Loading...
HomeMy WebLinkAbout2022-3067 Plans SHEET INDEX APPLICABLE CODES CONSTRUCTION NOTES PV1 TITLE SHEET 2019 CA BUILDING CODE A. A LADDER SHALL BE IN PLACE FOR ANY INSPECTIONS IN COMPLIANCE WITH OSHA REGULATIONS. PV2 ROOF/SITE PLAN 2019 CA RESIDENTIAL CODE B. PV MODULES ARE NON-COMBUSTIBLE IN NATURE. C. THIS SYSTEM IS A UTILITY INTERACTIVE(GRID CONNECTED)SYSTEM AND DOES NOT HAVE STORAGE BATTERIES(UNLESS SPECIFICALLY INDICATED ON SHEET PV3&PV3.1). PV3 ELECTRICAL LINE DIAGRAM/DETAILS 2019CA MECHANICALCODE D. AGROUND ELECTRODE SYSTEM WILL BE PROVIDED IN ACCORDANCE WITH CEC 690.47&250.50-250.166. GROUNDING ELECTRODE SYSTEM OF EXISTING BUILDING MAYBE USED WHEN 2019 CA ELECTRICAL CODE BONDED AT THE SERVICE ENTRANCE. IF EXISTING SYSTEM IS INACCESSIBLE OR INADEQUATE,OR IS ONLY METALLIC WATER PIPING,A SUPPLEMENTAL GROUNDING ELECTRODE WILL BE USED PV3.1(AS NEEDED) ELECTRICAL LINE DIAGRAM/DETAILS AT THE INVERTER LOCATION CONSISTING OF A UL LISTED 8FT GROUND ROD WITH ACORN CLAMP. GROUNDING ELECTRODE CONDUCTORS SHALL BE NO LESS THAN#8 AWG AND NO GREATER 2019CA GREEN CODE THAN#6 AWG COPPER AND BONDED TO THE EXISTING GROUNDING ELECTRODE TO PROVIDE FOR A COMPLETE GROUNDING SYSTEM. PV4 EQUIPMENT LABELS 2019CA PLUMBING CODE E. EACH MODULE WILL BE GROUNDED USING THE SUPPLIED CONNECTION POINTS IDENTIFIED IN THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. PV4.1 PLACARD F. THE EXPOSED METALLIC TABS OF THE SOLAREDGE OPTIMIZERS SHALL BE BONDED AND/OR GROUNDED PER NEC/CEC 690.43(A)AND THE MANUFACTURERS'INSTRUCTIONS. 2019CA ENERGY CODE G. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER CEC 110.26. PV5 ATTACHMENT PLAN 2019CARESIDENTIALFIRE CODE H. ALTERNATE POWER SOURCE PLACARD SHALL BE PLASTIC,ENGRAVED IN A CONTRASTING COLOR(WHITE). THIS PLAQUE WILL BE PERMANENTLY ATTACHED&UV RESISTANT. I. ALL PLAQUES AND SIGNS WILL BE INSTALLED AS REQUIRED BY 2019 CEC. PV6 STRUCTURAL COMPONENTS J. A SMOKE DETECTOR,APPROVED AND LISTED BY THE STATE FIRE MARSHAL,SHALL BE INSTALLED IN EACH DWELLING WHEN A PERMIT FOR ALTERATIONS,REPAIRS OR ADDITIONS EXCEEDS PV7 PROPERTY LINES $1,000.00. A BATTERY POWERED SMOKE DETECTOR SATISFIES THE REQUIREMENTS FOR A SMOKE DETECTOR. APPROVED COMBINED SMOKE ALARMS AND CARBON DIOXIDE ALARMS SHALL BE ACCEPTABLE.A CARBON MONOXIDE DETECTOR SHALL BE INSTALLED IN THE SPECIFIC EXISTING DWELLING UNIT THAT HAVE ATTACHED GARAGES OR FUEL-BURNING APPLIANCES FOR STRUCTURAL ENGINEERING CALCS(IF RECL) WHICH A PERMIT IS ISSUED FOR ALTERATIONS,REPAIRS OR ADDITIONS EXCEEDING$1,000.00. LISTED SINGLE-OR MULTI-STATION CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE EQUIPMENT DATA SHEETS OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EVERY LEVEL OF A DWELLING UNIT INCLUDING BASEMENTS. COMBINED SMOKE/CARBON MONOXIDE ALARMS MAY BE USED. THE ALARM SHALL RECEIVE ITS PRIMARY POWER FROM THE BUILDING WIRING EXCEPT IT IS PERMITTED TO BE SOLELY BATTERY OPERATED WHERE REPAIRS OR ALTERATIONS DO NOT RESULT IN THE REMOVAL OF WALLAND CEILING FINISHES OR THERE IS NO ACCESS BY MEANS OF AN ATTIC. CONTRACTORS LICENSE#&TYPE K. THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE BETWEEN THE GROUNDING ELECTRODE AND THE PANEL(OR INVERTER)IF SMALLER THAN#6 AWG OCCUPANCY&CONSTRUCTION TYPE COPPER WIRE AS PER CEC 250-64B. THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXCEPT FOR SPLICES OR JOINTS AS BUSBARS WITHIN LISTED EQUIPMENTAS PER CEC SCOTTLEDUC 250.64C. OCCUPANCY-133 L. ROOF COVERINGS SHALL BE DESIGNED,INSTALLED,AND MAINTAINED IN ACCORDANCE WITH THE BUILDING CODE OF THE LOCAL JURISDICTION. CONSTRUCTION-56 C-10#1020761 M. PV SYSTEMS CONNECTION IN THE SWITCH GEAR(PANEL)SHALL BE POSITIONED AT THE OPPOSITE END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AS PER CEC 705.12(B)(2)(3)(b). N. ALL EQUIPMENT SUPPLIED SHALL BE UL LISTED OR LISTED BY A LISTING AGENCY RECOGNIZED BY THE STATE IN WHICH THE SYSTEM IS CONSTRUCTED. 0. AC DISCONNECTS SHALL BE IN COMPLIANCE WITH CEC 690.17. P. ALL DC CONDUCTORS SHALL BE 90°RATED THHW,THWN-2,USE-2 OR PV WIRE.ALL AC CONDUCTORS SHALL BE 75°RATED THWN WIRE. Q. ANY DC RUNS INSIDE THE BUILDING MUST BE IN METAL CONDUIT AND LABELED EVERY 101. R. THE UTILITY DISCONNECT HAS VISIBLE BLADES,IS LOCKABLE AND IS ACCESSIBLE TO THE UTILITY 24/7. S. ALL BREAKERS SHALL BE SUITABLE FOR BACK FEED. WHEN BACK FED BREAKER IS THE METHOD OF UTILITY INTERCONNECTION THE BREAKER SHALL NOT READ TINE AND LOAD'. T. COORDINATE ANY POWER OUTAGE WITH LOCAL UTILITY AND PROPERTY OWNER. NOTIFY UTILITY BEFORE ACTIVATION OF PV SYSTEM. U. CITY BUILDING INSPECTOR SHALL INSPECT ACCESSIBLE STRUCTURAL CONNECTIONS AND THE HOUSE CURRENT SIDE OF THE SYSTEM,ALL OTHER EQUIPMENT SHALL BE UL LISTED AND APPROVED. V. PHOTOVOLTAIC MODULES SHALL NOT BE INSTALLED OVER ANY ATTIC,PLUMBING OR MECHANICAL VENT. PLUMBING VENTS TO EXTEND A MIN OF 6"ABOVE ROOF OR MODULE. NO BLDG, PLBG OR MECH VENTS TO BE COVERED,OBSTRUCTED OR ROUTED AROUND MODULES. W. ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER THE OPENINGS SUCH AS WINDOWS OR DOORS,AND LOCATED AT A STRONG POINT OF BUILDING CONSTRUCTION.FIELD VERIFY EXACT LOCATION. X. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED.NO SOLID WASTE,PETROLEUM BYPRODUCTS,SOIL PARTICULATE,CONSTRUCTION WASTE MATERIAL OR WASTEWATER ON CONSTRUCTION OR BY CONSTRUCTION ITIES SHALL BE PLACED, O �T T IHYyFDONYFY. ALL WRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS AND FOR SUCH USE AN EL I D OF OF THE ROOF A BUILDING DIVISION 'rECTOR Z. ALL EQUIPMENT AND CONDUITS SHALL BE PAINTED TO MATCH ITS EXISTING BACKGROUND COLOR OF THAT LOCATION. SYSTEM NOT TO BE ENERGIZED UNTIL BY THE LOCAL UTILITY. � } �n kr�� �,��.7 AA. NO ROOFTOP CONDUIT RUNS,J-BOXES,VENTS,OR OTHER EQUIPMENT OR OBSTRUCTIONS ARE ALLOWED IN THE ST IA—:F Ir AR Z Ltlj T I c�1Annr tG Y1 0 1 n e eFill a 6$7 W. GALENA PARK 041/0. STr. 10? PH01gE tDO1/ 990-1775 V I C I N I T) /07/2022 3:09:54 PM DRAPER, rl'PAN H4020 W14W.VE17TDR9E.C=M as+. ea _FA P, nyon Ni s Ca aA ry rrESSJ P QJ ns 3 Tel-Path Commu i 9 atlons re`g A P P��F' \O VIE D+ n PIS e c .m �,� G 7 n 0w� ,war Herk Bouris R� �6P OElementary School �i]! 