0 $29,250 25 Potholes in various locations 10/31/2015 N/A Project Manager:Mark Sisemore CA 92612 27156 Burbank Foothill Ranch,CA Pat Pots 92610 Potholes for Yucaipa Valley Water Krieger&Stewart Krieger&Stewart 124 District 3602 University Ave 3602 University Ave $23,850.00 Riverside,CA 92501 Riverside,CA 92501 $0 $23,850 27 Potholes 4/8/2015 N/A Weka Foreman:Vince Davidson (951)684-6900 (951)684-6900 Potholes for Coachella Valley Water Krieger&Stewart Krieger&Stewart 121 District 3602 University Ave 3602 University Ave Riverside,CA 92501 Riverside,CA 92501 $19,850,00 $775 $20,625 30 Potholes 3/4/2015 N/A Weka Foreman:Vince Davidson (951)6846900 (951)6846900 014-03 25AR C-Waterline Relocation on Umonite Ave,Troth St Santa Ana River Water Company AlbertA Webb Associates and Marlatt St,Jurupa Valley 10530 54th Street 3788 McCray Street Install a rox 200ft 12"and ap prox 900 ft 8"steel p 120 Sub to Downing Construction Mira Loma,CA 91752 Riverside,CA 92506 Mike $429,154.00 $0 $429,154 7/3/2015 N/A Incorporated Arnold Rodriguez Errante waterline with appurtenances DCl/Weka Project Manager:Mark (951)685-6591 (951)686-1070 Pyrite Creek Trunk Sewer Project-Phase Jurupa Community Sew Dist 11201 Albert A Webb Associates 2B Sub Harrel Street 3788 McCray Street 119 to Downing Construction IncorporatedInstall approx 8,250 LF 8",12",24",and 30"Sewer main, Mira Loma,CA 91752 Riverside,CA 92506 54,055,368.00 $0 54,055,368 approx 3,380 LF Sewer slip lining 2/2/2016 270 cal days N/A DCl/Weka Project Manager.Mark Kelly Strahl Siming Zhang Sisemore (951)685-7434 (951)686-1070 Tuscany Trunk Sewer.unctlon and Flow Elsinore Valley Water District Control Structure Projectructi 71 31315 Chaney Street Lake Krieger&Stewart 3602 University LIS Sub to Downing ratedCons uRian Elsinore,CA 92531 William George Ave Riverside,CA 92501 $286,763.00 $0 $286,763 Install Sewer Junction and Flow Control Structure 12/31/2015 210 cal days N/A Incorporated Huffman (951)684-6900 DCl/Weka Prised Manager:Mark (951)674-3146 Sisemore AVRWC Tract 4492 Idaho,Symeron, Apple Valley Ranchos Water Apple Valley Ranchos Water Mondamon Company Company 117 Weka Foreman:Aurelio Viramontes 21760 Ottawa Rd 21760 Ottawa Rd Apple $626,149.00 -$11,224 $614,925 Install 6500'of 6"and 8"PVC,10 Hydrants,80 Potholes 3/31/2015 60 cal days N/A Weka Project Manager:Mark Sisemore Apple Valley,CA 92307 Valley,CA 92307 and approximately 60 services Michael Lent Gregory J.Miles (760)240-8317 (760)247-6484 Eastern Municipal Water Dist.P.O. Install approx 22OLF 8"PVC,60LF 10"PVC,201F 12"PVC, Salt Creek Regional Sewer Box 8300 Albert A Webb Associates 2566LF 15"PVC SDR 26,367LF VCP,3637LF 18"PVC Winchester,CA 3788 McCray Street PS115,2601LF 21"PVC/21"VCP,445LF 24"PVC P5115,14 Vince Davidson Beatriz Pillow Construction 116 Weka Foremen:Aurelio Viramontes and Perris,CA Riverside,CA 92506 $4,082,849.00 $270,710 $4,353,559 48"MH,15 60"MH,1 72"MH W/Epoxy,671f 24"steel 10/2/2015 395 cal days N/A uction Siming Zhang Casing,5491f 24"fusible pipe PVC,931LF 21"VCP,1670LF Weka Project Manager:Mark Sisemore Administrative/Field Engineer (951)928-3777 (951)686-1070 21"PVC PS715;10,0001f 12"HOPE Dewater Line. (Dewatering) 18 of 20 WEKA, INC. PROJECT LIST JOB NO. PROJECT NAME&LOCATION OWNER ENGINEER ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTAL CONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS The H.N.and Frances C. Berger The Altum Group 12"Extension-Berger Foundation Foundation PO 73-255 El Paseo Drive,Ste.15 Northstar Non-Potable Private Water Meter.623 LF 12" 113 Weka Foreman:Aurelio Viramontes Box 13390 Palm Desert,CA 92660 James $100,722.00 $3,682 $104,404 DIP w/field locks,20 LF 18"PVC,130 AC repair 12/5/2014 N/A Weka Project Manager:Mark Sisemore Palm Desert,CA 92255 Bazua Doug Vance 760 341-5293 760 3464750 Apple Valley Ranchos Water 21760 Wika&Kasota Rd-Apple Valley Ottawa Road 112 Weka Foreman:Aurelio Viramontes Apple Valley,CA 92307 Same as Owner $528,933.00 $8,600 $537,533 Install approx 1519 LF 12"PC350 DIP,76 LF 8"PVC,32 LF 1/31/2015 80 cal days N/A Weka Project Manager:Mark Sisemore Mike Lent 6"PVC,74 LF 4"PVC 760-247-6485 GEI Consultants Thomas E.Levy Coachella Valley Water District P.O. 101 N.Brand Blvd,Suite 1780 Construct 810 LF concrete lined Stormwater,30 FT by 35 111 Sub to Downing Construction,Inc. Box 1058 Coachella,CA 92236(760) Glendale,CA 91203 $252,528.00 $0 $252,528.00 FT rip-rap,2-180 LF 42"HDPE,and bank armoring 1/31/2015 N/A 398-2651 MarcJ Rozman approx.1855 LF of pond embankmentwith soil cement. (818)552-6400 Sage Associates,Inc 109 Tract 16335-San Clemente 1301 Dove St,Suite 820 Newport Beach,CA 92660 Same as Owner $7,279.00 $0 $7,279 Storm Sewer Repairs 11/30/2014 N/A (949)724-9600 Sage Associates,Inc 1301 109 Tract 16570-San Clemente Dove St,Suite 820 Newport Beach, Same as Owner $32,095.00 $0 $32,095 Storm Sewer Repairs 11/30/2014 N/A CA 92660(949)724-9600 Premier Silica 520S N.O'Connor