Loading...
HomeMy WebLinkAboutPRR 2024-282 Planetbids 6/10/24, 1:13 PM PlanetBids Vendor Portal The Avenues Master Plan Storm Drain Improvement Pro] ... Bid Detail Project Title The Avenues Master Plan Storm Drain Improvement Project Invitation # CIP Z10032 Bid Posting Date 01/31/20241:48 PM (PDT) Project Stage Award Pending Bid Due Date 04/09/2024 2:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items Subcontractor Bid Bond Required Bid Documents Type of Award Lump Sum Categories 91223-Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.) 91345-Construction,Sewer And Storm Drain 91396-Paving/Resurfacing,Street(Major And Residential) License Requirements The City has determined that a Class A or a combination of Specialty Class "C" licenses sufficient to cover all of the work to be performed by the prime contractor is necessary to bid this project.All subcontractors shall be properly licensed. Restriction eBidding Restricted To Must meet one of the following restrictions: CADIR- Registered DIR Public Works Contractor Or be in one of the following groups: Plan Rooms Department Engineering Department Address 130 S. Main Street Lake Elsinore,California 92530 County Riverside Bid Valid NO ESTIMATE AVAILABLE Liquidated Damages $1,000 per calendar day Estimated Bid Value NO ESTIMATE AVAILABLE Start/Delivery Date Project Duration 120 Working Days https://vendors.planetbids.com/portal/l4272/bo/bo-detail/113832 1/3 6/10/24, 1:13 PM PlanetBids Vendor Portal Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting Information Pre-Bid Meeting No Online Q&A Online Q&A Yes Q&A Deadline 03/26/2024 3:00 PM (PDT) Contact Information Contact Info Nicole McCalmont 951-674-3124 x245 nmccalmont@lake-elsinore.org Bids to PlanetBids Owner's Agent City of Lake Elsinore Description Scope of Services This project will include the construction of Master Drainage Plan (MDP) Line A. Line A will commence at the Avenue 2 and Mill Street intersection, head west to Avenue 1 and head south on Avenue 1 to Park Way. Line A will then head west on Park Way until it will head south on High Street before heading west on Lakeshore Drive. Line A will then join two existing 36" pipes with a junction structure on Lakeshore Drive.There will be various roadway rehabilitation treatments, including grind and overlay and street reconstruction. Streets receiving paving treatments are Mill Street,Avenue 1, Avenue 2, Park Way and Lakeshore Drive. Other Details All questions technical,commercial,or contractual in nature shall be directed to the Q&A section on the e-Procurement System PlanetBids. No Phone Calls. Contacting the City of Lake Elsinore personnel directly regarding this bid is prohibited and may be grounds for elimination from the selection process.All questions regarding this bid must be put in writing and submitted through the e-Procurement system PlanetBids no later than 3:00 pm, February 20,2023 https://vendors.planetbids.com/portal/l 4272/bo/bo-detail/113832 2/3