'C IV I'l.. y`4 Integritas Q f 6 e 4. i aS OF CA��� O Lake Elsinore T-Shirts Fa ale a < `a VI" Q Waxen no, i `ec ode o a"o, MacDonald Carpet Cleaning ,/y'y JFS J//Jy //�,//�' g � 0!9 V0t LOLL 9 a p� lei a Sq rp�rn a//SD VSE Project Number- U1932-0302-221 a .o Dog Gamut d you Rim or Apex Solar Co G0e,�o Qa 6„ Qlclean Commercial Vector Structural Engineering has reviewed the existing Q Q 8 c,,aC, services structure with loading from the solar array and seTew Super Divas _ connections to the existing framing.The design of the F`nn�,Ln x racking system,racking connections,and all other `°f structural is by others.Mechanical,architectural,and all ee'0A 6`9�i QCanyon Hills other nonstructural aspects of the design are by others. It 9, e° Electrical is by others.unless stamped by Dean Levorsen. 0 0 SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR 4SYSTEM SIZE SkW/DC 6kW/AC --- TITLE SHEET 103A MILLBURY ST, ERIC HOLLMAN Planar c t AUBURN MA 01501 � DATE: 10/13120223:49:53 PM --- 34269 CHAPAROSSA DR, 888-997-4469 1 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV1 C-10#1020761 DATE: 10/13/2022 3:49:53 PM REVIEWED BY: DARRIEL FERRER SAI i -- AZIMUTH ANDTILTANG ROOF LE CHAPAROSSA DR ROOF A: ROOF B: ROOF C: ROOF D: ROOF E: ROOF F: AZIMUTH TILTANGLE 4/12 4/12 MODULE COUNT 20 SOLARACCESS TSFR AV EREAGE INVERTERS SOIAREDGESE®BOH-USRGM 1 OPTIMIZER SOLAR EDGE P401 20 MODULE#1: COUNT: MODULE#2: COUNT: TOTAL COUNT: HANWHA O-CELLS O.PEAK DUO BLK ML-G lO.a+q00 20 20 O r--F� CALIFORNIA FIRE CODE SETBACKS 8 7 SYMBOLLEGEND 9 2 1 ❑ = MECHANICAL VENT 'L O = FLUE/ PLUMBING VENT H-,� MAIN SERVICE PANEL Q❑2 UTILITY METER AND GMA R A ROOF AREA CALCULATION: 7 AC DISCONNECT TOTAL AREA OF ARRAY(S)=639.7 SQ. FT. \ J TOTAL AREA OF ROOF=2532 SQ. FT. \ PERCENTAGE OF ROOF COVERAGE= 25.3% \ CEC 110.26 F4] PV SUB PANEL y �� Isinore \ \ ❑ I' I IG DIVISION 4.1 NOT USED ° \\ ° ermit [5] INVERTER& INTEGRATED DC DISCONNECT e: 7/2022 3:09:54 PM [5.1] EXISTING 3.84kW PV SYSTEM INCLUDES: (12)320W EXISTING MODULES 320W EXISTING MODULE: EXIST. EXIST. EXIST. EXIST. EXISTING INVERTER POWER ONE 360V 'VECTOR ° ------+------+------+------� APPROVED EXISTING AC DISCONNECT c n • I n c c R • EXIST. EXIST. I EXIST. I EXIST. l ° 65! W'.�a�EMA Pa a2®y,vp.`yTF- 141 AHONE r6L7f1 4917-I'�7S I I I I 1l(V4Yl N. rlLN sa Oar7 www.Y£L'T�RS£.CDM r------+ —+ —+ —� OOPTIMIZER (TYPICAL FOR EACH MODULE) FESSlp EXIST. EXIST. EXIST. 1 EXIST. �4 O .PR rL, r------ L-------L------�------� ❑ OJUNCTION BOX ROOF SIZED DETERMINED IN FIELD c,� ❑ ❑ LU LU 5 ❑ ❑ OPV MODULES * FLAT TILE OCONDUIT RUN IS SURFACE MOUNTED �r9 4FCA��FQ�\� (ACTUAL CONDUIT RUNS TO BE DETERMINED IN THE FIELD) a9/3o/2a22 Fol NOT USED VSE Project Number: U19320302221 Vector Structural Engineering has reviewed the existing structure wdh loading from the solar array and screw connections to the existing framing.The design of the racking system,racking connections,and all other 0' 5' 10, structural is by others.Mechanical,architectural,and all other nonshumnal aspects of the desgn are by others. Electrical is by others.,unless stamped by Dean Levorsen. SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR 103A MILLBURY ST, SYSTEM SIZE 8kWIDC 6kw/Ac ERIC HOLLMAN ROOF/SITE PLAN Planet , AUBURN MA 01501 DATE: 10/13/2022 3:49:55 PM --- 34269 CHAPAROSSA DR, 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV � C-10#1020761 DATE: 10/13/2022 3:49:55 PM REVIEWED BY: DARRIEL FERRER SAI OPTIMIZER SPECIFICATIONS PV MODULE#2 SPECIFICATIONS INVERTER SPECIFICATIONS EXISTING MAIN SERVICE PANEL MAKEANDMODEL SOLAR EDGE P401 CELLS SOLAR EDGE MANUFACTURER: EATON/CUTLER INPUTS OUTPUTS Q.PEAK DUO TEMP MANUFACTURER AND MODEL SE600OH- HAMMER MAX INPUT VOLTAGE ATVOCJMN 60 [VI 60 1 MAX OUTPUTVOLTAGE BLK ML- ADJUSTED MAX DC INPUTVOLTAGE IV] 490 PANEL MODEL NUMBER: MAX SHORT CIRCUIT CURRENT Isc 12.5 [A] IS MAX OUTPUTCURRENT MAKEANDMODEL G10_a.400 VALUES MAXOUTPUTPOWER [W] 500D [V] MAX POWER-POINT CURRENT(.. [A] 10.77 VOLTAGE: 240v MAX DC INPUTCURRENT 12.5 [A] 15 ACTUAL STRING OUTPUTCURRENT NOMINAL DC INTPUT VOLTAGE [V] 380 RATED INPUT DC POWER 401 WN] 380 ACTUAL STRING OUTPUTVOLTAGE MAX PORCUITVWER VOLTAGE (VA E(VM>) IV] 343.5 31.6 NOMINAL AC OUTPUT VOLTAGE V 240 PHASES: 1 I OPEN CIRCUIT VOLTAGE(Vag) IV] 43.5 46.6 NOTE L OPTIMZERSTO BE GROUNDED USING 114"HEX HEAD BOLT,WASHER,NUT FOR TOP RAIL MOUNT.SUPPLIED SS SHORT CIRCUIT CURRENT(Isj [A] 11.14 MAX CONTINUOUS OUTPUT CURRENT [A] 25 BOX/BUSS RATI NG: 125 [A] STAR WASHER. MAX SERIES FUSE(OCPD) IA] 201 MAX FUSE(OCPD) [A] 35 MAIN BREAKER: 125 [A] MAX POWER(P,_) [W] 400 MAX DC IN PUT CURREN T* [A] 16.5 PV SYSTEM BR EAKE R SIZE N/A [A] MAX VOLTAGE IV.) (V] 100p `DC CURRENT U MITED BY I NVERTER AT DC DISCONNECT. #OF SPARE BREAKERS 2 NOTE:SOLAR EDGE INVERTERS&OPTMIZERS WITH INTEGRATED GROUND MEETTHE REQUIREMENTS FOR UNGROUNDED PV POWER SYSTEMS IN SECTIONS 690.35&690.41 OF THE 2008,2011,2014 NEC,AND 2017 NEC(2019 CEC).THEREFORE GROUND FAULT RED.OF 690.35 ARE MET AND SIA NG OF CONNECTION BY UTILITY EXISTING INVERTER POWER ONE 360V EQUIPMENTGROUND PER 690A5&250.122 ARE SATISFIED. APPROVED GMA/RMA DEVICE EXISTING 4EXISTING STING NOTE 1: IFTHE EXISTING MAIN SERVICE PANEL DOES NOT HAVE VERIFIABLE GROUNDING ELECTRODE,IT IS THE PV CONTRACTOR'S RESPONSIBILITYTO INSTALL A SUPPLEMENTAL GROUNDING ELECTRODE. NOTE2:ENSURE G.E.C.INSTALLEDAS PER NEC 690.47&250.64. 2)EXISTNG MODULES 320W EXISTING PV MODULES ---------------------� INTEGRATED MODULE&RACKING GND METHOD UL 2703 APPROVED � 10 MODULES/OPTIMIZERS IN A STRING 3 � + RED I STRING CALCULATIONS CONNECTION MADE UTILITY 1 CIRCUIT WITH 10-SOLAR EDGE P401 OPTIMIZERS IN SERIES sE sE . . . sE L1 I APPROVED GMA DEVICE [2 4000W / 380V ACTUAL STRING CURRENT 10.53A 7.2 380V / 10 ACTUAL VOLTAGE PER OPTIMIZE 38.OV I I BLACK .