Blvd. TKE Engineering 2305 107 Rubidoux Plant Suite 20OW Chicago Avenue Riverside, $433258 Approx,2322 LF Shoring,1829 LF 8"SDR Sewer,251 LF 6" Weka Foreman:Lauro Hernandez Irving,Texas 75 0 3 9-3 746 Beverly CA 92507 Terry Renner , .00 $51,901 $485,159 Sewer Lat,130 LFD 14"Steel Casing,242 LF 1"WS 10/12/2015 N/A Weka Project Manager:Mark Sisemore Dougherty (951)680-0440 The Lakes Country Club Coachella Valley Water District P.O. 102 Sub to Downing Construction Box 1058 Same as Owner $1,136,443.00 $0 $1,136,443 Install approx 3900 LF 12"PVC C900 C905 DR25 11/30/2014 N/A Weka Foreman:Vince Davidson Coachella,CA 92236 Project Manager:Mark Sisemore (760)398-2651 Desert Horizons Country Club Coachella Valley Water District P.O. 101 Sub to Downing Construction Box 1058 Same as Owner $1,048,462.00 $0 $1,048,462 Install approx 960'11/2"Conduit 11/30/2014 N/A Weka Foreman:Vince Davidson Coachella,CA 92236 Project Manager:Mark Sisemore (760)398-2651 Palm Desert Country Club Coachella Valley Water District P.O. 100 Sub to Downing Construction Box 1058 Same as Owner $573,385.00 $0 $573,385 Install approx 3500'12"C900 C905 DR25 11/30/2014 N/A Weka Foreman:Vince Davidson Coachella,CA 92236 Project Manager:Mark Sisemore (760)398-2651 Desert Willow Golf Resort Coachella Valley Water District P.O. 99 Sub to Downing Construction Box 1058 Same as Owner $476,223.00 $0 $476,223 Install approx 1400 LF 20"C900 C905 DR25 11/30/2014 N/A Weka Foreman:Vince Davidson Coachella,CA 92236 Project Manager:Mark Sisemore (760)398-2651 Waterline Replacement Campbell and Jurupa Community Sery Dist 11201 AlbertA Webb Associates 98 Fleming Harrel Street 3788 McCray Street $1,294,307.00 $6,529 $1,300,836 Install approx 7500 LF 8"CML/CMC(10 GA)WSP and 3/31/2015 N/A Weka Foreman:Aurelio Viramontes Mira Loma,CA 91752 Kelly Riverside,CA 92506 Appurtenances Pro ect Manager:Mark Sisemore Strahl Shane Lee Bloomfield Waterline Replacement-Ridgecrest Indian Wells Valley Water District 500 92 Sub to Downing Construction West Ridgecrest Blvd.,Ridgecrest,CA Kreiger&Stewart $1,422,525.00 $0 $1,422,525 Install approx 2690 LF 12"C900 10/31/2014 N/A Project Manager:Mark Sisemore 93555 19 of 20 WEKA, INC. PROJECT LIST ORIGINAL CONTRACT AMOUNTANDTYPEOF TOTALCONTRACT DATE OF CLAIMS,MEDIATION,ARVITRATION JOB NO. PROTECT NAME&LOCATION OWNER ENGINEER AMOUNT CHANGE ORDERS AMOUNT DESCRIPTION COMPLETION CONTRACTTIME OR LAWSUITS,AMOUNT&RESULTS Waite Street 1467 Zone Pipeline Elsinore Valley Water District RBF Consulting 40810 Sub to Downing Construction 31315 Chaney Street County Center Dr., Suite 100 Install approx 3550 LF of 24"DIP 91 Incorporated Lake Elsinore,CA 92531 Temecula,CA 92591 100 $1,914,959.00 $0 $1,914,959 6572 LF of 20"DIP 5/1/2015 N/A Project Manager:Mark Sisemore Larry Rein A925942 (951)674-3146 870 Pressure Zone Pipeline Jurupa Community Sery Dist 11201 Albert A Webb Associates 3788 installapprox 3 LF 30"CMLC, LF 12"C900 90 Sub to Gowning Construction Mira Loma,CA 91752 92506 Sinning Zhang(951)686- $3,354,655.00 $0 $3,354,655 CMLC/C WSP 9,5323 LF 24"CMLC/C C WSP,3443 LF 16" 11/30/2014 N/A Project Manager:Mark Sisemore CMLC/WSP 30 24"DIA RCP 0.1500 Kelly Strahl(951)685-7434 1070 The H.N.and Frances C. Berger Northstar Non-Potable Foundation 89 Private Water Meter PO Box 13390 Same as Owner $71,000.00 $0 $71,000 Vault 2/6/2014 NTP 1/8/14,120 Cal Days, N A Weka Foreman:Vince Davidson Palm Desert,CA 92255 Exp Compl 5/16/14 / Project Manager:Mark Sisemore Doug Vance 760 341-5293 30"Water Pipeline East Valley Water District. Land Engineering Consultants 650 K CA. 31111 Green Spot Rd Highland, NTP i/8/14,120 Cal Days,88 Foreman: Tree CA 92346 Nemesciano Street $1,279,281.00 $92,210 $1,371,491 Install approx 5,315 LF of 30"DIP Water 8/12/2014 N/A Weka Foreman:Trent Himle Calimesa,CA 92320 Exp Compi 5/16/14 Project Manager:Mark Sisemore Ochoa ley.o 889- (909)795-8882 9501 eochoa@eastvalley.org Area B Trunk Sewer&Non-Potable Waterline in Bellegrave Ave Jurupa Jurupa Community Sery Dist 11201 Albert Webb Associates Y Valle,CA Harrel Street 3788 McCray Street NTP 12/17/13,370 Cal 87 Mira Loma,CA 91752 Riverside,CA 92506 $8,696,960.00 $848,210 $9,545,170 Install approx 24,000 LF of 18"&21"PVC Sewer; 10/31/2015 days Expected Comp]Dt N/A Weka Foremen:Vince Davidson,Aurelio Kelly Strahl Simin Zhan 11,200 LF of 16"Steel Water Viramontes,and Lauro Hernandez g g 4/2015 Project Manager:Mark Sisemore (951)685-7434 (951)686-1070 24"Mission Blvd.Pipeline Bid Sch.11 Rubidoux Community Services(Golden West Ave to Carrera Court) District TKE Engineering 2305 86 Jurupa Valley,CA P.O.Box 3098 Chicago Avenue Riverside, Contract/NTP is 7/19/13 by P $1,522,743.00 $22,291 $1,545,034 Install approx 3500 LF of 24"Steel CMLC 3/32/2014 3/16/14 240 Cal days after N/A Weka Foreman/Project Manager:Dave Jurupa Valley,CA 92519 CA 92507 Terry Renner 7/19/13 Himle Ron Young (951)684-7580 (951)680-0440 Peppertree Development Insurance Co.ofthe