Loading...
HomeMy WebLinkAbout11-044 SIGNING AND STRIPING GENERAL NOTES 1. ALL LINES AND MARKINGS SHALL CONFORM TO THE CALIFORNIA MANUAL ON TRAFFIC CONTROL DEVICES (CA MUTCD) AND 9. THE CONTRACTOR SHALL FURNISH AND INSTALL RAISED CALTRANS STANDAR PLANS AND SPECIFICATIONS(LATEST PAVEMENT MARKERS (RPMS) WITHIN SEVEN WORKING DAYS OF EDITION). ROADWAY STRIPING. ALL EXISTING RPMS WITHIN THE PROJECT AREA SHALL BE REPLACED IN KIND OR REMOVED IN