� 1 X 380V MAX SYSTEM VOLTAGE 380V ------- -------L---------� 1 X 15A MAX SYSTEM CURRENT 15A 10.1 9 30A-2P MAIN: 125A 10 X 40OW <---ACTUAL I MAX POWER DC---> 4000W 4 8.2 2 I ((2TTI0A AC) 1 (RELOCATED Citv of Lake Flsmnore 1 MODULES/OPTIMIZERS INA STRING EXISTG) $ USED + RED 60A-2P PlGULCL'JI19IB 11Tyr OS'j"fMERS IN SERIES (4 AA AC) I CI I1 I1 I1�11L tttF LL PG - L1 L1 I 4000w / 380V ACTUAL STRING CURRENT 10.53A sE El • • • sE L2 35A-2P L2 I 7'1 / T V PV OPTIMIZE 38.OV L N (25A AC) N 1 X 380V MAX SYSTEM VOLTAGE 380V _ BLACK L2 N (NEW) N I N 1 X 15 STEM CURRENT 15A ------- c------_L__-_------ _ ----- - -Ep J 10 X 400 <-- CTUAL[MAX POWER DC--->r L2G --- --- G GISIBLE BLAD GND I TOAPPROVED VISIBLE BLADE ELECTI UTILITY2 3 4 LOCKABLE l GRID W/UTILITY - 5 ACCESS 24/7 5 NOTE 1 EQUIPMENT SCHEDULE TAG DESCRIPTION MANUFACTURER PARTNUMBER NOTES 1 SOLAR PV MODULE#1 HANWHA Q-CELLS Q.PEAK DUO BILK ML-G1O.a+400 HANWHA Q-CELLS Q.PEAK DUO BILK ML-G10.a+400 QUANTITY 20 2 INVERTER#1 SOLAR EDGE SE6000H-USRGM SOLAR EDGE SE6000H-USRGM QUANTITY 1 3 OPTIMIZER SOLAR EDGE P401 SOLAR EDGE P401 OUANTITY 20 4 RACKING SNAPNRACK SNAPNRACK ULTRA CONDUIT AND CONDUCTOR SCHEDULE 5 IJ-BOX SELECTED IN EIELD TAG DESCRIPTION OF CONDUCTOR TYPE CONDUCTOR SIZE(AWG) #OFCONDUCTORS CONDUITTYPE CONDUITSIZE 6 GROUNDING SNAPNRACK SNAPNRACK ULTRA MODULE TO RAIL RAIL TO LBOX 7 NOT USED 1 PV WIRE #10 4 IN FREE AIR 7.1 GMA SCE 2 EGC/GEC #6 1 IN FREE AIR SOLID BARE 7.2 NEW SUBPANEL SQUARE D OR EQUAL 240V 60A-MLO 3R 12ckt NEMA 311 3 THWN-2 #10&#6 4&(1)G EMT 3/4" 4 THWN #8&#10 3&(1]G EMT 3/4" 8 AC UTILITY DISCONNECT SQUARE D OR EQUAL 0222RB,240V,60A,2P,3R NEMA 3R 5 THWN #6&#8 3&(1)G LFMC 1" CONDUCTOR CALCULATIONS: 1.ALL CONDUCTORS ARE 8.2 INTERGRATED DC DISCONNECT SOLAR EDGE 3)15 x 1.25=18.75a 4)25 x 1.25=31.25a DESIGNED FOR LESS THAN 2% 9 RAPID SHUTDOWN SOLAR EDGE INTEGRAL TO INVERTER #10AWG=40a #8AWG=50a VOLTAGE DROP. 310.15(3)(c)=58'C T310.15(0)(2)(a)=39"C 2.ALL EXTERIOR CONDUITS 10.1 INTERGRATED REVENUE METER SOLAR EDGE INTEGRAL TO INVERTER T690.31(A)18.75a/0.71=26.41a 31.25a/0.91=34.34a SHALL HAVE WATERPROOF 11 EXISTING MAIN SERVICE PANEL EATON/CUTLER HAMMER T310.15(13)(3)(a)=26.41a/0.8=33.01a 34.34a<50a FITTINGS. 33.01a<40a SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR SYSTEM SIZE skwroc 6kW/Ac RISER DIAGRAM 103A MILLBURY ST, ERIC HOLLMAN Mgt Planet AUBURN MA 01501 _14 �� DATE: 10/13/2022 3:50:02 PM --- 34269 CHAPAROSSA DR, > 888 997 4469 LAKE ELSINORE, CA 92532 - DESIGNER: D.LOPEZ PV3 CONTRACTOR LICENSE: C-10#1020761 DATE: 10/13/2022 3:50:02 PM REVIEWED BY: DARRIEL FERRER SAI NOTE: PLAQUES SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH NON CORROSIVE, POP-RIVETS, SCREWS, OR APPROVED ADHESIVE. O &AACATION: MAIN SERVICE PANEL O CONDUIT, RACEWAYS & ENCLOSURES 11 LOCATION: MAIN PANEL WARNING POWER ;: '. ' SOLAR PV SYSTEM EQUIPPED ELECTRIC SHOCK HAZARD WITH RAPID SHUTDOWN DO NOTTOUCH TERMINALS O LOCATION: DC DISCONNECT/INVERTER#1 TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED PHOTOVOLTAIC SYSTEM DC DISCONNECTTURN RAPID SHUTDOWN IN THE OPEN POSITION MAXIMUM CIRCUIT CURRENT16.5 A PHOTOVOLTAIC MODULES PRODUCE DC VOLTAGE SWITCH TO THE WHENEVER THEY ARE EISPOSEDTOSUNLIGHT MAXIMUM SYSTEM VOLTAGE480 V "OFF" POSITION TO SOLAR ELECTRIC OLOCATION: MAIN SERVICE PANEL MAXIMUM RATED OUTPUT CURRENT OF THEis A SHUT DOWN PV SYSTEM PV PANELS 2 PV BACK-FED BREAKER ''DC-to-DC AND REDUCE I SHOCK HAZARD INVERTER OUTPUT CONNECTION IN THE ARRAY DO NOT RELOCATE THIS O LOCATION: MAIN SERVICE PANEL OVERCURRENT DEVICE POINTPV SYSTEM CONNECTION 13 LOCATION: MAIN SERVICE PANEL/AC DISCONNECT 3 LOCATION: MAIN SERVICE PANEL SOLAR PV SYSTEM AC POINT OF • • PV BACK-FED BREAKER MAX AC OUTPUT & WARNIN MAX NOMI NAL AC VOLTAGE 1 240 V MAIN PHOTOVOLTAIC DUAL POWER SUPPLY THIS PANEL FED BY MULTIPLE SOURCES SYSTEM DISCONNECT SOURCES:UTILITY GRID AND SOLAR) PV SOLAR ELECTRIC SYSTEM 4O LOCATION: UTILITY METER O LOCATION: MAIN SERVICE PANEL 14 LOCATION: AC DISCONNECT City of Lake Elsinore WARN�N • • BUILDING DIVISION Permit # BLDG- -3067 THIS SERVICE METER WITH RAPID SHUTDOWN IS ALSO SERVED BY A Date: 11/07/2022 3:09:54 PM PHOTOVOLTAIC SYSTEM 10 O5 LOCATION: PV SUB PANEL(IF USED) LOCATION: INVERTER gAg WARNING RAPID SHUTDOWN SWITCH FOR APPROVED PHOTOVOLTAIC SYSTEM COMBINER PANEL SOLARFOR ILLUSTRATION ONLY(NOT ACTUAL MSP) DO NOT ADD LOADS PV SUB PANEL(IF USED) CONDUITS/RACEWAYS MAIN SERVICE PANEL O ;---12-- O a OI 0 5 O PLACARD 3 0 I m ❑ ❑ I m AC m DISCONNECT 11 m ❑ ❑ ❑ INVERTER (IF USED) I � _ m O10 7 0 cg) O m N 13 14 m 0 L-------------- SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR EQUIPMENT 103A MILLBURY ST, SYSTEM SIZE 8kW/DC 6kW/AC ERIC HOLLMAN LABELS Planet , AUBURN MA 01501 �� DATE: 10/13/2022 3:50:11 PM --- 34269 CHAPAROSSA DR, 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV4 C-10#1020761 DATE: 10/13/2022 3:50:11 PM REVIEWED BY: DARRIEL FERRER SAI 12 PLACARD CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN cn 0City of Lake Elsinore yl U) Q 3UILDING DIVISION Permit # LDG- 0 -3067 xx 0 Ir Date: 11/ 7/2022 3:09:54 PM a gig APPROVED SOLAR EXISTING MAIN INVERTER & DC SERVICE ENTRANCE DISCONNECT UTILITY AC DISCO SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR SYSTEM SIZE 8kW/Dc skw/Ac --- PLACARD 103A MILLBURY ST, /J ERIC HOLLMAN Pl11 ��4r` ( " AUBURN MA 01501 �/cs� DATE: 10/13/20223:50:11 PM --- 34269 CHAPAROSSA DR, V` y 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV4 . 