West Sage Associates,Inc Tract 29843 11455 El Camino Real 1301 Dove St.,Ste.820 Completion of Sewer,Storm Drain,Water,with vertical 82 Hemet,CA San Diego,CA Newport Beach, 92660 $2,117,169.00 $556,888 $2,974,057 turbine pump and controls in masonry building 2/9/2055 183 cal days N/A Weka Foreman:Lauro Hernandez Gordon Patersonrson Ron Nakagawa a Project Manager:Mark Sisemore 860-830-2744 (949)724-9600,ext.20 Pyrite Creek Trunk Sewer Project,Phase Install approx 6,211 LF of 36"PVC PS 115 Sewer; 150 1(DPN 2177)& Regional Jurupa Community Sery Dist 11201 Albert A Webb Associates LF of 10"PVC"SDR 26 Sewer; 2,900 LF of 24"PVC Wastewater Forcemain,Segment 1(DPN Harrel Street 3788 McCray Street C905 CL235 DR18 Swr,5,750 LF of 30"PVC PS 115 80 3729) Mira Loma,CA 91752 Riverside,CA 92506 $g 721,113.00 $2,903,887 $12,525,000 Sewer; 20 LF of 21"PVC PS115 Sewer; 1,780 LF of 11/15/2014 400 cal days N/A Weka Foremen:Vince Davidson,Aurelio Keith Backus Siming Zhang 12"PVC SDR 26 Sewer, 2,430 LF of 8"PVC SDR 26 Viramontes,and Lauro Hernandez (951)685-7434,■135 (951)686-1070 Sewer; 153 LF of 6"PVC 5DR 26 Sewer; 1,460 Project Manager:Mark Sisemore kbackus@jcsd.us siming.zhang@webbassociates.com LF of 12"CMI/CMC WSP Water; 1,230 LF of4"PVC Forcemain; 20 of 20 CITY OF LAKE ELSINORE CIP Project No. Z10032 CONTRACTOR INFORMATION THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 Contractor's License No.: Oo in Class: A a. Date first obtained: n� Expiration � -fin "2S b. Has Bidder's License ever been suspended or revoked? Un If yes, describe when and why: 0 Jig c. Any current claims against License or Bond? 00 If yes, describe claims: NI t� Principals in Company (List all—attach additional sheets if necessary): NAME TITLE LICENSE NO. (If Applicable) --- H; Ie. P -f� c ��'I C-18 CITY OF LAKE ELSINORE CIP Project No. Z10032 VIOLATIONS OF FEDERAL. STATE OR LOCAL LAWS THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 1. Has your firm or its officers been assessed any penalties by an agency for noncompliance or violations of Federal, State or Local labor laws and/or business or licensing regulations within the past five (5) years relating to your construction projects? YES NO (circle one) Federal /State/ Local (circle one) If"YES," identify and describe, (including agency and status): �T]I Have the penalties been paid? YES/ NO (circle one) 2. Does your firm or its officers have any ongoing investigations by any public agency regarding violations of the State Labor Code, California Business and Professions Code or State Licensing Laws? YES / NO (circle one) Code/Laws: Section/Article: If"yes," identify and describe, (including agency and status): 3. Has Bidder been "default terminated" by an owner(other than for convenience), or has a Surety completed a contract for Bidder within the last five (5) years? YES /R (circle one) If"yes," please explain: 4. Has Bidder been cited more than twice for failure to pay prevailing wages in the last five (5) years? YES / NO (circle one) If"yes," please explain: C-19 CITY OF LAKE ELSINORE CIP Project No. Z10032 Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. gI Signature Date II I 7P�i int Name Title Contractor Name C-20 CITY OF LAKE ELSINORE CIP Project No. Z10032 DISQUALIFICATION OR DEBARMENT THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 Has your firm, any officer of your firm, or any employee who has a proprietary interest in your firm ever been disqualified, removed, or otherwise prevented from bidding on, performing work on, or completing(a��f�ederal, state or local project because of a violation of law or a safety regulation? YES / `' (circle one) If yes, provide the following information (if more than once, use separate sheets): Date: Entity: Location: Reason: Provide Status and any Supplemental Statement: Ill A Has your firm been reinstated by this entity? YES / NO (circle one) Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification. 4 8 20 ignature D to q ;��� P int Name Title Contractor Name C-21 CITY OF LAKE ELSINORE CIP Project No. Z10032 If the Bidder fails to properly sign or omits the required signature,the bid will be considered non-responsive and will be rejected. UTILITY AGREEMENT THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO. Z10032 HONORABLE MAYOR AND CITY COUNCIL CITY OF LAKE ELSINORE, CALIFORNIA The undersigned hereby promises and agrees that in the performance of the work specified in this contract for Project No. Z10032, THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT, (1) (we) (it) will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to any electrical secondary, primary or transmission facilities. The term "Qualified person" is defined in Title 8, California Administrative code, Section 2700, as follows: Qualified Person: A person who by reason of experience or instruction, is familiar with the operation to be performed and the hazards involved." The undersigned