1 C-10#1020761 DATE: 10/13/2022 3:50:11 PM REVIEWED BY: DARRIEL FERRER SA Table R802.5.1(2)-Continued ROOF A: RAFTER SPANS FOR COMMON LUMBER SPECIES PHOTOVOLTAIC DEAD LOAD STATEMENT MOUNT ATTACHMENT ENDCLAMP, TYP. (Roof live load=20 psf,ceiling attached to rafters,L/A=240 TOTAL AREA OF ARRAY=362.78 SQ. FT. DEAD LOAD=10 psf I DEAD LOAD=20 psf ARRAY GROSS WEIGHT=943.22 LBS RAFTER 2,4 2 x 6 I 2 x 8 2x101 2x121 2 x 4 I 2 x 6 I 2 x 8 I 2x101 2 x 12 DEAD LOAD RATI NG=2.6 LBS/SQ.FT. SPACING SPECIES AND GRADE Maximum rafter spans` II II II II RAIL (inches) EXISTING STRUCTURAL FRAMING=2x4 24 IN.O.C. (feet- (feet- (feet- (feet- (feet- (feet- (feet- (feet- (feet- (feet- 3' inches) inches) inches) inches) inches) inches) inches) inches) inches) inches) II II II II II II II II II II --IL —ll —� J=Tr Douglas fir-larch SS 8-3 13-0 17-2 21-10 Note b 8-3 13-0 16-10 20-7 23-10 Douglas fir-larch #1 8-0 12-6 15-10 19-5 22-6 7-5 10-10 13-9 16-9 19-6 Douglas fir-larch #2 7-10 11-11 15-1 18-5 21-4 7-0 10-4 13-0 15-11 18-6 Douglas fir-larch #3 6-2 9-1 11-6 14-1 16-3 5-4 7-10 10-0 12-2 14-1 4 Him-fir SS 7-10 12-3 16-2 20-8 25-1 7-10 12-3 16-2 19-10 23-0 Him-fir #1 7-8 12-0 15-8 19-2 22-2 7-4 10-9 13-7 16-7 19-3 Him-fir #2 7-3 11-5 14-8 17-10 20-9 6-10 10-0 12-8 15-6 17-11 MIDCLAMP STRUCTURAL FRAMING 24 Him-fir #3 6-1 8-10 11-3 13-8 15-11 5-3 7-8 9-9 11-10 13-9 (2 PER MODULE) MEMBER @ 24" O.C. Southern Pine SS 8-1 12-9 16-10 21-6 Note b 8-1 12-9 16-10 20-10 24-8 Southern Pine #1 7-10 12-3 16-2 18-11 22-6 7-5 11-1 14-0 16-5 19-6 Southern Pine #2 7-4 11-0 13-11 16-6 19-6 6-4 9-6 12-1 14-4 16-10 Southern Pine #3 5-8 8-4 10-6 12-9 15-1 4-11 7-3 9-1 11-0 13-1 Spruce-pine-fir SS 7-8 12-0 15-10 20-2 24-7 7-8 12-0 15-4 18-9 21-9 Spruce-pine-fir #1 7-6 11-9 14-10 18-2 21-0 6-11 10-2 12-10 15-8 18-3 Spruce-pine-fir #2 7-6 11-9 14-10 18-2 21-0 6-11 10-2 12-10 15-8 18-3 Spruce-pine-fir #3 6-1 8-10 11-3 13-8 15-11 5-3 7-8 9-9 11-10 13-9 • = MOUNT ATTACHMENT LOCATION MAXIMUM OVERHANG (CANTILEVER)IS 19" MAXIMUM SPACING OF ANCHORS(FOOTINGS)IS 48 IN.O.C. FIELD VERIFY EXACT LOCATION OF STRUCTURE MEMBERS. City of Lake Elsinore V N 65 d W.gyp« Date t 11/07��Q22 3 09;�'14)P'M DRRP€e, UTAH S4020 ww.VECTORss.cam � D V. ED cLU c 5 09100/2022 VSE Project Number: U 1.932.0302.221 Vector Structural Engineering has reviewed the existing structure with loading from the solar array and screw connections to the existing framing The design of the racking system,rackirg connections,and all other structural is by others_Mechanical,arch iteclural,and all other nonstructural aspects of the design are by others. Electrical is by others,unless stamped by bean Levorsen_ SIGNATURE: PROJECT# BP5242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR ATTACHMENT 103A MILLBURY ST, SYSTEM SIZE 8kW/DC 6kW/AC ERIC HOLLMAN PLAN will Planet , AUBURN MA 01501 _4 DATE: 10/13/2022 3:50:12 PM --- 34269 CHAPAROSSA DR, 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV5 C-10#1020761 DATE: 10/13/2022 3:50:12 PM REVIEWED BY: DARRIEL FERRER SAI 4 SNAPNRACK ROOF MOUNT SYSTEM ° 5 6 c,`VECTOR In i in e e Ft a 2 65]IY GACENAeaaK9wp.5lF.'a, a rI50L990•IA]5 LAG BOLT SNOW/CRITTER GUARD TO BE INSTALLED, IF REQUIRED oR4Pca,ura,vaaoaa www.YE�roasf.�oM .30 01.00 p�5srp ROOF COVERING IS 3 g,PR F FLAT TILE OVER PLYWOOD fi 4 o ;r CLAMP ' C 5 � * RAIL s CIVl1. ,P SOLAR MODULE 4F0AG14 1 09/30/2022 VSE Project Number:U1932.0302.221 PARTS LIST Vedor$buclaral Engineering has reviewed the existing structure with loading iron the solar array and screw SEE PV5 FOR STRUCTURAL c nections to the existing framing.The desgn of the ITEM QTY DESCRIPTION rack;ngsyatem,radk,tlq nnedon5,and all Other INFORMATION 1 1 SNAPNRACK TILE HOOK F PRC SS stnicnirallseyomers.Mechanicsl,arenitectu tandall "INSTALLER TO VERIFY RAFTER SIZE&SPACING ra other noosauctar�aspects af the desgn are by others. 2 1 SNAPNRACK, ULTRA RAIL MOUNT THRU PRC, CLEAR Electrical is by others,unless stamped by Dean IT—mert TILE HOOK 4 1 SNAPNRACK, ULTRA RAIL MOUNT TAPPED PRC, CLEAR 3 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 1-3/4IN, SS O SNAPNRACK MOUNT W/FLASHING 5 1 SNAPNRACK, ULTRA RAIL MOUNT SPRING, SS •SEALANT APPLI �jj T 6 1 SNAPNRACK ULTRA RAIL MOUNT SPRING CAGE LAG BOLT INCLUDE: GE0C=V` f 0WM M1 NOTE. "FIELD TO DETERMINE WHICH SEALANT I�F'IJi RIDIt4G II f�pl/�I0&I0N 6 1 SNAPNRACK TILE HOOK REPLACEMENT FLASHING FLAT . SHALL BE AT LEAST 6"FROM ANY T V V v�V f��?r�rIQ#116LDG- 0 -3067 • 16'DIAMETER • MINIMUM EMBEDMENT OF 2.5" INTO STRUGTI IR 6-AT€Ma€R Date: 11/07/A 3:09:54 PM � e .94 12.20- 1.47 APPLICATION NOTE: OPTIMAL SPACING FROM EDGE AND IN BETWEEN CLAMI FOR USE WITH TILE HOOKS '>!'.f..� e o 0 SrmIMrock LANDSCAPE PANELS—\ —PORTRAIT PANE PA7 PROVED .rM DR POOINO 2 or 3' 18.55 16.93 MODULE � 0 0 MODULE CLAMP RAIL —14.00— 1.23 TILE HOOK AG BOLTS 2.45 ALL DIMENSIONS IN INCHES L SIGNATURE: PROJECT# BP5242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR STRUCTURAL SYSTEM SIZE 8kWIDC 6kW/AC 103A MILLBURY ST, ERIC HOLLMAN COMPONENTS AUBURN MA 01501 --4DATE: 10/13/2022 3:50:13 PM --- 34269 CHAPAROSSA DR, Planet 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV6 C-10#1020761 DATE: 10/13/2022 3:50:13 PM REVIEWED BY: DARRIEL FERRER SAI PROPERTY LINE O 1 1 1 s 1 � F w O z m Lu r D_ O m - a 1 1 1 ROOF A 1 ITT 1 � 7) OwL w X ZX,,rEXST ______1______i______i Oz EXIST. EXIST.I EXIST.: m F------+------+------+------d s !a EXIST. EXIST. EXIST. EXIST. i y of Lake Elsinore LLI EXIST.:EXIST.:EXIST.I EXIST.: z ______ ______1______1______, m - _ ,"� BUILDING DIVISION • DG- 2022-3067 1 1 _ ate: /07/2022 3:09:54 PM 1 1 g�4g 1 APPROV 1 � � J 1roOF Lu � z Om 1 1 1 _ *1 r PROPERTY LINEfor Ab _ - �•4 % SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR 103A MILLBURY ST, SYSTEM SIZE akwrDc skwrAc ERIC HOLLMAN PROPERTY LINES Planet , AUBURN MA 01501 DATE: 10/13/2022 3:50:15 PM --- 34269 CHAPAROSSA DR, 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV7 C-10#1020761 DATE: 10/13/2022 3:50:15 PM REVIEWED BY: DARRIEL FERRER SAi MAPPING INSTRUCTIONS: AZIMUTHANDnLTnNGLE INVERTER(S) SERIAL NUMBERS LMUfH 316 C UN7 �{./. 1. REMOVE THE'SQUARE' OPTIMIZER STICKER ILTANGLE 0/2 1I AND PLACE NEATLY ON THE APPROPRIATE -LE CBS T�{�./. NUMBERED SPACE. SERAVEREAGE # 1 2 3 4 5 NVERTERS -REDGES AWH-USRGM 1 II . WRITE THE CORRESPONDING NUMBER ON PTI._R _REDGE- 2D 2 hDDULE NI COUNT: NDDULEk2: CW NT. TOTALCOUNT. HANWHAO-CELLS O.PEAK DUO BLK ML-GLI.a*CW 20 20 THE APPROPRIATE MODULE WITHIN THE ARRAY. • DO NOT MAKE ANY TIE IN CHANGES UNLESS APPROVED AND DOCUMENTED BY BPS DESIGN TEAM 6 7 8 9 10 • MAXIMUM WATTAGE ALLOWED IN CIRCUIT/STRING IS 6000W FOR SOLAREDGE INVERTERS 7600-11400 • MAXIMUM WATTAGE ALLOWED IN CIRCUIT/STRING IS 570OW FOR SOLAREDGE INVERTERS 3000-6000 • MINIMUM OPTIMIZERS IN CIRCUIT/STRING = 8 (6 WITH P405/P505) 11 12 13 14 15 16 17 18 19 20 El ROOF City of Lake Elsinore UILDING DIVISION 11 Permit # LDG- 2022-3067 21 22 23 24 25 Date: 7/2022 3:09:55 PM 11 gAg 0 26 27 28 29 30 ° ° ° � APPROVED 0 El0 31 32 33 34 35 r------T------T------T � EXIST. EXIST. EXIST. EXIST. ------+------+------+------� EXIST. EXIST. EXIST. EXIST. ° 36 37 38 39 40 ------+------+------+------� EXIST. EXIST. EXIST. EXIST. L------ —----- ------ ------J ❑ 41 42 43 44 45 ❑ SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR OPTIMIZER SYSTEM SIZE 8kW/DC 6kW1AC 103A MILLBURY ST, ERIC HOLLMAN TRACKING Planet , AUBURN MA 01501 DATE: 10/13/2022 3:50:15 PM --- 34269 CHAPAROSSA DR, 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV � C-10#1020761DATE: 10/13/2022 3:50:15 PM REVIEWED BY: DARRIEL FERRER SAI LEGEND / JOB HAZARD ANALYSIS / LEYENDA ANALISIS DE RIESGOS LABORALES SITE NOTES (INCLUDE ANY HAZARD, NUMBERED AND EXPLAINED): EXCLUSION ZONE/ NOTAS DEL LUGAR (INCLUYE CUALQUIER RIESGO, NUMERADO CHAPAROSSA DR ZONA Y EXPLICADO): RESTRINGIDA I I xxxxxxxxxxxxx ELECTRICAL ZONE/ ZONA ELECTRICA CLOSEST URGENT CARE / MEDICAL FACILITY: SALA DE EMERGENCIA / HOSPITAL MAS CERCANO: I-L LADDER/ ESCALERA PUBLIC PROTECTION / PROTECION PUBLICA: ❑ EXCLUSION ZONES /ZONA RESTRINGIDA ❑ MARKED ENTRYWAYS / ENTRADA MARCADA ROOF A 0 [A] ANCHOR/ ANCLAJE FALL PROTECTION / PROTECCION DE CAIDAS: V1,1,EXIST.: ❑ ANCHORS /ANCLAJEof Lake Elsinore ❑ ROPES / CARABINERS & ROPE GRAB / SOGAS CARABINERO 0 0ANCHOR Y AGARRE DE SOGA IL DING DIVISION WORK ANGLES/ ❑ HARNESS /ARNESEXIST.: EXIST. 1 it # BLANCLAJE ❑ LANYARDS / SOGA ---+------+------+------di TRABAJADO EN EXIST. EXIST. EXIST. E �t�: 1°1/07/20 2 3:09:55 PM ANGULOS EXIST. EXIST.: EXIST. EXIST. A-g El ❑V VEHICLES/ PPE / EPP: o 0 AP ROVED VEHICULOS ❑ SAFETY GLASSES / GAFAS DE SEGURIDAD GLOVES/GUANTES ❑ HARD HATS/CASCO DE SEGURIDAD ❑ ARC FLASH SUIT/ HOT GLOVES / TRAJE AISLANTE/GUANTES H# HAZARD NUMBER PARA ELECTRICIDAD & EXPLAIN/ ❑ FIRST AID KIT / KIT DE PRIMEROS AUXILIOS RIESGOS ❑ COVID-19 PPE ON SITE / EPP POR COVID EN EL LUGAR NUMERADOS ❑ CREW ADHERING TO BPS COVID-19 PLAN / AJUSTE EN EL GRUPO Y EXPLICADOS AL PLAN POR COVID-19 DE BPS 0 TREE /ARBOL DATE / FECHA: E HOME CREW LEAD / LIDER DE GRUPO: ENTRANCES/ ENTRADA DE LA CREW MEMBERS / MIEMBROS DEL GRUPO: CASA SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR JOB HAZARD SYSTEM SIZE 8kW/DC 6kW/AC 103A MILLBURY ST, /� ERIC HOLLMAN ANALYSIS } Planet p AUBURN MA 01501 �r'/ �,� DATE: 10/13/2022 3:50:16 PM --- 34269 CHAPAROSSA DR, 888-997-4469 ,LAKE ELSINORE CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- PV9 C-10#1020761 DATE: 10/13/2022 3:50:16 PM REVIEWED BY: DARRIEL FERRER SAI BOM SHEET ITEM DESCRIPTION MANUFACTURER PART NUMBER QUANTITY NEEDED EQUIPMENT BREAKER PARTS PULLED PARTS RECEIVED 1 SOLAR PV MODULE#1 HANWHA Q-CELLS Q.PEAK DUO BLK ML-G10.a+400 HANWHA Q-CELLS Q.PEAK DUO BLK ML-G10.a+400 20 2 INVERTER#1 SOLAR EDGE SE6000H-USRGM SOLAR EDGE SE6000H-USRGM 1 INVERTER#1: 35A-2P 3 OPTIMIZERS SOLAR EDGE P401 SOLAR EDGE P401 20 4 RACKING SNAPNRACK SNAPNRACK ULTRA SEE RACKING/HARDWARE INFORMATION BELOW 5 J-BOX SELECTED BY FIELD SELECTED BY FIELD PULLAS REQUIRED INTEGRATED.SEE RACKING/ 6 GROUNDING INTEGRATED WITH RACKING HARDWARE INFORMATION BELOW 7 NOT USED IL 7.1 GMA SCE SCE PROVIDED BY UTILITY 7.2 NEW SUBPANEL SQUARE D OR EQUAL 240V,60A-MLO,3R,12ckt 1 TO SUBPANEL:60A-2P 8 AC(UTILITY)DISCONNECT SQUARE D OR EQUAL D222RB,240V,60A,2P,3R 1 8.2 INTEGRATED DC DISCONNECT SOLAR EDGE INTEGRATED TO THE INVERTER 9 RAPID SHUTDOWN SOLAR EDGE INTEGRATED TO THE INVERTER 10.1 INTEGRATED REVENUE METER SOLAR EDGE INTEGRATED TOTHE INVERTER 11 EXISTING MAIN SERVICE PANEL EATON/CUTLER HAMMER N/A EXISTING MAIN BREAKER:125A PV TIE IN:60A-2P ADD'L PARTS: Elsinore ADDT PARTS: BU LDING DIVISION ADDTPARTS: Dermit# BL - 067 - ADD'L PARTS: RACKING/MOUNTING HARDWARE Date: 11/07/2022 3:09:5 PM ROOFING TYPE:FLAT TILE STANDOFF(L FEET/HOOKS/SLIDER&MOUNT) SNAPNRACK ULTRA 50 FLASHING SNAPNRACK ULTRA 50 LAG BOLT SNAPNRACK ULTRA 50/100 GROUND LUGS SNAPNRACK ULTRA 5 E D RAIL SNAPNRACK ULTRA 16 SPLICES OR SKIRTS SNAPNRACK ULTRA 16 OPTIMIZER MOUNT SNAPNRACK ULTRA 20 MID CLAMPS SNAPNRACK ULTRA 40 END CLAMPS OR RL LINK SNAPNRACK ULTRA 20 ADDITIONAL KITS REQUIRED ISNAPNRACK ULTRA NOTES PICKED BY: RECEIVED BY: SIGNATURE: PROJECT# BPS242135 REV DATE DESCRIPTION BRIGHT PLANET SOLAR SYSTEM SIZE SkWIDC skw/Ac BOM SHEET 103A MILLBURY ST, ERIC HOLLMAN Planet c t AUBURN MA 01501 � DATE: 10/13120223:50:17 PM --- 34269 CHAPAROSSA DR, 888-997-4469 LAKE ELSINORE, CA 92532 CONTRACTOR LICENSE: DESIGNER: D.LOPEZ --- C-10#1020761 REVIEWEDY Pvi O DATE: 10/13/20223:50:17PM A SA r powered by Format 74.01n x 41.11n*1,261,(including frame)MECHANICAL SPECIFICATION (1879m x1045m x32 mm) us aem _ Is Weight 48.51bs(22.0 kg) Front Cover 0.13 In(3.2mm)thermally pre-stressed glass with ant]-reflection technology .apwirowim..o.vrl..emM r• Back Cover Composite film - Frame Black anodized aluminum Y i•m Cell 6 x 22 monocryselline Q.ANTUM solar half cells Junction Box 2.09-3.98inx1.26-2.36]nx0.59-0.71in (53-101mmx32-60mmx15-18mm),IP67,with bypass diodes Cable 4mm2 Solar cable;(+)z49.2in(1250mm),I-)z49.21n(1250mm) Connector Staubli MC4;IP68 nLnl . • ■ , ELECTRICAL CHARACTERISTICS ■ POWERCLASS 386 390 395 400 405 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC'(POWER TOLERANCE+5W/-OW) Power at MPP' Puva [wl 385 390 395 400 405 Short Circuit Current' Isc [A] 11.04 11e7 11,10 1114 1117 • E Open Circuit Voltage' I_ [A) 10.59 10.65 10.71 10.77 10.34 83 25� Current at MPP IMpp [A] 36.36 36.65 6.88 . 