also promises and agrees that all such work shall be performed in accordance with all applicable electrical utility company's requirements, Public Utility Commission orders, and State of California Cal-OSHA requirements. The undersigned further promises and agrees that the provisions herein shall be and are binding upon any subcontractor or subcontractors that may be retained or employed by the undersigned, and that the undersigned shall take steps as are necessary to assure compliance by any said subcontractor or subcontractors with the requirements contained herein. Signature By Name �rG51�� fro Title Contractor Name C-22 CITY OF LAKE ELSINORE CIP Project No. Z10032 PUBLIC CONTRACT CODE THE AVENUES MASTER PLAN STORM DRAIN IMPROVEMENT PROJECT CIP PROJECT NO.Z10032 Public Contract Code Section 10286.1 Statement In accordance with Public Contract Code Section 10285.1 (Chapter 376, State. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has , has not )t been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. Note: The bidder must place a check mark after"has"or"has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Public Contract Code Section 10162 Questionnaire In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation: Yes_ NO( If the answer is yes, explain the circumstances in the following space. Public Contract Code 10232 Statement In accordance with Public Contract Code Section 10232,the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediate preceding two-year period because of the Contractor's failure to comply with an order of federal court which orders the Contractor to comply with an order of the National Labor Relations Board. Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. ignature P (� Dat � �� z,- Print e/ ��LL Title n)�I Contractor(Name C-23 Registration Number Legal Entity Name Registration Start Date Registration Expiration Date Status Mailing Address DBA Name Craft Name 236 W.Orange Show Road#114 San Bernardino United States of America 92408- 1000003472 WEKA,INC. 7/1/2023 6/30/2024 Active 2036 Tea mster,Laborer,Operating Engineer CONTRACTORS CICC�'3 STATE LICENSE BOARD ACTIVE LICENSE y � Luenae Number 670100 E—Y CORP WEKA INC Ct.aa b,a t.�tat A 04i3Oi2025 www.csib.ca.aov Eabt at _ I a I F 0 R N AIR RESOURCES BOARD (Certificate of Deported Compliance Truck and Bus Regulation Issued to: x Weka Inc CA-274689 25 Vehicles Reported This certificate confirms that the Fleet owner has attested under penalty of perjury that the statements and information they provided to the California Air Resources Board {CARB) are true, accurate, and complete regarding all relevant vehicles in the fleet required to show compliance. CARB hereby finds that the fleet listed above has reported compliance with title 13, California Code of Regulations, section 2025 (Truck and Bus Regulation). If CARB subsequently finds that the statements and information that have been provided are not true, accurate, and complete, this certificate shall be effectively revoked and the fleet subject to noncompliance penalties. Thiscertificate is valid until.. December 31, 2024 Printed on 2923-12-28 TRUCRS Fleet Identification 18976 ]ace Kltcaws3cc Division Clttef,Mobile-Source Control Tc vecify the authenticity ai Ns certjfi ;:Fte,,visit Div sivrrCajifcrnfa Air RezrurYe- 9aard rrw,v +rb ca nQzyfmspr�-I R Ld 1-210iftbloOkLin nh� s r n I,.� 4t�. 'soiiiiie$�. aoy�•imo�oi'._ uo°59iiSa `is0��aa 9f■i•�/`'a eeiW"M ,,00{5111i{{faP1N�. if bOBjvals 1{IIIjPFIe`• io°���4®111BIPp�i, ro°tiS��j611Plds°a, •e°;91�OS91pe1°�+a�+oao°�g4ii891��+p, ,�agypEGQ?�8a�.—.�%°ajB®��pj+oi.—< R=• �019� �or,`,,E;{ IPP,y+•. ,00` ;5 PPS p+.a •agi 5!5 IlP fy., •e;e pg5i511fp 1 +a r°�e� {51lIIpP�I°i�� o°tg lllli � ♦. ro i� p B+ =`-1� 3+n 65 !!'�ii ��#�,4 P��llii �0 5`55 Pjlll5 \5 pp141!�°.f 555 P��II .i�0•�5551 P►P ��rp� oy,5{479NPOp�/°+a �e.h r�1111111 Illlilll/li •. . llllll/�i, ,. .. lHilllrr, �'� It •,�,..{ ����Illlldl/lli',. ����IlRiltl�ii ►:�`a�`��1111II1 - �_ 11.�,_ II-n��1�' �I \ „_i 1 /' 4� c.1�+'a_�1 ++ _���c ,LI� '. /'��\\ `_' �' �• 4 1 I;17 lr yl� � Iy 2t ���■j JANK r' � �•i.ter• r e� Z 11 f�i moo• ®ice`-- I • , '�ss®i Wy o+®ii o■lo� .,� �,�� saovf •.moo�: .-emu+ ar ��m ■ TT � y/�`\1�. 1 •` ► 9i•"+01+/J \`�1i•!�rl+lr �`�5�ii+/ha/ t,�`,�1•+�i%��/ `\�\,5• -I� \ '�.�/ \\-t'I,/ -i_ i,, —s �11J ►►IIp�l J ;1*• .I I�I 11 9�• •0 P/ 1,!�► ►P I�I i( 1`{Oe �IJJ/! ���{55s�.i��1li/f J �`1���i�►i!!!'l� ,,5 j. �. id —� a�Ip 1p /III{�II +i�e l�d/��1��"115ti 5�•i s+•#P�I/'���II'I l{5{{i�i eiP1/p '��1�1'� 5�;�i i•II/P��'�II��1�55 51�a+�►001!//l�Pt����111;1{1{#�`Ie/IlI�I"II'��1 •;.������SI•+�a�l�ift~�{a"a�`�iyPl{i1�0{�0��0��!4��li�liio�o�>��ofPPIIiY{{�{��•°�°ilflli®t9{fD:a a a`di�Oimb�j{i,°: .�QiP$P66ia/{I�;%�e�ia�al9ii0���i.:'_`� :illy- y- �"�iis�ra ��'�i:ii+ram `.�ai9�•�. ��n��.:ivsr •��iYYO��r °ice/gi•�srr �':ili6ii:rr ��iifee% STEVEN MILLER (909)522-1650 Scubasteve247g=ail,com 0BJECTIVI33 To partner with an industry leader that passionately pursues excellence by seeking new and innovative ways to redifine the way business is done. PROFESSIONAL PROFILE ■ Quick learner able to quickly assimilate new processes and responsibilities into daily workflow ■ Meticulous attention to detail as well as exceptional organization&time management skills ■ Positive team player,pro-active&dedicated,with a strong sense of ownership ■ Self-motivated to see jobs completed from beginning to end with a passion for excellence ■ Expert understanding of Excel able to conduct complex programming and processes ■ Thrive in high pressure environments with tight deadlines ■ High regard for customer service with an"extra mile"attitude EXPERIENCE 2022—Present WEKA,Inc. San Bernardino,CA. Estimator ■ Interpret civil engineering plans that include underground utilities,grading and paving ■ Responsible for all job walks&pre-bid meetings ■ Responsible for all project compliance to include bonds and permits ■ Set budgets,schedules and job costing for each project ranging from$100k-$10 Million ■ Manage contract administration acting as General Contractor ■ Managed staff and project priorities to meet budget and deadlines ■ Conduct presentations to showcase project schedules and bids ■ Extensive experience in cultivating long-term clients with a focus on establishing personal relationships 2020-2022 T.E.Roberts,Inc. Irvine,CA. Pr ject Manager/Estimator ■ Interpret civil engineering plans that include underground utilities,grading and paving ■ Responsible for all job walks&pre-bid meetings ■ Responsible for all project compliance to include bonds and permits ■ Set budgets,schedules and job costing for each project ranging from$100k-$10 Million ■ Manage contract administration acting as General Contractor ■ Managed staff and project priorities to meet budget and deadlines ■ Conduct presentations to showcase project schedules and bids ■ Extensive experience in cultivating long-term clients with a focus on establishing personal relationships 2014-2020 G.J.Gentry General Engineering,Inc. Upland,CA. Pr lect Manager/Estimator ■ Interpret civil engineering plans that include topography,grading,underground utilities,and paving ■ Expert in Agtek's"Earth Work 31)"used to execute GPS modeling at construction site ■ Responsible for all job walks&pre-bid meetings ■ Responsible for all project compliance to include bonds and permits ■ Set budgets,schedules and job costing for each project ranging from$100k-$10 Million ■ Manage contract administration acting as General Contractor ■ Managed staff and project priorities to meet budget and deadlines ■ Responsible for the development and maintenance of the Varner corporate website ■ Conduct presentations to showcase project management and project bids ■ Extensive experience in cultivating long-term clients with a focus on establishing personal relationships 2010-2014 Forza Const,/Calterra Inc. Santa Clarita,CA. Estimator ■ Interpret civil engineering plans that include topography,grading,underground utilities,and paving ■ Expert in Agtek's"Earth Work 3D"used to execute GPS modeling at construction site ■ Responsible for all job walks&pre-bid meetings ■ Responsible for all project compliance to include bonds and permits ■ Assisted in the value engineering of projects for the porpose of maintaining project budgets. ■ Set budgets,schedules and job costing for each project ranging from$5 Million-$15 Million ■ Manage contract administration acting as General Contractor ■ Managed staff and project priorities to meet budget and deadlines ■ Responsible for the development and maintenance of the Varner corporate website ■ Conduct presentations to showcase project management and project bids ■ Extensive experience in cultivating long-term clients with a focus on establishing personal relationships • E-MAIL SCUBASTEVE2470GMAII. CONIZ 29123 PALM VIEW LANE. • HIGHLAND, CA 92346 • PHONE (909) 522-1650 STEVEN K. HIMLE Weka, Inc. — Estimator 2003 to Present - Estimated over $1.5 Billion sewer, water and storm drain pipeline projects. - Successfully obtained over $300 Million worth of public works in Southern California. - Increased revenue to $25 - $35 Million per year. - Responsible for projects from submittals through project close out. - Coordinate with field superintendents for successful completion of projects on time and within budget. - Supervise office staff. - See Weka, Inc.'s Project List for references. Kenko, Inc. — Senior Construction Estimator 1986 to 2003 - Responsible for bidding over $3.5 Billion of sewer, water and storm drain pipeline projects throughout the United States. - Successfully obtained $898 Million in contracts. Obtained a 67% win, place or show capture ratio. - Increased revenue from $5 Million to $125 Million. - Supervise office staff of 5 and estimating staff of 3. - Responsible for Project Management of all projects from submittal to close