37.13 37.39 TOP BRAND VV ' Voltage at MPP VMpp [V] 36.36 38.62 36.88 37.13 37.39 ' Efficiency' it [%] >-19.6 2021 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, ' Warranty QCELLS Power at MPP Prnva [Wl •ihi 92. 29. sine) 303.8 ame"ca a°nom°�� Yeld Secumy E Short Circuit Current Isc [A] a.9L 8.9b 9.00 E Open Circuit Voltage Voc IV] 42. .72 42.76 �I rI BREAKING THE 20%EFFICIENCY BARRIER Current at MPP 1.11 [A] 835 8.41 8.46 8.51 8.57 Tail I Q.ANTUM DUO Z Technology with zero gap cell layout Voltage at MPP v_ 1"r'1 i 4. 79p. _ 3 35.25 35.46 1.wI1LL costs module efficiency up to 20.9%. 'Measurement tolerances PM 3%;Isc;Voc 5%at STC:1000W/m2,25 2°C,AM 15 accoding to IEC 60904-3.2BOOW/m2,NMOT,ain-trum AM 1.5 O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE THE MOST THOROUGH TESTING PROGRAMME IN THE INDUSTRY / c Q CELLS is the first solar module manufacturer to ass the most coin rehen- All...tt9a°>nof,¢�fi�war'¢,Irr�/Od/ �2�3.�9.}`)5 PM P P W* _"°'""'"°`°""""""'°� first ye�r.T rterih o5% -n sive quality programme in the industry:The new"Quality Controlled PV"of �O•� ------------ degredaron per year.Aueast93.5% 4P the independent certification institute TUV Rheinland. of nominal power up to 10 years.AtIsaat86%ofnommal powerupto ---- 25 years. INNOVATIVE ALL-WEATHER TECHNOLOGY •>? All data wnnm measurement rolerane- !'<�c Optimal yields,whatever the weather with excel lent as.Fwlwntyar s f000rda EL S •° �l the warranty terms of the Q CELLS low-light and temperature behavior. o sales organisation of your respective oantry Ri D Imo a pert I dition _ ENDURING HIGH PERFORMANCE penao arc do ( loco /m2) Long-term geld security with Anti LID Technology,Anti PID O° 9- Y Y 9Y. TEMPERATURE COEFFICIENTS Technology[,Hot-Spot Protect and Traceable Quality Tra.Qm^. Temperature coeffieientof lvc o [%/K] +0.04 Temperature Coefficientof Voc [ti [%/K] -0.27 Temperature Coefficient of P., y [%/K] -0.34 Nominal Module Operating Temperature NMOT [°F] 109 5.4(43 3°C) EXTREME WEATHER RATING High-tech aluminum alloy frame,certified for PROPERTIES FOR SYSTEM DESIGN ° n high snow(5400 Pa)and wind loads(4000 Pa). Maximum System voltage Vas IV] 1000(IEC)/1000(UL) PV module classification Class II o A RELIABLE INVESTMENT Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/ILL 61730 TYPE 2 Max.Design Load,Push/Pull' [lbs/ft21 75(3600Pa)/55(2660 Pa) Permitted Module Temperature -40°Fupto+185°F n o Iclusive 25-year product warranty and 25-year on conteuous Duty (-40°C up to+85°C) Max.Test Load,Push/Pull' [Ibs/ft'] 113(5400 Pe)/84(4000 Pa) linear performance warranty. 'See Installation Manual 'APT test conditions according to IEC/TS 62804-1:2015,method A(-1590V.96h) QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION 'See data sheet on rear for further'information. Cultry a.CE-cpmprient. PC61152016ed C31730ahenle d. C C E Nbv W19J �1 W,eC THE IDEAL SOLUTION FOR usPtaiamr,os,a ,21alsolareallsl SP" Hotsontal 76.4in 43.3]n 48.01n 1656Ibs 24 24 32 - OCwcedlOcatlonon ling. Co..i,ia U3 packaging 1940mm 1100mm 1220mm 751kg pallets pallets modules Rooftopermys on esident]sl buildings Note:Installation instructions must be followed.See the installation and operating manual or contact our technical service department for further information on approved installation,nd use of this product. Engineered in Germany CELLS 400 Spect-Ce$er Dr-,Suite 1400,Irvine,CA 92618,USA I TEL+1 949 748 59 96 1 EMAIL Inqu]ry@u gcellscom l WEB wwwq-census Single Phase Inverter With HD-Wave Technology for North America SE3000H-US/SE380OH-US/SE5000H-US/SE6000H-US/ Single Phase Inverter Z SE760OH-US/SE10000H-US/SE1140OH-US with HD-Wave Technology m OUTPUT 3800 @ 208V 5000 @ 240V 11400 @ 240V Rated AC Power Output 3000 5000 /boo l0000 VA 3300 @ 208V 5000 @ 206V 10000 @ 208V Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA for North America 3300@208V 5000@208V 0000@208V AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ ✓64) ✓ ✓ ✓ Vac SE3000H-US/SE380OH-US/SE5000H-US/SE6000H-US/ AC Out ota AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ Vac SE760OH-US/SE1000OH-US/SE1140OH-US ACFre Frequency AC Frequency(Nominal) 593-60-60.5n Hz Am M Maximum Continuous Output 123 16 21 25 32 42 -S A Current @240V solar,-T_.^,_' _HD � Maximum Continuous Output 16 - 24 - - 48.5 A Current @206V w GFDI Threshold 1 A V Il Utility Monitoring,Islanding p solar, 0 Protect ion,Country Configurable Yes Thresholds INPUT Maximum DC Power @240V 4650 5900 7 00 6 L1,M0 17650 W Maximum DC Power @208V - 5100 - 750 -1 W 1 15500 W m O Transformer-less,Ungrounded Y InputMaximum Vdc Nom nal DCInp t Vollttage Permit 480_ _ 400 Vdc Maximum Input Current @240Vln 8.5 10.5 13.5 16.5 20 27 30.5 Adc M Maximum Input Current @208Vb' - 9 - - - 27 Adc • ` S Max.Input Short Circuit CurrentDate- Adc p 9 Reverse-Polarity Protection Yes xe0 GmunMaximum Inv Isolation Detection 600ks vary Maximum Inverter Efficiency 99 99. % CEC Weighted Efficiency 99 99 @ 240V % 985 @ 208V to e q e Nighttime Power Consumption W 1W ADDITIONAL FEATURES Supported Communication Interfaces RS485, thernet, IgBee o ,ptions Cellu ar(op tonal) evenu Re Grade Data,ANSI C12.20 Optionall'a Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect Optimized installation with HD-Wave technology 2017690.12 STANDARD COMPLIANCE Safety UL1741,UL1741 SA,UL1699B,CSA C22.2,Canadian AFCI according to TI.L.M-07 / Specifically designed to work with / Extremely small Grid Connection standards IEEE1547,Rule 21,Rule 14(HI) power optimizers Emissions FCC Part 15 Class B / Record-breaking efficiency / Built-in module-level monitoring INSTALLATION SPECIFICATIONS AC Output Conduit Sze/AWG 3/4"minimum/14-6AWG 3/4"minimum/14-4 AWG Range / Fixed voltage inverter for longer strings / Outdoor and indoor installation DCmputCondoa Size/#ofStrings/ 3/4°minimum/1-24rings/14-6AWG 3/4'minimum/1d strings/14-6AWG AWG Range Dimensions with Safety Switch 177 x 14.6 x 6.8/450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 in/ / Integrated arc fault protection and rapid shutdown for/ Optional:Revenue grade data,ANSI C12.20 (HxwxD) mm NEC2014and2017,perarticle690.11and690.12 Class0.5(0.5%accuracy) Weight with Safety Switch 22110 25.1/114 6.z/n.9 38.8/176 lb/kg Noise <25 <50 dBA / UL1741 SA certified,for CPUC Rule 21 grid Cooling Natural Convection compliance Operating Temperature Range -40 to+140/-25 to+60a'I HOT/-40"C option). `F/'C Protection Rating NEMA 4X(Inverter with Safety Switch) '^For other regional settings please contact SolarFdge vpport s o I a r3', ' m A higher current source may be used the inverter will limit input current to the values ated Revenue grade inverter P/N:SE—H-US000NNC2 solaredge.eom For power de-rating Information refer tux trip, na pdf -40 version P/N:51—H-US000NNU4 bar uAgerechaologie,Inc.Allrights reserved.50LAREI) theS.I.nagelogo,OPTIMIZED RYSDWREDGEarebadii—iior sics.tredemarks of SolarEtlge technologies,Inc.Ali RoHS oth.—dii—men coned h.—are acid—rhs ottheir respective owners Date:12/2016Aa ngNG NAM.Subject W change without native. Power Optimizer ma For North America Power Optimizer O P320/ P340/ P370/ P400/ P401 / P405/ P485/ P505 For North America Optimizer model 320 =91M."Ills P400 P505 module (forE ll current P320/ P340/P370/ P400/P401 / P405/ P485/P505F •' 96_ modules) m INPUT Rated Input DC Powerm 320 350 370 400 405 1 ,a_ 505 W Absolute Maximum Input Voltage 48 60 80 60 125c' 83- Vdc (Voc at lowest temperature) MPPT Operating Range 8-48 8-60 8-80 8-60 12.5-105 12.5-83 Vdc O Maximum Short Circuit Current INC) 11 11.02 11 101 11.75 11 14 Adc Maximum DC Input Current 13.75 12.5 14.65 12.5 17.5 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 98.6 % Overvoltage Category 1 II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 65 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety output Voltage per Power I V O '-0. a e s i n o re Vd< Optimizer STANDARD COMPLIANCE NEMC FCC Par 0 Safety Permot E 1 9 saf 02 I..'..I Material 0, RoHS I yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage Vdc Compatible inverters All SolarEdge Single Phas Thr P verters 129x153x33.5 2 129x162x 59 mm Dimensions(W x L x H) 129 x 153 x 27.5/51 x 6 x 1.1 /5.1x6x 13 /5.1x6x1.16 129 x 159 x 49.5/5.1 x 6.3 x 1.9 /51x62x 59 /In Weight(including cables) 630/14 750/17 1 655/1.5 1 845/1.9 1064/2.3 gr/Ib Input Connector MC C4p ual MC4- Input Wire Length 0.16/0.52 /0.5 or 2.9n .2 m/ft Output Wire Type/Connector Double Insulated/MC4 Output Wire Length 0.9/2.95 1.2/3.9 m/ft PV power optimization at the module-level Operating Temperature Rangeto -40 to+85/-40 to+185 `C/T Protection Rating IP68/Type 6P Relative Humidity 0-100 % / Specifically designed to work with SolarEdge / Fast installation with a single bolt 0)Rated powe,ofthem,d,l,,t STC will not exceed the opamaer•Rated Input DC Power.Modules with up to.5%powe,tele,ance are allowed (2)NEC 2017 requires max input voltage be not more than 80V inverters (3)For other connector Types please contact SolarEdge / Next generation maintenance with module- (4)FD,coal version for pa,auelronneaionoftwomodme,u,eP485-4NMDMRM.In the caseofanoddnumb,,,fPVmodulesin on,sung,insralling one P485dualve,,ionp-,Dptirae,connected to gone PV module.When connetingasingle module seal the unused input connectors with thaeupplied pair ofseals / U to 25%more energy level monitoring (5)Longerinputs wire length are available foruse.For 0.9m input wire length order P401-xxxtxxx p gY (6)For ambleMtemperatureabove.85°C/+185°Fpowerde-mtingisapplied Refer to Power Optimizers Temperature De-Rating Technical Note for more details / Superior efficiency (99.5%) / Meets NEC requirements for arc fault PV System Design protection (AFCI) and Photovoltaic Rapid .. D ':®' ' .:� / Mitigates all types of module mismatch losses, Shutdown System PVRSS P32o,111,P37o, Y ( ) Minimum String Length P400,P401 18 from manufacturing tolerance to partial (Power Optimizers) P405,P485,P505 5 8 14 shading / Module-level voltage shutdown for installer Maximum String Length(Power Optimizers) 25 25 50" and firefighter safety 5700(6000 with / Flexible system design for maximum space Maximum Power per String SE7600-US-SE11400- s250 6000np1 12751)- W US) utilization Parallel Strings of Different Lengths or Orientations Ves (N For detailed ming sizing information refer to:http://wwwsolaredgecom/sites/default/files/ming_si zing_na.pdf (8)It Is not allowed to mix P405/P485/P505 with P320/P340/P370/P400/P401 in one Anng (9)AAnng with more than 30optimizers doesnot meet NEC rapidshutdown requirementrsafetyvol[agewill la-bovethe 30V requirement (10)For 208V grid:i[is allowed to install up to 6,500W per string when the maximum power difference between each string Is 1,000W (11)For 277/480V grid.it is allowed to install up to 15,000W per string when the maxZEDBimum power difference between each string is 2,000W solaredge.com solar . D��. Al solarEdge Technologies Ltd.All- reserved.ftdtDGE tM1e solarEdge Ingo,ORIM2021 FSSOIARE U-are kbje rks orregistered trademaAs of solarEtlge technologies,Inc. ROHQ All Mher trademarks mentioned M1erein are trademaMs of theirrespective owners.Date:12/2021 Ds-0000a4-13-NA.subjeR to change without notice. �l f7�7 Intertek Grounding Specifications snapnrack.COM Manufacturer Model Q.PLUS BFR-G4.1/TAA-XXX Q.PEAK DUO-L-G7.3-XXX Q.PLUS G4-XXX Q.PEAK DUO-L-G6-XXX Q.PLUS GY-XXX Q.PEAK DUO-L-G6.2-XXX Q.PLUS BFR-GY-XXX Q.PEAK DUO-L-G6.3-XXX Q.PRO BFR-G4-XXX O.PEAK DUO-L-GB-XXX Q.PRO BFR-G4.I-XXX Q.PEAK DUO-L-G8.I-XXX Q.PRO BFR-G4.3-XXX Q.PEAK DUO-L-G8.2-XXX Q.PRO BFR-GY-XXX Q.PEAK DUO-L-G8.3-XXX O.PRO BLK-GY-XXX Q.PEAK DUO-GS/SC-XXX _ Q.PRO G4-XXX Q.PEAK DUO-BLK-GS/SC-XXX Q.PRO GY-XXX Q.PEAK DUO-G6+/SC-XXX _ - Q.PRO GY/SC-XXX Q.PEAK DUO-BLK-G6+/SC-XXX Q.PEAK DUO-GS-XXX Q.PEAK DUO BLK-G6+/AC-XXX Q.PEAK DUIUOp-pBILK-GS-XXX Q.PEAK DUO-ML-G9-XXX OPLUSQ.PEAK Dk� CXbf LakeQ.M= XX X Q.PEAK DUO-BLK-IOi WLDING DWf8jG"LK-G5/TS-XXX EAK DU - K DUO-G6/TS-XXX &M -V6 - G- 2022-3� I - - - /T5-XXX Hanwha Q Cells Q.PEAK D�UOO-B®L.Ky-gG/6�(+--X(XrX� �pp Q.PEAK �DgUO-G6+/TS-XXX UCILC.UI I/V/ 2022 3.