out. These projects ranged from half million to 35 million dollars in size. - Coordinate with 9 field superintendents for successful completion of projects on time and within budget. Himle Plumbing & Excavating — Senior Estimator & Office Manager 1979 to 1986 - Estimator and office manager of a public works, commercial and residential plumbing and excavating construction firm. Rubber Engineering — Supervisor 1978 to 1979 - Shipping department head and production line worker. All Weather Insulation — Supervisor 1976 to 1978 - Supervisor of field crews. Himle Plumbing & Excavating — Head Pipelayer 1968 to 1973 - Pipelayer and general labor. Education: - 1984 Business Management Degree at Brigham Young University Achievements: July 2008 to January 2010 Humanitarian Aid and Missionary in Ethiopia working with government offices, engineers, contractors and local villages to install wells and water pipelines. JARED HIMLE Weka, Inc. — President, CEO & Estimator 2003 to Present - Estimating sewer, water and storm drain pipelines in Southern California. - Successfully obtained $150 Million worth of public works projects. - Coordinate with Superintendents and Foremen on project schedule, equipment, field personnel for successful completion of projects on time and with budget. - Interact and coordinate with Agency's project management. - Responsible for processing change orders. - See Weka, Inc.'s Project List for references. Kenko, Inc. — Estimator 2002 to 2003 - Estimated sewer, water and storm drain pipelines. - Successfully obtained $50 Million worth of public works projects. Weka, Inc. — Laborer 1999 to 2002 - Performed painting, landscaping, concrete work, bollards, air vacs, blowoffs, fencing and small residential and public works water projects. Education: - Crafton Hills Community College, Associate Business Courses - Utah Valley State University, Associate Business Courses - 1999 Redlands East Valley High School, Graduate - CPR/First Aid Training - Competent Person Training - QSP Training NEIL KAUFMAN-PRINCIPAL PROJECT MANAGER Total Experience: 27 years Mr. Kaufman brings over 27 years of professional experience in project management, construction administration,quality assurance and construction of Capital Improvement Projects. Positions of responsibilities have included; Construction Manager, Contract Professional Registration: Administration, Project Manager, Inspector, and General Superintendent. He has been involved with Transmission Pipelines, Booster Stations and Waste Water Reclamation A-General Facilities throughout Southern California, Nevada, and Arizona. Recently Neil has been Engineering License involved with Management and Inspection of Capital Improvement Projects overseeing No.1001558 the construction of Ground Water Recharge and Storage Facilities, Reservoirs,Sewer Lift Stations, Potable and Recycled Water Distribution Systems, Reinforced Concrete Structures and Storm Water Collection Basins. Neil has been involved in all aspects of Construction Management on both the private and the agency sides including project design review, bid preparation, estimating, field inspection, utility coordination, and contract administration. Key Experience: Representative Project Experience: Olive Avenue Regional Sewer Improvements Spec 1249S—Menifee CA • Over 27 Years of Scope of work included construction management and inspection of 10,418LF of 36" pExperience in Public PVC Gravity Sewer Main,observation and documentation of contractors de-watering Works Construction system treatment and discharge,coordination for connection to La Ventana Lift Station under live conditions, monitoring contractors confined space program,coordination • Project Scheduling: of effluent bypass systems,T-lock repairs and coordination of epoxy coating inspections. Microsoft Project Wildomar RW Phase 1 Off-Site Facilities • Multi-Agency Project Management and oversight the construction of 31,000 feet of reclaimed Coordination waterline for Elsinore Valley Municipal Water District.The project scope includes construction of 8"to 12" reclaimed waterlines within the City of Wildomar and Lake • Certificate-Construction Four flow meter/pressure reducing vaults,a bridge crossing, and two pipe jacking Scheduling& Analysis operations.The CM scope of services includes:General oversight on key personnel, schedule review and correspondence, attendance at weekly progress meetings,claims • Competent/Confined review, inspection oversight to insure construction compliance with designed plans and Space Training specifications;job safety;traffic control; review of city and consultant of punch lists, project acceptance and assistance in preparation of as-built plans. • ACI Grade 1 Sun City Force Main&Recycled Water Replacement Specification No. 11805 • 40 Hour HAZWOPER Scope of work included full time inspection and project management of a combined Training 26,000LF of 30"&36"diameter PVC Sewer