�.7.J:J rIVIBLK-G6+/TS-XXX Q.PEAK DUO-BLK-G6-XXX Q.PEAK DUO XL-G9.2-XXX Q.PEAK DUO XL-G9.3-XXX Q.PEAK DUO-GB+-XXX Q.PEAK DUO-BLK-GB+-XXX Q.PEAK DUO XL-G9.3/BFG-XXX* Q.PEAK DUO-GB-XXX Q.PEAK DUO XL-G10.2-XXX Q.PEAK Q.PLUS .P USO G -X 8 P R O �G103FXXXXX* SnapNrack Q.PLUS L-G4.I-XXX Q.PEAK DUO XL-G10.c-XXX Q.PLUS L-G4.2-XXX Q.PEAK DUO XL-G10.d-XXX Solar • • • • Q.PEAK L-G4.I-XXX Q.PEAK DUO L-G8.3/BFG-XXX* Q.PEAK L-G4.2-XXX Q.PEAK DUO L-G8.3/BGT-XXX* Q.PLUS DUO-L-GS-XXX Q.PEAK DUO ML-GI0-XXX Q.PLUS DUO-L-G5.I-XXX Q.PEAK DUO BLK ML-G10+-XXX Ultra Rail Q.PLUS DUO-L-G5.2-XXX Q.PEAK DUO ML-G10+-XXX Residential Q.PLUS DUO-L-G5.3-XXX Q.PEAK DUO BLK ML-GI0-XXX • • Mount System Q.PEAK DUO-L-G5.2-XXX Q.PEAK DUO ML-GiO.a+-XXX InstallationQ.PEAK DUO-L-G5.3-XXX Q.PEAK DUO BLK ML-G10.a+-XXX Q.PEAK DUO-L-G7-XXX Q.PEAK DUO ML-G10.a-XXX Q.PEAK DUO-L-G7.I-XXX Q.PEAK DUO BLK ML-G10.a-XXX Q.PEAK DUO-L-G7.2-XXX Hanwha SolarOne HSL60P6-PB-2-XXXQ HSL60P6-PB-4-XXXQ s n a p n ra c k.corn Heliene 60M-XXX 72M-XXX 60P-XXX 72P-XXX ® 2703 -• Mounting System 63 snapnrack.com Solar Mounting Solutions 'A'A CERTIFICATE OF COMPLIANCE SnapNrack UL 2703 Fire Classification Certificate Number 20190404-E359313 Aug.2021 Report Reference E359313-20171106 Issue Date 2019-APRIL-04 As of January 1st,2015 many jurisdictions are now enforcing codes based upon updates to Issued to: SUNRUN SOUTH LLC,DBA SNAPNRACK the International Building Code(IBC)and UL Standards 1703(modules)and 2703(mount- ing systems).The language included in the 2012 and 2018 IBC requires that the combination 775 Fiero Ln of roof mounted solar modules and racking components is to be considered a system (IBC Suite 200 Section 1509.7.2). Additionally,it requires that this system shall meet or exceed the fire San Luis Obispo CA 93401 classification of the roof assembly. This certificate confirms that MOUNTING SYSTEMS, MOUNTING DEVICES, The objective is to ensure that the representative samples of CLAMPING DEVICES AND GROUND LUGS FOR USE PV system does not adversely affect WITH PHOTOVOLTAIC MODULES AND PANELS the fire rating of the roof. Roof sur- face fire ratings are classified either See Addendum Page A,B,or C;Class A being the most City of Lake Elsinore resistant to the spread of flame. Have been r� (� with the Since the physical characteristics of Standards)llf �rhl§C"ekTie.�� the PV module(material,thickness %" Permit # BLDG- 0 -3067 of glass,etc)also potentially af- F f standard(s)for safety: ANSI/UL 2703-Mounting Systems, Mounting Devices, fect how a fire will act,modules are / E TT&inig f2l�"i js((�d�opK+ugs for use with now tested and assigned a"type" lat-Plate hotovolta``i�-c odu eS an Panels. based upon these characteristics and Additional Information: See the UL Online Cp5ttRs Directory at spread of flame test results.There are 15 total module types,Types 1,2 and 3 represent dif- https://ig.uIprospector.com for additional information. ferences in the module composition and Types 4-15 are the same module compositions as Types 1 -3 with differing fire test performance. AP P R VFtPSnapNrack Series 100,Ultra Rail and RL systems have been Certified for a Class A fire rating This Certificate of Compliance does not provide authorization to apply the Mar . Follow-Up with Type 1 and Type 2 modules, in accordance with the standards set forth in UL1703/2703 Services Procedure provides authorization to apply the UL Mark. and IBC 2012. In order to maintain this classification,the SnapNrack mounting systems must Only those products bearing the UL Mark should be considered as being UL Certified and covered under UL's be installed per the UL-approved Installation Manuals.Because the test was conducted with Follow-Up Services. the modules at 5 inches from the roof surface(worst case scenario),there is no restriction Look for the UL Certification Mark on the product. to the standoff height. Attachment 1 is the SnapNrack AIMS File which is accessed through the UL Online Certifica- tion Directory,or available here:SnapNrack QIMS File. o .ol.n`�tMa,,. ... .o.,dedoeenallof� o,a .no.,..dl,e,..o�.Fo, .,,,o, U� q SnapNrack-rack- Page 1 of 2 solar Mountlny sololO 877-732-2860 www.snapnrack.com contact(o�snapnrack.com ©2021 by SnapNrack Solar Mounting Solutions.All rights reserved CERTIFICATE OF COMPLIANCE Certificate Number 20190404-E359313 Report Reference E359313-20171106 Issue Date 2019-APRIL-04 This is to certify that representative samples of the product as specified on this certificate were tested according to the current UL requirements. Ultra Rail Mounting Systems UR-40 Mounting and Bonding Systems for use with Photovoltaic Modules,consisting of the following components:UR-40 Rail,Mid Clamp,X End Clamp,Universal End Clamp,UR-40 Splice,Composition Mount Kits,Standard Standoff,Four Hole Standoff,Heavy Duty Standoff,Metal Roof Base Standoff, Corrugated Block,Standard Base Seam Clamp,Wide Base Seam Clamp,Universal Tile Hook,Flat Tile Hook,Tile Hook F,Tile Hook WS,Flat Tile Replacement Kit,S Tile Replacement Kit,W Tile Replacement Kit,Hanger Bolt Clamp,Ground Lugs,Skirt Assembly,MLPE Frame Attachment Kit, MLPE Rail Attachment Kit,Smart Clips,Tilt Kits. UR-60 Mounting and Bonding Systems for use with Photovoltaic Modules,consisting of the same City of Lake Elsinore components as UR-40,except for UR-60 Rail and UR-60 Splice. BUILDING DIVISION Permit # BLDG- -3067 Date: 11/07/2022 3:09:55 PM gAg APPROVED :o :'oi:p`�M:'::ry°:are rovdedoeeealto,�««� o,ae atnor,..dl,ee,e.ot� For est,oe, lease 9 9 p contact a local uL Customer Service Representative at htm:riu1 comizeou Page 2 of 2