Force Main and Recycled Water,(5)60" diameter tunnels and improvements to the existing effluent Discharge Header at the Perris Valley Regional Water Reclamation Facility, Warm Springs 30" Force Main Specification 12165—Temecula CA Scope of work included construction management and inspection of 30"diameter PVC Force Main and 12001f of 48"diameter Directional Drill, one 48"diameter Jack& Bore and street improvements and restoration. Mark Sisemore Work experience: Apple Valley Construction Inc. Chief Estimator/Manager 1991 to 2004 Worked there as the Manager and Chief Estimator for 13 years. Achieved in taking it from a 3,000,000,00 dollar a year company, to a 10,000,000.00 dollar a year company. Tasks: Did all Project Management from start of project to end, ordered all material, worked with all crews,work with engineers, developers, and inspectors to solve problems as they arose to make jobs profitable and proceed with ease. Also did Management of over all running of business. I also worked with Bonding Companies, Insurance companies, and payables to achieve a smooth running of daily business. Hughes Supply Estimator 2004 to 2006 Worked as their estimator for all projects in the High Desert, along with helping out the Perris Branch with any overflow they had. Tasks: did all takeoffs, ordered material, worked with cities, engineering firms, inspectors, and developers. Did all project Management from start to finish on the jobs that I worked on. Pyramid Building and Engineering 2006 to 2008 Chief Estimator and Project Manager Began with Pyramid as a start up company in the pipe line business,we have worked on many private developments and commercial projects, and now have started to work on some public works jobs. Tasks: Chief Estimator,Project Manager, Purchasing all material for jobs, work with developers, engineers, inspectors, and suppliers to achieve a smooth job from start to finish. Weka Inc. 2008 to present - Worked as an estimator from 2008 to 2011,my tasks also included project management and working directly with the Superintend and Foreman from start to finish. I have bid single jobs from several hundred thousand up to 6,300,00.00 and followed them though form beginning to end. From 2011 to present I have been working as a Project Manager, and helping with bidding as necessary. I have Project Managed jobs simultaneously from several hundred thousand up to 12,500,000.00 from start to finish. My duties while project manger include working with City's,Engineering Firms, other contractor that may be also work on or near our site,Developers, along with our crew, Working with Safety Officers, Inspectors, along with the general public. Began work with Downing construction is the same capacity in January of 2013, both Weka and Downing Construction began doing r work as a team and I was asked to help with the Construction Management for both companies. I am also familiar with both mac and Pe computers and software. Downing Construction 2013 to July 2016 Working with both Weka and Downing Construction as their Project Manager. I have Project Managed jobs simultaneously from several hundred thousand up to 7,500,000.00 from start to finish. My duties while project manger include working with City's, Engineering Firms, other contractor that may be also work on or near our site, Developers, along with our crew, Working with Safety Officers, Inspectors, along with the general public. Also work with my piers to solve problems and keep the job running smoothly from start to finish. I am also familiar with both mac and Pc computers and software. My ability to grow organizations, optimize profitability,productivity, quality, and safety though best practices would be a strong asset to your team. Please review at your earliest convenience, and then contact me to discuss how I may contribute to your success Sincerely, Mark Sisemore TRENT HIMLE. Weka, Inc. — Vice President/Secretary, Superintendent & Operator 1996 to Present - Responsible for overseeing project schedule, equipment and field personnel. - Supervise field foremen on project installation. - Supervise and coordinate with truck drivers on equipment transportation and delivery of materials. - Responsible for coordinating maintenance of vehicles and equipment. - Interact with Agency's inspectors and project engineers. - Loader Operator as required on pipeline installations. - See Weka, Inc.'s Project List for references. Education: - Crafton Hills College, Business Courses - Ricks College, Business Courses - 1997 Redlands High School, Graduate - CPR/First Aid Training - Competent Person Training - Confined Space Training - QSP Training AURELIO VIRAMONTES SUMMARY OF QUALIFICATIONS • Pipeline Foreman • Pipe Layer • Storm Drain Structures • Concrete Finisher • Sewer T-Lock Manholes • Operate equipment to include backhoes, excavators, and loaders • Read blueprints • Full understanding and knowledge of elevations & survey staking SUMMARY OF EXPERIENCE • All phases of pipeline installation from being in the ditch to organizing crews as foreman, ensuring a safe working environment and teaching proper installation techniques; ordering materials; coordinating deliveries and equipment and communications between crews, management, and personnel. _ PROFESSIONAL CERTIFICATIONS • Confined Space Entry • Basic Electrical Safety • Competent Person • Heat Stress Safety • Cranes and Rigging • Barricades/Flaggers/Traffic Control =- • Hand & Power Tool Safety • GHS/SDS/HAZARD Communications • Health Hazards in Construction • 30 Hour OSHA • Fall Protection • Excavation & Soil Testing • CPR/Basic Plus First Aid/AED • MSHA EXPERIENCE FOREMAN WEKA, INC. - Highland, CA Aug 2012-Present PIPELAYER Don Kelly Construction, Bozeman, MT. Mar 2012-Jul 2012 PIPELAYER Pacific States Engineering, Menifee, CA. Jul 2011-Jan 2012 FOREMAN Karl Scanlan, Menifee, CA. Jan 1991-Feb 2010 Vincent W. Davidson SUMMARY OF QUALIFICATIONS • Pipeline Foreman • Pipe Layer • Storm Drain Structures • Concrete Finisher • Sewer T-Lock Manholes • Operate equipment to include backhoes, excavators, and loaders • Read blueprints • Full understanding and knowledge of elevations & survey staking SUMMARY OF EXPERIENCE • All phases of pipeline installation from being in the ditch to organizing crews as foreman, ensuring a safe working environment and teaching proper installation techniques; ordering materials; coordinating deliveries and equipment and communications between crews, management, and personnel. • Water Mains: Ductile iron, PVC, CMLC, HDPE (fused), water services, fire hydrants, hydro testing, chlorinating, bacteria sampling. • Sewer: Clay, PVC, ductile iron, SDR, build and pour t-lock manholes, air testing. • Storm Drain: Corrugated steel, RCP, HDPE • Concrete Structures: Manholes, junction structures, catch basins, headwalls, rebar, HDPE manholes, flatwork PROFESSIONAL CERTIFICATIONS -_ • Trench Excavation • Flagging • Trench Shoring • First Aid/CPR • Fall Protection • Confined Space Entry • Competent Person • SWPPP • AQMD EXPERIENCE FOREMAN WEKA, INC. - Highland, CA May 2012-Present MANHOLE CONSTRUCTION FOREMAN McGuire & Hester-Terracon, Oakland, CA. Feb 2011-Oct 2011 PIPELINE FOREMAN Sukut Construction, Inc., Santa Ana, CA. Aug 2008-Dec 2010 PIPELINE FOREMAN, STRUCTURE BUILDER, PIPE LAYER Desert Pipeline, Thermal, CA. Mar 1995-Aug 2008 Les Bredwick SUMMARY OF QUALIFICATIONS • Pipeline Foreman • Pipe Layer • Storm Drain Structures • Concrete Finisher • Sewer T-Lock Manholes • Operate equipment to include backhoes, excavators, and loaders • Read blueprints • Full understanding and knowledge of elevations & survey staking SUMMARY OF EXPERIENCE • All phases of pipeline installation from being in the ditch to organizing crews as foreman, ensuring a safe working environment and teaching proper installation techniques; ordering materials; coordinating deliveries and equipment and communications between crews, management, and personnel. • Water Mains: Ductile iron, PVC, CMLC, HDPE (fused), water services, fire hydrants, hydro testing, chlorinating, bacteria sampling. • Sewer: Clay, PVC, ductile iron, SDR, build and pour t-lock manholes, air testing. • Storm Drain: Corrugated steel, RCP, HDPE • Concrete Structures: Manholes, junction structures, catch basins, headwalls, rebar, HDPE manholes, flatwork PROFESSIONAL CERTIFICATIONS • Trench Excavation • Flagging • Trench Shoring • First Aid/CPR • Fall Protection • Confined Space Entry • Competent Person • SWPPP EXPERIENCE FOREMAN WEKA, INC. - Highland, CA Jan 2018-Present PIPELAYER WEKA, INC.-Highland, CA Sept 2005-Jan 2018 David Tosta Work Experience: Superintendent / Construction Foreman • Manage installation of equipment and instrumentation for automated control. • Work with regulatory staff. • Train others associated with job duties. • Manage and make decisions related to the performance of work, schedule, delivery, logistics, quality control, and trade employee staffing levels. • Provide technical assistance regarding construction methods and equipment. • Manage the work to ensure that is completed in compliance with and conforms to the approved contract documents. • Primary liaison with project managers and engineers with the day to day construction activities of the project t. • Monitor quality standards of all jobs, including contractor performance, and ensure that all quality assurance and company standards are being met. • Identify potential changed conditions and inform project engineer and project manager. • Provide guidance in resolving construction problems encountered. • Projects included water, sewer, storm drain, and gas. Recent Proiect completed: • Los Angeles Historical Park • San Diego CHP Facility Lake Gregory Dam Rehabilitation Project Rubidoux Sewer Lift Station Lake Forest Community Center and Sheriff Station Calico Ghost Town State RV Park